CONTRACT No.: CT-EPC/011/SH-EPM/EP-G/18

Realization of Gas Treatment Units (EPC 2 – Phase 1) South West Gas Fields Development Project, Algeria

FORMAT No.: P-0200/152/PAINT-01 REV No.: 01

SURFACE PREPARATION AND PAINTING INSPECTION REPORT CUSTOMER : SONATRACH Report No : HBH-ENC-FWT- PAI -0001 CONTRACTOR : L&T Hydrocarbon Engineering Limited Date : 19/09/2022 Visual Check : ACC Abrasive Used : SAND Steel Temp (OC) : 40° Manifact paint

Primer Intermidate Final

S.No

1

PPG / /

Drawing No. / Iso No.

Spool No

ROOF PLATE

SUB CONTRACTOR Sign Name Date

Abrasive Blasting

Surface Profile (Microns)

Sa 2,5

70

Brand Name SIGMAZINC 102 HS / / Surface Preparation & Painting Date & Time: Primer (DFT- microns) L&T Sign Required Range: 1 2 3 4 5 Avg 72

60

LTHE

62

66

61

64.2

Relative Humidity (%) : 2 Batch No. P121165496 / / Date & Time: Holiday check Acc/Not Acc

Primer+Intermediate+Final (DFT- microns)

1

Required Range: 2 3 4 5

/

/

/

/

/

Avg /

CLIENT

Remarks

Realization of Gas Treatment Units (EPC 2 – Phase 1) South West Gas Fields Development Project, Algeria

CONTRACT No.: CT-EPC/011/SH-EPM/EP-G/18

FORMAT No.: P-0200/152/PAINT-01 REV No.: 01

SURFACE PREPARATION AND PAINTING INSPECTION REPORT CUSTOMER : SONATRACH Report No : HBH-ENC-FWT- PAI -0002 CONTRACTOR : L&T Hydrocarbon Engineering Limited Date : 05/10/2022 Visual Check : ACC Abrasive Used : SAND Steel Temp (OC) : 32° Manifact paint

Primer Intermidate Final

S.No

1

/ BELGIUM /POLAND /

Drawing No. / Iso No.

Spool No

ROOF PLATE

SUB CONTRACTOR Sign Name Date

Abrasive Blasting

Sa 2,5

Surface Profile (Microns)

Brand Name / SIGMACOVER 435 / Surface Preparation & Painting Date & Time: Primer (DFT- microns) L&T Sign Required Range: 1 2 3 4 5 Avg /

/

LTHE

/

/

/

/

Relative Humidity (%) : 2 Batch No. / 21241179154 / Date & Time:

Primer+Intermediate+Final (DFT- microns)

1 190

Required Range: 2 3 4 5 178

182

184

Holiday check Acc/Not Acc

Avg

208 188.4

CLIENT

Remarks

CONTRACT No.: CT-EPC/011/SH-EPM/EP-G/18

Realization of Gas Treatment Units (EPC 2 – Phase 1) South West Gas Fields Development Project, Algeria

FORMAT No.: P-0200/152/PAINT-01 REV No.: 01

SURFACE PREPARATION AND PAINTING INSPECTION REPORT CUSTOMER : SONATRACH Report No : HBH-ENC-FWT- PAI -0001 CONTRACTOR : L&T Hydrocarbon Engineering Limited Date : 19/09/2022 Visual Check : ACC Abrasive Used : SAND Steel Temp (OC) : 38° Manifact paint

Primer Intermidate Final

S.No

PPG / /

Drawing No. / Iso No.

Spool No

Abrasive Blasting

Surface Profile (Microns)

Brand Name SIGMAZINC 102 HS /105 BAS / / Surface Preparation & Painting Date & Time: Primer (DFT- microns) L&T Sign Required Range: 1 2 3 4 5 Avg

Relative Humidity (%) : 3 Batch No. P121165496 / P132209891 / / Date & Time: Holiday check Acc/Not Acc

Primer+Intermediate+Final (DFT- microns)

