EQUIPMENT PRODUCTIVITY Code

Work Item

Rate

EARTHWORKS

EP1.1.1 EP1.1.2

Clearing & Grubbing Clearing & Grubbing (Volume) Clearing & Grubbing (Area)

92.05 613.64

m3/hr m2/hr

EP1.2.1 EP1.2.2

Ground Dressing Dressing (t < 250mm) (Volume) Dressing (t < 250mm) (Area)

103.32 413.27

m3/hr m2/hr

EP1.3.1 EP1.3.2 EP1.3.3

Ground Leveling Leveling (t > 250mm) (Volume) Leveling (t >250mm) (Area) Leveling (t > 500mm) (Volume)

97.70 325.68 88.24

EP1.3.4

Leveling (t >500mm) (Area)

176.47

m3/hr m2/hr m3/hr m2/hr

EXCAVATION & BACKFILLING

EP2.1.1 EP2.1.2 EP2.1.3 EP2.1.4 EP2.1.5 EP2.1.6

Bulk Excavation Bulk Excavation (Cap=0.8m3, Normal Soil) Bulk Excavation (Cap=0.8m3, Hard Soil) Bulk Excavation (Cap=0.8m3, Rocky Soil) Bulk Excavation (Cap=1.0m3, Normal Soil)

55.86 33.27

m3/hr m3/hr m3/hr m3/hr

Bulk Excavation (Cap=1.0m3, Hard Soil) Bulk Excavation (Cap=1.0m3, Rocky Soil)

22.76 56.01 33.36 22.82

EP2.2.1 EP2.2.2 EP2.2.3 EP2.2.4

Foundation Excavation Foundation Excavation (Cap=0.8m3, Normal Soil) Foundation Excavation (Cap=0.8m3, Hard Soil) Foundation Excavation (Cap=0.8m3, Rocky Soil) Foundation Excavation (Cap=1.0m3, Normal Soil)

40.16 26.99 19.63 40.26

m3/hr m3/hr m3/hr m3/hr

EP2.2.5 EP2.2.6

Foundation Excavation (Cap=1.0m3, Hard Soil) Foundation Excavation (Cap=1.0m3, Rocky Soil)

27.05 19.68

m3/hr m3/hr

m3/hr

Trench Excavation (Cap=0.4m3, Hard Soil) Trench Excavation (Cap=0.4m3, Rocky Soil) Trench Excavation (Cap=0.5m3, Normal Soil)

33.30 21.10 16.32 33.41

Trench Excavation (Cap=0.5m3, Hard Soil) Trench Excavation (Cap=0.5m3, Rocky Soil)

21.17 16.37

m3/hr m3/hr

EP2.3.1 EP2.3.2 EP2.3.3 EP2.3.4 EP2.3.5 EP2.3.6

Trench Excavation Trench Excavation (Cap=0.4m3, Normal Soil)

m3/hr m3/hr

m3/hr m3/hr m3/hr

EP2.4.1 EP2.4.2

Foundation Backfilling Foundation Backfilling (Cap=0.8m3, Normal Soil) Foundation Backfilling (Cap=1.0m3, Normal Soil)

22.42 23.08

m3/hr m3/hr

EP2.5.1 EP2.5.2

Trench Backfilling Trench Backfilling (Cap=0.4m3, Normal Soil) Trench Backfilling (Cap=0.5m3, Normal Soil)

18.42 18.75

m3/hr m3/hr

47.01 235.06

m3/hr m2/hr

63.03

m3/hr

420.17

m2/hr

EP4.1.1

Soil Loading / Filling Load/Fill by Backhoe (Cap=0.8m3)

42.69

m3/hr

EP4.1.2 EP4.1.3 EP4.1.4

Load/Fill by Backhoe (Cap=1.0m3) Load/Fill by Loader (Cap=1.5m3) Load/Fill by Loader (Cap=2.4m3)

43.90 58.57 65.82

m3/hr m3/hr m3/hr

8.33 9.42 10.83

m3/hr m3/hr m3/hr m3/hr m3/hr

EMBANKMENT WORKS

EP3.1.1 EP3.1.2

Embankment Grading Embankment Grading (Volume) Embankment Grading (Area)

EP3.2.1

Embankment Compaction Embankment Compaction (Volume)

EP3.2.2

Embankment Compaction (Area) QUARRYING & EARTH HANDLING WORKS

EP4.2.1 EP4.2.2 EP4.2.3 EP4.2.4 EP4.2.5 EP4.2.6 EP4.2.7 EP4.2.8

EP4.3.1 EP4.3.2 EP4.3.3 EP4.3.4 EP4.3.5 EP4.3.6 EP4.3.7

Soil Hauling (loading by Backhoe) Hauling (AHD= 30km Cap=15m3) (load by backhoe) Hauling (AHD= 25km Cap=15m3) (load by backhoe) Hauling (AHD= 20km Cap=15m3) (load by backhoe) Hauling (AHD= 15km Cap=15m3) (load by backhoe) Hauling (AHD= 10km Cap=15m3) (load by backhoe) Hauling (AHD= 7km Cap=15m3) (load by backhoe) Hauling (AHD= 5km Cap=15m3) (load by backhoe) Hauling (Free Haul Cap=15m3) (load by backhoe) Soil Hauling (loading by Payloader) Hauling (AHD= 30km Cap=15m3) (load by payloader) Hauling (AHD= 25km Cap=15m3) (load by payloader) Hauling (AHD= 20km Cap=15m3) (load by payloader) Hauling (AHD= 15km Cap=15m3) (load by payloader) Hauling (AHD= 10km Cap=15m3) (load by payloader) Hauling (AHD= 7km Cap=15m3) (load by payloader) Hauling (AHD= 5km Cap=15m3) (load by payloader)

12.75 15.49 17.79 19.74 25.29

8.79 10.01 11.63 13.87 15.40 20.06 22.58

m3/hr m3/hr m3/hr

m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr

EP4.3.8

Hauling (Free Haul Cap=15m3) (load by payloader)

30.13

m3/hr

EP4.4.1

Rock Breaking Rock Breaking by Backhoe with Breaker

21.63

m3/hr

EP4.5.1 EP4.5.2

Rock Loading / Filling Rock Load/Fill by Loader (Cap=1.5m3) Rock Load/Fill by Loader (Cap=2.4m3)

43.93 49.37

m3/hr m3/hr

EP4.6.1

Rock Hauling (loading by Payloader) Hauling (AHD= 30km Cap=15m3) (load by payloader)

5.84

m3/hr

EP4.6.2 EP4.6.3 EP4.6.4 EP4.6.5 EP4.6.6 EP4.6.7

Hauling (AHD= 25km Cap=15m ) (load by payloader) Hauling (AHD= 20km Cap=15m3) (load by payloader) Hauling (AHD= 15km Cap=15m3) (load by payloader) Hauling (AHD= 10km Cap=15m3) (load by payloader) Hauling (AHD= 7km Cap=15m3) (load by payloader) Hauling (AHD= 5km Cap=15m3) (load by payloader)

6.70 7.88 9.55 11.89 14.46 16.60

m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr

EP4.7.1 EP4.7.2

Stone Loading Stone Load/Fill by Loader (Cap=1.5m3) Stone Load/Fill by Loader (Cap=2.4m3)

49.78 55.95

m3/hr m3/hr

EP4.8.1 EP4.8.2 EP4.8.3

Stone Hauling Stone Hauling AHD=30kms Stone Hauling AHD=25kms Stone Hauling AHD=20kms

6.61 7.60 8.93

EP4.8.4 EP4.8.5 EP4.8.6 EP4.8.7

Stone Hauling AHD=15kms Stone Hauling AHD=10kms Stone Hauling AHD=7kms Stone Hauling AHD=5kms

10.82 13.48 16.39 18.81

m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr

EP4.9.1 EP4.9.2

Boulder Loading / Filling Boulder Load/Fill by Loader (Cap=1.5m3) Boulder Load/Fill by Loader (Cap=2.4m3)

24.85 29.62

m3/hr m3/hr

EP4.10.1 EP4.10.2

Boulder Hauling Boulder Hauling AHD=30kms Boulder Hauling AHD=25kms

3.33 3.83

EP4.10.3 EP4.10.4 EP4.10.5 EP4.10.6 EP4.10.7

Boulder Hauling AHD=20kms Boulder Hauling AHD=15kms Boulder Hauling AHD=10kms Boulder Hauling AHD=7kms Boulder Hauling AHD=5kms

4.52 5.50 6.89 8.42 9.72

m3/hr m3/hr m3/hr m3/hr m3/hr

3

PAVEMENT BREAKING

m3/hr

m3/hr m3/hr

EP5.1.1 EP5.1.2

Asphalt Pavement Breaking Asphalt Breaking t=50mm (Area) Asphalt Breaking t=50mm (Volume)

23.40 1.17

EP5.1.3 EP5.1.4

Asphalt Breaking t>50mm (Area) Asphalt Breaking t>50mm (Volume)

22.20 1.66

EP5.2.1 EP5.2.2 EP5.2.3 EP5.2.4

Concrete Pavement Breaking Concrete Breaking t=150mm (Area) Concrete Breaking t=150mm (Volume) Concrete Breaking t=200mm (Area) Concrete Breaking t=200mm (Volume)

17.18 2.58 13.75 3.16

EP5.2.5 EP5.2.6

Concrete Breaking t=300mm (Area) Concrete Breaking t=300mm (Volume)

12.76 3.19

m3/hr m2/hr m3/hr m2/hr m3/hr

479.83 71.97

m2/hr m3/hr

m2/hr m3/hr m2/hr m3/hr

m2/hr

WATERING EP6.1.1 EP6.1.2

Watering (Area) Watering (Volume) PILEWORKS

EP7.1.1 EP7.1.2 EP7.1.3

Pile Driving Pile Driving (PC 400mmx400mm) Pile Driving (Steel H350mmx350mm) Pile Driving (Sheet Type 2)

2.54 3.21 5.71

lm/hr lm/hr lm/hr

EP7.2.1

Pile Extraction Pile Extraction (Sheet Type 2)

8.09

lm/hr

EP7.3.1 EP7.3.2 EP7.3.3

Pile Load / Unload Load/Unload (PC 400mmx400mm) Load/Unload (Steel H350mmx350mm) Load/Unload (Sheet Type 2)

36.00 36.61 43.86

lm/hr lm/hr lm/hr

PIPELAYING WORKS

EP8.1.1 EP8.1.2 EP8.1.3 EP8.1.4

Pipe Laying Pipe Laying 1600mmØ-2000mmØ by Crane Pipe Laying 1200mmØ - 1500mmØ by Crane Pipe Laying 600mmØ - 1000mmØ by Crane Pipe Laying 300mmØ - 500mmØ by Crane

5.45 5.54 5.63 5.71

lm/hr lm/hr lm/hr lm/hr

EP8.2.1 EP8.2.2 EP8.2.3 EP8.2.4

Pipe Loading / Unloading Pipe Load/Unload 1600mmØ-2000mmØ by Crane Pipe Load/Unload 1200mmØ - 1500mmØ by Crane Pipe Load/Unload 600mmØ - 1000mmØ by Crane Pipe Load/Unload 300mmØ - 500mmØ by Crane

7.50 7.66 7.83 8.00

lm/hr lm/hr lm/hr lm/hr

Pipe Hauling

EP8.3.1.1 EP8.3.1.2 EP8.3.1.3 EP8.3.1.4 EP8.3.2.1 EP8.3.2.2 EP8.3.2.3 EP8.3.2.4 EP8.3.3.1 EP8.3.3.2 EP8.3.3.3 EP8.3.3.4 EP8.3.4.1 EP8.3.4.2 EP8.3.4.3 EP8.3.4.4 EP8.3.5.1 EP8.3.5.2 EP8.3.5.3 EP8.3.5.4 EP8.3.6.1 EP8.3.6.2 EP8.3.6.3 EP8.3.6.4 EP8.3.7.1 EP8.3.7.2 EP8.3.7.3 EP8.3.7.4

AHD = 30kms Pipe Hauling 1600mmØ-2000mmØ AHD=30kms Pipe Hauling 1200mmØ - 1500mmØ AHD=30kms Pipe Hauling 600mmØ - 1000mmØ AHD=30kms Pipe Hauling 300mmØ - 500mmØ AHD=30kms AHD = 25kms Pipe Hauling 1600mmØ-2000mmØ AHD=25kms Pipe Hauling 1200mmØ - 1500mmØ AHD=25kms Pipe Hauling 600mmØ - 1000mmØ AHD=25kms Pipe Hauling 300mmØ - 500mmØ AHD=25kms AHD = 20kms Pipe Hauling 1600mmØ-2000mmØ AHD=20kms Pipe Hauling 1200mmØ - 1500mmØ AHD=20kms Pipe Hauling 600mmØ - 1000mmØ AHD=20kms Pipe Hauling 300mmØ - 500mmØ AHD=20kms AHD = 15kms Pipe Hauling 1600mmØ-2000mmØ AHD=15kms Pipe Hauling 1150mmØ - 1500mmØ AHD=15kms Pipe Hauling 600mmØ - 1000mmØ AHD=15kms Pipe Hauling 300mmØ - 500mmØ AHD=15kms AHD = 10kms Pipe Hauling 1600mmØ-2000mmØ AHD=10kms Pipe Hauling 1100mmØ - 1500mmØ AHD=10kms Pipe Hauling 600mmØ - 1000mmØ AHD=10kms Pipe Hauling 300mmØ - 500mmØ AHD=10kms AHD = 7kms Pipe Hauling 1600mmØ-2000mmØ AHD=7kms Pipe Hauling 1200mmØ - 1500mmØ AHD=7kms Pipe Hauling 600mmØ - 1000mmØ AHD=7kms Pipe Hauling 300mmØ - 500mmØ AHD=7kms AHD = 5kms Pipe Hauling 1600mmØ-2000mmØ AHD=5kms Pipe Hauling 1200mmØ - 1500mmØ AHD=5kms Pipe Hauling 600mmØ - 1000mmØ AHD=5kms Pipe Hauling 300mmØ - 500mmØ AHD=5kms

2.45 2.90 3.40 3.85

lm/hr lm/hr lm/hr lm/hr

2.58 3.01 3.47 3.87

lm/hr lm/hr lm/hr lm/hr

2.73 3.13 3.54 3.89

lm/hr lm/hr lm/hr lm/hr

2.89 3.25 3.61 3.91

lm/hr lm/hr lm/hr lm/hr

3.08 3.38 3.69 3.94

lm/hr lm/hr lm/hr lm/hr

3.20 3.47 3.73 3.95

lm/hr lm/hr lm/hr lm/hr

3.29 3.53 3.76 3.96

lm/hr lm/hr lm/hr lm/hr

5.56 23.65

m3/hr m3/hr

13.04 96.00

tons/hr sqm/hr bags/hr

CONCRETING EP9.1.1 EP9.2.1

Concreting (Crane & Bucket) Concreting (Truck Mounted Pump) MATERIALS HANDLING

EP10.1.1 EP10.1.2 EP10.1.3

Materials Loading / Unloading Rebar Load/Unload Formworks Load/Unload Cement Load/Unload

EP10.2.1.1 EP10.2.1.2 EP10.2.1.3

Materials Hauling AHD=30kms Rebar Hauling AHD=30kms Formworks Hauling AHD=30kms Cement Hauling AHD=30kms

4.20 30.86 45.92

kgs/hr sqm/hr bags/hr

EP10.2.2.1 EP10.2.2.2 EP10.2.2.3

Materials Hauling AHD=25kms Rebar Hauling AHD=25kms Formworks Hauling AHD=25kms Cement Hauling AHD=25kms

4.46 32.68 47.12

kgs/hr sqm/hr bags/hr

EP10.2.3.1 EP10.2.3.2 EP10.2.3.3

Materials Hauling AHD=20kms Rebar Hauling AHD=20kms Formworks Hauling AHD=20kms Cement Hauling AHD=20kms

4.74 34.73 48.39

kgs/hr sqm/hr bags/hr

EP10.2.4.1 EP10.2.4.2 EP10.2.4.3

Materials Hauling AHD=15kms Rebar Hauling AHD=15kms Formworks Hauling AHD=15kms Cement Hauling AHD=15kms

5.06 37.06 49.72

kgs/hr sqm/hr bags/hr

EP10.2.5.1 EP10.2.5.2 EP10.2.5.3

Materials Hauling AHD=10kms Rebar Hauling AHD=10kms Formworks Hauling AHD=10kms Cement Hauling AHD=10kms

5.43 38.38 51.14

kgs/hr sqm/hr bags/hr

EP10.2.6.1 EP10.2.6.2 EP10.2.6.3

Materials Hauling AHD=7kms Rebar Hauling AHD=7kms Formworks Hauling AHD=7kms Cement Hauling AHD=7kms

5.67 41.51 52.02

kgs/hr sqm/hr bags/hr

EP10.2.7.1 EP10.2.7.2 EP10.2.7.3

Materials Hauling AHD=5kms Rebar Hauling AHD=5kms Formworks Hauling AHD=5kms Cement Hauling AHD=5kms

5.85 42.80 52.63

tons/hr sqm/hr bags/hr

EP10.3.1

Water Hauling Water Hauling AHD=30kms

2.33

m3/hr

EP10.3.2 EP10.3.3 EP10.3.4

Water Hauling AHD=25kms Water Hauling AHD=20kms Water Hauling AHD=15kms

2.63 3.02 3.54

EP10.3.5 EP10.3.6 EP10.3.7

Water Hauling AHD=10kms Water Hauling AHD=7kms Water Hauling AHD=5kms

4.27 4.88 5.39

m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr

EP10.4.1 EP10.4.2 EP10.4.3

Fuel Hauling (by Fuel Truck) Water Hauling AHD=30kms Water Hauling AHD=25kms Water Hauling AHD=20kms

1.63 1.67 1.71

li/hr li/hr li/hr

EP10.4.4 EP10.4.5 EP10.4.6 EP10.4.7

Water Hauling AHD=15kms Water Hauling AHD=10kms Water Hauling AHD=7kms Water Hauling AHD=5kms

1.75 1.80 1.83 1.85

li/hr li/hr li/hr li/hr

EP10.5.1 EP10.5.2 EP10.5.3 EP10.5.4 EP10.5.5

Asphalt Hauling Asphalt Hauling AHD=30kms Asphalt Hauling AHD=25kms Asphalt Hauling AHD=20kms Asphalt Hauling AHD=15kms Asphalt Hauling AHD=10kms

4.05 4.48 5.02 5.70 6.52

m3/hr

EP10.5.6 EP10.5.7 EP10.5.8 EP10.5.9 EP10.5.10 EP10.5.11 EP10.5.12 EP10.5.13 EP10.5.14

Asphalt Hauling AHD=7kms Asphalt Hauling AHD=5kms Asphalt Hauling AHD=30kms Asphalt Hauling AHD=25kms Asphalt Hauling AHD=20kms Asphalt Hauling AHD=15kms Asphalt Hauling AHD=10kms Asphalt Hauling AHD=7kms Asphalt Hauling AHD=5kms

7.27 7.82 8.91 9.86 11.03 12.53 14.33 16.00 17.20

m3/hr m3/hr tons/hr tons/hr tons/hr tons/hr tons/hr tons/hr tons/hr

EP10.6.1 EP10.6.2 EP10.6.3

Piles Hauling PC Hauling Piles Steel Hauling Piles Steel Sheet Hauling Piles

17.55 17.90 21.91

lm/hr lm/hr lm/hr

9.76 42.44 11.08 41.04 11.73 39.11

m3/hr m2/hr m3/hr

39.06 355.14 45.98 278.64 52.24 237.47

tons/hr m2/hr tons/hr m2/hr tons/hr m2/hr

9.49 86.27

tons/hr m2/hr

m3/hr m3/hr m3/hr m3/hr

PAVING WORK

EP11.1.1 EP11.1.2 EP11.1.3 EP11.1.4 EP11.1.5 EP11.1.6

Concrete Paving Concrete Paving t=230mm (Volume) Concrete Paving t=230mm (Area) Concrete Paving t=270mm (Volume) Concrete Paving t=270mm (Area) Concrete Paving t=300mm (Volume) Concrete Paving t=300mm (Area)

EP11.2.1 EP11.2.2 EP11.2.3 EP11.2.4 EP11.2.5 EP11.2.6

Asphalt Paving Asphalt Paving t=50mm (Weight) Asphalt Paving t=50mm (Area) Asphalt Paving t=75mm (Weight) Asphalt Paving t=75mm (Area) Asphalt Paving t=100mm (Weight) Asphalt Paving t=100mm (Area)

EP11.3.1 EP11.3.2

Asphalt Compaction Asphalt Compaction t=50mm (Weight) Asphalt Compaction t=50mm (Area)

m2/hr m3/hr m2/hr

EP11.3.3 EP11.3.4 EP11.3.5 EP11.3.6

Asphalt Compaction t=75mm (Weight) Asphalt Compaction t=75mm (Area) Asphalt Compaction t=100mm (Weight) Asphalt Compaction t=100mm (Area)

EP11.4.1 EP11.4.2 EP11.4.3 EP11.4.4 EP11.4.5 EP11.4.6 EP11.4.7 EP11.4.8

Asphalt Spraying Prime Coat Application (Weight) Prime Coat Application (Area) Tack Coat Application (Weight) Tack Coat Application (Area) Asphalt Spraying (1L/sqm) (Weight) Asphalt Spraying (1L/sqm) (Area) Asphalt Spraying (2L/sqm) (Weight) Asphalt Spraying (2L/sqm) (Area)

EP12.1.1 EP12.1.2 EP12.1.3 EP12.1.4 EP12.1.5

BRIDGE WORK PC Girder Installation Type 1 PC Girder Installation Type 2 PC Girder Installation Type 3 PC Girder Installation Type 4 PC Girder Installation Type 5

12.58 76.26 15.35 69.78

tons/hr m2/hr tons/hr m2/hr

0.62 388.35 0.73 1,224.42 0.97 1,014.00 1.24 776.71

tons/hr m2/hr tons/hr m2/hr tons/hr m2/hr tons/hr m2/hr

1.71 2.10 3.72 6.00 7.74

lm/hr lm/hr lm/hr lm/hr lm/hr

5.31 5.71 6.19 6.74 7.36 7.87 8.22

tons/hr tons/hr tons/hr tons/hr tons/hr tons/hr tons/hr

PC Items Handling

EP13.1.1 EP13.1.2 EP13.1.3 EP13.1.4 EP13.1.5 EP13.1.6 EP13.1.7

PC Item (1-2 tons/pc) PC Item (1-2 tons/pc) Hauling AHD=30kms PC Item (1-2 tons/pc) Hauling AHD=25kms PC Item (1-2 tons/pc) Hauling AHD=20kms PC Item (1-2 tons/pc) Hauling AHD=15kms PC Item (1-2 tons/pc) Hauling AHD=10kms PC Item (1-2 tons/pc) Hauling AHD=70kms PC Item (1-2 tons/pc) Hauling AHD=5kms

655.23 327.615614357727

19800

4950

12,549.30

1568.66197183099

1,960.0

773.11

PRODUCTIVITY CALCULATIONS Clearing and Grubbing Trial Strip

Parameter Segment Length Segment Width Depth of Cut Area of Embankment Volume Equipment Specifications Parameter Forward Speed Reverse Speed Blade Width Blade Capacity Fuel Consumption

Quantity 50.00 5.00 0.15 250.00 37.50 Bulddozer D7 Quantity 1.35 1.35 3.70 3.50 27.00

Unit km/hr km/hr m m3 li/hr

Rate

Time Required hrs

Time-Motion Table Activity

First Pass (one side) Maneuver Push Earth to 50m Maneuver Reverse to 50m First Pass (other side) Maneuver Push Earth to 50m Maneuver Reverse to 50m 2nd Pass (one side) Maneuver Push Earth to 50m Maneuver Reverse to 50m 2nd Pass (other side) Maneuver Push Earth to 50m Maneuver Reverse to 50m Total Productivity

Unit m m m sm m3

1.35 1.35

1.35 1.35

1.35 1.35

1.35 1.35

Time Required minutes

0.01 0.04 0.01 0.04

0.83 2.22 0.83 2.22

0.01 0.04 0.01 0.04

0.83 2.22 0.83 2.22

0.01 0.04 0.01 0.04

0.83 2.22 0.83 2.22

0.01 0.04 0.01 0.04

0.83 2.22 0.83 2.22

0.41

24.44

92.05 m3/hr

Productivity

613.64 m2/hr

PRODUCTIVITY CALCULATIONS Dressing Trial Strip

Parameter Segment Length Segment Width Depth of Cut Area of Embankment Volume Equipment Specifications Parameter Forward Speed Reverse Speed Blade Width Blade Capacity Fuel Consumption

Quantity 50.00 5.00 0.25 250.00 62.50 Bulldozer D7 Quantity 0.81 0.81 3.70 3.50 27.00

Unit km/hr km/hr m m3 li/hr

Rate

Time Required hrs

Time-Motion Table Activity

First Pass (one side) Maneuver Push Earth to 50m Maneuver Reverse to 50m First Pass (other side) Maneuver Push Earth to 50m Maneuver Reverse to 50m 2nd Pass (one side) Maneuver Push Earth to 50m Maneuver Reverse to 50m 2nd Pass (other side) Maneuver Push Earth to 50m Maneuver Reverse to 50m Total Productivity

Unit m m m sm m3

0.81 0.81

0.81 0.81

0.81 0.81

0.81 0.81

Time Required minutes

0.01 0.06 0.01 0.06

0.83 3.70 0.83 3.70

0.01 0.06 0.01 0.06

0.83 3.70 0.83 3.70

0.01 0.06 0.01 0.06

0.83 3.70 0.83 3.70

0.01 0.06 0.01 0.06

0.83 3.70 0.83 3.70

0.60

36.30

103.32 m3/hr

Productivity

413.27 m2/hr

PRODUCTIVITY CALCULATIONS Ground Leveling Trial Strip

Parameter Segment Length Segment Width Thickness Area of Embankment Volume Equipment Specifications Parameter Forward Speed Reverse Speed Blade Width Blade Capacity Fuel Consumption

Quantity 50.00 5.00 0.30 250.00 75.00 Bulldozer D7 Quantity 1.04 0.96 3.70 3.50 27.00

Unit km/hr km/hr m m3 li/hr

Rate

Time Required hrs

Time-Motion Table Activity

First Pass (one side) Maneuver Push Earth to 50m Maneuver Reverse to 50m First Pass (other side) Maneuver Push Earth to 50m Maneuver Reverse to 50m 2nd Pass (one side) Maneuver Push Earth to 50m Maneuver Reverse to 50m 2nd Pass (other side) Maneuver Push Earth to 50m Maneuver Reverse to 50m 3rd Pass (one side) Maneuver Push Earth to 50m

Unit m m m sm m3

Time Required minutes

0.01 0.05 0.01 0.05

0.83 2.88 0.83 3.13

0.01 0.05 0.01 0.05

0.83 2.88 0.83 3.13

0.01 0.05 0.01 0.05

0.83 2.88 0.83 3.13

0.96

0.01 0.05 0.01 0.05

0.83 2.88 0.83 3.13

1.04

0.01 0.05

0.83 2.88

1.04 0.96

1.04 0.96

1.04 0.96

1.04

Maneuver Reverse to 50m 3rd Pass (other side) Maneuver Push Earth to 50m Maneuver Reverse to 50m Total

0.96

1.04 0.96

0.01 0.05

0.83 3.13

0.01 0.05 0.01 0.05

0.83 2.88 0.83 3.13

0.77

46.06

Productivity

97.70 m3/hr

Productivity

325.68 m2/hr

PRODUCTIVITY CALCULATIONS Ground Cutting Trial Strip

Parameter Segment Length Segment Width Depth of Cut Area of Embankment Volume Equipment Specifications Parameter Forward Speed Reverse Speed Blade Width Blade Capacity Fuel Consumption

Quantity 50.00 5.00 0.50 250.00 125.00 Bulldozer D7 Quantity 0.32 0.96 3.70 3.50 27.00

Unit km/hr km/hr m m3 li/hr

Rate

Time Required hrs

Time-Motion Table Activity

First Pass (one side) Maneuver Push Earth to 50m Maneuver Reverse to 50m First Pass (other side) Maneuver Push Earth to 50m Maneuver Reverse to 50m 2nd Pass (one side) Maneuver Push Earth to 50m Maneuver Reverse to 50m 2nd Pass (other side) Maneuver Push Earth to 50m Maneuver Reverse to 50m 3rd Pass (one side) Maneuver Push Earth to 50m

Unit m m m sm m3

Time Required minutes

0.01 0.16 0.01 0.05

0.83 9.38 0.83 3.13

0.01 0.16 0.01 0.05

0.83 9.38 0.83 3.13

0.01 0.16 0.01 0.05

0.83 9.38 0.83 3.13

0.96

0.01 0.16 0.01 0.05

0.83 9.38 0.83 3.13

0.32

0.01 0.16

0.83 9.38

0.32 0.96

0.32 0.96

0.32 0.96

0.32

Maneuver Reverse to 50m 3rd Pass (other side) Maneuver Push Earth to 50m Maneuver Reverse to 50m Total

0.96

0.32 0.96

0.01 0.05

0.83 3.13

0.01 0.16 0.01 0.05

0.83 9.38 0.83 3.13

1.42

85.00

Productivity

88.24 m3/hr

Productivity

176.47 m2/hr

PRODUCTIVITY CALCULATIONS Embankment Grading Trial Strip

Parameter Segment Length Segment Width Thickness Area of Embankment Volume Equipment Specifications Parameter Forward Speed (Loaded) Reverse Speed (Empty) Blade Width Blade Capacity Fuel Consumption

Quantity 50.00 7.50 0.20 375.00 75.00 Grader 125HP Quantity 6.12 6.48 3.70 1.33 16.00

