34 0 6MB
Technical Publication SM-EV9 (Rev.0. 0)
Service Manual
Model Ecoview 9 (Dual type) [Digital Radiography X-Ray System]
Important ! Please read this manual thoroughly and use the system correctly before using the system. This manual desires to keep in promised place to use always again after reading.
EcoRay Co., Ltd. 621-14, Docheon-Dong, Gwangsan-Gu, Gwangju, Korea, 506-301 Tel: +82-62-952-3251 / Fax: +82-62-951-5261 Seoul Office #402, Cygnus B/D, 115-12, Nonhyun-Dong, Kangnam-Ku, Seoul, Korea 135-821 Tel) +82 70 7510 3402 Fax) +82 70 8630 3420 E-mail: [email protected]
EcoRay
HF 525Plus
EU Representative BCF Technology 3 Rutherford Square, Bruce field Industry Park, Livingston, West Lothian, Scotland EH54 9BU Tel: 44(0)1506 460023, Fax: 44(0)1506 460045
Important! This x-ray equipment is dangerous to both patient and operator unless safety instructions are strictly observed in use!
Also, our company informs that operator, installation people, and maintenance people have a responsibility to be educated fluently about radiation safety control regulation and understood about product use method.
The user must obey the Radiation Safety Control Regulation and the user and owner of this x-ray equipment have a responsibility. Also, our company has no responsibility about injury or calamity that occurs does not keep use method of this product and radiation safety control regulation.
Therefore, our company strongly advises that to be used this product after that person in charge of installation, maintenance and operator should understood radiation safety control regulation of domestic or foreign.
Ecoview 9 Dual type (Rev.1.0)
1
Service manual
EcoRay
HF 525Plus
NOTICE AND CONTRAINDICATION!
Danger! States a direct danger that may cause death or serious injury if it is not avoided.
Warning! States an indirect or potential danger that may cause death or serious injury if it is not avoided.
Caution! State a danger that may cause slight or medium injury or may cause damage in equipment or fire if it is not avoided.
NOTE ☞ States the information, which helps to use the system correctly.
CONTRAINDICATION! This x-ray system is not suitable for therapeutic applications.
The text of this manual is a translation based on the Korean alphabet (Hangŭl) original.
Ecoview 9 Dual type (Rev.1.0)
2
Service manual
EcoRay
HF 525Plus
EcoRay has a copyright of this manual and HF-525 Plus’s functions and specifications are could be changed without notice. Also, this manual may not be reproduced in whole or in part without the written permission of EcoRay Co., Ltd.
Before using the system, please read this manual thoroughly and use the system correctly. And please keep this manual near the place!
Ecoview 9 Dual type (Rev.1.0)
3
Service manual
EcoRay
HF 525Plus
Revision History Revision No.
Ecoview 9 Dual type (Rev.1.0)
Revision Date
4
Changed description
Service manual
EcoRay
HF 525Plus
Rev. 1.0
Ecoview 9 Dual type (Rev.1.0)
2010-03-26
5
Release version
Service manual
EcoRay
HF 525Plus
Table of Contents Chapter 1 1. Pre-installation ………………………………………………….……….…………………………………….…. 9 1.1 An Overview ………………………………………………………………….…………………………..… 10 1.2 Responsibility of Customers ….………………………………………….………….……………….……. 10 1.3 Constructions and Function ……………….………….…...……………………………………….….…. 10 1.4 General details ………………….……………………………..……………………………………….…. 11 1.5 Service Numbers ………………………...…………………………….……………………………………. 11 1.6 Product Pre-installation Data ………………………………………………………………………………. 11 1.7 X-ray room Requirements ……..………………………………………………………………….………. 15
Chapter 2 2. Installation …….…………………………………..…………………………………………………………… 18 2.1 An Overview ………………………………………………………………………………………….………. 19 2.2 Pre-installation checks points and Tools and Testers …………………..….…………………………... 19 2.3 Pre-installation Check ………..…………………………………………..…….……………………… 19 2.4 Installation of Generator ………………………………..……………………….….……………………... 21 2.5 Installation of Tube Stand ………………………………………………….……….……………………... 28 2.6 Installation of Ceiling Tube Support ………………………………………………………………………. 35 2.7 Installation of Table Bucky …………………………………………………………….……………………... 42 2.8 Installation of Wall Bucky …………………………….………………………………………..……………... 46 2.8 System Cable Wiring ………………………………….………………………………………..……………... 51
Chapter 3 3. Technical Information ………………………………..………………….……………….……………..……. 52 3.1 An Overview ……………………………………………….……………………………..…………..……… 53 3.2 Installation information ……………………….…………………………..…………….………...…..…… 53 3.3. Exposure condition data ………………………………..……………………………..………...………… 53 3.4 Maintenance History …………………………………………..…………………………….…..………… 54
Chapter 4 4. Calibration .…………………………………………….………………………….……………………………… 55 4.1 An Overview …………………………………………………………….…….……………………………… 56 4.2 Introduction ……….……………………………………………….…………………………………...……… 56 4.3 Needed tool and testers when Calibration ……………………………………………………………..…… 56 4.4 Check point before calibration ………….………………………………………………….………...…… 56 4.5 Consist of Calibration Program …………………………………………………..……………….……..… 57 4.6 How to use Calibration program ………………………………………………………….……….…….…… 57 4.7 Time of Calibration …………………………………………………………………….………...…….…… 58
Ecoview 9 Dual type (Rev.1.0)
6
Service manual
EcoRay
HF 525Plus
4.8 Must calibrated when Main Parts are repaired or replaced …………….…………….…………..….…… 59
Chapter 5 5. Trouble Shooting …………………..……………………………..………….….………………….…………. 60 5.1 An Overview ……………….……………………………………………….……..……………..…………… 61 5.2 Error type …………………………………………………………………………...………………..……… 61 5.3 Trouble Shooting …………………………………………………….………....……………………..…… 66 5.4 Handle Bar (SMS-TS-340 Board) .…..…………………………………..……………………...……..… 88 5.5 Troubleshooting for Table Bucky (SMS-BT-4) ……………...………..………………………...……..… 89
Chapter 6 6. Circuit Diagram ……………………………………………………………….…………………………...…. 90
Ecoview 9 Dual type (Rev.1.0)
7
Service manual
EcoRay
HF 525Plus
Chapter 1
Pre-installation Digital Radiography X-ray System Ecoview 9 (Dual)
Ecoview 9 Dual type (Rev.1.0)
8
Service manual
EcoRay
HF 525Plus
1. Pre-installation 1.1 An Overview 1.1.3 This system was made for medical examination, diagnosis and before surgical operation and after, and this manual explains how to install and how to operate the system. 1.1.2 These instructions are not suitable as a replacement for components, exchange of circuit or medical training. 1.1.3 This manual contains the information of product, components, required environment, and electrical requirements
1.2 Responsibility of Customers All individuals granted to operate this system should acknowledge how dangerous it is to be exposed by X-ray too much. All individuals granted to operate this system have the responsibility to acknowledge Law related Radiation, and how to use this system before operating. Therefore, about any accident or injury or disaster caused by misuse or caused by not following the related Law, the manufacturer has no responsibility. The owner of this system should check and confirm whether or not the installation site does not break the condition in law.
The owner and operators of this system have the responsibility to acknowledge and follow the operation and the related law, after discussing with the related national institution or an independent laboratory
The owner of this system has the responsibility to check and manage regularly how much X-ray dose is exposed to the operator. The owner should let the operator bring with him Pocket X-ray exposure dose meter.
Planning installation, and pre-installation should be checked and prepared by the customer, and bellows are the main check points which should be prepared before installation. 1. Complete floor, ceiling, wall and cleaning in the installation room. 2. Electric power facility (Circuit Breaker, ground, duct, raceway, etc.) 3. Radiation shield construction in the examination room 4. Cost of alteration and modifications when not specifically provided in sales contract.
1.3 Constructions and Function This X-ray system consists of Tube Stand which supports and moves X-ray tube, Detector Stand which supports and moves Detector, Console, X-ray generator, Patient table, and Image Acquizition software, PC, and X-ray tube unit.
Ecoview 9 Dual type (Rev.1.0)
9
Service manual
EcoRay
HF 525Plus
1.3.1 Console consists of each switch and adjusts exposure values and displays them.
1.3.2 X-ray generator consists of control unit and high voltage transformer unit. X-ray exposure values set by the console is sent to the control circuit. The controlled voltage is sent to the High Voltage transformer and creates High Voltage through circuit.
1.3.3 Tube Stand consists of main power supply unit, electric circuit, handle bar and mechanical devices and moves and rotates Tube; left right, up, down, rotation.
1.3.4 Wall Bucky consists of main power supply unit, electric circuit, detector bucky device, and mechanical devices. It is fixed on the floor and the detector bucky device moves up and down.
1.3.5 Patient table consists of tabletop and bucky devices, and patient will lie down on the table during examination.
1.3.6 X-ray tube unit consists of X-ray tube and collimator. X-ray tube exposes X-ray and collimator adjusts x-ray exposure area.
1.3.7 Image Acquisition Software receives image signal from the detectors on the patient table or wall bucky stand, sends the image signal to PC, does image process, and sends the image information PACS Server or saves it in the Work station.
Ecoview 9 Dual type (Rev.1.0)
10
Service manual
EcoRay
HF 525Plus
1.4 Manufacturer ECORAY Co.,LTD. Address of factory : 621-14, Dochun dong, Gwangsan gu, Gwangju, KOREA
1.5 Service call to +82 70 7510 3400 or [email protected]
Ecoview 9 Dual type (Rev.1.0)
11
Service manual
EcoRay
HF 525Plus
1.6 Dimensional distances and diagram OP console and X-ray generator. Physical characteristics Size (mm).
Parts
Weight(kg)
Width
Length
Height
OP console
320
240
90
2.5
HF Generator
670
400
710
105
OP console 320mm
240mm
HF Generator
710mm
670mm 400mm
Ecoview 9 Dual type (Rev.1.0)
12
Service manual
EcoRay
HF 525Plus
Tube stand Physical characteristics
Part
Size (mm)
Weight (kg)
Width
Length
Height
Floor rail
566
2,800
120
120
Stand
860
1,070
2,200
157
Dimension diagram
Ecoview 9 Dual type (Rev.1.0)
13
Service manual
EcoRay
HF 525Plus
Wall Bucky Physical characteristics Size (mm) Part
Wall bucky stand
Width
Length
Height
670
680
2,000
Weight (kg)
115
Dimension diagram
Ecoview 9 Dual type (Rev.1.0)
14
Service manual
EcoRay
HF 525Plus
Patient table Physical characteristics Size (mm) Part
Table
Width
Length
Height
2,100
800
500~840
Weight (kg)
140
Size photo 800mm 2100mm
500~8400mm
500~8400mm
Ecoview 9 Dual type (Rev.1.0)
15
Service manual
EcoRay
HF 525Plus
1.7 Required environment of operation Delivery and storage conditions Temperature: -10°C ~ +60°C Humidity: 10% ~ 90% (No dew effect) Pressure : 700hPa ~ 1,060hPa
Operational conditions Temperature : +10°C ~ +35°C Humidity : 30% ~ 65% (No dew effect) Pressure : 700hPa ~ 1,060hPa This product should be operated in gas-free zone.
The unit can be operated wrong ways or defective out of above conditions.
1.8 Technical info for installation Electrical requirements The product is designed and manufactured to perform normal X-ray exposure even under unstable power input however input power is out of acceptable range, we do not guarantee its performance for X-ray exposure. So stable and adequate input power is fully required for the machine.
■ Correct input power (electricity) Lower level power transformer is NOT recommended for this product. Do not use other electric device from the same power terminal.
■ Required electricity Main input power should have its fluctuation lower than ± 10%. Product
Ecview 9 (Dual)
Input power current
Max. 60 kVA
Ecoview 9 Dual type (Rev.1.0)
16
Service manual
EcoRay
HF 525Plus
Input voltage
Three phase 380VAC
Power cable thickness The wire profile size should be large enough to take required amount voltage and current. So recommended wires must be used.
External devices and GND connection. Main power cables should be connected to main circuit breaker. The external devices related to the product must be connected to separate power source. (independent circuit breaker or fuse)
System Block Diagram
AD
IGBT
HVT
Divider
Converter
Module
Transformer
Circuit
Charge & Discharge
Console
IGBT Driver
Connecting CPU
X-Ray tube
external
Detector Hand Switch
Detector
Converter
Main external devices connection diagram
X-Ray tube
PC & Monitor Cable 4
PACS Cable 5 Handle bar Cable 3
Cable 9
Input voltage
Cable 6
Tube support unit Detector support unit
Cable 7 Detector converter
Cable 1 Cable 8
Ecoview 9 Dual type (Rev.1.0)
17
IonService chamber manual (Option)
EcoRay
HF 525Plus
HVT
Generator
Cable 2
Main cables (related above external devices connecitons) Cable No.
Q’ty
Cable 1
1
Cable 2
1
15,000mm
Cable 3
1
9,000mm
Cable 4
1
50mm
Tube Stator
Including Temperature Relay signal cable
Cable 5
1
9,000mm
Power
Connecting to Handle bar
Cable 6
1
5,000mm
Power and signal
Connecting to Table
Cable 7
1
9,000mm
Power and signal
Connecting to Wall Bucky
Cable 8
Variable
15,000mm
Signal
Connecting to Table and Wall bucky
Cable 9
1 pair
NOTE ☞
Length Depends on the room size
Depends on the room size
Description
Remarks
380VAC 3 phase
Cables are following indicated spec.
