45 1 154KB
ACTIVITIES ITEM NO. A.
WORK DESCRIPTION
UNDERGROUND PIPING AND PLUMBING WORKS 1.00 LAYING ASBESTOS PIPES: 1//2Ø 3/4" Ø 1 1/4" 1 1/2 TO 2" Ø 2 1/2" Ø 3" Ø 3 1/2" Ø 4" Ø 2.00 CAST IRON PIPE 2" Ø 4" Ø 6" Ø 8" Ø 10" Ø 12" Ø 14" Ø 16" Ø 18" Ø 20" Ø 24" Ø 30" Ø 3.00 LAYING PVC PIPE 1/2 TO 3/4" Ø 1 TO 1 1/4" Ø 1 1/2 TO 2" Ø 2 1/2" Ø 3" Ø 4" Ø 5" Ø 6" Ø 4.00 LAYING RCP 8 MEN (1 TEAM) 24"Ø 36"Ø 48"Ø 6-18"Ø LAYING OF 24"Ø RCP LAYING OF 36"Ø RCP LAYING OF 48"Ø RCP
B.
INSULATION EQUIPMENT INSTALLATION VESSEL, EXCHANGE & TANKS
FIELD FABRICATION INSULATION FIELD FABRICATION SHEET METAL COVER
OUTPUT PE
3 WORKER PRODUCTI LOW
0.76 0.76 0.68 0.61 0.51 0.46 0.43 0.38 0.23 0.15 0.10 0.08 0.05 0.05 0.04 0.04 0.03 0.03 0.03 0.02 2.63 0.68 0.61 0.51 0.46 0.38 0.30 0.20 0.11 0.08 0.05 0.38 0.13 0.08 0.05 0.20 0.04
UNIT
L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour PIPEper hour PIPEper hour PIPEper hour
S.M.per hour S.M.per hour
APPLY INSULATION APPLY SHEET METAL COVER PUMPS, COMPRESSORS & TURBINES FABRICATE APPLY PIPINGS AND COMPONENT INSULATION FIELD FABRICATE FIELD FABRICATESHEET METAL COVER APPLY INSULATION APPLY SHEET METAL COVER OR METAL COVER FABRICATE INSTRUMENT COVER INSTALL INSTRUMENT COVER INSULATE PIPE HANGERS FOR STREAM TRACED LINES REMOVAL OF OLD OR EXISTING INSTALLATION C.
D.
FIRE PROOFING INSTALL STUDS INSTALL MESH POURED FORMING STRIP FORMS POUR CONCRETE CURING/PATCHING FINISHING TROWEL, PLASTERED PNEUMATIC APPLICATION GUNITE APPLY FINEBRICK OR BLOCK REMOVAL OF EXISTING OR OLD FIREPROOFING APPLY FIREPROOFING PAINT FIRE PROTERCTION: FIRE PROTECTION EQUIPMENT INSTALLATION: MONITOR HOSE REELS AND CARTS FIRE EXTINGUISHERS PERSONAL EQUIPMENT: EYE WASH SAFETY SHOWERS BREATHING APPARATUS SPRINKLER SYSTEM SPRAY NOZZLES WATER CANNONS
0.10 0.10 0.03 0.02 0.13 0.63 0.19 0.33 0.06 0.08 0.13 0.14 0.33 1.00 0.42 0.04 0.08 0.01 0.83 0.71 0.19 0.42 0.63 0.20 0.17 0.10 0.03 0.10 0.05 0.05 0.10 0.50 0.10
HEATING, VENTILATING AND CONDITIONING HEAVY PIPING DUCT WORK INSTALL DUCT WORK FAB. PACKAGE UNIT AIR CONDITIONER UNIT HEATER FINNED CONVERTER EXHAUST FAN PROPELLER GRAVITY ROOF PAINT
0.14 0.08 0.03 0.02 0.04 0.10 0.06 0.07
S.M.per hour S.M.per hour S.M.per hour S.M.per hour FLG.per hour S.M.per hour L.M.per hour EACHper hour EACHper hour EACHper hour EACHper hour L.M.per hour L.M.per hour
EACHper hour S.M.per hour S.M.per hour S.M.per hour S.M.per hour S.M.per hour S.M.per hour S.M.per hour S.M.per hour PC.per hour S.M.per hour S.M.per hour
EACHper hour EACHper hour EACHper hour EACHper hour EACHper hour EACHper hour EACHper hour EACHper hour
L.M.per hour S.M.per hour S.M.per hour EACHper hour EACHper hour EACHper hour EACHper hour L.M.per hour
POWER ROOF VENT ROUND ROOF VENT PLUMBING PIPING Q.