Unit km/hr km/hr m m3 li/hr

Rate

Time Required hrs

Time-Motion Table Activity

First Pass (one side) Maneuver Push Earth to 50m Maneuver Reverse to 50m First Pass (other side) Maneuver Push Earth to 50m Maneuver Reverse to 50m 2nd Pass (one side) Maneuver Push Earth to 50m Maneuver Reverse to 50m 2nd Pass (other side) Maneuver Push Earth to 50m Maneuver Reverse to 50m 3rd Pass (one side) Maneuver Push Earth to 50m Maneuver Reverse to 50m 3rd Pass (other side) Maneuver

Unit m m m m2 m3

6.12 6.48

6.12 6.48

6.12 6.48

6.12 6.48

6.12 6.48

Time Required minutes

0.13 0.01 0.13 0.01

7.50 0.49 7.50 0.46

0.13 0.01 0.13 0.01

7.50 0.49 7.50 0.46

0.13 0.01 0.13 0.01

7.50 0.49 7.50 0.46

0.13 0.01 0.13 0.01

7.50 0.49 7.50 0.46

0.13 0.01 0.13 0.01

7.50 0.49 7.50 0.46

0.13

7.50

Push Earth to 50m Maneuver Reverse to 50m Total

6.12 6.48

0.01 0.13 0.01

0.49 7.50 0.46

1.60

95.72

Productivity

47.01 m3/hr

Productivity

235.06 m2/hr

PRODUCTIVITY CALCULATIONS Compaction Trial Strip

Parameter Segment Length Segment Width Thickness Area of Embankment Volume Equipment Specifications Parameter Forward Speed Reverse Speed Drum Width Fuel Consumption

Quantity 50.00 5.00 0.15 250.00 37.50 Road Roller 10T Quantity 1.88 1.88 1.65 12.00

Unit km/hr km/hr m li/hr

Rate

Time Required hrs

Time-Motion Table Activity

1st Pass Maneuver Compact to 50m Maneuver Compact to 50m (Return) Maneuver Compact to 50m Maneuver Compact to 50m (Return) 2nd Pass Maneuver Compact to 50m Maneuver Compact to 50m (Return) Maneuver Compact to 50m Maneuver Compact to 50m (Return) 3rd Pass Maneuver Compact to 50m Maneuver Compact to 50m (Return) Maneuver

Unit m m m sm m3

1.88 1.88 1.88 1.88

1.88 1.88 1.88 1.88

1.88 1.88

Time Required minutes

0.03 0.03 0.03 0.03 0.01 0.03 0.03 0.03

2.00 1.60 2.00 1.60 0.50 1.60 2.00 1.60

0.01 0.03 0.03 0.03 0.01 0.03 0.03 0.03

0.50 1.60 2.00 1.60 0.50 1.60 2.00 1.60

0.01 0.03 0.03 0.03 0.01

0.50 1.60 2.00 1.60 0.50

Compact to 50m Maneuver Compact to 50m (Return) Total

1.88 1.88

0.03 0.03 0.03

1.60 2.00 1.60

0.60

35.70

Productivity

63.03 m3/hr

Productivity

420.17 m2/hr

PRODUCTIVITY CALCULATIONS Embankment Watering Trial Strip

Parameter Segment Length Segment Width Layer Thickness Area of Embankment Volume Distance from Water Source Equipment Specifications Parameter Travel Speed (Loaded) Travel Speed (Empty) Watering Speed (Loaded) Tank Capacity Water Loading Rate Spray Rate Sprayer Width Fuel Consumption

Quantity 200.00 7.50 0.15 1,500.00 225.00 25.00 Water Truck Quantity 40.00 60.00 2.50 4,000.00 3,000.00 3,600.00 3.00 16.00

Unit km/hr km/hr km/hr li li/hr li/hr m li/hr

Rate

Time Required hrs

Time-Motion Table Activity

Load & Haul Water Load Water Haul Water First Pass (one side) Maneuver Spray Water Maneuver Spray Water First Pass (other side) Maneuver Spray Water Maneuver Spray Water 2nd Pass (one side) Maneuver Spray Water Maneuver Spray Water 2nd Pass (other side)

Unit m m m sm m3 km

40.00

2.50 2.50

2.50 2.50

2.50 2.50

Time Required minutes

1.33 0.63

80.00 37.50

0.01 0.08 0.01 0.08

0.83 4.80 0.83 4.80

0.01 0.08 0.01 0.08

0.83 4.80 0.83 4.80

0.01 0.08 0.01 0.08

0.83 4.80 0.83 4.80

Maneuver Spray Water Maneuver Spray Water

2.50

0.01 0.08 0.01 0.08

0.83 4.80 0.83 4.80

60.00

0.42

25.00

3.13

187.57

2.50

Return to Base Travel to Base Total Productivity

71.97 m3/hr

Productivity

479.83 m2/hr

Water Dispensed (li)

-

288.00 288.00 288.00 288.00

288.00 288.00

288.00 288.00

2,304.00 1.54

PRODUCTIVITY CALCULATIONS Bulk Excavation Trial Excavation Area Parameter Segment Length Segment Width Depth of Cut Area of Excavation Maximum Volume

BACKHOE

(Excavation & Stockpiling)

Quantity 15.00 5.00 1.00 75.00 75.00

Unit m m m sm m3

Cap = 0.80 cu.m.

NORMAL SOIL Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption Productivity Rates Parameter Cut-Swing-Unload-Swing Area Covered / Position Volume / Position Excavation Duration / Position Number of Positions Total Excavation Duration

Backhoe Quantity

2.63 2.63 0.80 16.00

Quantity 45.00 30.00 30.00 0.47 2.50 1.17

Cap = 0.80 cu.m. Unit km/hr km/hr m3 li/hr

Unit secs m2 m3 hrs positions hrs

Excluding Travel

Time-Motion Table Activity

Maneuver Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

Rate

Manuever & Wait 0.17 -

Time Required (hours) Cut-Swing Load-Swing 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 -

Total Productivity

HARD SOIL

-

Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption Productivity Rates Parameter Cut-Swing-Unload-Swing Area Covered / Position Volume / Position Excavation Duration / Position Number of Positions Total Excavation Duration

Backhoe Quantity

2.63 2.63 0.80 16.00

Quantity 80.00 30.00 30.00 0.83 2.50 2.08

Cap = 0.80 cu.m. Unit km/hr km/hr m3 li/hr

Unit secs m2 m3 hrs positions hrs

Excluding Travel

Time-Motion Table Activity

Maneuver Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

Rate

Manuever & Wait 0.17 -

Time Required (hours) Cut-Swing Load-Swing 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 -

-

-

Total Productivity

ROCKY SOIL Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption Productivity Rates Parameter Cut-Swing-Unload-Swing Area Covered / Position Volume / Position Excavation Duration / Position Number of Positions Total Excavation Duration

Backhoe Quantity

2.63 2.63 0.80 16.00

Quantity 120.00 30.00 30.00 1.25 2.50 3.13

Cap = 0.80 cu.m. Unit km/hr km/hr m3 li/hr

Unit secs m2 m3 hrs positions hrs

Excluding Travel

Time-Motion Table Activity

Maneuver Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

Rate

Manuever & Wait 0.17 -

Time Required (hours) Cut-Swing Load-Swing 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -

-

-

-

-

Total Productivity

BACKHOE

Cap = 1.00 cu.m.

NORMAL SOIL Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption Productivity Rates Parameter Cut-Swing-Unload-Swing Area Covered / Position Volume / Position Excavation Duration / Position Number of Positions Total Excavation Duration

Backhoe Quantity

2.63 2.63 1.00 16.00

Quantity 45.00 30.00 30.00 0.38 2.50 0.94

Cap = 1.00 cu.m. Unit km/hr km/hr m3 li/hr

Unit secs m2 m3 hrs positions hrs

Excluding Travel

Time-Motion Table Activity

Maneuver Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

Rate

Manuever & Wait 0.17 -

Time Required (hours) Cut-Swing Load-Swing 0.01 0.01 0.01 0.01 0.01 0.01 0.01

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 -

-

-

-

-

Total Productivity

HARD SOIL Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption Productivity Rates Parameter Cut-Swing-Unload-Swing Area Covered / Position Volume / Position Excavation Duration / Position Number of Positions Total Excavation Duration

Backhoe Quantity

2.63 2.63 1.00 16.00

Quantity 80.00 30.00 30.00 0.67 2.50 1.67

Cap = 1.00 cu.m. Unit km/hr km/hr m3 li/hr

Unit secs m2 m3 hrs positions hrs

Excluding Travel

Time-Motion Table Activity

Maneuver Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

Rate

Manuever & Wait 0.17 -

Time Required (hours) Cut-Swing Load-Swing 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 -

Total Productivity

ROCKY SOIL Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption

Backhoe Quantity

2.63 2.63 1.00 16.00

Cap = 1.00 cu.m. Unit km/hr km/hr m3 li/hr

-

Productivity Rates Parameter Cut-Swing-Unload-Swing Area Covered / Position Volume / Position Excavation Duration / Position Number of Positions Total Excavation Duration

Quantity 120.00 30.00 30.00 1.00 2.50 2.50

Unit secs m2 m3 hrs positions hrs

Excluding Travel

Time-Motion Table Activity

Maneuver Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position

Rate

Manuever & Wait 0.17 -

Time Required (hours) Cut-Swing Load-Swing 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.03 0.03 0.03 -

Total Productivity

-

Case Description Case Description 15.00 Cut-Swing-Unload-Swing 25.00 Transfer Position 30.00 35.00 Maneuver

Time Required (hours) Transfer Position

Stockpile Volume Time Required (minutes)

Total

-

0.17 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

10.00 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75

Position

Cycle

30.00 cu.m. Volume (m

Position Running Total

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 8.80 9.60 10.40 11.20 12.00

0.00 -

0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.14 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

12.80 13.60 14.40 15.20 16.00 16.80 17.60 18.40 19.20 20.00 20.80 21.60 22.40 23.20 24.00 24.80 25.60 26.40 27.20 28.00 28.80 29.60 30.40 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 8.80 9.60 10.40 11.20 12.00 12.80 13.60 14.40 15.20 16.00 16.80 17.60 18.40 19.20 20.00 20.80 21.60 22.40 23.20 24.00

0.00 -

0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 -

0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.14 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 -

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

24.80 25.60 26.40 27.20 28.00 28.80 29.60 30.40 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 8.80 9.60 10.40 11.20 12.00 12.80 13.60 14.40 -

-

1.35 55.86 m3/hr

-

-

25.75 75.2 m3

-

Time Required (hours) Transfer Position

Stockpile Volume Time Required (minutes)

Total

-

0.17 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

10.00 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33

Position

Cycle

30.00 cu.m. Volume (m

Position Running Total

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 8.80 9.60 10.40 11.20 12.00 12.80 13.60 14.40 15.20 16.00 16.80 17.60 18.40 19.20 20.00 20.80 21.60 22.40 23.20 24.00 24.80

0.00 0.00 -

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02

1.33 1.33 1.33 1.33 1.33 1.33 1.33 0.14 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 0.14 1.33 1.33 1.33 1.33 1.33 1.33 1.33

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

25.60 26.40 27.20 28.00 28.80 29.60 30.40 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 8.80 9.60 10.40 11.20 12.00 12.80 13.60 14.40 15.20 16.00 16.80 17.60 18.40 19.20 20.00 20.80 21.60 22.40 23.20 24.00 24.80 25.60 26.40 27.20 28.00 28.80 29.60 30.40 0.80 1.60 2.40 3.20 4.00 4.80 5.60

-

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 -

1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 -

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

6.40 7.20 8.00 8.80 9.60 10.40 11.20 12.00 12.80 13.60 14.40 -

-

2.26 33.27 m3/hr

-

-

38.00 75.2 m3

-

Time Required (hours) Transfer Position

Stockpile Volume Time Required (minutes)

Total

0.00 -

0.17 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.00 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03

10.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0.14 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00

Position

Cycle

30.00 cu.m. Volume (m

Position Running Total

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 8.80 9.60 10.40 11.20 12.00 12.80 13.60 14.40 15.20 16.00 16.80 17.60 18.40 19.20 20.00 20.80 21.60 22.40 23.20 24.00 24.80 25.60 26.40 27.20 28.00 28.80 29.60 30.40 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40

0.00 -

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.00 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -

2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0.14 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 -

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

7.20 8.00 8.80 9.60 10.40 11.20 12.00 12.80 13.60 14.40 15.20 16.00 16.80 17.60 18.40 19.20 20.00 20.80 21.60 22.40 23.20 24.00 24.80 25.60 26.40 27.20 28.00 28.80 29.60 30.40 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 8.80 9.60 10.40 11.20 12.00 12.80 13.60 14.40 -

-

-

-

-

-

-

-

-

3.30

-

52.00

22.76 m3/hr

Time Required (hours) Transfer Position -

75.2 m3

Stockpile Volume Time Required (minutes)

Total

0.17 0.01 0.01 0.01 0.01 0.01 0.01 0.01

-

10.00 0.75 0.75 0.75 0.75 0.75 0.75 0.75

Position

Cycle

30.00 cu.m. Volume (m

Position Running Total

1.00 0.80 0.80 0.80 0.80 0.80 0.80

1.00 1.80 2.60 3.40 4.20 5.00 5.80

0.00 -

0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.14 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

6.60 7.40 8.20 9.00 9.80 10.60 11.40 12.20 13.00 13.80 14.60 15.40 16.20 17.00 17.80 18.60 19.40 20.20 21.00 21.80 22.60 23.40 24.20 25.00 25.80 26.60 27.40 28.20 29.00 29.80 30.60 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 8.80 9.60 10.40 11.20 12.00 12.80 13.60 14.40 15.20 16.00 16.80 17.60

0.00 -

0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 -

0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.14 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 -

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

18.40 19.20 20.00 20.80 21.60 22.40 23.20 24.00 24.80 25.60 26.40 27.20 28.00 28.80 29.60 30.40 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 8.80 9.60 10.40 11.20 12.00 12.80 13.60 14.40 -

-

-

-

-

-

-

-

-

1.35

-

25.75

56.01 m3/hr

Time Required (hours) Transfer Position -

75.4 m3

Stockpile Volume Time Required (minutes)

Total

0.17 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

-

10.00 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33

Position

Cycle

30.00 cu.m. Volume (m

Position Running Total

1.00 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

1.00 1.80 2.60 3.40 4.20 5.00 5.80 6.60 7.40 8.20 9.00 9.80 10.60 11.40 12.20 13.00 13.80 14.60 15.40 16.20 17.00 17.80 18.60

0.00 -

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 0.14 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

19.40 20.20 21.00 21.80 22.60 23.40 24.20 25.00 25.80 26.60 27.40 28.20 29.00 29.80 30.60 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 8.80 9.60 10.40 11.20 12.00 12.80 13.60 14.40 15.20 16.00 16.80 17.60 18.40 19.20 20.00 20.80 21.60 22.40 23.20 24.00 24.80 25.60 26.40 27.20 28.00 28.80 29.60 30.40

0.00 -

0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 -

0.14 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 -

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 8.80 9.60 10.40 11.20 12.00 12.80 13.60 14.40 -

-

2.26 33.36 m3/hr

-

-

38.00 75.4 m3

-

Time Required (hours) Transfer Position

Stockpile Volume Time Required (minutes)

Total

0.00

0.17 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.00

10.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0.14

Position

Cycle

30.00 cu.m. Volume (m

Position Running Total

1.00 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

1.00 1.80 2.60 3.40 4.20 5.00 5.80 6.60 7.40 8.20 9.00 9.80 10.60 11.40 12.20 13.00 13.80 14.60 15.40 16.20 17.00 17.80 18.60 19.40 20.20 21.00 21.80 22.60 23.40 24.20 25.00 25.80 26.60 27.40 28.20 29.00 29.80 30.60 -

0.00 -

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.00 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03

2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0.14 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 8.80 9.60 10.40 11.20 12.00 12.80 13.60 14.40 15.20 16.00 16.80 17.60 18.40 19.20 20.00 20.80 21.60 22.40 23.20 24.00 24.80 25.60 26.40 27.20 28.00 28.80 29.60 30.40 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 8.80 9.60 10.40 11.20 12.00

-

0.03 0.03 0.03 -

2.00 2.00 2.00 -

0.80 0.80 0.80 -

12.80 13.60 14.40 -

-

3.30 22.82 m3/hr

-

-

52.00 75.4 m3

-

Stockpile

75.00 cu.m.

Volume (m3) Cycle

Stockpile Running Total

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 8.80 9.60 10.40 11.20 12.00

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

12.80 13.60 14.40 15.20 16.00 16.80 17.60 18.40 19.20 20.00 20.80 21.60 22.40 23.20 24.00 24.80 25.60 26.40 27.20 28.00 28.80 29.60 30.40 30.40 31.20 32.00 32.80 33.60 34.40 35.20 36.00 36.80 37.60 38.40 39.20 40.00 40.80 41.60 42.40 43.20 44.00 44.80 45.60 46.40 47.20 48.00 48.80 49.60 50.40 51.20 52.00 52.80 53.60 54.40

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

55.20 56.00 56.80 57.60 58.40 59.20 60.00 60.80 60.80 61.60 62.40 63.20 64.00 64.80 65.60 66.40 67.20 68.00 68.80 69.60 70.40 71.20 72.00 72.80 73.60 74.40 75.20 -

-

75.2 m3

-

Stockpile

75.00 cu.m.

Volume (m ) 3

Cycle

Stockpile Running Total

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 8.80 9.60 10.40 11.20 12.00 12.80 13.60 14.40 15.20 16.00 16.80 17.60 18.40 19.20 20.00 20.80 21.60 22.40 23.20 24.00 24.80

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

25.60 26.40 27.20 28.00 28.80 29.60 30.40 30.40 31.20 32.00 32.80 33.60 34.40 35.20 36.00 36.80 37.60 38.40 39.20 40.00 40.80 41.60 42.40 43.20 44.00 44.80 45.60 46.40 47.20 48.00 48.80 49.60 50.40 51.20 52.00 52.80 53.60 54.40 55.20 56.00 56.80 57.60 58.40 59.20 60.00 60.80 60.80 61.60 62.40 63.20 64.00 64.80 65.60 66.40

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

67.20 68.00 68.80 69.60 70.40 71.20 72.00 72.80 73.60 74.40 75.20 -

-

75.2 m3

-

Stockpile

75.00 cu.m.

Volume (m ) 3

Cycle

Stockpile Running Total

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 8.80 9.60 10.40 11.20 12.00 12.80 13.60 14.40 15.20 16.00 16.80 17.60 18.40 19.20 20.00 20.80 21.60 22.40 23.20 24.00 24.80 25.60 26.40 27.20 28.00 28.80 29.60 30.40 30.40 31.20 32.00 32.80 33.60 34.40 35.20 36.00 36.80

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

37.60 38.40 39.20 40.00 40.80 41.60 42.40 43.20 44.00 44.80 45.60 46.40 47.20 48.00 48.80 49.60 50.40 51.20 52.00 52.80 53.60 54.40 55.20 56.00 56.80 57.60 58.40 59.20 60.00 60.80 60.80 61.60 62.40 63.20 64.00 64.80 65.60 66.40 67.20 68.00 68.80 69.60 70.40 71.20 72.00 72.80 73.60 74.40 75.20 -

-

-

-

-

75.2 m3

Stockpile

75.00 cu.m.

Volume (m ) 3

Cycle

Stockpile Running Total

1.00 0.80 0.80 0.80 0.80 0.80 0.80

1.00 1.80 2.60 3.40 4.20 5.00 5.80

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

6.60 7.40 8.20 9.00 9.80 10.60 11.40 12.20 13.00 13.80 14.60 15.40 16.20 17.00 17.80 18.60 19.40 20.20 21.00 21.80 22.60 23.40 24.20 25.00 25.80 26.60 27.40 28.20 29.00 29.80 30.60 30.60 31.40 32.20 33.00 33.80 34.60 35.40 36.20 37.00 37.80 38.60 39.40 40.20 41.00 41.80 42.60 43.40 44.20 45.00 45.80 46.60 47.40 48.20

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

49.00 49.80 50.60 51.40 52.20 53.00 53.80 54.60 55.40 56.20 57.00 57.80 58.60 59.40 60.20 61.00 61.00 61.80 62.60 63.40 64.20 65.00 65.80 66.60 67.40 68.20 69.00 69.80 70.60 71.40 72.20 73.00 73.80 74.60 75.40 -

-

-

-

-

75.4 m3

Stockpile

75.00 cu.m.

Volume (m3) Cycle

Stockpile Running Total

1.00 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

1.00 1.80 2.60 3.40 4.20 5.00 5.80 6.60 7.40 8.20 9.00 9.80 10.60 11.40 12.20 13.00 13.80 14.60 15.40 16.20 17.00 17.80 18.60

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

19.40 20.20 21.00 21.80 22.60 23.40 24.20 25.00 25.80 26.60 27.40 28.20 29.00 29.80 30.60 30.60 31.40 32.20 33.00 33.80 34.60 35.40 36.20 37.00 37.80 38.60 39.40 40.20 41.00 41.80 42.60 43.40 44.20 45.00 45.80 46.60 47.40 48.20 49.00 49.80 50.60 51.40 52.20 53.00 53.80 54.60 55.40 56.20 57.00 57.80 58.60 59.40 60.20 61.00

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

61.00 61.80 62.60 63.40 64.20 65.00 65.80 66.60 67.40 68.20 69.00 69.80 70.60 71.40 72.20 73.00 73.80 74.60 75.40 -

-

75.4 m3

-

Stockpile

75.00 cu.m.

Volume (m ) 3

Cycle

Stockpile Running Total

1.00 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

1.00 1.80 2.60 3.40 4.20 5.00 5.80 6.60 7.40 8.20 9.00 9.80 10.60 11.40 12.20 13.00 13.80 14.60 15.40 16.20 17.00 17.80 18.60 19.40 20.20 21.00 21.80 22.60 23.40 24.20 25.00 25.80 26.60 27.40 28.20 29.00 29.80 30.60 30.60

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

31.40 32.20 33.00 33.80 34.60 35.40 36.20 37.00 37.80 38.60 39.40 40.20 41.00 41.80 42.60 43.40 44.20 45.00 45.80 46.60 47.40 48.20 49.00 49.80 50.60 51.40 52.20 53.00 53.80 54.60 55.40 56.20 57.00 57.80 58.60 59.40 60.20 61.00 61.00 61.80 62.60 63.40 64.20 65.00 65.80 66.60 67.40 68.20 69.00 69.80 70.60 71.40 72.20 73.00

0.80 0.80 0.80 -

73.80 74.60 75.40 -

-

75.4 m3

-

PRODUCTIVITY CALCULATIONS Foundation Excavation Trial Excavation Area Parameter Segment Length Segment Width Depth of Excavation Area of Excavation Maximum Volume

BACKHOE

Excavation & Stockpiling

Quantity 26.00 8.00 2.00 40.00 80.00

Unit m m m sm m3

Remarks

10 Footings

Cap = 0.80 cu.m.

NORMAL SOIL Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption Productivity Rates Parameter Cut-Swing-Unload-Swing Area Covered / Position Volume / Position Excavation Duration / Position Number of Positions Total Excavation Duration

Backhoe Quantity

2.63 2.63 0.80 16.00

Quantity 60.00 4.00 8.00 0.17 10.00 1.67

Cap = 0.80 cu.m. Unit km/hr km/hr m3 li/hr

Unit secs m2 m3 hrs positions hrs

Excluding Travel

Time-Motion Table Activity

Maneuver Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

Rate

Manuever & Wait 0.17 -

Time Required (hours) Cut-Swing Load-Swing 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 -

Total Productivity

-

HARD SOIL Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption Productivity Rates Parameter Cut-Swing-Unload-Swing Area Covered / Position Volume / Position Excavation Duration / Position Number of Positions Total Excavation Duration

Backhoe Quantity

2.63 2.63 0.80 16.00

Quantity 95.00 4.00 8.00 0.26 10.00 2.64

Cap = 0.80 cu.m. Unit km/hr km/hr m3 li/hr

Unit secs m2 m3 hrs positions hrs

Excluding Travel

Time-Motion Table Activity

Maneuver Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

Rate

Manuever & Wait 0.17 -

Time Required (hours) Cut-Swing Load-Swing 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -

Total Productivity

ROCKY SOIL Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption Productivity Rates Parameter Cut-Swing-Unload-Swing Area Covered / Position Volume / Position Excavation Duration / Position Number of Positions

Backhoe Quantity

2.63 2.63 0.80 16.00

Quantity 135.00 4.00 8.00 0.38 10.00

Cap = 0.80 cu.m. Unit km/hr km/hr m3 li/hr

Unit secs m2 m3 hrs positions

-

Total Excavation Duration

3.75

hrs

Excluding Travel

Time-Motion Table Activity

Maneuver Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

Rate

Manuever & Wait 0.17 -

Time Required (hours) Cut-Swing Load-Swing 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing

-

0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 -

-

-

Total Productivity

BACKHOE

Cap = 1.00 cu.m.

NORMAL SOIL Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption Productivity Rates Parameter Cut-Swing-Unload-Swing Area Covered / Position Volume / Position Excavation Duration / Position Number of Positions Total Excavation Duration

Backhoe Quantity

2.63 2.63 1.00 16.00

Quantity 60.00 4.00 8.00 0.13 10.00 1.33

Cap = 1.00 cu.m. Unit km/hr km/hr m3 li/hr

Unit secs m2 m3 hrs positions hrs

Excluding Travel

Time-Motion Table Activity

Maneuver Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

Rate

Manuever & Wait 0.17 -

Time Required (hours) Cut-Swing Load-Swing 0.02 0.02 0.02 0.02 0.02 0.02

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 -

-

-

-

-

Total Productivity

HARD SOIL Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption Productivity Rates Parameter Cut-Swing-Unload-Swing Area Covered / Position Volume / Position Excavation Duration / Position Number of Positions Total Excavation Duration

Backhoe Quantity

2.63 2.63 1.00 16.00

Quantity 95.00 4.00 8.00 0.21 10.00 2.11

Cap = 1.00 cu.m. Unit km/hr km/hr m3 li/hr

Unit secs m2 m3 hrs positions hrs

Excluding Travel

Time-Motion Table Activity

Maneuver Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position

Rate

Manuever & Wait 0.17 -

Time Required (hours) Cut-Swing Load-Swing 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03

Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -

Total Productivity

ROCKY SOIL Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption

Backhoe Quantity

2.63 2.63 1.00 16.00

Cap = 1.00 cu.m. Unit km/hr km/hr m3 li/hr

-

Productivity Rates Parameter Cut-Swing-Unload-Swing Area Covered / Position Volume / Position Excavation Duration / Position Number of Positions Total Excavation Duration

Quantity 135.00 4.00 8.00 0.30 10.00 3.00

Unit secs m2 m3 hrs positions hrs

Excluding Travel

Time-Motion Table Activity

Maneuver Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

Rate

Manuever & Wait 0.17 -

Time Required (hours) Cut-Swing Load-Swing 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 -

Total Productivity

-

Case Description Case Description 15.00 Cut-Swing-Unload-Swing 25.00 Transfer Position 30.00 35.00 Maneuver

Remarks

Length: 2.00 m

Time Required (hours) Transfer Position

Width: 2.00 m

Stockpile Volume Time Required (minutes)

Total

0.02 -

0.17 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

10.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.06 1.00 1.00 1.00

Position

Cycle

8.00 cu.m. Volume (m

Position Running Total

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40

0.02 0.02 0.02 0.02 0.02 -

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.06 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.06 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.06 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.06 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.06 1.00 1.00

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60

0.02 0.02 0.02 -

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 -

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.06 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.06 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.06 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 -

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 -

-

1.99 40.16 m3/hr

-

-

31.06 80 m3

-

Time Required (hours) Transfer Position

Stockpile Volume Time Required (minutes)

Total

0.02 0.02 -

0.17 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03

10.00 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.06 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.06 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58

Position

Cycle

8.00 cu.m. Volume (m

Position Running Total

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40

0.02 0.02 0.02 0.02 0.02 -

0.03 0.03 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03

1.58 1.58 1.06 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.06 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.06 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.06 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.06 1.58 1.58 1.58 1.58 1.58 1.58 1.58

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60

0.02 0.02 -

0.03 0.03 0.03 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -

1.58 1.58 1.58 1.06 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.06 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 -

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 -

-

2.96 26.99 m3/hr

-

-

42.73 80 m3

-

Time Required (hours) Transfer Position

Stockpile Volume Time Required (minutes)

Total

0.02 0.02 0.02 0.02 -

0.17 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.02 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.02 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.02 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.02 0.04 0.04

10.00 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 1.06 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 1.06 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 1.06 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 1.06 2.25 2.25

Position

Cycle

8.00 cu.m. Volume (m

Position Running Total

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60

0.02 0.02 0.02 0.02 0.02 -

0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.02 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.02 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.02 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.02 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.02 0.04

2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 1.06 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 1.06 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 1.06 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 1.06 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 1.06 2.25

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80

-

0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 -

2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 -

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 -

-

-

-

4.08

-

56.06

19.63 m3/hr

Time Required (hours) Transfer Position -

80 m3

Stockpile Volume Time Required (minutes)

Total

0.17 0.02 0.02 0.02 0.02 0.02 0.02

-

10.00 1.00 1.00 1.00 1.00 1.00 1.00

Position

Cycle

8.00 cu.m. Volume (m

Position Running Total

1.00 0.80 0.80 0.80 0.80 0.80

1.00 1.80 2.60 3.40 4.20 5.00

0.02 0.02 0.02 0.02 0.02 -

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

1.00 1.00 1.00 1.00 1.06 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.06 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.06 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.06 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.06 1.00 1.00 1.00 1.00 1.00

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

5.80 6.60 7.40 8.20 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00

0.02 0.02 0.02 0.02 -

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 -

1.00 1.00 1.00 1.00 1.00 1.06 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.06 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.06 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.06 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 -

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 -

-

-

-

-

-

-

-

-

1.99

-

31.06

40.26 m3/hr

Time Required (hours) Transfer Position 0.02 0.02

80.2 m3

Stockpile Volume Time Required (minutes)

Total

0.17 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02

-

10.00 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.06 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.06

Position

Cycle

8.00 cu.m. Volume (m

Position Running Total

1.00 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

1.00 1.80 2.60 3.40 4.20 5.00 5.80 6.60 7.40 8.20 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 -

0.02 0.02 0.02 0.02 -

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03

1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.06 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.06 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.06 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.06 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00

0.02 0.02 0.02 -

0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 -

1.06 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.06 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.06 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 -

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 -

-

2.96 27.05 m3/hr

-

-

42.73 80.2 m3

-

Time Required (hours) Transfer Position

Stockpile Volume Time Required (minutes)

Total

0.02 0.02 0.02 -

0.17 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.02 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.02 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.02 0.04 0.04 0.04 0.04 0.04

10.00 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 1.06 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 1.06 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 1.06 2.25 2.25 2.25 2.25 2.25

Position

Cycle

8.00 cu.m. Volume (m

Position Running Total

1.00 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

1.00 1.80 2.60 3.40 4.20 5.00 5.80 6.60 7.40 8.20 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00

0.02 0.02 0.02 0.02 0.02 -

0.04 0.04 0.04 0.04 0.04 0.02 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.02 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.02 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.02 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.02 0.04 0.04 0.04 0.04

2.25 2.25 2.25 2.25 2.25 1.06 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 1.06 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 1.06 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 1.06 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 1.06 2.25 2.25 2.25 2.25

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20

0.02 -

0.04 0.04 0.04 0.04 0.04 0.04 0.02 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 -

2.25 2.25 2.25 2.25 2.25 2.25 1.06 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 -

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

4.00 4.80 5.60 6.40 7.20 8.00 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 -

-

4.08 19.68 m3/hr

-

-

56.06 80.2 m3

-

Description wing-Unload-Swing er Position

uver

Stockpile

80.00 cu.m.