Signal cable
Connection between HF generator and OP console
Power cable, Tube Stator cable
Connecting HF generator and Handle bar
Connecting between HV Transformer and X-ray HV cable tube
Notice
GND cable should follow the required regulation and its main GND terminal is locating at beside of HF Generator main fuses.
Ecoview 9 Dual type (Rev.1.0)
18
Service manual
EcoRay
HF 525Plus
Chapter 2
Installation
Digital Radiographic X-ray System EcoView 9
Ecoview 9 Dual type (Rev.1.0)
19
Service manual
EcoRay
HF 525Plus
2. Installation 2.1 Overall information This chapter indicates configurations of HF generator and how to install it to complete the system. There are also detailed instructions for correct applications of the unit to let users operate the system for maximum performance.
2.2 Tools required Tools and required measuring kits for installation Following list of tools is recommended for proper installation works.
And it is possible to have further required tools according to field conditions. And local engineers should prepare those required tools at site.
■ Basic measuring and detection tools like a multi-meter, screw drivers, various flyers, soldering irons etc. ■ Drills (electric) ■ Cutting tools ■ Cleaning machine ■ kV meter & mA meter ■ Radiation dose meter ■ Service manual
Only educated or trained engineers are allowed to install this product (EcoView9). Manufacturer has no responsibility of malfunctioning and technical problems once the unit has been installed uneducated persons.
2.3 Check before the installation The responsible engineers should check following subjects before entering installation.
Ecoview 9 Dual type (Rev.1.0)
20
Service manual
EcoRay
HF 525Plus
■ Check main electricity condition and other installation environment like RF shielding. ■ Make complete understanding to Service Manual. ■ Check if safety for patients and operators are fully satisfied. ■ Check main circuit breaker capacity and installation status. ■ Other safety related issues.
Check installation space – see the recommended space diagram below.
Check main electricity Measure the main voltage that supposed to engage to the generator. Check main circuit breaker’s function. The product EcoView9 generator is mainly requiring 380VAC 50/60Hz three phase power input.
2.4 HF Generator installation Uncover it first.. There are HF generator, communication cable, a Hand switch, OP console in the packing box.
Ecoview 9 Dual type (Rev.1.0)
21
Service manual
EcoRay
HF 525Plus
Unpack it and check if there is any broken part or damaged components and make quick report to manufacturer or local distributor if there is any harmed problem. And make sure if all the contents in the box are proper to the packing list. (and do not throw the papers away before the inspection is finished)
■ Generator label check and opening its cover. Check if label serial no. and paper’s serial no. is matching and then open the generator housing cover..
■ Check any internal damage in the HF Generator Uncover the generator and see if there is any damaged part, wires, connectors etc and make report if any problem has been happened.
Engineers can correct directly if any connectors are opened.
Ecoview 9 Dual type (Rev.1.0)
22
Service manual
EcoRay
HF 525Plus
System appearance and main parts ■ OP console
Main configuration of control part.
Filament & Driver Board High Voltage Transformer
Main I/O Board
Charge & Discharge Board AEC Board
Dual speed Anode stator Control Board
■ Functions at each part Filament & Driver Board : controls IGBT circuit and Tube filament. Charge & Discharge Board : monitors and controls main capacitor charge & discharge.
Ecoview 9 Dual type (Rev.1.0)
23
Service manual
EcoRay
HF 525Plus
Main I/O Board : having main microprocessor and controls main control signal and circuit.
High Voltage Transformer This is the part supplying HV (High Voltage) upto 150,000V to tube. Basic power is coming from HF generator.
AEC Board : controls Ion Chambers and manages X-ray exposure time automatically.
HF Generator installation Move the generator to the place you want. And make main power cable connection. Make and complete all the cable connection before the power is engaged. Once all the wiring job is done, then enable the main power input to the generator.
2.5 Installation of tube stand Unpack There are 2 boxes – one is tube stand and the other is floor rail.
Unpack it and check if there is any broken part or damaged components and make quick report to manufacturer or local distributor if there is any harmed problem. And make sure if all the contents in the box are proper to the packing list. (and do not throw the papers away before the inspection is finished) [Box 1] Tube Support unit
[Box 2] Floor rail
Note ☞ The Stand base is fixed in the rail, it should be released during the installation.
Ecoview 9 Dual type (Rev.1.0)
24
Service manual
EcoRay
HF 525Plus
Parts appearance and configurations
Tube Stand Tube
Stand base Floor rail Position meter
■ Functions Floor rail Moving tube stand from left to right (or right to left) and has stand base on it. Horizontal balance is quite required.
Tube stand Connecting to stand base and moves up/down, left/right, back/forth and rotating the tube head.
Tube head Tube, Collimator, Handle bar parts are belong to this position.
Position meter Sensing tube stand position (left & right) and convert it to electric signal.
Ecoview 9 Dual type (Rev.1.0)
25
Service manual
EcoRay
HF 525Plus
Installation of tube stand ■ Floor rail installation Move the rail to proper location and bottom of rail and floor itself should be completely horizontal, vertical against the wall.
Floor anchor bolts
Stand base Horizontal balance kit
Floor rail
Once the horizontal & vertical positioning is O.K, then make anchor bolts into the floor.
Ecoview 9 Dual type (Rev.1.0)
26
Service manual
EcoRay
HF 525Plus
■ Tube stand assembly Moves tube stand to the floor rail.
Put the stand on the stand base. (assemble it carefully, required 2 or more persons)
Ecoview 9 Dual type (Rev.1.0)
27
Service manual
EcoRay
HF 525Plus
Once the stand is assembled well into the base, fix it with bolts and install an electromagnetic breaker.
Check and adjust horizontal & vertical balance.
Tube
Stand
should
be
vertically assembled against floor.
Floor rail
■ Tube head installation Take the holders out like the photo below.
Ecoview 9 Dual type (Rev.1.0)
28
Service manual
EcoRay
HF 525Plus
Put the X-ray tube on it and fix the holders.
■ Collimator assembly Put Al Filter inside.
And install Handle Bar
Ecoview 9 Dual type (Rev.1.0)
29
Service manual
EcoRay
HF 525Plus
Attach the Collimator.
■ The picture shows complete assembly as below.
Ecoview 9 Dual type (Rev.1.0)
30
Service manual
EcoRay
HF 525Plus
■ Insert balance weight into the stand. Once tube stand is installed well, locate the tube in the middle of stand. (through up/down way) and weight box can be locating in the middle.
Using a bolt, fix the box in the position.
Put weight plates into the box until the balance is acceptable. Once the weight balance is O.K, take the fixing bolt out and put the cover on the box.
Weight plates
Fixing bolt
Balance is O.K, remove the bolt
Ecoview 9 Dual type (Rev.1.0)
31
Service manual
EcoRay
HF 525Plus
■ Wirings Wire connection on Handle Bar P7 goes to Tube anode stator side. P4 goes to collimator P6 goes to ECO-XR5-GC board in generator P9 goes to Tube rotating device P12 goes to tube stand electromagnetic breaker
To: Tube Anode
From: Collimator
To: Generator
Stator
P7
Ecoview 9 Dual type (Rev.1.0)
P4
P6
32
To: Tube Stand for
From: Tube Stand for
Tube Rotation
Electromagnetic rock
P9
P12
Service manual
EcoRay
HF 525Plus
Tube Anode side connections
Back side of Handle
NOTE ☞ When connecting of Tube Stator, never use
Anode side of X-ray Tube
“Temperature Relay” point.
Tube anode side circuit details
SC: Stator Common (Terminal 1) SM: Main Winding of the Stator (Terminal 2) SS: Shift of the Stator (Terminal 3) NC: Not use (Terminal 4) ET: Connect Earth (Terminal E) Tube 1 Temp: Temp. Relay (Terminal 5) Tube 1 Temp: Temp. Relay (Terminal 6)
Tube rotor specification
Ecoview 9 Dual type (Rev.1.0)
33
Service manual
EcoRay
HF 525Plus
Generator wiring Handle bar P6 goes to ECO-XR5-GC Board in generator.
Handle Bar 의 P6 Connector
ECO-XR5-GC Board CON703
ECO-XR5-GC Boar CON703circuit details are as follow.
ECO-XR5-GC Board CON703
Ecoview 9 Dual type (Rev.1.0)
34
Service manual
EcoRay
HF 525Plus
2.6 Wall Bucky Unpack There is one box for Wall bucky stand.
Unpack it and check if there is any broken part or damaged components and make quick report to manufacturer or local distributor if there is any harmed problem. And make sure if all the contents in the box are proper to the packing list. (and do not throw the papers away before the inspection is finished)
Appearance and configuration
■ Functions Bucky device Film or Detector can be installed and grid and ion chamber are inserted.
Stand Moves Bucky device up/down.
Floor plate Holds Wall Bucky to floor.
Upper side plate Fix the Wall Bucky to wall.
Ecoview 9 Dual type (Rev.1.0)
35
Service manual
EcoRay
HF 525Plus
Installation ■ Floor plate installation Move the Wall bucky to proper location and bottom of plate and floor itself should be completely horizontal, vertical against the wall. Once the horizontal & vertical positioning is O.K, then make anchor bolts into the floor.
Plate fixing bolt
Floor plate
Floor
■ Weight balance Following the same way of tube stand weight balance. (please refer the page 31)
■ Wirings ECO-XR5-GC Boar CON705circuit details are as follow.
ECO-XR5-GC Board 의 CON705
Ecoview 9 Dual type (Rev.1.0)
36
Service manual
EcoRay
HF 525Plus
2.7 Patient Table Unpack There is one box for Table.
Unpack it and check if there is any broken part or damaged components and make quick report to manufacturer or local distributor if there is any harmed problem. And make sure if all the contents in the box are proper to the packing list. (and do not throw the papers away before the inspection is finished)
Appearance and configuration Buckydevice
■ Main body
Table top
Lift
Foot switch
■ Foot switch
SW 1 SW 2 SW 3 SW 4
Ecoview 9 Dual type (Rev.1.0)
37
Service manual
EcoRay
HF 525Plus
■ Functions Bucky device Film or Detector can be installed and grid and ion chamber are inserted.
Lift (by motor control) Moves table Bucky up/down.
Table top : where patient lie down for examinations.
Foot switches SW1:
for electromagnetic lockers
SW2:
Lift the table up
SW3:
moves the table down
SW4:
for electromagnetic lockers
Ecoview 9 Dual type (Rev.1.0)
38
Service manual
EcoRay
HF 525Plus
Installation ■ Floor rail fixing Move the table to the correct location.
■ Adjustment of table height Once the location of table is fixed, make the power input to the table and adjust the table height by foot switch. (no.2
foot switch).
When the table location is completed, fix it into the floor with anchor bolts.
Ecoview 9 Dual type (Rev.1.0)
39
Service manual
EcoRay
HF 525Plus
■ Wirings Con2 in the table connection goes to Generator (ECO-XR5-GC Board).
CON2 & 3 in the table
ECO-XR5-GC Board CON704
ECO-XR5-GC BoarCON704 circuit details are as follow.
ECO-XR5-GC Board CON704
Ecoview 9 Dual type (Rev.1.0)
40
Service manual
EcoRay
HF 525Plus
2.8 Installation of Tube Stand 2.8.1 Appearance of Tube Stand (SMS-TS-2)
Front view
Side view
2.5.1 Consist of Main parts 8. Electromagnetic lockup device for vertical travel
7. Electromagnetic lockup device for tube rotation (Tube Arm)
1. Stand
6. X-ray tube 2. Vertical move device 5. Handle Bar
3. Stand base (for lateral travel) 4. Floor rail
3. Functions of main components (Also refer to subject 2.3.2) (1) Stand: Device helps the X-ray tube travelling up & down (2) Vertical move device: holding X-ray tube and to be connected to Tube Stand to support up & down travel. (3) Stand base: holding Tube Stand and to be connected to Floor rail for longitudinal travel. (4) Floor rail: supports Tube stand to move longitudinal way. (5) Handle Bar: The device has a Angle display panel, emergency PWR-off button, electromagnetic lockup buttons and user holding handles for X-ray tube position control. (6) X-ray tube device: where it has X-ray tube, Handle Bar and collimator assembled. (7) Tube Arm: Helping X-ray tube rotation from Handle Bar. (8) Electromagnetic lockup device for vertical travel: Helping X-ray tube up/down travel from Handle Bar. 2.5.2 Unpacking 1. The different devices are packed in several boxes for convenient and efficient transportation and installation. 2. Check if all the devices are well condition after unpacked. 3. In case any of the devices are broken or missed, please contact your local agent or manufacturer quickly. 4. They are packed as a set of Stand, a set of Handle Bar, a set of balance weight and a set of Floor rail.
Ecoview 9 Dual type (Rev.1.0)
41
Service manual
EcoRay
HF 525Plus
5. Do not scrap the packing boxes, envelops or inside papers before you make sure all about the contents.
It is necessary to have 2 or more people to move and install the Tube Stand devices.
Box 2
Box 1
Floor rail
Tube Stand
Note ☞ The Stand base is fixed in the box, it should be released during the installation.