MISCELLANEOUS WATER STOP INSTALLATION CAULKING SLAB JOINT ASPHALTING GROUTNG AND TOOL PLASTERING WATER PROOFING RUBBERIZED COPPER CLADDING ROOF DECK WATER PROOFING FLINKOTE DEMOLITION OF ADOBE WALL PAINTING COPPER WATER STOP CUT AND SHAPE COPPER WATER STOP CUT AND INSTALLATION SETTING ANCHOR BOLT SETTING ANCHOR BOXES
0.02 0.06 0.14 0.75 2.50 0.63 0.30 0.91 1.00 1.85 0.31 1.47 0.09 0.05 0.01 0.27
EACHper hour EACHper hour L.M.per hour
L.M.per hour L.M.per hour S.M.per hour S.M.per hour S.M.per hour L.M.per hour S.M.per hour CU.M.per hour S.M.per hour L.M.per hour L.M.per hour KGper hour CU.M.per hour
OUTPUT PER HOUR
₱
MANHOUR EQUIVALENT 83.62 per hour in area of NCR EQUIVALENT LABOR COST
3 WORKER PRODUCTIVITY RATE AVERAGE
1.52 1.52 1.35 1.22 1.02 0.93 0.87 0.76 0.46 0.30 0.20 0.15 0.10 0.10 0.08 0.07 0.07 0.06 0.06 0.05 5.26 1.35 1.22 1.02 0.93 0.76 0.61 0.41 0.25 0.16 0.09 0.75 0.25 0.16 0.09 0.40 0.08
UNIT
L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour PIPEper hour PIPEper hour PIPEper hour
S.M.per hour S.M.per hour
HIGH
1.89 1.89 1.69 1.52 1.43 1.16 1.09 0.94 0.57 0.38 0.25 0.19 0.13 0.12 0.10 0.09 0.08 0.08 0.07 0.06 6.67 1.69 1.52 1.28 1.16 0.95 0.76 0.51 0.31 0.20 0.12 0.94 0.31 0.20 0.12 0.50 0.10
UNIT
L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour L.M.per hour PIPEper hour PIPEper hour PIPEper hour
S.M.per hour S.M.per hour
LOW
₱ ₱ ₱ 110.38 ₱ 110.38 ₱ 123.76 ₱ 137.14 ₱ 164.73 ₱ 180.62 ₱ 192.33 ₱ 220.76 ₱ ₱ 366.25 ₱ 550.22 ₱ 822.82 ₱ 1,098.76 ₱ 1,647.31 ₱ 1,724.24 ₱ 2,015.24 ₱ 2,289.51 ₱ 2,565.46 ₱ 2,747.75 ₱ 3,022.02 ₱ 3,435.10 ₱ ₱ 31.78 ₱ 123.76 ₱ 137.14 ₱ 163.89 ₱ 180.62 ₱ 219.08 ₱ 274.27 ₱ 411.41 ₱ ₱ 752.58 ₱ 1,070.33 ₱ 1,784.45 ₱ 222.43 ₱ ₱ 668.96 ₱ 1,070.33 ₱ 1,782.77 ₱ ₱ ₱ ₱ ₱ 418.10 ₱ 2,006.88
PESOS PER
per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per PIPE per PIPE per PIPE
per S.M. per S.M.
AVERAGE
₱ ₱ ₱ 55.19 ₱ 55.19 ₱ 61.88 ₱ 68.57 ₱ 81.95 ₱ 90.31 ₱ 96.16 ₱ 110.38 ₱ ₱ 183.13 ₱ 275.11 ₱ 411.41 ₱ 549.38 ₱ 823.65 ₱ 862.12 ₱ 1,007.62 ₱ 1,144.75 ₱ 1,282.73 ₱ 1,373.87 ₱ 1,511.01 ₱ 1,717.55 ₱ ₱ 15.89 ₱ 61.88 ₱ 68.57 ₱ 81.95 ₱ 90.31 ₱ 109.54 ₱ 137.14 ₱ 205.70 ₱ ₱ 334.48 ₱ 535.17 ₱ 892.22 ₱ 111.21 ₱ ₱ 334.48 ₱ 535.17 ₱ 891.39 ₱ ₱ ₱ ₱ ₱ 209.05 ₱ 1,003.44
PESOS PER
per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per PIPE per PIPE per PIPE
per S.M. per S.M.
