Sl.No

Description

Unit

UNSKILLED LABOUR PRICE

HOUR

SKILLED LABOUR PRICE

HOUR

CHARGE HAND

HOUR

Open Excavation - 150 m3 ( upto 1.50 m Depth ) Soft ,Medium Soil

M3 150

Mechanical Shovel 966

No

Roller Compactor - 20T - 850 Dhs/No (1000 m2 / No)

m2

Unskilled Labour - 2 No

No

Charge Hand

No

Compaction test - 200 Dhs/No (750 m2/Test)

No

Manual Excavation

No

Actual Cost

Open Excavation - 150 m3 ( upto 4.00 m Depth ) Soft ,Medium Soil

M3 150

Mechanical Shovel 966 - 2 No

No

Roller Compactor - 20T - 850 Dhs/No (1000 m2 / No)

m2

Unskilled Labour - 2 No

No

Charge Hand

No

Compaction test - 200 Dhs/No (750 m2/Test)

No

Manual Excavation Actual Cost

Open Excavation - 50 m3

-

Hard Soil

M3 50

Bucket Excavator

No

Excavator with Drilling Hammer

No

Roller Compactor - 20T - 700 Dhs/No (1000 m2/No)

m2

Unskilled Labour - 2 No

No

Charge Hand

No

Compaction test - 200 Dhs/No (750 m2/Test)

No

Hand tool

item

Actual Cost

BACK FILLING - 250 m3

M3 200

Mechanical Shovel 966 - 750 QRs/ No - 2 No

No

Roller Compactor - 20T - 700 Dhs/No (1000 m2/No)

No

Unskilled Labour - 2 No

No

Charge Hand

No

Sweet water 5000 g- 10 g / m2

Trip

Compaction test - 200 Dhs/No (750 m2/Test)

No

Hand tool

item

Actual Cost

CART AWAY - 240 m3 - Upto 50 KM - Bulkage 1.25

M3 200

Mechanical Shovel 966

No

2 No - Dump Truck 35 T - 20 m3-6 trip/day

Trip

Unskilled Labour - 2 No

No

Charge Hand

No

Hand tool

item

Actual Cost

IMPORTED FILLING SAND - 200 m3

M3 200

Imported Filling Sand

No

Mechanical Shovel 966 - 2 No

No

Roller Compactor - 20T

No

Unskilled Labour - 2 No

No

Charge Hand

No

Sweet water 5000 g- 10 g / m2

Trip

Compaction test - 200 Dhs/No (750 m2/Test)

No

Actual Cost

Anti Termite Treatment

M2

Anti Termite Treatment - 3 Layer

m2

Actual Cost

Polythene sheet

M2

Polythene 1000 g (5.00 x 2.00 m = 100 m2 = 156 )

m2

lapping

m2

wastage

%

Labour - 300 M2/ Day

No

Actual Cost

Ruberized Bitumine Paint - 100 m2

M2 80

Bitumen(200L=500Dhs) => 100 m2 of 2 coats

200L

wastage - 10 % Misc./tools

item

Labour - 40 M2/ Per

No

Actual Cost

FOAM CONCRETE - 100 mm - (45 m2)

M3 10

Foam Concrete Subcontract

m2

OP Cement = (1 Bag / 1 m2) & ( 10 Bag/1 m3 )

m3

Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing- 1 hr/m3

No

Sweet water 5000 g- 15 g / m3

Trip

Hand Tools Actual Cost

FOAM CONCRETE - 100 mm - (45 m2)

M2 10

Foam Concrete Subcontract

m2

OP Cement = (1 Bag / 1 m2) & ( 10 Bag/1 m3 )

m3

Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing- 1 hr/m3

No

Sweet water 5000 g- 15 g / m3

Trip

Hand Tools Actual Cost

BLINDING CONCRETE - SRC - C20 - 50 mm THK - (500 m2) 50 mm thk

M2 30

Basic Cost - 5 % wastage

m3

Pump - 5 % wastage

m3

Temp.Control -5 % wastage

m3

Mason - 4 No

No

Unskilled Labour - 6 No

No

Charge Hand

No

Unskilled Labour - for Curing-

No

Carpenter -

No

Sweet water 5000 g- 15 g / m3

Trip

Hand Tools White wood - 0.28 m3 / 5 times ( + 10% wastage )

m3

Nail Actual Cost

BLINDING CONCRETE - SRC - C20 - 75 mm THK - (500 m2)

50 mm thk

M2

75 mm thk

40

Basic Cost - 5 % wastage

m3

Pump - 5 % wastage

m3

Temp.Control -5 % wastage

m3

Mason - 4 No Unskilled Labour - 6 No

No No

Charge Hand

No

Unskilled Labour - for Curing-

No

Carpenter -

No

Sweet water 5000 g- 15 g / m3

Trip

Hand Tools White wood - 0.28 m3 / 5 times ( + 10% wastage )

m3

Nail Actual Cost

BLINDING CONCRETE - SRC - C20 - 100 mm THK - (500 m2)

75 mm thk

M2 40

Basic Cost - 5 % wastage

m3

Pump - 5 % wastage

m3

Temp.Control -5 % wastage

m3

Mason - 4 No

No

Unskilled Labour - 6 No

No

Charge Hand

No

Unskilled Labour - for Curing-

No

Carpenter -

No

Sweet water 5000 g- 15 g / m3

Trip

Hand Tools

White wood - 0.28 m3 / 5 times ( + 10% wastage )

m3

Nail Actual Cost

BLINDING CONCRETE - SRC - C20 - 100 mm THK - (500 m2)

100 mm thk

M3 40

Basic Cost - 5 % wastage

m3

Pump - 5 % wastage

m3

Temp.Control -5 % wastage

m3

Mason - 4 No

No

Unskilled Labour - 6 No

No

Charge Hand

No

Unskilled Labour - for Curing-

No

Carpenter -

No

Sweet water 5000 g- 15 g / m3

Trip

Hand Tools White wood - 0.28 m3 / 5 times ( + 10% wastage )

m3

Nail Actual Cost

CONCRETE - OPC with GGBS - C40 - (200 m3)-SUBSTRUCTURE

100 mm thk

M3 160

Basic Cost - 2 % wastage

m3

Testing - 300 Dhs/ test x 2%

LS

Pump - 2 % wastage

m3

Temp.Control - 2 % wastage

m3

Mason - 8 No

No

Unskilled Labour - 16 No

No

Charge Hand - 2 No

No

Unskilled Labour - for Curing- 1 hr/m3

No

Carpenter - 2 No

No

Steel Fixer - 1 No

No

Sweet water 5000 g- 15 g / m3

Trip

Hand Tools Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs

No

Actual Cost

CONCRETE - OPC with GGBS - C50 - (200 m3)-SUBSTRUCTURE

M3 160

Basic Cost - 2 % wastage

m3

Testing - 300 Dhs/ test x 2%

LS

Pump - 2 % wastage

m3

Temp.Control - 2 % wastage

m3

Mason - 8 No

No

Unskilled Labour - 16 No

No

Charge Hand - 2 No

No

Unskilled Labour - for Curing- 1 hr/m3

No

Carpenter - 2 No

No

Steel Fixer - 1 No

No

Sweet water 5000 g- 15 g / m3

Trip

Hand Tools Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs

No

Actual Cost

CONCRETE - OPC with GGBS - C60 - (200 m3)-SUBSTRUCTURE

M3 160

Basic Cost - 2 % wastage

m3

Testing - 300 Dhs/ test x 2%

LS

Pump - 2 % wastage

m3

Temp.Control - 2 % wastage

m3

Mason - 8 No

No

Unskilled Labour - 16 No

No

Charge Hand - 2 No

No

Unskilled Labour - for Curing- 1 hr/m3

No

Carpenter - 2 No

No

Steel Fixer - 1 No

No

Sweet water 5000 g- 15 g / m3

Trip

Hand Tools Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs

No

Actual Cost

CONCRETE - OPC with GGBS - C40 - (200 m3)-SUPER-STRUCTURE

M3 160

Basic Cost - 2 % wastage

m3

Testing - 300 Dhs/ test x 2%

LS

Pump - 2 % wastage

m3

Temp.Control - 2 % wastage

m3

Mason - 8 No

No

Unskilled Labour - 16 No

No

Charge Hand - 2 No

No

Unskilled Labour - for Curing- 1 hr/m3

No

Carpenter - 2 No

No

Steel Fixer - 1 No

No

Sweet water 5000 g- 15 g / m3

Trip

Hand Tools Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs

No

Actual Cost

CONCRETE - OPC with GGBS - C50 - (200 m3)-SUPER-STRUCTURE

M3 160

Basic Cost - 2 % wastage

m3

Testing - 300 Dhs/ test x 2%

LS

Pump - 2 % wastage

m3

Temp.Control - 2 % wastage

m3

Mason - 8 No

No

Unskilled Labour - 16 No

No

Charge Hand - 2 No

No

Unskilled Labour - for Curing- 1 hr/m3

No

Carpenter - 2 No

No

Steel Fixer - 1 No

No

Sweet water 5000 g- 15 g / m3

Trip

Hand Tools Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs

No

Actual Cost

CONCRETE - OPC with GGBS - C60 - (200 m3)-SUPER-STRUCTURE

M3 160

Basic Cost - 2 % wastage

m3

Testing - 300 Dhs/ test x 2%

LS

Pump - 2 % wastage

m3

Temp.Control - 2 % wastage

m3

Mason - 8 No

No

Unskilled Labour - 16 No

No

Charge Hand - 2 No

No

Unskilled Labour - for Curing- 1 hr/m3

No

Carpenter - 2 No

No

Steel Fixer - 1 No

No

Sweet water 5000 g- 15 g / m3

Trip

Hand Tools Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs Actual Cost

No

FORMWORK ( Substructure ) - 100 m2

M2 100

Material Price( Usage 3 Times)

m2

White wood ( Usage 3 times )

m3

Nail - 32Dhs/ (6kg - Carton), 0.194 kg/ m2

m2

Wastage 5%

(Carp - 2 No+Help - 1 no) - Gang - 6 Nos (Incl Deshutter)