2.5.3 Installation procedure of Tube Stand 1. Check if the serial No. on the label is match with the serial No. on the quality certificate. 2. During the unpacking, check if all the devices are in well condition, especially at cables. In case any broken or damaged parts, please contact your local agent for replacements. 3. Bring the devices to the installation place. (Do not assemble the devices in advanced) 2 or more people are needed to move them because the devices are very heavy.
4. Fix (install) the Floor rail on a right position. 5. Connect Tube Stand into Floor rail through the Stand base. 6. Press down the tube head (tube arm) to the level where you can put the holding pin. It is necessary to pull it down without weight balance. 7. Put the holding pins around the balance weight box position. 8. Then install X-ray tube, Handle Bar and collimator. 9. And put balance weights into the tube stand (in the empty space of balance weights). The balance weights are very heavy, so please be careful when you move them into the space. 10. Check the cable connections and make them tight if necessary. 11. Make all the cable connections according to the cable diagram. 12. Check if all the connections are correct. 13. If the cable & wire connections are O.K, put main AC input power to the Generator. (Check AC input power level before you make Power ON) 14. One person holds the X-ray tube and the other removes the holding pin at behind of Tube Stand. 15. Check if the weight balance is O.K, if the balance is not perfect, add or remove the weight balances.
Ecoview 9 Dual type (Rev.1.0)
42
Service manual
EcoRay
HF 525Plus
16. PWR ON and check if electromagnetic lockup functions are all O.K – test it from Handle Bar. 17. The engineers should stay in the room until the installation works are all over.
■ Connection terminal for external devices.
GC Board
TS
BT
BS
Ecoview 9 Dual type (Rev.1.0)
43
Service manual
EcoRay
HF 525Plus
■ Power input Check the voltage and connect it.. Turn on the circuit breaker. Check the input voltage to each device. Press Power ON button on OP console and check the functions.
■ Verification Installation engineer should stay close to the product until the installation is completely over.
Do not have communication cable cut and connect it with an adapter. (dual connection will be influent to signal transportation)
Ecoview 9 Dual type (Rev.1.0)
44
Service manual
EcoRay
HF 525Plus
3. Connect High Voltage Transformer with X-ray Tube (1) Wiring High Voltage Cable (Connect High Voltage Transformer and X-ray tube) Socket Receptacle
Connected Image
X-ray Tube
(2) Connect High Voltage Cable Cable Plug
Insulation silicon oil for Receptacle Socket
reinforcement
The terminal pins of the high voltage cable are extremely delicate and easily damaged. And then, handle them with very carefully.
(3) Manufacturer’s Instructions 1) Prepare receptacle socket of high voltage transformer that will be installed and high voltage cable. (High voltage cable must be handling with always clean condition) 2) Apply enough insulation silicon to the entire of surface of Cable plug (High voltage transformer) and near of the pin. (Put approximately 1cm of insulation silicon into the High Voltage Transformer receptacle socket.) 3) Fix cable nut with firmly after connecting of high voltage cable with high voltage transformer. 4) Apply enough insulation silicon to the entire of surface of Cable plug (X-ray tube) and near of the pin. 5) Connect opposite side of high voltage cable to the X-ray tube receptacle socket. 6) Fix cable nut with firmly after connecting of high voltage cable with X-ray tube.
High voltage cable wiring must be done in dryness place without humidity.
Ecoview 9 Dual type (Rev.1.0)
45
Service manual
EcoRay
HF 525Plus
4. Connect Tube Stator (1) Wiring of X-ray tube Anode Stator External terminal of Generator (SMS-GC-340 board)
Back side of Handle
Anode side of X-ray Tube
NOTE ☞ When connecting of Tube Stator, never use “Temperature Relay” point. SC: Stator Common (Terminal 1) SM: Main Winding of the Stator (Terminal 2) SS: Shift of the Stator (Terminal 3) NC: Not use (Terminal 4) ET: Connect Earth (Terminal E) Tube 1 Temp: Temp. Relay (Terminal 5) Tube 1 Temp: Temp. Relay (Terminal 6)
(2) Specification of X-Ray Tube Anode Stator
X-ray tube Anode Stator wiring is must correctly with recommended by X-ray tube manufacturer. Never connect terminal No.1 to No. 5 and No. 6.
Ecoview 9 Dual type (Rev.1.0)
46
Service manual
EcoRay
HF 525Plus
The terminal pins of the high voltage cable are extremely delicate and easily damaged. And then, handle them with very carefully.
5. Power Cable Connection (1) The power cable of this generator must be connected correctly with main circuit breaker. (2) The power cable size is depends on generator’s model and power cable length. (Refer 3.2) (3) Cut the cable to the appropriate length and remove insulation from both ends of the Power and ground wires. (4) Connect power cable to the generator main fuse terminal. (5) Connect opposite side of cable to the main circuit breaker. (6) Turn ON the main circuit breaker when input voltage for generator is correct, and push the Power On switch if want to run X-ray generator. (7) Main power will be supplied to the generator if main circuit breaker is not off, turn off the main circuit breaker to disconnect electric power completely.
After wiring, adjust circuit for voltage level sensor for CnD Board. How to adjust: Refer to 5.3.1 Charge & Discharge circuit error (Check Cue-XR2-CnD Board)
6. Specification Item
Functions
SIG-40-525 / HF-525 PLUS
Generator Type
High Frequency Inverter
KVp range
40 ~ 125kVp ±5%
mA range
50 ~ 500mA ±5%
Exposure Time Generator
High Voltage Transformer
1mSec ~ 6Sec (Below 100mSec: inside ±1mSec. Over 100mSec: inside ±10%)
APR
288 (Standard)
AEC
Optional item
Output Frequency
40kHz
Maximum Power
40kW
Line Voltage
Single phase, 230V ±10% , 50/60Hz
Rating
125kV / 300mA,
80kV / 500mA at 100mSec
Maximum kVp
125kVp
Maximum mA
500mA
Ecoview 9 Dual type (Rev.1.0)
47
Service manual
EcoRay
HF 525Plus
2.8 Installation of Tube Stand 2.8.1 Appearance of Tube Stand (SMS-TS-2)
Front view
Side view
2.8.2 Consist of Main parts 8. Electromagnetic lockup device for vertical travel
7. Electromagnetic lockup device for tube rotation (Tube Arm)
1. Stand
6. X-ray tube 2. Vertical move device 5. Handle Bar
3. Stand base (for lateral travel) 4. Floor rail
3. Functions of main components (Also refer to subject 2.3.2) (1) Stand: Device helps the X-ray tube travelling up & down (2) Vertical move device: holding X-ray tube and to be connected to Tube Stand to support up & down travel. (3) Stand base: holding Tube Stand and to be connected to Floor rail for longitudinal travel. (4) Floor rail: supports Tube stand to move longitudinal way. (5) Handle Bar: The device has a Angle display panel, emergency PWR-off button, electromagnetic lockup buttons and user holding handles for X-ray tube position control. (6) X-ray tube device: where it has X-ray tube, Handle Bar and collimator assembled. (7) Tube Arm: Helping X-ray tube rotation from Handle Bar. (8) Electromagnetic lockup device for vertical travel: Helping X-ray tube up/down travel from Handle Bar. 2.8.3 Unpacking 1. The different devices are packed in several boxes for convenient and efficient transportation and installation. 2. Check if all the devices are well condition after unpacked. 3. In case any of the devices are broken or missed, please contact your local agent or manufacturer quickly.
Ecoview 9 Dual type (Rev.1.0)
48
Service manual
EcoRay
HF 525Plus
4. They are packed as a set of Stand, a set of Handle Bar, a set of balance weight and a set of Floor rail. 5. Do not scrap the packing boxes, envelops or inside papers before you make sure all about the contents.
It is necessary to have 2 or more people to move and install the Tube Stand devices.
Box 2
Box 1
Floor rail
Tube Stand
Note ☞ The Stand base is fixed in the box, it should be released during the installation.
2.8.4 Installation procedure of Tube Stand 1. Check if the serial No. on the label is match with the serial No. on the quality certificate. 2. During the unpacking, check if all the devices are in well condition, especially at cables. In case any broken or damaged parts, please contact your local agent for replacements. 3. Bring the devices to the installation place. (Do not assemble the devices in advanced) 2 or more people are needed to move them because the devices are very heavy.
4. Fix (install) the Floor rail on a right position. 5. Connect Tube Stand into Floor rail through the Stand base. 6. Press down the tube head (tube arm) to the level where you can put the holding pin. It is necessary to pull it down without weight balance. 7. Put the holding pins around the balance weight box position. 8. Then install X-ray tube, Handle Bar and collimator. 9. And put balance weights into the tube stand (in the empty space of balance weights). The balance weights are very heavy, so please be careful when you move them into the space. 10. Check the cable connections and make them tight if necessary. 11. Make all the cable connections according to the cable diagram. 12. Check if all the connections are correct. 13. If the cable & wire connections are O.K, put main AC input power to the Generator. (Check AC input power level before you make Power ON) 14. One person holds the X-ray tube and the other removes the holding pin at behind of Tube Stand.
Ecoview 9 Dual type (Rev.1.0)
49
Service manual
EcoRay
HF 525Plus
15. Check if the weight balance is O.K, if the balance is not perfect, add or remove the weight balances. 16. PWR ON and check if electromagnetic lockup functions are all O.K – test it from Handle Bar. 17. The engineers should stay in the room until the installation works are all over.
2.8.5 Starting of installation. 1. Understanding Wiring (1) Understanding of SMS-GC-340 Board.
PIN
(Upper side of Generator)
NO
Tube Support Unit
Ecoview 9 Dual type (Rev.1.0)
50
Tube Support part of SMS-GC-340 Board (Upper side of Generator)
1
Stator Com (SC1)
2
Stator Shift (SS1)
3
Stator Main (SM1)
4
AC Out
5
AC 0V
6
NC
7
DC 0V
8
DC24V
9
EMG
10
EMG
11
NC
12
Tube1 Temp.
13
Tube1 Temp.
14
Door
15
Door
16
GND
Service manual
EcoRay
HF 525Plus
(2) Understanding of SMS-TS-340 Board (Handle bar of Tube Stand) P6 Connector of
PIN NO.
P6 Connector
SMS-TS-340 Board (Handle bar of Tube Stand)
1
Stator Com (SC1)
2
Stator Main (SM1)
3
Stator Shift (SS1)
4
AC 0V
5
AC 24V
6
EMG
7
EMG
8
Tube1 Temp.
9
Tube1 Temp.
10
GND
(3) Connect SMS-GC-340 of Tube Support Unit and P6 Connector of SMS-TS-340 Tube support unit→
P6 Connector
Ecoview 9 Dual type (Rev.1.0)
Tube Support unit of
P6 Connector of
SMS-GC-340 Board
SMS-TS-340
(Upper side of Generator)
(Handle bar)
1
Stator Com (SC1)
1
Stator Com (SC1)
2
Stator Shift (SS1)
2
Stator Main(SM1)
3
Stator Main (SM1)
3
Stator Shift (SS1)
4
AC Out
4
AC 0V
5
AC 0V
5
AC 24V
6
NC
NC
NC
7
DC 0V
NC
NC
8
DC24V
NC
NC
9
EMG
6
EMG
10
EMG
7
EMG
11
NC
NC
12
Tube1 Temp.
8
Tube1 Temp.
13
Tube1 Temp.
9
Tube1 Temp.
14
Door
NC
NC
15
Door
NC
NC
16
GND
10
GND
51
Service manual
EcoRay
HF 525Plus
(4) Connect P7 of SMS-TS-340 with X-ray Tube
SMS-TS-340 SMS-TS-340 의
Anode side of X-
P7 Connector Handle bar
ray Tube
(Inside of Handle bar)
1
Stator Com (SC1)
1
Stator Com (SC1)
2
Stator Main(SM1)
2
Stator Main(SM1)
3
Stator Shift (SS1)
3
Stator Shift (SS1)
4
Tube1 Temp.
5
Tube1 Temp.
5
Tube1 Temp.
6
Tube1 Temp.
6
GND
E
GND
Anode side of X-ray tube
(5) Connect P8 connector of SMS-TS-340 with Emergency Switch (There is no electric polarity) (6) Connect P4 connector of SMS-TS-340 with Collimator (There is no electric polarity) (7) Connect P9 connector of SMS-TS-340 with X-ray Tube rotation electromagnetic rock. (Take notice of electric polarity) (8) Connect P12 connector of SMS-TS-340 with X-ray Tube rotation electromagnetic rock. (Take notice of electric polarity) (9) Connect P5 connector of SMS-TS-340 with SID display unit (Optional)
2. Floor rail and stand installation
Note ☞ The place should be dry and flat.
1. Put the Floor rail at the right place. 2. Install it horizontal way of the wall. 3. The floor should be flat.
4. Floor rail lie horizontal way from the wall and bottom side should be flat to the ground. 5. Fix the Floor rail to the ground with bolts.
Ecoview 9 Dual type (Rev.1.0)
52
Service manual
EcoRay
HF 525Plus
1
2
3
Fixation of Floor rail (bolts and nuts to the holes) 1:
Decide the hole position and make it the same at floor.
2:
Insert fixing bolt into the hole and make it tight enough.
3:
Floor rail up to the fixing bolt and join it with a nut. (Check the horizontal condition)
Holding pin position 6. Set up the stand on Floor rail. 7. Fix the stand with bolts. 8. Press the tube arm down to the position where you can put the holding pin.
