46 1 232KB
INSPECTION & TESTING STORAGE TANK Project
:
User
:
Location
:
Project Location Owner / User Contractor Third Party
: : : : :
NO. I
LEGEND RESPONSIBILITY : F : Fabricator / Contractor / Installator C : Client TP : Third Party (PJIT) M : Migas
ACTIVITY Document Review 1.1 QC System a. QA/QC Procedure b. Organization chart c. Planning & Scheduling d. Project Administration 1.2
1.3
Design Review & Calculation Review/Approval a. Shell Plate layout % Detail Drawing b. Nozzle detail & shell Opening drawing, shell Manhole, shell nozzle c. Bottom Plate layout & detail drawing d. Roof plate layout & Detail Drawing e. Accessories detail drawing, shell attchment & appurtenances wind gilder f. Any other drawing & calculation Material specification compying with standart, design & operation of tank
ACCEPTANCE
CRITERIA
Owner Spec.
API 650 3.6 API 650 FIG 3-4A, 3-5
LEGEND ACTIFITY : H : Hold Point A : Approval S : Surveillance W : Witness Activity
VERIFIYING DOCUMENT
P : Perform R : Review V : Verification Date : Rev :
SCOPE OF INSPECTION F C TP
Approved Document
P
A
R
Approved design & drawing
P
A
R
P
A
R
API 650 3.4, 3.5 API 650 3.10 API 650 3.8, 3.9 API 650 API 650 SEC.2
INSPECTION & TESTING STORAGE TANK Project
:
User
:
Location
:
Project Location Owner / User Contractor Third Party
: : : : :
1.4
LEGEND RESPONSIBILITY : F : Fabricator / Contractor / Installator C : Client TP : Third Party (PJIT) M : Migas
Welding Procedure a. Approved WPS b. PQR data supported c. All welding configuration covered by WPS d. Welded joint identification
ASME Sec. IX API 650 7.2
1.5
WPQT (Welder Qualification)
1.6
HSE Procedure a. Safety Policy & commitment b. Safety meeting, audit c. PPE requirement d. Hazards Analysis e. Emergency Respond Plan f. Construction waste treatment g. Others
ASME Sec. IX API 650 7.3 Owner Spec.
1.7
Fabrication Procedure a. PWHT procedure b. Hydrotest procedure
LEGEND ACTIFITY : H : Hold Point A : Approval S : Surveillance W : Witness Activity
Approved Document
P : Perform R : Review V : Verification Date : Rev :
P
V,A
R
Welder records Migas Certification Approved HSE Plan document
P
V,A
R,V
P
A
R
Approved Document
P
A
R
WPS MIGAS Approval
API 650
INSPECTION & TESTING STORAGE TANK Project
:
User
:
Location
:
Project Location Owner / User Contractor Third Party
: : : : :
LEGEND RESPONSIBILITY : F : Fabricator / Contractor / Installator C : Client TP : Third Party (PJIT) M : Migas
LEGEND ACTIFITY : H : Hold Point A : Approval S : Surveillance W : Witness Activity
P : Perform R : Review V : Verification Date : Rev :
c. NDT procedure d. Painting procedure e. Repair procedure II
Field Inspection 2.1 Material Verification
Original Mill Cert.No Defect or comply with API 650 App N
Mill Certificate or Material Test Result
P
R,V
H
Comply with approved Drawing & Procedures API 650 Sec. 4 & 5 Approved Procedure
Tank Fabricarion & Erection Record
P
V
S
Thickness Measurement Record
P
V
S
API 650 5.2
Welding Map Misalignment Record
P
V
W,S
2.2
Tank fabrication & Erection
2.3
Thickness Measurement
2.4
Joint Fit Up
2.5
Visual Welding Inspection
NDE & Testing Procedure
Visual Insp. Record
V
V
S
2.6
NDT Result Verification
NDE & Testing Procedure
NDT Records Cert. Calibration of
P
R,A
R
INSPECTION & TESTING STORAGE TANK Project
:
User
:
Location
:
Project Location Owner / User Contractor Third Party
: : : : :
LEGEND RESPONSIBILITY : F : Fabricator / Contractor / Installator C : Client TP : Third Party (PJIT) M : Migas
LEGEND ACTIFITY : H : Hold Point A : Approval S : Surveillance W : Witness Activity
P : Perform R : Review V : Verification Date : Rev :
Equip. Personnel Certificate 2.7 2.8
PWHT Verification Tank Dimension Measurement (Tank Diameter, Tank Height, Plumbness, Roundness Local Deviation)
2.9
Settlement Survey
2.10 Tank Safety Appurtenances Verification of : - Breather P/V Valve - Frangible Joint - Grounding - Fire Extinguisher 2.11 Hydrostatic Test III
Documentation & Report
PWHT Procedure API 650 Para 5.5
PWHT Record Tank Dimension Record (Plumbness, Roundness, Peaking, Bending)
P P
R,A W
R,V W
API 650
Settlement Record
P
W
W
Drawing design calculation API 650 3.10.2.5.2, API 574 7.6.2
Calibration Certificate
P
V
V
Hydrostatic Procedure
Hydrostatic Record
P
H
H
Completeness of all process
Approved MDR
P
R,A
V
INSPECTION & TESTING STORAGE TANK Project
:
User
:
Location
:
Project Location Owner / User Contractor Third Party
: : : : :
IV
LEGEND RESPONSIBILITY : F : Fabricator / Contractor / Installator C : Client TP : Third Party (PJIT) M : Migas
Verification of MDR Inspection Report Completion
Issued of Migas Certification (Tank Operation Permit)
LEGEND ACTIFITY : H : Hold Point A : Approval S : Surveillance W : Witness Activity
document & record dimensi format Report
Inspection Report
Inspection Report
Tank Certificate, Migas operation permit
P : Perform R : Review V : Verification Date : Rev :
P
Owner Representative
Third Party Representative
MIGAS
(..............)
