39 1 803KB
FORMULAIRE
PCI-FR-53/04
INSPECTION DAILY REPORT
Date de révision: 09/06/2015
RAPPORT JOURNALIER D’INSPECTION
Page: 1 / 6
I/ GENERALITIES GENERALITES Project Projet Client Client Standard Norme Specifications N° Spécifications N°
:
Storage Bullets, KO drum and Closed Drain Vessels
:
TDE
:
SSPC PA2
:
DPM-215015-TPROPEN-001
Inspection date Date d’inspection Inspection place Lieu d’inspection Inspector name Nom de l’inspecteur Report reference Reference du rapport
:
14 July, 2016
:
SOCOMENIN Workshop
:
Mustapha ARAARA
:
55/16
II/ ACTIVITIES ACTIVITÉS We have displaced to SOCOMENIN QA/QC department in the workshop P3 for visual and DFT inspection for final coat of NGO-340-TK-1500, NGO-340-TK-1600 and flare SECTION 1 &7. III/ PROJECTPROGRESS: PROGRESSION DU PROJET Inspection scope:
Visual inspection for top coat of NGO-340-TK-1500 and NGO-340-TK-1600.
DFT inspection of NGO-340-TK-1500 and NGO-340-TK-1600.
Table below describes activities executed in the workshop P3 during this visit
Observation
Visual inspection for top coat of NGO-340-TK1500 and NGO340-TK-1600.
Painting Faults
Pictures
FORMULAIRE
PCI-FR-53/04
INSPECTION DAILY REPORT
Date de révision: 09/06/2015
RAPPORT JOURNALIER D’INSPECTION
Visual inspection for top coat of NGO-340-TK1500 and NGO340-TK-1600.
Painting
Faults
(Orange peel) Visual inspection for top coat of NGO-340-TK1500 and NGO340-TK-1600.
Painting
Faults
(lack
of
thickness)
Visual inspection for top coat of NGO-340-TK1500 and NGO340-TK-1600.
Painting (lack thickness)
Faults of
Page: 2 / 6
FORMULAIRE
PCI-FR-53/04
INSPECTION DAILY REPORT
Date de révision: 09/06/2015
RAPPORT JOURNALIER D’INSPECTION
Visual inspection for top coat of NGO-340-TK1500 and NGO340-TK-1600.
Painting
Faults
(the outline of the repair zone is still open)
● DFT inspection of NGO340-TK-1500 and NGO340-TK-1600
● most areas the thickness of paint is acceptable, thickness lack in some area
Visual of flare SECTION 1&7 is acceptable .
.
Page: 3 / 6
FORMULAIRE
PCI-FR-53/04
INSPECTION DAILY REPORT
Date de révision: 09/06/2015
RAPPORT JOURNALIER D’INSPECTION
Visual inspection for top coat of flare SECTION 1&7 is acceptable
DFT inspection of flare SECTION 1&7 Acceptable
Page: 4 / 6
FORMULAIRE
PCI-FR-53/04
INSPECTION DAILY REPORT
Date de révision: 09/06/2015
RAPPORT JOURNALIER D’INSPECTION
IV/ REMARKS REMARQUES During this visit, we notice the following points:
Visual inspection and DFT for top coat of flare SECTION 1&7 are acceptable. Painting Faults to repair in NGO-340-TK-1500 and NGO-340-TK-1600. Lack of thickness in NGO-340-TK-1500 and NGO-340-TK-1600. .
Page: 5 / 6
FORMULAIRE
PCI-FR-53/04
INSPECTION DAILY REPORT
Date de révision: 09/06/2015
RAPPORT JOURNALIER D’INSPECTION
B.E.C.A ENGINEER
Page: 6 / 6
CONSTRUCTION SUPERVISION DEPARTMENT
Name: ARAARA Mustapha Nom
Name: Aymen ABID Nom
Date: 14 July, 2016 Date Signature Signature
Date: 14 July , 2016 Date Signature Signature