43 0 525KB
DATASHEET FOR HIGH PRESSURE DBB VALVE
Appendix 1 - Vendor Response Sheet
Page 11 of 12
VENDOR RESPONSE SHEET Client :
Petroleum Development Oman
Project No. : ICO12939
Vendor :
Project :
Modular Wellhead Skid – FEED
Equipment: High Pressure DBB Valve
Purchaser : Date :
Requisition No.
STATUS LEGENDS : VTA = VENDOR TO ADVISE S.No.
DESCRIPTION
REQUISITION REQUIREMENTS
A
GENERAL
1.1
MESC No.
As per Datasheet
1.2
SAP no.
As per Datasheet
1.3
QUANTITY
As per Sec.I
1.4
MAKE / MANUFACTURER
VTA
1.5
COUNTRY OF ORIGIN
VTA
1.6
Piping Class
1003834P1
1.7
Design Pressure
690 Barg. @ Minus 50 DegC 690 Barg @ Plus 120 DegC
1.8
Design Temperature, min
Minus 50 Deg C
1.9
Design Temperature, max
Plus 120 Deg C
1.10
Service Description
HP GAS, SOUR
1.11
Sour Service - Material Requirements
NACE MR-0175 / ISO 15156 ( Latest) , DEP 39.01.10.12-Gen.
B
MECHANICAL DATA
1.1
Pipe Size, Sch
DN50, Sch160
1.2
API Size
1 13/16”
1.3
Type of Valve
Modular Double block and bleed, Flanged at both ends, Three Piece design
1.4
Pressure designation
API 6A, 10000# rating
1.5
Design spec
Manufacturer's Standard / EEMUA Publication No. 182 / API 6A
1.6
Design Spec, end flanges (Inlet / Outlet connection)
1 13/16”, 6BX, API 6A
1.7
Type of end connection (Inlet / Outlet connection)
10000#, Flanged Type 6BX, Weld neck
1.8
Type of Bleed Connection
1/2 inch BSPP Female
1.9
Type of face
Ring Joint (RTJ)
1.10
Flange Ring Groove face finish, Ring No.
As per API 6A, BX-151
1.11
Product Specification Level
PSL 3G
1.12
Performance Requirement level
PR 2
1.13
Fugitive Emission class @ 690 barg
A(HS)
1.14
Fire Safe Design
As per API 6FA / ISO 10497 / BS 67552 / API 607
1.15
Uni/ bi-directional
Bi-Directional
1.16
Bore size, min
14 mm
1.17
Length F to F
Manufacturer's Standard (Bidder to specify)
D
MATERIAL OF CONSTRUCTION, ISOLATION VALVE
Page 1 of 5
OFFERED BY VENDOR
VENDOR RESPONSE SHEET Client :
Project :
Petroleum Development Oman
Modular Wellhead Skid – FEED
Project No. : ICO12939
Vendor :
Equipment: High Pressure DBB Valve
Purchaser : Date :
Requisition No.
STATUS LEGENDS : VTA = VENDOR TO ADVISE S.No.
DESCRIPTION
REQUISITION REQUIREMENTS
1.1
Type of Isolation valve, Primary/ Secondary
Ball
1.2
Type of closure member
Trunnion Mounted Ball, Side Entry
1.3
Type of Bore
Reduced
1.4
Type of Seat
Metal
1.5
Type of Piston
Single Piston effect with lip seal Design
1.6
Mat, body
Inconel UNS N06625
1.7
Mat, trim
Inconel UNS N06625
1.8
Mat, seals
Thermoplastic / Graphite
1.9
Mat spec, body
Inconel UNS N06625
1.10
Mat spec, gland flange
Inconel UNS N06625
1.11
Mat spec, gland ring
Inconel UNS N06625
1.12
Mat spec, closure member
Inconel UNS N06625
1.13
Mat spec, stem
Inconel UNS N06625
1.14
Mat spec, trunnion
Inconel UNS N06625
1.15
Mat spec, seat
Inconel UNS N06625
1.16
Mat spec, closure member, seat hard facing
Tungsten Carbide coating
1.17
Mat spec, seals
Lip Seal + Eligiloy (UNS R30003)
1.18
Mat spec, packing, stem, gland
Graphite
1.19
Mat spec, spring(s)
ASTM B637 UNS N07718
1.2
Mat spec, locking pins
UNS S31803
1.21
Mat spec, bolts/studs
ASTM A1014 UNS 07718
1.22
Mat spec, nuts
ASTM A1014 UNS 07718
1.23
Mat spec, all wetted parts
Inconel UNS N06625
E
MATERIAL OF CONSTRUCTION, BLEED VALVE
1.1
Type of bleed valve
Globe / Needle
1.2
Type of Bonnet
Bolted
1.3
Type of Stem
Outside Screw
1.4
Connection size, type
1/2 inch BSP Female
1.5
Design spec, end connection
ASME B1.20.1
1.6
Needle valve, Bleed Outlet bore size, min.
