61 0 437KB
EPC for Flowlines, Gathering lines and Export Pipelines (BOC-1703)
ITP for Pipeline Welding Procedure
002
issued for Approval
13/05/2021
Huang Xianke
Zhang Shuli
Tao Ji
001
Issued for Review
03/05/2021
Huang Xianke
Zhang Shuli
Tao Ji
Rev.
Reason for Issue
Date
Author
Checker
Approver
Rev.
MGP1-PL1-CPP-QA-5733-0002
002
Project:
EPC for Flowlines, Gathering lines and Export Pipelines (BOC-1703)
Document Title
ITP for Pipeline Welding Procedure
Document No.:
MGP1-PL1-CPP-QA-5733-0002
Revision No.:
002
Revision History
Revision Date
Revision Number
Approver
Summary of Changes
03/05/2021
001
Taoji
Issued for Review
13/05/2021
002
Taoji
Edit according to comments
Holds Hold Ref.
Description / Reason for Hold
Ref. Section
Reference Documents Ref.
Document Number
Rev.
Page 2 of 15
Document Title
Rev002
CHINA PETROLEUM PIPELINE ENGINEERING COMPANY BASRA OIL COMPANY LIMITED Project: Contract №: EPC for Flowlines, Gathering lines and Export BOC-1703 Pipelines (BOC-1703) Security Classification:
Revision:
Restricted
002
Rev. Date:
13/05/2021
Sheet №:
15
Document Number: Project ID
Plant Code
Originator Code
Discipline
Doc Type
Sequential №
MGP1
PL1
CPP
QA
5733
0002
Document Title: ITP for Pipeline Welding Procedure
Abstract:
This ITP procedure is complied in accordance with the project requirement of BOC-1703 and is applied for the pipeline welding activities in EPC for Flowlines, Gathering lines and Export Pipelines construction activities.
Page 3 of 15
Rev002
4
ITP for Pipeline Welding Procedure MGP1-PL1-CPP-QA-5733-0002
Content 1. INSPECTION AND TEST PLAN..............................................................................................................................5 2. CONSTRUCTION REPORT.................................................................................................................................. 11
Page 4 of 15
Rev002
ITP for Pipeline Welding Procedure MGP1-PL1-CPP-QA-5733-0002 1. INSPECTION AND TEST PLAN
MAJNOON EPC FOR FLOWLINES, GATHERLINES AND EXPORT PIPELINES ITP FOR PIPELINE WELDING PROCEDURE
DEFINITION OF INSPECTION AND TEST PLAN SYMBOLS “H” - HOLD: A point beyond which work shall not proceed without formal approval by appropriate inspectorate. Achievement of “H” points shall be notified to COMPANY. “W” - WITNESS: A point beyond which work may proceed without formal documented approval by any of the inspectorate. Achievement of “W” points shall be notified to COMPANY. “S” - SURVEILLANCE: A point where CONSORTIUM and others may carry out surveillance of work in progress and documentation associated on an unscheduled basis, with no notification required by any party and without amendment to the scheduled production programme. “R” - REVIEW: The documents are to be submitted to the appropriate inspectorate for review by COMPANY. Note that where a document is subject to COMPANY approval, work shall not proceed until the COMPANY’s approval is given. “C” - CERTIFICATION: Specific and appropriate certification documentation is to be included in the document package.
REMARKS
Page 5 of 15
Rev002
ITP for Pipeline Welding Procedure MGP1-PL1-CPP-QA-5733-0002
MAJNOON EPC FOR FLOWLINES, GATHERLINES AND EXPORT PIPELINES ITP FOR PIPELINE WELDING PROCEDURE Item No. 1.0
Inspection Activity & Specific Check Point Area
Reference Document
Acceptance Criteria, Code & Standard
FORM-QA-5733-0002API 1104 0001 Welding of pipelines Daily Welding Report and Related Facilities
Welding procedure review for final approval.
1.2
HSE Requirements for PPE and certified lifting API 1104 Welding of pipelines equipment. and Related Facilities Pipe inspection for pipe identification, physical and physical damage, manufacturing stamp. MGP1-PL1-CPP-BAASME B31.4-2019 Electrode Control for class batch No. 6070-0009 Pipeline Welding Procedure Chapter V Electrode Tracing by marking batch No. against Construction,Weldin welding g and Assembly
1.4 1.5 1.6
CPP
COMPANY
H
H
W/C
R
W/C
C/S
W/C
S
W
C/S
W/H
C/S
General
1.1
1.3
Verifying Record
Pipe tracing by pipe No, heat No, and length.Check material spec,diameter,schedule,colour coding and preservation the ID prior to cutting.