0.20 0.20 0.06 0.03 0.25 1.25 0.37 0.67 0.13 0.17 0.25 0.27 0.67 2.00 0.83 0.07 0.17 0.01 1.67 1.43 0.37 0.83 1.25 0.40 0.33 0.20 0.07 0.20 0.10 0.10 0.20 1.00 0.20 0.29 0.17 0.06 0.04 0.08 0.20 0.13 0.14
S.M.per hour S.M.per hour
EACHper hour EACHper hour
0.25 0.25 0.07 0.04 0.31 1.56 0.46 0.83 0.16 0.21 0.31 0.34 0.83 2.50 1.04 0.09 0.21 0.02 2.08 1.79 0.46 1.04 1.56 0.50 0.42 0.25 0.08 0.25 0.13 0.13 0.25 0.01 0.25
L.M.per hour S.M.per hour S.M.per hour EACHper hour EACHper hour EACHper hour EACHper hour L.M.per hour
0.36 0.21 0.07 0.05 0.10 0.25 0.16 0.17
S.M.per hour S.M.per hour FLG.per hour S.M.per hour L.M.per hour EACHper hour EACHper hour EACHper hour EACHper hour L.M.per hour L.M.per hour
EACHper hour S.M.per hour S.M.per hour S.M.per hour S.M.per hour S.M.per hour S.M.per hour S.M.per hour S.M.per hour PC.per hour S.M.per hour S.M.per hour
EACHper hour EACHper hour EACHper hour EACHper hour EACHper hour EACHper hour
S.M.per hour S.M.per hour
EACHper hour EACHper hour
₱ 836.20 ₱ 836.20 ₱ ₱ 2,843.07 ₱ 5,017.19 ₱ ₱ 668.96 ₱ 133.79 ₱ 451.55 ₱ 250.86 ₱ 1,337.92 ₱ 1,003.44 ₱ 668.96 ₱ 618.79 ₱ 250.86 ₱ ₱ ₱ 83.62 ₱ 200.69 ₱ ₱ 2,341.35 ₱ 1,003.44 ### ₱ 100.34 ₱ 117.07 ₱ 451.55 ₱ ₱ 200.69 ₱ 133.79 ₱ 418.10 ₱ 501.72 ₱ ₱ ₱ 836.20 ₱ 2,508.59 ₱ 836.20 ₱ ₱ 1,672.40 ₱ 1,672.40 ₱ 836.20 ₱ ₱ 167.24 ₱ 836.20
L.M.per hour S.M.per hour S.M.per hour EACHper hour EACHper hour EACHper hour EACHper hour L.M.per hour
₱ ₱ 585.34 ₱ 1,003.44 ₱ 3,010.31 ₱ 4,013.75 ₱ 2,006.88 ₱ 836.20 ₱ 1,337.92 ₱ 1,170.68
S.M.per hour S.M.per hour FLG.per hour S.M.per hour L.M.per hour EACHper hour EACHper hour EACHper hour EACHper hour L.M.per hour L.M.per hour
EACHper hour S.M.per hour S.M.per hour S.M.per hour S.M.per hour S.M.per hour S.M.per hour S.M.per hour S.M.per hour PC.per hour S.M.per hour S.M.per hour
EACHper hour EACHper hour EACHper hour EACHper hour EACHper hour EACHper hour
per S.M. per S.M.
per EACH per EACH
₱ 418.10 ₱ 418.10 ₱ ₱ 1,421.54 ₱ 2,508.59 ₱ ₱ 334.48 ₱ 66.90 ₱ 225.77 ₱ 125.43 ₱ 668.96 ₱ 501.72 ₱ 334.48 ₱ 309.39 ₱ 125.43 ₱ ₱ ₱ 41.81 ₱ 100.34 ₱ ₱ 1,170.68 ₱ 501.72 ₱ 5,853.39 ₱ 50.17 ₱ 58.53 ₱ 225.77 ₱ ₱ 100.34 ₱ 66.90 ₱ 209.05 ₱ 250.86 ₱ ₱ ₱ 418.10 ₱ 1,254.30 ₱ 418.10 ₱ ₱ 836.20 ₱ 836.20 ₱ 418.10 ₱ ₱ 83.62 ₱ 418.10
per L.M. per S.M. per S.M. per EACH per EACH per EACH per EACH per L.M.