No

Unskilled Labour - 4 No

No

Charge Hand - 1 No

No

Waste Oil

m2

Hand Tool support scaffolding - 15Dhs / m2

m2

Actual Cost

FORMWORK ( Superstructure ) - 100 m2

M2 100

Material Price( Usage 3 Times)

m2

White wood ( Usage 3 times )

m3

Nail - 32 Dhs/ (6kg - Carton), 0.194 kg/ m2

m2

Wastage 5% Waste Oil

(Carp - 2 No+Help - 1 no) - 1 Gang - 7 Nos (Incl Deshutter)

m2

No

Unskilled Labour - 5 No

No

Charge Hand - 1 No

No

Hand Tool support scaffolding - 15Dhs / m2

m2

Actual Cost

REINFORCEMENT ( EMIRATES)

TONNE

Basic Cost ( Cut & Bent )

T

20 Gauge - Binding Wire- 25 kg/Ton

Kg

Steel Fixer - 3 No

No

Unskilled Labour - 3 No

No

Charge Hand - 1 No

No

Wastage 0% Actual Cost

Epoxy coat 650 QRs/T REINFORCEMENT ( EMIRATES)

Kg

Basic Cost ( Cut & Bent )

Kg

20 Gauge - Binding Wire- 25 kg/Ton

Kg

Steel Fixer - 3 No

No

Unskilled Labour - 3 No

No

Charge Hand - 1 No

No

Wastage 0% Actual Cost

Epoxy coat 650 QRs/T

SCREED CONCRETE - SRC - C20 - 75 mm THK - (500 m2)

M2

75 mm thk

40

Basic Cost - 5 % wastage

m3

Pump - 5 % wastage

m3

Temp.Control -5 % wastage

m3

Mason - 4 No

No

Unskilled Labour - 6 No

No

Charge Hand

No

Unskilled Labour - for Curing-

No

Carpenter -

No

Sweet water 5000 g- 15 g / m3

Trip

Hand Tools White wood - 0.28 m3 / 5 times ( + 10% wastage )

m3

Nail Actual Cost

WATER TANK, HOLDING TANK Concrete

75 mm thk

m3 m3

Formwork

m2

Reinforcement

kg

Actual Cost

SWIMMING POOL

m3 Concrete

m3

Formwork

m2

Reinforcement

kg

Actual Cost

PILE CAP

m3 Concrete

m3

Formwork

m2

Reinforcement

kg

Actual Cost

ISOLATED FOOTING

m3 Concrete

m3

Formwork

m2

Reinforcement

kg

Actual Cost

RAFT FOUNDATION

m3 Concrete

m3

Formwork

m2

Reinforcement

kg

Actual Cost

NECK

m3

COLUMN

Concrete

m3

Formwork

m2

Reinforcement

kg

Actual Cost

m3

COLUMN

Concrete

m3

Formwork

m2

Reinforcement

kg

Actual Cost

TIE BEAM

m3 Concrete

m3

Formwork

m2

Reinforcement

kg

Actual Cost

ROOF BEAM

m3 Concrete

m3

Formwork

m2

Reinforcement

kg

Actual Cost

COREWALL ( SUBSTRUCTURE )

m3

Concrete

m3

Formwork

m2

Reinforcement

kg

Actual Cost

COREWALL ( SUPER-STRUCTURE )

m3

Concrete

m3

Formwork

m2

Reinforcement

kg

Actual Cost

RETAINING WALL

m3 Concrete

m3

Formwork ( One Side )

m2

Reinforcement

kg

Actual Cost

STIFFNER COLUMN , COPPING BEAM

m3

Concrete

m3

Formwork

m2

Reinforcement

kg

Actual Cost

SLAB, RAMP - 200 mm thk

m3 Concrete

m3

Formwork

m2

Reinforcement

kg

Actual Cost

SLAB, RAMP - 200 mm thk

m2 Concrete

m3

Formwork

m2

Reinforcement

kg

Actual Cost

SLAB, RAMP - 320 mm thk

m2 Concrete

m3

Formwork

m2

Reinforcement

kg

Actual Cost

SLAB, RAMP - 420 mm thk

m2 Concrete

m3

Formwork

m2

Reinforcement

kg

Actual Cost

STAIRCASE

m3

Concrete

m3

Formwork

m2

Reinforcement

kg

Actual Cost

PARAPET - 150 mm thk

m3

Concrete

m3

Formwork

m2

Reinforcement

kg

Actual Cost

SILL

M

Concrete

m3

Formwork

m2

Reinforcement

kg

Actual Cost

LINTEL ( m3 )

m3

Concrete

m3

Formwork

m2

Reinforcement

kg

Actual Cost

LINTEL ( m )

M Concrete

m3

Formwork

m2

Reinforcement

kg

Actual Cost

A/C EQUIPMENT BASE CONCRETE Concrete

m3

m3

Formwork

m2

Reinforcement

kg

Actual Cost

265 mm thk HOLLOW CORE SLAB

m2

Hollow Core Slab Concrete

m

A393 BRC Mesh

Times

Formwork

m2

Actual Cost

300 mm thk HOLLOW CORE SLAB

m2

Hollow Core Slab Concrete

m

A393 BRC Mesh

Times

Formwork

m2

Actual Cost

320 mm thk HOLLOW CORE SLAB

m2

Hollow Core Slab Concrete

m

A393 BRC Mesh

Times

Formwork

m2

Actual Cost

500 mm thk HOLLOW CORE SLAB

m2

Hollow Core Slab Concrete

m

A393 BRC Mesh

Times

Formwork

m2

Actual Cost

200 mm Grade Slab With A 393 Mesh ( m3 )

m3

Concrete

m

A393 BRC Mesh

Times

Formwork

m2

Flexel Board Actual Cost

200 mm Grade Slab With A 393 Mesh ( m2 )

m2

Concrete

m

A393 BRC Mesh

Times

Formwork

m2

Flexel Board Actual Cost

150 mm Grade Slab With A 393 Mesh

m3

Concrete

m

A393 BRC Mesh

Times

Formwork

m2

Flexel Board Actual Cost

150 mm Grade Slab With A 393 Mesh

m2

Concrete

m

A393 BRC Mesh

Times

Formwork

m2

Flexel Board Actual Cost

120 mm Grade Slab With A 252 Mesh

m3

Concrete

m

A252 BRC Mesh

Times

Formwork

m2

Flexel Board Actual Cost

120 mm Grade Slab With A 252 Mesh

m2

Concrete

m

A252 BRC Mesh

Times

Formwork

m2

Flexel Board Actual Cost

100 mm Grade Slab With A 393 Mesh

m3

Concrete

m

A393 BRC Mesh

Times

Formwork

m2

Flexel Board Actual Cost

100 mm Grade Slab With A 252 Mesh

m2

Concrete

m

A393 BRC Mesh

Times

Formwork

m2

Flexel Board Actual Cost

200 mm POST TENSION SLAB

m3

Concrete

m2

Formwork

m2

Reinforcement

kg

Slab Post Tensioning - 40 / m2 Grouting 10 % of concrete Actual Cost

230 mm POST TENSION SLAB

m2

Concrete

m2

Formwork

m2

Reinforcement

kg

Slab Post Tensioning - 40 / m2 Grouting 10 % of concrete Actual Cost

250 mm POST TENSION SLAB

m3

Concrete

m2

Formwork

m2

Reinforcement

kg

Slab Post Tensioning - 40 / m2

Grouting 10 % of concrete Actual Cost

270 mm POST TENSION SLAB

m2

Concrete

m2

Formwork

m2

Reinforcement

kg

Slab Post Tensioning - 40 / m2 Grouting 10 % of concrete Actual Cost

280 mm POST TENSION SLAB

m3

Concrete

m2

Formwork

m2

Reinforcement

kg

Slab Post Tensioning - 40 / m2 Grouting 10 % of concrete Actual Cost

300 mm POST TENSION SLAB

m3

Concrete

m2

Formwork

m2

Reinforcement

kg

Slab Post Tensioning - 40 / m2 Grouting 10 % of concrete Actual Cost

320 mm POST TENSION SLAB

m3

Concrete

m2

Formwork

m2

Reinforcement

kg

Slab Post Tensioning - 40 / m2 Grouting 10 % of concrete

Actual Cost

POST TENSION

m3

( BEAM )

Concrete

m3

Formwork

m2

Reinforcement

kg

Slab Post Tensioning - 350 / m3 Grouting 10 % of concrete Actual Cost

100 mm DECKING SLAB With A 142 Mesh

M2

Concrete

m2

A393 BRC Mesh

kg

Actual Cost

M2

BRC Mesh 142 ( 230 m2)

230 Cost of materials 4.8*2.4=11.52

m2

Over laps

%

cover block , binding wires

item

Steel Fixer

No

Unskilled Labour

No

Actual Cost

M2

BRC Mesh 193 (230 m2)

230 Cost of materials 4.8*2.4=11.52

m2

Over laps

%

cover block , binding wires

item

Steel Fixer

No

Unskilled Labour

No

Actual Cost

M2

BRC Mesh 252 (230 m2)

230 Cost of materials 4.8*2.4=11.52

m2

Over laps

%

cover block , binding wires

item

Steel Fixer

No

Unskilled Labour

No

Actual Cost

M2

BRC Mesh 393 (230 m2 )

230 Cost of materials 4.8*2.4=11.52

m2

Over laps

%

cover block , binding wires

item

Steel Fixer

No

Unskilled Labour

No

Actual Cost

M2

SOLID BLOCK - 100 mm - 8 m2

8 Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

SOLID BLOCK - 150 mm - 8 m2

M2 8

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

SOLID BLOCK - 200 mm - 8 m2

M2 8

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

SOLID BLOCK - 250 mm - 8 m2

M2 8

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

SOLID BLOCK - 300 mm - 8 m2

M2 8

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

SOLID BLOCK - 100 mm - 8 m2 ( 1 Hr Fire Rated )

