30 1 327KB
Contract No. Main Contractor Project Owner Document No.
NATURAL GAS TRANSPORTATION DEVELOPMENT PROJECT – SIAK RIAU
: XXXX : XXXXX : WMTI : SIA-03-WMTI-D-QA-PLN-002
INSPECTION TEST PLAN (ITP) at Shop Discipline
Rev.
Legend H : Hold Point W : 100% Witness
PIPELINE
1
SW : Spot/Random Witness CON : CONTRACTOR
No
DESCRIPTION
INSPECTION METHODE
A : Approval
M : Monitoring
R : Review
P : Perform / Prepare
V : Verification
I : Information
PMC : Project Management Consultan
ACCEPTANCE CRITERIA/ REFFERENCE DOCUMENT
CLIENT
: WMTI
RESPONSIBILITY VERIFYING DOCUMENT
CON
WMTI
1.0 Pipe 1.1 Carbon Steel Pipe a. Material Specification / Mill Certificate b. Visual and Dimensional Inspection c. Identification & Marking Check 1.2 PQT (Pre Qualification Test) a. Tensile Test b. Charpy Impact Test c. Hardness Test d. Micrographic Examination e. Chemical Analysis 1.3 Flexible /Victaulic Pipe
Mill Certificate
P
R
Visual Visual
Material Requisition and Specification Pipe Specification Material Specification
Inspection Report Inspection Report
P/M P/M
SW SW
Test Test Test Test Test
Manufacture Specification Manufacture Specification Manufacture Specification Manufacture Specification Manufacture Specification
Vendor Document / Test Report Vendor Document / Test Report Vendor Document / Test Report Vendor Document / Test Report Vendor Document / Test Report
W W W W W
W W W W W
Mill Certificate
P
R
Inspection Report Inspection Report
P/M P/M
SW SW
FAT Document FAT Document Subcontracting Plan Vendor list
P P P P
W/A W/A R/A R/A
Review
a. Material Specification / Mill Certificate
Review
b. Visual and Dimensional Inspection c. Identification & Marking Check
Visual Visual
Material Requisition and Specification Material Specification Material Specification
Review and Visual Review and Visual Review Review
Mfr. Spec & Project Spec Mfr. Spec & Project Spec Subcontracting Plan Procedure Vendor list Procedure
2.0 PROCUREMENT DOCUMENT 2.1 FAT a. FAT for Valves b. FAT for Insulating Joint 2.2 Subcontracting Plan 2.3 Vendor List 3.0 Valves ( Gate, Check & Ball ) 3.1 Gate,Check & Ball
Mill Certificate
P
R
Review Test
Material Requisition and Specification ASME IX & API 1104 Material Specification
WPS/PQR Inspection Report
P P/M
R R
Test Test
ASME V Vendor's Procedure
Test Report Test Report
P/M P/M
R R/SW
Test Test Test Visual
Vendor's Procedure Vendor's Procedure Vendor's Procedure IFC Drawing
Test Report Test Report Test Report Inspection Report
P/M P/M P/M P/M
R/SW R/SW R/SW R
a. Material Specification/Mill Certificate (Body, bonnet/ cover, stem, disc)
Review
b. WPS & PQR c. Material Identification for Alloy (if specified) ( Using Checking devices such as Metascope ) d. NDT (if specified) e. Hydrostatic Test for body f. Seat Leakage Test - Low Pressure Closure Test - High Pressure Closure Test - Back Seat Test g. Visual and Dimensional Inspection
PJIT
MIGAS
REMARK
Contract No. Main Contractor Project Owner Document No.
NATURAL GAS TRANSPORTATION DEVELOPMENT PROJECT – SIAK RIAU
: XXXX : XXXXX : WMTI : SIA-03-WMTI-D-QA-PLN-002
INSPECTION TEST PLAN (ITP) at Shop Discipline
Rev.
Legend H : Hold Point W : 100% Witness
PIPELINE
1
SW : Spot/Random Witness CON : CONTRACTOR
No
DESCRIPTION
h. i. j. k.
Stem Test (when specified) Low Temperature Test ( when specified ) Operation/Function Test Identification & Marking Check
A : Approval
M : Monitoring
R : Review
P : Perform / Prepare
V : Verification
I : Information
PMC : Project Management Consultan
CLIENT
: WMTI
RESPONSIBILITY
INSPECTION METHODE
ACCEPTANCE CRITERIA/ REFFERENCE DOCUMENT
VERIFYING DOCUMENT
Test Test Test Visual
Vendor's Procedure Vendor's Procedure Vendor's Procedure Material Specification
CON
WMTI
Test Report Test Report Test Report Inspection Report
P/M P/M P/M P/M
R R R R/SW
Mill Certificate
P
R
Inspection Report Test Report Inspection Report Inspection Report
P P P P
R R SW R/SW
PJIT
MIGAS
REMARK
4.0 Fitting and Flange a. Material Specification / Mill Certificate ( press test, mill test, etc) b. c. d. e.
Heat Treatment (if specified) NDT (if specified) Visual and Dimensional Inspection Identification & Marking Check
Review Visual Test Visual Visual
Material Requisition and Specification ASME IX & API 1104 ASME V IFC Drawing Material Specification
5.0 Bolts, Nuts & Gasket Mill Certificate
P
R
Visual
Material Requestion and Specification Material specification
Inspection Report
P/M
R
Review
Document Procedure
Document Report
P
R
a. Material specification / Certificates Material
Review
b. Visual and Dimensional Check 6.0 Final Shop Documentation (reporting, etc)
Prepared By CONTRACTOR
Name :
Reviewed/Approved By, WMTI
Date :
Name :
Date :