₱ ₱ 292.67 ₱ 501.72 ₱ 1,505.16 ₱ 2,006.88 ₱ 1,003.44 ₱ 418.10 ₱ 668.96 ₱ 610.42
per S.M. per S.M. per FLG. per S.M. per L.M. per EACH per EACH per EACH per EACH per L.M. per L.M.
per EACH per S.M. per S.M. per S.M. per S.M. per S.M. per S.M. per S.M. per S.M. per PC. per S.M. per S.M.
per EACH per EACH per EACH per EACH per EACH per EACH
per S.M. per S.M. per S.M. per S.M. per FLG. per S.M. per L.M. per EACH per EACH per EACH per EACH per L.M. per L.M.
per EACH per S.M. per S.M. per S.M. per S.M. per S.M. per S.M. per S.M. per S.M. per PC. per S.M. per S.M.
per EACH per EACH per EACH per EACH per EACH per EACH per EACH per EACH
per L.M. per S.M. per S.M. per EACH per EACH per EACH per EACH per L.M.
0.04 0.13 0.29 1.49 5.00 1.25 0.60 1.82 2.00 3.70 0.63 2.94 0.17 0.09 0.02 0.55
EACHper hour EACHper hour L.M.per hour
L.M.per hour L.M.per hour S.M.per hour S.M.per hour S.M.per hour L.M.per hour S.M.per hour CU.M.per hour S.M.per hour L.M.per hour L.M.per hour KGper hour CU.M.per hour
0.05 0.16 0.36 1.85 6.25 1.56 1.19 3.57 4.00 7.14 1.25 5.88 33.33 16.67 4.17 1.10
EACHper hour EACHper hour L.M.per hour
L.M.per hour L.M.per hour S.M.per hour S.M.per hour S.M.per hour L.M.per hour S.M.per hour CU.M.per hour S.M.per hour L.M.per hour L.M.per hour KGper hour CU.M.per hour
₱ 4,013.75 ₱ 1,337.92 ₱ 585.34 ₱ ₱ ₱ 112.05 ₱ 33.45 ₱ 133.79 ₱ 279.29 ₱ 91.98 ₱ 83.62 ₱ 45.15 ₱ 267.58 ₱ 56.86 ₱ 919.82 ₱ 1,839.64 ₱ 8,111.12 ₱ 304.38
per EACH per EACH per L.M.
per L.M. per L.M. per S.M. per S.M. per S.M. per L.M. per S.M. per CU.M. per S.M. per L.M. per L.M. per KG per CU.M.
₱ 2,006.88 ₱ 668.96 ₱ 292.67 ₱ ₱ ₱ 56.03 ₱ 16.72 ₱ 66.90 ₱ 139.65 ₱ 45.99 ₱ 41.81 ₱ 22.58 ₱ 133.79 ₱ 28.43 ₱ 501.72 ₱ 919.82 ₱ 4,097.37 ₱ 152.19
per EACH per EACH per L.M.
per L.M. per L.M. per S.M. per S.M. per S.M. per L.M. per S.M. per CU.M. per S.M. per L.M. per L.M. per KG per CU.M.
LENT
ABOR COST HIGH
₱ ₱ ₱ 44.32 ₱ 44.32 ₱ 49.34 ₱ 55.19 ₱ 58.53 ₱ 71.91 ₱ 76.93 ₱ 88.64 ₱ ₱ 146.33 ₱ 219.92 ₱ 329.46 ₱ 439.84 ₱ 667.29 ₱ 689.86 ₱ 806.09 ₱ 915.64 ₱ 1,026.01 ₱ 1,098.76 ₱ 1,209.14 ₱ 1,373.87 ₱ ₱ 12.54 ₱ 49.34 ₱ 55.19 ₱ 65.22 ₱ 71.91 ₱ 87.80 ₱ 109.54 ₱ 164.73 ₱ ₱ 267.58 ₱ 428.13 ₱ 714.11 ₱ 88.64 ₱ ₱ 267.58 ₱ 428.13 ₱ 713.28 ₱ ₱ ₱ ₱ ₱ 167.24 ₱ 802.75
PESOS PER
per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per L.M. per PIPE per PIPE per PIPE
per S.M. per S.M.