(..............)
(..............)
PECTION & TESTING STORAGE TANK
SCOPE OF INSPECTION M R.A
R
R
PECTION & TESTING STORAGE TANK
A
W R
PECTION & TESTING STORAGE TANK
R S
R
PECTION & TESTING STORAGE TANK
H
H R
PECTION & TESTING STORAGE TANK
A
INSPECTION AND TESTING PLAN SWITCHGEAR
Project Location Owner / User Contractor Third Party
: : : : :
LEGEND RESPONSIBILITY :
LEGEND ACTIFITY :
F : Fabricator / Contractor /
H - Mandatory Hold Point
Installator
V - Verity documents
C : Client
R - Review documents
TP : Third Party (PJIT)
W - Witness Activity
M : Migas
DESCRIPTION
PROCESS DESCRIPTION INSPECTION ACTIVITIES
Date : Rev :
SURVEILLANCE INSPECTION F
C
TP
M
PRE INSPECTION MEETING
Inform the client regarding the Certification Agencies scope of work
H
H
---
DESIGN APPRAISAL
-
Drawing Calculations General Specifications
R R R
R R R
-------
FACTORY ACCEPTANCE TEST (FAT)
-
Identification of Component, Material and Purchasing order Contact resistence test for CB Visual Inspection Insulation Resistance Test Primary Injection Voltage Test Electrical & Mechanical interlock test Secondary current injection test Check Ground Bus DC Power supply test (if Required) Function Test Safety Devices Relay Test Metering calibration
H W W W W W W W W W W W W
V W W W W W W W W W W W W
V W W W W W W W W W W W W
INSPECTION AND TESTING PLAN SWITCHGEAR
Project Location Owner / User Contractor Third Party
: : : : :
LEGEND ACTIFITY :
F : Fabricator / Contractor /
H - Mandatory Hold Point
Installator
V - Verity documents
C : Client
R - Review documents
TP : Third Party (PJIT)
W - Witness Activity
M : Migas
DESCRIPTION
PRE-COMMISSIONING TEST (ON-SITE)
LEGEND RESPONSIBILITY :
PROCESS DESCRIPTION INSPECTION ACTIVITIES -
Switchgear Wiring Test
-
Verify nameplate of equipment with data sheet Check Equipment Layout based on classification area Check Instruction's Book / Manual Guidance Contact resistance bus Open the cell doors and with the design document, check each cell to ensure the correct component are installed Earthing measurement Check each drawer motor stater or feeder breaker assembly properly Check mechanism door locking and defeat function prpperly Inspect for the tighten Check cleaning on exterior and interior the MCC Check the cable feeder termination Check the power cables are properly color coded MCC wiring test Function test Relay test (as required) Insulation Resistance Test DC Hi pot Test
-
Date : Rev :
SURVEILLANCE INSPECTION F
C W
TP W
M W
H W R W W
V W R W W
-----------
W W W W W W W W
W W W W W W W W
-----------------
W W
W W
-----
INSPECTION AND TESTING PLAN SWITCHGEAR
Project Location Owner / User Contractor Third Party
: : : : :
F : Fabricator / Contractor /
H - Mandatory Hold Point V - Verity documents
C : Client
R - Review documents
TP : Third Party (PJIT)
W - Witness Activity
M : Migas
Date : Rev :
PROCESS DESCRIPTION INSPECTION ACTIVITIES
SURVEILLANCE INSPECTION F
C W
Performance Test
3rd Party Inspection Company
(....................)
LEGEND ACTIFITY :
Installator
DESCRIPTION COMMISSIONING TEST , FINAL INSPECTION , TAKING OF CERTIFICATE (TOC)
LEGEND RESPONSIBILITY :
TP W
Owner / User
MIGAS
(.......................)
(....................)