Balance weights
Holding pin position 9. Check the holding pin position and put it in. 10. Insert balance weights into the stand. 11. Holding the Arm well and remove the holding pin then check if the weight balance is O.K
12. Check weight balance of tube arm and add or remove the balance weights if necessary. 13. PWR ON and check Handle Bar functioning 15. Check electromagnetic lockers’ functions.
Ecoview 9 Dual type (Rev.1.0)
53
Service manual
EcoRay
HF 525Plus
3. Assemble of X-ray tube device (1) X-ray tube device consists of X-ray tube, tube arm (rotation), Handle Bar and collimator. X-ray tube
Tube arm
Handle Bar
X-ray tube device
Collimator
4. Verification of cables. (1) Compare the cable configuration is matching to the circuit diagram or cable diagram. (2) Connect PWR input to Tube Stand (3) Main PWR ON (4) Test the electromagnetic locker functions by controlling Handle Bar. 5. Cabling between Tube Stand and HFG (1) Power line connection → The PWR cables are coming from HFG and it is necessary to measure input PWR level before the actual PWR engages to Tube Stand. → The PWR level is 24VDC and should be measure by a multi-meter to make it sure.
Tube stand (side view)
Ecoview 9 Dual type (Rev.1.0)
SMS-GC-430 (Upper side of Generator
54
Service manual
EcoRay
HF 525Plus
2.9 Installation of Ceiling Tube Support 2.9.1 External appearance (SMS-TC-1) 1. External image.
2. Consist of Main parts
Ecoview 9 Dual type (Rev.1.0)
55
Service manual
EcoRay
HF 525Plus
3. Functions of main parts. (1) Column unit: X-ray tube support unit to move forward and backward and move left and right and move up and down. (2) Ceiling Rail: Column unit was assembled with this rail and helps to move. (3) Handle: Angle, Emergency Stop switch and electromagnetic control switch was assembled. (4) X-ray Tube: Electron Tube for x-ray generation. Assembled with Handle, X-ray tube, Collimator (5) Electromagnetic: For tube rotation, it was controlled by Handle switch. (6) Electromagnetic: For up/down movement of X-ray tub, it was controlled by Handle switch.
2.9.2 Unpacking 1. The different devices are packed in several boxes for convenient and efficient transportation and installation. 2. Check if all the devices are well condition after unpacked. 3. In case any of the devices are broken or missed, please contact your local agent or manufacturer quickly. 4. They are packed as a set of Stand, a set of Handle Bar, a set of balance weight and a set of Floor rail. 5. Do not scrap the packing boxes, envelops or inside papers before you make sure all about the contents.
It is necessary to have 2 or more people to move and install the Tube Stand devices.
2.9.3 Installation procedure of Ceiling Tube Support 1. Check if the serial No. on the label is match with the serial No. on the quality certificate. 2. During the unpacking, check if all the devices are in well condition, especially at cables. In case any broken or damaged parts, please contact your local agent for replacements. 3. Bring the devices to the installation place. (Do not assemble the devices in advanced) 2 or more people are needed to move them because the devices are very heavy. 4. Fix (install) the ceiling rail. 5. Insert Ceiling Tube Support column unit to the ceiling rail. 6. Press down the tube head (tube arm) to the easy wiring position and pull out the holding pin to the fixing position. (Located upper side of Column unit) 7. Then install X-ray tube, Handle Bar and collimator. 8. Check the cable connections and make them tight if necessary. 9. Make all the cable connections according to the cable diagram. 10. If the cable & wire connections are O.K, put main AC input power to the Generator. (Check AC input power level before you make Power ON) 11. One person holds the X-ray tube and the other removes the holding pin at behind of Tube Stand. 12. Check if the weight balance is O.K, if the balance is not perfect, add or remove the weight balances.
Ecoview 9 Dual type (Rev.1.0)
56
Service manual
EcoRay
HF 525Plus
13. PWR ON and check if electromagnetic lockup functions are all O.K – test it from Handle Bar. 14. The engineers should stay in the room until the installation works are all over.
Pull out holding pin of Column unit to the fixing position before installation, and after installation, release the holding pin to be used.
PIN NO 2.9.4 Starting of installation. 1. Understanding Wiring (1) Understanding of SMS-GC-340 Board. (Upper side of Generator)
Tube Support Unit
Ecoview 9 Dual type (Rev.1.0)
57
Ceiling Tube Support part of SMS-GC-340 Board (Upper side of Generator)
1
Stator Com (SC1)
2
Stator Shift (SS1)
3
Stator Main (SM1)
4
AC Out
5
AC 0V
6
NC
7
DC 0V
8
DC24V
9
EMG
10
EMG
11
NC
12
Tube1 Temp.
13
Tube1 Temp.
14
Door
15
Door
16
GND
Service manual
EcoRay
HF 525Plus
(2) Understanding of SMS-TS-340 Board (Handle bar of Ceiling Tube Support)
PIN NO. P6 Connector
P6 Connector of SMS-TS-340 Board (Handle bar of Tube Support)
1
Stator Com (SC1)
2
Stator Main (SM1)
3
Stator Shift (SS1)
4
AC 0V
5
AC 24V
6
EMG
7
EMG
8
Tube1 Temp.
9
Tube1 Temp.
10
GND
(3) Connect SMS-GC-340 of Ceiling Tube Support Unit and P6 Connector of SMS-TS-340 Ceiling Tube support unit→
P6 Connector
Ecoview 9 Dual type (Rev.1.0)
Tube Support unit of
P6 Connector of
SMS-GC-340 Board
SMS-TS-340
(Upper side of Generator)
(Handle bar)
1
Stator Com (SC1)
1
Stator Com (SC1)
2
Stator Shift (SS1)
2
Stator Main(SM1)
3
Stator Main (SM1)
3
Stator Shift (SS1)
4
AC Out
4
AC 0V
5
AC 0V
5
AC 24V
6
NC
NC
NC
7
DC 0V
NC
NC
8
DC24V
NC
NC
9
EMG
6
EMG
10
EMG
7
EMG
11
NC
NC
12
Tube1 Temp.
8
Tube1 Temp.
13
Tube1 Temp.
9
Tube1 Temp.
14
Door
NC
NC
15
Door
NC
NC
16
GND
10
GND
58
Service manual
EcoRay
HF 525Plus
(4) Connect P7 of SMS-TS-340 with X-ray Tube
SMS-TS-340 SMS-TS-340 의
Anode side of X-
P7 Connector Handle bar
Anode side of X-ray tube
ray Tube
(Inside of Handle bar)
1
Stator Com (SC1)
1
Stator Com (SC1)
2
Stator Main(SM1)
2
Stator Main(SM1)
3
Stator Shift (SS1)
3
Stator Shift (SS1)
4
Tube1 Temp.
5
Tube1 Temp.
5
Tube1 Temp.
6
Tube1 Temp.
6
GND
E
GND
2. Installation of Ceiling Rail (1) Installed image of Ceiling Rail
1. Assemble fixing unit of Ceiling Rail
2. Assemble upper rail to the fixing unit.
3. Insert Low rail to the Upper rail and then insert Assemble upper rail to the fixing unit.
Ceiling Rail must be installed at the ceiling parallel with floor without moisture place.
Ecoview 9 Dual type (Rev.1.0)
59
Service manual
EcoRay
HF 525Plus
Fixing bolts are must assembled with ceiling rail to be strongly enough to hold column, if assembled with weak or loosely, column or ceiling rail could fall down. And it cause of death or serious injuries.
(2) Assembly Ceiling Rail 1
2
3 Ceiling Concrete
Fixing bolt Assemble Ceiling rail to the fixing bolts.
Installation Procedure 1. [Picture 1] Making a hole after making a position. 2. [Picture 2] Insert fixing bolts to the hole. 3. [Picture 3] Assembly Upper rail with fixing bolts. 4. Assembly Upper rail. 5. Insert Lower rail to the Upper rail 6. Insert Column unit to the Lower rail
NOTE ☞ Ceiling Tube Support Lower rail should be installed in 2,600 ~ 2,800mm height place.
3. Assembly Column unit (1) Lower rail and Column unit must be paralleled. (Use lift) (2) Insert Column unit slowly to the Lower rail.
4. Assembly Column unit and X-ray tube (1) Lower rail and Column unit must be paralleled. (Use lift) (2) Insert Column unit slowly to the Lower rail.
Ecoview 9 Dual type (Rev.1.0)
60
Service manual
EcoRay
HF 525Plus
(3) Release lock condition with pull down holding pin of weight balance. (4) Pull down bottom of Column unit with hand by eye level. (5) Other engineer makes lock condition with pull down holding pin of weight balance during engineer holding column unit. (6) Assembly X-ray Tube unit. (X-ray tube, Handle, Collimator, Etc.) X-ray Tube
Tube Arm
Handle
X-ray Tub Unit
Collimator
5. Starting Wiring (1) Cable wiring Ceiling Tube Support with X-ray generator 1) Start cable wiring after checking external terminal of X-ray generator and Circuit diagram. (Refer to 1. Understanding Wiring of 2.5.4 Starting of installation) 2) Power will be supplied from X-ray generator and check voltage with tester before connect power. 3) 24VDC will be supplied to Ceiling Tube Support from X-ray generator and could check it tester.
X-ray Tube
SMS-GC-430
Handle
(Upper side of Generator)
Ecoview 9 Dual type (Rev.1.0)
Column unit
61
Service manual
EcoRay
HF 525Plus
2.10 Installation of Table Bucky
2.10.1 External appearance 1. External images
2. Consist of Main parts (1) Table Bucky device
Upper table
Bucky device Foot switch-light sensor
Fixture plate
(2) Bucky Device Protection cover X-ray Grid and Oscillator Ion Chamber
Ion Chamber Fixture
Cassette Tray Cassette Tray Handle
3. Function of main parts (1) Table Bucky device → Bucky device restrains scattered X-ray. → Foot switch controls upper table which is fixed with electromagnet. → Fixture plate settles the product on the floor after the installation. → Patient lays down on the upper table which made with easy-radioactivity-penetrate material. (2) Bucky device → Cassette Tray locates cassette → Cassette holder is a fixture that does not move the cassette. → Grid is a lattice to get rid of scattered X-ray. → Oscillator moves grid right and left. → Ion Chamber controls exposure time automatically.
Ecoview 9 Dual type (Rev.1.0)
62
Service manual
EcoRay
HF 525Plus
2.10.2 Unpacking 1. Product is packed as one package to make easy its transportation and installation. 2. Check any damage of the product after the unpacking. 3. If any damage is found, stop the installation, user should inform about the damage to the forwarder and the representative 4. User should confirm every device is same as it ordered, do not dump any package, box, document and other contents until completion of confirmation.
At least 4 people work together to move tube stand for installation. 2.10.3 Installation procedure of Table Bucky 1. Identify a label on the product with serial number of test report that included in package. 2. If user finds out any harm of damage on external appearance or internal wiring, user should order immediately substitutes to prevent delay of installation. 3. Move the table to the place where it would install. (At least 4 adults move the Table Bucky, or a lift is required.) 4. Disconnected while transportation could be connected while its installation. 5. Wiring according to wiring diagram. 6. Reconfirmation after wiring. 7. Supply a main power after wiring reconfirmation. (Voltage should be checked) 8. Check function of electromagnet and centering signal by foot switch. 9. Engineer should be remaining the work place until the installation would be completed. 2.7.4 Starting Installation 1. Check wiring (1) Understanding of SMS-GC-340 Board (Upper side Generator)
PIN NO.
Ecoview 9 Dual type (Rev.1.0)
63
of
Table Bucky of SMS-GC-340 Board (Upper side of Generator)
1
AC 0V
2
AC Out
3
NC
4
NC
5
NC
6
Bucky Com
7
Bucky Out
Service manual
EcoRay
HF 525Plus
8
Bucky Signal
9
Bucky Signal
10
GND
TCON2 Connector of PIN TABLE BUCKY Board NO
(1) Understanding of Table Bucky Board (Bottom side
(Bottom side of Table Bucky) 1
AC 24V
2
(There is no polarity)
3
BK-IN
4
(There is no polarity)
of
Table Bucky)
(2) Connect SMS-GC-340 with P6 Connector of SMS-TS-340 SMS-GC-340 Board
TCON2 Connector
for Table Bucky
of TABLE BUCKY Board
(Upper side of Generator)
(Bottom side of Table Bucky)
1
AC 0V
1
2
AC out
2
3
NC
NC
4
NC
NC
5
NC
NC
6
Bucky Com
3
AC 24V
Ecoview 9 Dual type (Rev.1.0)
64
BK_IN
Service manual
EcoRay
HF 525Plus
7
Bucky Out
4
8
Bucky Signal
NC
9
Bucky Signal
NC
10
GND
Ground it directly to Bucky Table body
Ground: Connect directly to Table Bucky body
2. Position of Table Bucky (1) It should be located a place with no moisture and horizontal floor.
1. Patient table should make a bar level with a tube stand. 2. At least 25cm remains between tube stand and patient table. 3. Start wiring
4. Turn on the collimator light after check distance of two devices. 5. Make sure that patient table and tube stand are even level with moving tube stand right and left. (The light should remain the center of the patient table.)
