BASIC WELL COMPLETION
PRESENTATION OUTLINE 1) 2) 3) 4) 5) 6)
Well Completion Design Criteria Surface Equipments Subsurface Accessories Artificial Lift Q&A Quiz
2
WELL COMPLETION DESIGN CRITERIA What is well completion ? An activities and methods necessary to prepare a well for the production of oil and gas
Reason of having well completion ? To provide communication between reservoirs and surface.
3
WELL COMPLETION DESIGN CRITERIA (cont’) Why well completion is so important ? Main factor to ensure optimum production and recovery to meet economic requirement. To ensure safe production operations (mech.+human) over the field life.
4
WELL COMPLETION DESIGN CRITERIA 4 types of well completion Open Hole
Screen
Perforated casing
Without Casing
5
SURFACE EQUIPMENTS Wellhead & X-mas Tree
Crown Valve
Choke Wings Valve
Master Valve Lower Master Valve
Wellhead
6
SUBSURFACE ACCESSORIES Objectives of subsurface completion accessories? To provide access to the reservoir for surveillance requirement and well stimulation. To provide mechanical control to the conduit for safe transfer of the reservoir fluids to the surface.
7
COMPLETION ACCESSORIES The typical accessories used in well completion: Tubing hanger Tubing Hanger Subsurface Safety Valve (with control line)
SCSSV
Production Packer Flow Coupling
Landing/Seating nipple SSD
No-go nipple
Side Pocket Mandrel (SPM) Landing Nipples No-go Nipple
Gaslift mandrel (Side pocket mandrel) Production casing Dual packer
Sliding Sleeve Door (SSD) Blast Joint
1/4” control line Flow coupling
Wireline Entry Guide
Tubing Blast joint
Single packer
Perforation 8
COMPLETION ACCESSORIES Tubing hanger
Tubing Hanger: To provide a seal between tubing & wellhead. To support tubing.
Flow coupling
Flow Coupling: To protect from internal erosion caused by high velocity & turbulence flow resulted from ID reduction of another completion accessories, i.e. SCSSV 9
COMPLETION ACCESSORIES Subsurface Safety Valve: To prevent uncontrolled formation flow from wellbore to surface by manipulating hydraulic line from surface
Surface Controlled Subsurface Safety Valve (SCSSSV)
Gas lift Mandrel @ Side Pocket Mandrels
Gas Lift Mandrel (GLM): A place for installed gas lift valve for artificial lift purposes.
10
COMPLETION ACCESSORIES Sliding Side Doors (SSD): To enable communication between tubing & annulus to enable circulation or production of fluid.
Sliding Side Doors (SSD)
To equalize tubing pressure & Landing annulus pressure. Nipples
Landing Nipples: To provide receptacle to locate, lock & seal subsurface flow controls equipment.
11
COMPLETION ACCESSORIES Production Packers: To provide a seal between the outside of tubing & the inside of the production casing or liner. To protect the casing from pressure & Production produced fluids. Packers To isolate multiple production zones. To eliminate or reduce pressure surging or heading. To hold kill fluids in the annulus. To permit the use of certain artificial lift methods.
12
COMPLETION ACCESSORIES Blast Joint: To protect from external erosion or damage caused by the jetting fluid of the zone perforations.
BJ
13
ARTIFICIAL LIFT What is artificial lift ? Is a method to assist wells to sustain flow of oil to surface at adequate rates.
When do we need artificial lift ? When the reservoir pressure is insufficient to sustain flow of oil to the surface as a result of increased water cut and/or pressure depletion. Why do we need artificial lift ? To increase production. 14
GAS LIFT PRINCIPLES: The injected gas aerates the fluid column & reduce the density of the fluid. As the gas moves up the tubing, it expands providing the scrubbing action to bring the fluid column to surface. With the density of the column reduced, less reservoir pressure is required to push the liquid to surface. In other words, the hydrostatic back pressure to the reservoir is reduced & the reservoir pressure can overcome this reduced pressure & initiates the well to flow. 15
Q&A
16
QUIZ 1) What is the objective of well completion ? To provide communication between reservoirs and surface. 2) Why do we need artificial lift ? To increase production.
3) From the diagram, please show: SCSSV Blast Joint
SSD
17
18
WELLHEAD & X-MAS TREE Single X-Mas Tree
Dual X-Mas Tree
19