MIGAS
M W
INSPECTION AND TESTING PLAN MOTOR CONTROL CENTER (MCC)
Project Location Owner / User Contractor Third Party
: : : : :
LEGEND RESPONSIBILITY :
LEGEND ACTIFITY :
F : Fabricator / Contractor /
H - Mandatory Hold Point
Installator
V - Verity documents
C : Client
R - Review documents
TP : Third Party (PJIT)
W - Witness Activity
M : Migas
DESCRIPTION
PROCESS DESCRIPTION INSPECTION ACTIVITIES
Date : Rev :
SURVEILLANCE INSPECTION F
C
TP
M
PRE INSPECTION MEETING
Inform the client regarding the Certification Agencies scope of work
H
H
---
DESIGN APPRAISAL
-
Drawing Calculations General Specifications
R R R
R R R
-------
FACTORY ACCEPTANCE TEST (FAT)
-
Identification of Component, Material and Purchasing order Visual Inspection Wiring & Continuity Test MCC Contruction Check Small dry-type Distribution Transformer For Controls Primary Injection Voltage Test Electrical & Mechanical interlock test Fuction Test Check Ground Bus Metering calibration Automatic Transfer switch test (if Required) Insulation Resistance Test Relay Test
H W W W W W W W W W W W W
V W W W W W W W W W W W W
V W W W W W W W W W W W W
INSPECTION AND TESTING PLAN MOTOR CONTROL CENTER (MCC)
Project Location Owner / User Contractor Third Party
: : : : :
LEGEND ACTIFITY :
F : Fabricator / Contractor /
H - Mandatory Hold Point
Installator
V - Verity documents
C : Client
R - Review documents
TP : Third Party (PJIT)
W - Witness Activity
M : Migas
DESCRIPTION
PRE-COMMISSIONING TEST (ON-SITE)
LEGEND RESPONSIBILITY :
PROCESS DESCRIPTION INSPECTION ACTIVITIES
Date : Rev :
SURVEILLANCE INSPECTION F
C
TP
M
-
DC Hi pot test Current & Potential Transformer Test Current Transducer test
W W W
W W W
W W W
-
Verify nameplate of equipment with data sheet Check Equipment Layout based on classification area Check Instruction's Book / Manual Guidance Contact resistance bus Open the cell doors and with the design document, check each cell to ensure the correct component are installed Earthing measurement Check each drawer motor stater or feeder breaker assembly properly Check mechanism door locking and defeat function prpperly Inspect for the tighten Check cleaning on exterior and interior the MCC Check the cable feeder termination Check the power cables are properly color coded MCC wiring test Function test Relay test (as required)
H W R W W
V W R W W
-----------
W W W W W W W W
W W W W W W W W
-----------------
-
INSPECTION AND TESTING PLAN MOTOR CONTROL CENTER (MCC)
Project Location Owner / User Contractor Third Party
: : : : :
LEGEND ACTIFITY :
F : Fabricator / Contractor /
H - Mandatory Hold Point
Installator
V - Verity documents
C : Client
R - Review documents
TP : Third Party (PJIT)
W - Witness Activity
M : Migas
DESCRIPTION
COMMISSIONING TEST , FINAL INSPECTION , TAKING OF CERTIFICATE (TOC)
LEGEND RESPONSIBILITY :
Rev :
PROCESS DESCRIPTION INSPECTION ACTIVITIES
-
SURVEILLANCE INSPECTION F
Insulation Resistance Test DC Hi pot Test Performance Test
3rd Party Inspection Company
(....................)
Date :
C
TP
M
W W W
W W W
----W
Owner / User
MIGAS
(.......................)
(....................)
MIGAS
INSPECTION AND TESTING PLAN GENERATOR
Project Location Owner / User Contractor Third Party
: : : : :
DESCRIPTION
PRE INSPECTION MEETING DESIGN APPRAISAL
LEGEND RESPONSIBILITY :
LEGEND ACTIFITY :
F : Fabricator / Contractor /
H - Mandatory Hold Point
Installator
V - Verity documents
C : Client
R - Review documents
TP : Third Party (PJIT)
W - Witness Activity
M : Migas
PROCESS DESCRIPTION INSPECTION ACTIVITIES
Inform the client regarding the Certification Agencies scope of work
FACTORY ACCEPTANCE TEST (FAT) PRE-COMMISSIONING -
Drawing Calculations General Specifications Identification of Component, Material and Purchasing order Vibration Test Visual Inspection Over Speed Test Impulse Test No Load Test (O/C test) Load test HV. Test Short Circuit Test Winding Resistance Measurement Resistance Temperature Detector (RTD) Safety Devices Insulation resistance measurement Verify nameplate of equipment with data sheet
May 27, 2005 1
Date : Rev :
SURVEILLANCE INSPECTION F
C
TP
M
H
H
---
R R R H
R R R V
------or V
W W W W W W W W W W W W H
W W W W W W W W W W W W V
or W or W or W or W or W or W or W or W or W or W or W or W ---
INSPECTION AND TESTING PLAN GENERATOR
Project Location Owner / User Contractor Third Party
: : : : :
LEGEND ACTIFITY :
F : Fabricator / Contractor /
H - Mandatory Hold Point
Installator
V - Verity documents
C : Client
R - Review documents
TP : Third Party (PJIT)
W - Witness Activity
M : Migas
DESCRIPTION
TEST (ON-SITE)
LEGEND RESPONSIBILITY :
PROCESS DESCRIPTION INSPECTION ACTIVITIES
-
Check Instruction's Book / Manual Guidance Check Equipment Layout based on classification area Winding resistance test Control Panel Inspection Inspection of Power / Control Cables Inspect for physical damages Inspect for alignment & grouting Inspect for the tighten bolts on foundation Inspect & measure Earthing System Safety facility for personal and warning sign inspection Phase rotation Insulation Resistance Test Control Panel Test for Star Stop, Shutdown and Interlock System For Generator Couple Prime Mover: - Performance Test (as per required load) - Load Rejection Test (as required) Temperature Sensor & Level Indicator Test - Vibration Test - Noise Level Measurement - Over Speed Test
May 27, 2005 1
Date : Rev :
SURVEILLANCE INSPECTION F
C
TP
M
R W W W W W W W W W W W W
W W W W W W W W W W W W
---------------------------
W W W W W W
W W W W W W
-------------
INSPECTION AND TESTING PLAN GENERATOR
Project Location Owner / User Contractor Third Party
: : : : :
LEGEND RESPONSIBILITY :
LEGEND ACTIFITY :
F : Fabricator / Contractor /
H - Mandatory Hold Point
Installator
V - Verity documents
C : Client
R - Review documents
TP : Third Party (PJIT)
W - Witness Activity
M : Migas
DESCRIPTION
Rev :
PROCESS DESCRIPTION INSPECTION ACTIVITIES
-
COMMISSIONING TEST , FINAL INSPECTION , TAKING OF CERTIFICATE (TOC)
May 27, 2005 1
Date :
SURVEILLANCE INSPECTION F
Pressure Switch & Control System Test Black Start Control, Alarm Test AVR, Synchron, Metering Protective relay coordination Control Auxiliary Trip & throttle valve test (for steam turbine) Turning gear test Lubrication oil pump test Lubrication oil pressure test Lubrication oil temperature test Performance Test
3rd Party Inspection Company
Owner / User
MIGAS
C
TP
M
W W W W W W W W W W W W
W W W W W W W W W W W W
----------------------W
MIGAS
INSPECTION AND TESTING PLAN GENERATOR
Project Location Owner / User Contractor Third Party
: : : : :
DESCRIPTION
(....................)