Ecoview 9 Dual type (Rev.1.0)
65
Service manual
EcoRay
HF 525Plus
3. Fixture of Table Bucky 1. After horizontal confirmation, user fix the table. (See the picture) 2. Fixture of patient table is performed for certain. (See the below picture)
1 after position confirmation.2 1: Make holes
3
2: Put the fixture bolt into the hole and do not fall out. 3: Check vertical and horizontal statues of the table with fixture bolt on the hole of floor Rail, and fix them finally.
4. Wiring Table Bucky and Generator 1. Power supply ● Power supplies from generator and it should be pre-check its voltage with voltage meter. ● The power supplied to tube stand is 24VDC and the voltage could be checked with
voltage meter. 2. Wiring check of Table Bucky ● Check the wiring with generator is same with wiring diagram. ● Supplying power to the Table Bucky after checking the voltage. ● Switch on the console ● Check operation of electromagnet with switches of handle bar.
2.8 Installation of Wall Bucky 2.8.1 External appearance 1. External images
Ecoview 9 Dual type (Rev.1.0) Front View
66
Service manual Side View
EcoRay
HF 525Plus
2. Consist of main parts (1) Bucky support device
Bucky device Electromagnetic fixing switch
Anchor
2. Bucky device
Protection cover X-ray Grid and Oscillation device
Ion Chamber
Ion Chamber fixing bar
Cassette Tray Cassette Tray handle
3. Explanation for main parts function (1) Bucky support device ● Bucky device: Bucky is a device that moves the grid while x-ray is being taken. ● Electro-magnetic fixing switch: Use this device when you move bucky device up and down ● Anchor: use this device when you fix equipment to floor
(2). Bucky device ● Cassette tray: device that could insert and draw cassette ● Cassette holder: device not to move cassette ● Grid: used to reduce the amount of scattered radiation reaching the x-ray film. ● Oscillation device: used to move grid right and left ● Ion Chamber: sensor that controls automatically x-ray shooting time
2.8.2 Unpacking 1. Wall Bucky is packed not to need to assemble again for efficient delivery and installation 2. Upon receipt of the product, inspect if there is any damage 3. If damage is found, notify the carrier or his agent immediately 4. Don’t waste documents, box and development that are inside of box until you confirm that
Ecoview 9 Dual type (Rev.1.0)
67
Service manual
EcoRay
HF 525Plus
all parts are o.k.
At least, more than two person needs to move this units for installation.
Wall Bucky of
PIN NO.
2.8.3 Installation procedure of Wall Bucky 1. Confirm if the serial number on the label is same with the serial number on the test report
SMS-GC-340 Board ( Upper side of Generator)
1
DC 0V
2
DC 24V
3
AC 0V
4
AC Out
2. Confirm if exterior and inside wires have no damage. If you find any damage, you should order replacement parts immediately. 3. Move Wall Bucky to suitable position that will be installed. (more than two persons or forklift need to move this unit for installation) 4. If any connector is removed during delivery, you should connect it in the installation site 5. Start wiring according to wiring diagram 6. Reconfirm if all wiring is correct after wiring 7. Connect power cable after reconfirmation (you must check voltage before supplying power) 8. After power input, operate electro-magnetic fixing device to check the condition 9. Engineer must stay in installation site until installation is finished
2.8.4 Starting of installation 1. Check wiring (1) Understanding wiring of SMS-GC-340 with Wall Bucky (Upper side of Generator)
Ecoview 9 Dual type (Rev.1.0)
68
Service manual
EcoRay
HF 525Plus
5
NC
6
Bucky COM
7
Bucky Out
8
Bucky Signal
9
Bucky Signal
10
GND
(2) Understanding wiring of Wall Bucky (Wiring of Wall Bucky)
PIN NO
Wiring of
Wall Bucky
1
DC 0V
2
DC 24V
3
Bucky C
4
Bucky 24V
5
GND
3) Wiring SMS-GC-340 with Wall Bucky Wall Bucky of SMS-GC-340
Ecoview 9 Dual type (Rev.1.0)
69
Pin NO. of Wall Bucky
Service manual
EcoRay
HF 525Plus
(Upper side of Generator)
1
DC 0V
1
DC 0V
2
DC 24V
2
DC 24V
3
AC 0V
NC
NC
4
AC Out
NC
NC
5
NC
NC
NC
6
Bucky COM
3
Bucky COM
7
Bucky Out
4
Bucky Out
8
Bucky Signal
NC
NC
9
Bucky Signal
NC
NC
10
GND
5
GND
2. Positing of Wall Bucky position (1) Wall Bucky must be installed in the not humid and the floor must be flat. Fixing device
1. Move Wall Bucky to installation site devi
2. The floor must be flat 3. Wall Bucky must be horizontal and vertical with wall
wall
Wall Wall
4. Fix anchor to floor after installation
Bucky\\ stand
floor
5. Turn collimator lamp 6. Collimator light must be located on Wall Bucky center 7. Move tube support device left and right and Wall Bucky not to move Collimator light out of center of Wall Bucky
8. If the collimator light is not out of center of Wall Bucky, fix Wall Bucky to floor
Ecoview 9 Dual type (Rev.1.0)
70
Service manual
EcoRay
HF 525Plus
Pic1: Decide where to fix and make hole on the floor to fix Pic2: Insert bolt to the hole to fix Pic3: Insert bolt to floor rail ‘s hole and fix it with nut after checking vertical and horizontal condition
3. Starting wires between Wall Bucky and generator (1) Power input
■ Power is supplied by generator and check the voltage with voltmeter before supplying power ■ Input power at tube support is 24VDC and the voltage could be checked voltmeter (2) Wall Bucky wiring check and input power check → Wiring connected with exterior device must be same with circuit diagram → Supply power after checking voltage → Console switch On → Press handle bar switch and check the condition of electro-magnet
2.9 System Cable Wiring
Ecoview 9 Dual type (Rev.1.0)
71
Service manual
① ⑤
EcoRay
HF 525Plus
NOTE! If do not use Door and EMG functions, then never remove the attached pin of tube support connector pin (Door and EMG). If needs these functions, use these pin connectors
Ecoview 9 Dual type (Rev.1.0)
72
Service manual
EcoRay
HF 525Plus
Chapter 4
Calibration General Purpose Radiographic System Model: HF-525 PLUS
Ecoview 9 Dual type (Rev.1.0)
73
Service manual
EcoRay
HF 525Plus
4. Calibration 4.1 Overview The manual contains how to adjust the exposure condition of a generator and modify data. The adjusted and modified data are saved at a memory chip at the Cue-XR2-Mio Board as digital value.
4.2 Introducing calibration program 4.2.1 The calibration tool is a specified program that supplied by EcoRay and it will be operated on desktop computer. 4.2.2 Controlling exposure value (ex. kV, mA etc) 4.2.3 The calibration tool should be operated by a qualified engineer who was trained by EcoRay. 4.2.4 The calibration tool is based on a lot of experiences of manufacturer and the calibration could be operated with only the program that supplied by manufacturer.
4.3 Required tools and testers for the calibration 4.3.1 The required tools and tester for the calibration are as follows and the additional tools could be prepared, if it is required; 1. Program for Calibration, 2. General testers and tools, 3. Insulation silicon for high voltage cable reinforcement, 4. Digital voltage meter, 5. kV meter, 6. mA meter, 7. Time meter, 8. Radiation Dose meter, 9. Al Filter set for half value layer test, 10. Various phantoms for fluoroscopy test, 11. Other testers for calibration.
4.4 Check point before start the calibration 4.4.1 Input voltage 4.4.2 Ground condition 4.4.3 Required testers and tools for calibration 4.4.4 X-ray tube model (technical data) and additional equipment.
Ecoview 9 Dual type (Rev.1.0)
74
Service manual
EcoRay
HF 525Plus
4.5 Composition of calibration program 4.5.1 Composition of main function
2. Calibration mode 1. Controller mode
5. Communication state display & Memory display window
3. X-ray Tube selection window
4. Bucky selection window
4.5.2 Main functions 1. Controller mode: Display Radiographic, Fluoroscopy and AEC function 2. Calibration mode: Adjust calibration data after running the program and save it 3. X-ray Tune selection window: Select radiographic X-ray tube and fluoroscopic X-ray tube and set tube stator working condition. 4. Bucky selection window: Select Bucky position, Bucky type and change date 5. Communication state display & Memory display window: Communicate generator with PC and read or save the setting data.
Ecoview 9 Dual type (Rev.1.0)
75
Service manual
EcoRay
HF 525Plus
4.6 How to use the Calibration program 4.6.1 Functions of Icons 1. Starting Icon. If you click this icon on the screen, the program will run automatically
2. Power Icon. If you click this icon, the program will activate. (Running: Green lamp, Stop: Yellow lamp condition) 3. Communication port: Only COM1 port supplied 4. Select Radiographic, Fluoroscopic or AEC function
5. Display window for kV, mA, Time
6. Microprocessor information window: memory mA data, kV data, exposure count, product serial No. microprocessor program version
7. Calibration mode ON/OFF switch
8. Select calibrationdata area input and display 9. Calibration windowinput data 10. Compensation mode of mA data 11. Used compensate mA data, if mA data tolerance is too high. Click “Advanced..” icon if you want to compensate mA data. 12. After running, could see mA graphic and could adjust it.
13. Initialize the compensated mA data. 14. Save the compensated mA data. 15. Read the compensated mA data 16. Read the compensated mA data from PRAM of Microprocessor 17. Save the compensated mA data from PRAM of Microprocessor 18. Save the compensated mA data to another computer 19. Read the compensated mA data from another computer
Ecoview 9 Dual type (Rev.1.0)
76
Service manual
EcoRay
HF 525Plus
4.6.2 Start the calibration 1. Click the starting icon on the PC screen. 2. Select Radiographic, Fluoroscopic, AEC functions on the controller mode. 3. Select X-ray tube position and Tube stator on the Tube selection window. 4. Select Bucky position and type on the Bucky selection window. 5. Click ON icon of calibration mode and then program will activate. 6. Adjust calibration data after running of calibration program. (The calibration program should be operated by a qualified engineer who was trained by manufacturer)
4.7 Time of Calibration 4.7.1 In installation: After installation, this x-ray system must be inspected by radiation inspection office even though this x-ray system was calibrated at the factory before delivery. And must be calibrated when needs calibration. 4.7.2 In periodic inspection: This x-ray system must be inspected by radiation inspection office per every 3 years. And must be calibrated when needs calibration. 4.7.3 In repaired or replaced: If main parts are repaired or replaced, x-ray system must be inspected by radiation inspection office. And must be calibrated when needs calibration. 4.7.4. In re-installation or move: If re-install or install it another place then x-ray system must be inspected by radiation inspection office. And must be calibrated when needs calibration.
4.8 Must calibrated when Main Parts are repaired or replaced 4.8.1 Repaired or Replaced of X-ray Tube 4.8.2 Repaired or Replaced of Cue-XR2-MiO Board 4.8.3 Repaired or Replaced of Cue-XR2-CnD Board 4.8.4 Repaired or Replaced of Cue-XR2-FnD Board 4.8.5 Repaired or Replaced of High Voltage Transformer 4.8.6 Replaced of High Voltage Cable or replaced with another length of high voltage cable.
Ecoview 9 Dual type (Rev.1.0)
77
Service manual
EcoRay
HF 525Plus
Chapter 5
Trouble Shooting General Purpose Radiographic System Model: SIG-40-525 / HF-525 PLUS
5. Trouble Shooting
Ecoview 9 Dual type (Rev.1.0)
78
Service manual
EcoRay
HF 525Plus
5.1 An Overview 5.1.1 This generator has a self-diagnosing function and display error code on the console display if system has an error. 5.2 Error type 5.2.1 Error type No
1
Error type Charge Circuit problem
Cause 1. Charging to Main Capacity is not normal. 2. Input voltage is out of boundary. (Too high or too low) (Standard input voltage: Single phase, 220VAC ±10%)
2
3
Tube stator
1. Cable connection to Tube stator is wrong.
Circuit problem
2. Cue-XR2-MiO in Stator circuit is out of order.
Tube Filament Circuit problem
1. Tube Filament circuit connection is wrong. 2. Filament circuit is out of order. 3. Tube Filament is short. HV-DRV-OLP (Cue-XR2-FnD) signal or circuit is wrong. error. (See circuit diagram) Generator
4
IGBT-OCP (Cue-XR2-FnD) signal or circuit is
Over current to IGBT Module may occur the
wrong. (See circuit diagram)
error
Protection Circuit problem
DRV-PWR-UVP (Cue-XR2-FnD) signal or circuit is wrong.
Voltage from the IGBT Driver IC is lower than standard. (See circuit diagram) FIL-OCP (Cue-XR2-FnD) signal or circuit is wrong. (See circuit diagram)
5
Over current to IGBT Driver IC may occur the
Over current on the Tube Filament Communication
1. Wrong connection of communication cable.
program
2. Communication circuit in the Main board or Console board is out of order. 1. Wrong connection of communication cable.
6
AEC problem
2. Wrong cable connection between AEC Board and Ion Chamber. 3. AEC Board or Ion Chamber is out of order.
7
Irregular Exposure
1. Actual exposure time is shorter than set time.
Time problem
2. Exposure switch is bad condition.
5.2.2 Error type and display
Ecoview 9 Dual type (Rev.1.0)
79
Service manual
EcoRay
HF 525Plus
Error code will be displayed on the console when occurred error.
Error displayed as like image.