Volume (m3) Cycle

Stockpile Running Total

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 8.00 8.80 9.60 10.40

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

11.20 12.00 12.80 13.60 14.40 15.20 16.00 16.00 16.80 17.60 18.40 19.20 20.00 20.80 21.60 22.40 23.20 24.00 24.00 24.80 25.60 26.40 27.20 28.00 28.80 29.60 30.40 31.20 32.00 32.00 32.80 33.60 34.40 35.20 36.00 36.80 37.60 38.40 39.20 40.00 40.00 40.80 41.60 42.40 43.20 44.00 44.80 45.60 46.40 47.20 48.00 48.00 48.80 49.60

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

50.40 51.20 52.00 52.80 53.60 54.40 55.20 56.00 56.00 56.80 57.60 58.40 59.20 60.00 60.80 61.60 62.40 63.20 64.00 64.00 64.80 65.60 66.40 67.20 68.00 68.80 69.60 70.40 71.20 72.00 72.00 72.80 73.60 74.40 75.20 76.00 76.80 77.60 78.40 79.20 80.00 -

-

80 m3

-

Stockpile

80.00 cu.m.

Volume (m ) 3

Cycle

Stockpile Running Total

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 8.00 8.80 9.60 10.40 11.20 12.00 12.80 13.60 14.40 15.20 16.00 16.00 16.80 17.60 18.40 19.20 20.00 20.80 21.60 22.40

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

23.20 24.00 24.00 24.80 25.60 26.40 27.20 28.00 28.80 29.60 30.40 31.20 32.00 32.00 32.80 33.60 34.40 35.20 36.00 36.80 37.60 38.40 39.20 40.00 40.00 40.80 41.60 42.40 43.20 44.00 44.80 45.60 46.40 47.20 48.00 48.00 48.80 49.60 50.40 51.20 52.00 52.80 53.60 54.40 55.20 56.00 56.00 56.80 57.60 58.40 59.20 60.00 60.80 61.60

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

62.40 63.20 64.00 64.00 64.80 65.60 66.40 67.20 68.00 68.80 69.60 70.40 71.20 72.00 72.00 72.80 73.60 74.40 75.20 76.00 76.80 77.60 78.40 79.20 80.00 -

-

80 m3

-

Stockpile

80.00 cu.m.

Volume (m ) 3

Cycle

Stockpile Running Total

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 8.00 8.80 9.60 10.40 11.20 12.00 12.80 13.60 14.40 15.20 16.00 16.00 16.80 17.60 18.40 19.20 20.00 20.80 21.60 22.40 23.20 24.00 24.00 24.80 25.60 26.40 27.20 28.00 28.80 29.60 30.40 31.20 32.00 32.00 32.80 33.60

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

34.40 35.20 36.00 36.80 37.60 38.40 39.20 40.00 40.00 40.80 41.60 42.40 43.20 44.00 44.80 45.60 46.40 47.20 48.00 48.00 48.80 49.60 50.40 51.20 52.00 52.80 53.60 54.40 55.20 56.00 56.00 56.80 57.60 58.40 59.20 60.00 60.80 61.60 62.40 63.20 64.00 64.00 64.80 65.60 66.40 67.20 68.00 68.80 69.60 70.40 71.20 72.00 72.00 72.80

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

73.60 74.40 75.20 76.00 76.80 77.60 78.40 79.20 80.00 -

-

-

80 m3

Stockpile

80.00 cu.m.

Volume (m ) 3

Cycle

Stockpile Running Total

1.00 0.80 0.80 0.80 0.80 0.80

1.00 1.80 2.60 3.40 4.20 5.00

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

5.80 6.60 7.40 8.20 8.20 9.00 9.80 10.60 11.40 12.20 13.00 13.80 14.60 15.40 16.20 16.20 17.00 17.80 18.60 19.40 20.20 21.00 21.80 22.60 23.40 24.20 24.20 25.00 25.80 26.60 27.40 28.20 29.00 29.80 30.60 31.40 32.20 32.20 33.00 33.80 34.60 35.40 36.20 37.00 37.80 38.60 39.40 40.20 40.20 41.00 41.80 42.60 43.40 44.20

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

45.00 45.80 46.60 47.40 48.20 48.20 49.00 49.80 50.60 51.40 52.20 53.00 53.80 54.60 55.40 56.20 56.20 57.00 57.80 58.60 59.40 60.20 61.00 61.80 62.60 63.40 64.20 64.20 65.00 65.80 66.60 67.40 68.20 69.00 69.80 70.60 71.40 72.20 72.20 73.00 73.80 74.60 75.40 76.20 77.00 77.80 78.60 79.40 80.20 -

-

-

-

-

80.2 m3

Stockpile

80.00 cu.m.

Volume (m ) 3

Cycle

Stockpile Running Total

1.00 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

1.00 1.80 2.60 3.40 4.20 5.00 5.80 6.60 7.40 8.20 8.20 9.00 9.80 10.60 11.40 12.20 13.00 13.80 14.60 15.40 16.20 16.20

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

17.00 17.80 18.60 19.40 20.20 21.00 21.80 22.60 23.40 24.20 24.20 25.00 25.80 26.60 27.40 28.20 29.00 29.80 30.60 31.40 32.20 32.20 33.00 33.80 34.60 35.40 36.20 37.00 37.80 38.60 39.40 40.20 40.20 41.00 41.80 42.60 43.40 44.20 45.00 45.80 46.60 47.40 48.20 48.20 49.00 49.80 50.60 51.40 52.20 53.00 53.80 54.60 55.40 56.20

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

56.20 57.00 57.80 58.60 59.40 60.20 61.00 61.80 62.60 63.40 64.20 64.20 65.00 65.80 66.60 67.40 68.20 69.00 69.80 70.60 71.40 72.20 72.20 73.00 73.80 74.60 75.40 76.20 77.00 77.80 78.60 79.40 80.20 -

-

80.2 m3

-

Stockpile

80.00 cu.m.

Volume (m3) Cycle

Stockpile Running Total

1.00 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

1.00 1.80 2.60 3.40 4.20 5.00 5.80 6.60 7.40 8.20 8.20 9.00 9.80 10.60 11.40 12.20 13.00 13.80 14.60 15.40 16.20 16.20 17.00 17.80 18.60 19.40 20.20 21.00 21.80 22.60 23.40 24.20 24.20 25.00 25.80 26.60 27.40 28.20

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

29.00 29.80 30.60 31.40 32.20 32.20 33.00 33.80 34.60 35.40 36.20 37.00 37.80 38.60 39.40 40.20 40.20 41.00 41.80 42.60 43.40 44.20 45.00 45.80 46.60 47.40 48.20 48.20 49.00 49.80 50.60 51.40 52.20 53.00 53.80 54.60 55.40 56.20 56.20 57.00 57.80 58.60 59.40 60.20 61.00 61.80 62.60 63.40 64.20 64.20 65.00 65.80 66.60 67.40

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

68.20 69.00 69.80 70.60 71.40 72.20 72.20 73.00 73.80 74.60 75.40 76.20 77.00 77.80 78.60 79.40 80.20 -

-

80.2 m3

-

PRODUCTIVITY CALCULATIONS Bulk Excavation Trial Excavation Area Parameter Segment Length Segment Width Depth of Cut Area of Excavation Maximum Volume

BACKHOE

(Excavation & Stockpiling)

Quantity 15.00 2.00 1.00 30.00 30.00

Unit m m m sm m3

Cap = 0.80 cu.m.

NORMAL SOIL Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption Productivity Rates Parameter Cut-Swing-Unload-Swing Area Covered / Position Volume / Position Excavation Duration / Position Number of Positions Total Excavation Duration

Backhoe Quantity

2.63 2.63 0.40 14.00

Quantity 35.00 4.00 4.00 0.10 8.00 0.78

Cap = 0.40 cu.m. Unit km/hr km/hr m3 li/hr

Unit secs m2 m3 hrs positions hrs

Excluding Travel

Time-Motion Table Activity

Maneuver Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

Rate

Manuever & Wait 0.17 -

Time Required (hours) Cut-Swing Load-Swing 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 -

Total Productivity

HARD SOIL

-

Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption Productivity Rates Parameter Cut-Swing-Unload-Swing Area Covered / Position Volume / Position Excavation Duration / Position Number of Positions Total Excavation Duration

Backhoe Quantity

2.63 2.63 0.40 14.00

Quantity 60.00 4.00 4.00 0.17 8.00 1.33

Cap = 0.40 cu.m. Unit km/hr km/hr m3 li/hr

Unit secs m2 m3 hrs positions hrs

Excluding Travel

Time-Motion Table Activity

Maneuver Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

Rate

Manuever & Wait 0.17 -

Time Required (hours) Cut-Swing Load-Swing 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 -

-

-

-

-

Total Productivity

ROCKY SOIL Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption Productivity Rates Parameter Cut-Swing-Unload-Swing Area Covered / Position Volume / Position Excavation Duration / Position Number of Positions Total Excavation Duration

Backhoe Quantity

2.63 2.63 0.40 14.00

Quantity 80.00 4.00 4.00 0.22 8.00 1.78

Cap = 0.40 cu.m. Unit km/hr km/hr m3 li/hr

Unit secs m2 m3 hrs positions hrs

Excluding Travel

Time-Motion Table Activity

Maneuver Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

Rate

Manuever & Wait 0.17 -

Time Required (hours) Cut-Swing Load-Swing 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 -

-

-

-

-

Total Productivity

BACKHOE

Cap = 0.50 cu.m.

NORMAL SOIL Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption Productivity Rates Parameter Cut-Swing-Unload-Swing Area Covered / Position Volume / Position Excavation Duration / Position Number of Positions Total Excavation Duration

Backhoe Quantity

2.63 2.63 0.50 14.00

Quantity 35.00 4.00 4.00 0.08 8.00 0.62

Cap = 0.50 cu.m. Unit km/hr km/hr m3 li/hr

Unit secs m2 m3 hrs positions hrs

Excluding Travel

Time-Motion Table Activity

Maneuver Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

Rate

Manuever & Wait 0.17 -

Time Required (hours) Cut-Swing Load-Swing 0.01 0.01 0.01 0.01 0.01 0.01 0.01

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 -

-

-

-

-

Total Productivity

HARD SOIL Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption Productivity Rates Parameter Cut-Swing-Unload-Swing Area Covered / Position Volume / Position Excavation Duration / Position Number of Positions Total Excavation Duration

Backhoe Quantity

2.63 2.63 0.50 14.00

Quantity 60.00 4.00 4.00 0.13 8.00 1.07

Cap = 0.50 cu.m. Unit km/hr km/hr m3 li/hr

Unit secs m2 m3 hrs positions hrs

Excluding Travel

Time-Motion Table Activity

Maneuver Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing

Rate

Manuever & Wait 0.17 -

Time Required (hours) Cut-Swing Load-Swing 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position

-

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 -

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.02 0.02 0.02 0.02 0.02 -

Total Productivity

ROCKY SOIL Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption

Backhoe Quantity

2.63 2.63 0.50 14.00

Cap = 0.50 cu.m. Unit km/hr km/hr m3 li/hr

-

Productivity Rates Parameter Cut-Swing-Unload-Swing Area Covered / Position Volume / Position Excavation Duration / Position Number of Positions Total Excavation Duration

Quantity 80.00 4.00 4.00 0.18 8.00 1.42

Unit secs m2 m3 hrs positions hrs

Excluding Travel

Time-Motion Table Activity

Maneuver Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

Rate

Manuever & Wait 0.17 -

Time Required (hours) Cut-Swing Load-Swing 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Transfer Position Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing Cut-Swing-Unload-Swing

-

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 -

-

-

Total Productivity

-

Case Description Case Description 15.00 Cut-Swing-Unload-Swing 25.00 Transfer Position 30.00 35.00 Maneuver

Time Required (hours) Transfer Position

Stockpile Volume Time Required (minutes)

Total

0.00 -

0.17 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.01 0.01 0.01 0.01

10.00 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.04 0.58 0.58 0.58 0.58

Position

Cycle

4.00 cu.m. Volume (m

Position Running Total

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60

0.00 0.00 0.00 0.00 0.00 -

0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.01 0.01 0.01

0.58 0.58 0.58 0.58 0.58 0.58 0.04 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.04 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.04 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.04 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.04 0.58 0.58 0.58

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20

0.00 -

0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.01 -

0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.04 0.58 0.58 0.58 0.58 0.58 -

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 -

1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 -

-

0.90 33.30 m3/hr

-

-

21.71 30 m3

-

Time Required (hours) Transfer Position

Stockpile Volume Time Required (minutes)

Total

0.00 0.00 -

0.17 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

10.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.04 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.04 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Position

Cycle

4.00 cu.m. Volume (m

Position Running Total

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60

0.00 0.00 0.00 0.00 0.00 -

0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 -

1.00 0.04 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.04 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.04 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.04 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.04 1.00 1.00 1.00 1.00 1.00 -

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 -

4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 -

-

-

-

-

-

-

1.42 21.10 m3/hr

-

-

30.04 30 m3

-

Time Required (hours) Transfer Position

Stockpile Volume Time Required (minutes)

Total

0.00 0.00 0.00 0.00 -

0.17 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02

10.00 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 0.04 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 0.04 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 0.04 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 0.04 1.33 1.33 1.33

Position

Cycle

4.00 cu.m. Volume (m

Position Running Total

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20

0.00 0.00 0.00 -

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 -

1.33 1.33 1.33 1.33 1.33 1.33 1.33 0.04 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 0.04 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 0.04 1.33 1.33 1.33 1.33 1.33 -

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 -

1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 -

-

-

-

-

-

-

-

-

1.84

-

36.71

16.32 m3/hr

Time Required (hours) Transfer Position -

30 m3

Stockpile Volume Time Required (minutes)

Total

0.17 0.01 0.01 0.01 0.01 0.01 0.01 0.01

-

10.00 0.58 0.58 0.58 0.58 0.58 0.58 0.58

Position

Cycle

4.00 cu.m. Volume (m

Position Running Total

0.50 0.40 0.40 0.40 0.40 0.40 0.40

0.50 0.90 1.30 1.70 2.10 2.50 2.90

0.00 0.00 0.00 0.00 0.00 -

0.01 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.01 0.01

0.58 0.58 0.58 0.04 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.04 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.04 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.04 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.04 0.58 0.58 0.58 0.58 0.58 0.58

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

3.30 3.70 4.10 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40

0.00 0.00 -

0.01 0.01 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.01 -

0.58 0.58 0.58 0.58 0.04 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.04 0.58 0.58 0.58 0.58 0.58 -

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 -

2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 -

-

-

-

-

-

-

-

-

0.90

-

21.71

33.41 m3/hr

Time Required (hours) Transfer Position 0.00 0.00 -

30.1 m3

Stockpile Volume Time Required (minutes)

Total

0.17 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02

-

10.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.04 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.04 1.00

Position

Cycle

4.00 cu.m. Volume (m

Position Running Total

0.50 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

0.50 0.90 1.30 1.70 2.10 2.50 2.90 3.30 3.70 4.10 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40

0.00 0.00 0.00 0.00 0.00

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.04 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.04 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.04 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.04 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.04

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 -

0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 -

-

0.02 0.02 0.02 0.02 0.02 -

1.00 1.00 1.00 1.00 1.00 -

0.40 0.40 0.40 0.40 0.40 -

0.40 0.80 1.20 1.60 2.00 -

-

1.42 21.17 m3/hr

-

-

30.04 30.1 m3

-

Time Required (hours) Transfer Position

Stockpile Volume Time Required (minutes)

Total

0.00 0.00 0.00 -

0.17 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02

10.00 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 0.04 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 0.04 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 0.04 1.33 1.33 1.33 1.33 1.33 1.33

Position

Cycle

4.00 cu.m. Volume (m

Position Running Total

0.50 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

0.50 0.90 1.30 1.70 2.10 2.50 2.90 3.30 3.70 4.10 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40

0.00 0.00 0.00 0.00 -

0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.00 0.02 0.02 0.02 0.02 0.02 -

1.33 1.33 1.33 1.33 0.04 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 0.04 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 0.04 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33 0.04 1.33 1.33 1.33 1.33 1.33 -

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 -

2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 0.40 0.80 1.20 1.60 2.00 -

-

-

-

-

-

-

1.84 16.37 m3/hr

-

-

36.71 30.1 m3

-

Stockpile

30.00 cu.m.

Volume (m3) Cycle

Stockpile Running Total

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 4.00 4.40 4.80 5.20 5.60

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

6.00 6.40 6.80 7.20 7.60 8.00 8.00 8.40 8.80 9.20 9.60 10.00 10.40 10.80 11.20 11.60 12.00 12.00 12.40 12.80 13.20 13.60 14.00 14.40 14.80 15.20 15.60 16.00 16.00 16.40 16.80 17.20 17.60 18.00 18.40 18.80 19.20 19.60 20.00 20.00 20.40 20.80 21.20 21.60 22.00 22.40 22.80 23.20 23.60 24.00 24.00 24.40 24.80 25.20

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 -

25.60 26.00 26.40 26.80 27.20 27.60 28.00 28.00 28.40 28.80 29.20 29.60 30.00 -

-

30 m3

-

Stockpile

30.00 cu.m.

Volume (m ) 3

Cycle

Stockpile Running Total

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 4.00 4.40 4.80 5.20 5.60 6.00 6.40 6.80 7.20 7.60 8.00 8.00 8.40 8.80 9.20 9.60 10.00 10.40 10.80 11.20 11.60

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 -

12.00 12.00 12.40 12.80 13.20 13.60 14.00 14.40 14.80 15.20 15.60 16.00 16.00 16.40 16.80 17.20 17.60 18.00 18.40 18.80 19.20 19.60 20.00 20.00 20.40 20.80 21.20 21.60 22.00 22.40 22.80 23.20 23.60 24.00 24.00 24.40 24.80 25.20 25.60 26.00 26.40 26.80 27.20 27.60 28.00 28.00 28.40 28.80 29.20 29.60 30.00 -

-

-

-

30 m3

-

Stockpile

30.00 cu.m.

Volume (m ) 3

Cycle

Stockpile Running Total

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 4.00 4.40 4.80 5.20 5.60 6.00 6.40 6.80 7.20 7.60 8.00 8.00 8.40 8.80 9.20 9.60 10.00 10.40 10.80 11.20 11.60 12.00 12.00 12.40 12.80 13.20 13.60 14.00 14.40 14.80 15.20 15.60 16.00 16.00 16.40 16.80 17.20

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 -

17.60 18.00 18.40 18.80 19.20 19.60 20.00 20.00 20.40 20.80 21.20 21.60 22.00 22.40 22.80 23.20 23.60 24.00 24.00 24.40 24.80 25.20 25.60 26.00 26.40 26.80 27.20 27.60 28.00 28.00 28.40 28.80 29.20 29.60 30.00 -

-

-

-

-

30 m3

Stockpile

30.00 cu.m.

Volume (m ) 3

Cycle

Stockpile Running Total

0.50 0.40 0.40 0.40 0.40 0.40 0.40

0.50 0.90 1.30 1.70 2.10 2.50 2.90

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

3.30 3.70 4.10 4.10 4.50 4.90 5.30 5.70 6.10 6.50 6.90 7.30 7.70 8.10 8.10 8.50 8.90 9.30 9.70 10.10 10.50 10.90 11.30 11.70 12.10 12.10 12.50 12.90 13.30 13.70 14.10 14.50 14.90 15.30 15.70 16.10 16.10 16.50 16.90 17.30 17.70 18.10 18.50 18.90 19.30 19.70 20.10 20.10 20.50 20.90 21.30 21.70 22.10 22.50

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 -

22.90 23.30 23.70 24.10 24.10 24.50 24.90 25.30 25.70 26.10 26.50 26.90 27.30 27.70 28.10 28.10 28.50 28.90 29.30 29.70 30.10 -

-

-

-

-

30.1 m3

Stockpile

30.00 cu.m.

Volume (m3) Cycle

Stockpile Running Total

0.50 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

0.50 0.90 1.30 1.70 2.10 2.50 2.90 3.30 3.70 4.10 4.10 4.50 4.90 5.30 5.70 6.10 6.50 6.90 7.30 7.70 8.10 8.10 8.50

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 -

8.90 9.30 9.70 10.10 10.50 10.90 11.30 11.70 12.10 12.10 12.50 12.90 13.30 13.70 14.10 14.50 14.90 15.30 15.70 16.10 16.10 16.50 16.90 17.30 17.70 18.10 18.50 18.90 19.30 19.70 20.10 20.10 20.50 20.90 21.30 21.70 22.10 22.50 22.90 23.30 23.70 24.10 24.10 24.50 24.90 25.30 25.70 26.10 26.50 26.90 27.30 27.70 28.10 28.10

0.40 0.40 0.40 0.40 0.40 -

28.50 28.90 29.30 29.70 30.10 -

-

30.1 m3

-

Stockpile

30.00 cu.m.

Volume (m ) 3

Cycle

Stockpile Running Total

0.50 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

0.50 0.90 1.30 1.70 2.10 2.50 2.90 3.30 3.70 4.10 4.10 4.50 4.90 5.30 5.70 6.10 6.50 6.90 7.30 7.70 8.10 8.10 8.50 8.90 9.30 9.70 10.10 10.50 10.90 11.30 11.70 12.10 12.10 12.50 12.90 13.30 13.70 14.10 14.50

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 -

14.90 15.30 15.70 16.10 16.10 16.50 16.90 17.30 17.70 18.10 18.50 18.90 19.30 19.70 20.10 20.10 20.50 20.90 21.30 21.70 22.10 22.50 22.90 23.30 23.70 24.10 24.10 24.50 24.90 25.30 25.70 26.10 26.50 26.90 27.30 27.70 28.10 28.10 28.50 28.90 29.30 29.70 30.10 -

-

-

-

30.1 m3

-

PRODUCTIVITY CALCULATIONS Trench Backfilling - Backhoe Trial Strip

Parameter Segment Length Segment Width Thickness Area of Embankment Volume Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Swing Bucket Cycle Lower - Load Bucket Cycle Swing / Unload Bucket Cycle Fuel Consumption

Quantity 50.00 5.00 0.25 250.00 62.50 Backhoe Excavation Quantity

2.63 2.63 0.40 8.00 13.00 8.00 16.00

Time-Motion Table Activity

Maneuver & Waiting Time Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty

Rate

Unit m m m sm m3 Cap = 0.40 cu.m. Vol = 5.00 cu.m. Unit km/hr km/hr m3 secs secs secs li/hr

Time Required hrs

0.167 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 -

0.73 0.73

Excavation Volume Time Required minutes

10.00 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 -

Total

0.27

Productivity

18.42 m3/hr

Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Swing Bucket Cycle Lower - Load Bucket Cycle Swing / Unload Bucket Cycle Fuel Consumption

Backhoe Quantity

2.63 2.63 0.50 10.00 16.00 10.00 16.00

Time-Motion Table Activity

Maneuver & Waiting Time Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing

Total Productivity

16.28

Rate

Cap = 0.50 cu.m. Unit km/hr km/hr m3 secs secs secs li/hr

Time Required hrs

0.73 0.73

Excavation Volume Time Required minutes

0.167 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 -

10.00 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 -

0.27

16.00

18.75 m3/hr

m/s m/s

Excavation Volume = Volume (m3)

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 -

5.00 cu.m. Running Volume (m3)

0.40 0.80 1.20 1.60 2.00 2.40 2.80 3.20 3.60 4.00 4.40 4.80 5.20 5.20 5.20 5.20 5.20 5.20 5.20 5.20 5.20

m/s m/s

Excavation Volume = Volume (m3)

0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 -

5.00 cu.m. Running Volume (m3)

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

PRODUCTIVITY CALCULATIONS Foundation Backfilling - Backhoe Trial Strip

Parameter Segment Length Segment Width Thickness Area of Embankment Volume Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Swing Bucket Cycle Lower - Load Bucket Cycle Swing / Unload Bucket Cycle Fuel Consumption

Quantity 50.00 5.00 0.25 250.00 62.50 Backhoe Excavation Quantity

2.63 2.63 0.80 8.00 13.00 8.00 16.00

Time-Motion Table Activity

Maneuver & Waiting Time Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty

Rate

Unit m m m sm m3 Cap = 0.80 cu.m. Vol = 5.00 cu.m. Unit km/hr km/hr m3 secs secs secs li/hr

Time Required hrs

0.167 0.008 0.008 0.008 0.008 0.008 0.008 0.008 -

0.73 0.73

Excavation Volume Time Required minutes

10.00 0.48 0.48 0.48 0.48 0.48 0.48 0.48 -

Total

0.22

Productivity

22.42 m3/hr

Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Swing Bucket Cycle Lower - Load Bucket Cycle Swing / Unload Bucket Cycle Fuel Consumption

Backhoe Quantity

2.63 2.63 1.00 10.00 16.00 10.00 16.00

Time-Motion Table Activity

Maneuver & Waiting Time Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing

Total Productivity

13.38

Rate

Cap = 1.00 cu.m. Unit km/hr km/hr m3 secs secs secs li/hr

Time Required hrs

0.73 0.73

Excavation Volume Time Required minutes

0.167 0.010 0.010 0.010 0.010 0.010 -

10.00 0.60 0.60 0.60 0.60 0.60 -

0.22

13.00

23.08 m3/hr

m/s m/s

Excavation Volume = Volume (m3)

0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

5.00 cu.m. Running Volume (m3)

0.80 1.60 2.40 3.20 4.00 4.80 5.60 5.60 5.60 5.60 5.60 5.60 5.60 5.60 5.60 5.60 5.60 5.60 5.60 5.60 5.60

m/s m/s

Excavation Volume = Volume (m3)

1.00 1.00 1.00 1.00 1.00 -

5.00 cu.m. Running Volume (m3)

1.00 2.00 3.00 4.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

PRODUCTIVITY CALCULATIONS Loading from Stockpile - Loader Trial Strip

Parameter Segment Length Segment Width Thickness Area of Embankment Volume Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Dig - Raise Cycle Reverse-Forward Cycle Dump - Lower Empty Cycle Fuel Consumption

Quantity 50.00 5.00 0.25 250.00 62.50 Loader 100HP Dump Truck Quantity 6.40 7.70 1.50 16.40 10.30 5.50 15.00

Cap = 1.50 cu.m. ### Unit km/hr km/hr m3 secs secs secs li/hr

Rate

Time Required hrs

Time-Motion Table Activity

Maneuver & Waiting Time Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty

Unit m m m sm m3

0.167 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 -

1.78 2.14

Dump Truck Capacity Time Required minutes

10.00 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 -

Total

0.26

Productivity

58.57 m3/hr

Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Dig - Raise Cycle Reverse-Forward Cycle Dump - Lower Empty Cycle Fuel Consumption

Loader 117HP Quantity 7.10 7.80 2.40 16.60 9.69 5.20 19.00

Time-Motion Table Activity

Maneuver & Waiting Time Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty

Total Productivity

15.37

Rate

Cap = 2.40 cu.m. Unit km/hr km/hr m3 secs secs secs li/hr

Time Required hrs

1.97 2.17

Dump Truck Capacity Time Required minutes

0.167 0.009 0.009 0.009 0.009 0.009 0.009 0.009 -

10.00 0.52 0.52 0.52 0.52 0.52 0.52 0.52 -

0.23

13.67

65.82 m3/hr

m/s m/s

Dump Truck Capacity = Volume (m3)

1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 -

15.00 cu.m. Running Volume (m3)

1.50 3.00 4.50 6.00 7.50 9.00 10.50 12.00 13.50 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00

m/s m/s

Dump Truck Capacity = Volume (m3)

2.40 2.40 2.40 2.40 2.40 2.40 2.40 -

15.00 cu.m. Running Volume (m3)

2.40 4.80 7.20 9.60 12.00 14.40 16.80 16.80 16.80 16.80 16.80 16.80 16.80 16.80 16.80 16.80 16.80 16.80 16.80 16.80 16.80

PRODUCTIVITY CALCULATIONS Loading from Stockpile - Backhoe Trial Strip

Parameter Segment Length Segment Width Thickness Area of Embankment Volume Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Swing Bucket Cycle Lower - Load Bucket Cycle Swing / Unload Bucket Cycle Fuel Consumption