M2 8

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

SOLID BLOCK - 150 mm - 8 m2 ( 1 Hr Fire Rated )

M2 8

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

SOLID BLOCK - 200 mm - 8 m2 ( 1 Hr Fire Rated )

M2 8

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

SOLID BLOCK - 250 mm - 8 m2 ( 1 Hr Fire Rated )

M2 8

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

SOLID BLOCK - 300 mm - 8 m2 ( 1 Hr Fire Rated )

M2 8

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc…

Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

SOLID BLOCK - 100 mm - 8 m2 ( 2 Hr Fire Rated )

M2 8

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

SOLID BLOCK - 150 mm - 8 m2 ( 2 Hr Fire Rated )

M2 8

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

SOLID BLOCK - 200 mm - 8 m2 ( 2 Hr Fire Rated )

M2 8

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

HOLLOW BLOCK - 350 mm - 10 m2

M2 10

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

HOLLOW BLOCK - 300 mm - 10 m2

M2 10

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

HOLLOW BLOCK - 250 mm - 10 m2

M2 10

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

HOLLOW BLOCK - 200 mm - 10 m2

M2 10

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

HOLLOW BLOCK - 150 mm - 10 m2

M2

10 Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

HOLLOW BLOCK - 100 mm - 11 m2

M2 9

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

DOUBLE SKIN HOLLOW BLOCK with 50 mm Insulation 100+50+100 mm - 11 m2

M2 11

50 mm Insulation 100 mm Hollow Block 100 mm Hollow Block Actual Cost

HOLLOW BLOCK - 350 mm - 10 m2 ( 1 Hr Fire Rated )

M2

9 Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

HOLLOW BLOCK - 300 mm - 10 m2 ( 1 Hr Fire Rated )

M2 10

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

HOLLOW BLOCK - 250 mm - 10 m2 ( 1 Hr Fire Rated )

M2 10

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

HOLLOW BLOCK - 200 mm - 10 m2 ( 1 Hr Fire Rated )

M2 10

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

HOLLOW BLOCK - 150 mm - 10 m2

(1 Hr Fire Rated )

M2 10

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

HOLLOW BLOCK - 100 mm - 11 m2 (1 Hr Fire Rated )

M2 11

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

HOLLOW BLOCK - 350 mm - 10 m2 ( 2 Hr Fire Rated )

M2 10

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

HOLLOW BLOCK - 300 mm - 10 m2 ( 2 Hr Fire Rated )

M2 10

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

HOLLOW BLOCK - 250 mm - 10 m2 ( 2 Hr Fire Rated )

M2 10

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

HOLLOW BLOCK - 200 mm - 10 m2 ( 2 Hr Fire Rated )

M2 10

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

HOLLOW BLOCK - 150 mm - 10 m2

(2 Hr Fire Rated )

M2 10

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc…

Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

HOLLOW BLOCK - 100 mm - 11 m2 ( 2 Hr Fire Rated )

M2 11

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

INSULATED BLOCK - 200mm - 6 m2

M2 8

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

INSULATED BLOCK - 250mm - 6 m2

M2 8

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

INSULATED BLOCK - 300mm - 6 m2

M2 8

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

INSULATED BLOCK -300mm - 6 m2(2 Hrs Fire Rated)

M2 8

Blocks + 5 % Wastage

No.

Cement

Bags

Sand

Cu.M

wastage Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Sweet water 5000 g - 20 g / m2

Trip

Hand Tools Actual Cost

THERMALITE AAC BLOCK - 100mm - 8 m2

M2 8

Blocks + 5 % Wastage (150 Dhs/m3 )

No.

AAC Mortor - 0.35kg x 40kg/m3

Bags

wastage Sweet water 5000 g - 20 g / m2

Trip

Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

AAC Block Set Tools - 260 Dhs/50m2

m2

Actual Cost

THERMALITE AAC BLOCK - 150mm - 8 m2

M2 8

Blocks + 5 % Wastage (150 Dhs/m3 )

No.

AAC Mortor - 0.35kg x 40kg/m3

Bags

wastage Sweet water 5000 g - 20 g / m2

Trip

Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

AAC Block Set Tools - 260 Dhs/50m2

m2

Actual Cost

THERMALITE AAC BLOCK - 200mm - 8 m2

M2 8

Blocks + 5 % Wastage (150 Dhs/m3 )

No.

AAC Mortor - 0.35kg x 40kg/m3

Bags

wastage Sweet water 5000 g - 20 g / m2

Trip

Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

AAC Block Set Tools - 260 Dhs/50m2

m2

Actual Cost

THERMALITE AAC BLOCK - 250mm - 8 m2

M2 8

Blocks + 5 % Wastage (150 Dhs/m3 )

No.

AAC Mortor - 0.35kg x 40kg/m3

Bags

wastage Sweet water 5000 g - 20 g / m2

Trip

Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

AAC Block Set Tools - 260 Dhs/50m2

m2

Actual Cost

THERMALITE AAC BLOCK - 300mm - 8 m2

M2 8

Blocks + 5 % Wastage (150 Dhs/m3 )

No.

AAC Mortor - 0.35kg x 40kg/m3

Bags

wastage Sweet water 5000 g - 20 g / m2

Trip

Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

AAC Block Set Tools - 260 Dhs/50m2

m2

Actual Cost

THERMALITE AAC BLOCK - 350mm - 8 m2

M2 8

Blocks + 5 % Wastage (150 Dhs/m3 )

No.

AAC Mortor - 0.35kg x 40kg/m3

Bags

wastage Sweet water 5000 g - 20 g / m2

Trip

Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

AAC Block Set Tools - 260 Dhs/50m2

m2

Actual Cost

THERMALITE AAC BLOCK - 100mm - 8 m2 ( 1 Hr Fire rated )

M2 8

Blocks + 5 % Wastage (150 Dhs/m3 )

No.

AAC Mortor - 0.35kg x 40kg/m3

Bags

wastage Sweet water 5000 g - 20 g / m2

Trip

Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

AAC Block Set Tools - 260 Dhs/50m2

m2

Actual Cost

THERMALITE AAC BLOCK - 150mm - 8 m2 ( 1 Hr Fire rated )

M2 8

Blocks + 5 % Wastage (150 Dhs/m3 )

No.

AAC Mortor - 0.35kg x 40kg/m3

Bags

wastage Sweet water 5000 g - 20 g / m2

Trip

Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

AAC Block Set Tools - 260 Dhs/50m2

m2

Actual Cost

THERMALITE AAC BLOCK - 200mm - 8 m2 ( 1 Hr Fire rated )

M2 8

Blocks + 5 % Wastage (150 Dhs/m3 )

No.

AAC Mortor - 0.35kg x 40kg/m3

Bags

wastage Sweet water 5000 g - 20 g / m2

Trip

Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

AAC Block Set Tools - 260 Dhs/50m2

m2

Actual Cost

THERMALITE AAC BLOCK - 250mm - 8 m2 ( 1 Hr Fire rated )

M2 8

Blocks + 5 % Wastage (150 Dhs/m3 )

No.

AAC Mortor - 0.35kg x 40kg/m3

Bags

wastage Sweet water 5000 g - 20 g / m2

Trip

Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

AAC Block Set Tools - 260 Dhs/50m2

m2

Actual Cost

THERMALITE AAC BLOCK - 300mm - 8 m2 ( 1 Hr Fire rated )

M2 8

Blocks + 5 % Wastage (150 Dhs/m3 )

No.

AAC Mortor - 0.35kg x 40kg/m3

Bags

wastage

Sweet water 5000 g - 20 g / m2

Trip

Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

AAC Block Set Tools - 260 Dhs/50m2

m2

Actual Cost

THERMALITE AAC BLOCK - 350mm - 8 m2 ( 1 Hr Fire rated )

M2 8

Blocks + 5 % Wastage (150 Dhs/m3 )

No.

AAC Mortor - 0.35kg x 40kg/m3

Bags

wastage Sweet water 5000 g - 20 g / m2

Trip

Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

AAC Block Set Tools - 260 Dhs/50m2

m2

Actual Cost

THERMALITE AAC BLOCK - 100mm - 8 m2 ( 2 Hr Fire rated )

M2 8

Blocks + 5 % Wastage (150 Dhs/m3 )

No.

AAC Mortor - 0.35kg x 40kg/m3

Bags

wastage Sweet water 5000 g - 20 g / m2

Trip

Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

AAC Block Set Tools - 260 Dhs/50m2

m2

Actual Cost

THERMALITE AAC BLOCK - 150mm - 8 m2 ( 2 Hr Fire rated )

M2 8

Blocks + 5 % Wastage (150 Dhs/m3 )

No.

AAC Mortor - 0.35kg x 40kg/m3

Bags

wastage Sweet water 5000 g - 20 g / m2

Trip

Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

AAC Block Set Tools - 260 Dhs/50m2

m2

Actual Cost

THERMALITE AAC BLOCK - 200mm - 8 m2 ( 2 Hr Fire rated )

M2 8

Blocks + 5 % Wastage (150 Dhs/m3 )

No.

AAC Mortor - 0.35kg x 40kg/m3

Bags

wastage Sweet water 5000 g - 20 g / m2

Trip

Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

AAC Block Set Tools - 260 Dhs/50m2

m2

Actual Cost

THERMALITE AAC BLOCK - 250mm - 8 m2 ( 2 Hr Fire rated )

M2 8

Blocks + 5 % Wastage (150 Dhs/m3 )

No.

AAC Mortor - 0.35kg x 40kg/m3

Bags

wastage Sweet water 5000 g - 20 g / m2

Trip

Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

AAC Block Set Tools - 260 Dhs/50m2

m2

Actual Cost

THERMALITE AAC BLOCK - 300mm - 8 m2 ( 2 Hr Fire rated )

M2 8

Blocks + 5 % Wastage (150 Dhs/m3 )

No.

AAC Mortor - 0.35kg x 40kg/m3

Bags

wastage Sweet water 5000 g - 20 g / m2

Trip

Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

AAC Block Set Tools - 260 Dhs/50m2

m2

Actual Cost

THERMALITE AAC BLOCK - 350mm - 8 m2 ( 2 Hr Fire rated )

M2 8

Blocks + 5 % Wastage (150 Dhs/m3 )

No.