1. Error type 1: Displayed E r r
C r F P at kVp, mA, Time section
Tube Charge
Refer to Cue-XR2-CnD Circuit Filament
Commu
AEC
Filament
nication
Circuit
- OLP
error
error
Normal
Normal
Commu
AEC
Filament
nication
Circuit
- OLP
error
error
Normal
Normal
Stator Circuit
Exposure Circuit
Circuit error
HV-DRV
IGBT-OCP
time error
DRV-PER
error error To be checked To be checked
Normal
(Any one of 4 is possibly faulty)
2. Error type 2: Displayed E r r
C r F at kVp, mA, Time section
Tube Charge
Refer to Cue-XR2-CnD Circuit Filament
Stator Circuit
Exposure Circuit
Circuit error
HV-DRV
IGBT-OCP
time error
DRV-PER
error error To be checked
Normal
3. Error type 3: Displayed E r r
Cr
Tube Charge
P at kVp, mA, Time section Refer to Cue-XR2-CnD Circuit
Filament
Commu
AEC
Filament
nication
Circuit
- OLP
error
error
Normal
Normal
Stator Circuit
Exposure Circuit
Circuit error
Normal
HV-DRV
IGBT-OCP
time error
DRV-PER
error error To be checked
To be checked
Normal
Normal
(Any one of 4 is possibly faulty)
4. Error type 4: Displayed E r r
Ecoview 9 Dual type (Rev.1.0)
C r at kVp, mA, Time section
80
Service manual
EcoRay
HF 525Plus
Tube Charge
Refer to Cue-XR2-CnD Circuit Filament
Commu
AEC
Filament
nication
Circuit
- OLP
error
error
Normal
Normal
Commu
AEC
Filament
nication
Circuit
- OLP
error
error
Normal
Normal
Commu
AEC
Filament
nication
Circuit
- OLP
error
error
Normal
Normal
Commu
AEC
Filament
nication
Circuit
- OLP
error
error
Normal
Normal
Stator Circuit
Exposure Circuit
Circuit error
HV-DRV
IGBT-OCP
time error
DRV-PER
error error
To be checked
Normal
5. Error type 5: Displayed E r r
Normal
C FP at kVp, mA, Time section
Tube Charge
Refer to Cue-XR2-CnD Circuit Filament
Stator Circuit
Exposure Circuit
Circuit error
Normal
HV-DRV
IGBT-OCP
time error
DRV-PER
error error
To be
To be
To be checked
checked
(Any one of 4 is possibly faulty)
Normal checked
6. Error type 6: Displayed E r r
C F at kVp, mA, Time section
Tube Charge
Refer to Cue-XR2-CnD Circuit Filament
Stator Circuit
Exposure Circuit
Circuit error
Normal
HV-DRV
IGBT-OCP
time error
DRV-PER
error error
To be
To be Normal
checked
Normal
Normal
checked
7. Error type 7: Displayed E r r
C P at kVp, mA, Time section
Tube Charge
Refer to Cue-XR2-CnD Circuit Filament
Stator Circuit
Exposure Circuit
Circuit error
HV-DRV
IGBT-OCP
time error
DRV-PER
error error
To be
To be checked Normal
Normal
checked
8. Error type 8: Displayed E r r
Ecoview 9 Dual type (Rev.1.0)
Normal
(Any one of 4 is possibly faulty)
CHA at kVp, mA, Time section
81
Service manual
EcoRay
HF 525Plus
Tube Charge
Refer to Cue-XR2-CnD Circuit Filament
Commu
AEC
Filament
nication
Circuit
- OLP
error
error
Normal
Normal
Commu
AEC
Filament
nication
Circuit
- OLP
error
error
Normal
Normal
Commu
AEC
Filament
nication
Circuit
- OLP
error
error
Normal
Normal
Commu
AEC
Filament
nication
Circuit
- OLP
error
error
Normal
Normal
Stator Circuit
Exposure Circuit
Circuit error
HV-DRV
IGBT-OCP
time error
DRV-PER
error error
To be Normal
Normal
Normal
Normal
checked
9. Error type 9: Displayed E r r
r FP at kVp, mA, Time section
Tube Charge
Refer to Cue-XR2-CnD Circuit Filament
Stator Circuit
Exposure Circuit
Circuit error
HV-DRV
IGBT-OCP
time error
DRV-PER
error error To be checked
Normal
To be checked
Normal
(Any one of 4 is possibly faulty)
10. Error type 10: Displayed E r r
r F at kVp, mA, Time section
Tube Charge
Refer to Cue-XR2-CnD Circuit Filament
Stator Circuit
Exposure Circuit
Circuit error
HV-DRV
IGBT-OCP
time error
DRV-PER
error error
Normal
To be checked
Normal
11. Error type 11: Displayed E r r
r
Tube Charge
P at kVp, mA, Time section Refer to Cue-XR2-CnD Circuit
Filament Stator
Circuit
Exposure Circuit
Circuit error
Normal
HV-DRV
IGBT-OCP
time error
DRV-PER
error error To be
Normal
To be checked Normal
checked
12. Error type 12: Displayed E r r
Ecoview 9 Dual type (Rev.1.0)
Normal
(Any one of 4 is possibly faulty)
roto at kVp, mA, Time section
82
Service manual
EcoRay
HF 525Plus
Tube Charge
Refer to Cue-XR2-CnD Circuit Filament
Commu
AEC
Filament
nication
Circuit
- OLP
error
error
Normal
Normal
Commu
AEC
Filament
nication
Circuit
- OLP
error
error
Normal
Normal
Commu
AEC
Filament
nication
Circuit
- OLP
error
error
Normal
Normal
Commu
AEC
Filament
nication
Circuit
- OLP
error
error
Stator Circuit
Exposure Circuit
Circuit error
HV-DRV
IGBT-OCP
time error
DRV-PER
error error To be
Normal
Normal
Normal
Normal
checked
13. Error type 13: Displayed E r r
FP at kVp, mA, Time section
Tube Charge
Refer to Cue-XR2-CnD Circuit Filament
Stator Circuit
Exposure Circuit
Circuit error
HV-DRV
IGBT-OCP
time error
DRV-PER
error error
Normal
To be
To be checked
checked
(Any one of 4 is possibly faulty)
Normal
14. Error type 14: Displayed E r r
FILA at kVp, mA, Time section
Tube Charge
Refer to Cue-XR2-CnD Circuit Filament
Stator Circuit
Exposure Circuit
Circuit error
Normal
HV-DRV
IGBT-OCP
time error
DRV-PER
error error To be
Normal
Normal
Normal
Normal
checked
15. Error type 15: Displayed E r r
232 at kVp, mA, Time section
Tube Charge
Refer to Cue-XR2-CnD Circuit Filament
Stator Circuit
Exposure Circuit
Circuit error
HV-DRV
IGBT-OCP
time error
DRV-PER
error error
To be Normal
Normal
Normal
Normal
Normal
Normal
checked
16. Error type 16: Displayed E r r
Ecoview 9 Dual type (Rev.1.0)
AEC at kVp, mA, Time section
83
Service manual
EcoRay
HF 525Plus
Tube Charge
Refer to Cue-XR2-CnD Circuit Filament
Commu
AEC
Filament
nication
Circuit
- OLP
error
error
Stator Circuit
Exposure Circuit
Circuit error
HV-DRV
IGBT-OCP
time error
DRV-PER
error error
To be Normal
Normal
Normal
Normal
Normal
Normal checked
17. Error type 17: Displayed E r r
SEC at kVp, mA, Time section
Tube Charge
Refer to Cue-XR2-CnD Circuit Filament
Commu
AEC
Filament
nication
Circuit
- OLP
error
error
Normal
Normal
Stator Circuit
Exposure Circuit
Circuit error
HV-DRV
IGBT-OCP
time error
DRV-PER
error error
To be Normal
Normal
Normal
Normal
checked
18. Error type 18: Displayed E r r
Pro----O at kVp, mA, Time section
Tube Charge
Refer to Cue-XR2-CnD Circuit Filament
Commu
AEC
Filament
nication
Circuit
- OLP
error
error
Normal
Normal
Normal
Commu
AEC
Filament
nication
Circuit
- OLP
error
error
Normal
Normal
Normal
Stator Circuit
Exposure Circuit
Circuit error
HV-DRV
IGBT-OCP
time error
DRV-PER
error error To be
Normal
Normal
Normal
Normal
Normal
Normal
checked
19. Error type 19: Displayed E r r
Pro--I-- at kVp, mA, Time section
Tube Charge
Refer to Cue-XR2-CnD Circuit Filament
Stator Circuit
Exposure Circuit
Circuit error
HV-DRV
IGBT-OCP
time error
DRV-PER
error error To be
Normal
Normal
Normal
Normal
Normal
Normal
checked
20. Error type 20: Displayed E r r
Ecoview 9 Dual type (Rev.1.0)
Pro---P- at kVp, mA, Time section
84
Service manual
EcoRay
HF 525Plus
Tube Charge
Refer to Cue-XR2-CnD Circuit Filament
Commu
AEC
Filament
nication
Circuit
- OLP
error
error
Normal
Normal
Normal
Commu
AEC
Filament
nication
Circuit
- OLP
error
error
Normal
Normal
Stator Circuit
Exposure Circuit
Circuit error
HV-DRV
IGBT-OCP
time error
DRV-PER
error error To be
Normal
Normal
Normal
Normal
Normal
Normal
checked
21. Error type 21: Displayed E r r
Pro----F at kVp, mA, Time section
Tube Charge
Refer to Cue-XR2-CnD Circuit Filament
Stator Circuit
Exposure Circuit
Circuit error
HV-DRV
IGBT-OCP
time error
DRV-PER
error error
To be Normal
Normal
Normal
Normal
Normal
Normal
Normal
checked
22. Error type 22: Displayed E r r
Inte at kVp, mA, Time section
1. Inter Lock signal trouble and circuit trouble 2. Inter Lock is Door Open, Tube Temperature, Bucky start signal, Emergency Stop switch.
5.3 Trouble Shooting
Ecoview 9 Dual type (Rev.1.0)
85
Service manual
EcoRay
HF 525Plus
5.3.1 Charge & Discharge circuit error (Check Cue-XR2-CnD Board) 1. Consist of part
2. Check Procedures 1
Ecoview 9 Dual type (Rev.1.0)
86
Service manual
EcoRay
HF 525Plus
(1) Board Name: Cue-XR2-CnD (2) Functions:
This board controls charge/discharge of Main Condenser.
(3) Followings are the check procedures for Cue-XR2-CnD board when charge/discharge trouble. Under normal condition Provide main input power to generator and check if LED (804) is ON. *Before the power ON at the console.
Under defective
How to maintain
1. Check Connector (P803) and measure No light at LED (D804)
the voltage (Normal: 220VAC) 2. Check the Fuse F801. 3. Measure the voltage TP801 and U801 Heat sink (Gnd) (Normal: 21VDC ±0.5V) 4. Resistor(R806) 을 점검.
Console Power ON. 1. Check LED (D816) lightening.
Standby lamp flickering then turns Standby lamp is flickering of
yellow and error
Console
code displayed on
(Normal: Red light) 2. Check the Connector (P805) and measure the voltage on it. (Normal: 310VDC between pin 1 & 4)
the FND
3. Check the Connector (P804) and measure the voltage on it.
Standby lamp turned to green
(Normal: 220VAC between pin 1 & 2) 4. Check the Connector (P802).
and LCD display goes enabled..
5. Measure the voltage between Test point TP803 & TP804 (Normal: +5VDC ±0.2V) In case of Relay
6. Measure the voltage between Test
(RL801, 802) do not
Operating is ready
(Normal: +12VDC ± 0.2V)
work correctly, check the frequency
is ON and stops when main capacitor
(TP802, 803) and
how to adjust the frequency.
7. Check the function of Relay (RL801) Normal: it works when OP console PWR
at Test point
Chapter 4.1.3.1 is describing
point TP803 & TP805
charges about 90%
make sure if it is
8. Check the function of Relay (RL802)
75kHz or not.
Normal: RL802 starts to work immediately when RL801 stops.
(4) Board Name: Cue-XR2-CnD
Ecoview 9 Dual type (Rev.1.0)
87
Service manual
EcoRay
(5) Functions:
HF 525Plus
This board controls charge/discharge of Main Condenser.
(5) Adjust frequency between Test point TP803 and TP802. Under normal condition
Under defective
How to maintain In order to readjust input power freq....
OP console Power On.
1. Short circuit of P801 pin1 & pin2. 2. Tester probe connection to TP803 (Gnd) and TP802.
Study the function of P801 at Cue-XR2-CnD Board.
3. Read the detected value. Freq. readjustment
4. Adjust VR801 to meet 75KHz (deviation allowed: 75KHz ±0.5KHz) 5. with PSU: 76-78KHz (deviation:±1KHz )
P801 function of Connector P801 pin 1: Voltage input freq. selective terminal (L. volt) P801 pin 2: Common ground P801 pin 3: freq. Selective terminal for charge (C. volt) Charging freq. check
In order to adjust charging power freq..
Measuring input power freq.
