42 1 154KB
LABOR PRODUCTIVITY Description
Code MANUAL EXCAVATION LP1.1 LP1.2
Manual Excavation Manual Trimming
LP1.3 LP1.4 LP1.5
Canal Excavation Compaction using Plate Compactor Manual Backfill and Compaction REBAR WORKS
LP2.1.1
Rebar Fabrication Rebars Fabrication
1 Steelman
LP2.2.1 LP2.2.2 LP2.2.3 LP2.2.4 LP2.2.5 LP2.2.6
Rebar Installation Rebar Installation (on ground) Rebar Installation (on wall) Rebar Installation (on suspended slab) Rebar Installation (on column) Rebar Installation (on elevated beams) Rebar Installation
1 1 1 1 1 1
Steelman Steelman Steelman Steelman Steelman Steelman
MASONRY WORKS
LP3.1.1 LP3.1.2
Mortar Mixing Mortar Mixing - using bagger mixer Mortar Mixing - manual
4 Laborer 4 Laborer
LP3.2.1 LP3.2.2 LP3.2.3
CHB Laying CHB Laying (150mm (6") thick) CHB Laying (100mm (4") thick) Finishing of CHB/PC Concrete Joint
1 Mason 1 Mason 1 Mason
1 Laborer 1 Laborer 1 Laborer
LP3.3.1 LP3.3.2 LP3.3.3 LP3.3.4
Plastering & Mortar Works Plastering Corner Edging Scouring Floor Cement Finishing
1 1 1 1
1 1 1 1
LP3.3.5 LP3.3.6 LP3.3.7 LP3.3.8
Concrete Topping / Setting Mortar Rubbed Concrete Sleeve Mortar Grouting (Using Grout Pump)
LP3.4.1 LP3.4.2
Tile Works Floor tiles Wall tiles
Mason Mason Mason Mason
Laborer Laborer Laborer Laborer
1 Mason 1 Mason
1 Laborer 1 Laborer
1 Mason 1 Mason
1 Laborer 1 Laborer
LABOR PRODUCTIVITY Description
Code LP3.4.3
Tile capping
1 Mason
1 Laborer
LP3.5.1
Brick Works Red bricks
1 Mason
1 Laborer
LP3.6.1
Marble Works Marble slab
1 Mason
1 Laborer
LP3.6.2
Marble wall
1 Mason
1 Laborer
LP3.7.1
Peeble Wash-out Peeble Wash-out (Floor)
1 Mason
1 Laborer
LP3.7.2 LP3.7.2
Peeble Wash-out (Wall) Peeble Wash-out (Stair)
1 Mason 1 Mason
1 Laborer 1 Laborer
LP3.8.1 LP3.8.2 LP3.8.3 LP3.8.4 LP3.8.5 LP3.8.6 LP3.8.7
Stone Masonry Placing Escombro Riprap Riprap Grouted Riprap Stone Masonry Gabions - Setting of Mesh Basket Gabions - Filling of Stones Gabions - Fixing Internal Ties
1 1 1 1 1 1 1
4 4 4 4 4 4
Painting Works Interior Wall (Masonry)
1 Painter
1 Helper
1 1 1 1
1 1 1 1
Exterior Wall (Masonry) Interior Wall (Drywall) Ceiling Plywood (3mts High) Ceiling Sofit (3mts high) Ceiling Plywood (5mts High) Ceiling Sofit (5mts high)
LP3.9.1 LP3.9.2
Finishing Masonry Paper Holder Installation Soap Holder Installation MISCELLANEOUS SITE WORKS
LP4.1 LP4.2 LP4.3 LP4.4 LP4.5
Waterstop Installation Polyethelene Laying Joint Filler Installation Sandbagging Manual Hauling of Stones (Up to 30m)
Laborer Mason Mason Mason Mason Mason Mason
Painter Painter Painter Painter
1 Painter
1 Mason 1 Mason
Laborer Laborer Laborer Laborer Laborer Laborer
Helper Helper Helper Helper
1 Helper
LABOR PRODUCTIVITY Description
Code CONCRETE WORKS
LP5.1.1 LP5.1.2
Concrete Pouring Concreting (Substructures, Footings & Grade Slab) Concreting (Floor Beams)
1 Mason 1 Mason
1 Laborer 1 Laborer
LP5.1.3 LP5.1.4 LP5.1.5 LP5.1.6 LP5.1.7 LP5.1.8
Concreting (Roof Beams) Concreting (Suspended Slab) Concreting (Roof Slab) Concreting (Walls & Stair) Concreting (Column) Concreting
1 1 1 1 1 1
Mason Mason Mason Mason Mason Mason
1 1 1 1 1 1
Laborer Laborer Laborer Laborer Laborer Laborer
LP5.2.1
Concrete Curing Concrete Curing
LP5.3.1
Concrete Chipping / Hacking Concrete Chipping (Manual)
LP5.3.2
Concrete Chipping (w/ Chipper) PIPE LAYING WORKS
LP6.1.1 LP6.1.2 LP6.1.3 LP6.1.4 LP6.1.5 LP6.1.6 LP6.1.7 LP6.1.8 LP6.1.9 LP6.1.10 LP6.1.11 LP6.1.12 LP6.1.13
RCP Installation RCP Installation 8" dia. RCP Installation 10" dia. RCP Installation 12" dia. RCP Installation 15" dia. RCP Installation 18" dia. RCP Installation 24" dia. RCP Installation 30" dia. RCP Installation 36" dia. RCP Installation 42" dia. RCP Installation 48" dia. RCP Installation 54" dia. RCP Installation 60" dia. RCP Installation 72" dia.