LEGEND RESPONSIBILITY :
LEGEND ACTIFITY :
F : Fabricator / Contractor /
H - Mandatory Hold Point
Installator
V - Verity documents
C : Client
R - Review documents
TP : Third Party (PJIT)
W - Witness Activity
M : Migas
May 27, 2005 1
Date : Rev :
PROCESS DESCRIPTION INSPECTION ACTIVITIES
(.......................)
SURVEILLANCE INSPECTION F
C
TP
(....................)
M
INSPECTION AND TEST PLAN - CRANE Project : User : Location : PJIT : Contractor :
Migas Appointment Letter No. : Tgl :
Project Duration
No. 1
Activity DOCUMENT REVIEW 1. OWNER QA/QC Procedure 2. 3. 4. 5. 6.
2
:
Inspection Certificate & Operating Permit of Facility of Crane Base Support Crane Manufacturer's Data Report & Crane Manual Installation Document of Crane Support & Crane Bearing Previous Inspection Report & Migas Operating Permit Certificate Crane Repair & History Report
PHYSICAL CRANE INSPECTION (PCI) 1. Structural Component 2.
Hydraulic & Electrical Components
AR : Approval Required A1,A2 : Actual Inspection W1,W2 : Witness Inspection S : Operation surveilance/provide
R1,R2 T/C H M
REFERENCE DOCUMENT
VERIFIED DOCUMENT
ACCEPTANCE CRITERIA
- Inspection Procedure - Applicable Code, Standard, Specification & Regulation - SK 84K/38/DJM/1998
- Design, Fabrication Installation & Inspection Procedure & Document - NDT Procedure - Crane Manufacturer Data Report & Crane Manual - Inspection, Maintenance, Repair & History Record
- Inspection Procedure - Applicable Code, Standard, Specification & Regulation
- Inspection Procedure - Applicable Code, Standard, Specification & Regulation - SK 84K/38/DJM/1998
- Inspection Procedure - Inspection Report
- Inspection Procedure - Applicable Code, Standard, Specification & Regulation
INSPECTION AND TEST PLAN - CRANE Project : User : Location : PJIT : Contractor :
Migas Appointment Letter No. : Tgl :
Project Duration
:
No.
Activity 3.
Wire Rope
4.
Hook Blocks & Sheaves
5.
Welding & Bolting Connections
6.
Non Destructive Testing (NDT)
7.
Prime Mover
8.
Crane Cabin
9.
Safety Devices
REFERENCE DOCUMENT
AR : Approval Required A1,A2 : Actual Inspection W1,W2 : Witness Inspection S : Operation surveilance/provide VERIFIED DOCUMENT
R1,R2 T/C H M
ACCEPTANCE CRITERIA
10. PCI Overall Comment 3
Recertification Action 1. Repair Procedure
- Inspection Procedure
- Inspection Procedure
- Inspection Procedure
INSPECTION AND TEST PLAN - CRANE Project : User : Location : PJIT : Contractor :
Migas Appointment Letter No. : Tgl :
Project Duration
:
No.
4
Activity
2.
Repair Activity
3.
Inspection
4.
Inspection
5.
Resume of Recertification Action
FUNCTIONAL TESTING 1. Functional Testing Procedure 2.
Functional Testing Execution
3.
Post Functional Testing Inspection
4.
Functional Testing Release Note
AR : Approval Required A1,A2 : Actual Inspection W1,W2 : Witness Inspection S : Operation surveilance/provide
R1,R2 T/C H M
REFERENCE DOCUMENT
VERIFIED DOCUMENT
ACCEPTANCE CRITERIA
- Applicable Code, Standard, Specification & Regulation - SK 84K/38/DJM/1998
- Recertification Procedure - Inspection Report
- Applicable Code, Standard, Specification & Regulation
- Inspection Procedure - Applicable Code, Standard, Specification & Regulation - SK 84K/38/DJM/1998
- Inspection Procedure - Inspection Procedure - Functional Testing Procedur - Applicable Code, Standard, - Inspection Report Specification & Regulation
INSPECTION AND TEST PLAN - CRANE Project : User : Location : PJIT : Contractor :
Migas Appointment Letter No. : Tgl :
Project Duration
No. 5
6
:
Activity LOAD TESTING (if Required) 1. Load Testing Procedure/Sequence 2.
Load Testing Execution
3.
Post Inspection of Load Testing
4.
Load Testing Release Note
REPORTING 1. Final Inspection Report Inspection Certificate New Load Chart & Table 2.
Report Handling to MIGAS
AR : Approval Required A1,A2 : Actual Inspection W1,W2 : Witness Inspection S : Operation surveilance/provide
REFERENCE DOCUMENT
VERIFIED DOCUMENT
R1,R2 T/C H M
ACCEPTANCE CRITERIA
- Inspection Procedure - Applicable Code, Standard, Specification & Regulation - SK 84K/38/DJM/1998
- Inspection Procedure - Inspection Procedure - Functional Testing Procedur - Applicable Code, Standard, - Inspection Report Specification & Regulation
- Inspection Procedure - Applicable Code, Standard, Specification & Regulation - SK 84K/38/DJM/1998
-
Inspection Report Inspection Certificate New Load Chart & Table Any Recommendations
- Inspection Report - Applicable Code, Standard, Specification & Regulation
INSPECTION AND TEST PLAN - CRANE Project : User : Location : PJIT : Contractor :
Migas Appointment Letter No. : Tgl :
Project Duration
No.
