Item Descriptions Nos 1 Bar Bending Works Slab & Beam Footing

2

3

4

5 6

7

8

crew Fiter Helper Fiter Helper

Formwork Fixing & is a Removal Slab & Beam Carpenter Helper Footing Carpenter Helper Column box fix Carpenter Helper Column Starter fix Carpenter Helper Formwork Making Beam Side Carpenter Helper Column box fix Carpenter Helper Starter Carpenter Helper Concrete Slab & Beam Mason Helper Block Mason Helper Plastering Internal Mason Helper External Mason Helper Ceiling Mason Helper Corner beading fixing Mason Helper Mesh fixing & packing Mason Helper Earth Works Excavation Manual Excavation DL Machine Operated Water Proofing horizontal membrane application applicator Helper vertical membrane application applicator Helper brush on application applicator Helper

crew nos

Production per 8hrs

1 1.5 1 1.5

170

Kg/day

21.25

Kg/hrs

200

Kg/day

25

Kg/hrs

1 1.5 1 1.5 1 2 1 2

5

Sqm/day

0.625

Sqm/hrs

7

Sqm/day

0.875

Sqm/hrs

20

Sqm/day

2.5

Sqm/hrs

6

Nos/day

0.75

Nos/hrs

1 1 1 1 1 1

6

Sqm/day

0.75

Sqm/hrs

3

Sqm/day

0.375

Sqm/hrs

5

Nos/day

0.625

Nos/hrs

1 1 1 1.5

20

M3/day

2.5

M3/hrs

6

M2/day

0.75

M2/hrs

1 1.5 1 1.5 1 1.5 1 1 1 1.5

10

M2/day

1.25

M2/hrs

12

M2/day

1.5

M2/hrs

12

M2/day

1.5

M2/hrs

7

Nos/day

0.875

Nos/hrs

60

Running ft/d

2

2.83 60

M3/day M3/day

0.35375 7.5

M3/hrs M3/hrs

1 1 1 2 1 1

150

m2/day

18.75

m2/hrs

50

m2/day

6.25

m2/hrs

20

m2/day

2.5

m2/hrs

Unit

Production per hrs

7.5

Unit

Running ft/hrs

bore packing 9

Plumbing Works toilet chasing waterline fixing sanitary line fixing sanitary &cp fitting

applicator Helper chipper plumber helper plumber helper plumber helper

1 1

3

No/day

0.375

No/hrs

1 1 1.5 1 2 1.5 3

7 3

Rmt/day toilet/day

0.875 0.375

Rmt/hrs toilet/hrs

3

toilet/day

0.375

toilet/hrs

4

toilet+kitch

0.5

toilet+kitchen/hrs

Running ft/hrs

toilet+kitchen/hrs

Ite m 1 1.1 1.2

1.3 1.4

1.5 1.6

2 2.1

2.2

2.3 2.4 2.5 2.6 2.7 2.8 2.9 3 3.1

3.2

3.3

4

Description Excavation & Earth Work Site clearing to remove depth of 20cm Trench Excavation in ordinary soil a. To a depth of 1.2m b. To a depth of 2.2m c. To a depth of 3.00m Bulk excavation in ordinary soil a. To a depth of 1.5m Cart Away a. To 500m away from the site b. To 1km away from the site Hard-coring 25cm thick Back fill around foundation: a. Loose soil b. Aggregate Concrete Work Lean concrete a. 5cm thick b. 8cm thick Floor Slab a. 8cm thick b. 10cm thick c. 15cm thick Ground beam Footing Foundation column Upper tie beam Lintel Column up to 2m Column above 2m Masonry Work Stone Masonry sub-structure. a. 40cm thick b. 50cm thick c. 60cm thick Stone Masonry super structure a. 40cm thick b. 50cm thick c. 60cm thick Brick Masonry Wall for plastering. a. 25cm thick up to 2m b. 12cm thick up to 2m c. 25cm thick from 2-4m d. 12cm thick from 2-4m

