CONTRACT No.: CT-EPC/011/SH-EPM/EP-G/18
Realization of Gas Treatment Units (EPC 2 – Phase 1) South West Gas Fields Development Project, Algeria
FORMAT No.: P-0200/152/PAINT-01 REV No.: 01
SURFACE PREPARATION AND PAINTING INSPECTION REPORT CUSTOMER : SONATRACH Report No : HBH-ENC-FWT- PAI -0001 CONTRACTOR : L&T Hydrocarbon Engineering Limited Date : 19/09/2022 Visual Check : ACC Abrasive Used : SAND Steel Temp (OC) : 40° Manifact paint
Primer Intermidate Final
S.No
1
PPG / /
Drawing No. / Iso No.
Spool No
ROOF PLATE
SUB CONTRACTOR Sign Name Date
Abrasive Blasting
Surface Profile (Microns)
Sa 2,5
70
Brand Name SIGMAZINC 102 HS / / Surface Preparation & Painting Date & Time: Primer (DFT- microns) L&T Sign Required Range: 1 2 3 4 5 Avg 72
60
LTHE
62
66
61
64.2
Relative Humidity (%) : 2 Batch No. P121165496 / / Date & Time: Holiday check Acc/Not Acc
Primer+Intermediate+Final (DFT- microns)
1
Required Range: 2 3 4 5
/
/
/
/
/
Avg /
CLIENT
Remarks
Realization of Gas Treatment Units (EPC 2 – Phase 1) South West Gas Fields Development Project, Algeria
CONTRACT No.: CT-EPC/011/SH-EPM/EP-G/18
FORMAT No.: P-0200/152/PAINT-01 REV No.: 01
SURFACE PREPARATION AND PAINTING INSPECTION REPORT CUSTOMER : SONATRACH Report No : HBH-ENC-FWT- PAI -0002 CONTRACTOR : L&T Hydrocarbon Engineering Limited Date : 05/10/2022 Visual Check : ACC Abrasive Used : SAND Steel Temp (OC) : 32° Manifact paint
Primer Intermidate Final
S.No
1
/ BELGIUM /POLAND /
Drawing No. / Iso No.
Spool No
ROOF PLATE
SUB CONTRACTOR Sign Name Date
Abrasive Blasting
Sa 2,5
Surface Profile (Microns)
Brand Name / SIGMACOVER 435 / Surface Preparation & Painting Date & Time: Primer (DFT- microns) L&T Sign Required Range: 1 2 3 4 5 Avg /
/
LTHE
/
/
/
/
Relative Humidity (%) : 2 Batch No. / 21241179154 / Date & Time:
Primer+Intermediate+Final (DFT- microns)
1 190
Required Range: 2 3 4 5 178
182
184
Holiday check Acc/Not Acc
Avg
208 188.4
CLIENT
Remarks
CONTRACT No.: CT-EPC/011/SH-EPM/EP-G/18
Realization of Gas Treatment Units (EPC 2 – Phase 1) South West Gas Fields Development Project, Algeria
FORMAT No.: P-0200/152/PAINT-01 REV No.: 01
SURFACE PREPARATION AND PAINTING INSPECTION REPORT CUSTOMER : SONATRACH Report No : HBH-ENC-FWT- PAI -0001 CONTRACTOR : L&T Hydrocarbon Engineering Limited Date : 19/09/2022 Visual Check : ACC Abrasive Used : SAND Steel Temp (OC) : 38° Manifact paint
Primer Intermidate Final
S.No
PPG / /
Drawing No. / Iso No.
