PRODUCTIVITY RATES

01 GENERAL RE a.

SITE FACILITIES

b. c. d.

02 SITE W Excavation a. b. c. d. e.

EARTHWORK

f.

Backfilling a. b. c. d.

Interlock Paving a. b. c.

PAVING & SURFACING

d.

Precast Kerb Stone a. b. c. d.

03 CONC

Shuttering (with supports) a. b. c. d. e. f. g. h.

CONCRETE FORMWORK

i. j. k. l. m. n. o. p. s. u. t.

Reinforcement (Lightening for Cut & Bend Steel) a. b. c. d. e. f.

REINFORCEMENT

g. h. i. j.

REINFORCEMENT

k. l. l.

Mesh Reinforcement a.

Casting Concreting (Readymix) a. b. c. d. e. f. g. h. i.

PLACE CONCRETE

j. k. l. m. n. o. p. q. r. s. u. v.

04 MASO Solid Block a.

Hollow Block a. b.

c. d. e. f. g.

Claustra Block a. b.

05 MET Steel Structure a. b. c. d. e. f.

STRUCTURAL STEEL

g. h. i. j. k. l. m. n. o.

07 MOISTURE THE Polythene Sheets a. b. c.

Bitumin Paint a. b.

Bituminous Membranes a.

Construction Joints a. b.

09 FINI Internal Plaster a. b. c. d. e.

PLASTER

f.

External Plaster a. b. c.

Mosaic a. b. c. d.

Ceramic a. b. c. d. e.

TILING

f. g. h.

PVC Tiles a. b.

Marble a. b. c. d.

Floor Screed (50mm) a.

SCREED

b.

Wooden Skirting a.

Threshold a.

False Ceiling a.

Dry Wall Partition a.

Tyrolene (Cullamix) a. b.

Normal Paint (Emulsion Oil) WALL COVERINGS

a. c. d. e.

Epoxy Painting a.

15 MECHA

Copper & PVC Pipes PLUMBING INSTALLATIONS

a. b. c. d.

Plumbing Fixtures a. b. c.

PLUMBING FIXTURES

d. e. f. g. h. i.

PLUMBING APPLIANCES

Plumbing Appliances a.

16 ELECT

RACE WAYS

Race Ways a. b.

CONDUCTORS Conductors & Grounding & GROUNDING

WIRING

a.

Wiring a.

BOARDS

Boards a. b.

PRODUCTIVITY RATES 01 GENERAL REQUIREMENT Watchman & Curing

(Duration x 2H)

Site Cleaning

(Dhs. Contract value/ 50,000) Helper-Day

Fencing

1C + 2H + 1P

Fixing of Light Weight Scaffolding

1C + 1H

02 SITE WORK

Soft Soil (Hand Tools)

1H

Hard Soil (Hand Tools)

1H

Soft Soil

-

Hard Soil

-

Soft Soil

-

Hard Soil

-

Filling in foundation, pinth

-

Level, Compaction

1H

Spreading 200mm layer (Subkha, Road Base)

-

Compaction 200mm layer (Subkha, Road Base)

1H

Compaction / Levelling

2H

Spreading Sand and Brushing

2H

Laying Tiles

1M+2H

Filling, Compaction

1H

Excavation & Blinding for Curbstone

1H

Laying Kerbs

1M+2H

Karb stone on curved lines

1M+1H

Hunching

1M+1H

03 CONCRETE

Shutt. of Blinding

1C+1H

Shutt. of Footing (Plywood)

1C+1H

Shutt. of Footing (Plates)

1C+1H

Shutt. of Slub Column

1C+1H

Shutt. of Strap / Tie Beam (Plywood)

1C+1H

Shutt. of Strap / Tie Beam (Plates)

1C+1H

Shutt. of Wall

1C+1H

Shutt. of Column 20x20

1C+1H

Shutt. of Column 20x40

1C+1H

Shutt. of Beam with support

1C+1H

Shutt. of Roof Slab

1C+2H

Shutt. of Lintel

1C+1H

Shutt. of Copying Beam 20x20cm

1C+1H

Shutt. of Parapet

1C+1H

Shutt. of Arch Lintel

1C+1H

Expansion Joints / Ground Slab

1C+1H

Shutt. of Beam & Column for 8m to 12m high

1C+1H

Shutt. of Staircase

1C+1H

De-shuttering Works

20% of Shuttering Works

Reinf. of Footing

1 SF + 1 H

Reinf. of Slub Column

1 SF + 1 H

Reinf. of Strap Beam

1 SF + 1 H

Reinf. of Tie Beam

1 SF + 1 H

Reinf. of Wall

1 SF + 1 H

Reinf. of Column

1 SF + 1 H

Reinf. of Beam

1 SF + 1 H

Reinf. of Solid Slab

1 SF + 1 H

Reinf. of Lintel

1 SF + 1 H

Reinf. Copying Beam 20x20cm

1 SF + 1 H

Reinf. of Parapet

1 SF + 1 H

Reinf. of Arch Lintel

1 SF + 1 H

Reinf. of Staircase

1 SF + 1 H

Mesh Reinforcement

1 SF + 2 H

Cast. Blinding 5cm

1M+2H

Cast. Blinding 10cm

1M+2H

Cast. Blinding 5cm, 10cm

2M+4H

Cast. of Footing

2M+4H

Cast. of Footing (Pump)