Time

Production per 8hrs

Production per hrs

Unit

1D. L

8hr

10

1.250

m2

1D.L 1D.L 1D.L

8hr 8hr 8hr

1.25 1 0.75

0.156 0.125 0.094

m3 m3 m3

1D.L

8hr

1.5

0.188

m3

1D.L 1D.L 1M+4D.L

8hr 8hr 8hr

1.5 1 18

0.188 0.125 2.250

m3 m3 m2

1D.L 1D.L

8hr 8hr

2 5.5

0.250 0.688

m3 m3

1M+6D.L 1M+6D.L

8hr 8hr

20 15

2.500 1.875

m2 m2

1M+6D.L 1M+6D.L 1M+6D.L 1M+6D.L 1M+6D.L 1M+6D.L 1M+6D.L 1M+6D.L 1M+6D.L 1M+6D.L

8 hr 8hr 8hr 8hr 8hr 8hr 8hr 8hr 8hr 8hr

15 12.5 10 1.5 1.5 1.25 1.5 1 1 1.25

1.875 1.563 1.250 0.188 0.188 0.156 0.188 0.125 0.125 0.156

m2 m2 m2 m3 m3 m3 m3 m3 m3 m3

2M+6D.L 2M+6D.L 2M+6D.L

8hr 8hr 8hr

5 6 7

0.625 0.750 0.875

m3 m3 m3

2M+6D.L 2M+6D.L 2M+6D.L

8hr 8hr 8hr

3 4 5

0.375 0.500 0.625

m3 m3 m3

1M+3D.L 1M+3D.L 1M+3D.L 1M+3D.L

8hr 8hr 8hr 8hr

7 9 5 7

0.875 1.125 0.625 0.875

m2 m2 m2 m2

Gang

5 5.2 Ridge cover 5.3 Valley cover 5.4 Gutter fixing 5.5 Joining eucalyptus truss up to 10m span on ground 6

Plastering & Pointing 7.1 1st cost plastering 7.2 2nd cost plastering 7.3 3rd cost plastering 7.4 Pointing on stone Wall 7.5 7.6 7.7 7.8

8

9 9.1 9.2 10 10.1 10.2 10.3 10.4 10.4

8hr 8hr 8hr

4pcs 10m2 10m2

2hr/pos 48min/m2 48min/m2

1C+2D.L

8hr

13m2

48min/m2

1W+2D.L 1W+2D.L 1W+2D.L

8hr 8hr 8hr

3pcs 4pcs 2pcs

2.66hr/pcs 2hr/pcs 4hr/pcs

1P+2D.L

8hr

35m2

14min/m2

1P+2D.L

8hr

10m2

48min/m2

1P+2D.L

8hr

14m2

34min/m2

1P+2D.L 1P+2D.L 1P+2D.L 1P+2D.L

8hr 8hr 8hr 8hr

8m2 14m2 12m2 20m2

4hr/m2 34min/m2 40min/m2 24min/m2

1M+2D.L 1M+2D.L 1M+2D.L 1M+2D.L 1C+2D.L 1M+2D.L 1M+2D.L 1M+2D.L 1M+2D.L 1M+2D.L 1M+2D.L 1M+2D.L

8hr 8hr 8hr 8hr 8hr 8hr 8hr 8hr 8hr 8hr 8hr 8hr

14m2 10m2 17m2 15m2 8m2 7m2 40ml 12ml 12ml 16ml 10ml 6ml

34min/m2 48min/m2 48min/m2 32min/m2 1hr/m2 1.14hrn/m2 12min/ml 40min/m2 40min/m2 30min/m2 48min/ml 1.33min/ml