AAC Mortor - 0.35kg x 40kg/m3

Bags

wastage Sweet water 5000 g - 20 g / m2

Trip

Accessories ,Mesh etc… Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

AAC Block Set Tools - 260 Dhs/50m2

m2

Actual Cost

15 mm INTERNAL PLASTER - 17 m2

M2 17

Cement

Bags

White washed Sand

Cu.M

wastage

Sweet water 5000 g - 25 g / m2

Trip

Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Hand Tools Scaffolding Accessories Actual Cost

20 mm INTERNAL PLASTER - 17 m2

M2 17

Cement

Bags

White washed Sand

Cu.M

wastage Sweet water 5000 g - 25 g / m2

Trip

Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Hand Tools Scaffolding Accessories Actual Cost

15 mm INTERNAL PLASTER - 17 m2 (Above 6 m Height)

M2 16

Cement

Bags

White washed Sand

Cu.M

wastage Sweet water 5000 g - 25 g / m2

Trip

Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Hand Tools Scaffolding Accessories Actual Cost

20 mm INTERNAL PLASTER - 16 m2 ( Above 6 m Height)

M2 16

Cement

Bags

White washed Sand

Cu.M

wastage Sweet water 5000 g - 25 g / m2

Trip

Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Hand Tools Scaffolding Accessories Actual Cost

25 mm EXTERNAL PLASTER - 17 m2

M2 16

Cement

Bags

White washed Sand

Cu.M

wastage Sweet water 5000 g - 25 g / m2

Trip

Mason

No

Unskilled Labour

No

Charge Hand

No

Unskilled Labour - for Curing

No

Hand Tools Scaffolding Accessories Actual Cost

SCREED RMC CONCRETE - OPC - C20 - 150 mm THK - (400 m2)

M2

150 mm thk

40

Basic Cost - 5 % wastage

m3

Pump - 5 % wastage

m3

Temp.Control -5 % wastage

m3

Mason - 4 No

No

Unskilled Labour - 6 No

No

Charge Hand

No

Unskilled Labour - for Curing-

No

Carpenter -

No

Sweet water 5000 g- 15 g / m3

Trip

Hand Tools White wood - 0.28 m3 / 5 times ( + 10% wastage )

m3

Nail Actual Cost

SCREED RMC CONCRETE - OPC - C20 - 100 mm THK - (400 m2)

M2

M2

100 mm thk

40

Basic Cost - 5 % wastage

m3

Pump - 5 % wastage

m3

Temp.Control -5 % wastage

m3

Mason - 4 No

No

Unskilled Labour - 6 No

No

Charge Hand

No

Unskilled Labour - for Curing-

No

Carpenter -

No

Sweet water 5000 g- 15 g / m3

Trip

Hand Tools White wood - 0.28 m3 / 5 times ( + 10% wastage )

m3

Nail Actual Cost

SCREED RMC CONCRETE - OPC - C20 - 90 mm THK - (400 m2)

M2

M2

90 mm thk

40

Basic Cost - 5 % wastage

m3

Pump - 5 % wastage

m3

Temp.Control -5 % wastage

m3

Mason - 4 No

No

Unskilled Labour - 6 No

No

Charge Hand

No

Unskilled Labour - for Curing-

No

Carpenter -

No

Sweet water 5000 g- 15 g / m3

Trip

Hand Tools White wood - 0.28 m3 / 5 times ( + 10% wastage )

m3

Nail Actual Cost

M2

SCREED RMC CONCRETE - OPC - C20 - 75 mm THK - (400 m2)

M2

75 mm thk

40

Basic Cost - 5 % wastage

m3

Pump - 5 % wastage

m3

Temp.Control -5 % wastage

m3

Mason - 4 No

No

Unskilled Labour - 6 No

No

Charge Hand

No

Unskilled Labour - for Curing-

No

Carpenter -

No

Sweet water 5000 g- 15 g / m3

Trip

Hand Tools White wood - 0.28 m3 / 5 times ( + 10% wastage )

m3

Nail Actual Cost

SCREED RMC CONCRETE - OPC - C20 - 50 mm THK - (400 m2)

M2

M2

50 mm thk

40

Basic Cost - 5 % wastage

m3

Pump - 5 % wastage

m3

Temp.Control -5 % wastage

m3

Mason - 4 No

No

Unskilled Labour - 6 No

No

Charge Hand

No

Unskilled Labour - for Curing-

No

Carpenter -

No

Sweet water 5000 g- 15 g / m3

Trip

Hand Tools White wood - 0.28 m3 / 5 times ( + 10% wastage )

m3

Nail Actual Cost

SCREED RMC CONCRETE - OPC - C20 - 40 mm THK - (400 m2)

M2

M2

40 mm thk

40

Basic Cost - 5 % wastage

m3

Pump - 5 % wastage

m3

Temp.Control -5 % wastage

m3

Mason - 4 No

No

Unskilled Labour - 6 No

No

Charge Hand

No

Unskilled Labour - for Curing-

No

Carpenter -

No

Sweet water 5000 g- 15 g / m3

Trip

Hand Tools White wood - 0.28 m3 / 5 times ( + 10% wastage )

m3

Nail Actual Cost

SCREED RMC CONCRETE - OPC - C20 - 25 mm THK - (400 m2)

M2

M2

25 mm thk

40

Basic Cost - 5 % wastage

m3

Pump - 5 % wastage

m3

Temp.Control -5 % wastage

m3

Mason - 4 No

No

Unskilled Labour - 6 No

No

Charge Hand

No

Unskilled Labour - for Curing-

No

Carpenter -

No

Sweet water 5000 g- 15 g / m3

Trip

Hand Tools White wood - 0.28 m3 / 5 times ( + 10% wastage )

m3

Nail Actual Cost

MOSAIC TILES

M2

M2 12 3 Times Polising Misc./Tools Cement Fix Sweet Water Mason

No

Unskilled Labour

No

Charge Hand

No

Actual Cost

CERAMIC / PORCELAIN FLOOR

M2 12 Misc./Tools

Cement Fix + Grout Sweet Water Mason

No

Unskilled Labour

No

Charge Hand

No

Actual Cost

CERAMIC / PORCELAIN FLOOR ( Epoxy Coat )

M2 12

Misc./Tools Epoxy Coat - 110 QR / 18 Litre ( 3 kg/ m2 ) Cement Fix + Grout Sweet Water Mason

No

Unskilled Labour

No

Charge Hand

No

Actual Cost

GRANITE / MARBLE for floor

M2 10

Cement Fix + Grout

m2

Seal Coating for Granite / Marble

m2

Sweet Water Misc./tools/Accessories

m2

Mason

No

Unskilled Labour

No

Charge Hand

No

Actual Cost

GRANITE / MARBLE for floor ( Epoxy Coat )

M2 10

Epoxy Coat - 110 QR / 18 Litre ( 3 kg/ m2 ) Seal Coating for Granite / Marble

m2

Sweet Water Misc./tools/Accessories

LS

Mason

No

Unskilled Labour

No

Charge Hand

No

Actual Cost

CERAMIC / PORCELAIN

FLOOR

CERAMIC FLOOORING

m2

Screed Fixing Adhesive + Labour Charges

CERAMIC FLOOORING

m2

Screed Fixing Adhesive + Labour Charges

PORCELAIN

m2

Screed Fixing Adhesive + Labour Charges

GRANITE / MARBLE

m2

Screed Fixing Adhesive + Labour Charges

SLOPED ROOF CLAY TILE

m2

Plaster Screed Fixing Adhesive + Labour Charges

PORCELAIN

m2

Screed Fixing Adhesive + Labour Charges

GRANITE TREAD & RISER Screed Fixing Adhesive + Labour Charges

m2

MOSAIC

m2

Screed Fixing Adhesive + Labour Charges

MOSAIC TREAD & RISER

m2

Screed Fixing Adhesive + Labour Charges

THRESHOLD - 250 mm

m2

Screed Fixing Adhesive + Labour Charges

THRESHOLD - 100 mm

m2

Fixing Adhesive + Labour Charges

THRESHOLD - 130 mm

m2

Fixing Adhesive + Labour Charges

THRESHOLD - 265 mm

m2

Fixing Adhesive + Labour Charges

CERAMIC WALL

TILES

M2 12 Misc./tools/scaffolding Glue Fix + Grout Sweet Water Mason

No

Unskilled Labour

No

Charge Hand

No

Actual Cost

Granite for walls (wet Fix )

M2

7 Glue

Ls

Seal Coating for Granite / Marble

m2

Sweet Water Misc./tools/scaffolding

LS

Mason

No

Unskilled Labour

No

Charge Hand

No

Actual Cost

Granite for walls (wet Fix - with Epoxy Coat )

M2 7

Epoxy Coat - 110 QR / 18 Litre ( 3 kg/ m2 ) Glue

LS

Seal Coating for Granite / Marble

m2

Sweet Water Misc./tools/scaffolding

LS

Mason

No

Unskilled Labour

No

Charge Hand

No

Actual Cost

STONE / GRANITE FOR WALL (MECH FIX )