1 1 1 1 1 1 1 1 1 1 1 1 1
Mason Mason Mason Mason Mason Mason Mason Mason Mason Mason Mason Mason Mason
2 2 2 3 3 3 4 4 4 5 5 5 6
Laborer Laborer Laborer Laborer Laborer Laborer Laborer Laborer Laborer Laborer Laborer Laborer Laborer
LP6.2.1 LP6.2.2 LP6.2.3 LP6.2.4 LP6.2.5 LP6.2.6 LP6.2.7 LP6.2.8 LP6.2.9
RCP Collaring RCP collaring 8" dia. RCP collaring 10" dia. RCP collaring 12" dia. RCP collaring 15" dia. RCP collaring 18" dia. RCP collaring 24" dia. RCP collaring 30" dia. RCP collaring 36" dia. RCP collaring 42" dia.
1 1 1 1 1 1 1 1 1
Mason Mason Mason Mason Mason Mason Mason Mason Mason
1 1 2 2 2 2 2 2 2
Laborer Laborer Laborer Laborer Laborer Laborer Laborer Laborer Laborer
LABOR PRODUCTIVITY Description
Code LP6.2.10 LP6.2.11 LP6.2.12 LP6.2.13
RCP collaring 48" dia. RCP collaring 54" dia. RCP collaring 60" dia. RCP collaring 72" dia.
1 1 1 1
Mason Mason Mason Mason
FORM WORKS
LP7.1.1
Batterboard Installation Batterboard Installation
2 - Carpenter
LP7.2.1
Forms Fabrication Forms Fabrication
2 - Carpenter
LP7.3.1 LP7.3.2
Forms Installation Forms Installation - Slab on Ground Forms Installation - Wall/Beam on ground
2 - Carpenter 2 - Carpenter
LP7.3.3 LP7.3.4 LP7.3.5
Forms Installation - Wall/Beam above 10' Forms Installation - Beams Forms Installation - Columns
2 - Carpenter 2 - Carpenter 2 - Carpenter
LP7.3.6 LP7.3.7 LP7.3.8 LP7.3.9 LP7.3.10
Forms Installation - Suspended Slab up to 18' Forms Installation - Suspended Slab 19' to 36' Forms Installation - Suspended Slab 36" up Forms Installation - Stairs Forms Installation
2 2 2 2 2
LP7.4.1 LP7.4.2 LP7.4.3
Forms Stripping Forms Stripping - Slab / Wall on Ground Forms Stripping - Wall / Beam above 10' Forms Stripping - Beams
2 - Carpenter 2 - Carpenter 2 - Carpenter
LP7.4.4 LP7.4.5 LP7.4.6 LP7.4.7
Forms Stripping - Columns Forms Stripping - Suspended slab up to 18' Forms Stripping - Suspended slab 19' to 36' Forms Stripping - Suspended slab 36' up
2 2 2 2
LP7.4.8 LP7.4.9
Forms Stripping - Stairs Forms Stripping
2 - Carpenter 2 - Carpenter
- Carpenter - Carpenter - Carpenter - Carpenter - Carpenter
- Carpenter - Carpenter - Carpenter - Carpenter
MISCELLANEOUS CARPENTRY
LP8.1.1 LP8.1.2 LP8.1.3
Wall & Partition Works Plywood Partition Partition Frame Work Partition Plywood Board Ceiling Works
2 - Carpenter 2 - Carpenter 2 - Carpenter
2 2 2 2
Laborer Laborer Laborer Laborer
LABOR PRODUCTIVITY Description
Code LP8.2.1 LP8.2.2 LP8.2.3
Ceiling Joist Ceiling plywood board Installation & alignment of Wooden Cornice
2 - Carpenter 2 - Carpenter 1 - Carpenter
LP8.3.1 LP8.3.2 LP8.3.3
Flooring Works Floor framing T & G Flooring Installation & alignment of Wooden Baseboard
2 - Carpenter 2 - Carpenter 1 - Carpenter
LP8.4.1 LP8.4.2 LP8.4.3 LP8.4.4
Truss & Roofing Works Truss Fabrication Truss Installation Purlins Installation Facia Board Installation
2 4 2 2
- Carpenter - Carpenter - Carpenter - Carpenter
LP8.5.1 LP8.5.2 LP8.5.3 LP8.5.4 LP8.5.5 LP8.5.6 LP8.5.7
Door Works Jamb Installation Fabrication of Wooden Flush Door Wooden Flush Door Installation Wooden panel Door Installation Lockset Installation for Wooden Door Closer Installation for Wooden Door Stopper Installation for Wooden Door