Spool No
Abrasive Blasting
Surface Profile (Microns)
Brand Name SIGMAZINC 102 HS /105 BAS / / Surface Preparation & Painting Date & Time: Primer (DFT- microns) L&T Sign Required Range: 1 2 3 4 5 Avg
Relative Humidity (%) : 3 Batch No. P121165496 / P132209891 / / Date & Time: Holiday check Acc/Not Acc
Primer+Intermediate+Final (DFT- microns)
1
Required Range: 2 3 4 5
Avg
1
OUTERSHELL 01
Sa 2,5
70
75
78
80
88
79
80
/
/
/
/
/
/
2
OUTERSHELL 02
Sa 2,5
71
77
84
82
74
86
80.6
/
/
/
/
/
/
3
OUTERSHELL 03
Sa 2,5
72
80
82
78
86
76
80.4
/
/
/
/
/
/
4
OUTERSHELL 04
Sa 2,5
73
78
85
88
82
74
81.4
/
/
/
/
/
/
5
OUTERSHELL 05
Sa 2,5
74
102
92
88
86
88
91.2
/
/
/
/
/
/
SUB CONTRACTOR Sign Name Date
LTHE
CLIENT
Remarks
Realization of Gas Treatment Units (EPC 2 – Phase 1) South West Gas Fields Development Project, Algeria
CONTRACT No.: CT-EPC/011/SH-EPM/EP-G/18
FORMAT No.: P-0200/152/PAINT-01 REV No.: 01
SURFACE PREPARATION AND PAINTING INSPECTION REPORT CUSTOMER : SONATRACH Report No : HBH-ENC-FWT- PAI -0004 CONTRACTOR : L&T Hydrocarbon Engineering Limited Date : 20/10/2022 Visual Check : ACC Abrasive Used : SAND Steel Temp (OC) : 32° Manifact paint
Primer Intermidate Final
S.No
/ PPG /
Drawing No. / Iso No.
Spool No
Abrasive Blasting
Surface Profile (Microns)
Brand Name / SIGMACOVER 435 / Surface Preparation & Painting Date & Time: Primer (DFT- microns) L&T Sign Required Range: 1 2 3 4 5 Avg
Relative Humidity (%) : 2 Batch No. / 21241179154 / Date & Time:
Primer+Intermediate+Final (DFT- microns)
1
Required Range: 2 3 4 5
Avg
1
OUTERSHELL -01
Sa 2,5
/
/
/
/
/
/
202
196
192
208
210 201.6
2
OUTERSHELL -02
Sa 2,5
/
/
/
/
/
/
204
218
220
204
198 208.8
3
OUTERSHELL -03
Sa 2,5
/
/
/
/
/
/
198
212
210
208
204 206.4
4
OUTERSHELL -04
Sa 2,5
/
/
/
/
/
/
188
200
220
196
207 202.2
5
OUTERSHELL -05
Sa 2,5
/
/
/
/
/
/
222
214
216
192
190 206.8
SUB CONTRACTOR Sign Name Date
LTHE
Holiday check Acc/Not Acc
CLIENT
Remarks
Realization of Gas Treatment Units (EPC 2 – Phase 1) South West Gas Fields Development Project, Algeria
CONTRACT No.: CT-EPC/011/SH-EPM/EP-G/18
FORMAT No.: P-0200/152 PAINT REV No.: 01
SURFACE PREPARATION AND PAINTING INSPECTION REPORT CUSTOMER : SONATRACH Report No : HBH-ENC-FWT- PAI -0006 CONTRACTOR : L&T Hydrocarbon Engineering Limited Date : 12/12/2022 Visual Check : ACC Abrasive Used : SAND Steel Temp (OC) : 32° Manifact paint
Primer Intermidate Final
S.No
/ / INTERNATIONAL
Drawing No. / Iso No.
Spool No
Abrasive Blasting
Surface Profile (Microns)
Brand Name / / INTHERTANE 990 Surface Preparation & Painting Date & Time: Primer (DFT- microns) L&T Sign Required Range: 1 2 3 4 5 Avg
Relative Humidity (%) : 6 Batch No. / / 2331281040 Date & Time:
Primer+Intermediate+Final (DFT- microns)
1
Required Range: 2 3 4 5
Avg
1
OUTERSHELL -01
Sa 2,5
/
/
/
/
/
/
280
275
312
325
295 297.4
2
OUTERSHELL -02
Sa 2,5
/
/
/
/
/
/
290
310
305
400
265
3
OUTERSHELL -03
Sa 2,5
/
/
/
/
/
/
310
300
258
274
269 282.2
4
OUTERSHELL -04
Sa 2,5
/
/
/
/
/
/
250
228
305
320
270 274.6
5
OUTERSHELL -05
Sa 2,5
/
/
/
/
/
/
315
295
300
270
220
274
ROOF PLATE
Sa 2,5
/
/
/
/
/
/
320
275
250
355
265
293
SUB CONTRACTOR Sign Name Date
LTHE
Holiday check Acc/Not Acc
314
CLIENT
Remarks