M2 6.5

Stainless Steel Fixure for wall tiles

No

Seal Coating for Granite / Marble

m2

Misc./tools/scaffolding

LS

Mason

No

Unskilled Labour

No

Charge Hand

No

Actual Cost

CERAMIC / PORCELAIN

WALL CERAMIC WALL

m2

Plaster Fixing Adhesive + Laying Charges

PORCELAIN / CERAMIC WALL Plaster Fixing Adhesive + Laying Charges

m2

INTERNAL GRANITE / MARBLE WALL

m2

Plaster Fixing Adhesive + Laying Charges

CERAMIC WALL

m2

Plaster Fixing Adhesive + Laying Charges

EXTERNAL GRANITE / MARBLE WALL

m2

Plaster Bitumen Paint Fixing Adhesive + Laying Charges

EXTERNAL STONE CLADDING

m2

Plaster Bitumen Paint Fixing Adhesive + Laying Charges

10 cm High - Ceramic / Porcelain Skirting - 30 m/day

M 30

FIXING - Mortar - Cement

Bags

Sand

Cu.M

wastage Sweet Water Hand Tool Glue Fix + Grout Mason

No

Unskilled Labour

No

Charge Hand

No

Actual Cost 15 cm High - Ceramic / Porcelain Skirting - 30 m/day

M 25

FIXING - Mortar - Cement

Bags

Sand

Cu.M

wastage Sweet Water Hand Tool Glue Fix + Grout Mason

No

Unskilled Labour

No

Charge Hand

No

Actual Cost Mosaic Skirting - 30 m/day

M 30 Morter - Cement

Bags

Sand

Cu.M

wastage Sweet Water Hand Tool Glue Fix + Grout Mason

No

Unskilled Labour

No

Charge Hand

No

Actual Cost

Granite/Marble Skirting - 30 m/day

M 30

Granite / Marble PC Rate-50 Dhs/m

m

Morter - Cement

Bags

Sand

Cu.M

wastage Sweet Water Hand Tool Glue Fix + Grout Mason

No

Unskilled Labour

No

Charge Hand

No

Edging chages Actual Cost

CERAMIC / PORCELAIN

SKIRTING ( 30 m / Day )

10 cm High - PORCELAIN SKIRTING

m

Fixing Adhesive + Laying Charges

10 cm High - TERRAZO SKIRTING

m

Fixing Adhesive + Laying Charges

10 cm High - WOODEN SKIRTING

m

Fixing Adhesive + Laying Charges

10 cm High - CERAMIC

SKIRTING

m

Fixing Adhesive + Laying Charges

10 cm High - GRANITE

SKIRTING

m

Fixing Adhesive + Laying Charges

10 cm High - GRANITE

SKIRTING

m

Fixing Adhesive + Laying Charges

10 cm High - MOSAIC

SKIRTING

m

Fixing Adhesive + Laying Charges

Ceramic Steps - 8 m / Day

M 8

Ceramic Tile PC Rate-30 Dhs/m

m

Screed - 0.75 m2 / 2 Glue Fix + Grout Sweet Water Misc./tools/Accessories

No

Mason

No

Unskilled Labour

No

Charge Hand

No

Actual Cost

Mosaic Steps

M 10 Mosaic Tile PC Rate- 25 Dhs/m

m

Screed - 0.75 m2 / 2 Glue Fix + Grout Sweet Water Misc./tools/Accessories

No

Mason

No

Unskilled Labour

No

Charge Hand

No

Actual Cost

Granite/Marble Steps

M 8

Granite / Marble PC Rate- 150 Dhs/m

m

Screed - 0.75 m2 / 2 Glue Fix + Grout Sweet Water Misc./tools/Accessories

No

Mason

No

Unskilled Labour

No

Charge Hand

No

Actual Cost

CEMENT TILES ( ROOF )

M2 17

Mosaic Tile PC Rate- 25 Dhs/m2 Screed

m2

Misc./Tools Cement Fix Sweet Water Mason

No

Unskilled Labour

No

Charge Hand

No

Actual Cost

CEMENT TILES SKIRTING - 30 m/day ( ROOF )

M 30

Mosaic Tile PC Rate- 10 Dhs/m Morter - Cement

Bags

Sand

Cu.M

wastage Sweet Water Hand Tool Glue Fix + Grout

m

Mason

No

Unskilled Labour

No

Charge Hand

No

Actual Cost

Interlock paving 80 mm - 30 m2

M2 25

compaction & prepration of base

m2

Interlock supply price - 42 Dhs /m2

m2

roadbase 250 mm

m3

compaction of road base

m3

Sweet water 5000 g- 10 g / m2 Sand 50 mm

m3

wastage 5%

%

Mason

No

Unskilled Labour

No

Charge Hand

No

Actual Cost

Interlock paving 60 mm - 30 m2

M2 25

compaction & prepration of base

m2

Interlock supply price - 37 Dhs /m2

m2

roadbase 150 mm

m3

compaction of road base

m3

Sweet water 5000 g- 10 g / m2 Sand 50 mm

m3

wastage 5%

%

Mason

No

Unskilled Labour

No

Charge Hand

No

Actual Cost

Roadbase for Large Area - 250 m3

M3 250

Material cost with Bulkage

m3

Mechanical Shovel 966 - 2 No

m3

Roller Compactor - 20T

m2

compaction test for road base-500 m2/test-75 Dhs

m2

Unskilled Labour - 10 No

No

Charge Hand

No

Sweet water 5000 g- 10 g / m2

Trip

Actual Cost

Roadbase for Footing / Small Area - 40 m3

M3 40

Material cost with Bulkage

m3

Mechanical Shovel 966

m3

Roller Compactor - 20T

m2

Baby Roller 1.5 T

m2

compaction test for road base-500 m2/test-75Dhs

m2

Unskilled Labour - 10 No

No

Charge Hand

No

Sweet water 5000 g- 10 g / m2

Trip

Actual Cost

IMPORTED FILLING SAND - 150 m3

M3 150

Imported Filling Sand + Bulkage

m3

Mechanical Shovel 966 - 1 No

m3

Roller Compactor - 20T

m2

Unskilled Labour

No

Charge Hand

No

Sweet water 5000 g- 10 g / m2

G

Compaction test - 200 Dhs/No (750 m2/Test)

No

Actual Cost

Kerb stone - 10 m 10 kerbstone Price - 27 Dhs / m - ( 914 xx300 x 150 )mm

m

Excavation

m3

compaction of road base

m2

wastage 5%

%

Mason

No

Unskilled Labour

No

Charge Hand

No

concrete Hunching

m3

Sweet water 5000 g- 10 g / m2

G

Actual Cost

ASPHALT ROAD Granular Fill - 150 mm

m2

Bitumen Prime Coat

m2

70 mm Asphalt Base Course

m2

Bitumen Tack Coat

m2

40 mm Asphalt Wearing Course

m2

Actual Cost

SUBCONTRACTING WORK FALSE CEILING Gypsum False ceiling

m2

Decorative Gypsum False ceiling

m2

60 x 60 cm Gypsum Tile False ceiling

m2

Gypsum Bulk Head

m

Gypsum Cove

m

Gypsum Cornice

m

Plain Aluminium Perforated

False ceiling

Aluminium

False ceiling

m2 m2

10 cm Gypsum Partition

m2

Emulsion Paint

m2

External Epoxy Paint

m2

External Acrylic Based Paint

m2

Polyurethene Anti carbonate

m2

Enamel Paint

m2

Floor Epoxy Paint

m2

Floor Hardner

m2

Floor Sealer

m2

Membrane 4 mm SBS

m2

Membrane 4 mm APP

m2

3 mm GRP Lining

m2

6 mm GRP Lining

m2

PAINTING

WATERPROOFING

METAL WORKS Aluminium

Cladding

Aluminium Composite Cladding

m2 m2

POST TENSION SLAB & BEAM S no

Description POST TECH

Unit

Slab Post Tensioning - 80 / m2

m2

Grouting 10 % of concrete ( 5623 m3 x 10% x 1000 )/ Area

m2

Beam Post Tensioning - 350 / m3

m3

Grouting 10 % of concrete ( 10% x 1000 )/ Area

m3

Post Post Post Post

m2

Tensioning Tensioning Tensioning Tensioning

Slab & beams Formwork ( 90+35 ) concrete for Slab & beams Slab Reinforcement Beam Reinforcement

m3 Kg Kg

Su

Main contractor overhead & Pro

Grand

SHORING (Seacant Pile) S no

Description

No

Total length=145 rm Total amount as per the Stromek Add O H & profit-15% Concrete- C40 ( Dia 70 cm )

238

steel

1

Guide beam

1

excavation for the same

1

Capping beam

1

B.W.- 10 % Main contractor overhead & Profit -15%

Guniting Description

Unit

Guniting

m2

B.W - 5% Shotcrete

m3

Reinf - mesh A393

m2

Diesel-5 pumps @ 7 gall per day

gall

Cleaning

m2

scaffolding

m2

Su

Main contractor overhead & Pro

Grand

Guniting

145

Description

Unit

Guniting

m2

B.W - 5% Shotcrete

m3

Reinf - mesh A393

m2

Diesel-5 pumps @ 7 gall per day

gall

Cleaning

m2

scaffolding

m2

Phonix Engineering & M

Amount - AED 3470 per Day Productivity - 15 to 20 m3 per day

Su

Main contractor overhead & Pro

Grand

Dewatering-12 month -365 Days Description

S no

Unit

Dewatering system as per the ETA quotation-SRS/DEW/QUT/840-R1/09 Mobilisation , Installation Including technician ,Diesel, Oil and commisioning

Lumsum

Installation of complete system Hire charges

Day

Hire charges for the diesel generators

Day

Diesel-5 pumps @ 7 gall per day

gall

Bore hole Mobilization No

Sacrificed pumps Diesel Associated civil & builders works - Aggregate , Inject water , Make Trench , civil works , Cranage ,wateranalysis,testing and making installation of dewatering system complete(approximately 10% of above)

Su

Main contractor overhead & Pro

Grand

Dewatering- 4 month -120 Days Description

S no

Unit

Dewatering system as per the ETA quotation-SRS/DEW/QUT/840-R1/09 Mobilisation , Installation Including technician ,Diesel, Oil and commisioning Installation of complete system Hire charges

Lumsum

Hire charges for the diesel generators Diesel-5 pumps @ 7 gall per day Bore hole Mobilization Sacrificed pumps Diesel Days

Daily Maintenance Builders work Associated civil & builders works - Aggregate , Inject water , Make Trench , civil works , Cranage ,wateranalysis,testing and making installation of dewatering system complete(approximately 10% of above)

Su

Main contractor overhead & Pro

Grand

MANHOLE

SIZE - 1.20 X 1.20 X1.4 Description

MANHOLE

Unit

SIZE - 1.20 X 1.20 X1.4

Excavation

1

Cart Away

1

Back Filling Polythene Sheet

1

Blinding Concrete

1

20 cm thk

1

Block work

Plaster

1 1

Man Hole Cover 60 x 60 cm Dia - 850 / no+ 300 Membrane

1 1

GULLY TRAP

SIZE - 0.30 X 0.30 X1.00 Description

GULLY TRAP Excavation

Unit

SIZE - 0.30 X 0.30 X1.00 1

Cart Away

1

Back Filling Polythene Sheet

1

Blinding Concrete

1

20 cm thk

1

Block work

Plaster

1 1

Man Hole Cover 60 x 60 cm Dia - 300 / no+ 50 Membrane

1 1

DUCTED PVC PIPE

SIZE - 0.50 X 0.30 Description

DUCTED PVC PIPE

Unit

SIZE - 0.50 X 0.30

Excavation

1

Cart Away

1

Back Filling Polythene Sheet

1

Blinding Concrete & Shuttering

1

Boundary Wall Footing, Beam

Nos.