1 1 1 1 1 1 1
- Carpenter - Carpenter - Carpenter - Carpenter - Carpenter - Carpenter - Carpenter
LP8.6.1 LP8.6.2 LP8.6.3 LP8.6.4 LP8.6.5 LP8.6.6
Cabinet Works Fabrication of plywood cabinet Fabrication & installation of plywood capping Installation of cabinet door hinges Installation of cabinet door piano hinges Installation of cabinet handle Installation of cabinet door catches
1 1 1 1 1 1
- Carpenter - Carpenter - Carpenter - Carpenter - Carpenter - Carpenter
LP8.7.1
Railings Installation of wooden hand railings
1 - Carpenter
LP8.8.1 LP8.8.2
Rough Carpentry Planing of rough lumber (No alignment) Planing of rough lumber (including alignment)
1 - Carpenter 1 - Carpenter
MISCELLANEOUS PAVEMENT WORKS LP9.1 LP9.2 LP9.3 LP9.4
Asphalt Pavement Cutting Concrete Pavement Cutting Asphalt Joint Sealant Application (w6xd50) Broom Finishing
LP9.5
Asphalt Joint Filler Application
LABOR PRODUCTIVITY Description
Code STEEL WELDING & CUTTING
LP10.1.1 LP10.1.2 LP10.1.3 LP10.1.4 LP10.1.5 LP10.1.6 LP10.1.7
Welding Welding t=18 Welding t=16 Welding t=14 Welding t=12 Welding t=10. Welding t=8 Welding t=6
LP10.2.1 LP10.2.2 LP10.2.3 LP10.2.4 LP10.2.5 LP10.2.6 LP10.2.7
Cutting Cutting t=18 Cutting t=16 Cutting t=14 Cutting t=12 Cutting t=10 Cutting t=8 Cutting t=6 PILING WORKS
LP11.1 LP11.2 LP11.3
Sheet Pile Cutting PC Pile Cutting Bored Pile Hacking/Cutting PIPE FITTING WORKS
LP12.1 LP12.2 LP12.3 LP12.4 LP12.5 LP12.6 LP12.7 LP12.8
Pipe Fitting 300mm Pipe Fitting 400mm Pipe Fitting 500mm Pipe Fitting 600mm Pipe Fitting 800mm Pipe Fitting 900mm Pipe Fitting 1050mm Pipe Fitting 1200mm MISCELLANEOUS METALS WORKS
LP13.1
Ladder Rung Installation SCAFFOLDING WORKS
LP14.1 LP14.2 LP14.3 LP14.4
Set/Dismantle of Scaffoldings (1-3 Layers) Set/Dismantle of Scaffoldings (4-6 Layers) Set/Dismantle of Scaffoldings (7-9 Layers) Set/Dismantle of Scaffoldings (10-15 Layers)
LABOR PRODUCTIVITY Description
Code MISCELLANEOUS RAIL WORKS LP15.1
Sleepers Installation MATERIALS HANDLING
LP16.1 LP16.2 LP16.3
0 0 0
Loading / Unloading Cement Loading / Unloading Formworks Loading / Unloading Rebar
per Day
Productivity
per Hour
Manhour Capacity
1.60 6.00
m3/day m3/day
0.20 0.75
m3/hr m3/hr
5.000 1.333
mhr/m3 mhr/m3
7.00 8.00 6.00
m3/day m3/day m3/day
0.88 1.00 0.50
m3/hr m3/hr m3/hr
1.143 1.000 2.000
mhr/m3 mhr/m3 mhr/m3
350.00
kgs/day
43.75
kgs/hr
0.023
mhr/kgs
300.00 250.00 280.00 250.00 250.00 266.00
kgs/day kgs/day kgs/day kgs/day kgs/day kgs/day
37.50 31.25 35.00 31.25 31.25 33.25
kgs/hr kgs/hr kgs/hr kgs/hr kgs/hr kgs/hr
0.027 0.032 0.029 0.032 0.032 0.030
mhr/kgs mhr/kgs mhr/kgs mhr/kgs mhr/kgs mhr/kgs
4.40 3.25
m3/day m3/day
0.55 0.41
m3/hr m3/hr
1.818 2.462
mhr/m3 mhr/m3
12.00 15.00
pcs/hr pcs/hr
0.96 1.20 3.00
m2/hr m2/hr m2/hr
1.042 0.833 0.333
mhr/m2 mhr/m2 mhr/m2
1.10 1.30 1.50 4.00
0.909 0.769 0.667 0.250
1.00 6.00 0.48 1.50
m2/hr lm/hr lm/hr m2/hr m2/hr m2/hr lm/hr m3/hr
1.000 0.167 2.083 0.667
mhr/m2 mhr/lm mhr/lm mhr/m2 mhr/m2 mhr/m2 mhr/lm mhr/cu.m.
