33 0 74KB
PRODUCTION RATE OF MANPOWER ITEM NO.
ITEM DESCRIPTION
1. F
FORMWORK
CREW SIZE
F1
FORMWORK TO FOOTING
1 CARPENTER, LABOR
1
F2
FORMWORK TO ISOLATED FOOTING
1 CARPENTER, LABOR
1
F3
FORMWORKS TO TIE BEAMS
1 CARPENTER, LABOR
1
F4
FORMWORKS TO BEAM
1 CARPENTER, LABOR
1
F5
FORMWORKS TO RETAINING WALL
1 CARPENTER, LABOR
1
F6
FORMWORKS TO COLUMNS
1 CARPENTER, LABOR
1
F7
FORMWORKS TO SLAB
1 CARPENTER, LABOR
1
F8
FORMWORKS TO SLAB (DECKING)
1 CARPENTER, LABOR
1
F9
FORMWORKS TO STAIRCASE (except spiral)
1 CARPENTER, LABOR
1
F10
FORMWORKS TO BALCONY
1 CARPENTER, LABOR
1
F11
FORMWORKS TO PARAPETS
1 CARPENTER, LABOR
1
2. FS
HOURLY PRODUCTION RATE
UNIT/HR
PRODUCTION PER 8 HRS.(1 DAY) PER UNIT
UNIT/DAY
1.10
SQ.M./HR
8.80
SQ.M./DAY
1.10
SQ.M./HR
8.80
SQ.M./DAY
0.80
SQ.M./HR
6.40
SQ.M./DAY
0.50
SQ.M./HR
4.00
SQ.M./DAY
0.80
SQ.M./HR
6.40
SQ.M./DAY
0.60
SQ.M./HR
4.80
SQ.M./DAY
1.10
SQ.M./HR
8.80
SQ.M./DAY
1.40
SQ.M./HR
11.20
SQ.M./DAY
0.30
SQ.M./HR
2.40
SQ.M./DAY
0.40
SQ.M./HR
3.20
SQ.M./DAY
0.55
SQ.M./HR
4.40
SQ.M./DAY
2.06
SQ.M./HR
16.48
SQ.M./DAY
1.70
SQ.M./HR
13.60
SQ.M./DAY
2.16
SQ.M./HR
17.28
SQ.M./DAY
FORMWORK STRIPPING
FS1
BEAMS
1 CARPENTER, LABOR
1
FS2
COLUMNS
1 CARPENTER, LABOR
1
FS3
SUSPENDED SLAB
1 CARPENTER, LABOR
1
ITEM NO.
ITEM DESCRIPTION
CREW SIZE
HOURLY PRODUCTION RATE
UNIT/HR
PRODUCTION PER 8 HRS.(1 DAY) PER UNIT
UNIT/DAY
3. M M1 M2 M3 M4
MASONRY WORKS CHB WORK (100 mm) CHB WORK (150 mm) CHB WORK (200 mm) 1/4" x 2" x 8" RED BRICKS
1 MASON, 1 LABOR 1 MASON, 1 LABOR 1 MASON, 1 LABOR 1 MASON, 1 LABOR
1.88 1.50 1.25 5.00
SQ.M./HR SQ.M./HR SQ.M./HR SQ.M./HR
15.04 12.00 10.00 40.00
SQ.M./DAY SQ.M./DAY SQ.M./DAY SQ.M./DAY
4. E E1 E2
EARTHWORKS (MANUAL) EXCAVATION FILL MATERIALS
2 LABOR 2 LABOR
0.41 0.78
CU.M./HR CU.M./HR
3.28 6.24
CU.M./DAY CU.M./DAY
5. P P1
PLASTERING WORKS PLASTERING WORKS (EXTERNAL)
1 MASON, 1 LABOR
1.35
SQ.M./HR
10.80
SQ.M./DAY
P2
PLASTERING WORKS (INTERNAL)
1 MASON, 1 LABOR
1.60
SQ.M./HR
12.80
SQ.M./DAY
25.00 25.00 20.00 18.00 25.00 25.00 50.00 W = ((D^2)xL)/162 DIAMETER 10 mm2 12 mm2 16 mm2 20 mm2
KGS/HR KGS/HR KGS/HR KGS/HR KGS/HR KGS/HR KGS/HR
200.00 200.00 160.00 144.00 200.00 200.00 400.00
KGS./DAY KGS./DAY KGS./DAY KGS./DAY KGS./DAY KGS./DAY KGS./DAY
PRODUCTION PER 8 HRS.(1 DAY) PER UNIT
UNIT/DAY
6. R REINFORCEMENT WORKS R1 REBAR TO FOOTING R2 REBAR TO TIE BEAMS R3 REBAR TO COLUMNS R4 REBAR TO BEAMS & GIRDERS R5 REBAR TO SOLID SLABS R6 REBAR TO RETAINING WALLS R7 REBAR TO STEEL CUTTING AND BENDING *note : to know quantity of rebar in pieces use formula: where; W = Weight of Bar (kgs) D = Bar Diameter (mm) L = Length of Rebar (meter)
ITEM NO.