1G+2D.L 1G+2D.L

8hr 8hr

50m2 20m2

10min/m2 24min/m2

1P + 1DL 1P + 1DL 1P + 1DL 1P + 1DL 1P + 1DL

8hr 8hr 8hr 8hr 8hr

30m2 25m2 20m2 20m2 20m2

16min/m2 19min/m2 24min/m2 24min/m2 24ming/m2

1p + ID1 1p + ID1 1p + ID1

8hr 8hr 8hr

25m2 25m2 25m2

19min/m2 19min/m2 19min/m2

Metal Work 6.1 Metal door fixing 6.2 Metal Window fixing 6.3 French Window fixing

7

1C+2D.L 1C+2D.L 1C+2D.L

Pointing on brick wall Pointing on Hollow block Pointing on dressed stone Rendering

Flooring Cement Screed Cement tile fixing Plastic tile fixing Par - quet flooring Wooden flooring Ceramic wall tile Plastic tile skirting Cement tile skirting Marble slate flooring Marble slate skirting Fixing pre-cast windows Fixing un pre-cat window sill Glazing Cutting Fixing

Painting a) Plastic paint Painting plastered wallSurface 3ocats Painting Rendered wallsurface Painting Abujedid wall Painting Hard board obi Painting Cheap boardceiling

b) Synthetic paint 10.6 Plastered wall surface in 3 coats 10.7 Wooden surface 10.8 Metal surface

11 Sanitary work 11.1 G.1. pipe laying inGround ½ - 11/4 Fixing – Bath tubeShower complete, 11.2 washBasin, water closest, bidetSink, urinal 12 2 12.2 .12.3 .12.4 .12.5 . 13 13.1

13.2 13.3 13.4 13.5

1P+2DL

8hr

120m2

4min/ml

1p+1DL

8hr

1pcs

8hr/pcs

1E+1DL 1E+1DL 1E+1DL 1E+1DL 1E+1DL

8hr 8hr 8hr 8hr 8hr

40ml 50ml 20pcs 10pcs 10pcs

12min/ml 10min/ml 24min/pcs 48min/pcs 8min/pcs

1m+3DL

8hr 8hr 8hr 8hr

30ml 20ml 10ml 30ml

16min/ml 24min/ml 48min/ml 16min/ml

1m+3DL

8hr

3pcs

4hr/pcs

1m+3DL

8hr

2pcs

4hr/pcs

1C+2DL

8hr

50m2

10min/m2

Electrical installation Fixing conduits Pulling wires Fixing switch & out-lets Fixing fittings Fitting distribution board

Site Work Drain laying 0.10 - 0.30m 0.40 - 0.60 m 0.80 - 1.00 m Curb Stone 0.60 x 0.60 x 0.60m manhole out of brick 0.60 x 0.60 x 0.60m manhole out of hollow block Fencing with Galv. Fencing net

1M +3 1DL

Item

Type of activity

Unit

1

5cm thick lean concrete (c-7)

m3

2

Concrete C-15

m3

3

C-25 concrete for footing

m3

4

C-25 concrete for column

m3

5

C-25 concrete for Grade beam

m3

6

C-25 Concrete for slab

m3

7

C-25 top beam and Lintel

m3

8

30 cm Ribbed slab

m2

9

Wooden form work (Footing)

m2

10 Wooden form work (Column)

m2

CREW FORMATION Labour Equipment 1 Forman 2 mason 1 mixer 45 D/L 1 Forman 1Mixer 2 mason 1 Vibrator 45 D/L 1 Forman 1 Mixer 2 mason 1 Vibrator 45 D/L 1 Forman 1 Mixer 2 mason 2 Vibrator 25 D/L 1Forman 1 Mixer 2 mason 2 Vibrator 45 D/L 1 Forman 1 Mixer 2 Mason 2 Vibrator 45 D/L 1 Forman 1 Mixer 2 Mason 2 Vibrator 45 D/L 1/6 Forman 1Mason 2 D/L 1/6 Forman 1 carpenter 1 Helper 1 D/L 1/6 Forman 1 carpenter 1 Helper 1 D/L

Hourly Output 2.25m3

2.25m3

2.25m3

0.75m3

1.75m3

2.50m3

1.50m3

2.00m2

0.60m2

0.50m2