COVER PAGE

e

l&T Hydroc•rbon Engineering



• smeuz ~SUBSEA

Riser Clamp Installation Procedure

DATE 19-JAN-18

PROJECT: Balance Work Pipeline Replacement Project, Phase - 4(BW PRP-4) CONTRACT NO. : MR/ES/MM/BWPRP-4/10/2017(P851C17006)

I

DOC. NO. : PRO-S180000-17-SD-03

REVS

Riser Clamp Installation Procedure PREPARED BY -

SUBMITTED BY -

tKREUZ

SUBS EA

L&T Hydrocar bon Engineering

KREUZ SUBSEA PTE. LTD.

KSS

SIGN

DATE

L&THE

L& T HYDROCARBON ENGINEERING ~fE'.

ONGC (OD)

-17 19-JAN-2018

c;v..,

H

~

_,

,R/

B

19-JAN-18

Issued for Approval (IFA)

DY

GS

AB

A

28-Dec-17

Issued for Review (IFR)

DY

GS

AB

REV.

DATE

REASON FOR ISSUE

PRE PD

CHKD.

APPD.

-

-

- - - - - --

Balance Work Pipeline Replacement  Project, Phase – 4 CMT# 0097

PARAGRAPH 1.2.

Riser Clamp Installation Procedure COMMENT Noted the DSV SEAMAC III shall be mobilised and undertake sub-sea diving works at 16 nos. platforms.

MWS COMMENT SHEET ON REV A

Date ‐ 11‐01‐2018

DATE ADDED

DATE MODIFIED

CLIENT RESPONSE COLUMN

IGOPL RESPONSE

A

11-Jan-18

11-Jan-18

Not Req'd

Not Req'd

2

A

11-Jan-18

11-Jan-18

STATUS

CODE

DOC REV

OBSERV.

3

OPEN

NOTES

0098

1.0.

Please include a list of abbreviations / definitions.

0099

4

The DSV and support vessel(s), if any, will require inspection and approval by MWS.

OBSERV.

3

A

11-Jan-18

11-Jan-18

Not Req'd

Not Req'd

OBSERV.

3

A

11-Jan-18

11-Jan-18

Not Req'd

Not Req'd

OBSERV.

3

A

11-Jan-18

11-Jan-18

Not Req'd

Not Req'd

OBSERV.

3

A

11-Jan-18

11-Jan-18

Not Req'd

Not Req'd

OBSERV.

3

A

11-Jan-18

11-Jan-18

Not Req'd

Not Req'd

0100

4.3.

Certification for all loose lifting equipment to be available for inspection onboard.

0101

5.2.

Weather limits (diving) shown as: Sig wave Hs