ITEM DESCRIPTION
7. C
CONCRETE WORKS (MANUAL)
1 STEEL MAN 1 STEEL MAN 1 STEEL MAN 1 STEEL MAN 1 STEEL MAN 1 STEEL MAN 1 STEEL MAN
CREW SIZE
HOURLY PRODUCTION RATE
WEIGHT 3.7 kgs 5.33 kgs 9.48 kgs 14.81 kgs
UNIT/HR
C1 C2 C3 C4 C5 C6 C7
CONCRETE TO FOOTING CONCRETE TO TIE BEAMS CONCRETE TO COLUMNS CONCRETE TO BEAMS & GIRDERS CONCRETE TO SOLID SLABS CONCRETE TO SOLID WALLS CONCRETE TO STAIRS
1 MASON, 1 LABOR 1 MASON, 1 LABOR 1 MASON, 1 LABOR 1 MASON, 1 LABOR 1 MASON, 1 LABOR 1 MASON, 1 LABOR 1 MASON, 1 LABOR
2.40 1.00 0.35 0.30 0.33 0.29 0.25
CU.M./HR CU.M./HR CU.M./HR CU.M./HR CU.M./HR CU.M./HR CU.M./HR
19.20 8.00 2.80 2.40 2.66 2.32 2.00
CU.M./DAY CU.M./DAY CU.M./DAY CU.M./DAY CU.M./DAY CU.M./DAY CU.M./DAY
8. PW PW1 PW1 PW2 PW3 PW4 PW5
PAINTING WORKS (1 COAT) CONCRETE NEUTRALIZER EXTERIOR WALL PAINTING INTERIOR WALL PAINTING CEILING PAINTING (overhead) WOOD PAINTING (closet, doors) STEEL PAINTING (rails)
1 PAINTER 1 PAINTER 1 PAINTER 1 PAINTER 1 PAINTER 1 PAINTER
0.26 1.38 1.54 1.27 1.64 1.58
SQ.M./HR SQ.M./HR SQ.M./HR SQ.M./HR SQ.M./HR SQ.M./HR
2.08 11.04 12.32 10.16 13.12 12.64
CU.M./DAY CU.M./DAY CU.M./DAY CU.M./DAY CU.M./DAY CU.M./DAY
9. TW TW1 TW2
TILING WORKS TILE WORKS (FLOOR TILES) TILE WORKS (WALL TILES)
1 MASON, 2 LABOR 1 MASON, 2 LABOR
2.25 1.50
SQ.M./HR SQ.M./HR
18.00 12.00
SQ.M./DAY SQ.M./DAY
10. S S1 S2 S3
STONE MASONRY CRIB WALL GROUTED RIP RAP PLASTERING OF RIPRAP (ROUGH FINISH)
1 SKILLED 1 SKILLED 1 MASON, 1 LABOR
0.47 0.47 1.80
CU.M./HR CU.M./HR SQ.M./HR
3.79 3.79 14.40
CU.M./DAY CU.M./DAY CU.M./DAY
11. R R1 R1 R1 R2 R3
ROADWORKS COMPACTION AGGREGATE BASE CONCRETE PAVEMENT CURB & GUTTER SIDEWALK @ 4" thick
1 LABOR 1 MASON, 1 LABOR 1 MASON, 1 LABOR 1 MASON, 1 LABOR 1 MASON, 1 LABOR
9.00 5.20 0.17 1.75 1.67
SQ.M./HR SQ.M./HR CU.M./HR L.M./HR SQ.M./HR
CU.M./DAY CU.M./DAY CU.M./DAY L.M./DAY S.M./DAY
HOURLY PRODUCTION RATE
UNIT/HR
72.00 41.60 1.34 14.00 13.36 PRODUCTION PER 8 HRS.(1 DAY) PER UNIT
1.50
SQ.M./HR
12.00
SQ.M./DAY
ITEM NO.
