36 2 76KB
PROJECT COMPANY CONTRACTOR SUB-CONTRACTOR PROJECT NO.
: RASGAS ONSHORE EXPANSION PROJECT, PHASE 2 (RGX-2) / AL KHALEEJ GAS PROJECT PHASE 2 (AKG-2) : RASGAS COMPANY LIMITED / EXXON MOBIL MIDDLE EAST GAS MARKETING LIMITED : CTJV (JV of Chiyoda – Technip) : Dodsal Engineering & construction Pte Ltd : RG6-CS-004 / AKG2-CS-001
PAINTING INSPECTION REPORT Report Ref.:DOD/RGX/TP/ PR 2064
Area: EFFLUENT / C80Y
Date: 04 / 03 / 09
Weather Condition Windy
Wet
Dry
Cloudy
Surface Preparation Standard of Blast : SA- 2.5 Profile:
Mechanical:
Minimum
Maximum
Average
Abrasive Type: GARNET
Grade: 30/60
Wheelabrator:
Open Blast:
Surface Contamination Removed
System / Coating GALVACOAT
Product Name
Coat
Batch A
Batch B
HEMPELS 16380
FINAL
8074042
-
Solvent Type 08080
Solvent Batch 8042307
Yes
WFT
DFT
150 µ
75 µ
COMMENT: TP-6-944D-2-WU-001 REF RFI : DOD/M/34186 1.SURFACE PREPARATION BY SOLVENT AND HAND TOOL CLEANING OF DAMAGED AREA AND CARRIED OUT PAINTING WITH GALVACOAT SYSTEM DFT CHECKED IN THE PIPE LINE TESTS / SETTINGS & READINGS ARE WITHIN THE PARAMETERS OF THE PROJECT SPECIFICATION TESTEX TAPE
ADHESION TEST Description
CHLORIDE TESTING Mg / CM2 Accept
ELECTRICAL INSPECTION K V Settings
Yes
No
Accept
Yes
DODSAL Name:
ANOOP CHANDRAN
No
Result
Cross Hatch
Accept
Reject
Cross Cut
Accept
Reject
Pull Off
Accept
Reject
WFT (Mean Average) Minimum
Minimum
75 µ
Maximum
Maximum
85 µ
CTJV
RASGAS
Name:
Name:
Sign:
Sign:
Sign:
Date:
Date:
Date:
Form No.:DOD-RGX2/AKG2-F072 Rev 4 Dtd. 20.07.2008
DFT (Mean Average)