5 MM
1.7
Mat spec, Needle body / bonnet
Inconel UNS N06625
1.8
Mat spec, Needle stem
Inconel UNS N06625
1.9
Mat spec, Gland/ Gland follower
Inconel UNS N06625
Page 2 of 5
OFFERED BY VENDOR
VENDOR RESPONSE SHEET Client :
Petroleum Development Oman
Project : GD Modular Wellhead Skid – FEED
Project No. : ICO12939
Vendor :
Equipment: High Pressure DBB Valve
Purchaser :
Requisition No. STD-99-103440-MP-2105-00008-0000-GG1000SR0523
Date :
STATUS LEGENDS : VTA = VENDOR TO ADVISE S.No.
DESCRIPTION
REQUISITION REQUIREMENTS
1.10
Mat spec, Gland ring
Inconel UNS N06625
1.11
Plug
Inconel UNS N06625
1.12
Mat, packing, stem, gland
Graphite
1.13
Mat spec, bolts/studs
ASTM A1014 UNS 07718
1.14
Mat spec, nuts
ASTM A1014 UNS 07718
1.15
Mat spec, all wetted parts
Inconel UNS N06625
Page 3 of 5
OFFERED BY VENDOR
VENDOR RESPONSE SHEET Client :
Petroleum Development Oman
Project :
Modular Wellhead Skid – FEED
Project No. : ICO12939
Vendor :
Equipment: High Pressure DBB Valve
Purchaser :
0523
Requisition No.
Date :
STATUS LEGENDS : VTA = VENDOR TO ADVISE S.No.
F
DESCRIPTION
REQUISITION REQUIREMENTS
OTHER REQUIREMENT
1.1
Spare Requirement’s
Bidder to specify
1.2
Painting
Not Applicable
J 1.1
MANDATORY SP / DEP /SPE REQUIREMENT MESC SPE REQUIREMENT (LATEST REVISION)
1.1.1
Alloy and Stainless Steel Forgings to ASTM A182
MESC SPE 76/212
1.1.2
Process-to-instrument valves
MESC SPE 77/170
1.1.3
General Requirements for Valves
MESC SPE 77/302
1.1.4
Fugitive Emission Production Testing to ISO 15848-2
MESC SPE 77/312
1.1.5
Metal Ring Joint Gaskets to ASME B16.20
MESC SPE 85/112
1.1.6
Graphitic Packing Material to ASTM F2168
MESC SPE 85/203
1.1.7
Packing material, graphite and carbon braided yarn
MESC SPE 85/204
1.2 1.2.1
1.3
PDO SP'S (LATEST REVISION) SP-2154
Valves Technical Specification
DEP (version 42) (LATEST REVISION)
1.3.1
Technical requirements for the supply of components in 6Mo Austenitic, 22Cr Duplex & 25Cr Super Duplex Stainless Steel.
DEP 30.10.02.35-Gen.
1.3.2
Selection of Materials for Life Cycle Performance (Upstream Equipment) Including H2S Containing Environments (Amendments/Supplements to ISO 15156:2009)
DEP 39.01.10.12-Gen.
1.3.3
Material Control & Verification for Pressurized Equipment DEP 31.10.00.10-Gen.
L
INSPECTION & TESTING / CERTIFICATION / SPECIAL AS PER VQMR REQUIREMENT
M
QUALITY REQUIREMENTS
1.1
CONFIRM FULL COMPLIANCE TO SP-1171 IN CONJUNCTION WITH ISO 29001.
REQUIRED
1.2
QUALITY CONTROL PLAN
REQUIRED
1.3
QUALITY CERTIFICATION
REQUIRED
P 1.1
PREPARATION FOR SHIPMENT Material Handling, Packing, Preservation etc.
AS PER MATERIAL REQUISITION
Q 1.1 1.2
DELIVERY Delivery Period Delivery Location
Vendor to specify DDP, MUSCAT
Page 4 of 5
OFFERED BY VENDOR
VENDOR RESPONSE SHEET Client :
Petroleum Development Oman
Project No. : ICO12939
Vendor :
Project :
Modular Wellhead Skid – FEED
Equipment: High Pressure DBB Valve
Purchaser : Date :
Requisition No.
STATUS LEGENDS : VTA = VENDOR TO ADVISE S.No.
R
DESCRIPTION
GUARANTEE/ WARRANTY
REQUISITION REQUIREMENTS 12 month after completion of site commissioning and performance testing or 18 months from the date of shipment, which ever is earlier
Page 5 of 5
OFFERED BY VENDOR