Earth Works

Back Filling + Compaction

Excavation work in soft soil Excavation Work in Hard Soil

120 50

m3/day m3/day

In layer of 150 mm thickness with 95% MDD value

150

m2/day

Concrete Protection Works Bitumen Priming Works

Including surface preparation

200

m2/day

Bitustic works

Horizontal/Vertical surface

150

m2/day

Protection works (torch applied)

Horizontal/Vertical Surface

80

m2/day

75/100 mm thick Blinding works

120

m2/day

40/50 mm thick C/S Screed 75/100 mm thick screed with welded steel fabric

200

m2/day

120

m2/day

Up to 16 mm dia bars

200

kg

Above 16 mm dia bars

300

kg

200

kg

Up to 12 mm

300

kg

16 mm and Above

400

kg

With Ordinary(Ply wood) shutter "

8

m2/day m2/day

"

12

Concrete Blinding Works

Screed Works

Reinforcement Works Isolated/ Strap Footing

Column/Corewall/Staircase Slab with beam/Raft

Shuttering Footing Column/Core Wall/Staircase

6

Slab

m2/day

Concrete Pumping Works Placing with concrete Pump

60 40

Boom Placer

m3/hr m3/hr

Concrete Works Footings

Concrete Placing and Trowel Finishing

Staircase

"

60

m3/day

Slab

"

150

m3/day

Placing in line and level

400

m2/day

10/15/20 cm thick Block works

10

m2/day

15 mm thick Plaster Works with Acc.

12

m2/day

20 mm thick Plaster Works with Acc.

10

m2/day

Including Surface preparation works

150

m2/day

75

m2/day

First Coat

250

m2/day

Second Coat

350

m2/day

Placing Precast/Hollow Core Slab

Block works

Plaster Works

160

m3/day

Ordinary Painting Priming Works Putty Works Painting Works

Epoxy Paint

Gypsum Partition Works

False Ceiling

Tile Works

Marble/Granite Works

Surface Prep + Priming

50

m2/day

Painting

100

m2/day

Frame + Gypsum Partition Installation

120

m2/day

Frame + False Ceiling Fixing

30

m2/day

On Floor

15

m2/day

On Walls

12

m2/day

on Floor

20

m2/day

Excavator (bucket type) Rock breaker

1 Skilled, 4 Unskilled, 1 shovel,1 Roller compactor

1 skilled + 1 unskilled 1 skilled + 1 unskilled 1 skilled + 1 unskilled

1 Mason + 2 Helper

1 Mason + 2 Helper 1 Mason + 2 Helper

1 SF + 1 Helper 1 SF + 1 Helper 1 SF + 1 Helper 1 SF + 1 Helper 1 SF + 1 Helper

1 Carpenter + 1 Helper 1 Carpenter + 1 Helper 1 Carpenter + 1 Helper

1 Mason + 3 helper 1 Mason + 2 helper 2 Mason + 3 Helper

2 Rigger + 1 Mason + 2 Helper

1 mason + 1 Helper

1 Plaster Mason + 1 Helper 1 Plaster Mason + 1 Helper

1 Painter + 1 Helper 1 Painter + 1 Helper 1 painter 1 Painter

1 Painter + 1 Helper 1 Painter + 1 Helper

1 Mason + 1 Helper

1 Mason + 1 Helper

1 Mason + 1 Helper 1 Mason + 1 Helper

2 Mason + 1 Helper