:
Activity 3.
REFERENCE DOCUMENT
AR : Approval Required A1,A2 : Actual Inspection W1,W2 : Witness Inspection S : Operation surveilance/provide VERIFIED DOCUMENT
R1,R2 T/C H M
ACCEPTANCE CRITERIA
MIGAS Operating Permit
Note 1 : This ITP is the minimum requirement, and for practical implementation, it shall be added necessary in accordance with the actual crane type, model and or 2 : Regularly, this ITP will be reviewed and evaluated for a new revision by the team formed by MIGAS Owner Representative
Third Party Representative
MIGAS
(..............)
(..............)
(..............)
AND TEST PLAN - CRANE
: : : :
Review of Docum 100% Test Certification 10% Hold Point Monitoring Inspection Level OWNER
PJIT
S
R1
S
R1
S
R1
S
R1
S
R1
S
R1
S
V
S
V
MIGAS
AND TEST PLAN - CRANE
: : : :
Review of Docum 100% Test Certification 10% Hold Point Monitoring Inspection Level OWNER
PJIT
S
V
S
V
S
V
S
V
S
V
S
V
S
V
S
V
S/AR
R1
MIGAS
AND TEST PLAN - CRANE
: : : :
Review of Docum 100% Test Certification 10% Hold Point Monitoring Inspection Level OWNER
PJIT
S
V
S
V
S
V
S
V
S/AR
R1
S
H
S
V
S/AR
AR
MIGAS
AND TEST PLAN - CRANE
: : : :
Review of Docum 100% Test Certification 10% Hold Point Monitoring Inspection Level OWNER
PJIT
MIGAS
S/AR
R1
S
H
S
V
S/AR
AR
S
S
-
-
S
-
S
S
-
S
-
-
AND TEST PLAN - CRANE
: : : :
Review of Docum 100% Test Certification 10% Hold Point Monitoring Inspection Level OWNER
PJIT
MIGAS
-
-
S/AR
l be added necessary in accordance with the actual crane type, model and or the contract requirement
INSPECTION AND TEST PLAN FOR EXISTING PRESSURE VESSEL PROJECT : USER : LOCATION : PJIT : PT. Marka Inpektindo Technical (Marindotech) PROJECT DURATION : NO 1
ACTIVITY PRE-INSPECTION Documents Review - Quality system - Design information - Inspection history - As built drawing - Current PV jurisdictional Insp. License - ASME code stamp
2
DOCUMENT EVALUATION
3
EXTERNAL INSPECTION a. Visual - Foundation and Support, anchors - Level glass, PSV, press. & Temp gauges - Shell, head, nozzles, flange connections - Coating and insulation b. NDT (as required) c. Settlement measurement d. Thicknees Measuremant*
REFERENCE DOCUMENT
ISO 9000 series or similar SK Migas 84K/38/DJM/1998 ANSI-NB 23 API 510 API 520 History Card Drawing (as built) Repair / Alteration Procedure Log Book Report of Document Review
Remark R : Actual Inspection V : Verification H : Hold Point VERIFIED DOCUMENT
QMS Procedures level 2/3 or similar Manufacture data report Insp. Report & record Drawing (as built) PV Migas license Name plate record Repair/alteration procedure Log book Report of Document Review
API RP 572 ANSI-NB23
NDT procedure
P : Provide AR : Approval Required W : Withness ACCEPTANCE CRITERIA
NDT report
Minute of Meeting
SCOPE OF INSP. USER PJIT MIGAS
P P P P P P
R R R R R R
H
H
R*
P P P P P P P
V V V V V V V
-
INSPECTION AND TEST PLAN FOR EXISTING PRESSURE VESSEL PROJECT : USER : LOCATION : PJIT : PT. Marka Inpektindo Technical (Marindotech)
4
INTERNAL INSPECTION - Visual Inspection - Corrosion Mapping - Wall Thickness Measurement - NDT (as required)
Remark R : Actual Inspection
Inspection procedure
Inspection report / record
P : Provide P P P P P
V V V V V
-
P
V
-
5
RUBBING NAME PLATE
ASME-NB23
Name plate rubbing / record
6
FINAL INSPECTION
ASME Sect. VIII
Hydrostatic Test Procedure
Hydrostatic Test Procedure
H
W
W
7
FINAL EVALUATION
Insp. Report Documents
Insp. Report Documents
Minute of meeting
H
H
-
8
REPORT - Final Inspection Report - Certificate of Inspection
AR -
P P
R
-
-
P
9
ISSUED MIGAS LICENSE
3rd Party Inspection Company
Owner / User
MIGAS
INSPECTION AND TEST PLAN FOR EXISTING PRESSURE VESSEL PROJECT : USER : LOCATION : PJIT : PT. Marka Inpektindo Technical (Marindotech)
(....................)
Remark R : Actual Inspection
(.......................)
P : Provide
(....................)