Boundary Wall Footing

6

Column

7

Tie Beam

1

Coumn

7

Coping Beam

1

Total =

Description

Unit

Excavation ( 5.0 x 4.0 x 2.80 ) m

6

Cart Away

Back Filling

Road Base Below Footing

6

20 cm thk Block Work

1

Plaster

2

Epoxy paint

2

H BEAM SHORING for 6 m Depth , 315 m Length Sl No

1 2 3 4 5 6

Description

Qty

Mobilisation

1 1 115

Builders Work

H Beam Installation H Beam Prices

Concrete Panel Supply- 4 m Depth Concrete Panel Installation

460 5 Total

Add Overhead & Profit 15% Total

Item

Amount

LIST FOR ALL THE MATERIALS Description

Unit

1

Concrete OPC 250; Grade 20/20 SRC 250; Grade 20/20 OPC 400; Grade 40/20 SRC 400; Grade 40/20 OPC 420 ; Grade 50/20 SRC 420 ; Grade 50/20

Pump Charges Temperature Control Screed Concrete

m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

Steel Reinforcement Qatari Straight Qatari Cut & Bend

MT MT

BRC Mesh - Size ( 4.80 m x 2.40 m ) A 142 = ( 93QR / 11.52 m2 ) A193 = ( 130 QR / 11.52 m2 ) A252 = ( 159 QR / 11.52 m2 ) A393 = ( 225 QR / 11.52 m2 )

m2 m2 m2 m2

Solid Blocks - 10.5 - 15 N/ mm2 100mm 150mm 200mm 250mm 300mm

No. No. No. No. No.

OPC 420Kg; Grade C40/20 (45% OPC + 55% GGBS) OPC 400Kg; Grade C40/20 (70%OPC + 30% GGBS) OPC 400Kg; Grade C40/20 (45%OPC + 55% GGBS + WP) SRC 420Kg; Grade C40/20 (45%OPC + 55% GGBS + WP)

2

3

4

5

6

Hollow Blocks - 7 N/ mm2 100mm 150mm 200mm 250mm 300mm 350mm 200mm - SRC Note - 1, 2 Hours Fire Rated 10% & 20% QR More Hourdy Blocks 150mm 200mm

No. No. No. No. No. No. No.

No. No.

7

8

9

10

11

250mm 300mm 350mm

No. No. No.

Insulated Blocks 200mm 250mm 300mm 350mm

No. No. No. No.

Interlock 60mm (Grey) ( Lime Stone ) 60mm ( Red ) 60mm (Block) 60mm ( Yellow )

m2 m2 m2 m2

80mm (Grey) 80mm ( Red ) 80mm (Block) 80mm ( Yellow )

m2 m2 m2 m2

60mm (Grey) ( Gabbro Aggregate ) 60mm ( Red ) 60mm (Block) 60mm ( Yellow )

m2 m2 m2 m2

80mm (Grey) 80mm ( Red ) 80mm (Block) 80mm ( Yellow )

m2 m2 m2 m2

Kerb Stones (Heel) Kerb Stones (915 x 300 x 150 ) mm Heel Kerb Stones (915 x 300 x 100 ) mm

m m

Cement OPC GGBS SRC GGBS Sand Black Washed Sand White Washed Sand Interlock Sand Sweet Sand Dune Sand Filling Sand

Bags Bags

m3 m3 m3 m3 m3 m3

12

13

14

15

Shuttering Materials 4mm commercial plywood ( 2.40 m x 1.20 m ) 6mm commercial plywood ( 2.40 m x 1.20 m ) 12mm commercial plywood ( 2.40 m x 1.20 m ) 18mm marine ply wood ( 2.40 m x 1.20 m ) White Wood

No. No. No. No. m3

Road Base Road Base ( Natural ) Road Base ( Crushed )

m3 m3

Polythene Sheet 1200G Polythene Sheet ( 50.00 x 2.00 ) 1000G Polythene Sheet ( 50.00 x 2.00 ) 500G Polythene Sheet ( 50.00 x 2.00 ) Flexcell Sheel ( 2.40 m x 1.20 m ) 12mm 18mm 25mm

100 m2 100 m2 100 m2

No. No. No.

16

Bitumen Paint Bituthene 8000 HC Membrane 4 mm SBS Membrane 4 mm APP Roof Anti Root Membrane Protection Board - 3 mm thk Protection Board - 6 mm thk (1 *2 m - 48 QR / 2 m2 )

17

Tiles Adhesive Tiles Adhesive - 42 QR / 25 kg - ( 2 kg / m2 ) Tile Grouting - 69 QR / 25 kg - (1 kg / 4 m2 )

Bag Bag

Painting Internal Emulsion External Epoxy

m2 m2

18

19

200 lts m2 m2 m2 m2 m2 m2

Asphalt Road Granular Fill - 150 mm Bitumen Prime Coat 70 mm Asphalt Base Course Bitumen Tack Coat

m2 m2 m2 m2

20 21 22

40 mm Asphalt Wearing Course

m2

Extruded Polystrene 50 mm thk - 2.00x 1.00 = 25 QR Cast Iron Manhole Cover - India Wooden Nail 4 mm Membrane ( 1.00 x 10.00 = 10 m2 = 125 QR )

