COVER PAGE
e
l&T Hydroc•rbon Engineering
•
• smeuz ~SUBSEA
Riser Clamp Installation Procedure
DATE 19-JAN-18
PROJECT: Balance Work Pipeline Replacement Project, Phase - 4(BW PRP-4) CONTRACT NO. : MR/ES/MM/BWPRP-4/10/2017(P851C17006)
I
DOC. NO. : PRO-S180000-17-SD-03
REVS
Riser Clamp Installation Procedure PREPARED BY -
SUBMITTED BY -
tKREUZ
SUBS EA
L&T Hydrocar bon Engineering
KREUZ SUBSEA PTE. LTD.
KSS
SIGN
DATE
L&THE
L& T HYDROCARBON ENGINEERING ~fE'.
ONGC (OD)
-17 19-JAN-2018
c;v..,
H
~
_,
,R/
B
19-JAN-18
Issued for Approval (IFA)
DY
GS
AB
A
28-Dec-17
Issued for Review (IFR)
DY
GS
AB
REV.
DATE
REASON FOR ISSUE
PRE PD
CHKD.
APPD.
-
-
- - - - - --
Balance Work Pipeline Replacement Project, Phase – 4 CMT# 0097
PARAGRAPH 1.2.
Riser Clamp Installation Procedure COMMENT Noted the DSV SEAMAC III shall be mobilised and undertake sub-sea diving works at 16 nos. platforms.
MWS COMMENT SHEET ON REV A
Date ‐ 11‐01‐2018
DATE ADDED
DATE MODIFIED
CLIENT RESPONSE COLUMN
IGOPL RESPONSE
A
11-Jan-18
11-Jan-18
Not Req'd
Not Req'd
2
A
11-Jan-18
11-Jan-18
STATUS
CODE
DOC REV
OBSERV.
3
OPEN
NOTES
0098
1.0.
Please include a list of abbreviations / definitions.
0099
4
The DSV and support vessel(s), if any, will require inspection and approval by MWS.
OBSERV.
3
A
11-Jan-18
11-Jan-18
Not Req'd
Not Req'd
OBSERV.
3
A
11-Jan-18
11-Jan-18
Not Req'd
Not Req'd
OBSERV.
3
A
11-Jan-18
11-Jan-18
Not Req'd
Not Req'd
OBSERV.
3
A
11-Jan-18
11-Jan-18
Not Req'd
Not Req'd
OBSERV.
3
A
11-Jan-18
11-Jan-18
Not Req'd
Not Req'd
0100
4.3.
Certification for all loose lifting equipment to be available for inspection onboard.
0101
5.2.
Weather limits (diving) shown as: Sig wave Hs