INSPECTION AND TEST PLAN Project : User : Location : PJIT : Contractor : Project Duration
Migas Appointment Letter No. : Tgl : :
AR : Approval Requir A1,A2 : Actual Inspection W1,W2 : Witness Inspectio S : Operation surveilance/provide
R1,R2 : T/C : H: M:
Review of Document Test Certification Required Hold Point Monitoring Level Inspection
No. 1
2
Activity Review Document - Manufacture data report - Inspection Procedure - SKPP lama - Drawing - History card Visual Inspection - Condition rotating equipment & driver - Condition of foundation - Condition of drain system - Levelling check - Leaking - Piping system - Instrument & Electrical - Pressure/temperature gauge - Safety device
Reference Document
Verified Document
Acceptance Criteria
- Application code/ standart - User/owner spec.
-
Manufacturer Report Inspection Report Maintenance Report O&M Manual
- Application code/ standart - User/owner spec.
- Application code/ standart - User/owner spec.
-
Manufacturer Report Inspection Report Maintenance Report O&M Manual
- Application code/ standart - User/owner spec.
User ….
PJIT
S
R1
S&A1
R1
INSPECTION AND TEST PLAN Project : User : Location : PJIT : Contractor : Project Duration
Migas Appointment Letter No. : Tgl : :
AR : Approval Requir A1,A2 : Actual Inspection W1,W2 : Witness Inspectio S : Operation surveilance/provide
R1,R2 : T/C : H: M:
Review of Document Test Certification Required Hold Point Monitoring Level Inspection
3
Name plate Verification
Reference Document - Application code/ standart - User/owner spec.
4
Function test - Vibration measurement - Temperature measurement - Sound measurement - Rotation (RPM) measurement
- Application code/ standart - User/owner spec.
No.
5
Activity
Verified Document - Manufacturer Report - Maintenance Report - O&M Manual
Acceptance Criteria - Application code/ standart - User/owner spec.
-
- Application code/ standart - User/owner spec.
Manufacturer Report Inspection Report Maintenance Report FAT document O&M Manual
Documentation - Complete Report - Issued SKPP
3rd Party Inspection Company
Owner / User
MIGAS
User ….
PJIT
S&A1
W1
S&A1
W1
S/AR -
R1/AR -
INSPECTION AND TEST PLAN Project : User : Location : PJIT : Contractor : Project Duration
Migas Appointment Letter No. : Tgl : :
AR : Approval Requir A1,A2 : Actual Inspection W1,W2 : Witness Inspectio S : Operation surveilance/provide
R1,R2 : T/C : H: M:
Review of Document Test Certification Required Hold Point Monitoring Level Inspection
No.
Activity
(....................)
Reference Document
(.......................)
Verified Document
Acceptance Criteria
(....................)
User ….
PJIT
TION AND TEST PLAN
1= 2=
100% 10%
Level Inspection Migas
TION AND TEST PLAN
1= 2=
100% 10%
Level Inspection Migas
INSPECTION AND TEST PLAN EXISTING PLATFORMS Project Company Location MAJOR INSPECTION (Above Water and Underwater Inspection) PJIT :
No A 1
2
3
AR A W S Activity Preparation Migas Appointment Letter - Request Letter - List of Platform - Inspection Schedule - Previous Inspection Summary Report
: Approval Required : Actual Inspection : Witness Inspection : Operation Surveillance/Provide Reference Document
- Database - Previous Inspection Status - Inspection Report
Inspection Program Development - As-built drawings - Previous Inspection Summary Report - Latest Design Appraisal
- As-built drawings - Inspection Report - Design Appraisal - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999
Procedures Review - CP Procedures - NDT Procedures - Diving Procedures - NDT Personnel Qualification
- Inspection Program - Company's CP Drop Cell Procedures - Company's NDT Procedures - Company's Diving Procedures - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999
R : Review Document T/C : Test Certification Required H : Hold Point M : Monitoring Verified Document
Acceptance Criteria
- List of platforms
Inspection Level Company PJIT
S S S -
R R S&R
API RP-2A
S S
R S&R R
- NDT Personnel Certificates API RP-2A
S S S S
R R R R
- Inspection Program
INSPECTION AND TEST PLAN EXISTING PLATFORMS Project Company Location MAJOR INSPECTION (Above Water and Underwater Inspection) PJIT :
AR A W S
No 4
B 1
2
3
Activity HSE Assessment - HSE Plan Above Water Inspection Visual Inspection Deck Structure - Equipment Lay-out verification - Primary structure - Crane Pedestal Column and Boom-rest
: Approval Required : Actual Inspection : Witness Inspection : Operation Surveillance/Provide Reference Document
- Company's HSE Policy & Manual
- As-built drawings - Equipment database - Inspection Program - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999
Visual Inspection Jacket Structure - Jacket legs - Bracings - Jacket Pile Connection (crown)
- As-built drawings - Inspection Program - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999
Visual Insp. Boatlanding & Barge Bumper - General Condition (corrosion) - Rubber Fender - Barge Bumper
- As-built drawings - Inspection Program - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999
R : Review Document T/C : Test Certification Required H : Hold Point M : Monitoring Verified Document
Acceptance Criteria
- HSE Plan
Company requirements
- Inspection Record
Inspection Level Company PJIT S/R/AR
S/R/AR
API RP-2A
-
A A A A
- Inspection Record
API RP-2A
-
A A A
- Inspection Record
API RP-2A
-
A A A
INSPECTION AND TEST PLAN EXISTING PLATFORMS Project Company Location MAJOR INSPECTION (Above Water and Underwater Inspection) PJIT :
No 4
5
6
7
8
AR A W S Activity
: Approval Required : Actual Inspection : Witness Inspection : Operation Surveillance/Provide
Visual Inspection Riser - Number, Size and Lay-out Verification - General Condition - Support/Clamps/Bolts