Quantity 50.00 5.00 0.25 250.00 62.50 Backhoe Dump Truck Quantity 2.63 2.63 0.80 10.00 15.00 10.00 16.00

Cap = 0.80 cu.m. ### Unit km/hr km/hr m3 secs secs secs li/hr

Rate

Time Required hrs

Time-Motion Table Activity

Maneuver & Waiting Time Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty

Unit m m m sm m3

0.167 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 -

0.73 0.73

Dump Truck Capacity Time Required minutes

10.00 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 -

Total

0.35

Productivity

42.69 m3/hr

Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Swing Bucket Cycle Lower - Load Bucket Cycle Swing / Unload Bucket Cycle Fuel Consumption

Backhoe Quantity

2.63 2.63 1.00 12.00 18.00 12.00 16.00

Time-Motion Table Activity

Maneuver & Waiting Time Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing Dig-Swing-Unload-Swing

Total Productivity

21.08

Rate

Cap = 1.00 cu.m. Unit km/hr km/hr m3 secs secs secs li/hr

Time Required hrs

0.73 0.73

Dump Truck Capacity Time Required minutes

0.167 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 -

10.00 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 -

0.34

20.50

43.90 m3/hr

m/s m/s

Dump Truck Capacity = Volume (m3)

0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 -

15.00 cu.m. Running Volume (m3)

0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 7.20 8.00 8.80 9.60 10.40 11.20 12.00 12.80 13.60 14.40 15.20 15.20 15.20

m/s m/s

Dump Truck Capacity = Volume (m3)

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 -

15.00 cu.m. Running Volume (m3)

1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00

PRODUCTIVITY CALCULATIONS Soil Hauling by Dump Truck

Equipment Specifications Parameter Loaded Speed Empty Speed Load Capacity Fuel Consumption

Dump Truck Quantity 40.00 60.00 15.00 15.00

Unit km/hr km/hr m3 li/hr

###

LOADING BY BACKHOE AHD = Time-Motion Table Activity

5.000 km(s) Time Required hrs

Rate

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

40.00

60.00

Total Productivity

AHD= 5.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

0.08 0.35 0.13 0.08 0.03 0.08

5.00 21.08 7.50 5.00 2.00 5.00

0.76

45.58

19.74 m3/hr

7.000 km(s) Time Required hrs

Rate

40.00

60.00

Total Productivity

Time Required minutes

AHD= 7.000 km(s)

Time Required minutes

0.08 0.35 0.18 0.08 0.03 0.12

5.00 21.08 10.50 5.00 2.00 7.00

0.84

50.58

17.79 m3/hr

AHD = Time-Motion Table Activity

10.000 km(s) Time Required hrs

Rate

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

40.00

60.00

Total Productivity

AHD= 10.000 km(s)

AHD = Time-Motion Table Activity

40.00

60.00

AHD= 15.000 km(s)

Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

5.00 21.08 15.00 5.00 2.00 10.00

0.97

58.08

15.49 m3/hr

Time Required hrs

Rate

Total

AHD = Time-Motion Table

0.08 0.35 0.25 0.08 0.03 0.17

15.000 km(s)

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

Productivity

Time Required minutes

Time Required minutes

0.08 0.35 0.38 0.08 0.03 0.25

5.00 21.08 22.50 5.00 2.00 15.00

1.18

70.58

12.75 m3/hr

20.000 km(s) Time Required hrs

Rate

40.00

60.00

0.08 0.35 0.50 0.08 0.03 0.33

Time Required minutes

5.00 21.08 30.00 5.00 2.00 20.00

Total Productivity

1.38 AHD= 20.000 km(s)

AHD = Time-Motion Table Activity

Time Required hrs

Rate

40.00

60.00

Total AHD= 25.000 km(s)

AHD = Time-Motion Table Activity

Time Required minutes

0.08 0.35 0.63 0.08 0.03 0.42

5.00 21.08 37.50 5.00 2.00 25.00

1.59

95.58

9.42 m3/hr

30.000 km(s) Time Required hrs

Rate

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

40.00

60.00

Total Productivity

10.83 m3/hr

25.000 km(s)

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

Productivity

83.08

AHD= 30.000 km(s)

Time Required minutes

0.08 0.35 0.75 0.08 0.03 0.50

5.00 21.08 45.00 5.00 2.00 30.00

1.80

108.08

8.33 m3/hr

LOADING BY WHEEL LOADER AHD = Time-Motion Table Activity

Maneuver & Wait

5.000 km(s)

Rate

Time Required hrs

0.08

Time Required minutes

5.00

Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

40.00

60.00

Total Productivity

AHD= 5.000 km(s)

AHD = Time-Motion Table Activity

40.00

60.00

AHD= 7.000 km(s)

Activity

Rate

40.00

60.00

AHD= 10.000 km(s)

Activity

22.58 m3/hr

Time Required minutes

0.08 0.26 0.18 0.08 0.03 0.12

5.00 15.37 10.50 5.00 2.00 7.00

0.75

44.87

20.06 m3/hr

Time Required hrs

Total

AHD = Time-Motion Table

39.87

10.000 km(s)

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

Productivity

0.66

Time Required hrs

Rate

Total

AHD = Time-Motion Table

15.37 7.50 5.00 2.00 5.00

7.000 km(s)

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

Productivity

0.26 0.13 0.08 0.03 0.08

Time Required minutes

0.08 0.26 0.35 0.08 0.03 0.17

5.00 15.37 21.08 5.00 2.00 10.00

0.97

58.45

15.40 m3/hr

15.000 km(s)

Rate

Time Required

Time Required

Activity

Rate

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

hrs

40.00

60.00

Total Productivity

AHD= 15.000 km(s)

AHD = Time-Motion Table Activity

Rate

40.00

60.00

AHD= 20.000 km(s)

Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

1.08

64.87

13.87 m3/hr

Time Required minutes

0.08 0.26 0.50 0.08 0.03 0.33

5.00 15.37 30.00 5.00 2.00 20.00

1.29

77.37

11.63 m3/hr

25.000 km(s) Time Required hrs

Rate

40.00

60.00

Total Productivity

5.00 15.37 22.50 5.00 2.00 15.00

Time Required hrs

Total

AHD = Time-Motion Table

0.08 0.26 0.38 0.08 0.03 0.25

20.000 km(s)

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

Productivity

minutes

AHD= 25.000 km(s)

Time Required minutes

0.08 0.26 0.63 0.08 0.03 0.42

5.00 15.37 37.50 5.00 2.00 25.00

1.50

89.87

10.01 m3/hr

AHD = Time-Motion Table

30.000 km(s)

Activity

Time Required hrs

Rate

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

40.00

60.00

Total Productivity

AHD= 30.000 km(s)

Time Required minutes

0.08 0.26 0.75 0.08 0.03 0.50

5.00 15.37 45.00 5.00 2.00 30.00

1.71

102.37

8.79 m3/hr

FREE HAUL - LOADING BY BACKHOE AHD = Time-Motion Table Activity

1.000 km(s) Time Required hrs

Rate

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

40.00

60.00

Total Productivity

AHD= 1.000 km(s)

Time Required minutes

0.08 0.35 0.03 0.08 0.03 0.02

5.00 21.08 1.50 5.00 2.00 1.00

0.59

35.58

25.29 m3/hr

FREE HAUL - LOADING BY WHEEL LOADER AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading

1.000 km(s)

Rate

Time Required hrs

0.08 0.26

Time Required minutes

5.00 15.37

Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

40.00

60.00

Total Productivity

AHD= 1.000 km(s)

0.03 0.08 0.03 0.02

1.50 5.00 2.00 1.00

0.50

29.87

30.13 m3/hr

PRODUCTIVITY CALCULATIONS Quarrying Related Productivities Ground Cutting (Excavation & Stockpiling)

Bulldozer D7 Backhoe Backhoe Soil Hauling by Dump Truck Dump Truck Speed Loaded 40.00 AHD= Speed Empty 60.00 AHD= Time to Dump 0.03 AHD= AHD= AHD= AHD= AHD= Trial Strip Parameter Quantity Unit Length 12.50 m Width 10.00 m Cut Depth 0.50 m Area 125.00 sm Volume 62.50 m3 AHD 10.00 km(s)

88.24 m3/hr 55.86 m3/hr 56.01 m3/hr

Cap = 0.80 cu.m. Cap = 1.00 cu.m. Cap = 15.00 cu.m.

19.74 17.79 15.49 12.75 10.83 9.42 8.33

5.000 km(s) 7.000 km(s) 10.000 km(s) 15.000 km(s) 20.000 km(s) 25.000 km(s) 30.000 km(s)

Bulldozer Productivity : Work Item Clearing/Pushing Clearing/Pushing Clearing/Pushing Clearing/Pushing

Backhoe 88.24 m3/hr

Volume

Time Needed

Time Elapsed

0.36 0.18 0.18 0.18

0.36 0.54 0.71 0.89

31.500 cu m 15.750 cu m 15.750 cu m 15.750 cu m

Productivity : Work Item Wait Dig/Swing/Load Dig/Swing/Load Dig/Swing/Load Dig/Swing/Load Wait Dig/Swing/Load

78.750 cu m Dumptruck 2 Productivity : Work Item Wait Wait Wait (Loading) Haul & Dump

15.000 cu m

Time Needed

Time Elapsed

0.36 0.28 0.28 0.45

0.36 0.64 0.92 1.37 1.37

Wait Wait Wait Wait (Loading) Haul & Dump

2.02

Quarry Productivity

Total Time Elapsed Legend:

Dumptruck 1 56.01 m3/hr

Volume

Time Needed

15.750 cu m

0.36 0.28 0.28 0.28 0.28 (0.39) 0.28

78.750 cu m

44.67

15.750 cu m 15.750 cu m 15.750 cu m 15.750 cu m

Time Elapsed 0.36 0.64 0.92 1.20 1.48 1.09 1.76

Productivity : Work Item Wait Wait (Loading) Haul & Dump Wait Wait (Loading) Haul & Dump Return

AHD= 10.00 km(s)

Volume

15.49 m3/hr

15.000 cu m

Activities OVERLAPPED by LATER Activities of other Equipment. Second Load Carry Over to SUMMARY SHEET

Time Elapsed

0.36 0.28 0.45

0.36 0.64 1.09 1.09 1.48 1.76 1.97 2.02

0.39 0.28 0.21 0.05

15.000 cu m

Dumptruck 4

Time Needed

Time Elapsed

Productivity : Work Item

0.36 0.28 0.28 0.28 0.45

0.36 0.64 0.92 1.20 1.65 1.65

Wait Wait Wait Wait Wait (Loading) Haul & Dump

AHD= 10.00 km(s)

Volume

15.49 m3/hr

Time Needed

15.000 cu m

Dumptruck 3 Productivity : Work Item

AHD= 10.00 km(s)

Volume

m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr

15.49 m3/hr

38.93 m3/hr

AHD= 10.00 km(s)

Volume

15.000 cu m

Time Elapsed

0.36 0.28 0.28 0.28 0.28 0.45

0.36 0.64 0.92 1.20 1.48 1.93 1.93

Quarry Productivity Bull Dozer Productivity Backhoe Productivity Dump Truck

15.49 m3/hr

Time Needed

311.41 m3/day 88.24 m3/hr 38.93 m3/hr 38.93 m3/hr

PRODUCTIVITY CALCULATIONS Pavement Breaking Pavement Breaking

Asphalt

Trial Strip

Parameter Segment Length Segment Width Pavement Thickness Area of Embankment Volume Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption

Thickness = 50.00 mm

Quantity 50.00 3.00 0.05 150.00 7.50

Unit m m m sm m3

Backhoe w/ Breaker Quantity 2.63 2.63 0.80 16.00

Unit km/hr km/hr m3 li/hr

Productivity Rates - Breaking Breaker Penetration Rate Duration per Breaking Stroke Swing-Lower/Raise-Swing Cycle Area Covered / Penetration Direct Area Breaking Rate Area Covered / Position Duration per Position Number of Positions Total Duration (Breaking)

6.00 21.60 0.002 35.00 0.80 345.60 18.75 0.06 8.00 0.51

mm/sec m/hr hrs secs m2 m2/hr m2 hrs positions hrs

Excluding Travel

0.28 35.00 28.80 18.75 0.94 0.03 8.00 0.26

m3 secs m3/hr m2 m3 hrs positions hrs

Excluding Travel

Productivity Rates - Scraping & Loading Volume / Digging Stroke Swing-Scrape-Swing-Load Cycle Scraping - Loading Rate Area Covered / Position Volume Covered / Position Duration per Position Number of Positions Total Duration (Scraping & Loading) Time-Motion Table Activity

Breaking

Rate

Time Required hrs

Time Required minutes

Fix Breaker, Maneuver, Wait Moving Forward, Positioning Breaking Fix Bucket, Maneuver, Wait

1.25 0.82 0.51 1.25

75.00 49.14 30.71 75.00

Scraping & Loading Debris Manuever, Wait Moving Forward, Positioning Scraping & Loading Debris Manuever, Wait

0.75 0.82 0.26 0.75

45.00 49.14 15.63 45.00

6.41

384.62

Total Productivity

1.17 m3/hr

Productivity

23.40 m2/hr

Pavement Breaking

Asphalt

Trial Strip

Parameter Segment Length Width Pavement Thickness Area of Embankment Volume Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption

Thickness = 75.00 mm

Quantity 50.00 3.00 0.08 150.00 11.25

Unit m m m sm m3

Backhoe w/ Breaker Quantity 2.63 2.63 0.80 16.00

Unit km/hr km/hr m3 li/hr

Productivity Rates - Breaking Breaker Penetration Rate Duration per Breaking Stroke Swing-Lower/Raise-Swing Cycle Area Covered / Penetration Direct Area Breaking Rate Area Covered / Position Duration per Position Number of Positions Total Duration (Breaking) Productivity Rates - Scraping & Loading Volume / Digging Stroke

6.00 21.60 0.003 35.00 0.80 230.40 18.75 0.09 8.00 0.73

0.28

mm/sec m/hr hrs secs m2 m2/hr m2 hrs positions hrs

m3

Excluding Travel

Swing-Scrape-Swing-Load Cycle Scraping - Loading Rate Area Covered / Position Volume Covered / Position Duration per Position Number of Positions Total Duration (Scraping & Loading)

35.00 28.80 18.75 1.41 0.05 8.00 0.39

Time-Motion Table Activity

secs m3/hr m2 m3 hrs positions hrs

Time Required hrs

Rate

Excluding Travel

Time Required minutes

Breaking Change Attach., Maneuver, Wait Moving Forward, Positioning Breaking Change Attach., Maneuver, Wait

1.25 0.82 0.73 1.25

75.00 49.14 43.73 75.00

Scraping & Loading Debris Manuever, Wait Moving Forward, Positioning

0.75 0.82

45.00 49.14

6.76

405.45

Total Productivity

1.66 m3/hr

Productivity

22.20 m2/hr

Pavement Breaking Trial Strip

Parameter Segment Length Width Pavement Thickness Area of Embankment Volume Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption Productivity Rates - Breaking Breaker Penetration Rate

Concrete

Thickness = 150.00 mm

Quantity 50.00 3.00 0.15 150.00 22.50

Unit m m m sm m3

Backhoe w/ Breaker Quantity 2.63 2.63 0.80 16.00

Unit km/hr km/hr m3 li/hr

3.50 12.60

mm/sec m/hr

Duration per Breaking Stroke Swing-Lower/Raise-Swing Cycle Area Covered / Penetration Direct Area Breaking Rate Area Covered / Position Duration per Position Number of Positions Total Duration (Breaking)

0.012 35.00 0.80 67.20 18.75 0.29 8.00 2.31

hrs secs m2 m2/hr m2 hrs positions hrs

Excluding Travel

Productivity Rates - Scraping & Loading Volume / Digging Stroke Swing-Scrape-Swing-Load Cycle Scraping - Loading Rate Area Covered / Position Volume Covered / Position Duration per Position Number of Positions Total Duration (Scraping & Loading)

0.28 35.00 28.80 18.75 2.81 0.10 8.00 0.78

m3 secs m3/hr m2 m3 hrs positions hrs

Excluding Travel

Time-Motion Table Activity

Rate

Time Required hrs

Time Required minutes

Breaking Fix Breaker, Maneuver, Wait Moving Forward, Positioning Breaking Fix Bucket, Maneuver, Wait

1.25 0.82 2.31 1.25

75.00 49.14 138.60 75.00

Scraping & Loading Debris Manuever, Wait Moving Forward, Positioning Scraping & Loading Debris Manuever, Wait

0.75 0.82 0.78 0.75

45.00 49.14 46.88 45.00

8.73

523.76

Total Productivity

2.58 m3/hr

Productivity

17.18 m2/hr

Pavement Breaking Trial Strip

Parameter Segment Length Width

Concrete

Quantity 50.00 3.00

Thickness = 230.00 mm

Unit m m

Pavement Thickness Area of Embankment Volume Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption

0.23 150.00 34.50

m sm m3

Backhoe w/ Breaker Quantity 2.63 2.63 0.80 16.00

Productivity Rates - Breaking Breaker Penetration Rate

Unit km/hr km/hr m3 li/hr

Duration per Breaking Stroke Swing-Lower/Raise-Swing Cycle Area Covered / Penetration Direct Area Breaking Rate Area Covered / Position Duration per Position Number of Positions Total Duration (Breaking)

3.00 10.80 0.021 35.00 0.80 37.57 18.75 0.51 8.00 4.07

mm/sec m/hr hrs secs m2 m2/hr m2 hrs positions hrs

Excluding Travel

Productivity Rates - Scraping & Loading Volume / Digging Stroke Swing-Scrape-Swing-Load Cycle Scraping - Loading Rate Area Covered / Position Volume Covered / Position Duration per Position Number of Positions Total Duration (Scraping & Loading)

0.28 35.00 28.80 18.75 4.31 0.15 8.00 1.20

m3 secs m3/hr m2 m3 hrs positions hrs

Excluding Travel

Time-Motion Table Activity

Rate

Time Required hrs

Time Required minutes

Breaking Fix Breaker, Maneuver, Wait Moving Forward, Positioning Breaking Fix Bucket, Maneuver, Wait

1.25 0.82 4.07 1.25

75.00 49.14 244.25 75.00

Scraping & Loading Debris Manuever, Wait Moving Forward, Positioning Scraping & Loading Debris Manuever, Wait

0.75 0.82 1.20 0.75

45.00 49.14 71.88 45.00

Total

10.91

654.41

Productivity

3.16 m3/hr

Productivity

13.75 m2/hr

Pavement Breaking

Concrete

Trial Strip

Parameter Segment Length Width Pavement Thickness Area of Embankment Volume Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption

Thickness = 250.00 mm

Quantity 50.00 3.00 0.25 150.00 37.50

Unit m m m sm m3

Backhoe w/ Breaker Quantity 2.63 2.63 0.80 16.00

Unit km/hr km/hr m3 li/hr

Productivity Rates - Breaking Breaker Penetration Rate Duration per Breaking Stroke Swing-Lower/Raise-Swing Cycle Area Covered / Penetration Direct Area Breaking Rate Area Covered / Position Duration per Position Number of Positions Total Duration (Breaking)

2.75 9.90 0.025 35.00 0.80 31.68 18.75 0.60 8.00 4.81

mm/sec m/hr hrs secs m2 m2/hr m2 hrs positions hrs

Excluding Travel

Productivity Rates - Scraping & Loading Volume / Digging Stroke Swing-Scrape-Swing-Load Cycle Scraping - Loading Rate Area Covered / Position Volume Covered / Position Duration per Position Number of Positions Total Duration (Scraping & Loading)

0.28 35.00 28.80 18.75 4.69 0.16 8.00 1.30

m3 secs m3/hr m2 m3 hrs positions hrs

Excluding Travel

Time-Motion Table Activity

Rate

Time Required

Time Required

Activity

Rate

hrs

minutes

Breaking Fix Breaker, Maneuver, Wait Moving Forward, Positioning Breaking Fix Bucket, Maneuver, Wait

1.25 0.82 4.81 1.25

75.00 49.14 288.76 75.00

Scraping & Loading Debris Manuever, Wait Moving Forward, Positioning Scraping & Loading Debris Manuever, Wait

0.75 0.82 1.30 0.75

45.00 49.14 78.13 45.00

11.75

705.17

Total Productivity

3.19 m3/hr

Productivity

12.76 m2/hr

PRODUCTIVITY CALCULATIONS Pile Driving Works Pile Driving - PC Piles Trial Pile Set Parameter Pile Dimension 1 Pile Dimension 2 Pile Length Quantity of Piles Total Pile Length Equipment Specifications Parameter Forward Speed Reverse Speed Lifting Capacity Fuel Consumption Pile Penetration Rate

Quantity 400.00 400.00 12.00 10.00 120.00

Remarks

Crane 40.00 Tons w/ Vibratory Hammer Quantity Unit Remarks 2.00 km/hr 2.00 km/hr 40.00 tons 27.00 li/hr 3.00 lm/hr

Time-Motion Table Activity

Unit mm mm m nos m

Time Required hrs

Rate

Time Required minutes

Equipment Set-up Setting-Up of Rig

1.50

90.00

Pile Driving - Pile No. 1 Maneuver to Position Pick-Up Pile Drive Pile Release Pile

0.25 0.25 4.00 0.08

15.00 15.00 240.00 5.00

0.25 0.25 4.00 0.08

15.00 15.00 240.00 5.00

0.25 0.25 4.00 0.08

15.00 15.00 240.00 5.00

0.25

15.00

Pile Driving - Pile No. 2 Maneuver to Position Pick-Up Pile Drive Pile Release Pile Pile Driving - Pile No. 3 Maneuver to Position Pick-Up Pile Drive Pile Release Pile Pile Driving - Pile No. 4 Maneuver to Position

3.00

3.00

3.00

Pick-Up Pile Drive Pile Release Pile

3.00

Pile Driving - Pile No. 5 Maneuver to Position Pick-Up Pile Drive Pile Release Pile Pile Driving - Pile No. 6 Maneuver to Position Pick-Up Pile Drive Pile Release Pile Pile Driving - Pile No. 7 Maneuver to Position Pick-Up Pile Drive Pile Release Pile Pile Driving - Pile No. 8 Maneuver to Position Pick-Up Pile Drive Pile Release Pile Pile Driving - Pile No. 9 Maneuver to Position Pick-Up Pile Drive Pile Release Pile Pile Driving - Pile No. 10 Maneuver to Position Pick-Up Pile Drive Pile Release Pile

3.00

3.00

3.00

3.00

3.00

3.00

Total Productivity

0.25 4.00 0.08

15.00 240.00 5.00

0.25 0.25 4.00 0.08

15.00 15.00 240.00 5.00

0.25 0.25 4.00 0.08

15.00 15.00 240.00 5.00

0.25 0.25 4.00 0.08

15.00 15.00 240.00 5.00

0.25 0.25 4.00 0.08

15.00 15.00 240.00 5.00

0.25 0.25 4.00 0.08

15.00 15.00 240.00 5.00

0.25 0.25 4.00 0.08

15.00 15.00 240.00 5.00

47.33

2,840.00

2.54 lm/hr

Pile Driving - H Piles Trial Pile Set Parameter Pile Dimension 1

Quantity 350.00

Unit mm

Remarks

Pile Dimension 2 Pile Length Quantity of Piles Total Pile Length Equipment Specifications Parameter Forward Speed Reverse Speed Lifting Capacity Fuel Consumption Pile Penetration Rate

350.00 12.00 10.00 120.00

Crane 40.00 Tons w/ Vibratory Hammer Quantity Unit Remarks 2.00 km/hr 2.00 km/hr 40.00 tons 27.00 li/hr 4.00 lm/hr

Time-Motion Table Activity

mm m nos m

Time Required hrs

Rate

Time Required minutes

Equipment Set-up Setting-Up of Rig

1.50

90.00

Pile Driving - Pile No. 1 Maneuver to Position Pick-Up Pile Drive Pile Release Pile

0.25 0.25 3.00 0.08

15.00 15.00 180.00 5.00

0.25 0.25 3.00 0.08

15.00 15.00 180.00 5.00

0.25 0.25 3.00 0.08

15.00 15.00 180.00 5.00

0.25 0.25 3.00 0.08

15.00 15.00 180.00 5.00

0.25 0.25 3.00 0.08

15.00 15.00 180.00 5.00

Pile Driving - Pile No. 2 Maneuver to Position Pick-Up Pile Drive Pile Release Pile Pile Driving - Pile No. 3 Maneuver to Position Pick-Up Pile Drive Pile Release Pile Pile Driving - Pile No. 4 Maneuver to Position Pick-Up Pile Drive Pile Release Pile Pile Driving - Pile No. 5 Maneuver to Position Pick-Up Pile Drive Pile Release Pile

4.00

4.00

4.00

4.00

4.00

Pile Driving - Pile No. 6 Maneuver to Position Pick-Up Pile Drive Pile Release Pile Pile Driving - Pile No. 7 Maneuver to Position Pick-Up Pile Drive Pile Release Pile Pile Driving - Pile No. 8 Maneuver to Position Pick-Up Pile Drive Pile Release Pile Pile Driving - Pile No. 9 Maneuver to Position Pick-Up Pile Drive Pile Release Pile Pile Driving - Pile No. 10 Maneuver to Position Pick-Up Pile Drive Pile Release Pile

4.00

4.00

4.00

4.00

4.00

Total Productivity

0.25 0.25 3.00 0.08

15.00 15.00 180.00 5.00

0.25 0.25 3.00 0.08

15.00 15.00 180.00 5.00

0.25 0.25 3.00 0.08

15.00 15.00 180.00 5.00

0.25 0.25 3.00 0.08

15.00 15.00 180.00 5.00

0.25 0.25 3.00 0.08

15.00 15.00 180.00 5.00

37.33

2,240.00

3.21 lm/hr

Pile Driving - Sheet Piles Trial Pile Set Parameter Pile Dimension 1 Pile Dimension 2 Pile Length Quantity of Piles Total Pile Length Equipment Specifications Parameter Forward Speed Reverse Speed

Quantity 100.00 400.00 12.00 10.00 120.00

Unit mm mm m nos m

Remarks

Crane 40.00 Tons w/ Vibratory Hammer Quantity Unit Remarks 2.00 km/hr 2.00 km/hr

Lifting Capacity Fuel Consumption Pile Penetration Rate

40.00 27.00 8.00

Time-Motion Table Activity

tons li/hr lm/hr

Time Required hrs

Rate

Time Required minutes

Equipment Set-up Setting-Up of Pile Driver

1.00

60.00

Pile Driving - Pile No. 1 Maneuver to Position Pick-Up Pile Drive Pile Release Pile

0.25 0.17 1.50 0.08

15.00 10.00 90.00 5.00

0.25 0.17 1.50 0.08

15.00 10.00 90.00 5.00

0.25 0.17 1.50 0.08

15.00 10.00 90.00 5.00

0.25 0.17 1.50 0.08

15.00 10.00 90.00 5.00

0.25 0.17 1.50 0.08

15.00 10.00 90.00 5.00

0.25 0.17 1.50 0.08

15.00 10.00 90.00 5.00

0.25

15.00

Pile Driving - Pile No. 2 Maneuver to Position Pick-Up Pile Drive Pile Release Pile Pile Driving - Pile No. 3 Maneuver to Position Pick-Up Pile Drive Pile Release Pile Pile Driving - Pile No. 4 Maneuver to Position Pick-Up Pile Drive Pile Release Pile Pile Driving - Pile No. 5 Maneuver to Position Pick-Up Pile Drive Pile Release Pile Pile Driving - Pile No. 6 Maneuver to Position Pick-Up Pile Drive Pile Release Pile Pile Driving - Pile No. 7 Maneuver to Position

8.00

8.00

8.00

8.00

8.00

8.00

Pick-Up Pile Drive Pile Release Pile

8.00

Pile Driving - Pile No. 8 Maneuver to Position Pick-Up Pile Drive Pile Release Pile

8.00

Pile Driving - Pile No. 9 Maneuver to Position Pick-Up Pile Drive Pile Release Pile

8.00

Pile Driving - Pile No. 10 Maneuver to Position Pick-Up Pile Drive Pile Release Pile

8.00

Total Productivity

0.17 1.50 0.08

10.00 90.00 5.00

0.25 0.17 1.50 0.08

15.00 10.00 90.00 5.00

0.25 0.17 1.50 0.08

15.00 10.00 90.00 5.00

0.25 0.17 1.50 0.08

15.00 10.00 90.00 5.00

21.00

1,260.00

5.71 lm/hr

Pile Extraction - Sheet Piles Trial Pile Set Parameter Pile Dimension 1 Pile Dimension 2 Pile Length Quantity of Piles Total Pile Length Equipment Specifications Parameter Forward Speed Reverse Speed Lifting Capacity Fuel Consumption Pile Extraction Rate

Quantity 100.00 400.00 12.00 10.00 120.00

Remarks

Crane 40.00 Tons w/ Vibratory Hammer Quantity Unit Remarks 2.00 km/hr 2.00 km/hr 40.00 tons 27.00 li/hr 12.00 lm/hr

Time-Motion Table Activity

Unit mm mm m nos m

Rate

Time Required hrs

Time Required minutes

Equipment Set-up Setting-Up of Pile Driver Pile Driving - Pile No. 1 Maneuver to Position Drive Pile Lay Pile to Ground Pile Driving - Pile No. 2 Maneuver to Position Drive Pile Lay Pile to Ground Pile Driving - Pile No. 3 Maneuver to Position Drive Pile Lay Pile to Ground Pile Driving - Pile No. 4 Maneuver to Position Drive Pile Lay Pile to Ground Pile Driving - Pile No. 5 Maneuver to Position Drive Pile Lay Pile to Ground Pile Driving - Pile No. 6 Maneuver to Position Drive Pile Lay Pile to Ground Pile Driving - Pile No. 7 Maneuver to Position Drive Pile Lay Pile to Ground Pile Driving - Pile No. 8 Maneuver to Position Drive Pile Lay Pile to Ground Pile Driving - Pile No. 9 Maneuver to Position Drive Pile Lay Pile to Ground Pile Driving - Pile No. 10 Maneuver to Position