0.46 0.38
m2/hr m2/hr
2.174 2.632
mhr/m2 mhr/m2
per Day
Productivity
Manhour Capacity
per Hour 4.00
lm/hr
0.250
mhr/lm
0.40
m2/hr
2.500
mhr/m2
0.50
2.000
0.40
m2/hr m2/hr
2.500
mhr/m2 mhr/m2
5.25
sq.m./day
0.66
m2/hr
1.524
mhr/m2
4.50 3.75
sq.m./day sq.m./day
0.56 0.47
m2/hr m2/hr
1.778 2.133
mhr/m2 mhr/m2
0.27 0.60 0.45 0.35 15.00 0.50 5.00
cu.m./hr cu.m./hr cu.m./hr cu.m./hr pc(s)/hr cu.m./hr kgs/hr
0.27 0.60 0.45 0.35 15.00 0.50 5.00
m3/hr
3.750 1.667 2.222 2.857 0.067 2.000 0.200
mhr/cu.m. mhr/cu.m. mhr/cu.m. mhr/cu.m. mhr/pc mhr/cu.m. mhr/kgs
10.00
sq.m./day
1.25
0.800
8.00 10.00 10.00 10.00 8.00 8.00
sq.m./day sq.m./day sq.m./day sq.m./day sq.m./day sq.m./day
1.00 1.25 1.25 1.25 1.00 1.25
mhr/m2 mhr/m2 mhr/m2 mhr/m2
1.00 1.00
set/day set/day
1.00 1.00
15.00 240.00 5.76 3.24 0.66
m /hr m3/hr m3/hr pc(s)/hr m3/hr kgs/hr 3
m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr
1.000 0.800 0.800 0.800 1.000 0.800
set(s)/hr set(s)/hr
1.000 1.000
lm/hr m2/hr m2/hr m2/hr m3/hr
mhr/m2 mhr/m2 mhr/m2
mhr/pc mhr/pc
per Day
Productivity
per Hour
Manhour Capacity
6.00 5.00
m3/day m3/day
0.75 0.63
m3/hr m3/hr
1.333 1.600
mhr/m3 mhr/m3
4.50 4.50 4.50 3.50 4.00 4.57
m3/day m3/day m3/day m3/day m3/day m3/day
0.56 0.56 0.56 0.44 0.50 0.57
m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr
1.778 1.778 1.778 2.286 2.000 1.750
mhr/m3 mhr/m3 mhr/m3 mhr/m3 mhr/m3 mhr/m3
1.50
m3/hr
0.667
mhr/m3
0.03
m3/hr
40.000
mhr/m3
0.10
m3/hr
10.000
mhr/m3
26.00 24.00 22.00 20.00 18.00 16.00 14.00 12.00 10.00 8.00 6.00 4.00 2.00
pc(s)/day pc(s)/day pc(s)/day pc(s)/day pc(s)/day pc(s)/day pc(s)/day pc(s)/day pc(s)/day pc(s)/day pc(s)/day pc(s)/day pc(s)/day
3.25 3.00 2.75 2.50 2.25 2.00 1.75 1.50 1.25 1.00 0.75 0.50 0.25
pc(s)/hr pc(s)/hr pc(s)/hr pc(s)/hr pc(s)/hr pc(s)/hr pc(s)/hr pc(s)/hr pc(s)/hr pc(s)/hr pc(s)/hr pc(s)/hr pc(s)/hr
0.308 0.333 0.364 0.400 0.444 0.500 0.571 0.667 0.800 1.000 1.333 2.000 4.000
mhr/pc mhr/pc mhr/pc mhr/pc mhr/pc mhr/pc mhr/pc mhr/pc mhr/pc mhr/pc mhr/pc mhr/pc mhr/pc
25.00 23.00 21.00 19.00 17.00 15.00 13.00 11.00 9.00
pc(s)/day pc(s)/day pc(s)/day pc(s)/day pc(s)/day pc(s)/day pc(s)/day pc(s)/day pc(s)/day
3.13 2.88 2.63 2.38 2.13 1.88 1.63 1.38 1.13
pc(s)/hr pc(s)/hr pc(s)/hr pc(s)/hr pc(s)/hr pc(s)/hr pc(s)/hr pc(s)/hr pc(s)/hr
0.320 0.348 0.381 0.421 0.471 0.533 0.615 0.727 0.889
mhr/pc mhr/pc mhr/pc mhr/pc mhr/pc mhr/pc mhr/pc mhr/pc mhr/pc
per Day 7.00 5.00 3.00 1.00
Productivity
pc(s)/day pc(s)/day pc(s)/day pc(s)/day
per Hour
Manhour Capacity
0.88 0.63 0.38 0.13
pc(s)/hr pc(s)/hr pc(s)/hr pc(s)/hr
1.143 1.600 2.667 8.000
mhr/pc mhr/pc mhr/pc mhr/pc
32.00
bdft/hr
0.031
mhr/bdft
1.50
m2/hr
0.667
mhr/m2
1.50 1.00
m2/hr m2/hr
0.667 1.000
mhr/m2 mhr/m2
0.85 0.65 0.85
m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr
1.176 1.538 1.176
mhr/m2 mhr/m2 mhr/m2 mhr/m2 mhr/m2 mhr/m2
1.35 1.30 1.25 0.75 1.06
m2/hr m2/hr
0.741 0.769 0.800 1.333 0.947
8.00 1.55 1.95
m2/hr m2/hr m2/hr
0.125 0.645 0.513
mhr/m2 mhr/m2 mhr/m2
2.35 1.75 1.50 1.35
0.426 0.571 0.667 0.741
1.85 2.54
m2/hr m2/hr m2/hr m2/hr m2/hr m2/hr
0.541 0.394
mhr/m2 mhr/m2 mhr/m2 mhr/m2 mhr/m2 mhr/m2
0.99 7.50 1.98
m2/hr bdft/hr m2/hr
1.009 0.133 0.504
mhr/m2 mhr/bdft mhr/m2
mhr/m2 mhr/m2
per Day
Productivity
Manhour Capacity
per Hour 5.87 1.49 2.00
bdft/hr m2/hr lm/hr
0.170 0.672 0.500
mhr/bdft mhr/m2 mhr/lm
4.13 14.00 2.50
bdft/hr bdft/hr lm/hr
0.242 0.071 0.400
mhr/bdft mhr/bdft mhr/l.m.
