Winone Elevator Connection Diagram [PDF]

  • 0 0 0
  • Gefällt Ihnen dieses papier und der download? Sie können Ihre eigene PDF-Datei in wenigen Minuten kostenlos online veröffentlichen! Anmelden
Datei wird geladen, bitte warten...
Zitiervorschau

Control system

Control cabinet

Traction machine Encoder

relay contactor

to connection box

To wire terminal Main circuit

Speed governor

XA XB XC U V W PE

Traction motor

Encoder

Speed governor traveling Rope gripper cable

ZQ1 ZQ2 COM BK 150 114 TC

135 136 110

C00

shaft cable R01 R02 R04 R05 R06 R07

R03

C00 traveling cabin TVVBP40

Cabin top inspection box Lighting relay

M01A M01B M02 M02A

Car top INS

Car lighting inter phone

M03 M04 M04A M06A M06B M07-1 M07-2 M07A-1 M07A-2

Emergency power

M08

Arrival gong

Door zone switch

shaft

COM 84

Forced slow (up)

133 134

Limited switch (UP)

Forced slow 1 (up)

Cabin door lock

Forced slow 2 (up)

Safety gear switch

n floor HOP

Shaft upper cable R04/R06

COM 88 COM 92

Light sensor and safe edge device light and fan Front door machine

n floor door lock 116 nMT PE

Back door machine

Cabin top back door emergency stop

(n-1) floor HOP

n-1 floor door lock nMT(n-1)MT PE

T01

R02 shaft door lock cable

T02

COP connection terminal

2 floor door lock

ground floor door lock

R01 shaft pit cable

R03 shaft communication cable

T03 T04

图 号

菱王电梯股份有限公司

T05

系统总图

DRW NO

Rope gripper

System Diagram WINONE ELEVATOR CORPORATION LIMITED

Wiring terminals

VER:4.0C

P35 3.1201.16A

41 2MT 3MT PE

2 floor HOP

120 2MT PE

Commanding board for each floor

and commanding light

COM 94

Forced slow 2 (DN) Attendant switch/Door open close signal /lighting switch /UP or DOWN buttom by pass buttom/fan switch/Iso running Buzzle/overload light

Shaft lower cable

COM 90

Forced slow 1 (DN) Forced slow

(DN)

COM 86

Ground floor HOP

R05/R07

Limited switch (DN)

Cabin

Fire switch

Over load switch

132 133

COM XF Alarm bell

M05

Pit

240

pit 220v plug

240

pit 220v light

C.W buffer switch car buffer switch

241 241

emergency stop emergency stop in pit

P- 811 137 137A 137A 137B

emergency stop 137B 138 for through door Rope cut switch 110 137

131 132 15

communication compensation power

131

200 202

P+ P- R+ R-

Inter phone

42

136

COM

SSOL

39 COM

GND

+24V

Electrical overload switch

39

SSOL

250

EK1

241

240

PE

XC

XB

XA

251

250B

250A

Traction machine

F2

F1

QF

3 ~ N PE 380V ±7% 50Hz

Machenical overload switch

135

SSLS

speed governor

N

PE

L3

L2

L1

Machine room power

MQ2

P+ PE

P-

82

HA HB

R+

78

200

150 240

118

HE

PE

YD1

HG

HA

V>=3m/s

COM

137

202

PE

PE

XF

240

118A

Machine Room Wiring Diagram

机房布线图

200

116-1 120

241

118C

132

811

backup R15

R+

P-

R04

P+

R01

92

118C

120

DRW NO

图 号

PE

133

84

PE

132

86

COM

94

PE

PE

3.2101.21A

134

88

R05

shaft lower cable

COM

118A

116-1

P36

VER:4.0C

133

90

PE

24V+ 24V- MODH MODL

COM

R06、R07

R02-2

R02-1

R03

shaft upper cable

Shaft communication cable

Shaft door lock cable

Shaft door lock cable

shaft pit cable

HF

WINONE ELEVATOR CORPORATION LIMITED

菱王电梯股份有限公司

R-

COM MQS

202

138

travelling cable

24V+ 24V- CANH CANL

MQ1

811

MQX

80

241

116-2 backup 78

120

C00 118A

B1

Motor

CA CB CC CD

Control cabinet

HB

HC

Shaft communication cable

R05

HF

TVV7(6*0.75+1*2.0)

PE

92

PE

94

COM

133

132

86

COM 90

R07

HE HG

R06

COM

H10

COM

H07

COM

P+ R-

COM

88

84

133 134

R04 TVV3(2*0.75+1*2.0)

PE

HA P811

HB R+ 15

241 COM XF

132 118A 118C 137

240 备用

H01

133

134

PE

94

92

COM

88

COM

H09

84

COM

H03

SSD2 (Forced slow 2

90

202

200

302 备用

301

R01

PE

TVV19(18*0.75+1*2.0)

TVV7(6*0.75+1*2.0)

TVV3(2*0.75+1*2.0)

SLUL Limited switch (UP)

SSU (Forced slow v