1.50

90.00

12.00

0.25 1.00 0.08

15.00 60.00 5.00

12.00

0.25 1.00 0.08

15.00 60.00 5.00

12.00

0.25 1.00 0.08

15.00 60.00 5.00

12.00

0.25 1.00 0.08

15.00 60.00 5.00

12.00

0.25 1.00 0.08

15.00 60.00 5.00

12.00

0.25 1.00 0.08

15.00 60.00 5.00

12.00

0.25 1.00 0.08

15.00 60.00 5.00

12.00

0.25 1.00 0.08

15.00 60.00 5.00

12.00

0.25 1.00 0.08

15.00 60.00 5.00

0.25

15.00

Drive Pile Lay Pile to Ground

12.00

Total Productivity

1.00 0.08

60.00 5.00

14.83

890.00

8.09 lm/hr

Pile Loading / Unloading - PC Piles Trial Pile Set Parameter Pile Dimension 1 Pile Dimension 2 Pile Length Pile Weight Quantity of Piles Total Pile Length Total Pile Weight Equipment Specifications Parameter Forward Speed Reverse Speed Lifting Capacity Fuel Consumption Swing-Hoist Up-Swing-Hoist Down

Quantity 400.00 400.00 12.00 4,608.00 5.00 60.00 23,040.00

Unit mm mm m kgs nos m kgs

Remarks

Crane 40.00 Tons Quantity 2.00 2.00 40.00 27.00 120.00

Unit km/hr km/hr tons li/hr secs

Remarks

Rate

Time Required hrs

Time Required minutes

Time-Motion Table Activity

Pile No. 1 Maneuver to Position Rig Pile Swing-Hoist Up-Swing-Hoist Down Unrig Pile Pile No. 2 Maneuver to Position Rig Pile Swing-Hoist Up-Swing-Hoist Down Unrig Pile Pile No. 3 Maneuver to Position Rig Pile Swing-Hoist Up-Swing-Hoist Down Unrig Pile

0.03

0.03

0.03

0.15 0.10 0.03 0.05

9.00 6.00 2.00 3.00

0.15 0.10 0.03 0.05

9.00 6.00 2.00 3.00

0.15 0.10 0.03 0.05

9.00 6.00 2.00 3.00

Pile No. 4 Maneuver to Position Rig Pile Swing-Hoist Up-Swing-Hoist Down Unrig Pile

0.03

Pile No. 5 Maneuver to Position Rig Pile Swing-Hoist Up-Swing-Hoist Down Unrig Pile

0.03

Total Productivity

0.15 0.10 0.03 0.05

9.00 6.00 2.00 3.00

0.15 0.10 0.03 0.05

9.00 6.00 2.00 3.00

1.67

100.00

36.00 lm/hr

Pile Loading / Unloading - Steel Piles Trial Pile Set Parameter Pile Dimension 1 Pile Dimension 2 Pile Length Pile Weight Quantity of Piles Total Pile Length Total Pile Weight Equipment Specifications Parameter Forward Speed Reverse Speed Lifting Capacity Fuel Consumption Swing-Hoist Up-Swing-Hoist Down

Quantity 350.00 350.00 12.00 1,980.00 5.00 60.00 9,900.00

Unit mm mm m kgs nos m kgs

Remarks

Crane 40.00 Tons Quantity 2.00 2.00 40.00 27.00 100.00

Unit km/hr km/hr tons li/hr secs

Remarks

Rate

Time Required hrs

Time Required minutes

Time-Motion Table Activity

Pile No. 1 Maneuver to Position Rig Pile Swing-Hoist Up-Swing-Hoist Down Unrig Pile

0.03

0.15 0.10 0.03 0.05

9.00 6.00 1.67 3.00

Pile No. 2 Maneuver to Position Rig Pile Swing-Hoist Up-Swing-Hoist Down Unrig Pile

0.03

Pile No. 3 Maneuver to Position Rig Pile Swing-Hoist Up-Swing-Hoist Down Unrig Pile

0.03

Pile No. 4 Maneuver to Position Rig Pile Swing-Hoist Up-Swing-Hoist Down Unrig Pile

0.03

Pile No. 5 Maneuver to Position Rig Pile Swing-Hoist Up-Swing-Hoist Down Unrig Pile

0.03

Total Productivity

0.15 0.10 0.03 0.05

9.00 6.00 1.67 3.00

0.15 0.10 0.03 0.05

9.00 6.00 1.67 3.00

0.15 0.10 0.03 0.05

9.00 6.00 1.67 3.00

0.15 0.10 0.03 0.05

9.00 6.00 1.67 3.00

1.64

98.33

36.61 lm/hr

Pile Loading / Unloading - Sheet Piles Trial Pile Set Parameter Pile Dimension 1 Pile Dimension 2 Pile Length Pile Weight Quantity of Piles Total Pile Length Total Pile Weight Equipment Specifications Parameter Forward Speed Reverse Speed Lifting Capacity Fuel Consumption Swing-Hoist Up-Swing-Hoist Down

Quantity 400.00 100.00 12.00 50.00 5.00 60.00 250.00 Crane 40.00 Tons Quantity 2.00 2.00 40.00 27.00 85.00

Unit mm mm m kgs nos m kgs

Remarks

Unit km/hr km/hr tons li/hr secs

Remarks

Time-Motion Table Activity

Pile No. 1 Maneuver to Position Rig Pile Swing-Hoist Up-Swing-Hoist Down Unrig Pile Pile No. 2 Maneuver to Position Rig Pile Swing-Hoist Up-Swing-Hoist Down Unrig Pile Pile No. 3 Maneuver to Position Rig Pile Swing-Hoist Up-Swing-Hoist Down Unrig Pile Pile No. 4 Maneuver to Position Rig Pile Swing-Hoist Up-Swing-Hoist Down Unrig Pile Pile No. 5 Maneuver to Position Rig Pile Swing-Hoist Up-Swing-Hoist Down Unrig Pile

Time Required hrs

Rate

0.02

0.02

0.02

0.02

0.02

Total Productivity

0.15 0.05 0.02 0.05

9.00 3.00 1.42 3.00

0.15 0.05 0.02 0.05

9.00 3.00 1.42 3.00

0.15 0.05 0.02 0.05

9.00 3.00 1.42 3.00

0.15 0.05 0.02 0.05

9.00 3.00 1.42 3.00

0.15 0.05 0.02 0.05

9.00 3.00 1.42 3.00

1.37

82.08

43.86 lm/hr

PILES HAULING

PC PILES Equipment Specifications Parameter Loaded Speed Empty Speed

Time Required minutes

Trailer Truck Quantity 25.00 40.00

Cap = 40,000.00 kgs.

Unit km/hr km/hr

Load Capacity (Weight) Load Capacity (lm) Fuel Consumption AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Wait While Unloading Travel (Empty)

40,000.00 104.00 15.00

kgs. lm li/hr

1.000 km(s)

Rate

Time Required hrs

36.00 lm/hr 25.00 36.00 lm/hr 40.00

Total Productivity

Time Required minutes

0.08 2.89 0.04 2.89 0.03

5.00 173.33 2.40 173.33 1.50

5.93

355.57

17.55 lm/hr

AHD= 1.000 km(s)

STEEL PILES Equipment Specifications Parameter Loaded Speed Empty Speed Load Capacity (Weight) Load Capacity (lm) Fuel Consumption

Cargo Truck Quantity 25.00 40.00 20,000.00 121.00 15.00

AHD = Time-Motion Table

1.000 km(s)

Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Wait While Unloading Travel (Empty)

Rate

36.61 lm/hr 25.00 36.61 lm/hr 40.00

Total Productivity

STEEL SHEET PILES

AHD= 1.000 km(s)

Cap = 20,000.00 kgs.

Unit km/hr km/hr kgs. lm li/hr

Time Required hrs

Time Required minutes

0.08 3.31 0.04 3.31 0.03

5.00 198.31 2.40 198.31 1.50

6.76

405.51

17.90 lm/hr

Equipment Specifications Parameter Loaded Speed Empty Speed Load Capacity (Weight) Load Capacity (lm) Fuel Consumption

Cargo Truck Quantity 25.00 40.00 20,000.00 4,800.00 15.00

AHD = Time-Motion Table

1.000 km(s)

Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Wait While Unloading Travel (Empty)

Rate

43.86 lm/hr 25.00 43.86 lm/hr 40.00

Total Productivity

AHD= 1.000 km(s)

Cap = 20,000.00 kgs.

Unit km/hr km/hr kgs. lm li/hr

Time Required hrs

Time Required minutes

0.08 109.44 0.04 109.44 0.03

5.00 6,566.67 2.40 6,566.67 1.50

219.04

13,142.23

21.91 lm/hr

19800 7795.276 974.4094 243.6024

123.75

PRODUCTIVITY CALCULATIONS Pipe Laying Works RC Pipe Laying Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Quantity of Pipes Total Pipe Length Total Pipe Weight Equipment Specifications Parameter Forward Speed Reverse Speed Lifting Capacity Fuel Consumption Swing-Hoist Up-Swing-Hoist Down

1600Ø mm

Quantity

Unit m m kgs no(s) m kgs

Remarks

Crane 25.00 Tons Quantity 2.00 2.00 25.00 27.00 120.00

Unit km/hr km/hr tons li/hr secs

Remarks

Rate

Time Required hrs

Time Required minutes

Equipment Set-up / Waiting Set-up / Waiting / Maneuvering Pipe Laying 1 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

120.00

Pipe Laying 2 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

120.00

Pipe Laying 3 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

120.00

Pipe Laying 4

2000Ø mm

2.00 1.00 785.40 10.00 10.00 7,853.98

Time-Motion Table Activity

to

0.33

20.00

0.03 0.03 0.05 0.03

2.00 2.00 3.00 2.00

0.03 0.03 0.05 0.03

2.00 2.00 3.00 2.00

0.03 0.03 0.05 0.03

2.00 2.00 3.00 2.00

Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

120.00

Pipe Laying 5 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

120.00

Pipe Laying 6 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

120.00

Pipe Laying 7 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

120.00

Pipe Laying 8 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

120.00

Pipe Laying 9 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

120.00

Pipe Laying 10 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

120.00

Total Productivity

RC Pipe Laying Trial Pipe Set Parameter

0.03 0.03 0.05 0.03

2.00 2.00 3.00 2.00

0.03 0.03 0.05 0.03

2.00 2.00 3.00 2.00

0.03 0.03 0.05 0.03

2.00 2.00 3.00 2.00

0.03 0.03 0.05 0.03

2.00 2.00 3.00 2.00

0.03 0.03 0.05 0.03

2.00 2.00 3.00 2.00

0.03 0.03 0.05 0.03

2.00 2.00 3.00 2.00

0.03 0.03 0.05 0.03

2.00 2.00 3.00 2.00

1.83

110.00

5.45 lm/hr

1200Ø mm

Quantity

to

Unit

1500Ø mm

Remarks

Pipe Diameter Pipe Length Pipe Weight Quantity of Pipes Total Pipe Length Total Pipe Weight Equipment Specifications Parameter Forward Speed Reverse Speed Lifting Capacity Fuel Consumption Swing-Hoist Up-Swing-Hoist Down

1.50 1.00 441.79 10.00 10.00 4,417.86

m m kgs no(s) m kgs

Crane 25.00 Tons Quantity 2.00 2.00 25.00 27.00 110.00

Unit km/hr km/hr tons li/hr secs

Remarks

Rate

Time Required hrs

Time Required minutes

Time-Motion Table Activity

Equipment Set-up / Waiting Set-up / Waiting / Maneuvering

0.33

20.00

Pipe Laying 1 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

0.03 0.03 0.05 0.03

2.00 1.83 3.00 2.00

0.03 0.03 0.05 0.03

2.00 1.83 3.00 2.00

0.03 0.03 0.05 0.03

2.00 1.83 3.00 2.00

0.03 0.03 0.05 0.03

2.00 1.83 3.00 2.00

0.03 0.03

2.00 1.83

110.00

Pipe Laying 2 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

110.00

Pipe Laying 3 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

110.00

Pipe Laying 4 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

110.00

Pipe Laying 5 Rig Pipe Swing-Hoist Up-Swing-Hoist Down

110.00

Align Pipe Unrig Pipe Pipe Laying 6 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

110.00

Pipe Laying 7 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

110.00

Pipe Laying 8 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

110.00

Pipe Laying 9 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

110.00

Pipe Laying 10 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

110.00

Total Productivity

RC Pipe Laying Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Quantity of Pipes Total Pipe Length Total Pipe Weight Equipment Specifications

0.05 0.03

3.00 2.00

0.03 0.03 0.05 0.03

2.00 1.83 3.00 2.00

0.03 0.03 0.05 0.03

2.00 1.83 3.00 2.00

0.03 0.03 0.05 0.03

2.00 1.83 3.00 2.00

0.03 0.03 0.05 0.03

2.00 1.83 3.00 2.00

0.03 0.03 0.05 0.03

2.00 1.83 3.00 2.00

1.81

108.33

5.54 lm/hr

600Ø mm

Quantity

1.00 1.00 196.35 10.00 10.00 1,963.50

Crane 25.00 Tons

to

Unit m m kgs no(s) m kgs

1000Ø mm

Remarks

Parameter Forward Speed Reverse Speed Lifting Capacity Fuel Consumption Swing-Hoist Up-Swing-Hoist Down

Quantity

2.00 2.00 25.00 27.00 100.00

Time-Motion Table Activity

Rate

Equipment Set-up / Waiting Set-up / Waiting / Maneuvering Pipe Laying 1 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

100.00

Pipe Laying 2 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

100.00

Pipe Laying 3 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

100.00

Pipe Laying 4 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

100.00

Pipe Laying 5 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

100.00

Pipe Laying 6 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

100.00

Unit km/hr km/hr tons li/hr secs

Remarks

Time Required hrs

Time Required minutes

0.33

20.00

0.03 0.03 0.05 0.03

2.00 1.67 3.00 2.00

0.03 0.03 0.05 0.03

2.00 1.67 3.00 2.00

0.03 0.03 0.05 0.03

2.00 1.67 3.00 2.00

0.03 0.03 0.05 0.03

2.00 1.67 3.00 2.00

0.03 0.03 0.05 0.03

2.00 1.67 3.00 2.00

0.03 0.03 0.05 0.03

2.00 1.67 3.00 2.00

Pipe Laying 7 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

100.00

Pipe Laying 8 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

100.00

Pipe Laying 9 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

100.00

Pipe Laying 10 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

100.00

Total Productivity

RC Pipe Laying Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Quantity of Pipes Total Pipe Length Total Pipe Weight Equipment Specifications Parameter Forward Speed Reverse Speed Lifting Capacity Fuel Consumption Swing-Hoist Up-Swing-Hoist Down Time-Motion Table

0.03 0.03 0.05 0.03

2.00 1.67 3.00 2.00

0.03 0.03 0.05 0.03

2.00 1.67 3.00 2.00

0.03 0.03 0.05 0.03

2.00 1.67 3.00 2.00

0.03 0.03 0.05 0.03

2.00 1.67 3.00 2.00

1.78

106.67

5.63 lm/hr

300Ø mm

Quantity

to

500Ø mm

0.50 1.00 49.09 10.00 10.00 490.87

Unit m m kgs no(s) m kgs

Remarks

Crane 25.00 Tons Quantity 2.00 2.00 25.00 27.00 90.00

Unit km/hr km/hr tons li/hr secs

Remarks

Activity

Time Required hrs

Rate

Time Required minutes

Equipment Set-up / Waiting Set-up / Waiting / Maneuvering

0.33

20.00

Pipe Laying 1 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

90.00

0.03 0.03 0.05 0.03

2.00 1.50 3.00 2.00

Pipe Laying 2 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

90.00

0.03 0.03 0.05 0.03

2.00 1.50 3.00 2.00

Pipe Laying 3 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

90.00

0.03 0.03 0.05 0.03

2.00 1.50 3.00 2.00

Pipe Laying 4 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

90.00

0.03 0.03 0.05 0.03

2.00 1.50 3.00 2.00

Pipe Laying 5 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

90.00

0.03 0.03 0.05 0.03

2.00 1.50 3.00 2.00

Pipe Laying 6 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

90.00

0.03 0.03 0.05 0.03

2.00 1.50 3.00 2.00

Pipe Laying 7 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

90.00

0.03 0.03 0.05 0.03

2.00 1.50 3.00 2.00

Pipe Laying 8

Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

90.00

Pipe Laying 9 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

90.00

Pipe Laying 10 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Align Pipe Unrig Pipe

90.00

Total Productivity

0.03 0.03 0.05 0.03

2.00 1.50 3.00 2.00

0.03 0.03 0.05 0.03

2.00 1.50 3.00 2.00

0.03 0.03 0.05 0.03

2.00 1.50 3.00 2.00

1.75

105.00

5.71 lm/hr

RC Pipe Loading / Unloading Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Quantity of Pipes Total Pipe Length Total Pipe Weight Equipment Specifications Parameter Forward Speed Reverse Speed Lifting Capacity Fuel Consumption Swing-Hoist Up-Swing-Hoist Down

1600Ø mm

Quantity

Equipment Set-up / Waiting Set-up / Waiting / Maneuvering Pipe Loading / Unloading 1

2000Ø mm

2.00 1.00 785.40 10.00 10.00 7,853.98

Unit m m kgs no(s) m kgs

Remarks

Crane 25.00 Tons Quantity 2.00 2.00 25.00 27.00 120.00

Unit km/hr km/hr tons li/hr secs

Remarks

Rate

Time Required hrs

Time Required minutes

Time-Motion Table Activity

to

0.33

20.00

Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 2 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 3 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 4 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 5 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 6 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 7 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 8 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 9 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 10 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Total

120.00

0.03 0.03 0.03

2.00 2.00 2.00

120.00

0.03 0.03 0.03

2.00 2.00 2.00

120.00

0.03 0.03 0.03

2.00 2.00 2.00

120.00

0.03 0.03 0.03

2.00 2.00 2.00

120.00

0.03 0.03 0.03

2.00 2.00 2.00

120.00

0.03 0.03 0.03

2.00 2.00 2.00

120.00

0.03 0.03 0.03

2.00 2.00 2.00

120.00

0.03 0.03 0.03

2.00 2.00 2.00

120.00

0.03 0.03 0.03

2.00 2.00 2.00

120.00

0.03 0.03 0.03

2.00 2.00 2.00

1.33

80.00

Productivity

7.50 lm/hr

RC Pipe Loading / Unloading Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Quantity of Pipes Total Pipe Length Total Pipe Weight Equipment Specifications Parameter Forward Speed Reverse Speed Lifting Capacity Fuel Consumption Swing-Hoist Up-Swing-Hoist Down

1200Ø mm

Quantity

Unit m m kgs no(s) m kgs

Remarks

Crane 25.00 Tons Quantity 2.00 2.00 25.00 27.00 110.00

Unit km/hr km/hr tons li/hr secs

Remarks

Rate

Time Required hrs

Time Required minutes

Equipment Set-up / Waiting Set-up / Waiting / Maneuvering Pipe Loading / Unloading 1 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 2 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 3 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 4 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe

1500Ø mm

1.50 1.00 441.79 10.00 10.00 4,417.86

Time-Motion Table Activity

to

0.33

20.00

110.00

0.03 0.03 0.03

2.00 1.83 2.00

110.00

0.03 0.03 0.03

2.00 1.83 2.00

110.00

0.03 0.03 0.03

2.00 1.83 2.00

110.00

0.03 0.03 0.03

2.00 1.83 2.00

Pipe Loading / Unloading 5 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 6 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 7 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 8 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 9 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 10 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe

110.00

0.03 0.03 0.03

2.00 1.83 2.00

110.00

0.03 0.03 0.03

2.00 1.83 2.00

110.00

0.03 0.03 0.03

2.00 1.83 2.00

110.00

0.03 0.03 0.03

2.00 1.83 2.00

110.00

0.03 0.03 0.03

2.00 1.83 2.00

110.00

0.03 0.03 0.03

2.00 1.83 2.00

1.31

78.33

Total Productivity

RC Pipe Loading / Unloading Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Quantity of Pipes Total Pipe Length Total Pipe Weight Equipment Specifications Parameter Forward Speed

7.66 lm/hr

600Ø mm

Quantity

to

1000Ø mm

1.00 1.00 196.35 10.00 10.00 1,963.50

Unit m m kgs no(s) m kgs

Remarks

Crane 25.00 Tons Quantity 2.00

Unit km/hr

Remarks

Reverse Speed Lifting Capacity Fuel Consumption Swing-Hoist Up-Swing-Hoist Down

2.00 25.00 27.00 100.00

Time-Motion Table Activity

Rate

Equipment Set-up / Waiting Set-up / Waiting / Maneuvering Pipe Loading / Unloading 1 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 2 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 3 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 4 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 5 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 6 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 7 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 8 Rig Pipe

km/hr tons li/hr secs

Time Required hrs

Time Required minutes

0.33

20.00

100.00

0.03 0.03 0.03

2.00 1.67 2.00

100.00

0.03 0.03 0.03

2.00 1.67 2.00

100.00

0.03 0.03 0.03

2.00 1.67 2.00

100.00

0.03 0.03 0.03

2.00 1.67 2.00

100.00

0.03 0.03 0.03

2.00 1.67 2.00

100.00

0.03 0.03 0.03

2.00 1.67 2.00

100.00

0.03 0.03 0.03

2.00 1.67 2.00

0.03

2.00

Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 9 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 10 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe

100.00

0.03 0.03

1.67 2.00

100.00

0.03 0.03 0.03

2.00 1.67 2.00

100.00

0.03 0.03 0.03

2.00 1.67 2.00

1.28

76.67

Total Productivity

7.83 lm/hr

RC Pipe Loading / Unloading Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Quantity of Pipes Total Pipe Length Total Pipe Weight Equipment Specifications Parameter Forward Speed Reverse Speed Lifting Capacity Fuel Consumption Swing-Hoist Up-Swing-Hoist Down

300Ø mm

Quantity

500Ø mm

0.50 1.00 49.09 10.00 10.00 490.87

Unit m m kgs no(s) m kgs

Remarks

Crane 25.00 Tons Quantity 2.00 2.00 25.00 27.00 90.00

Unit km/hr km/hr tons li/hr secs

Remarks

Rate

Time Required hrs

Time Required minutes

Time-Motion Table Activity

to

Equipment Set-up / Waiting Set-up / Waiting / Maneuvering

0.33

20.00

Pipe Loading / Unloading 1 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe

0.03 0.03 0.03

2.00 1.50 2.00

90.00

Pipe Loading / Unloading 2 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 3 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 4 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 5 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 6 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 7 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 8 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 9 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Pipe Loading / Unloading 10 Rig Pipe Swing-Hoist Up-Swing-Hoist Down Unrig Pipe Total Productivity

90.00

0.03 0.03 0.03

2.00 1.50 2.00

90.00

0.03 0.03 0.03

2.00 1.50 2.00

90.00

0.03 0.03 0.03

2.00 1.50 2.00

90.00

0.03 0.03 0.03

2.00 1.50 2.00

90.00

0.03 0.03 0.03

2.00 1.50 2.00

90.00

0.03 0.03 0.03

2.00 1.50 2.00

90.00

0.03 0.03 0.03

2.00 1.50 2.00

90.00

0.03 0.03 0.03

2.00 1.50 2.00

90.00

0.03 0.03 0.03

2.00 1.50 2.00

1.25

75.00

8.00 lm/hr

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

1600Ø mm to Hauling Distance: 30.00 km(s)

Quantity

Activity

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty)

Unit m m kgs m3 no(s) m kgs m3 km

Remarks

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Time Required hrs

Time Required minutes

2.00 1.00 785.40 4.00 10.00 10.00 7,853.98 40.00 30.00

Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 10.00

Time-Motion Table Rate

7.50 40.00 7.50 60.00

Total Productivity

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length

2000Ø mm

0.17 1.33 0.75 1.33 0.50

10.00 80.00 45.00 80.00 30.00

4.08

245.00

2.45 lm/hr

1200Ø mm to Hauling Distance: 30.00 km(s)

Quantity

1.50 1.00

Unit m m

1500Ø mm

Remarks

Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

441.79 2.25 17.00 17.00 7,510.37 38.25 30.00 Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 17.00

Time-Motion Table Activity

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty)

kgs m3 no(s) m kgs m3 km

Rate

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Time Required hrs

Time Required minutes

7.66 40.00 7.66 60.00

Total Productivity

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance

0.17 2.22 0.75 2.22 0.50

10.00 133.17 45.00 133.17 30.00

5.86

351.33

2.90 lm/hr

600Ø mm to Hauling Distance: 30.00 km(s)

Quantity

1.00 1.00 196.35 1.00 37.00 37.00 7,264.93 37.00 30.00

Unit m m kgs m3 no(s) m kgs m3 km

1000Ø mm

Remarks

Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 37.00

Time-Motion Table Activity

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty)

Rate

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Time Required hrs

Time Required minutes

7.83 40.00 7.83 60.00

Total Productivity

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption

0.17 4.73 0.75 4.73 0.50

10.00 283.67 45.00 283.67 30.00

10.87

652.33

3.40 lm/hr

300Ø mm to Hauling Distance: 30.00 km(s)

Quantity

0.50 1.00 49.09 0.25 145.00 145.00 7,117.67 36.25 30.00

Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00

500Ø mm

Unit m m kgs m3 no(s) m kgs m3 km

Remarks

Unit km/hr km/hr tons li/hr

Remarks

Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

3.00 6.00 2.00 36.00 145.00

Time-Motion Table Activity

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty)

m m m m3 pcs

Time Required hrs

Rate

8.00 40.00 8.00 60.00

Total Productivity

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes) Time-Motion Table

Time Required minutes

0.17 18.13 0.75 18.13 0.50

10.00 1,087.50 45.00 1,087.50 30.00

37.67

2,260.00

3.85 lm/hr

1600Ø mm to Hauling Distance: 25.00 km(s)

Quantity

2.00 1.00 785.40 4.00 10.00 10.00 7,853.98 40.00 25.00

Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 10.00

2000Ø mm

Unit m m kgs m3 no(s) m kgs m3 km

Remarks

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Activity

Time Required hrs

Rate

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty)

7.50 40.00 7.50 60.00

Total Productivity

Time Required minutes

0.17 1.33 0.63 1.33 0.42

10.00 80.00 37.50 80.00 25.00

3.88

232.50

2.58 lm/hr

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

1200Ø mm to Hauling Distance: 25.00 km(s)

Quantity

Activity

Waiting / Maneuvering Loading of Pipes Travel (Loaded)

Unit m m kgs m3 no(s) m kgs m3 km

Remarks

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Time Required hrs

Time Required minutes

1.50 1.00 441.79 2.25 17.00 17.00 7,510.37 38.25 25.00

Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 17.00

Time-Motion Table Rate

7.66 40.00

1500Ø mm

0.17 2.22 0.63

10.00 133.17 37.50

Unloading of Pipes Travel (Empty)

7.66 60.00

Total Productivity

133.17 25.00

5.65

338.83

3.01 lm/hr

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

600Ø mm to Hauling Distance: 25.00 km(s)

Quantity

Activity

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty) Total

Remarks

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Time Required hrs

Time Required minutes

Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 37.00

Rate

7.83 40.00 7.83 60.00

1000Ø mm

Unit m m kgs m3 no(s) m kgs m3 km

1.00 1.00 196.35 1.00 37.00 37.00 7,264.93 37.00 25.00

Time-Motion Table

Productivity

2.22 0.42

0.17 4.73 0.63 4.73 0.42

10.00 283.67 37.50 283.67 25.00

10.66

639.83

3.47 lm/hr

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

300Ø mm to Hauling Distance: 25.00 km(s)

Quantity

Activity

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty)

Unit m m kgs m3 no(s) m kgs m3 km

Remarks

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Time Required hrs

Time Required minutes

0.50 1.00 49.09 0.25 145.00 145.00 7,117.67 36.25 25.00

Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 145.00

Time-Motion Table Rate

8.00 40.00 8.00 60.00

Total Productivity

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter

500Ø mm

0.17 18.13 0.63 18.13 0.42

10.00 1,087.50 37.50 1,087.50 25.00

37.46

2,247.50

3.87 lm/hr

1600Ø mm to Hauling Distance: 20.00 km(s)

Quantity

2.00

Unit m

2000Ø mm

Remarks

Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

1.00 785.40 4.00 10.00 10.00 7,853.98 40.00 20.00 Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 10.00

Time-Motion Table Activity

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty)

m kgs m3 no(s) m kgs m3 km

Rate

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Time Required hrs

Time Required minutes

7.50 40.00 7.50 60.00

Total Productivity

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume

0.17 1.33 0.50 1.33 0.33

10.00 80.00 30.00 80.00 20.00

3.67

220.00

2.73 lm/hr

1200Ø mm to Hauling Distance: 20.00 km(s)

Quantity

1.50 1.00 441.79 2.25 17.00 17.00 7,510.37 38.25

Unit m m kgs m3 no(s) m kgs m3

1500Ø mm

Remarks

Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

20.00 Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 17.00

Time-Motion Table Activity

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty)

km

Rate

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Time Required hrs

Time Required minutes

7.66 40.00 7.66 60.00

Total Productivity

RC Pipe Hauling

Parameter Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity

0.17 2.22 0.50 2.22 0.33

10.00 133.17 30.00 133.17 20.00

5.44

326.33

3.13 lm/hr

600Ø mm to Hauling Distance: 20.00 km(s) Quantity Quantity

1.00 1.00 196.35 1.00 37.00 37.00 7,264.93 37.00 20.00

Truck with Liting Boom Quantity 40.00 60.00 20.00

1000Ø mm

Unit Unit m m kgs m3 no(s) m kgs m3 km

Remarks Remarks

Unit km/hr km/hr tons

Remarks

Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

10.00 3.00 6.00 2.00 36.00 37.00

Time-Motion Table Activity

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty)

li/hr m m m m3 pcs

Time Required hrs

Rate

7.83 40.00 7.83 60.00

Total Productivity

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

Time Required minutes

0.17 4.73 0.50 4.73 0.33

10.00 283.67 30.00 283.67 20.00

10.46

627.33

3.54 lm/hr

300Ø mm to Hauling Distance: 20.00 km(s)