5.75 5.00 2.29 4.38
bdft/hr bdft/hr lm/hr bdft/hr
0.174 0.200 0.437 0.228
mhr/bdft mhr/bdft mhr/lm mhr/bd.ft.
5.33 0.25 0.33 0.25 0.50 0.50 1.00
bdft/hr pc(s)/hr pc(s)/hr pc(s)/hr pc(s)/hr pc(s)/hr pc(s)/hr
0.188 4.000 3.000 4.000 2.000 2.000 1.000
mhr/bdft mhr/pc mhr/pc mhr/pc mhr/pc mhr/pc mhr/pc
0.50 2.50 2.00 1.50 3.00 3.00
m2/hr lm/hr pc(s)/hr lm/hr pc(s)/hr pc(s)/hr
2.000 0.400 0.500 0.667 0.333 0.333
mhr/m2 mhr/lm mhr/pc mhr/lm mhr/pc. mhr/pc.
1.00
lm/hr
1.000
mhr/lm
120.00 48.00
bdft/hr bdft/hr
0.008 0.021
mhr/bdft mhr/bdft
20.00 10.00 20.00 20.00
lm/hr lm/hr lm/hr m2/hr
0.050 0.100 0.050 0.050
mhr/lm mhr/lm mhr/lm mhr/m2
0.01
m3/hr
166.667
mhr/m3
per Day
Productivity
Manhour Capacity
per Hour
0.20 0.24 0.31 0.36 0.54 0.72 1.09
lm/hr lm/hr lm/hr lm/hr lm/hr lm/hr lm/hr
5.059 4.139 3.219 2.759 1.840 1.380 0.920
mhr/lm mhr/lm mhr/lm mhr/lm mhr/lm mhr/lm mhr/lm
1.14 1.29 1.47 1.71 2.06 2.57 3.43
lm/hr lm/hr lm/hr lm/hr lm/hr lm/hr lm/hr
0.875 0.778 0.681 0.583 0.486 0.389 0.292
mhr/lm mhr/lm mhr/lm mhr/lm mhr/lm mhr/lm mhr/lm
20.00 2.00 0.75
pc(s)/hr pc(s)/hr pc(s)/hr
0.050 0.500 1.333
mhr/pc mhr/pc mhr/pc
0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15
joint/hr joint/hr joint/hr joint/hr joint/hr joint/hr joint/hr joint/hr
2.000 2.222 2.500 2.857 3.333 4.000 5.000 6.667
mhr/joint mhr/joint mhr/joint mhr/joint mhr/joint mhr/joint mhr/joint mhr/joint
10.00
pc(s)/hr
0.100
mhr/pc
4.00 3.00 2.00 1.00
set(s)/hr set(s)/hr set(s)/hr set(s)/hr
0.250 0.333 0.500 1.000
mhr/set mhr/set mhr/set mhr/set
per Day
Productivity
per Hour
0.10
28.85 114.60 6,486.49
Manhour Capacity
m3/hr
10.000
mhr/m3
bag(s)/hr m2/hr kgs.hr
0.035 0.009 0.000
mhr/bag mhr/m2 mhr/kg
PRODUCTIVITY CALCULATIONS
WELDING & CUTTING WORKS WELDING WORKS
Welding
6 mm
Weld Plate Thickness Weld Thickness Area of Weld Volume for 1m Length
6 6.9 48.17 48,170.97
mm mm sq mm cu mm
Welding Rod Rod Diameter Area of Weld Volume per Rod No. of Rods / 1m Weld Weight per Rod Weight per 1m Weld
6 28.27 5,089.38 9.46 0.05549 0.53
mm sq mm cu mm pcs. kgs kgs
Volume per 1m Pass Number of Passes Number of Rods/Pass
28,274.33 cu mm 2.00 passes 5.56 rods
Labor Productivity - per Rod Draw, Clip & Position Rod Use up 1 Rod Grind/Brush/Clean Weld Rest (4 mins/4 Rods) Total Total Time per 1m Pass Total Time for 2 Passes Productivity Welding
10 240 30 18 298
secs secs secs secs secs
1,655.56 0.46 0.92 1.09
secs hrs hrs lm/hr
8 mm
Weld Plate Thickness Weld Thickness Area of Weld Volume for 1m Length
8 9.2 76.44 76,437.28
mm mm sq mm cu mm
Welding Rod Rod Diameter Area of Weld Volume per Rod No. of Rods / 1m Weld
6 28.27 5,089.38 15.02
mm sq mm cu mm pcs.