₱ 334.48 ₱ 334.48 ₱ ₱ 1,137.23 ₱ 2,006.88 ₱ ₱ 267.58 ₱ 53.52 ₱ 180.62 ₱ 100.34 ₱ 535.17 ₱ 401.38 ₱ 267.58 ₱ 247.51 ₱ 100.34 ₱ ₱ ₱ 33.45 ₱ 80.28 ₱ ₱ 936.54 ₱ 401.38 ₱ 4,682.71 ₱ 40.14 ₱ 46.83 ₱ 180.62 ₱ ₱ 80.28 ₱ 53.52 ₱ 167.24 ₱ 200.69 ₱ ₱ ₱ 334.48 ₱ 1,003.44 ₱ 334.48 ₱ ₱ 668.96 ₱ 668.96 ₱ 334.48 ₱ ₱ 6,689.58 ₱ 334.48 ₱ ₱ 234.14 ₱ 401.38 ₱ 1,204.13 ₱ 1,605.50 ₱ 802.75 ₱ 334.48 ₱ 535.17 ₱ 488.34
per S.M. per S.M. per S.M. per S.M. per FLG. per S.M. per L.M. per EACH per EACH per EACH per EACH per L.M. per L.M.
per EACH per S.M. per S.M. per S.M. per S.M. per S.M. per S.M. per S.M. per S.M. per PC. per S.M. per S.M.
per EACH per EACH per EACH per EACH per EACH per EACH per EACH per EACH
per L.M. per S.M. per S.M. per EACH per EACH per EACH per EACH per L.M.
₱ 1,605.50 ₱ 535.17 ₱ 234.14 ₱ ₱ ₱ 45.15 ₱ 13.38 ₱ 53.52 ₱ 70.24 ₱ 23.41 ₱ 20.90 ₱ 11.71 ₱ 66.90 ₱ 14.22 ₱ 2.51 ₱ 5.02 ₱ 20.07 ₱ 76.09
per EACH per EACH per L.M.
per L.M. per L.M. per S.M. per S.M. per S.M. per L.M. per S.M. per CU.M. per S.M. per L.M. per L.M. per KG per CU.M.
MANHOUR EQUIVALENT RATE (Drop-Down List)
NCR Quantity Rate
CHOOSE RATE :
Position Foreman Skilled Labor
1 ₱ 3 ₱ 5 ₱
Total Daily Rate 926.25 748.13 570.00
₱ ₱ ₱
Hourly Pay
926.25 ₱ 2,244.38 ₱ 2,850.00 ₱
Total Rate per Manhour =
₱
NOTE : You can change the quantities of the manpower per position and their respective rates in the Table.
115.78 280.55 356.25
83.62
Area NCR CAR Region 1 Region 2 Region 3 Region 4A Region 4B Region 5 Region 6 Region 7 Region 8 Region 9 Region 10 Region 11 Region 12 Region 13 BARMM
Table of Rates Position Foreman Skilled Labor 926.25 748.13 570.00 525.00 400.00 650.00 525.00 400.00 650.00 525.00 400.00 650.00 603.75 460.00 747.50 616.88 470.00 763.75 465.94 355.00 576.88 479.06 365.00 593.13 590.63 450.00 731.25 570.94 435.00 706.88 492.19 375.00 609.38 460.69 351.00 570.38 531.56 405.00 658.13 581.44 443.00 719.88 483.00 368.00 598.00 459.38 350.00 568.75 447.56 341.00 554.13
1.3125 1.63
ACTIVITIES ITEM NO. A.
WORK DESCRIPTION
TRADE: UNDERGROUND PIPING AND PLUMBING WORKS 1.00 LAYING ASBESTOS PIPES: 1//2Ø 3/4" Ø 1 1/4" 1 1/2 TO 2" Ø 2 1/2" Ø 3" Ø 3 1/2" Ø 4" Ø 2.00 CAST IRON PIPE 2" Ø 4" Ø 6" Ø 8" Ø 10" Ø 12" Ø 14" Ø 16" Ø 18" Ø 20" Ø 24" Ø 30" Ø 3.00 LAYING PVC PIPE 1/2 TO 3/4" Ø 1 TO 1 1/4" Ø 1 1/2 TO 2" Ø 2 1/2" Ø 3" Ø 4" Ø 5" Ø 6" Ø 4.00 LAYING RCP 8 MEN (1 TEAM) 24"Ø 36"Ø 48"Ø 6-18"Ø LAYING OF 24"Ø RCP LAYING OF 36"Ø RCP LAYING OF 48"Ø RCP
INPUT HERE
QUANTITY UNIT LOW AVERAG L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. L.M. PIPE PIPE PIPE -
B.