Quantity

0.50 1.00 49.09 0.25 145.00 145.00 7,117.67 36.25 20.00

Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 145.00

500Ø mm

Unit m m kgs m3 no(s) m kgs m3 km

Remarks

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Time-Motion Table Activity

Time Required hrs

Rate

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty)

8.00 40.00 8.00 60.00

Total Productivity

Time Required minutes

0.17 18.13 0.50 18.13 0.33

10.00 1,087.50 30.00 1,087.50 20.00

37.25

2,235.00

3.89 lm/hr

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

1600Ø mm to Hauling Distance: 15.00 km(s)

Quantity

Activity

Waiting / Maneuvering Loading of Pipes

Unit m m kgs m3 no(s) m kgs m3 km

Remarks

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Time Required hrs

Time Required minutes

2.00 1.00 785.40 4.00 10.00 10.00 7,853.98 40.00 15.00

Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 10.00

Time-Motion Table Rate

7.50

2000Ø mm

0.17 1.33

10.00 80.00

Travel (Loaded) Unloading of Pipes Travel (Empty)

40.00 7.50 60.00

Total Productivity

22.50 80.00 15.00

3.46

207.50

2.89 lm/hr

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

1200Ø mm to Hauling Distance: 15.00 km(s)

Quantity

Activity

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty) Total

Remarks

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Time Required hrs

Time Required minutes

Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 17.00

Rate

7.66 40.00 7.66 60.00

1500Ø mm

Unit m m kgs m3 no(s) m kgs m3 km

1.50 1.00 441.79 2.25 17.00 17.00 7,510.37 38.25 15.00

Time-Motion Table

Productivity

0.38 1.33 0.25

0.17 2.22 0.38 2.22 0.25

10.00 133.17 22.50 133.17 15.00

5.23

313.83

3.25 lm/hr

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

600Ø mm to Hauling Distance: 15.00 km(s)

Quantity

Activity

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty)

Unit m m kgs m3 no(s) m kgs m3 km

Remarks

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Time Required hrs

Time Required minutes

1.00 1.00 196.35 1.00 37.00 37.00 7,264.93 37.00 15.00

Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 37.00

Time-Motion Table Rate

7.83 40.00 7.83 60.00

Total Productivity

RC Pipe Hauling

Trial Pipe Set Parameter

1000Ø mm

0.17 4.73 0.38 4.73 0.25

10.00 283.67 22.50 283.67 15.00

10.25

614.83

3.61 lm/hr

300Ø mm to Hauling Distance: 15.00 km(s)

Quantity

Unit

500Ø mm

Remarks

Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

0.50 1.00 49.09 0.25 145.00 145.00 7,117.67 36.25 15.00 Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 145.00

Time-Motion Table Activity

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty)

m m kgs m3 no(s) m kgs m3 km

Rate

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Time Required hrs

Time Required minutes

8.00 40.00 8.00 60.00

Total Productivity

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight

0.17 18.13 0.38 18.13 0.25

10.00 1,087.50 22.50 1,087.50 15.00

37.04

2,222.50

3.91 lm/hr

1600Ø mm to Hauling Distance: 10.00 km(s)

Quantity

2.00 1.00 785.40 4.00 10.00 10.00 7,853.98

Unit m m kgs m3 no(s) m kgs

2000Ø mm

Remarks

Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

40.00 10.00 Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 10.00

Time-Motion Table Activity

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty)

m3 km

Rate

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Time Required hrs

Time Required minutes

7.50 40.00 7.50 60.00

Total Productivity

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty)

0.17 1.33 0.25 1.33 0.17

10.00 80.00 15.00 80.00 10.00

3.25

195.00

3.08 lm/hr

1200Ø mm to Hauling Distance: 10.00 km(s)

Quantity

1.50 1.00 441.79 2.25 17.00 17.00 7,510.37 38.25 10.00

Unit m m kgs m3 no(s) m kgs m3 km

Truck with Liting Boom Quantity Unit 40.00 km/hr 60.00 km/hr

1500Ø mm

Remarks

Remarks

Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

20.00 10.00 3.00 6.00 2.00 36.00 17.00

Time-Motion Table Activity

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty)

tons li/hr m m m m3 pcs

Time Required hrs

Rate

7.66 40.00 7.66 60.00

Total Productivity

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

Time Required minutes

0.17 2.22 0.25 2.22 0.17

10.00 133.17 15.00 133.17 10.00

5.02

301.33

3.38 lm/hr

600Ø mm to Hauling Distance: 10.00 km(s)

Quantity

1.00 1.00 196.35 1.00 37.00 37.00 7,264.93 37.00 10.00

Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 37.00

1000Ø mm

Unit m m kgs m3 no(s) m kgs m3 km

Remarks

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Time-Motion Table Activity

Time Required hrs

Rate

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty)

7.83 40.00 7.83 60.00

Total Productivity

Time Required minutes

0.17 4.73 0.25 4.73 0.17

10.00 283.67 15.00 283.67 10.00

10.04

602.33

3.69 lm/hr

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

300Ø mm to Hauling Distance: 10.00 km(s)

Quantity

Activity

Waiting / Maneuvering

Unit m m kgs m3 no(s) m kgs m3 km

Remarks

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Time Required hrs

Time Required minutes

0.50 1.00 49.09 0.25 145.00 145.00 7,117.67 36.25 10.00

Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 145.00

Time-Motion Table Rate

500Ø mm

0.17

10.00

Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty)

8.00 40.00 8.00 60.00

Total Productivity

18.13 0.25 18.13 0.17

1,087.50 15.00 1,087.50 10.00

36.83

2,210.00

3.94 lm/hr

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

1600Ø mm to Hauling Distance: 7.00 km(s)

Quantity

Activity

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty) Total

Unit m m kgs m3 no(s) m kgs m3 km

Remarks

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Time Required hrs

Time Required minutes

2.00 1.00 785.40 4.00 10.00 10.00 7,853.98 40.00 7.00

Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 10.00

Time-Motion Table Rate

7.50 40.00 7.50 60.00

2000Ø mm

0.17 1.33 0.18 1.33 0.12

10.00 80.00 10.50 80.00 7.00

3.13

187.50

Productivity

3.20 lm/hr

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

1200Ø mm to Hauling Distance: 7.00 km(s)

Quantity

Activity

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty) Total Productivity

RC Pipe Hauling

Trial Pipe Set

Unit m m kgs m3 no(s) m kgs m3 km

Remarks

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Time Required hrs

Time Required minutes

1.50 1.00 441.79 2.25 17.00 17.00 7,510.37 38.25 7.00

Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 17.00

Time-Motion Table Rate

7.66 40.00 7.66 60.00

1500Ø mm

0.17 2.22 0.18 2.22 0.12

10.00 133.17 10.50 133.17 7.00

4.90

293.83

3.47 lm/hr

600Ø mm to Hauling Distance: 7.00 km(s)

1000Ø mm

Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

Quantity

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty)

Remarks

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Time Required hrs

Time Required minutes

Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 37.00

Time-Motion Table Activity

Unit m m kgs m3 no(s) m kgs m3 km

1.00 1.00 196.35 1.00 37.00 37.00 7,264.93 37.00 7.00

Rate

7.83 40.00 7.83 60.00

Total Productivity

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length

0.17 4.73 0.18 4.73 0.12

10.00 283.67 10.50 283.67 7.00

9.91

594.83

3.73 lm/hr

300Ø mm to Hauling Distance: 7.00 km(s)

Quantity

0.50 1.00 49.09 0.25 145.00 145.00

Unit m m kgs m3 no(s) m

500Ø mm

Remarks

Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

7,117.67 36.25 7.00 Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 145.00

Time-Motion Table Activity

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty)

kgs m3 km

Rate

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Time Required hrs

Time Required minutes

8.00 40.00 8.00 60.00

Total Productivity

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded)

0.17 18.13 0.18 18.13 0.12

10.00 1,087.50 10.50 1,087.50 7.00

36.71

2,202.50

3.95 lm/hr

1600Ø mm to Hauling Distance: 5.00 km(s)

Quantity

2.00 1.00 785.40 4.00 10.00 10.00 7,853.98 40.00 5.00

Unit m m kgs m3 no(s) m kgs m3 km

Truck with Liting Boom Quantity Unit 40.00 km/hr

2000Ø mm

Remarks

Remarks

Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

60.00 20.00 10.00 3.00 6.00 2.00 36.00 10.00

Time-Motion Table Activity

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty)

km/hr tons li/hr m m m m3 pcs

Time Required hrs

Rate

7.50 40.00 7.50 60.00

Total Productivity

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume

Time Required minutes

0.17 1.33 0.13 1.33 0.08

10.00 80.00 7.50 80.00 5.00

3.04

182.50

3.29 lm/hr

1200Ø mm to Hauling Distance: 5.00 km(s)

Quantity

1.50 1.00 441.79 2.25 17.00 17.00 7,510.37 38.25 5.00

Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00

1500Ø mm

Unit m m kgs m3 no(s) m kgs m3 km

Remarks

Unit km/hr km/hr tons li/hr m m m m3

Remarks

Capacity (number of Pipes)

17.00

Time-Motion Table Activity

Time Required hrs

Rate

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty)

pcs

7.66 40.00 7.66 60.00

Total Productivity

Time Required minutes

0.17 2.22 0.13 2.22 0.08

10.00 133.17 7.50 133.17 5.00

4.81

288.83

3.53 lm/hr

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

600Ø mm to Hauling Distance: 5.00 km(s)

Quantity

Activity

Unit m m kgs m3 no(s) m kgs m3 km

Remarks

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Time Required hrs

Time Required minutes

1.00 1.00 196.35 1.00 37.00 37.00 7,264.93 37.00 5.00

Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 37.00

Time-Motion Table Rate

1000Ø mm

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty)

7.83 40.00 7.83 60.00

Total Productivity

0.17 4.73 0.13 4.73 0.08

10.00 283.67 7.50 283.67 5.00

9.83

589.83

3.76 lm/hr

RC Pipe Hauling

Trial Pipe Set Parameter Pipe Diameter Pipe Length Pipe Weight Pipe Volume (Cube Volume) Quantity of Pipes Total Pipe Length Total Pipe Weight Total Pipe Volume Hauling Distance Equipment Specifications Parameter Speed (Loaded) Speed (Empty) Load Capacity Fuel Consumption Loading Bay Width Loading Bay Length Loading Bay Height Loading Bay Volume Capacity (number of Pipes)

300Ø mm to Hauling Distance: 5.00 km(s)

Quantity

Activity

Waiting / Maneuvering Loading of Pipes Travel (Loaded) Unloading of Pipes Travel (Empty) Total

Unit m m kgs m3 no(s) m kgs m3 km

Remarks

Unit km/hr km/hr tons li/hr m m m m3 pcs

Remarks

Time Required hrs

Time Required minutes

0.50 1.00 49.09 0.25 145.00 145.00 7,117.67 36.25 5.00

Truck with Liting Boom Quantity 40.00 60.00 20.00 10.00 3.00 6.00 2.00 36.00 145.00

Time-Motion Table Rate

8.00 40.00 8.00 60.00

500Ø mm

0.17 18.13 0.13 18.13 0.08

10.00 1,087.50 7.50 1,087.50 5.00

36.63

2,197.50

Productivity

3.96 lm/hr

PRODUCTIVITY CALCULATIONS Concreting Concreting by Crane and Bucket Equipment Specifications Parameter Forward Speed Reverse Speed Capacity Bucket Capacity Fuel Consumption

Crane 25 Tons with 0.5 m3 Bucket Quantity Unit 40.00 km/hr 10.00 km/hr 25.00 tons 0.50 m3 10.00 li/hr

Time-Motion Table Activity

Maneuver Swing Boom w/ Empty Bucket Load Concrete Swing Boom w/ Loaded Bucket Unload Concrete Swing Boom w/ Empty Bucket Load Concrete Swing Boom w/ Loaded Bucket Unload Concrete Swing Boom w/ Empty Bucket Load Concrete Swing Boom w/ Loaded Bucket Unload Concrete Swing Boom w/ Empty Bucket Load Concrete Swing Boom w/ Loaded Bucket Unload Concrete Swing Boom w/ Empty Bucket Load Concrete Swing Boom w/ Loaded Bucket Unload Concrete Swing Boom w/ Empty Bucket Load Concrete Swing Boom w/ Loaded Bucket Unload Concrete Swing Boom w/ Empty Bucket Load Concrete Swing Boom w/ Loaded Bucket Unload Concrete Swing Boom w/ Empty Bucket

Rate

Volume = Time Required hrs

8.00 cu.m. Time Required minutes

0.08 0.01 0.02 0.01 0.05 0.01 0.02 0.01 0.05 0.01 0.02 0.01 0.05 0.01 0.02 0.01 0.05 0.01 0.02 0.01 0.05 0.01 0.02 0.01 0.05 0.01 0.02 0.01 0.05 0.01

5.00 0.33 1.00 0.75 3.00 0.33 1.00 0.75 3.00 0.33 1.00 0.75 3.00 0.33 1.00 0.75 3.00 0.33 1.00 0.75 3.00 0.33 1.00 0.75 3.00 0.33 1.00 0.75 3.00 0.33

Load Concrete Swing Boom w/ Loaded Bucket Unload Concrete Swing Boom w/ Empty Bucket Load Concrete Swing Boom w/ Loaded Bucket Unload Concrete Swing Boom w/ Empty Bucket Load Concrete Swing Boom w/ Loaded Bucket Unload Concrete Swing Boom w/ Empty Bucket Load Concrete Swing Boom w/ Loaded Bucket Unload Concrete Swing Boom w/ Empty Bucket Load Concrete Swing Boom w/ Loaded Bucket Unload Concrete Swing Boom w/ Empty Bucket Load Concrete Swing Boom w/ Loaded Bucket Unload Concrete Swing Boom w/ Empty Bucket Load Concrete Swing Boom w/ Loaded Bucket Unload Concrete Swing Boom w/ Empty Bucket Load Concrete Swing Boom w/ Loaded Bucket Unload Concrete Swing Boom w/ Empty Bucket Load Concrete Swing Boom w/ Loaded Bucket Unload Concrete

Total Productivity

1.00 0.75 3.00 0.33 1.00 0.75 3.00 0.33 1.00 0.75 3.00 0.33 1.00 0.75 3.00 0.33 1.00 0.75 3.00 0.33 1.00 0.75 3.00 0.33 1.00 0.75 3.00 0.33 1.00 0.75 3.00 0.33 1.00 0.75 3.00

1.44

86.33

5.56 m3/hr

Concreting by Truck-Mounted Concrete Pump Equipment Specifications Parameter Forward Speed Reverse Speed Pump Rate Fuel Consumption

0.02 0.01 0.05 0.01 0.02 0.01 0.05 0.01 0.02 0.01 0.05 0.01 0.02 0.01 0.05 0.01 0.02 0.01 0.05 0.01 0.02 0.01 0.05 0.01 0.02 0.01 0.05 0.01 0.02 0.01 0.05 0.01 0.02 0.01 0.05

Truck-mounted Concrete Quantity Unit 60.00 km/hr 10.00 km/hr 50.00 m3/hr 10.00 li/hr

Time-Motion Table Activity

Maneuver / Set-up Extend / Swing / Position Boom Prime / Grout Pump Pre-load Pump Pump Concrete (Mixer 1) Wait / Reposition Boom Pump Concrete (Mixer 2) Wait / Reposition Boom Pump Concrete (Mixer 3) Wait / Reposition Boom Pump Concrete (Mixer 4) Wait / Reposition Boom Pump Concrete (Mixer 5) Wait / Reposition Boom Pump Concrete (Mixer 6) Wait / Reposition Boom Pump Concrete (Mixer 7) Wait / Reposition Boom Pump Concrete (Mixer 8) Wait / Reposition Boom Pump Concrete (Mixer 9) Wait / Reposition Boom Pump Concrete (Mixer 10) Wait / Reposition Boom Clean-up Swing / Retract Boom

Total Productivity

Rate

50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00

Volume = Time Required hrs

80.00 cu.m. Time Required minutes

0.25 0.17 0.17 0.03 0.16 0.08 0.16 0.08 0.16 0.08 0.16 0.08 0.16 0.08 0.16 0.08 0.16 0.08 0.16 0.08 0.16 0.08 0.16 0.08 0.25 0.08

15.00 10.00 10.00 2.00 9.60 5.00 9.60 5.00 9.60 5.00 9.60 5.00 9.60 5.00 9.60 5.00 9.60 5.00 9.60 5.00 9.60 5.00 9.60 5.00 15.00 5.00

3.38

203.00

23.65 m3/hr

PRODUCTIVITY CALCULATIONS

MATERIALS HANDLING MATERIALS LOADING/UNLOADING REBAR LOADING/UNLOADING Load Assumptions Parameter Weight per Bundle Maximum Truck Capacity Total Number of Bundles Equipment Specifications Parameter Forward Speed Reverse Speed Lifting Capacity Fuel Consumption Swing-Hoist Up-Swing-Hoist Down

Quantity 2,500.00 20,000.00 8.00

Unit kgs kgs bundles

Remarks

Crane 25.00 Tons Quantity 2.00 2.00 25.00 27.00 120.00

Unit km/hr km/hr tons li/hr secs

Remarks

Rate

Time Required hrs

Time Required minutes

Time-Motion Table Activity

Equipment Set-up / Waiting Set-up / Waiting / Maneuvering Loading/Unloading Tie/Rig Bundle Swing-Hoist Up-Swing-Hoist Down Unrig Bundle Misc. Waiting

120.00

Loading/Unloading Cycle Total Productivity

0.33

20.00

0.05 0.03 0.05 0.02

3.00 2.00 3.00 1.00

1.05

63.00

1.53

92.00

13.04 ton(s)/hr

FORMWORKS LOADING / UNLOADING Load Assumptions Parameter Weight per Load/Lift Volume per Load/Lift Area / Load Maximum Truck Capacity (Weight)

Quantity 1,235.50 3.65 28.80 10,000.00

Unit kgs m3 m2 kgs

Remarks

Maximum Truck Capacity (Volume) Total Number of Loads/Lifts Total Area

15.00 4.00 115.20

m3 loads/lifts m2

Equipment Specifications Parameter Forward Speed Reverse Speed Lifting Capacity Fuel Consumption Swing-Hoist Up-Swing-Hoist Down

Crane 25.00 Tons Quantity 2.00 2.00 25.00 27.00 120.00

Unit km/hr km/hr tons li/hr secs

Remarks

Rate

Time Required hrs

Time Required minutes

Time-Motion Table Activity

Equipment Set-up / Waiting Set-up / Waiting / Maneuvering Loading/Unloading Tie/Rig Load Swing-Hoist Up-Swing-Hoist Down Unrig Load Misc. Waiting

120.00

Loading/Unloading Cycle Total Productivity

0.33

20.00

0.08 0.03 0.08 0.02

5.00 2.00 5.00 1.00

0.65

39.00

1.20

72.00

96.00 m2/hr

MATERIALS HAULING REINFORCING BAR HAULING Equipment Specifications Parameter Loaded Speed Empty Speed Load Capacity (Weight) Fuel Consumption

Flat Bed Truck Quantity 35.00 40.00 20,000.00 15.00

AHD = Time-Motion Table

5.000 km(s)

Activity

Rate

Unit km/hr km/hr kgs. li/hr

###

Time Required hrs

Time Required minutes

Maneuver & Wait Wait While Loading Travel (Loaded) Wait While Unloading Travel (Empty)

13.04 ton(s)/hr 35.00 13.04 ton(s)/hr 40.00

Total Productivity

AHD= 5.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Wait While Unloading Travel (Empty)

Rate

13.04 ton(s)/hr 35.00 13.04 ton(s)/hr 40.00

AHD= 7.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Wait While Unloading Travel (Empty)

Rate

13.04 ton(s)/hr 35.00 13.04 ton(s)/hr 40.00

AHD= 10.000 km(s)

AHD = Time-Motion Table Activity

3.42

205.07

5.85 ton(s)/hr

Time Required hrs

Time Required minutes

0.08 1.53 0.20 1.53 0.18

5.00 92.00 12.00 92.00 10.50

3.53

211.50

5.67 ton(s)/hr

10.000 km(s)

Total Productivity

5.00 92.00 8.57 92.00 7.50

7.000 km(s)

Total Productivity

0.08 1.53 0.14 1.53 0.13

Time Required hrs

Time Required minutes

0.08 1.53 0.29 1.53 0.25

5.00 92.00 17.14 92.00 15.00

3.69

221.14

5.43 ton(s)/hr

15.000 km(s)

Rate

Time Required hrs

Time Required minutes

Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Wait While Unloading Travel (Empty)

Rate

13.04 ton(s)/hr 35.00 13.04 ton(s)/hr 40.00

Total Productivity

AHD= 15.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Wait While Unloading Travel (Empty)

Rate

13.04 ton(s)/hr 35.00 13.04 ton(s)/hr 40.00

AHD= 20.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Wait While Unloading Travel (Empty)

Rate

13.04 ton(s)/hr 35.00 13.04 ton(s)/hr 40.00

AHD= 25.000 km(s)

AHD = Time-Motion Table Activity

3.95

237.21

5.06 ton(s)/hr

Time Required hrs

Time Required minutes

0.08 1.53 0.57 1.53 0.50

5.00 92.00 34.29 92.00 30.00

4.22

253.29

4.74 ton(s)/hr

25.000 km(s)

Total Productivity

5.00 92.00 25.71 92.00 22.50

20.000 km(s)

Total Productivity

0.08 1.53 0.43 1.53 0.38

Time Required hrs

Time Required minutes

0.08 1.53 0.71 1.53 0.63

5.00 92.00 42.86 92.00 37.50

4.49

269.36

4.46 ton(s)/hr

30.000 km(s)

Rate

Time Required

Time Required

Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Wait While Unloading Travel (Empty)

Rate

hrs

13.04 ton(s)/hr 35.00 13.04 ton(s)/hr 40.00

Total Productivity

minutes

0.08 1.53 0.86 1.53 0.75

5.00 92.00 51.43 92.00 45.00

4.76

285.43

4.20 ton(s)/hr

AHD= 30.000 km(s)

FORMWORKS HAULING Equipment Specifications Parameter Loaded Speed Empty Speed Load Capacity (Form Area) Load Capacity (Weight) Fuel Consumption

Cargo Truck Quantity 40.00 60.00 115.20 4,941.99 15.00

AHD = Time-Motion Table

5.000 km(s)

Activity

96.00 40.00 96.00 60.00

Total Productivity

AHD= 5.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded)

###

Time Required hrs

Rate

Maneuver & Wait Wait While Loading Travel (Loaded) Wait While Unloading Travel (Empty)

Unit km/hr km/hr m2 kgs. li/hr

Time Required minutes

0.08 1.20 0.13 1.20 0.08

5.00 72.00 7.50 72.00 5.00

2.69

161.50

42.80 m2/hr

7.000 km(s) Time Required hrs

Rate

96.00 40.00

0.08 1.20 0.18

Time Required minutes

5.00 72.00 10.50

Wait While Unloading Travel (Empty)

96.00 60.00

Total Productivity

AHD= 7.000 km(s)

AHD = Time-Motion Table Activity

96.00 40.00 96.00 60.00

AHD= 10.000 km(s)

Activity

96.00 40.00 96.00 60.00

AHD= 15.000 km(s)

Activity

Maneuver & Wait Wait While Loading

41.51 m2/hr

Time Required minutes

0.08 1.20 0.35 1.20 0.17

5.00 72.00 21.08 72.00 10.00

3.00

180.08

38.38 m2/hr

Time Required hrs

Rate

Total

AHD = Time-Motion Table

166.50

15.000 km(s)

Maneuver & Wait Wait While Loading Travel (Loaded) Wait While Unloading Travel (Empty)

Productivity

2.78

Time Required hrs

Rate

Total

AHD = Time-Motion Table

72.00 7.00

10.000 km(s)

Maneuver & Wait Wait While Loading Travel (Loaded) Wait While Unloading Travel (Empty)

Productivity

1.20 0.12

Time Required minutes

0.08 1.20 0.38 1.20 0.25

5.00 72.00 22.50 72.00 15.00

3.11

186.50

37.06 m2/hr

20.000 km(s) Time Required hrs

Rate

96.00

0.08 1.20

Time Required minutes

5.00 72.00

Travel (Loaded) Wait While Unloading Travel (Empty)

40.00 96.00 60.00

Total Productivity

Activity

Rate

96.00 40.00 96.00 60.00

Maneuver & Wait Wait While Loading Travel (Loaded) Wait While Unloading Travel (Empty)

0.08 1.20 0.63 1.20 0.42

5.00 72.00 37.50 72.00 25.00

3.53

211.50

30.000 km(s) Time Required hrs

Rate

96.00 40.00 96.00 60.00

Total Productivity

5.00 72.00 45.00 72.00 30.00

3.73

224.00

30.86 m2/hr

AHD= 30.000 km(s)

Cargo Truck Quantity 40.00 60.00 15,000.00

Time Required minutes

0.08 1.20 0.75 1.20 0.50

CEMENT (IN BAGS) HAULING Equipment Specifications Parameter Loaded Speed Empty Speed Load Capacity (Weight)

Time Required minutes

32.68 m2/hr

AHD= 25.000 km(s)

Activity

199.00

Time Required hrs

Total

AHD = Time-Motion Table

3.32

25.000 km(s)

Maneuver & Wait Wait While Loading Travel (Loaded) Wait While Unloading Travel (Empty)

Productivity

30.00 72.00 20.00

34.73 m2/hr

AHD= 20.000 km(s)

AHD = Time-Motion Table

0.50 1.20 0.33

Unit km/hr km/hr kgs.

###

Load Capacity (Bags) Fuel Consumption

375.00 15.00

kgs. li/hr

Cement Loading / Unloading Rate

109.76

bags/hr

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Wait While Unloading Travel (Empty)

5.000 km(s)

Rate

109.76 40.00 109.76 60.00

Total Productivity

AHD= 5.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Wait While Unloading Travel (Empty)

Rate

109.76 40.00 109.76 60.00

AHD= 7.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Wait While Unloading Travel (Empty)

Time Required hrs

Time Required minutes

0.08 3.42 0.13 3.42 0.08

5.00 205.00 7.50 205.00 5.00

7.13

427.50

52.63 bags/hr

7.000 km(s)

Total Productivity

Refer to Labor Productivity

Time Required hrs

Time Required minutes

0.08 3.42 0.18 3.42 0.12

5.00 205.00 10.50 205.00 7.00

7.21

432.50

52.02 bags/hr

10.000 km(s)

Rate

109.76 40.00 109.76 60.00

Time Required hrs

0.08 3.42 0.25 3.42 0.17

Time Required minutes

5.00 205.00 15.00 205.00 10.00

Total Productivity

7.33 AHD= 10.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Wait While Unloading Travel (Empty)

Rate

109.76 40.00 109.76 60.00

AHD= 15.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Wait While Unloading Travel (Empty)

Rate

109.76 40.00 109.76 60.00

AHD= 20.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Wait While Unloading

Time Required hrs

Time Required minutes

0.08 3.42 0.38 3.42 0.25

5.00 205.00 22.50 205.00 15.00

7.54

452.50

49.72 bags/hr

20.000 km(s)

Total Productivity

51.14 bags/hr

15.000 km(s)

Total Productivity

440.00

Time Required hrs

Time Required minutes

0.08 3.42 0.50 3.42 0.33

5.00 205.00 30.00 205.00 20.00

7.75

465.00

48.39 bags/hr

25.000 km(s)

Rate

109.76 40.00 109.76

Time Required hrs

0.08 3.42 0.63 3.42

Time Required minutes

5.00 205.00 37.50 205.00

Travel (Empty)

60.00 Total

Productivity

AHD= 25.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Wait While Unloading Travel (Empty)

25.00

7.96

477.50

47.12 bags/hr

30.000 km(s)

Rate

109.76 40.00 109.76 60.00

Total Productivity

0.42

AHD= 30.000 km(s)

Time Required hrs

Time Required minutes

0.08 3.42 0.75 3.42 0.50

5.00 205.00 45.00 205.00 30.00

8.17

490.00

45.92 bags/hr

Material Plywood Timber/Wood Scaffolds

Dimension 2.4mx1.2mx12mm 100mm x 50mm x 6m 1500mm x 1200mm

Unit Weight 300 kg/m3 500 kg/m3 7850 kg/m3

For Columns / Walls: Plywood Timber/Wood Scaffolds

1 m2 10.4 lm 0 pcs

10.4

For Slab Plywood Timber/Wood Scaffolds

1 m2 9 lm 2 pcs

9 2

to Labor Productivity

Volume / Pc. 0.03 cu.m. 0.03 cu.m. 0.09 cu.m.

Weight / Pc. 10.37 kgs 15.00 kgs 19.09 kgs

No. of Pcs. Total Volume 10 0.35 cu.m. 50 1.5 cu.m. 20 1.8 cu.m. Total 3.65 cu.m.

Total Weight 103.68 kgs 750.00 kgs 381.82 kgs 1235.50 kgs

Total Area 28.80 sq.m.