FORM-QA-5733-00020002 Pipe Log Book
FORM-QA-5733-00020003 Weld Box
Definitions of Symbols: H - Hold Point W - Witness Point S - Surveillance R - Review C – Certification
Page 6 of 15
Rev002
ITP for Pipeline Welding Procedure MGP1-PL1-CPP-QA-5733-0002
MAJNOON EPC FOR FLOWLINES,GATHERLINES AND EXPORT PIPELINES ITP FOR PIPELINE WELDING PROCEDURE
Item No. 2.0 2.1 2.2 2.3
2.4
2.5 2.6
Inspection Activity & Specific Check Point Area
Reference Document
Acceptance Criteria, Code & Standard
Verifying Record
CPP
COMPANY
H/W
H
H/W
H
H/W
H
H/W
H
H/W W/C
S/C S/C
Welder Qualification
FORM-QA-6066-00010001 Welder API 1104 Weld qualification test procedure Status for final Qualification Test Welding of pipelines Record approval. and Related Facilities Pre-weld preparations by bevel dimensions, clamp API 1104 Welding of pipelines FORM-QA-6066-0001type, root gap, alignment. and Related Facilities 0002 WQT Visual Welding Control by weather protection like wind Inspection Report shield, welding parameters as per WPS, ensure ASME B31.4-2019 FORM-QA-6066-0001finishing by removal of slag grind high points and file MGP1-PL1-CPP-BA6070-0009 Pipeline 0001 Welder out under cuts. Chapter V Welding Procedure Qualification Test Visual Inspection for marking and good workmanship Construction, Certificate of fit up inspection, root, cap, profile, surface Approved WPS & PQR Welding and discontinuities. FORM-QA-5733-0002Assembly NDT 100% for RT for butt welds. 0004 NDT Request Welder approval in WQT records with qualification, status, welder certificates, and cards
Definitions of Symbols: H - Hold Point W - Witness Point S - Surveillance R - Review C – Certification
Page 7 of 15
Rev002
ITP for Pipeline Welding Procedure MGP1-PL1-CPP-QA-5733-0002
MAJNOON EPC FOR FLOWLINES,GATHERLINES AND EXPORT PIPELINES ITP FOR PIPELINE WELDING PROCEDURE Item No.
Inspection Activity & Specific Check Point Area
3.0 3.1
Pipeline Welding Pipe size, type and quality. Check quality of welding product and handle, storage, oven and issue Verifying welding procedure Verifying welder qualification Line up joint clean Check line up clearance, high-low of spiral seam or/and long seam Check preheat temperature as per WPS Check welding environment in accordance with requirement Check length of Fixed welding, weld identification 100% visual examination for all joints, slag& spatter removed. Cap height, under cut, porosity, arc strikes, welder ID number(s), joint number. Ensure avoiding foreign matter into pipeline (add flange) Job site inspection (ensure ROW without any electrode heads, etc.) Transfer of heat NO. & color coding where applicable on piping to be cut.
3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9
3.10
3.11
Reference Document
API 1104 Welding of pipelines and Related Facilities
Acceptance Criteria, Code & Standard
Verifying Record
API 1104 Welding of pipelines FORM-QA-5733-0002-0001 and Related Facilities Daily Welding Report
ASME B31.4-2019 MGP1-PL1-CPP-BA- Chapter V 6070-0009 Pipeline Construction, Welding Procedure Welding Assembly Approved WPS & PQR
and
FORM-QA-5733-0002-0002 Pipe Log Book FORM-QA-5733-0002-0003 Weld Box
Definitions of Symbols: H - Hold Point W - Witness Point S - Surveillance R - Review C – Certification Page 8 of 15
Rev002
CPP
COMP ANY
W/S
S
S/R S/C W W
S S S S
W W
S S
W H
S S/R
W
S
W
S
ITP for Pipeline Welding Procedure MGP1-PL1-CPP-QA-5733-0002
MAJNOON EPC FOR FLOWLINES,GATHERLINES AND EXPORT PIPELINES ITP FOR PIPELINE WELDING PROCEDURE Item No.
Inspection Activity & Specific Check Point Area
4.0 4.1
Tie-in Trench is clear of debris and water. The inside of adjoining pipes is clear from foreign material. Both ends of adjoining pipes are beveled as per WPS joint design, and the surface are clean within 100mm distance from the ends Bell hole for Tie-in is adequate for Tie-in welding operation, and as per specifications. Ensure that adjoining pipes are stress free before welding. Offset of adjoining pipes is divided equally around the pipes, and within specified tolerance. Tie-in welding is performed by qualified welders with approved WPS. Visual inspection to the final weld is acceptable. Tie-in weld is passed by RT/UT/PT testing.