1

Required Range: 2 3 4 5

Avg

1

OUTERSHELL 01

Sa 2,5

70

75

78

80

88

79

80

/

/

/

/

/

/

2

OUTERSHELL 02

Sa 2,5

71

77

84

82

74

86

80.6

/

/

/

/

/

/

3

OUTERSHELL 03

Sa 2,5

72

80

82

78

86

76

80.4

/

/

/

/

/

/

4

OUTERSHELL 04

Sa 2,5

73

78

85

88

82

74

81.4

/

/

/

/

/

/

5

OUTERSHELL 05

Sa 2,5

74

102

92

88

86

88

91.2

/

/

/

/

/

/

SUB CONTRACTOR Sign Name Date

LTHE

CLIENT

Remarks

Realization of Gas Treatment Units (EPC 2 – Phase 1) South West Gas Fields Development Project, Algeria

CONTRACT No.: CT-EPC/011/SH-EPM/EP-G/18

FORMAT No.: P-0200/152/PAINT-01 REV No.: 01

SURFACE PREPARATION AND PAINTING INSPECTION REPORT CUSTOMER : SONATRACH Report No : HBH-ENC-FWT- PAI -0004 CONTRACTOR : L&T Hydrocarbon Engineering Limited Date : 20/10/2022 Visual Check : ACC Abrasive Used : SAND Steel Temp (OC) : 32° Manifact paint

Primer Intermidate Final

S.No

/ PPG /

Drawing No. / Iso No.

Spool No

Abrasive Blasting

Surface Profile (Microns)

Brand Name / SIGMACOVER 435 / Surface Preparation & Painting Date & Time: Primer (DFT- microns) L&T Sign Required Range: 1 2 3 4 5 Avg

Relative Humidity (%) : 2 Batch No. / 21241179154 / Date & Time:

Primer+Intermediate+Final (DFT- microns)

1

Required Range: 2 3 4 5

Avg

1

OUTERSHELL -01

Sa 2,5

/

/

/

/

/

/

202

196

192

208

210 201.6

2

OUTERSHELL -02

Sa 2,5

/

/

/

/

/

/

204

218

220

204

198 208.8

3

OUTERSHELL -03

Sa 2,5

/

/

/

/

/

/

198

212

210

208

204 206.4

4

OUTERSHELL -04

Sa 2,5

/

/

/

/

/

/

188

200

220

196

207 202.2

5

OUTERSHELL -05

Sa 2,5

/

/

/

/

/

/

222

214

216

192

190 206.8

SUB CONTRACTOR Sign Name Date

LTHE

Holiday check Acc/Not Acc

CLIENT

Remarks

Realization of Gas Treatment Units (EPC 2 – Phase 1) South West Gas Fields Development Project, Algeria

CONTRACT No.: CT-EPC/011/SH-EPM/EP-G/18

FORMAT No.: P-0200/152 PAINT REV No.: 01

SURFACE PREPARATION AND PAINTING INSPECTION REPORT CUSTOMER : SONATRACH Report No : HBH-ENC-FWT- PAI -0006 CONTRACTOR : L&T Hydrocarbon Engineering Limited Date : 12/12/2022 Visual Check : ACC Abrasive Used : SAND Steel Temp (OC) : 32° Manifact paint

Primer Intermidate Final

S.No

/ / INTERNATIONAL

Drawing No. / Iso No.

Spool No

Abrasive Blasting

Surface Profile (Microns)

Brand Name / / INTHERTANE 990 Surface Preparation & Painting Date & Time: Primer (DFT- microns) L&T Sign Required Range: 1 2 3 4 5 Avg

Relative Humidity (%) : 6 Batch No. / / 2331281040 Date & Time:

Primer+Intermediate+Final (DFT- microns)

1

Required Range: 2 3 4 5

Avg

1

OUTERSHELL -01

Sa 2,5

/

/

/

/

/

/

280

275

312

325

295 297.4

2

OUTERSHELL -02

Sa 2,5

/

/

/

/

/

/

290

310

305

400

265

3

OUTERSHELL -03

Sa 2,5

/

/

/

/

/

/

310

300

258

274

269 282.2

4

OUTERSHELL -04

Sa 2,5

/

/

/

/

/

/

250

228

305

320

270 274.6

5

OUTERSHELL -05

Sa 2,5

/

/

/

/

/

/

315

295

300

270

220

274

ROOF PLATE

Sa 2,5

/

/

/

/

/

/

320

275

250

355

265

293

SUB CONTRACTOR Sign Name Date

LTHE

Holiday check Acc/Not Acc

314

CLIENT

Remarks