28.80 kgs

lm/m

2

lm/m pcs/m2 2

0.01 m3/m2 0.05 m3/m2

3.60 kgs/m2 26.00 kgs/m2

Total

29.60 kgs/m2

0.01 m3/m2 0.05 m3/m2 0.18 m3/m2 Total

3.60 22.50 38.18 64.28

kgs/m2 kgs/m2 kgs/m2 kgs/m2

0.42 5.00

0.42 4.00 2.00

Remarks

pc pcs/pc of plywood

USE

pc pcs/pc of plywood pcs/pc of plywood

USE

PRODUCTIVITY CALCULATIONS Concrete Paving Concrete Paving t = 230.00 mm Equipment Specifications Parameter Forward Speed Reverse Speed Capacity (area/pass) Screed Width Boom Speed Trial Strip

Parameter Pavement Length Pavement Width Pavement Thickness Area of Pavement Volume No of Setups / Positions

Somero 160 - Concrete Paver/Finisher Quantity Unit 6.10 km/hr 3.00 km/hr 14.90 m2/pass 2.44 m 108.00 m/hr

Quantity 30.00 3.65 230.00 109.50 25.19 13.00

Time-Motion Table Activity

Rate

Mobilization / Setup / Wait Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete

6.10 108.00 81.00 6.10 108.00 81.00 6.10 108.00 81.00 6.10 108.00 81.00

Unit m m mm m2 m3

Volume = Time Required hrs

25.19 cu.m. Time Required minutes

0.67

40.00

0.00 0.03 0.01 0.05 0.01 0.00 0.03 0.01 0.05 0.01 0.00 0.03 0.01 0.05 0.01 0.00 0.03 0.01 0.05

0.02 2.03 0.50 2.70 0.50 0.02 2.03 0.50 2.70 0.50 0.02 2.03 0.50 2.70 0.50 0.02 2.03 0.50 2.70

Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust

6.10 108.00 81.00 6.10 108.00 81.00 6.10 108.00 81.00 6.10 108.00 81.00 6.10 108.00 81.00 6.10 108.00 81.00 6.10 108.00 81.00 6.10 108.00 81.00 6.10 108.00 81.00 0 0 0 0

-

0.01 0.00 0.03 0.01 0.05 0.01 0.00 0.03 0.01 0.05 0.01 0.00 0.03 0.01 0.05 0.01 0.00 0.03 0.01 0.05 0.01 0.00 0.03 0.01 0.05 0.01 0.00 0.03 0.01 0.05 0.01 0.00 0.03 0.01 0.05 0.01 0.00 0.03 0.01 0.05 0.01 0.00 0.03 0.01 0.05 0.01 -

0.50 0.02 2.03 0.50 2.70 0.50 0.02 2.03 0.50 2.70 0.50 0.02 2.03 0.50 2.70 0.50 0.02 2.03 0.50 2.70 0.50 0.02 2.03 0.50 2.70 0.50 0.02 2.03 0.50 2.70 0.50 0.02 2.03 0.50 2.70 0.50 0.02 2.03 0.50 2.70 0.50 0.02 2.03 0.50 2.70 0.50 -

0 0 0 0 0 0

-

-

Cleanup / Demobilization Total

-

0.67

40.00

2.58

154.82

Productivity

9.76 m3/hr

Productivity

42.44 m2/hr

Concrete Paving t = 270.00 mm Equipment Specifications Parameter Forward Speed Reverse Speed Capacity (area/pass) Screed Width Boom Speed Trial Strip

Parameter Pavement Length Pavement Width Pavement Thickness Area of Pavement Volume No of Setups / Positions

Somero 160 - Concrete Paver/Finisher Quantity Unit 6.10 km/hr 3.00 km/hr 14.90 m2/pass 2.44 m 90.00 m/hr

Quantity 30.00 3.65 270.00 109.50 29.57 13.00

Time-Motion Table Activity

Rate

Mobilization / Setup / Wait Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust

6.10 90.00 81.00

Unit m m mm m2 m3

Volume = Time Required hrs

29.57 cu.m. Time Required minutes

0.67

40.00

0.00 0.04 0.01 0.05 0.01

0.02 2.43 0.50 2.70 0.50

Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust

6.10 90.00 81.00 6.10 90.00 81.00 6.10 90.00 81.00 6.10 90.00 81.00 6.10 90.00 81.00 6.10 90.00 81.00 6.10 90.00 81.00 6.10 90.00 81.00 6.10 90.00 81.00 6.10 90.00 81.00

0.00 0.04 0.01 0.05 0.01 0.00 0.04 0.01 0.05 0.01 0.00 0.04 0.01 0.05 0.01 0.00 0.04 0.01 0.05 0.01 0.00 0.04 0.01 0.05 0.01 0.00 0.04 0.01 0.05 0.01 0.00 0.04 0.01 0.05 0.01 0.00 0.04 0.01 0.05 0.01 0.00 0.04 0.01 0.05 0.01 0.00 0.04 0.01 0.05 0.01

0.02 2.43 0.50 2.70 0.50 0.02 2.43 0.50 2.70 0.50 0.02 2.43 0.50 2.70 0.50 0.02 2.43 0.50 2.70 0.50 0.02 2.43 0.50 2.70 0.50 0.02 2.43 0.50 2.70 0.50 0.02 2.43 0.50 2.70 0.50 0.02 2.43 0.50 2.70 0.50 0.02 2.43 0.50 2.70 0.50 0.02 2.43 0.50 2.70 0.50

Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust

6.10 90.00 81.00 6.10 90.00 81.00 0 0 0 0 0 0 0 0 0 0

-

Cleanup / Demobilization Total

0.00 0.04 0.01 0.05 0.01 0.00 0.04 0.01 0.05 0.01 -

0.02 2.43 0.50 2.70 0.50 0.02 2.43 0.50 2.70 0.50 -

0.67

40.00

2.67

160.09

Productivity

11.08 m3/hr

Productivity

41.04 m2/hr

Concrete Paving t = 300.00 mm Equipment Specifications Parameter Forward Speed Reverse Speed Capacity (area/pass) Screed Width Boom Speed Trial Strip

Parameter Pavement Length Pavement Width Pavement Thickness Area of Pavement Volume No of Setups / Positions

Somero 160 - Concrete Paver/Finisher Quantity Unit 6.10 km/hr 3.00 km/hr 14.90 m2/pass 2.44 m 72.00 m/hr

Quantity 30.00 3.65 300.00 109.50 32.85 13.00

Unit m m mm m2 m3

Time-Motion Table Activity

Rate

Mobilization / Setup / Wait Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward

6.10 72.00 81.00 6.10 72.00 81.00 6.10 72.00 81.00 6.10 72.00 81.00 6.10 72.00 81.00 6.10 72.00 81.00 6.10 72.00 81.00 6.10 72.00 81.00 6.10

Volume = Time Required hrs

32.85 cu.m. Time Required minutes

0.67

40.00

0.00 0.05 0.01 0.05 0.01 0.00 0.05 0.01 0.05 0.01 0.00 0.05 0.01 0.05 0.01 0.00 0.05 0.01 0.05 0.01 0.00 0.05 0.01 0.05 0.01 0.00 0.05 0.01 0.05 0.01 0.00 0.05 0.01 0.05 0.01 0.00 0.05 0.01 0.05 0.01 0.00

0.02 3.04 0.50 2.70 0.50 0.02 3.04 0.50 2.70 0.50 0.02 3.04 0.50 2.70 0.50 0.02 3.04 0.50 2.70 0.50 0.02 3.04 0.50 2.70 0.50 0.02 3.04 0.50 2.70 0.50 0.02 3.04 0.50 2.70 0.50 0.02 3.04 0.50 2.70 0.50 0.02

Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust Move Forward Extend Boom Lower Boom / Adjust Retract Boom / Pave Concrete Raise Boom / Adjust

Cleanup / Demobilization Total

72.00 81.00 6.10 72.00 81.00 6.10 72.00 81.00 6.10 72.00 81.00 6.10 72.00 81.00 0 0 0 0 0 0 0 0 0 0

-

0.05 0.01 0.05 0.01 0.00 0.05 0.01 0.05 0.01 0.00 0.05 0.01 0.05 0.01 0.00 0.05 0.01 0.05 0.01 0.00 0.05 0.01 0.05 0.01 -

3.04 0.50 2.70 0.50 0.02 3.04 0.50 2.70 0.50 0.02 3.04 0.50 2.70 0.50 0.02 3.04 0.50 2.70 0.50 0.02 3.04 0.50 2.70 0.50 -

0.67

40.00

2.80

168.00

Productivity

11.73 m3/hr

Productivity

39.11 m2/hr

Setup Number

-

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

13.00

13.00

-

Setup Number

-

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

13.00

13.00

-

Setup Number

-

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

13.00

13.00

-

PRODUCTIVITY CALCULATIONS Asphalt Paving Asphalt Paver Specifications Paver Type / Make / Model

Paver Width (m)

Dynapac F300 CS Dynapac F182 CS Dynapac F181 C Dynapac F141 CS

Working Speed (km/hr)

16.00 6.10 3.00 5.10

Travel Speed (km/hr)

1.2 1.38 1.2 1.2

3.6 5 3.8 4.6

Tonnage = Time Required hrs

120.45 tons Time Required minutes

0.67

40.00

1.20

0.08 0.03 0.08

5.00 1.67 5.00

Load Pave Stop & Wait

1.20

0.08 0.03 0.08

5.00 1.67 5.00

Load Pave Stop & Wait

1.20

0.08 0.03 0.08

5.00 1.67 5.00

0.08 0.03

5.00 1.67

Asphalt Paving t = 50.00 mm Trial Strip

Parameter Pavement Length Pavement Width Pavement Thickness Area of Pavement Volume Tonnage Number of Load(s) Length Paved / Load

Quantity 300.00 3.65 50.00 1,095.00 54.75 120.45 9.00 33.33

Time-Motion Table Activity

Rate

Mobilization / Setup / Wait Load Pave Stop & Wait

Load Pave

1.20

Unit m m mm m2 m3 tons m

Stop & Wait

0.08

5.00

Load Pave Stop & Wait

1.20

0.08 0.03 0.08

5.00 1.67 5.00

Load Pave Stop & Wait

1.20

0.08 0.03 0.08

5.00 1.67 5.00

Load Pave Stop & Wait

1.20

0.08 0.03 0.08

5.00 1.67 5.00

Load Pave Stop & Wait

1.20

0.08 0.03 0.08

5.00 1.67 5.00

Load Pave Stop & Wait

1.20

0.08 0.03 0.08

5.00 1.67 5.00

0 0 0

-

-

-

0 0 0

-

-

-

0 0 0

-

-

-

0 0 0

-

-

-

0 0 0

-

-

-

0 0 0

-

-

-

-

-

-

0 0 0

0 0 0

-

-

-

0 0 0

-

-

-

Cleanup / Demobilization Total Productivity

0.67

40.00

3.08

185.00

39.06 ton(s)/hr

Productivity

355.14 m2/hr

Asphalt Paving t = 75.00 mm Trial Strip

Parameter Pavement Length Pavement Width Pavement Thickness Area of Pavement Volume Tonnage Number of Load(s) Length Paved / Load

Quantity 300.00 3.65 75.00 1,095.00 82.13 180.68 14.00 21.43

Time-Motion Table

Unit m m mm m2 m3 tons m Tonnage = Time Required hrs

180.68 tons Time Required minutes

Mobilization / Setup / Wait

0.67

40.00

Load Pave Stop & Wait

1.14

0.08 0.02 0.08

5.00 1.13 5.00

Load Pave Stop & Wait

1.14

0.08 0.02 0.08

5.00 1.13 5.00

0.08 0.02

5.00 1.13

Activity

Load Pave

Rate

1.14

Stop & Wait

0.08

5.00

Load Pave Stop & Wait

1.14

0.08 0.02 0.08

5.00 1.13 5.00

Load Pave Stop & Wait

1.14

0.08 0.02 0.08

5.00 1.13 5.00

Load Pave Stop & Wait

1.14

0.08 0.02 0.08

5.00 1.13 5.00

Load Pave Stop & Wait

1.14

0.08 0.02 0.08

5.00 1.13 5.00

Load Pave Stop & Wait

1.14

0.08 0.02 0.08

5.00 1.13 5.00

Load Pave Stop & Wait

1.14

0.08 0.02 0.08

5.00 1.13 5.00

Load Pave Stop & Wait

1.14

0.08 0.02 0.08

5.00 1.13 5.00

Load Pave Stop & Wait

1.14

0.08 0.02 0.08

5.00 1.13 5.00

Load Pave Stop & Wait

1.14

0.08 0.02 0.08

5.00 1.13 5.00

Load Pave Stop & Wait

1.14

0.08 0.02 0.08

5.00 1.13 5.00

Load Pave Stop & Wait

1.14

0.08 0.02 0.08

5.00 1.13 5.00

-

-

-

0 0 0

0 0 0

-

-

-

0 0 0

-

-

-

-

-

-

0 0 0

Cleanup / Demobilization Total Productivity

0.67

40.00

3.93

235.79

45.98 ton(s)/hr

Productivity

278.64 m2/hr

Asphalt Paving t = 100.00 mm Trial Strip

Parameter Pavement Length Pavement Width Pavement Thickness Area of Pavement Volume Tonnage Number of Load(s) Length Paved / Load

Quantity 300.00 3.65 100.00 1,095.00 109.50 240.90 18.00 16.67

Time-Motion Table Activity

Rate

Mobilization / Setup / Wait Load Pave Stop & Wait Load Pave

1.08

1.08

Unit m m mm m2 m3 tons m Tonnage = Time Required hrs

240.90 tons Time Required minutes

0.67

40.00

0.08 0.02 0.08

5.00 0.93 5.00

0.08 0.02

5.00 0.93

Stop & Wait

0.08

5.00

Load Pave Stop & Wait

1.08

0.08 0.02 0.08

5.00 0.93 5.00

Load Pave Stop & Wait

1.08

0.08 0.02 0.08

5.00 0.93 5.00

Load Pave Stop & Wait

1.08

0.08 0.02 0.08

5.00 0.93 5.00

Load Pave Stop & Wait

1.08

0.08 0.02 0.08

5.00 0.93 5.00

Load Pave Stop & Wait

1.08

0.08 0.02 0.08

5.00 0.93 5.00

Load Pave Stop & Wait

1.08

0.08 0.02 0.08

5.00 0.93 5.00

Load Pave Stop & Wait

1.08

0.08 0.02 0.08

5.00 0.93 5.00

Load Pave Stop & Wait

1.08

0.08 0.02 0.08

5.00 0.93 5.00

Load Pave Stop & Wait

1.08

0.08 0.02 0.08

5.00 0.93 5.00

Load Pave Stop & Wait

1.08

0.08 0.02 0.08

5.00 0.93 5.00

Load Pave Stop & Wait

1.08

0.08 0.02 0.08

5.00 0.93 5.00

1.08

0.08 0.02 0.08

5.00 0.93 5.00

Load Pave Stop & Wait

Cleanup / Demobilization Total Productivity Productivity

0 0 0

1.08

0.08 0.02 0.08

5.00 0.93 5.00

0 0 0

1.08

0.08 0.02 0.08

5.00 0.93 5.00

0 0 0

1.08

0.08 0.02 0.08

5.00 0.93 5.00

0 0 0

1.08

0.08 0.02 0.08

5.00 0.93 5.00

0 0 0

-

-

-

0 0 0

-

-

-

0.67

40.00

4.61

276.67

52.24 ton(s)/hr 237.47 m2/hr

Laying Thickness (mm) 350 350 300 300

Setup Number

1.00

2.00

3.00

Hopper Capacity (m3) tons 6.80 7.80 6.00 6.00

15.00 18.10 13.00 13.00

4.00

5.00

6.00

7.00

8.00

9.00

9.00

9.00

9.00

9.00

9.00

9.00

9.00

9.00

9.00

-

6.00 truckloads 30.83 mins/truckloads

Setup Number

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00

14.00

14.00

14.00

14.00

-

6.00 truckloads 39.30 mins/truckloads

Setup Number

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

18.00

18.00

18.00

-

6.00 truckloads 46.11 mins/truckloads

PRODUCTIVITY CALCULATIONS Asphalt Compacting Asphalt Compactor Specifications Paver Type / Make / Model

Drum Width (m)

Dynapac CC142 Dynapac CG223HF Dynapac CC322

Working Speed (km/hr)

1.30 1.45 1.68

Travel Speed (km/hr)

1 1.2 1.3

10 12 13

Tonnage = Time Required hrs

13.38 tons Time Required minutes

0.17

10.00

Asphalt Paving t = 50.00 mm Asphalt Compactor Specifications Parameter Forward Speed Reverse Speed Drum Width Trial Strip

Parameter Pavement Length Pavement Width Pavement Thickness Area of Pavement Volume Tonnage No. of Passes (per drum width) Total No. of Passes

Quantity

1.30 1.30 1.68

Quantity 33.33 3.65 50.00 121.67 6.08 13.38 7.00 3.00

Time-Motion Table Activity

Rate

Wait

Unit km/hr km/hr m

Unit m m mm m2 m3 tons passes passes

Move Forward Reverse

1.30 1.30

0.03 0.03

1.54 1.54

Move Forward Reverse

1.30 1.30

0.03 0.03

1.54 1.54

Move Forward

1.30

0.03

1.54

Reverse

1.30

0.03

1.54

Move Forward Reverse

1.30 1.30

0.03 0.03

1.54 1.54

Move Forward Reverse

1.30 1.30

0.03 0.03

1.54 1.54

Move Forward Reverse

1.30 1.30

0.03 0.03

1.54 1.54

Move Forward Reverse

1.30 1.30

0.03 0.03

1.54 1.54

0 0

-

-

-

0 0

-

-

-

0 0

-

-

-

0 0

-

-

-

0 0

-

-

-

Compaction Cycle

3 cycles

Wait Total Productivity

21.54

0.17

10.00

1.41

41.54

9.49 ton(s)/hr

Productivity

86.27 m2/hr

Asphalt Paving t = 75.00 mm Asphalt Compactor Specifications Parameter Forward Speed Reverse Speed Drum Width

1.08

Quantity

1.30 1.30 1.68

Unit km/hr km/hr m

Trial Strip

Parameter Pavement Length Pavement Width Pavement Thickness Area of Pavement Volume Tonnage No. of Passes (per drum width) Total No. of Passes

Quantity 21.43 3.65 75.00 78.21 5.87 12.91 7.00 3.00

Time-Motion Table Activity

Rate

Wait

Unit m m mm m2 m3 tons passes passes Tonnage = Time Required hrs

12.91 tons Time Required minutes

0.17

10.00

Move Forward Reverse

1.30 1.30

0.02 0.02

0.99 0.99

Move Forward Reverse

1.30 1.30

0.02 0.02

0.99 0.99

Move Forward Reverse

1.30 1.30

0.02 0.02

0.99 0.99

Move Forward Reverse

1.30 1.30

0.02 0.02

0.99 0.99

Move Forward Reverse

1.30 1.30

0.02 0.02

0.99 0.99

Move Forward Reverse

1.30 1.30

0.02 0.02

0.99 0.99

Move Forward Reverse

1.30 1.30

0.02 0.02

0.99 0.99

0 0

-

-

-

0 0

-

-

-

0 0

-

-

-

0 0

-

-

-

0 0

-

-

-

Compaction Cycle

3 cycles

0.69

13.85

cycles

0.17

10.00

1.03

33.85

Wait Total Productivity

12.58 ton(s)/hr

Productivity

76.26 m2/hr

Asphalt Paving t = 100.00 mm Asphalt Compactor Specifications Parameter Forward Speed Reverse Speed Drum Width Trial Strip

Parameter Pavement Length Pavement Width Pavement Thickness Area of Pavement Volume Tonnage No. of Passes (per drum width) Total No. of Passes

Quantity

1.30 1.30 1.68

Quantity 16.67 3.65 100.00 60.83 6.08 13.38 7.00 3.00

Time-Motion Table Activity

Rate

Wait

Move Forward

1.30

Unit km/hr km/hr m

Unit m m mm m2 m3 tons passes passes Tonnage = Time Required hrs

13.38 tons Time Required minutes

0.17

10.00

0.01

0.77

Reverse

1.30

0.01

0.77

Move Forward Reverse

1.30 1.30

0.01 0.01

0.77 0.77

Move Forward Reverse

1.30 1.30

0.01 0.01

0.77 0.77

Move Forward Reverse

1.30 1.30

0.01 0.01

0.77 0.77

Move Forward Reverse

1.30 1.30

0.01 0.01

0.77 0.77

Move Forward Reverse

1.30 1.30

0.01 0.01

0.77 0.77

Move Forward Reverse

1.30 1.30

0.01 0.01

0.77 0.77

0 0

-

-

-

0 0

-

-

-

0 0

-

-

-

0 0

-

-

-

0 0

-

-

-

Compaction Cycle Wait Total

3 cycles

0.54

10.77

0.17

10.00

0.87

30.77

Productivity

15.35 ton(s)/hr

Productivity

69.78 m2/hr

Weight (tons) 4.40 8.20 8.80

Setup Number

1.00

2.00

3.00

4.00

5.00

6.00

7.00

7.00

7.00

7.00

7.00

7.00

Setup Number

1.00

2.00

3.00

4.00

5.00

6.00

7.00

7.00

7.00

7.00

7.00

7.00

Setup Number

1.00

2.00

3.00

4.00

5.00

6.00

7.00

7.00

7.00

7.00

7.00

7.00

PRODUCTIVITY CALCULATIONS Prime Coat Distributing Asphalt Distributor Specifications Parameter Tank Capacity Tank Capacity Travel Speed (Loaded) Travel Speed (Empty) Pump (Rated) Capacity Application Rate Application Rate Application Rate Spray Bar Length Application Speed Application Speed Area per Truckload

Quantity 5.00 6,250.00 30.00 50.00 15.00 1.00 0.0008 15,000.00 6.20 2,419.35 40.32 6,250.00

Unit tons li km/hr km/hr m3/hr li/m2 tons/m2 m2/hr m m/hr m/min m2

Site Conditions Parameter Pavement Length Pavement Width Area of Pavement Application Requirement Volume Distance to/from Plant

Quantity 500.00 7.30 3,650.00 2.00 7,300.00 30.00

Unit m m m2 li/m2 li kms

Time-Motion Table Activity

Load Bitumen Travel to Site (Loaded) Wait at Site Unload Bitumen Travel to Plant (Empty) Adjustment Factor Total Productivity Productivity

Rate

30.00 1,209.68 50.00

Tonnage = Time Required hrs

5.84 tons Time Required minutes

2.34 1.00 0.35 0.41 0.60

140.16 60.00 21.00 24.80 36.00

4.70 9.40 0.62 ton(s)/hr 388.35 m2/hr

281.96

Setup Number

PRODUCTIVITY CALCULATIONS Tack Coat Distributing Asphalt Distributor Specifications Parameter Tank Capacity Tank Capacity Travel Speed (Loaded) Travel Speed (Empty) Pump (Rated) Capacity Application Rate Application Rate Application Rate Spray Bar Length Application Speed Application Speed Area per Truckload

Quantity 5.00 6,250.00 30.00 50.00 15.00 1.00 0.0008 15,000.00 6.20 2,419.35 40.32 6,250.00

Unit tons li km/hr km/hr m3/hr li/m2 tons/m2 m2/hr m m/hr m/min m2

Site Conditions Parameter Pavement Length Pavement Width Area of Pavement Application Requirement Volume Distance to/from Plant

Quantity 500.00 7.30 3,650.00 0.75 2,737.50 30.00

Unit m m m2 li/m2 li kms

Time-Motion Table Activity

Load Bitumen Travel to Site (Loaded) Wait at Site Unload Bitumen Travel to Plant (Empty) Adjustment Factor Total Productivity Productivity

Rate

30.00 3,225.81 50.00

Tonnage = Time Required hrs

2.19 tons Time Required minutes

0.88 1.00 0.35 0.16 0.60

52.56 60.00 21.00 9.30 36.00

2.98 0.73 ton(s)/hr 1,224.42 m2/hr

178.86

Setup Number

PRODUCTIVITY CALCULATIONS Asphalt Material Application (1) Asphalt Distributor Specifications Parameter Tank Capacity Tank Capacity Travel Speed (Loaded) Travel Speed (Empty) Pump (Rated) Capacity Application Rate Application Rate Application Rate Spray Bar Length Application Speed Application Speed Area per Truckload

Quantity 5.00 6,250.00 30.00 50.00 15.00 1.00 0.0008 15,000.00 6.20 2,419.35 40.32 6,250.00

Unit tons li km/hr km/hr m3/hr li/m2 tons/m2 m2/hr m m/hr m/min m2

Site Conditions Parameter Pavement Length Pavement Width Area of Pavement Application Requirement Volume Distance to/from Plant

Quantity 500.00 7.30 3,650.00 1.20 4,380.00 30.00

Unit m m m2 li/m2 li kms

Time-Motion Table Activity

Load Bitumen Travel to Site (Loaded) Wait at Site Unload Bitumen Travel to Plant (Empty) Adjustment Factor Total Productivity Productivity

Rate

30.00 2,016.13 50.00

Tonnage = Time Required hrs

3.50 tons Time Required minutes

1.40 1.00 0.35 0.25 0.60

84.10 60.00 21.00 14.88 36.00

3.60 0.97 ton(s)/hr 1,014.00 m2/hr

215.98

Setup Number

PRODUCTIVITY CALCULATIONS Asphalt Material Application (2) Asphalt Distributor Specifications Parameter Tank Capacity Tank Capacity Travel Speed (Loaded) Travel Speed (Empty) Pump (Rated) Capacity Application Rate Application Rate Application Rate Spray Bar Length Application Speed Application Speed Area per Truckload

Quantity 5.00 6,250.00 30.00 50.00 15.00 1.00 0.0008 15,000.00 6.20 2,419.35 40.32 6,250.00

Unit tons li km/hr km/hr m3/hr li/m2 tons/m2 m2/hr m m/hr m/min m2

Site Conditions Parameter Pavement Length Pavement Width Area of Pavement Application Requirement Volume Distance to/from Plant

Quantity 500.00 7.30 3,650.00 2.00 7,300.00 30.00

Unit m m m2 li/m2 li kms

Time-Motion Table Activity

Load Bitumen Travel to Site (Loaded) Wait at Site Unload Bitumen Travel to Plant (Empty) Adjustment Factor Total Productivity Productivity

Rate

30.00 1,209.68 50.00

Tonnage = Time Required hrs

5.84 tons Time Required minutes

2.34 1.00 0.35 0.41 0.60

140.16 60.00 21.00 24.80 36.00

4.70 4.70 1.24 ton(s)/hr 776.71 m2/hr

281.96

Setup Number

PRODUCTIVITY CALCULATIONS Water Hauling by Water Truck

Equipment Specifications Parameter Loaded Speed Empty Speed Load Capacity Fuel Consumption Suction/Discharge Rate

Water Truck Quantity 45.00 60.00 4.00 15.00 350.00

AHD = Time-Motion Table

5.000 km(s)

Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Discharge Load Travel (Empty)

Rate

350.000 lpm 45.00 350.000 lpm 60.00

Total Productivity

AHD= 5.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Discharge Load Travel (Empty)

Time Required hrs

Time Required minutes

0.08 0.19 0.11 0.08 0.19 0.08

5.00 11.43 6.67 5.00 11.43 5.00

0.74

44.52

5.39 m3/hr

7.000 km(s)

Rate

350.000 lpm 45.00 350.000 lpm 60.00

Total Productivity

Cap = 4.00 cu.m. Unit km/hr km/hr m3 li/hr li/m

AHD= 7.000 km(s)

Time Required hrs

Time Required minutes

0.08 0.19 0.16 0.08 0.19 0.12

5.00 11.43 9.33 5.00 11.43 7.00

0.82

49.19

4.88 m3/hr

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Discharge Load Travel (Empty)

10.000 km(s)

Rate

350.000 lpm 45.00 350.000 lpm 60.00

Total Productivity

AHD= 10.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Discharge Load Travel (Empty)

Rate

350.000 lpm 45.00 350.000 lpm 60.00

AHD= 15.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Discharge Load Travel (Empty) Total

Time Required minutes

0.08 0.19 0.22 0.08 0.19 0.17

5.00 11.43 13.33 5.00 11.43 10.00

0.94

56.19

4.27 m3/hr

15.000 km(s)

Total Productivity

Time Required hrs

Time Required hrs

Time Required minutes

0.08 0.19 0.33 0.08 0.19 0.25

5.00 11.43 20.00 5.00 11.43 15.00

1.13

67.86

3.54 m3/hr

20.000 km(s)

Rate

350.000 lpm 45.00 350.000 lpm 60.00

Time Required hrs

Time Required minutes

0.08 0.19 0.44 0.08 0.19 0.33

5.00 11.43 26.67 5.00 11.43 20.00

1.33

79.52

Productivity

AHD= 20.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Discharge Load Travel (Empty)

25.000 km(s)

Rate

350.000 lpm 45.00 350.000 lpm 60.00

Total Productivity

AHD= 25.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Discharge Load Travel (Empty)

Time Required hrs

Time Required minutes

0.08 0.19 0.56 0.08 0.19 0.42

5.00 11.43 33.33 5.00 11.43 25.00

1.52

91.19

2.63 m3/hr

30.000 km(s)

Rate

350.000 lpm 45.00 350.000 lpm 60.00

Total Productivity

3.02 m3/hr

AHD= 30.000 km(s)

Time Required hrs

Time Required minutes

0.08 0.19 0.67 0.08 0.19 0.50

5.00 11.43 40.00 5.00 11.43 30.00

1.71

102.86

2.33 m3/hr

PRODUCTIVITY CALCULATIONS Fuel Hauling Hauling by Fuel Truck

Equipment Specifications Parameter Loaded Speed Empty Speed Load Capacity Fuel Consumption Suction/Discharge Rate

Fuel Truck Quantity 45.00 60.00 13.00 15.00 65.00

AHD = Time-Motion Table

5.000 km(s)

Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Discharge Load Travel (Empty)

Rate

65.000 lpm 45.00 65.000 lpm 60.00

Total Productivity

AHD= 5.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Discharge Load Travel (Empty)

###

Time Required hrs

Time Required minutes

0.08 3.33 0.11 0.08 3.33 0.08

5.00 200.00 6.67 5.00 200.00 5.00

7.03

421.67

1.85 m3/hr

7.000 km(s)

Rate

65.000 lpm 45.00 65.000 lpm 60.00

Total Productivity

Unit km/hr km/hr m3 li/hr li/m

AHD= 7.000 km(s)