Reference Document - As-built drawings - Inspection Program - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999
Visual Inspection Conductor - Number, Size and Lay-out Verification - General Condition - Support/Clamps/Bolts
- As-built drawings - Inspection Program - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999
Visual Inspection Caisson - Number, Size and Lay-out Verification - General Condition - Support/Clamps/Bolts Damage/Corroded Area Detail Inspection - Dimension Measurement - Thickness NDT Measurement - Alignment Measurement
- As-built drawings - Inspection Program - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999 - Inspection program - Previous Inspection Record - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999
Visual Inspection Helideck Structure
- As-built drawings
R : Review Document T/C : Test Certification Required H : Hold Point M : Monitoring Verified Document
Acceptance Criteria
Inspection Level Company PJIT
- Inspection Record
API RP-2A
-
A A A
- Inspection Record
API RP-2A
-
A A A
- Inspection Record
API RP-2A
-
A A A
- Inspection Record
API RP-2A
S S S
W W W
INSPECTION AND TEST PLAN EXISTING PLATFORMS Project Company Location MAJOR INSPECTION (Above Water and Underwater Inspection) PJIT :
AR A W S
No
Activity - Primary Structure
C 1
2
3
Under Water Inspection General Visual Inspection - Jacket legs - Bracings - Risers, conductors, caissons
Thickness Measurement - Thickness measurement on selected leg
Cathodic Protection - CP reading on all legs
: Approval Required : Actual Inspection : Witness Inspection : Operation Surveillance/Provide
Reference Document - Inspection Program - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999
- As-built drawings - Inspection Program - Diving Procedures - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999 - Inspection Program - Diving Procedures - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999 - Inspection Program - Diving Procedures - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999
R : Review Document T/C : Test Certification Required H : Hold Point M : Monitoring Verified Document - Inspection Record
Acceptance Criteria API RP-2A
Inspection Level Company PJIT A
- Inspection Record
API RP-2A
S S S
W W W
- Inspection Record
API RP-2A
S
W
- Inspection Record
API RP-2A
S
W
INSPECTION AND TEST PLAN EXISTING PLATFORMS Project Company Location MAJOR INSPECTION (Above Water and Underwater Inspection) PJIT :
No 4
5
6
7
AR A W S Activity Marine Growth Survey - Marine growth measurement on selected leg
: Approval Required : Actual Inspection : Witness Inspection : Operation Surveillance/Provide
Reference Document - Inspection Program - Diving Procedures - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999
Anode Survey - Anode Mapping - Depletion observation
- Inspection Program - Diving Procedures - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999
Debris survey - Debris attached to bracing - Debris on seabed
- Inspection Program - Diving Procedures - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999
Scour Survey - Scour survey on all legs and horizontal members- Inspection Program - Diving Procedures - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999
R : Review Document T/C : Test Certification Required H : Hold Point M : Monitoring Verified Document
Acceptance Criteria
Inspection Level Company PJIT
- Inspection Record
API RP-2A
S
W
- Inspection Record
API RP-2A
S S
W W
- Inspection Record
API RP-2A
S S
W W
- Inspection Record
API RP-2A
S
W
INSPECTION AND TEST PLAN EXISTING PLATFORMS Project Company Location MAJOR INSPECTION (Above Water and Underwater Inspection) PJIT :
No 8
9
10
11
AR A W S Activity Riser Survey - General condition - Supports/Clamps/bolts
: Approval Required : Actual Inspection : Witness Inspection : Operation Surveillance/Provide
Reference Document - Inspection Program - Diving Procedures - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999
Outboard conductor survey - General Condition - Supports/Clamps/bolts
- Inspection Program - Diving Procedures - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999
Caisson Survey - General condition - Supports/Clamps/bolts
- Inspection Program - Diving Procedures - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999
Damage/Corroded area detail inspection - Dimension Measurement - Thichness UT measurement - Aligment Measurement
- Inspection Program - Diving Procedures - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999
R : Review Document T/C : Test Certification Required H : Hold Point M : Monitoring Verified Document
Acceptance Criteria
Inspection Level Company PJIT
- Inspection Record
API RP-2A
S S S
W W W
- Inspection Record
API RP-2A
S S
W W
- Inspection Record
API RP-2A
S S
W W
- Inspection Record
API RP-2A
S S S
W W W
INSPECTION AND TEST PLAN EXISTING PLATFORMS Project Company Location MAJOR INSPECTION (Above Water and Underwater Inspection) PJIT :
AR A W S
No
D 1
2
Activity
Reporting Field Report - Under water report - Above water report Final Report
: Approval Required : Actual Inspection : Witness Inspection : Operation Surveillance/Provide Reference Document
R : Review Document T/C : Test Certification Required H : Hold Point M : Monitoring Verified Document
- Inspection Program - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999 - Inspection Program - PerMen No. 05/P/M/PERTAMB/1977 - Sk 21-K/38/DJM/1999
Acceptance Criteria
Inspection Level Company PJIT
- Inspection Record - Inspection Report
API RP-2A
R/S/AR R/AR
R/AR R/S/AR
- Inspection Report
API RP-2A
R & AR
S&R
3rd Party Inspection Company
Owner / User
MIGAS
(....................)
(.......................)