Less Grind
Weight per Rod Weight per 1m Weld Volume per 1m Pass Number of Passes Number of Rods/Pass
0.05549 kgs 0.83 kgs 28,274.33 cu mm 3.00 passes 5.56 rods
Labor Productivity - per Rod Draw, Clip & Position Rod Use up 1 Rod Grind/Brush/Clean Weld Rest (4 mins/4 Rods) Total Total Time per 1m Pass Total Time for 3 Passes Productivity Welding
10 240 30 18 298
secs secs secs secs secs
1,655.56 0.46 1.38 0.72
secs hrs hrs lm/hr
10 mm
Weld Plate Thickness Weld Thickness Area of Weld Volume for 1m Length
10 11.5 110.81 110,808.25
mm mm sq mm cu mm
Welding Rod Rod Diameter Area of Weld Volume per Rod No. of Rods / 1m Weld Weight per Rod Weight per 1m Weld
6 28.27 5,089.38 21.77 0.05549 1.21
mm sq mm cu mm pcs. kgs kgs
Volume per 1m Pass Number of Passes Number of Rods/Pass
Less Grind
28,274.33 cu mm 4.00 passes 5.56 rods
Labor Productivity - per Rod Draw, Clip & Position Rod Use up 1 Rod Grind/Brush/Clean Weld Rest (4 mins/4 Rods) Total Total Time per 1m Pass Total Time for 4 Passes
10 240 30 18 298
secs secs secs secs secs
1,655.56 secs 0.46 hrs 1.84 hrs
Less Grind
Productivity Welding
0.54 lm/hr 12 mm
Weld Plate Thickness Weld Thickness Area of Weld Volume for 1m Length
12 13.8 151.28 151,283.88
mm mm sq mm cu mm
Welding Rod Rod Diameter Area of Weld Volume per Rod No. of Rods / 1m Weld Weight per Rod Weight per 1m Weld
6 28.27 5,089.38 29.73 0.05549 1.65
mm sq mm cu mm pcs. kgs kgs
Volume per 1m Pass Number of Passes Number of Rods/Pass
28,274.33 cu mm 6.00 passes 5.56 rods
Labor Productivity - per Rod Draw, Clip & Position Rod Use up 1 Rod Grind/Brush/Clean Weld Rest (4 mins/4 Rods) Total Total Time per 1m Pass Total Time for 6 Passes Productivity Welding
10 240 30 18 298
secs secs secs secs secs
1,655.56 0.46 2.76 0.36
secs hrs hrs lm/hr
14 mm
Weld Plate Thickness Weld Thickness Area of Weld Volume for 1m Length
14 16.1 197.86 197,864.17
mm mm sq mm cu mm
Welding Rod Rod Diameter Area of Weld Volume per Rod No. of Rods / 1m Weld Weight per Rod Weight per 1m Weld
6 28.27 5,089.38 38.88 0.05549 2.16
mm sq mm cu mm pcs. kgs kgs
Volume per 1m Pass
28,274.33 cu mm
Less Grind
Number of Passes Number of Rods/Pass
7.00 passes 5.56 rods
Labor Productivity - per Rod Draw, Clip & Position Rod Use up 1 Rod Grind/Brush/Clean Weld Rest (4 mins/4 Rods) Total Total Time per 1m Pass Total Time for 7 Passes Productivity Welding
10 240 30 18 298
secs secs secs secs secs
1,655.56 0.46 3.22 0.31
secs hrs hrs lm/hr
16 mm
Weld Plate Thickness Weld Thickness Area of Weld Volume for 1m Length
16 18.4 250.55 250,549.12
mm mm sq mm cu mm
Welding Rod Rod Diameter Area of Weld Volume per Rod No. of Rods / 1m Weld Weight per Rod Weight per 1m Weld
6 28.27 5,089.38 49.23 0.05549 2.73
mm sq mm cu mm pcs. kgs kgs
Volume per 1m Pass Number of Passes Number of Rods/Pass
Less Grind
28,274.33 cu mm 9.00 passes 5.56 rods
Labor Productivity - per Rod Draw, Clip & Position Rod Use up 1 Rod Grind/Brush/Clean Weld Rest (4 mins/4 Rods) Total Total Time per 1m Pass Total Time for 9 Passes Productivity Welding
Weld
10 240 30 18 298
secs secs secs secs secs
1,655.56 0.46 4.14 0.24
secs hrs hrs lm/hr
18 mm
Less Grind
Plate Thickness Weld Thickness Area of Weld Volume for 1m Length
18 20.7 309.34 309,338.73
mm mm sq mm cu mm
Welding Rod Rod Diameter Area of Weld Volume per Rod No. of Rods / 1m Weld Weight per Rod Weight per 1m Weld
6 28.27 5,089.38 60.78 0.05549 3.37
mm sq mm cu mm pcs. kgs kgs
Volume per 1m Pass Number of Passes Number of Rods/Pass
28,274.33 cu mm 11.00 passes 5.56 rods