TRADE INSULATION EQUIPMENT INSTALLATION VESSEL, EXCHANGE & TANKS
FIELD FABRICATION INSULATION FIELD FABRICATION SHEET METAL COVER APPLY INSULATION APPLY SHEET METAL COVER PUMPS, COMPRESSORS & TURBINES FABRICATE APPLY PIPINGS AND COMPONENT INSULATION FIELD FABRICATE FIELD FABRICATESHEET METAL COVER APPLY INSULATION APPLY SHEET METAL COVER OR METAL COVER FABRICATE INSTRUMENT COVER INSTALL INSTRUMENT COVER INSULATE PIPE HANGERS FOR STREAM TRACED LINES REMOVAL OF OLD OR EXISTING INSTALLATION C.
TRADE:FIRE PROOFING INSTALL STUDS INSTALL MESH POURED FORMING STRIP FORMS POUR CONCRETE CURING/PATCHING FINISHING TROWEL, PLASTERED PNEUMATIC APPLICATION GUNITE APPLY FINEBRICK OR BLOCK REMOVAL OF EXISTING OR OLD FIREPROOFING APPLY FIREPROOFING PAINT FIRE PROTERCTION: FIRE PROTECTION EQUIPMENT INSTALLATION: MONITOR HOSE REELS AND CARTS FIRE EXTINGUISHERS PERSONAL EQUIPMENT: EYE WASH SAFETY SHOWERS BREATHING APPARATUS SPRINKLER SYSTEM SPRAY NOZZLES WATER CANNONS
D.
TRADE:HEATING VENTILATING AND CONDITIONING
S.M. S.M. S.M. S.M. S.M. S.M.
-
-
FLG. S.M. L.M. EACH EACH EACH EACH L.M. L.M. EACH S.M. S.M. S.M. S.M. S.M. S.M. S.M. S.M. PC. S.M. S.M. EACH EACH EACH EACH EACH EACH EACH EACH -
HEAVY PIPING DUCT WORK INSTALL DUCT WORK FAB. PACKAGE UNIT AIR CONDITIONER UNIT HEATER FINNED CONVERTER EXHAUST FAN PROPELLER GRAVITY ROOF PAINT POWER ROOF VENT ROUND ROOF VENT PLUMBING PIPING E.
MISCELLANEOUS WATER STOP INSTALLATION CAULKING SLAB JOINT ASPHALTING GROUTNG AND TOOL PLASTERING WATER PROOFING RUBBERIZED COPPER CLADDING ROOF DECK WATER PROOFING FLINKOTE DEMOLITION OF ADOBE WALL PAINTING COPPER WATER STOP CUT AND SHAPE COPPER WATER STOP CUT AND INSTALLATION SETTING ANCHOR BOLT SETTING ANCHOR BOXES
L.M. S.M. S.M. EACH EACH EACH EACH L.M. EACH EACH L.M. L.M. L.M. S.M. S.M. S.M. L.M. S.M. CU.M. S.M. L.M. L.M. KG CU.M. TOTAL LABOR COST
choose labor productivity rate BELOW
LABOR PRODUCTIVITY HIGH RATE PER UNIT HIGH ₱ ₱ ₱ 44.32 ₱ 44.32 ₱ 49.34 ₱ 55.19 ₱ 58.53 ₱ 71.91 ₱ 76.93 ₱ 88.64 ₱ ₱ 146.33 ₱ 219.92 ₱ 329.46 ₱ 439.84 ₱ 667.29 ₱ 689.86 ₱ 806.09 ₱ 915.64 ₱ 1,026.01 ₱ 1,098.76 ₱ 1,209.14 ₱ 1,373.87 ₱ ₱ 12.54 ₱ 49.34 ₱ 55.19 ₱ 65.22 ₱ 71.91 ₱ 87.80 ₱ 109.54 ₱ 164.73 ₱ ₱ 267.58 ₱ 428.13 ₱ 714.11 ₱ 88.64 ₱ ₱ 267.58 ₱ 428.13 ₱ 713.28 ₱ -
TOTAL COST ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱
-
₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱
167.24 802.75 334.48 334.48 1,137.23 2,006.88 267.58 53.52 180.62 100.34 535.17 401.38 267.58 247.51 100.34 33.45 80.28 936.54 401.38 4,682.71 40.14 46.83 180.62 80.28 53.52 167.24 200.69 334.48 1,003.44 334.48 668.96 668.96 334.48 6,689.58 334.48 -
₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱
-
₱
-
₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱
234.14 401.38 1,204.13 1,605.50 802.75 334.48 535.17 488.34 1,605.50 535.17 234.14 45.15 13.38 53.52 70.24 23.41 20.90 11.71 66.90 14.22 2.51 5.02 20.07 76.09
TOTAL LABOR COST =
₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱ ₱
-
₱
-
PROBABLE OUTPUT OF HEAVY EQUIPMENT EQUIPMENT
PROBABLE OUTPUT
A.1 DOZER 165 HP Cutting & Stockpiling Clearing & Grubbing A.2 DOZER D65P-7 Stripping Excavation Quarrying Pushing B.1 LOADER -1.91 CU.M. Loading B.2 LOADER 950 C.
DUMP TRUCK - 10 CU.M. Hauling (dist. = 600M)
D.
GRADER- 130G 10 Passes Subgrading Spreading
30.00 cu.m./hr. 300.00 sq.m./hr
0.033 hr/m³ 0.003 hr/m²
200.00 25.00 50.00 3.00
0.005 0.040 0.020 0.333
sq.m./hr cu.m./hr. cu.m./hr. sq.m./hr
hr/m² hr/m³ hr/m³ hr/m²
70.00 cu.m./hr.
0.014 hr/m³
90.00 cu.m./hr.
0.011 hr/m³
700.00 sq.m./hr 300.00 sq.m./hr 40.00 cu.m./hr.
0.001 hr/m² 0.003 hr/m² 0.025 hr/m³
600.00 sq.m./hr
0.002 hr/m²
135.00 cu.m./hr.
0.007 hr/m³
24.00 cu.m./hr.
0.042 hr/m³
240.00 cu.m./hr.
0.004 hr/m³
24.00 cu.m./hr.
0.042 hr/m³
1,600.00 sq.m./hr
0.001 hr/m²
E.1 ROLLER VIBRATORY 10 Passes SHEETS FOOT ROLLER Static Rolling 12 passes-15m3 lift Vibratory Rolling-4 pases-15m3 lift No.3W Road Roller-static rolling 4 passes-15 m3 lift Tractor Drawn Roller (1-d) Static Rolling 6 passes-20m3 lift Tandem Roller-static rolling 6 passes-20 m3 lift E.2 VIBRATORY COMPACTOR CA25D G.
WATER TRUCK - 10 CU.M. Watering ASPHALT PAVER ASPHALT DISTRIBUTOR PLATE COMPACTOR Grave Bedding Concrete Vibrator: Vibrating Concrete
SPRAYING PHALT 8.00 cu.m./hr.
0.125 hr/m³
40.00 cu.m./hr.
0.025 hr/m³
Clearing & Grubbing
300
Lot Grading (Cut & Fill) m3
30
m3/hr
232.55
m3/hr
232.55
m3/hr
384.62
m3/hr
303.03
m3/hr
769.23
m3/hr
Trench Excavation
Disposal of Unsuitable Materials m3-km
Road way Excavation (m3)
29.41 m3/hr
125.00 m3/hr
125.00 m3/hr
Embankment/Imported Backfill (m3)
142.86
125.00 333.33
Subgrade Preparation (m2)
m3/hr
769.23 sq.m./hr
m3/hr
588.23 sq.m./hr
m3/hr
1,666.67 sq.m./hr
Aggregate Sub-base Course (m3)
Aggregate Base Course (m3)
76.92
m3/hr
115.38
m3/hr
58.82
m3/hr
88.23
m3/hr
166.67
m3/hr
250.00
m3/hr
Bituminous Asphalt Pavement (MT)
65.00
Concrete Pavement (m3)
MT/hr
32.50 MT/hr 300 SQ.M.