(....................)
n Level Migas
AR R R
n Level Migas
n Level Migas
n Level Migas
n Level Migas
n Level Migas
n Level Migas
AR
INSPECTION AND TESTING PRESSURE VESSEL Document No. Owner/Client Item No. Description Project Title Date Rev. Page No. Drawing
: : : : : : : :
PE-001 RUDI ERIANTO (PT. BMS) PV-001 PRESSURE VESSEL FABRICATION & INSTALLATION PRESSURE VESSEL 17/10/17 000 01
REF No. 1.0
PROCESS DESCRIPTION INSPECTION ACTIVITIES
Legend : V H W R M X A P
CONTROL
ACCEPTANCE
DOCUMENT
CRITERIA
DESIGN 1.1 REVIEW DESIGN AND CALCULATION SHEET
ASME
ASME SECT.VIII
2.1 WPS, PQR & WQT
ASME
ASME SECT.VIII, IX
2.2 REPAIR WELD PROCEDURE
ASME
ASME SECT.VIII, IX
2.3 NDT PROCEDURE (RADYOGRAPHIC TEST)
ASME
ASME SECT V, VIII, IX
3.1 MATERIAL TEST TO KNOWING/VERIFY/COMPARE TO CODE
ASME
ASME SECT.II
3.2 INSPECT MATERIAL CONDITION
ASME
ASME SECT II & VIII
3.3 MATERIAL ASSESSMENT
ASME API
ASME VIII API-150
ASME
ASME SECT. IX
1.2 REVIEW ENGINEERING DRAWING 2.0
DOCUMENT
1.5.1 LONGITUDINAL 1.5.2 CIRCUM 1.5.3 NOZZLE ATTACHMENTS 1.5.4 REINFORCEMENT PADDLE 1.5.5 OTHERS 3.0
4.0
MATERIALS
FABRICATION 4.1 CHECK WORK METODE
PROCEDURE 4.2 CHECK CUTTING PLAN
ASME
ASME SECT IX
4.3 CHECK FIT-UP ( Edge Preparation, Alignment, Root Face & Gap )
ASME
ASME SECT VIII , IX
4.4 CHECK CONFORMANCE TO WPS,WELDERS, AND WELDING OPERATOR
ASME
WPS/PQR ASME SECT VIII , IX
5.0
INSPECTION 5.1 EXTERNAL INSPECTION 5.1.1 CHECK MAIN PART OF VESSELS (HEAD,SHELL,NECK) AND BOLTING
DRAWING
5.1.2 CHECK SECONDARY PART OF VESSELS (CONNECTIONS, GASKET)
DRAWING
5.1.3 CHECK PAINTING
DRAWING
5.1.4 CHECK SAFETY DEVICE ( PSV, LEVEL GAUGE )
DRAWING
5.2 INTERNAL INSPECTION 5.1.1 RADIOGRAPHY TEST ( HEAD , SHELL, NOZZLE )
6.0
ASME SECT V, VIII, IX
ASME
ASME SECT. VIII
HYDROTEST 6.1 PROCEDURE
7.0
ASME
OWNER SPEC.
OWNER SPEC.
6.2 CALIBRATION OF GAUGES
ASME
ASME SECT. VIII
6.3 HYDROTEST OPERATION 6.4 RECORD
ASME
PROCEDURE ASME SECT. VIII
7.1 CHECK INTERNAL ARE INSTALLAED AND TIGHTENED PROPERLY
AFC DRAWING
AFC DRAWING
7.2 CHECK THAT VESSEL NAME PLATE'S CONTENT IS CORRECT AND
AFC DRAWING
AFC DRAWING
7.3 QUALITY RECORDS
OWNER SPEC.
OWNER SPEC.
DISPATCH AND DOCUMENTATION
ECTION AND TESTING PLAN PRESSURE VESSEL Prepared By QA/QC : : : : : : : :
Verification Hold Point Witness Review Monitor Responsibility Approved Provide
CERTIFYING
DOCUMENT
VERIFIYING DOC.
TO BE INCL IN REVERSE DATA
DATA SHEET
Approved by OWNER/CLIENT THIRD PARTY
Verified by DISNAKER
INSPECTION QA/QC
SIGN
OWNER/
SIGN
THIRD
CLIENT
PARTY
P
A/R
R
P
A/R
R
P
A/R
R
P
A/R
R
P
A/R
R
V
A
P,X
V
A
P,X
V
A
P,X
V,R
A
P,X
DATA CALCULATION DWG STANDARD P&I D WELDING PROCEDURE PERSONNELS CERTIFICATE REPAIR PROCEDURE PERSONNELS CERTIFICATE NDT PROCEDURE & INSP. REPORTS PERSONNELS CERTIFICATE
PROCEDURE MILL CERTIFICATE PROCEDURE PERSONNELS CERTI PROCEDURE PERSONNELS CERTI
WPS/PQR OWNER SPEC. DRAWING
DRAWING
V,R
A
P,X
PROCEDURE
PROCEDURE
V,W
A
P,X
SIGN
DISNAKER
FIT-UP REPORT
FIT-UP REPORT
WELDING MAP
WELDING MAP
CERTIFICATES
CERTIFICATES
PROCEDURE PROCEDURE
V,R
A
P,X
REPORT
V
A/R
-
REPORT
V
A/R
-
PROCEDURE
REPORT
V
A
-
PROCEDURE
REPORT
V
A/R
-
NDT PROCEDURE
REPORT
V,R
A
R
PERSONEL CERTIFICATE
REPORT
CALIBRATION CERTIF
REPORT
HYDROTEST PROC.
HYDROTEST PROC.
X
A
R
CALIB. CERT.
CALIB. CERT.
HYDROTEST REPORT
HYDROTEST REPORT
QC DOSSIER
X,W
A
R
X,W W
H A
H X,H
X
W
R
X
W
R
X
R
R
rified by SNAKER
SIGN