Labor Productivity - per Rod Draw, Clip & Position Rod Use up 1 Rod Grind/Brush/Clean Weld Rest (4 mins/4 Rods) Total Total Time per 1m Pass Total Time for 11 Passes Productivity
10 240 30 18 298
secs secs secs secs secs
1,655.56 0.46 5.06 0.20
secs hrs hrs lm/hr
CUTTING WORKS
Cutting
Plate Thickness
6 mm 6 mm
Labor Productivity - per 6mm thick x 1000mm Length Preparation Cutting Grinding Total Total Time per 100mm
Cutting
Productivity Plate Thickness
15 30 60 105
secs secs secs secs
105.00 0.03 3.43 8 8
secs hrs lm/hr mm mm
Labor Productivity - per 8mm thick x 1000mm Length
Less Grind
Preparation Cutting Grinding Total Total Time per 100mm
Cutting
Productivity Plate Thickness
15 30 60 105
secs secs secs secs
105.00 0.03 2.57 10 10
secs hrs lm/hr mm mm
Labor Productivity - per 6mm thick x 1000mm Length Preparation Cutting Grinding Total Total Time per 100mm
Cutting
Productivity Plate Thickness
15 30 60 105
secs secs secs secs
105.00 0.03 2.06 12 12
secs hrs lm/hr mm mm
Labor Productivity - per 8mm thick x 1000mm Length Preparation Cutting Grinding Total Total Time per 100mm
Cutting
Productivity Plate Thickness
15 30 60 105
secs secs secs secs
105.00 0.03 1.71 14 14
secs hrs lm/hr mm mm
Labor Productivity - per 6mm thick x 1000mm Length Preparation Cutting Grinding Total Total Time per 100mm
Cutting
Productivity Plate Thickness
15 30 60 105
secs secs secs secs
105.00 0.03 1.47 16 16
secs hrs lm/hr mm mm
Labor Productivity - per 8mm thick x 1000mm Length Preparation Cutting Grinding Total Total Time per 100mm
Cutting
Productivity Plate Thickness
15 30 60 105
secs secs secs secs
105.00 0.03 1.29 18 18
secs hrs lm/hr mm mm
Labor Productivity - per 6mm thick x 1000mm Length Preparation Cutting Grinding Total Total Time per 100mm Productivity
15 30 60 105
secs secs secs secs
105.00 secs 0.03 hrs 1.14 lm/hr
t 60
o
3mm
PRODUCTIVITY CALCULATIONS
CEMENT (IN BAGS) LOADING / UNLOADING CEMENT (IN BAGS) LOADING / UNLOADING Load Assumptions Parameter Weight per Bag Total Number of Bags
Quantity 40.00 375.00
Labor Crew Assumptions Description Labor - Hauler Labor - Loader Labor - Arranger Total
Quantity
Equipment Specifications Parameter Load Capacity (Weight) Load Capacity (Bags)
5.00 2.00 1.00 8.00
Remarks
Rate
Time Required hrs
Total
Temporary Works
Unit persons persons persons persons
Unit kgs. bags
Temporary Works Labor - Loader Set-Up Ramp Labor - Loader Remove Ramp Labor - Hauler Waiting Labor - Arranger Waiting
Loading/Unloading Labor - Hauler Load Bag Haul Bag to Truck Return to Stockpile Labor - Loader @ Stockpile Loading Labor - Arranger @ Truck Arranging
Remarks
Cargo Truck Quantity 15,000.00 375.00
Time-Motion Table Activity
Unit kgs. bags
###
Remarks
Time Required minutes
0.08
5.00
0.08
5.00
0.17
10.00
0.17
10.00
0.50
30.00
0.00 0.01 0.01
0.17 0.75 0.75
0.01
0.33
0.01 0.04
0.33 2.33
5.00 bags/cycle
Total
128.57 bags/hr
0.50
Loading/Unloading Cycle Total Productivity
128.57 bags/hr
2.92 3.42 109.76 bags/hr
Time Required seconds
Number of Worker
Total Manhours
300.00
2.00
0.1667
300.00
2.00
0.1667
600.00
5.00
0.8333
600.00
1.00
0.1667
1.3333
10.00 45.00 45.00
5.00 5.00 5.00
0.0139 0.0625 0.0625
20.00
2.00
0.0111
20.00
1.00
0.0056 0.1556 1.3333
32.14 bags/mhr
11.6667 13.0000
28.85 bags/mhr
PRODUCTIVITY CALCULATIONS
FORMWORKS LOADING / UNLOADING FORMWORKS LOADING / UNLOADING Load Assumptions Parameter No. of Plywood No. of Timber No. of Scaffolds Total Equivalent Form Area
Quantity 40.00 200.00 80.00 115.20