1. Short circuit of P801 pin2 & pin3.
1. Connect pin 1 & 2 of P801.
2. Tester probe connection to TP803 (Gnd)
2. Tester probe connection to TP803 (GND) and TP802.
and TP802. Freq. readjustment
3. Read the detected value.
3. Read the detected value. 4. Adjust VR801 to meet 76KHz
4. Normal value: 75KHz
(deviation allowed: 76KHz ±0.5KHz)
(with PSU: 76-78KHz)
Measuring charging power freq. 1. Connect pin 2 & 3 of P801. 2. Tester probe connection to TP803 (Gnd) and TP802 3. Read the detected value. 4. Normal value: 76KHz (with PSU: 76-78KHz)
Measure the charging power frequency.
5. with PSU: 76-78KHz (deviation:±1KHz)
Check charge frequency after adjustment of input power frequency.
1. Check input power and charging power freq after adjustment of charging frequency. 2. System turn off and on again, and measure the frequency. 3. Open P801 pin 1, 2, 3 if input power frequency is normal.
5.3.2 Tube Stator Circuit error (Check Cue-XR2-Mio Board)
Ecoview 9 Dual type (Rev.1.0)
88
Service manual
EcoRay
HF 525Plus
1. Consist of part
2. Consist of Tube Stator Temperature Relay Tube Anode Socket Receptacle
Anode Stator wiring terminal
Anode Stator Coil terminal
M: Main wiring of X-ray tube stator. A: Assistance wiring of X-ray tube stator. NC: Not use ET: Earth
Note! Never connect terminal 1 to terminal 5 or 6. 3. Check procedure
Ecoview 9 Dual type (Rev.1.0)
89
Service manual
EcoRay
HF 525Plus
(1) Board Name: Cue-XR2-Mio Board (2) Functions: Controlling generator including Tube Stator movement. (3) Under the tube stator trouble, check tube stator wiring condition and then check Cue-XR2-Mio Board and check points are as follows; Under normal condition
Under defective
How to maintain 1. Check the cable connection between
Provide main power to generator and
HFG and X-ray tube (Tube Stator lines)
Power ON at console
(7-5. Tube Stator circuit error sub 2, 3) 2. Check the Connector (P901) and voltage on it -- 220VAC is normal 3. Check the Fuse (F901, F701). 4. Measure the voltage output between
Press ‘Ready’ button on OP
Test point (TP109) and Test point (TP105);
console.
3VDC ±0.2V is normal. 5. If above voltage is not normal, adjust VR701 to fix it at 3VDC. 6. Measure the voltage between Test point (TP109) and Test point (TP106)
Ready lamp lightening of console
No Ready lamp light on of console
; 3VDC ±0.2V is normal. 7. In case the voltage output is not good, adjust VR702 to fix it at 3VDC. 8. Check the output voltage from Diode (D701, 702) -- 7~8 VDC is normal. 9. In case the output voltage is not O.K, check the coil winding status on
Functioning well
transformer T701, 702 and measure the coil value. (see the circuit diagram for check
Contact service dept. in Korea
If you still have the
points)
same problem
Normal: Input pin 1 & 3 = 1 output pin 4 & 5 = 1.5
(No LED light ON with Ready)
5.3.3 Tube Filament Circuit error (Check Cue-XR2-FnD Board)
Ecoview 9 Dual type (Rev.1.0)
90
Service manual
EcoRay
HF 525Plus
1. Consist of part
2. High Voltage Cable
Measuring method and Procedure - Must power off before checking X-ray tube filament short condition. - Remove Cathode ( - ) from the high voltage transformer. - Check resistance value C with S or C with L of cable plug. - If short condition, resistance value could not check. 3. Check procedure (1) Board Name: Cue-XR2-FnDBoard
Ecoview 9 Dual type (Rev.1.0)
91
Service manual
EcoRay
HF 525Plus
(2) Functions: Controlling Tube Filament (3) Under Tube Filament circuit trouble, check high voltage and wiring condition of circuit and then check Cue-XR2-FnD board. Under normal condition
Under defective
How to maintain
Turn on the Main power and then
1. Check Connector (P501) and measure the voltage on it ; 220VAC is normal
turn on the Console Power
2. Check Fuse (F501). 3. Fix the Relay (RL501) position and check LED (D516, 517, 518) Not Cue-XR2-FnD (Driver Board) LED (D516, 517, 518)
lighting
its functioning. Normal: Relay working and Ready lamp ON
Normal: All LED lighted
4. Measure the voltage between Heat sink
with green
(U406) and Test point (M5V) Normal: 5VDC
점등상태확인
±0.1V
정상: LED 모두 녹색점등
5. Measure the voltage between Heat sink
Set exposure values
(U406) and KA324 (U518 pin 4) ; 12VDC ±0.1V is normal 6. Measure the voltage between Heat sink Push the “Ready” button
(U406) and KA324 (U518 pin 11)
Error when Ready
; -12VDC ±0.1V is normal 7. In case above voltages are not good, check input PWR of Cue-XR2-Mio (Main Board). 8. Fix the Connector (P403) well. X-ray switch could use after Ready lamp lightening. 1. Check HV cables. (Anode, Cathode directions and contact condition) 2. Tube Focal LED lightening check. 3. Check cable connections between Could use system after repair
Connector (P401) and HV Transformer. 4. Fix the RL401 Relay of focal change, and check its functioning
7. Voltage checks before Ready between Heat sink (U406) and Resistor
(Normal: Relay On -> Large, Relay off -> Small)
(R426).
5. Voltage check between Connector (P401)
(Normal: approx.RMS 0.8VDC ±0.1V and voltage is difference at each mA
pin 3 and pin 4 before Ready at Small focus
with Ready condition)
(Normal: 35VDC ±2V)
8. Before pressing Ready, measure the voltage between Heat sink (U406)
6. Voltage check between Connector (P401)
and KA39 3(U519 pin3)
pin 2 & 4 before Ready at Large focus.
(Normal: 1VDC ±0.1V and this is different at each mA under Ready
(Normal: 35VDC ±2V)
condition)
5.3.4 IGBT Device signal and Protection circuit trouble (Check Cue-XR2-FnD Board)
Ecoview 9 Dual type (Rev.1.0)
92
Service manual
EcoRay
HF 525Plus
1. Consist of part
2. Check procedure
Ecoview 9 Dual type (Rev.1.0)
93
Service manual
EcoRay
HF 525Plus
(1) Board Name: Cue-XR2-FnD Board (2) Functions: Controlling IGBT and Tube Filament (3) Check high voltage cable, filament short condition of X-ray tube, wiring condition of circuit when IGBT Device signal and protection circuit trouble and then check Cue-XR2-FnD Board condition as bellows. Under normal condition
Under defective
How to maintain
1. Power OFF before the circuit check.
Set exposure value
2. Check resistance value between P502 pin 1 & 2, and check Diode voltage on Driver board. (Detection point is same and measure it at Power OFF status only) (Normal: resistance -> 1 ㏀ ± 50Ω, Diode voltage -> 0.7VDC ± 0.1V)
Push the Ready button
3. Measure the resistance between P502 pin 3 & 4 and voltage at Diode in Power OFF condition. (Normal: Resistance -> 1 ㏀ ± 50Ω,
Push the X-ray button
Error
Diode voltage -> 0.7VDC ± 0.1V)
comes
4. Measure resistance value between P503 pin 1 & 2 and Diode voltage
when X-
under Power OFF status. (Normal: Resistance -> 1 ㏀ ± 50Ω,
ray
Diode voltage -> 0.7VDC ± 0.1V)
exposure
5. Measure resistance between P503 pin 3 & 4 and Diode voltage at Power OFF status. (Normal: Resistance Diode voltage -> 0.7VDC ± 0.1V)
X-ray exposure is OK
5.3.5 HV-DRV-OLP trouble or Error Pro
Ecoview 9 Dual type (Rev.1.0)
O- - -
error (Cue-XR2-FnD Board)
94
Service manual
EcoRay
HF 525Plus
1. Consist of PCB
2. Check procedure about Board (1) Board Name: Cue-XR2-FnD Board (2) Functions: Controlling IGBT and Tube Filament (3) Check wiring condition of Cue-XR2-FnD Board and check waveforms at the HV-DRV-OLP check point with oscilloscope when IGBT Device signal and protection circuit trouble and checked waveforms are as follows. Error code display
Normal waveform
Abnormal waveform
Displayed on console
(Error Pro o---)
5.3.6 IGBT_OCP trouble or Error Pro - I- - error (Cue-XR2-FnD Board)
Ecoview 9 Dual type (Rev.1.0)
95
Service manual
EcoRay
HF 525Plus
1. Consist of PCB
2. Check procedure about Board (1) Board Name: Cue-XR2-FnD Board (2) Functions: Controlling IGBT and Tube Filament (3) Check wiring condition of Cue-XR2-FnD Board and then check IGBT_OCP trouble when IGBT Device signal and protection circuit trouble. Check procedure is as follows. Normal Operation
Under defective
How to check and repair 1. Fix the Connector (P504)
Set exposure value
(connected to IGBT current sensor) 2. Detect waveform between U519 pin 7 and Heat sink (U406). Error comes when
Push Ready button
3. If the waveform is nor normal, adjust VR702 to
X-Ray exposure
make proper waveform. 4. This setting is always completed in factory, so do not adjust VR702 except educated engineers. 5. In case IGBT_OCP circuit is out of order, please Push X-ray button
change IGBT or call Service center.
X-ray exposure is done
5.3.7 IGBT_OCP trouble or Error Pro - I- -
Ecoview 9 Dual type (Rev.1.0)
error (Cue-XR2-FnD Board)
96
Service manual
EcoRay
HF 525Plus
1. Consist of PCB
2. Check procedure (1) Board Name: Cue-XR2-FnD Board (2) Functions: Controlling IGBT and Tube Filament (3) Check wiring condition of Cue-XR2-FnD Board and check IGBT_OCP trouble when IGBT Device signal and protection circuit troubles. And check procedures are as follows. Error code display
Normal waveform
Abnormal waveform
Displayed on console
(Error Pro -I--)
5.3.8 DRV _ PWR _ UVP trouble or Error Pro - - P – error (Cue-XR2-FnD Board)
Ecoview 9 Dual type (Rev.1.0)
97
Service manual
EcoRay
HF 525Plus
1. Consist of PCB
2. Check procedure (1) Board Name: Cue-XR2-FnD Board (2) Functions: Controlling IGBT and Tube Filament (3) Check wiring condition of Cue-XR2-FnD Board and the check IGBT_OCP trouble when IGBT Device signal and protection circuit trouble. And check procedures are as follows. Normal Operation
Under defective
How to check and repair 1. LED light ON check at D516, 517, 518
Set exposure value
(Normal: All LEDs are light ON) 2. Fix the Connector (P501) and check voltage (normal : 220VAC) Error comes when
Push Ready button
3. Check the Fuse (F501).
X-ray exposure
4. Fix the Relay (RL501) and check its functioning (normal: Relay working with lamp ON) 5. Measure the voltage between Test point Push X-ray button
(TP500, 501) (normal: 18VDC ±0.2V) 6. If above voltage is not O.K, adjust VR501 to meet the proper range at 18VDC. 7. In case there is no voltage out, check the Resistor (R502).
X-ray exposure is done
5.3.9 DRV _ PWR _ UVP trouble or Error Pro --P- error (Cue-XR2-FnD Board)
Ecoview 9 Dual type (Rev.1.0)
98
Service manual
EcoRay
HF 525Plus
1. Consist of PCB.
2. Check procedure (1) Board Name: Cue-XR2-FnD Board (2) Functions: Controlling IGBT and Tube Filament (3) Check wiring condition of Cue-XR2-FnD Board and then check IGBT _ OCP troubles when IGBT Device signal and protection circuit troubles. And check procedures are as follows. Normal Operation
Under defective
How to check and repair
Error comes when X-ray Set exposure value
Normal Operation
Ecoview 9 Dual type (Rev.1.0)
8. See next page about repair
exposure
Under defective
How to check and repair
99
Service manual
EcoRay
HF 525Plus
Set exposure value
9. Check voltage between Heat sink (U504) and Diode Cathode (D504) (Normal: 18VDC ±0.3V) 10. Check voltage between Heat sink (U504) and Diode Anode (D505) (Normal: -13VDC ±0.3V) Error comes
Push Ready button
11. Check voltage between Heat sink (U504) and Diode
when X-ray
Anode (D524) (Normal: -10VDC ±0.3V)
exposure
12. Check voltage between Heat sink (U504) and Resister (R526) (Normal: 15VDC ±0.3V) 13. Check voltage between Heat sink (U506) and Diode Cathode (D506) (Normal: 18VDC ±0.3V) 14. Check voltage between Heat sink (U506) and Diode
Push X-ray button
Anode (D507) (Normal: -13VDC ±0.3V) 15. Check voltage between Heat sink (U506) and Diode Anode (D519) (Normal: -10VDC ±0.3V) 16. Check voltage between Heat sink (U505) and Resister (R521) (Normal: 15VDC ±0.3V) 17. Check voltage between Heat sink (U508) and Diode
X-ray exposure is done
Cathode (D508) (Normal: 18VDC ±0.3V) 18. Check voltage between Heat sink (U508) and Diode Anode (D509) (Normal: -13VDC ±0.3V) 19. Check voltage between Heat sink (U508) and Diode Anode (D521) (Normal: -10VDC ±0.3V) 20. Check voltage between Heat sink (U508) and Resister (R523) (Normal: 15VDC ±0.3V)
5.3.10 FIL _ OCP trouble or Error Pro - - F - error (Cue-XR2-FnD Board) 1. Consist of PCB
Ecoview 9 Dual type (Rev.1.0)
100
Service manual
EcoRay
HF 525Plus
2. Check procedure (1) Board Name: Cue-XR2-FnD Board (2) Functions: Controlling IGBT and Tube Filament (3) Check wiring condition of Cue-XR2-FnD Board and then check FIL _ OCP trouble when IGBT Device signals and protection circuit trouble. And check procedures are as follows.