3M+8H

Cast. of Strap / Tie Beam

1M+6H

Cast. of Tie Beam (Pump)

2M+6H

Cast. of Ground Floor Slab 10cm

3M+5H

Cast. of Ground Floor Slab 15cm

3M+5H

Cast. of Ground Floor Slab 20cm

3M+5H

Cast. of Wall

1M+1C+3H

Cast. of Column

1M+4H

Cast. of Beam of Slab

1M+4H

Cast. of Roof Slab

2M+2C+5H

Cast. of Lintel

1M+2H

Cast. of Copying Beam 20x20cm (up to2.5m)

1C+5H

Cast. of Copying Beam 20x20cm (above 2.5m)

1C+5H

Cast. of Parapet

1M+1C+4H

Cast. of Arch Lintel

1M+3H

Casting of Neck Column

1M+3H

Casting of Staircase

1C+1H

04 MASONRY 200mm Solid Block up to 2.5m Height

1M+2H

100mm Hollow Block up to 2.5m Height

1M+1H

100mm Hollow Block - 2.5m to 6m Height

1M+2H

150mm Hollow Block up to 2.5m Height

1M+1H

200mm Hollow Block up to 2.5m Height

1M+1H

200mm Hollow Block - 2.5m to 6m Height

1M+2H

200mm Block Work above 6m Height

1M+2H

200mm Block Work including pointing

1M+1H

Claustra Block 200x200

1M+1H

Claustra Block 150x150

1M+1H

05 METALS

Painting for steel structure columns

1P+1H

Painting for steel structure rafters

1P+1H

Erection of steel structure main frame ( Eave Height up to 6m span up to 25m) Erection of steel structure main frame ( Eave Height up to 6m span up to 36m) Fixing of Single Skin Sheet (Roof)

3E+3H

Fixing of Single Skin Sheet (Walls)

3E+3H

Single skin with Fibre Glass Insulation (Roof)

3E+3H

Single skin with Fibre Glass Insulation (Wall)

3E+3H

Sandwich Panels (Roof)

3E+3H

Sandwich Panels (Wall)

3E+3H

Corner Fisshing & Trims, etc

1E+3H

4m x 4m Double Sliding Door

1E+3H

Wall or Roof opening + Frames (1.0mx1.0m)

1E+3H

Ridge Ventilator

1E+3H

Gutter / Down Spout

1E+3H

3E+3H 3E+3H

07 MOISTURE THERMAL CONTROL

Polythene under footings

1C+1H

Polythene under slab

1C+1H

Polythene under tie beam

1H

Cold Bituminous Painting

1H

Hot Bituminous Painting

2H

Bituminous Membrane + Protection Board

1C+1H

Flexel Board

1C+1H

Sealant

1H

09 FINISHES Ceiling Plaster

1M+1H

Wall Plaster up to 3m Height

1M+1H

Wall Plaster 3m to 6m Height

1M+2H

Wall Plaster above 6m Height

1M+2H

Fixing of Plaster Mesh

1C+1H

Fixing of Corner Beed

1M+1H

Wall Plaster up to 3m Height

1M+1H

Wall Plaster 3m to 6m Height

1M+2H

Wall Plaster above 6m Height

1M+2H

Floor Mosaic Tiles

1M+1H

Mosaic Skirting

1M+1H

Mosaic Steps (Riser & Tread)

1M+1H

Mosaic Polishing

1 Po + 1 H

Fixing of Ceramic Wall Tiles (Glur Type)

1M+1H

Grouting of Ceramic Wall Tiles

1M+1H

Fixing of Ceramic Wall Tiles (Cement Monar Type)

1M+1H

Fixing of Ceramic Floor Tiles 20x20cm

1M+1H

Fixing of Ceramic Floor Tiles 30x30cm

1M+1H

Fixing of Ceramic Floor Tiles 50x50cm

1M+1H

Grouting of Ceramic Floor Tiles

1M+1H

Ceramic Skirting

1M+1H

PVC Tiles

1M+1H

PVC Skirting

1M+1H

Marble Wall

1M+1H

Marble Floor

1M+1H

Marble Skirting

1M+1H

Marble Steps (Riser & Treads)

1M+1H

Floor Screed (50mm)

1M+1H

Cement Skirting

1M+1H

Timber

1C+1H

Threshold

1M

False Ceiling - Suspended Type

1C+1H

Dry Wall Partition

1C+1H

Tyrolene over plastered surface

1M+1H

Tyrolene over block wall

1M+1H

Primer

1P

Stucco (Putty)

1P

Emulsion Paint

1P

Oil Paint

1P

Epoxy Painting

1P+1H

15 MECHANICAL

1/2" to 1" Copper Pipe (Hot water)