Labor Crew Assumptions Description Labor - Hauler Labor - Loader Labor - Arranger Total
Quantity
Equipment Specifications Parameter Load Capacity (Weight) Load Capacity (Area)
4.00 2.00 2.00 8.00
Unit persons persons persons persons
Remarks
Unit kgs m2
Rate
Time Required hrs
Temporary Works Labor - Loader Set-Up Ramp Labor - Loader Remove Ramp Labor - Hauler Waiting Labor - Arranger Waiting
Total Loading/Unloading - Plywood Labor - Hauler Load Plywood Haul Plywood to Truck Return to Stockpile Labor - Loader @ Stockpile Loading Labor - Arranger @ Truck Arranging
Remarks
Cargo Truck Quantity 4,940.00 115.20
Time-Motion Table Activity
Unit pcs pcs pcs m2
###
Remarks
Time Required minutes
0.08
5.00
0.08
5.00
0.17
10.00
0.17
10.00
0.50
30.00
0.00 0.01 0.01
0.17 0.83 0.75
0.01
0.44
0.01 0.04
0.44 2.63
16.00 pcs/cycle
Total
365.71 pcs/hr
Loading/Unloading - Timber Labor - Hauler Load Plywood Haul Plywood to Truck Return to Stockpile Labor - Loader @ Stockpile Loading Labor - Arranger @ Truck Arranging
40.00 pcs/cycle
Total
1066.67 pcs/hr
Loading/Unloading - Scaffolds Labor - Hauler Load Plywood Haul Plywood to Truck Return to Stockpile Labor - Loader @ Stockpile Loading Labor - Arranger @ Truck Arranging Total
16.00 pcs/cycle
384.00 pcs/hr
Temporary Works Loading/Unloading Cycle Plywood Timber Scaffolds Total Productivity
0.00 0.01 0.01
0.17 0.58 0.75
0.01
0.38
0.01 0.04
0.38 2.25
0.00 0.01 0.01
0.17 0.75 0.75
0.01
0.42
0.01 0.04
0.42 2.50
0.50
365.71 pcs/hr 1066.67 pcs/hr 384.00 pcs/hr
0.11 0.19 0.21 1.01 114.60 m2/hr
See Equipment Productivity Formworks Loading & Unloading
Time Required seconds
Number of Worker
Total Manhours
300.00
2.00
0.1667
300.00
2.00
0.1667
600.00
4.00
0.6667
600.00
2.00
0.3333
1.3333
10.00 50.00 45.00
4.00 4.00 4.00
0.0111 0.0556 0.0500
26.25
2.00
0.0146
26.25
2.00
0.0146 0.1458
10.00 35.00 45.00
4.00 4.00 4.00
0.0111 0.0389 0.0500
22.50
2.00
0.0125
22.50
2.00
0.0125 0.1250
10.00 45.00 45.00
4.00 4.00 4.00
0.0111 0.0500 0.0500
25.00
2.00
0.0139
25.00
2.00
0.0139 0.1389
1.3333
109.71 pcs/mhr 320.00 pcs/mhr 115.20 pcs/mhr
0.3646 0.6250 0.6944 3.0174
38.18 m2/mhr
PRODUCTIVITY CALCULATIONS
REBAR LOADING / UNLOADING REBAR LOADING / UNLOADING Load Assumptions Parameter Weight per Load Bundle Total Number of Loads Total Weight
Quantity 200.00 50.00 10,000.00
Labor Crew Assumptions Description Labor - Hauler Labor - Loader Labor - Arranger Total
Quantity
Equipment Specifications Parameter Load Capacity (Weight) Total Load
4.00 2.00 1.00 7.00
Unit persons persons persons persons
Remarks
Unit kgs. kgs.
Rate
Time Required hrs
Temporary Works Labor - Loader Set-Up Ramp Labor - Loader Remove Ramp Labor - Hauler Waiting Labor - Arranger Waiting
Total Loading/Unloading Labor - Hauler Load Rebar Bundle Haul Rebar Bundle to Truck Return to Stockpile Labor - Loader @ Stockpile Loading Labor - Arranger @ Truck Arranging
Remarks
Cargo Truck Quantity 15,000.00 10,000.00
Time-Motion Table Activity
Unit kgs. Loads kgs.
###
Remarks
Time Required minutes
0.08
5.00
0.08
5.00
0.17
10.00
0.17
10.00
0.50
30.00
0.00 0.01 0.01
0.17 0.75 0.75
0.01
0.42
0.01 0.04
0.42 2.50
400.00 kgs/cycle
Total
9600.00 kgs/hr
Temporary Works Loading/Unloading Cycle Total Productivity
0.50 9600.00 kgs/hr
1.04 1.54 6,486.49 kgs/hr
Time Required seconds
Number of Worker
Total Manhours
300.00
2.00
0.1667
300.00
2.00
0.1667
600.00
4.00
0.6667
600.00
1.00
0.1667
1.1667
10.00 45.00 45.00
4.00 4.00 4.00
0.0111 0.0500 0.0500
25.00
2.00
0.0139
25.00
1.00
0.0069 0.1319
1.1667 3031.58 kgs/mhr
3.2986 4.4653
2,239.50 kgs/mhr