ITEM DESCRIPTION
12. SC
SCAFFOLDINGS
SC1
SCAFFOLDS UP TO 3m ht. (WOOD)
CREW SIZE
1 CARPENTER, LABOR
1
UNIT/DAY
SC2
SCAFFOLDS UP TO 3m ht. (G.I. pipe)
13. WT
1 SKILLED,
1 LABOR
1.80
SQ.M./HR
14.40
SQ.M./DAY
10.36
B.F./HR
82.88
B.F./DAY
23.72
B.F./HR
189.76
B.F./DAY
6.42
B.F./HR
51.36
B.F./DAY
7.87
B.F./HR
62.96
B.F./DAY
13.47
B.F./HR
107.76
B.F./DAY
1.69
SQ.M./HR
13.52
SQ.M./DAY
WOOD TRUSS
WT1
TRUSS FABRICATION
1 CARPENTER, LABOR
1
WT2
TRUSS INSTALLATION
1 CARPENTER, LABOR
1
WT3
GIRTS INSTALLATION
1 CARPENTER, LABOR
1
WT4
PURLINS INSTALLATION
1 CARPENTER, LABOR
1
WT5
FASCIA BOARD INSTALLATION
1 CARPENTER, LABOR
1
WT6
TRUSS PAINTING
1 PAINTER
14. ST
STEEL TRUSS
ST1
TRUSS FABRICATION
1 WELDER,
1 LABOR
5.66
L.M./HR
45.28
L.M./DAY
ST2
TRUSS INSTALLATION
1 WELDER,
1 LABOR
11.32
L.M./HR
90.56
L.M./DAY
ST3
GIRTS INSTALLATION
1 WELDER,
1 LABOR
3.47
L.M./HR
27.76
L.M./DAY
ST4
PURLINS INSTALLATION
1 WELDER,
1 LABOR
4.26
L.M./HR
34.08
L.M./DAY
ST5
FASCIA BOARD INSTALLATION
1 WELDER,
1 LABOR
7.28
L.M./HR
58.24
L.M./DAY
ST6
TRUSS PAINTING
1 PAINTER
2.46
SQ.M./HR
19.68
SQ.M./DAY
HOURLY PRODUCTION RATE
UNIT/HR
PRODUCTION PER 8 HRS.(1 DAY) PER UNIT
UNIT/DAY
4.88
SQ.M./HR
39.02
SQ.M./DAY
1.78
L.M./HR
14.24
L.M./DAY
ITEM NO.
ITEM DESCRIPTION
15. RW
ROOF WORKS
CREW SIZE
RW1
INSTALLATION OF ROOFING
1 CARPENTER, LABOR
1
RW2
INSTALLATION OF GUTTER
1 CARPENTER, LABOR
1
RW3
LIFTING OF MATERIALS
1 LABOR
16. W W1 W2
WINDOW INSTALLATION WINDOW INSTALLATION FIXED WINDOW INSTALLATION
1 SKILLED, 1 SKILLED ,
17. D
1 LABOR 1 LABOR
2.16
SQ.M./HR
17.28
SQ.M./DAY
1.44 2.56
SQ.M./HR SQ.M./HR
11.52 20.48
SQ.M./DAY SQ.M./DAY
0.75
B.F./HR
6.00
B.F./DAY
1.03
B.F./HR
8.20
B.F./DAY
0.38
SET/HR
3.00
SET/DAY
DOOR INSTALLATION
D1
DOOR JAMB FABRICATION
1 CARPENTER, LABOR
1
D1
DOOR JAMB INSTALLATION
1 CARPENTER, LABOR
1
D1
DOOR INSTALLATION
1 CARPENTER, LABOR
1
D1
DOOR LOCKSET
1 CARPENTER
1.60
SET/HR
12.80
SET/DAY
SOIL TREATMENT TREATMENT OF SOIL
2 LABOR
1.90
SQ.M./HR
15.20
SQ.M./DAY
1.94
B.F./HR
15.52
B.F./DAY
1.00
SQ.M./HR
8.00
SQ.M./DAY
1.34
SQ.M./HR
10.72
SQ.M./DAY
HOURLY PRODUCTION RATE
UNIT/HR
PRODUCTION PER 8 HRS.(1 DAY) PER UNIT
UNIT/DAY
1.23
SQ.M./HR
9.84
SQ.M./DAY
2.00
SQ.M./HR
16.00
SQ.M./DAY
1.52
SQ.M./HR
12.16
SQ.M./DAY
1.85
SQ.M./HR
14.80
SQ.M./DAY
18. ST ST1 19. J
JOIST
J1
WOOD FLOOR JOIST
1 CARPENTER, LABOR
1
J2
WOOD WALL JOIST
1 CARPENTER, LABOR
1
J3
METAL FURRING WALL JOIST
1 SKILLED,
ITEM NO.
ITEM DESCRIPTION
20. CW
CEILING WORKS
1 LABOR
CREW SIZE
CW1
WOOD FRAME INSTALLATION
1 CARPENTER, LABOR
1
CW2
PLYWOOD/BOARD CEILING
1 CARPENTER, LABOR
1
CW2
METAL FURRING/T RUNNERS INSTALLATION
1 CARPENTER, LABOR
1
CW3
ACOUSTICAL CEILING
1 CARPENTER, LABOR
1
21. C
CLOSET / CABINET
C1
FRAMING
1 CARPENTER, LABOR
1
C2
BOARDING
1 CARPENTER, LABOR
1
0.39
B.F./HR
3.12
B.F./DAY
0.76
SQ.M./HR
6.08
SQ.M./DAY