1 Pl + 1 H

1/2" to 1 1/2" PVC Pipe

1 Pl + 1 H

2" to 3" PVC Pipe

1 Pl + 1 H

4" to 6" PVC Pipe

1 Pl + 1 H

Shower Tray

1 Pl + 1 H

Kitchen Sink

1 Pl + 1 H

Urinals + Partition

1 Pl + 1 H

Wash Basin

1 Pl + 1 H

W/C Asian

1 Pl + 1 H

W/C Western

1 Pl + 1 H

Bidet

1 Pl + 1 H

Booster Pump

1 Pl

Manhole 60cm to 90cm

1M+1H

Water Heater

1 Pl + 1 H

16 ELECTRICAL

Conduits

1 El + 1 H

Trunking

1 El + 1 H

Laying Cables

1 El + 2 H

Wiring

1 El + 1 H

D.B's

1 El + 1 H

M.D.B's

1 El + 1 H

C=Carpenter, M=Mason, P=Painter, SF=Steel Fitter, E=Erector, H=Helper, Po=Polisher, Elec=El, Pl=Plumber One Day is considered as 8 working hours.

Rev. 01

02/11/05

Day

-

Day

1

Rm/Day

50

M2/Day

70

Hand Tools

M3/Day

3

Hand Tools

M3/Day

1

Shovel

M3/Hr

40

Shovel

M3/Hr

25

JCB

M3/Hr

20

J.C.B.

M3/Hr

10

Shovel

M3/Hr

30

Roller Compr.

M2/Day

100

Shovel

M2/Hr

100

Roller Compr.

M2/Day

200

Roller Compr.

M2/Day

200

M2/Day

200

M2/Day

60

M2/Day

150

R.M/Day

10

R.M/Day

35

R.M/Day

15

R.M/Hr

20

Plate Compr.

M2/Day

35

M2/Day

15

M2/Day

20

M2/Day

5

M2/Day

12

M2/Day

20

M2/Day

14

M2/Day

10

M2/Day

10

M2/Day

12

M2/Day

10

M2/Day

6

M2/Day

6

M2/Day

12

M2/Day

6

L.M/Day

70

M2/Day

8

M2/Day

12

KG/Day

400

KG/Day

250

KG/Day

300

KG/Day

350

KG/Day

400

KG/Day

300

KG/Day

300

KG/Day

300

KG/Day

150

KG/Day

200

Pump

Pump

Pump

Pump

Pump

Pump

KG/Day

300

KG/Day

150

KG/Day

250

M2/Day

300

M2/Day

30

M2/Day

40

M2/Day

250

M3/Day

40

M3/Day

120

M3/Day

20

M3/Day

50

M3/Day

30

M3/Day

45

M3/Day

50

M3/Day

40

M3/Day

4

M3/Day

12

M3/Day

50

Nos./Hr

4

RM/Day

150

RM/Day

60

M3/Day

10

M3/Day

5

M3/Day

4

M3/Day

12

Nos./Day

140

Nos./Day

150

Nos./Day

140

Nos./Day

150

Nos./Day

180

Nos./Day

140

Nos./Day

100

Nos./Day

120

M2/Day

10

M2/Day

8

M2/Day/ Coat M2/Day/ Coat M2/Day

50 250

M2/Day

175

M2/Day

350

M2/Day

150

M2/Day

250

M2/Day

100

M2/Day

250

M2/Day

150

Rm/Day

80

40

No.

1

No.

8

No./Day

6

Rm/Day

70

M2/Day

200

M2/Day

1000

Rm/Day

200

M2/Day/ Coat M2/Day/ Coat

100 60

M2/Day

30

RM/Hr

18

RM/Hr

7

M2/Day

10

M2/Day

20

M2/Day

17

M2/Day

15

Rm/Day

90

Rm

30

M2/Day

20

M2/Day

18

M2/Day

15

M2/Day

15

Rm/Day

40

Rm/Day

14

M2/Day

100

M2/Day

10

M2/Day

30

M2/Day

8

M2/Day

12

M2/Day

15

M2/Day

20

M2/Day

40

Rm/Day

30

M2/Day

35

Lm/Day

40

M2/Day

6

M2/Day

15

Rm/Day

30

Rm/Day

10

M2/Day

50

Rm/Day

25

Rm/Day

100

Rm/Day

10

M2/Day

30

M2/Day

20

M2/Day/ Coat M2/Day/ Coat

100

M2/Day/ Coat M2/Day/ Coat M2/Day/ Coat M2/Day/ Coat

200

M2/Day/ Coat

50

R.M/Day

12

R.M/Day

20

R.M/Day

75

R.M/Day

60

100

80 100 60

Nos./Day

2

Nos./Day

2

Nos./Day

3

Nos./Day

2

Nos./Day

2

Nos./Day

2

Nos./Day

2

Nos./Day

1

Nos./Day

2

Nos./Day

2

R.M/Day

50

R.M/Day

50

R.M/Day

150

R.M/Day

300

Nos./Day

2

Nos./Day

1