Time Required hrs

Time Required minutes

0.08 3.33 0.16 0.08 3.33 0.12

5.00 200.00 9.33 5.00 200.00 7.00

7.11

426.33

1.83 m3/hr

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Discharge Load Travel (Empty)

10.000 km(s)

Rate

65.000 lpm 45.00 65.000 lpm 60.00

Total Productivity

AHD= 10.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Discharge Load Travel (Empty)

Rate

65.000 lpm 45.00 65.000 lpm 60.00

AHD= 15.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Discharge Load Travel (Empty) Total

Time Required minutes

0.08 3.33 0.22 0.08 3.33 0.17

5.00 200.00 13.33 5.00 200.00 10.00

7.22

433.33

1.80 m3/hr

15.000 km(s)

Total Productivity

Time Required hrs

Time Required hrs

Time Required minutes

0.08 3.33 0.33 0.08 3.33 0.25

5.00 200.00 20.00 5.00 200.00 15.00

7.42

445.00

1.75 m3/hr

20.000 km(s)

Rate

65.000 lpm 45.00 65.000 lpm 60.00

Time Required hrs

Time Required minutes

0.08 3.33 0.44 0.08 3.33 0.33

5.00 200.00 26.67 5.00 200.00 20.00

7.61

456.67

Productivity

AHD= 20.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Discharge Load Travel (Empty)

25.000 km(s)

Rate

65.000 lpm 45.00 65.000 lpm 60.00

Total Productivity

AHD= 25.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Discharge Load Travel (Empty)

Time Required hrs

Time Required minutes

0.08 3.33 0.56 0.08 3.33 0.42

5.00 200.00 33.33 5.00 200.00 25.00

7.81

468.33

1.67 m3/hr

30.000 km(s)

Rate

65.000 lpm 45.00 65.000 lpm 60.00

Total Productivity

1.71 m3/hr

AHD= 30.000 km(s)

Time Required hrs

Time Required minutes

0.08 3.33 0.67 0.08 3.33 0.50

5.00 200.00 40.00 5.00 200.00 30.00

8.00

480.00

1.63 m3/hr

PRODUCTIVITY CALCULATIONS Rock Breaking Rock Breaking

Diameter = 5000.00 mm

Trial Boulder Parameter Boulder Length Boulder Width Boulder Height Area of Boulder Volume Equipment Specifications Parameter Forward Speed Reverse Speed Bucket Capacity Fuel Consumption

Quantity

Backhoe w/ Breaker Quantity 2.63 2.63 0.80 16.00

Productivity Rates - Breaking Breaker Penetration Rate

4.00 14.40 0.347 35.00 2.00 5.76 12.50 2.18 2.00 4.36

Duration per Breaking Stroke Swing-Lower/Raise-Swing Cycle Area Covered / Penetration Direct Area Breaking Rate Area Covered / Position Duration per Position Number of Positions Total Duration (Breaking) Time-Motion Table Activity

Breaking Fix Breaker, Maneuver, Wait Moving Forward, Positioning Breaking Maneuver, Wait

Total Productivity

Unit m m m sm m3

5.00 5.00 5.00 25.00 125.00

Rate

Unit km/hr km/hr m3 li/hr

mm/sec m/hr hrs secs m2 m2/hr m2 hrs positions hrs

Time Required hrs

Excluding Travel

Time Required minutes

1.00 0.17 4.36 0.25

60.00 10.23 261.58 15.00

5.78

346.81

21.63 m3/hr

PRODUCTIVITY CALCULATIONS Rock Loading from Stockpile - Loader Trial Pile Pile Length Pile Width Height Area of Pile Volume

Parameter

Equipment Specifications Parameter Forward Speed Reverse Speed Actual Bucket Capacity : 75.000% Dig - Raise Cycle Reverse-Forward Cycle Dump - Lower Empty Cycle Fuel Consumption

Quantity

Unit m m m sm m3

Loader 100HP Dump Truck Quantity 6.40 7.70 1.13 16.40 10.30 5.50 15.00

Cap = 1.50 cu.m. ### Unit km/hr km/hr m3 secs secs secs li/hr

Rate

75% Time Required hrs

5.00 5.00 4.00 25.00 33.33

Time-Motion Table Activity

Maneuver & Waiting Time Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty

0.167 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 -

1.78 2.14

Dump Truck Capacity Time Required minutes

10.00 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 -

Total

0.26

Productivity

43.93 m3/hr

Equipment Specifications Parameter Forward Speed Reverse Speed Actual Bucket Capacity : 75.000% Dig - Raise Cycle Reverse-Forward Cycle Dump - Lower Empty Cycle Fuel Consumption

Loader 117HP Dump Truck Quantity 7.10 7.80 1.80 16.60 9.69 5.20 19.00

Cap = 2.40 cu.m. ### Unit km/hr km/hr m3 secs secs secs li/hr

Rate

75% Time Required hrs

Time-Motion Table Activity

Maneuver & Waiting Time Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty

Total Productivity

15.37

1.97 2.17

Dump Truck Capacity Time Required minutes

0.167 0.009 0.009 0.009 0.009 0.009 0.009 0.009 -

10.00 0.52 0.52 0.52 0.52 0.52 0.52 0.52 -

0.23

13.67

49.37 m3/hr

m/s m/s

Dump Truck Capacity = Volume (m3)

1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 -

11.25 cu.m. Running Volume (m3)

1.13 2.25 3.38 4.50 5.63 6.75 7.88 9.00 10.13 11.25 11.25 11.25 11.25 11.25 11.25 11.25 11.25 11.25 11.25 11.25 11.25

m/s m/s

Dump Truck Capacity = Volume (m3)

1.80 1.80 1.80 1.80 1.80 1.80 1.80 -

11.25 cu.m. Running Volume (m3)

1.80 3.60 5.40 7.20 9.00 10.80 12.60 12.60 12.60 12.60 12.60 12.60 12.60 12.60 12.60 12.60 12.60 12.60 12.60 12.60 12.60

PRODUCTIVITY CALCULATIONS Rock Hauling by Dump Truck

Equipment Specifications Parameter Loaded Speed Empty Speed Actual Capacity : 75.000% Fuel Consumption

Dump Truck Quantity 30.00 60.00 11.25 15.00

Unit km/hr km/hr m3 li/hr

###

LOADING BY WHEEL LOADER AHD = Time-Motion Table Activity

5.000 km(s) Time Required hrs

Rate

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

30.00

60.00

Total Productivity

AHD= 5.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

0.08 0.23 0.17 0.08 0.03 0.08

5.00 13.67 10.00 5.00 2.00 5.00

0.68

40.67

16.60 m3/hr

7.000 km(s) Time Required hrs

Rate

30.00

60.00

Total Productivity

Time Required minutes

AHD= 7.000 km(s)

Time Required minutes

0.08 0.23 0.23 0.08 0.03 0.12

5.00 13.67 14.00 5.00 2.00 7.00

0.78

46.67

14.46 m3/hr

AHD = Time-Motion Table Activity

10.000 km(s) Time Required hrs

Rate

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

30.00

60.00

Total Productivity

AHD= 10.000 km(s)

AHD = Time-Motion Table Activity

30.00

60.00

AHD= 15.000 km(s)

Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

5.00 13.67 21.08 5.00 2.00 10.00

0.95

56.76

11.89 m3/hr

Time Required hrs

Rate

Total

AHD = Time-Motion Table

0.08 0.23 0.35 0.08 0.03 0.17

15.000 km(s)

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

Productivity

Time Required minutes

Time Required minutes

0.08 0.23 0.50 0.08 0.03 0.25

5.00 13.67 30.00 5.00 2.00 15.00

1.18

70.67

9.55 m3/hr

20.000 km(s) Time Required hrs

Rate

30.00

60.00

0.08 0.23 0.67 0.08 0.03 0.33

Time Required minutes

5.00 13.67 40.00 5.00 2.00 20.00

Total Productivity

1.43 AHD= 20.000 km(s)

AHD = Time-Motion Table Activity

Time Required hrs

Rate

30.00

60.00

Total AHD= 25.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

Time Required minutes

0.08 0.23 0.83 0.08 0.03 0.42

5.00 13.67 50.00 5.00 2.00 25.00

1.68

100.67

6.70 m3/hr

30.000 km(s) Time Required hrs

Rate

30.00

60.00

Total Productivity

7.88 m3/hr

25.000 km(s)

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

Productivity

85.67

AHD= 30.000 km(s)

Time Required minutes

0.08 0.23 1.00 0.08 0.03 0.50

5.00 13.67 60.00 5.00 2.00 30.00

1.93

115.67

5.84 m3/hr

PRODUCTIVITY CALCULATIONS Stone Loading from Stockpile - Loader Trial Pile Pile Length Pile Width Height Area of Pile Volume

Parameter

Equipment Specifications Parameter Forward Speed Reverse Speed Actual Bucket Capacity : 85.000% Dig - Raise Cycle Reverse-Forward Cycle Dump - Lower Empty Cycle Fuel Consumption

Quantity

Unit m m m sm m3

Loader 100HP Dump Truck Quantity 6.40 7.70 1.28 16.40 10.30 5.50 15.00

Cap = 1.50 cu.m. ### Unit km/hr km/hr m3 secs secs secs li/hr

Rate

85% Time Required hrs

5.00 5.00 4.00 25.00 33.33

Time-Motion Table Activity

Maneuver & Waiting Time Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty

0.167 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 -

1.78 2.14

Dump Truck Capacity Time Required minutes

10.00 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 -

Total

0.26

Productivity

49.78 m3/hr

Equipment Specifications Parameter Forward Speed Reverse Speed Actual Bucket Capacity : 85.000% Dig - Raise Cycle Reverse-Forward Cycle Dump - Lower Empty Cycle Fuel Consumption

Loader 117HP Dump Truck Quantity 7.10 7.80 2.04 16.60 9.69 5.20 19.00

Cap = 2.40 cu.m. ### Unit km/hr km/hr m3 secs secs secs li/hr

Rate

85% Time Required hrs

Time-Motion Table Activity

Maneuver & Waiting Time Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty

Total Productivity

15.37

1.97 2.17

Dump Truck Capacity Time Required minutes

0.167 0.009 0.009 0.009 0.009 0.009 0.009 0.009 -

10.00 0.52 0.52 0.52 0.52 0.52 0.52 0.52 -

0.23

13.67

55.95 m3/hr

m/s m/s

Dump Truck Capacity = Volume (m3)

1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 -

12.75 cu.m. Running Volume (m3)

1.28 2.55 3.83 5.10 6.38 7.65 8.93 10.20 11.48 12.75 12.75 12.75 12.75 12.75 12.75 12.75 12.75 12.75 12.75 12.75 12.75

m/s m/s

Dump Truck Capacity = Volume (m3)

2.04 2.04 2.04 2.04 2.04 2.04 2.04 -

12.75 cu.m. Running Volume (m3)

2.04 4.08 6.12 8.16 10.20 12.24 14.28 14.28 14.28 14.28 14.28 14.28 14.28 14.28 14.28 14.28 14.28 14.28 14.28 14.28 14.28

PRODUCTIVITY CALCULATIONS Stone Hauling by Dump Truck

Equipment Specifications Parameter Loaded Speed Empty Speed Actual Capacity : 85.000% Fuel Consumption

Dump Truck Quantity 30.00 60.00 12.75 15.00

Unit km/hr km/hr m3 li/hr

###

LOADING BY WHEEL LOADER AHD = Time-Motion Table Activity

5.000 km(s) Time Required hrs

Rate

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

30.00

60.00

Total Productivity

AHD= 5.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

0.08 0.23 0.17 0.08 0.03 0.08

5.00 13.67 10.00 5.00 2.00 5.00

0.68

40.67

18.81 m3/hr

7.000 km(s) Time Required hrs

Rate

30.00

60.00

Total Productivity

Time Required minutes

AHD= 7.000 km(s)

Time Required minutes

0.08 0.23 0.23 0.08 0.03 0.12

5.00 13.67 14.00 5.00 2.00 7.00

0.78

46.67

16.39 m3/hr

AHD = Time-Motion Table Activity

10.000 km(s) Time Required hrs

Rate

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

30.00

60.00

Total Productivity

AHD= 10.000 km(s)

AHD = Time-Motion Table Activity

30.00

60.00

AHD= 15.000 km(s)

Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

5.00 13.67 21.08 5.00 2.00 10.00

0.95

56.76

13.48 m3/hr

Time Required hrs

Rate

Total

AHD = Time-Motion Table

0.08 0.23 0.35 0.08 0.03 0.17

15.000 km(s)

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

Productivity

Time Required minutes

Time Required minutes

0.08 0.23 0.50 0.08 0.03 0.25

5.00 13.67 30.00 5.00 2.00 15.00

1.18

70.67

10.82 m3/hr

20.000 km(s) Time Required hrs

Rate

30.00

60.00

0.08 0.23 0.67 0.08 0.03 0.33

Time Required minutes

5.00 13.67 40.00 5.00 2.00 20.00

Total Productivity

1.43 AHD= 20.000 km(s)

AHD = Time-Motion Table Activity

Time Required hrs

Rate

30.00

60.00

Total AHD= 25.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

Time Required minutes

0.08 0.23 0.83 0.08 0.03 0.42

5.00 13.67 50.00 5.00 2.00 25.00

1.68

100.67

7.60 m3/hr

30.000 km(s) Time Required hrs

Rate

30.00

60.00

Total Productivity

8.93 m3/hr

25.000 km(s)

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

Productivity

85.67

AHD= 30.000 km(s)

Time Required minutes

0.08 0.23 1.00 0.08 0.03 0.50

5.00 13.67 60.00 5.00 2.00 30.00

1.93

115.67

6.61 m3/hr

PRODUCTIVITY CALCULATIONS Boulder Loading from Stockpile - Loader Trial Pile Pile Length Pile Width Height Area of Pile Volume

Parameter

Equipment Specifications Parameter Forward Speed Reverse Speed Actual Bucket Capacity : 45.000% Dig - Raise Cycle Reverse-Forward Cycle Dump - Lower Empty Cycle Fuel Consumption

Quantity

Unit m m m sm m3

Loader 100HP Dump Truck Quantity 6.40 7.70 0.68 21.40 10.30 6.10 15.00

Cap = 1.50 cu.m. ### Unit km/hr km/hr m3 secs secs secs li/hr

Rate

45% Time Required hrs

5.00 5.00 4.00 25.00 33.33

Time-Motion Table Activity

Maneuver & Waiting Time Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty

0.167 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 -

1.78 2.14

Dump Truck Capacity Time Required minutes

10.00 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 -

Total

0.27

Productivity

24.85 m3/hr

Equipment Specifications Parameter Forward Speed Reverse Speed Actual Bucket Capacity : 45.000% Dig - Raise Cycle Reverse-Forward Cycle Dump - Lower Empty Cycle Fuel Consumption

Loader 117HP Dump Truck Quantity 7.10 7.80 1.08 16.60 9.69 5.20 19.00

Cap = 2.40 cu.m. ### Unit km/hr km/hr m3 secs secs secs li/hr

Rate

45% Time Required hrs

Time-Motion Table Activity

Maneuver & Waiting Time Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty Dig-Raise-Dump-Lower Empty

Total Productivity

16.30

1.97 2.17

Dump Truck Capacity Time Required minutes

0.167 0.009 0.009 0.009 0.009 0.009 0.009 0.009 -

10.00 0.52 0.52 0.52 0.52 0.52 0.52 0.52 -

0.23

13.67

29.62 m3/hr

m/s m/s

Dump Truck Capacity = Volume (m3)

0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 -

6.75 cu.m. Running Volume (m3)

0.68 1.35 2.03 2.70 3.38 4.05 4.73 5.40 6.08 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75

m/s m/s

Dump Truck Capacity = Volume (m3)

1.08 1.08 1.08 1.08 1.08 1.08 1.08 -

6.75 cu.m. Running Volume (m3)

1.08 2.16 3.24 4.32 5.40 6.48 7.56 7.56 7.56 7.56 7.56 7.56 7.56 7.56 7.56 7.56 7.56 7.56 7.56 7.56 7.56

PRODUCTIVITY CALCULATIONS Stone Hauling by Dump Truck

Equipment Specifications Parameter Loaded Speed Empty Speed Actual Capacity : 45.000% Fuel Consumption

Dump Truck Quantity 30.00 50.00 6.75 15.00

Unit km/hr km/hr m3 li/hr

###

LOADING BY WHEEL LOADER AHD = Time-Motion Table Activity

5.000 km(s) Time Required hrs

Rate

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

30.00

50.00

Total Productivity

AHD= 5.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

0.08 0.23 0.17 0.08 0.03 0.10

5.00 13.67 10.00 5.00 2.00 6.00

0.69

41.67

9.72 m3/hr

7.000 km(s) Time Required hrs

Rate

30.00

50.00

Total Productivity

Time Required minutes

AHD= 7.000 km(s)

Time Required minutes

0.08 0.23 0.23 0.08 0.03 0.14

5.00 13.67 14.00 5.00 2.00 8.40

0.80

48.07

8.42 m3/hr

AHD = Time-Motion Table Activity

10.000 km(s) Time Required hrs

Rate

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

30.00

50.00

Total Productivity

AHD= 10.000 km(s)

AHD = Time-Motion Table Activity

30.00

50.00

AHD= 15.000 km(s)

Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

5.00 13.67 21.08 5.00 2.00 12.00

0.98

58.76

6.89 m3/hr

Time Required hrs

Rate

Total

AHD = Time-Motion Table

0.08 0.23 0.35 0.08 0.03 0.20

15.000 km(s)

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

Productivity

Time Required minutes

Time Required minutes

0.08 0.23 0.50 0.08 0.03 0.30

5.00 13.67 30.00 5.00 2.00 18.00

1.23

73.67

5.50 m3/hr

20.000 km(s) Time Required hrs

Rate

30.00

50.00

0.08 0.23 0.67 0.08 0.03 0.40

Time Required minutes

5.00 13.67 40.00 5.00 2.00 24.00

Total Productivity

1.49 AHD= 20.000 km(s)

AHD = Time-Motion Table Activity

Time Required hrs

Rate

30.00

50.00

Total AHD= 25.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

Time Required minutes

0.08 0.23 0.83 0.08 0.03 0.50

5.00 13.67 50.00 5.00 2.00 30.00

1.76

105.67

3.83 m3/hr

30.000 km(s) Time Required hrs

Rate

30.00

50.00

Total Productivity

4.52 m3/hr

25.000 km(s)

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

Productivity

89.67

AHD= 30.000 km(s)

Time Required minutes

0.08 0.23 1.00 0.08 0.03 0.60

5.00 13.67 60.00 5.00 2.00 36.00

2.03

121.67

3.33 m3/hr

PRODUCTIVITY CALCULATIONS Asphalt Hauling by Dump Truck

Equipment Specifications Parameter Loaded Speed Empty Speed Load Capacity Load Capacity Fuel Consumption Unloading Rate

Dump Truck Quantity 30.00 60.00 10.50 23.10 15.00 39.30

### Unit km/hr km/hr m3 tons li/hr mins/truckload

Equipment Specifications Parameter Loading Rate

Asphalt Plant Quantity 85.00

Cap = 100.00 tph Unit tons/hr

Quantity

Unit tons/m3

Asphalt Specifications Parameter Density AHD = Time-Motion Table Activity

2.20 5.000 km(s)

Time Required hrs

Rate

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

30.00

60.00

Total

Time Required minutes

0.08 0.27 0.17 0.08 0.65 0.08

5.00 16.31 10.00 5.00 39.30 5.00

1.34

80.60

Productivity

AHD= 5.000 km(s)

7.82 m3/hr

Productivity

AHD= 5.000 km(s)

17.20 tons/hr

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading

7.000 km(s)

Rate

Time Required hrs

0.08 0.27

Time Required minutes

5.00 16.31

Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

30.00

60.00

Total

0.23 0.08 0.65 0.12

14.00 5.00 39.30 7.00

1.44

86.60

Productivity

AHD= 7.000 km(s)

7.27 m3/hr

Productivity

AHD= 7.000 km(s)

16.00 tons/hr

AHD = Time-Motion Table Activity

10.000 km(s) Time Required hrs

Rate

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

30.00

60.00

Total

Time Required minutes

0.08 0.27 0.35 0.08 0.65 0.17

5.00 16.31 21.08 5.00 39.30 10.00

1.61

96.69

Productivity

AHD= 10.000 km(s)

6.52 m3/hr

Productivity

AHD= 10.000 km(s)

14.33 tons/hr

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

15.000 km(s) Time Required hrs

Rate

30.00

60.00

Total

Time Required minutes

0.08 0.27 0.50 0.08 0.65 0.25

5.00 16.31 30.00 5.00 39.30 15.00

1.84

110.60

Productivity

AHD= 15.000 km(s)

5.70 m3/hr

Productivity

AHD= 15.000 km(s)

12.53 tons/hr

AHD = Time-Motion Table Activity

20.000 km(s) Time Required hrs

Rate

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

30.00

60.00

Total

Time Required minutes

0.08 0.27 0.67 0.08 0.65 0.33

5.00 16.31 40.00 5.00 39.30 20.00

2.09

125.60

Productivity

AHD= 20.000 km(s)

5.02 m3/hr

Productivity

AHD= 20.000 km(s)

11.03 tons/hr

AHD = Time-Motion Table Activity

25.000 km(s) Time Required hrs

Rate

Maneuver & Wait Wait While Loading Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

30.00

60.00

Total

Time Required minutes

0.08 0.27 0.83 0.08 0.65 0.42

5.00 16.31 50.00 5.00 39.30 25.00

2.34

140.60

Productivity

AHD= 25.000 km(s)

4.48 m3/hr

Productivity

AHD= 25.000 km(s)

9.86 tons/hr

AHD = Time-Motion Table Activity

Maneuver & Wait Wait While Loading

30.000 km(s)

Rate

Time Required hrs

0.08 0.27

Time Required minutes

5.00 16.31

Travel (Loaded) Maneuver & Wait Dump Travel (Empty)

30.00

60.00

Total

1.00 0.08 0.65 0.50

60.00 5.00 39.30 30.00

2.59

155.60

Productivity

AHD= 30.000 km(s)

4.05 m3/hr

Productivity

AHD= 30.000 km(s)

8.91 tons/hr

PRODUCTIVITY CALCULATIONS

PC Girder Setting AASHTO TYPE 1

Length :

Equipment Specifications Parameter Forward Speed Reverse Speed Lifting Capacity Fuel Consumption

Crane 80.00 Tons Quantity 2.00 2.00 80.00 27.00

Unit km/hr km/hr tons li/hr

Remarks

Rate

Time Required hrs

Time Required minutes

Time-Motion Table Activity

8.000 m

Equipment Mobilization / Waiting Mobilization/Waiting

0.75

45.00

Loading/Unloading Tie/Rig Girder Swing-Hoist Up-Swing-Hoist Up Set - Hoist Down - Untie/Rig Girder Swing-Hoist Up

0.25 0.42 0.25 0.17

15.00 25.00 15.00 10.00

Demobilization Demobilization

0.50

30.00

2.33

140.00

Total Number of Units Total Time for 2 Units

2 nos. 4.67 hrs

Productivity

1.71 lm/hr

AASHTO TYPE 2

Length :

Equipment Specifications Parameter Forward Speed Reverse Speed Lifting Capacity Fuel Consumption

Crane 80.00 Tons Quantity 2.00 2.00 80.00 27.00

Time-Motion Table Activity

Rate

10.000 m

Unit km/hr km/hr tons li/hr

Remarks

Time Required

Time Required

Activity

Rate

hrs

minutes

Equipment Mobilization / Waiting Mobilization/Waiting

0.75

45.00

Loading/Unloading Tie/Rig Girder Swing-Hoist Up-Swing-Hoist Up Set - Hoist Down - Untie/Rig Girder Swing-Hoist Up

0.25 0.47 0.25 0.17

15.00 28.00 15.00 10.00

Demobilization Demobilization

0.50

30.00

2.38

143.00

Total Number of Units Total Time for 2 Units

2 nos. 4.77 hrs

Productivity

2.10 lm/hr

AASHTO TYPE 3

Length :

Equipment Specifications Parameter Forward Speed Reverse Speed Lifting Capacity Fuel Consumption

Crane 80.00 Tons Quantity 2.00 2.00 80.00 27.00

Unit km/hr km/hr tons li/hr

Remarks

Rate

Time Required hrs

Time Required minutes

Time-Motion Table Activity

18.000 m

Equipment Mobilization / Waiting Mobilization/Waiting

0.75

45.00

Loading/Unloading Tie/Rig Girder Swing-Hoist Up-Swing-Hoist Up Set - Hoist Down - Untie/Rig Girder Swing-Hoist Up

0.25 0.50 0.25 0.17

15.00 30.00 15.00 10.00

Demobilization Demobilization

0.50

30.00

2.42

145.00

Total

Number of Units Total Time for 2 Units

2 nos. 4.83 hrs

Productivity

3.72 lm/hr

AASHTO TYPE 4

Length :

Equipment Specifications Parameter Forward Speed Reverse Speed Lifting Capacity Fuel Consumption

Crane 80.00 Tons Quantity 2.00 2.00 80.00 27.00

Unit km/hr km/hr tons li/hr

Remarks

Rate

Time Required hrs

Time Required minutes

Time-Motion Table Activity

30.000 m

Equipment Mobilization / Waiting Mobilization/Waiting

0.75

45.00

Loading/Unloading Tie/Rig Girder Swing-Hoist Up-Swing-Hoist Up Set - Hoist Down - Untie/Rig Girder Swing-Hoist Up

0.25 0.58 0.25 0.17

15.00 35.00 15.00 10.00

Demobilization Demobilization

0.50

30.00

2.50

150.00

Total Number of Units Total Time for 2 Units

2 nos. 5.00 hrs

Productivity

6.00 lm/hr

AASHTO TYPE 5

Length :

Equipment Specifications Parameter Forward Speed Reverse Speed Lifting Capacity Fuel Consumption

Crane 80.00 Tons Quantity 2.00 2.00 80.00 27.00

40.000 m

Unit km/hr km/hr tons li/hr

Remarks

Time-Motion Table Activity

Rate

Time Required hrs

Time Required minutes

Equipment Mobilization / Waiting Mobilization/Waiting

0.75

45.00

Loading/Unloading Tie/Rig Girder Swing-Hoist Up-Swing-Hoist Up Set - Hoist Down - Untie/Rig Girder Swing-Hoist Up

0.25 0.67 0.25 0.17

15.00 40.00 15.00 10.00

Demobilization Demobilization

0.50

30.00

2.58

155.00

Total Number of Units Total Time for 2 Units

2 nos. 5.17 hrs

Productivity

7.74 lm/hr

PRODUCTIVITY CALCULATIONS PC Panel Hauling by Truck with Lifting Crane

Equipment Specifications Parameter Loaded Speed Empty Speed Actual Capacity : 100.000% Fuel Consumption Loading/Unloading Rate

Boom Truck Quantity 30.00 50.00 20.00 15.00 20.00

Cap = 20.00 tons Unit km/hr km/hr tons li/hr tons/hr

Self Loading AHD = Time-Motion Table Activity

5.000 km(s) Time Required hrs

Rate

Maneuver & Wait Load Travel (Loaded) Maneuver & Wait Unload Travel (Empty)

30.00

50.00

Total Productivity

AHD= 5.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Load Travel (Loaded) Maneuver & Wait Unload Travel (Empty)

0.08 1.00 0.17 0.08 1.00 0.10

5.00 60.00 10.00 5.00 60.00 6.00

2.43

146.00

8.22 tons/hr

7.000 km(s) Time Required hrs

Rate

30.00

50.00

Total Productivity

Time Required minutes

AHD= 7.000 km(s)

Time Required minutes

0.08 1.00 0.23 0.08 1.00 0.14

5.00 60.00 14.00 5.00 60.00 8.40

2.54

152.40

7.87 tons/hr

AHD = Time-Motion Table Activity

10.000 km(s) Time Required hrs

Rate

Maneuver & Wait Load Travel (Loaded) Maneuver & Wait Unload Travel (Empty)

30.00

50.00

Total Productivity

AHD= 10.000 km(s)

AHD = Time-Motion Table Activity

30.00

50.00

AHD= 15.000 km(s)

Activity

Maneuver & Wait Load Travel (Loaded) Maneuver & Wait Unload Travel (Empty)

5.00 60.00 21.08 5.00 60.00 12.00

2.72

163.08

7.36 tons/hr

Time Required hrs

Rate

Total

AHD = Time-Motion Table

0.08 1.00 0.35 0.08 1.00 0.20

15.000 km(s)

Maneuver & Wait Load Travel (Loaded) Maneuver & Wait Unload Travel (Empty)

Productivity

Time Required minutes

Time Required minutes

0.08 1.00 0.50 0.08 1.00 0.30

5.00 60.00 30.00 5.00 60.00 18.00

2.97

178.00

6.74 tons/hr

20.000 km(s) Time Required hrs

Rate

30.00

50.00

0.08 1.00 0.67 0.08 1.00 0.40

Time Required minutes

5.00 60.00 40.00 5.00 60.00 24.00

Total Productivity

3.23 AHD= 20.000 km(s)

AHD = Time-Motion Table Activity

Time Required hrs

Rate

30.00

50.00

Total AHD= 25.000 km(s)

AHD = Time-Motion Table Activity

Maneuver & Wait Load Travel (Loaded) Maneuver & Wait Unload Travel (Empty)

Time Required minutes

0.08 1.00 0.83 0.08 1.00 0.50

5.00 60.00 50.00 5.00 60.00 30.00

3.50

210.00

5.71 tons/hr

30.000 km(s) Time Required hrs

Rate

30.00

50.00

Total Productivity

6.19 tons/hr

25.000 km(s)

Maneuver & Wait Load Travel (Loaded) Maneuver & Wait Unload Travel (Empty)

Productivity

194.00

AHD= 30.000 km(s)

Time Required minutes

0.08 1.00 1.00 0.08 1.00 0.60

5.00 60.00 60.00 5.00 60.00 36.00

3.77

226.00

5.31 tons/hr