m2 No m2

Qty

Rate/Day

Rate ( Dhs ) LABOUR

MATERIAL

PLANT

SUBCONTRACT

10 12 15 Qty

Rate/Day

15

1

900

6.00

6.00

500

850

1.70

1.70

2

90.00

1.20

1.20

0.4

135.00

0.36

0.36

1

0.89

1.00

90

5.00

5

15.3

6.6

8.33

Qty

Rate/Day

1.00

0.0

7.7

21

2

900

12.00

12.00

500

850

1.70

1.70

2

90.00

1.20

1.20

0.4

135.00

0.36

0.36

1

0.89

1.00

90

5.00

5

21.3

6.6

8.33

Qty

Rate/Day

1.00

0.0

13.7

1.0

46

1

900

18.00

18.00

1

1000

20.00

20.00 1.70

850

1.70

2

90.00

3.60

3.60

0.4

135.00

1.08

1.08

1

0.89

1.00

1

0.50

0.50

500

1.0

45.9

1.00 0.50

4.7

0.0

40.2

1.0

Qty

Rate/Day

22

2

900

9.00

9.00

1

850

4.25

4.25

2

90.00

0.90

0.90

0.4

135.00

0.27

0.27

1.5

550.00

4.13

3

200.00

3.00

1

0.50

0.50

22.0

4.13 3.00 0.50

1.2

4.1

13.8

3.0

21 1

900

5.63

5.63

1

2,000.00

12.50

12.50

4

90.00

2.25

2.25

0.4

135.00

0.34

0.34

1

0.50

0.50

21.2

Qty

Rate/Day

0.50

2.6

0.0

18.6

55

1

33

33.00

2

900

9.00

9.00

1

850

4.25

4.25

2

90.00

0.90

0.90

1

135.00

0.23

0.23

7500

0.12

4.50

200.00

3.00

3

54.9

Qty 1

Rate 2.5

0.0

33.00

4.50 3.00

1.1

37.5

13.3

3.0

4.00 4 4.0

4.00 0.0

0.0

2.55

Qty

Rate

1

1.56

1.56

1.56

0.2

1.56

0.312

0.31

0.0

4.0

5%

1.56

0.078

2

90.00

0.60

0.60

2.6

0.6

0.08

2.0

Qty

Rate

12

1

500

6.25

6.25

0.63

0.63

1

20

0.50

5

90.00

4.50

4.50

11.9

4.5

6.9

0.0

0.0

0.0

0.0

0 Qty

Rate/Day

10

10

100

0.1

15

157.5

1

90

9.00

9.00

1.5

90.00

13.50

13.50

1

135.00

2.25

2.25

1

10.00

1.00

1.00

15

0.1

1.50

285.3 100.00 157.50

1.50

0.5

285.3

Qty

Rate/Day

0.50

25.8

159.0

0.5

100.0

28.5

m3 10

10

100

0.1

15

157.5

1

90

9.00

9.00

1.5

90.00

13.50

13.50

1

135.00

2.25

2.25

1

10.00

1.00

1.00

15

0.1

1.50

100.00 157.50

1.50

0.5

28.5

Qty m3

Rate/Day

19.7

0.50

2.6

15.9

0.1

10.0

1.05

220

231

231.00

1.05

15

15.75

15.75

1.05

15

15.75

15.75

4

108.00

14.40

14.40

6

90.00

18.00

18.00

1

135.00

3.00

3.00

0.1

90.00

0.30

0.30

2

108.00

4.32

4.32

15

0.12

1.80

1.80

0.50 0.056

850

Qty

Rate/Day

0.50

52.36

52.36

0.50

0.50

19.7

50 mm thk

Temp.Control -5 % wastage

2.2

17.4

0.028

0.0

29.5

m3 1.05

220

231

231.00

1.05

15

15.75

15.75

1.05

15

15.75

15.75

4 6

108.00 90.00

10.80 13.50

10.80 13.50

1

135.00

2.25

2.25

0.1

90.00

0.23

0.23

2

108.00

4.32

4.32

15

0.12

1.80

1.80

0.50 0.056

850

52.36

52.36

0.50

0.50

29.5

75 mm thk

Qty

Rate/Day

0.50

2.6

26.8

0.042

34.9

m3 1.05

220

231

231.00

1.05

15

15.75

15.75

1.05

15

15.75

15.75

4

108.00

10.80

10.80

6

90.00

13.50

13.50

1

135.00

2.25

2.25

0.1

90.00

0.23

0.23

2

108.00

4.32

4.32

15

0.12

1.80 0.50

1.80 0.50

0.0

0.056

850

52.36

52.36

0.50

0.50

34.9

100 mm thk

Qty

Rate/Day

3.1

31.7

0.1

0.0

0.0

0.0

348

m3 1.05

220

231

231.00

1.05

15

15.75

15.75

1.05

15

15.75

15.75

4

108.00

10.80

10.80

6

90.00

13.50

13.50

1

135.00

2.25

2.25

0.1

90.00

0.23

0.23

2

108.00

4.32

4.32

15

0.12

1.80

1.80

0.056

850

52.36

52.36

0.50

0.50

348.3

100 mm thk

31.1

317.2

310

Qty

Rate/Day

1.02

245

249.9

249.90

2%

300

6.00

6.00

1.02

15

15.3

15.30

1.02

15

15.3

15.30

8

108.00

5.40

5.40

16

90.00

9.00

9.00

2

135.00

3.15

3.15

0.1

10.00

1.00

1.00

2

108.00

1.35

1.35

1

108.00

0.68

0.68

15

0.1

1.50

1.50

0.50 3

65

1.22

310.3

Qty

Rate/Day

0.50

322

1.22

20.6

288.0

1.7

0.0

1.02

256

261.12

261.12

2%

300

6.00

6.00

1.02

15

15.3

15.30

1.02

15

15.3

15.30

108.00

5.40

5.40

16

90.00

9.00

9.00

2

135.00

3.15

3.15

0.1

10.00

1.00

1.00

2

108.00

1.35

1.35

1

108.00

0.68

0.68

15

0.1

1.50

8

3

65

1.50

0.50

0.50

1.22

1.22

321.5

20.6

299.2

Rate/Day

1.02

268

273.36

273.36

2%

300

6.00

6.00

1.02

15

15.3

15.30 15.30

15

15.3

8

108.00

5.40

5.40

16

90.00

9.00

9.00

2

135.00

3.15

3.15

0.1

10.00

1.00

1.00

2

108.00

1.35

1.35

1

108.00

0.68

0.68

15

0.1

1.50

3

65

0.0

334

Qty

1.02

1.7

1.50

0.50

0.50

1.22

1.22

333.8

20.6

311.5

310

Qty

Rate/Day

1.02

245

249.9

249.90

2%

300

6.00

6.00

1.02

15

15.3

15.30

1.02

15

15.3

15.30

8

108.00

5.40

5.40

16

90.00

9.00

9.00

2

135.00

3.15

3.15

0.1

10.00

1.00

1.00

1.7

0.0

2

108.00

1.35

1.35

1

108.00

0.68

0.68

15

0.1

1.50

1.50

0.50 3

65

0.50

1.22

310.3

1.22

20.6

288.0

Rate/Day

1.02

250

255

255.00

2%

300

6.00

6.00

1.02

15

15.3

15.30

1.02

15

15.3

15.30

8

108.00

5.40

5.40

16

90.00

9.00

9.00

2

135.00

3.15

3.15

0.1

10.00

1.00

1.00

2

108.00

1.35

1.35

1

108.00

0.68

0.68

15

0.1

1.50

3

65

1.50

0.50

0.50

1.22

315.4

1.22

20.6

293.1

Rate/Day

1.02

266

271.32

271.32

2%

300

6.00

6.00

1.02

15

15.3

15.30

1.02

15

15.3

15.30

108.00

5.40

5.40

9.00

9.00

3.15

3.15

1.00

1.00

2 0.1

90.00 135.00 10.00

2

108.00

1.35

1.35

1

108.00

0.68

0.68

15

0.1

1.50

65

0.0

1.50

0.50 3

1.7

332

Qty

16

0.0

315

Qty

8

1.7

0.50

1.22

331.7

1.22

20.6

309.4

1.7

0.0

53

Qty

Rate

2.88

90.00

10.42

10.42

0.035

850.00

9.92

9.92

0.194

5.33

1.03

1.03

1.02

1.02

7

5

2

306.00

90.00

108.00

2.5

1.00

0.00

15.00

21.42

21.42

4.50

4.50

2.16

2.16

0.40

0.40

2.00

2.00

0.00

52.9

0.00

28.1

22.8

Rate

2.88

90.00

10.42

10.42

0.035

850.00

9.92

9.92

0.194

5.33

1.03

1.03

1.02

1.02

0.40

0.40

2.5

7 5 1.33

1.00 306.00 90.00 135.00

21.42

21.42

4.50

4.50

1.80

1.80

2.00 1.00

15.00

10.00

.