4.2
4.3 4.4 4.5 4.6 4.7 4.8
Reference Document
Acceptance Criteria, Code & Standard
Verifying Record
FORM-QA-57330002-0001 Daily Welding Report
API 1104 Welding of pipelines API 1104 FORM-QA-5733Welding of pipelines and Related Facilities 0002-0002 Pipe Log and Related Facilities Book MGP1-PL1-CPP-BA6070-0009 Pipeline ASME B31.4-2019 Welding Procedure Chapter V Construction,Welding Approved WPS & PQR and Assembly
FORM-QA-57330002-0003 Weld Box FORM-QA-57330002-0004 NDT Request
Definitions of Symbols: H - Hold Point W - Witness Point S - Surveillance R - Review C – Certification
Page 9 of 15
Rev002
CPP
COMPA NY
W
S
W
S
W/S
S/R
W
S
W
S
W/R
S
W R/C
S/R R
ITP for Pipeline Welding Procedure MGP1-PL1-CPP-QA-5733-0002 2. CONSTRUCTION REPORT MAJNOON EPC FOR FLOWLINES,GATHERLINES AND EXPORT PIPELINES ITP FOR PIPELINE WELDING PROCEDURE Item No. 5.0 5.1
5.2 5.3
5.4 5.5
5.6
Inspection Activity & Specific Check Point Area
Reference Document
Acceptance Criteria, Code & Standard
Pipeline welding NDT Non-destructive test inspecting technician shall be experienced and competent with qualification certificate. NDT operator API 1104 qualification requirement e.g. BINDT Level II, Welding of pipelines API 1104 ASNT-TC-1A Level II or equivalent etc. and Related Facilities Welding of pipelines and Related Facilities Inspect RT films and inspection reports Inspect MT reports
equipment
and inspection MGP1-PL1-CPP-BA6070-0009 Pipeline Welding Procedure ASME B31.4-2019 Chapter V Inspect PT liquid and inspection reports. Construction,Welding and Assembly Inspect UT equipment and inspection reports.
Verifying Record
FORM-QA-5733-0002-0004 NDT Request
Record welding history and NDT reports on a daily basis.
Definitions of Symbols: H - Hold Point W - Witness Point S - Surveillance R - Review C – Certification Page 10 of 15
Rev002
CPP
COMPANY
H
R
W
S/R
W
S/R
W
S/R
W
S/R
R
R
ITP for Pipeline Welding Procedure MGP1-PL1-CPP-QA-5733-0002 NO. FORM-QA-5733-0002-0001 Daily Welding Report Report No. Pipe NO.
Heat No.
Line No. Pipe Material
Diamete r (Inch)
W.T. (mm )
Joint No.
Date: WPS NO.
Fitup
Preheat (℃)
CPP
Sheet Welders
Root
Hot
Fill1
Fill2
Fill3
COMPANY
Name Signature Date
Page 11 of 15
of
Rev002
Cap
Visual Inspection
Remarks
ITP for Pipeline Welding Procedure MGP1-PL1-CPP-QA-5733-0002 NO. FORM-QA-5733-0002-0002 Pipe Log Book Pipe NO.
Heat No.
Length Dia. (m) (Inch)
W.T. (mm)
Joint Welding WPS No. Date NO.
Welders Root
Hot
Fill1
Fill2
Page 12 of 15
Fill3
Cap
Welding Report No
RT/UT/MT/PT Reports Date
Resul ts
Rev002
Report No.
Coating Date
Resu lts
Repor t No.
ITP for Pipeline Welding Procedure MGP1-PL1-CPP-QA-5733-0002 NO. FORM-QA-5733-0002-0003 WELD BOX
WELD NO.
WPS NO.
L
R
PIPE NO.
HEAT NO.
R
H
F
C
VT
DATE
Page 13 of 15
Rev002
ITP for Pipeline Welding Procedure MGP1-PL1-CPP-QA-5733-0002
NO. FORM-QA-5733-0002-0004 Report NO.: Drawing No.: S.N.
Weld NO.
NDT REQUEST Line No.: Date: DIA X THICK
WPS NO.
CPP
Sheet: REQUEST FOR RT
UT
PT
MT
of
Welders
NDT COMPANY
Name Signature Date Page 14 of 15
Rev002
REMARKS
ITP for Pipeline Welding Procedure MGP1-PL1-CPP-QA-5733-0002
NO. FORM-QA-5733-0002-0005
TIE-IN CHECK LIST
Report No.:
Line No.: Date:
QC CHECK POINTS
YES/NO
1.
Trench is clear of debris and water.
2.
The inside of adjoining pipes is clear from foreign material.
3.
Both ends of adjoining pipes are bevelled as per WPS joint design, and the surface are clean within 100mm distance from the ends
4.
Bell hole for Tie-in is adequate for Tie-in welding operation, and as per specifications.
5.
Pipes to be joined are free from any mechanical damages; pup piece length is more than 2.0 meter if used.
6.
The weld seams of the adjoining pipes are offset as per specification.
7.
Ensure that adjoining pipes are stress free before welding.
8.
Offset of adjoining pipes is divided equally around the pipes, and within specified tolerance.
9.
Tie-in welding is performed by qualified welders with approved WPS.
10.
Visual inspection to the final weldment is acceptable.
11.
Tie-in weldment is passed by radiographic, ultrasonic and penetrating testing.
REMARKS
APPROVALS
CPP
COMPANY
Name Signature Date
Page 15 of 15
Rev002