Normal Operation
Under defective
How to check and repair
Set exposure value
1. The function of FIL_OCP is to protect tube focal spots. 2. Check voltage between Test point (TP402) and Heat sink (U406)
Error comes when Push Ready button
(Normal: 3.6VDC ±0.1V)
X-ray exposure
3. If the voltage is not O.K, adjust VR402 to fix the correct voltage. 4. It is strongly recommended that VR402 is strictly prohibited from uneducated persons. (Keeping factory setting is very
Push X-ray button
important) 5. In case FIL_OCP circuit is defective, X-ray tube or Driver board should be replaced. Call to Service center for the further actions.
X-ray exposure is done
5.3.11 Communication error between generator and console or Err
232 error
(Cue-XR2-Mio Boar & SMS-CONB-340 Board)
Ecoview 9 Dual type (Rev.1.0)
101
Service manual
EcoRay
HF 525Plus
1. Consist of PCB
2. Check procedure (1) Board Name: Cue-XR2-Mio Boar and SMS-CONB-340 Board (2) Functions: Communication transfer between generator and console. (3) Check communication cable condition when communication problem between console and Cue-XR2-Mio Board. And check procedures are as follows. Normal Operation
Under defective
Turn ON power of console
Self-diagnosing automatically by program
Err 232 appeared on the console
System is ready to work
Err 232 appeared Set exposure value on the console
How to check and repair 1. Communication cable connection check. 2. LED (D107, 108) light check. Normal: D107 flickering when parameters are being set (green light) Abnormal: D108 light ON (Red color) 3. LED (D906, 911, 912) check. Normal: D906 light on before Power On .D911, 912 light ON after Power ON. Abnormal: No LED light ON after Power ON. 4. Connector (P901) checks and measures the voltage. (Normal: 220VAC) 5. Check the Fuse (F901) 6. Check voltage between Test point (TP109) and Test point (TP110) (Normal: 7.5VDC ± 0.1V) 7. If the voltage (TP110) is not correct, adjust VR901 to fix it at 7.5VDC. 8. Check voltage between Test point (TP109) and Test point (TP111) (Normal: 15VDC ± 0.1V) 9. In case the voltage from TP111 is wrong, adjust VR902 to fix it at 15VDC. 10. Check RX signal between MAX232 (U101) pin 13 and Test point (TP109). Normal: see the next page (Oscilloscope waveform) 11. Check TX signal between MAX232 (U101) pin 14 and Test point (TP109). Normal: see the next page (Oscilloscope waveform)
X-ray exposure
5.3.12 Error
AEC error (Cue-XR2-Mio Boar and SMS-CONB-340 Board)
1. Connect part
Ecoview 9 Dual type (Rev.1.0)
102
Service manual
EcoRay
HF 525Plus
2. Check procedure (1) Check Ion Chamber connector condition. (2) Chamber position and Bucky position must be same. (Same position) (3) Check Number flickering or not on the Time display of console after X-ray exposure with ‘beep’ sound (4 times). (Normal: Changed normal display condition after Number flickering on the Time display)
3. Consist of part 1
Ecoview 9 Dual type (Rev.1.0)
103
Service manual
EcoRay
HF 525Plus
4. Check procedure 1 (1) Board Name: SMS-CONB-340 Board (2) Functions: Controlling Ion Chamber (3) Check communication cable condition and then check circuit when communication troubles occurred between console and Cue-XR2-Mio Board and Ion Chamber. And check procedures are as follows.
Normal Operation
Under defective
Turn ON power of console
How to check and repair 1. Fix the Communication cable between OP console and HFG 2. Fix the Connector (CCON7). 3. Fix the Connector (CCON6).
Self-diagnosing automatically by program
Err AEC comes on the display
4. Fix the Connector (PCON1). 5. Check LED (PD1, 2, 3) Normal: LED (PD1, 2, 3) light ON. 6. Check LED (MD2)
System is ready to be used.
Normal: MD2 is flickering with data communication. 7. Check the voltage between Connector (PCON1) pin 1 & 4 Normal: 7.5VDC ±0.2V
Select AEC function
8. Check the voltage of Capacitor (PC6)-both end Normal: 5VDC ±0.1V 9. Check the voltage of Capacitor ( PC17)-both end
Set exposure value
Normal: 3.3VDC ±0.1V 10. Check the voltage of Capacitor (PC19)-both end Normal: 1.9VDC ±0.1V
X-ray exposure
Ecoview 9 Dual type (Rev.1.0)
104
Service manual
EcoRay
HF 525Plus
5. Consist of part 2
6. Check procedure 2 (1) Board Name: SMS-AEC Board (2) Functions: Controlling Ion Chamber (3) Check communication condition when communication trouble occurred between input/output signal of Ion Chamber and circuit error. And check procedures are as follows. Normal Operation
Under defective
How to check and repair
1. Fix the communication cable between OP console and AEC
Turn ON power of console
board. Self-diagnosing automatically by program
Err AEC comes on
2. Check the Connector (CCON1). 3. Check Connector (CCON3, 4, 5).
the display
4. Check the console and Connector (CON1) cable connections. 5. Check LED (LED1, 2, 3)
System is ready to be used.
Normal: LED (LED1, 2, 3) light ON 6. Check LED (LED4) Normal: LED4 flickers during data communication
Select AEC function
7. Measure the voltage of Capacitor (PC1) -both end Normal: 5VDC ±0.1V 8. Measure the voltage of Capacitor (PC2)-both end Normal: 1.9VDC ±0.1V
Set exposure value
9. Measure the voltage of Capacitor (PC4)-both end Normal: 3.3VDC ±0.1V X-ray exposure
10. Measure the voltage of Capacitor (PC17)-both end Normal: 3.3VDC ±0.1V
7. Consist of part 3
Ecoview 9 Dual type (Rev.1.0)
105
Service manual
EcoRay
HF 525Plus
8. Check procedure 3 (1) Board Name: Cue-XR2-Mio Board (2) Functions: Controlling Ion Chamber Normal Operation
Under defective
1. Check communication cable between OP console and
Turn ON power of console
Connector (P101).
. Self-diagnosing automatically by program
How to check and repair
2. Check cable connection between SMS-AEC Err AEC comes on
(AEC Board) and Connector (P102). 3. Check LED (D107, 108)
the display
Normal: D107 flickers during data setting (green) Abnormal: D108 light ON (Red) 4. Check LED (D906, 911, 912) Normal: D906 lights ON before Power On
System is ready to be used.
D911, 912 light ON after Power On Abnormal: No LED light ON after Power On 5. Check the Connector (P901) and voltage. (Normal: 220VAC)
Select AEC function
6. Check the Fuse (F901) 7. Measure the voltage Test point (TP109) and Test point (TP110)
Set exposure value
(Normal: 7.5VDC ±0.1V) 8. In case the TP110 voltage is not normal, adjust VR901 to fix 7.5VDC. 9. Measure the voltage Test point (TP109) and Test point (TP111)
X-ray exposure
(Normal: 15VDC ±0.1V) 10. In case Test point (TP111) voltage is not normal, adjust VR902 to meet 15VDC.
Ecoview 9 Dual type (Rev.1.0)
106
Service manual
EcoRay
HF 525Plus
9. Consist of working signal
10. Followings are standard sensitivity value by program. Sensitivity range
Value from Test point(DC Out) & Test point(CCON2 pin3)-GND Sensitivity switch in OP console (Density) is operated from -8 to
-8 ~ +8
+8, and the voltage between Test point(DC Out) & Test point (CCON2 pin3)-GND will move from -1.5V to -9.5V (deviation: ±0.1V)
5.3.13 Error
SEC error (SMS-CONB-340 Board)
1. Error type: Caused by SMS-CONB-340 (Console Board) trouble, Membrane switch trouble, Hand switch trouble 1. Refer to clause 4 of 4.1.3.12 about SMS-CONB-340 Board checking. 2. Check hand switch working condition. 3. Check membrane switch condition.
Ecoview 9 Dual type (Rev.1.0)
107
Service manual
EcoRay
HF 525Plus
4. The error comes when you release the exposure switch earlier than set exposure time, which it is not a failure. 5.4 Handle Bar (SMS-TS-340 Board)
5.4.1 Compositions Rectification diode D1
Fuse F1, F2
5.4.2 How to check and verify
P6 Connector (SMS-GC-340 Board in HFG)
(1) Board name: SMS-GC-340 Board (2) Function: Transmit and receive the signal & voltage of external devices to HFG. (3) Followings are check sequence when SMS-GC-340 Board is out of order Normal Function
Faulty status
Handle Bar functioning at
Maintain Handle Bar
1. SMS-TS-340 Board F1, F2 fuse check
PCB (SMS-TS-340)
2. SMS-TS-340 Board D1 rectification diode
Tube stand
Failure details and trouble shooting
check 3. Input power check on SMS-TS-340 Board P6 Connector 4. SMS-TS-340 Board 의 P8 wire connection check (disconnected or not) 5. SMS-GC-340 Board function check
Check HFG external
Electromagnetic functioning
1. SMS-TS-340 Board F1, F2, F3, F4, F5 Fuse check
interface board (SMS-GC-340 Board)
2. SMS-TS-340 Board D1, D2 rectification diode check 3. SMS-TS-340 Board’s P6 Connector input power check 4. SMS-TS-340 Board 의 P8 wire connection check (if disconnected or not)
Normal functioning
Ecoview 9 Dual type (Rev.1.0)
Repair completed
108
5. SMS-GC-340 Board function check
Service manual
EcoRay
HF 525Plus
5.5 Troubleshooting for Table Bucky (SMS-BT-4)
5.5.1 Device composition fuse (TF2) fuse (TF1)
Rectifying diode (TD2)
Rectifying diode (TD1)
Input power and bucky signal: TCON2 Connector (Connet to SMS-GC-340 Board of Generator)
5.5.2 How to check (1) (1) Board name: SMS-BT-4 Board (2) Function: Control electromagnet of table and operate bucky device (3) Check points of SMS-BT-4 Board are as below
Normal working
breakdown
Breakdown details and trouble shooting
Operate table bucky
Fixture of
(sensor location :
electromagnet is not
bottom of the product))
unlocked
1. Check the fuse of TF1, TF2 of SMS-BT-4 Board 의 TF1, TF2 2. Check rectifying diode of TD1 and TD2 of SMS-BT-4 Board 3. Check input power into PCON2 Connector of SMS-BT-4 Board 4. Check disconnection of PCON6 of SMS-BT-4
Select Bucky on the Console
Board 5. Check operation of SMS-GC-340 Board
Select Ready on the console
Grid is not moving
1. Check voltage of bucky device while bucky operation. 2. Check bucky signal of SMS-GC-340 Board
Select Ready on the console
Ecoview 9 Dual type (Rev.1.0)
After repair
109
Service manual
EcoRay
HF 525Plus
Chapter 6
Circuit Diagram General Purpose Radiographic System Model: SIG-40-525 / HF-525 PLUS
Ecoview 9 Dual type (Rev.1.0)
110
Service manual
EcoRay
HF 525Plus
6. Circuit Diagram 6.1 Block Diagram
Ecoview 9 Dual type (Rev.1.0)
111
Service manual
EcoRay
HF 525Plus
6.2 SMS-340-CON Board
Ecoview 9 Dual type (Rev.1.0)
112
Service manual
EcoRay
Ecoview 9 Dual type (Rev.1.0)
HF 525Plus
113
Service manual
EcoRay
Ecoview 9 Dual type (Rev.1.0)
HF 525Plus
114
Service manual
EcoRay
Ecoview 9 Dual type (Rev.1.0)
HF 525Plus
115
Service manual
EcoRay
HF 525Plus
6.3 Cue-XR2-Mio Board
Ecoview 9 Dual type (Rev.1.0)
116
Service manual
EcoRay
Ecoview 9 Dual type (Rev.1.0)
HF 525Plus
117
Service manual
EcoRay
HF 525Plus
6.4 Cue-XR2-CnD Board
Ecoview 9 Dual type (Rev.1.0)
118
Service manual
EcoRay
HF 525Plus
6.5 Cue-XR2-FnD Board
Ecoview 9 Dual type (Rev.1.0)
119
Service manual
EcoRay
HF 525Plus
6.6 Handle Bar (SMS-TS-340)
Ecoview 9 Dual type (Rev.1.0)
120
Service manual
EcoRay
HF 525Plus
6.7. External terminal of Generator
Ecoview 9 Dual type (Rev.1.0)
121
Service manual
EcoRay
HF 525Plus
6.8 Table Bucky
Ecoview 9 Dual type (Rev.1.0)
122
Service manual
EcoRay
HF 525Plus
6.9 Wiring Table Bucky with Generator
Ecoview 9 Dual type (Rev.1.0)
123
Service manual
EcoRay
HF 525Plus
6.10 Wall Bucky
Ecoview 9 Dual type (Rev.1.0)
124
Service manual
EcoRay
HF 525Plus
6.11 Wiring Wall Bucky with Generator
Ecoview 9 Dual type (Rev.1.0)
125
Service manual