62.5

2.00 10.00

27.7

22.8

3,116 1 25

5.20

0.0

63

Qty

100.00

2.0

2500

2500.00

130.00

130.00

2.0

10.0

4

108.00

432.00

432.00

0

90.00

0.00

0.00

1

135.00

54.00

54.00

0.00

3116.0

486.0

2630.0

0.0

0.0

0.0

0.0

3.12 1

2500

2500.00 130.00

25

5.20

130.00

4

108.00

432.00

432.00

0

90.00

0.00

0.00

1

135.00

54.00

54.00

0.00

3.12

Qty

Rate/Day

0.5

2.6

26.4

m3 1.05

200

210

210.00

1.05

10

10.5

10.50

1.05

10

10.5

10.50

108.00

5.40

5.40

13.50

13.50

2.25

2.25

0.23

0.23 4.32

2 6 1 0.1

90.00 135.00 90.00

2

108.00

4.32

15

0.12

1.80

1.80

0.50 0.056

850

52.36

52.36

0.50

0.50

26.4

75 mm thk

1

0.50

2.2

24.2

0.042

0.0

20.0

288.0

1.7

0.0

6.5

130.0

148.1

13.0

0.0

100

75.0

263.0

0.0

0.0

225.0

699.1

14.7

0.0

1

20.0

288.0

1.7

0.0

3

130.0

68.4

6.0

0.0

100

75.0

263.0

0.0

0.0

225.0

619.4

7.7

0.0

16.275

20.0

288.0

1.7

0.0

1.50

42.1

34.2

3.0

0.0

80

38.9

210.4

0.0

0.0

101.0

532.6

4.7

0.0

1

20.0

288.0

1.7

0.0

2

56.2

45.6

4.0

0.0

938.8

852.1

638.3

80

38.9

210.4

0.0

0.0

115.0

544.0

5.7

0.0

1

20.0

288.0

1.7

0.0

0.25

7.0

5.7

0.5

0.0

110

53.5

289.3

0.0

0.0

80.5

583.0

2.2

0.0

1.001

20.0

299.2

1.7

0.0

7.722

56.2

175.9

15.4

0.0

250

75.0

657.5

0.0

0.0

151.2

1132.7

17.2

0.0

664.7

665.7

1301.0

1.001

20.0

293.1

1.7

0.0

7.722

130.0

175.9

15.4

77.2

200

75.0

526.0

0.0

0.0

225.0

995.0

17.2

77.2

1.00625

20.0

288.0

1.7

0.0

8.05

56.2

183.4

16.1

0.0

175

75.0

460.3

0.0

0.0

151.2

931.7

17.8

0.0

20.0

288.0

1.7

0.0

8.05

130.0

183.4

16.1

80.5

175

75.0

460.3

0.0

0.0

225.0

931.7

17.8

80.5

1.00

20.0

299.2

1.7

0.0

8

130.0

182.3

16.0

0.0

1314.4

1100.6

1.00625

1.01

1255.0

275

75.0

723.3

0.0

0.0

225.0

1204.7

17.7

0.0

1.00

20.0

293.1

1.7

0.0

8

130.0

182.3

16.0

80.0

225

75.0

591.8

0.0

0.0

225.0

1067.1

17.7

80.0

1

20.0

288.0

1.7

0.0

4

130.0

182.3

16.0

0.0

1447.5

1389.8

175

75.0

460.3

0.0

0.0

225.0

930.5

17.7

0.0

1

20.0

288.0

1.7

0.0

10

130.0

227.8

20.0

100.0

140

75.0

394.5

0.0

0.0

225.0

910.3

21.7

100.0

1

20.0

288.0

1.7

0.0

5

130.0

113.9

10.0

50.0

110

75.0

315.6

0.0

0.0

225.0

717.5

11.7

50.0

1

20.0

288.0

1.7

0.0

5

130.0

113.9

10.0

50.0

110

75.0

315.6

0.0

0.0

45.0

143.5

2.3

10.0

1.04

20.0

288.0

1.7

0.0

3.125

130.0

71.2

6.3

31.3

110

75.0

315.6

0.0

0.0

72.0

215.9

2.6

10.0

1

20.0

288.0

1.7

0.0

2.38

130.0

54.2

4.8

23.8

110

75.0

315.6

0.0

0.0

94.5

276.4

2.7

10.0

1173.2

1257.1

1004.2

200.8

300.5

383.7

1

20.0

288.0

1.7

0.0

6

130.0

136.7

12.0

60.0

110

75.0

315.6

0.0

0.0

225.0

740.3

13.7

60.0

1.005

20.0

288.0

1.7

0.0

10.44

130.0

305.3

26.8

104.4

80

75.0

210.4

0.0

0.0

225.0

803.7

28.5

104.4

1.005

20.0

288.0

1.7

0.0

12

337.0

273.4

24.0

120.0

100

48.6

263.0

0.0

0.0

6.8

13.7

0.4

2.0

1

20.0

288.0

1.7

0.0

12.5

351.0

284.8

25.0

125.0

1039.0

1161.6

22.9

90

43.7

236.7

0.0

0.0

414.7

809.5

26.7

125.0

1

20.0

288.0

1.7

0.0

12.5

351.0

284.8

25.0

125.0

90

43.7

236.7

0.0

0.0

20.7

40.5

1.3

6.3

20.0

288.0

1.7

0.0

1376.0

68.8

1

2

56.2

45.6

4.0

20.0

15

7.3

39.5

0.0

0.0

83.5

373.0

5.7

20.0

12.5

1.7

24.0

0.1

0.0

1

1.7

25.8

0.0

0.0

0.1

2.8

2.3

0.2

6.2

52.1

0.3

482.2

170

228.6

170.0

177 12.5

1.7

24.0

0.1

0.0

1

1.7

25.8

0.0

0.0

0.1

2.8

2.3

0.2

6.2

52.1

0.3

12.5

1.7

24.0

0.1

0.0

1

1.7

25.8

0.0

0.0

0.1

2.8

2.3

0.2

6.2

52.1

0.3

235.6

177.0

180

238.6

180.0

300 12.5

1.7

24.0

0.1

0.0

1

1.7

25.8

0.0

0.0

0.1

2.8

2.3

0.2

6.2

52.1

0.3

300.0

1

20.0

288.0

1.7

0.0

5

8.6

129.1

0.0

0.0

1

28.1

22.8

2.0

0.0

20.0

35.0

76.7

474.9

3.7

0.0

358.6

555.3

1

20.0

288.0

1.7

0.0

5

8.6

129.1

0.0

0.0

1

28.1

22.8

2.0

0.0

20.0

35.0

15.3

95.0

0.7

0.0

1

20.0

288.0

1.7

0.0

7

12.1

180.8

0.0

0.0

1

28.1

22.8

2.0

0.0

20.0

35.0

80.1

526.6

3.7

0.0

1

20.0

288.0

1.7

0.0

7

12.1

180.8

0.0

0.0

1

28.1

22.8

2.0

0.0

20.0

35.0

12.0

78.9

0.6

0.0

1

20.0

288.0

1.7

0.0

10

17.2

188.4

0.0

0.0

1

28.1

22.8

2.0

0.0

20.0

35.0

85.3

534.2

3.7

0.0

1

20.0

288.0

1.7

0.0

10

17.2

188.4

0.0

0.0

1

28.1

22.8

2.0

0.0

20.0

35.0

10.2

64.1

0.4

0.0

111.1

610.4

91.5

623.2

74.8

1

20.0

288.0

1.7

0.0

10

17.2

258.3

0.0

0.0

1

28.1

22.8

2.0

0.0

20.0

35.0

8.5

60.4

0.4

0.0

1

20.0

288.0

1.7

0.0

10

17.2

188.4

0.0

0.0

1

28.1

22.8

2.0

0.0

20.0

35.0

17.1

106.8

0.7

0.0

5.00

20.0

288.0

1.7

0.0

5.10

143.2

116.2

10.2

51.0

60

29.2

157.8

0.0

0.0

69.3

124.6

48.5

242.5 2.0

28.8

0.2

0.0

38.9

118.2

2.4

58.7

4.35

20.0

288.0

1.7

0.0

4.45

124.9

101.3

8.9

44.5

60

29.2

157.8

0.0

0.0

218.2

48.5

210.9 2.0

28.8

0.2

0.0

40.5

132.5

2.5

58.7

4.00

20.0

288.0

1.7

0.0

4.10

115.1

93.4

8.2

41.0

60

29.2

157.8

0.0

0.0

234.2

48.5

194.0

2.0

28.8

0.2

0.0

41.6

142.0

2.5

58.8

3.70

20.0

288.0

1.7

0.0

3.80

106.8

86.7

7.6

38.0

60

29.2

157.8

0.0

0.0

244.8

48.5

179.6 2.0

28.8

0.2

0.0

42.7

151.5

2.6

58.8

3.57

20.0

288.0

1.7

0.0

3.67

103.1

83.7

7.3

36.7

75

36.5

197.3

0.0

0.0

255.5

48.5

173.2 2.0

28.8

0.2

0.0

45.2

167.4

2.6

58.8

3.33

20.0

288.0

1.7

0.0

3.43

96.4

78.2

6.9

34.3

75

36.5

197.3

0.0

0.0

274.0

48.5

161.7 2.0

28.8

0.2

0.0

46.5

177.7

2.6

58.8

3.13

20.0

288.0

1.7

50.0

3.23

90.6

73.5

6.5

32.3

75

36.5

197.3

0.0

0.0

285.6

48.5

151.6 2.0

28.8

0.2

5.0

314.8

47.7

188.0

2.7

1.00

20.0

288.0

1.7

0.0

5.00

130.0

113.9

10.0

50.0

100

75.0

263.0

0.0

0.0

350

350.0

1332.6

0.1

49.6 Qty 11.52

Rate

13.57

93.00

8.07 1.78 2.00 0.94 0.78 13.6

22%

1

1

2

108.00

2

90.00

Qty 11.52

Rate

17.49

130.00

11.28 2.48 2.00 0.94 0.78 17.5

22%

1

1

2

108.00

2

90.00

Qty 11.52 22%

76.4

Rate

20.56

159.00

13.80 3.04

2.0

28.8

0.2

0.0

227.0

693.7

11.9

400.0

2.1

28.8

0.2

5.0

1.7

11.8

0.0

0.0

3.8

40.6

0.2

5.0

0.0

0.0

0.0

0.0

8.07 1.78 2.00 0.94 0.78

1.7

11.8

11.28 2.48 2.00 0.94 0.78

1.7

15.8

13.80 3.04

1

1

2

108.00

2

90.00

Qty 11.52

2.00 0.94 0.78 20.6

Rate

27.55

225.00

19.53 4.30 2.00 0.94 0.78 27.5

22%

1

1

2

108.00

2

90.00

2.00 0.94 0.78

1.7

18.8

0.0

0.0

0.0

0.0

19.53 4.30 2.00 0.94 0.78

1.7

25.8

75 Rate 12.5

2.70

35.44

35.44

0.3

13.00

3.90

3.90

0.0225

60.00

1.35

1.35

0.26

0.26

5%

2.50

2.50

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

0.1

10.00

1.00

1.00

20

0.1

2.00

2.00

1.00

75.0

1.00

30.0

45.5

80 Rate 12.5

2.90

38.06

38.06

0.375

13.00

4.88

4.88

0.039

60.00

2.34

2.34

0.36

0.36

5%

2.50

2.50

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1

10.00

1.0

0.0

20

0.1

2.00

2.00

1.00

79.7

1.00

30.0

50.1

1.0

0.0

84 Rate 12.5

3.10

40.69

40.69

0.5

13.00

6.50

6.50

0.045

60.00

2.70

2.70

0.46

0.46

2.50

2.50

5% 1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

84.4

1.00

30.0

54.8

1.0

0.0

101 Rate 12.5

4.10

53.81

53.81

0.675

13.00

8.78

8.78

0.062

60.00

3.72

3.72

0.62

0.62

2.50

2.50

5% 1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

101.0

1.00

30.0

71.4

121 Rate 12.5

5.50

72.19

72.19

0.8

13.00

10.40

10.40

1.0

0.0

0.0675

60.00

5%

4.05

4.05

0.72

0.72

2.50

2.50

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

121.4

1.00

30.0

91.9

1.0

0.0

79 Rate 12.5

2.97

38.98

38.98

0.3

13.00

3.90

3.90

0.0225

60.00

1.35

1.35

0.26

0.26

2.50

2.50

5% 1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

78.6

1.00

30.0

49.0

1.0

0.0

84 Rate 12.5

3.19

41.87

41.87

0.375

13.00

4.88

4.88

0.04

60.00

2.40

2.40

0.36

0.36

2.50

2.50

5% 1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

83.6

1.00

30.0

54.0

1.0

0.0

88 Rate 12.5

3.41

44.76

44.76

0.5

13.00

6.50

6.50

0.045

60.00

2.70

2.70

0.46

0.46

2.50

2.50

5% 1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

88.5

1.00

30.0

58.9

1.0

0.0

106 Rate 12.5

4.51

59.19

59.19

0.675

13.00

8.78

8.78

0.062

60.00

3.72

3.72

0.62

0.62

2.50

2.50

5% 1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

106.4

1.00

30.0

76.8

129 Rate 12.5

6.05

79.41

79.41

0.8

13.00

10.40

10.40

0.0675

60.00

4.05

4.05

0.72

0.72

3.00

3.00

5%

1.0

0.0

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

129.1

1.00

30.0

99.6

1.0

0.0

82 Rate 12.5

3.24

42.53

42.53

0.3

13.00

3.90

3.90

0.0225

60.00

1.35

1.35

0.26

0.26

2.50

2.50

5% 1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

82.1

1.00

30.0

52.5

1.0

0.0

87 Rate 12.5

3.48

45.68

45.68

0.375

13.00

4.88

4.88

0.039

60.00

2.34

2.34

0.36

0.36

2.50

2.50

5% 1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

87.3

1.00

30.0

57.8

1.0

0.0

93 Rate 12.5

3.72

48.83

48.83

0.5

13.00

6.50

6.50

0.045

60.00

2.70

2.70

0.46

0.46

5%

2.50

2.50

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

92.5

1.00

30.0

63.0

1.0

0.0

101 Rate 12.5

4.10

53.81

53.81

0.9

13.00

11.70

11.70

0.095

60.00

5.70

5.70

0.87

0.87

2.50

2.50

5% 1

108.00

10.80

10.80

1

90.00

9.00

9.00

1

135.00

2.25

2.25

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

100.6

1.00

30.0

76.6

92 Rate 12.5

3.60

47.25

47.25

0.8

13.00

10.40

10.40

0.084

60.00

5.04

5.04

0.77

0.77

2.50

2.50

5% 1

108.00

10.80

10.80

1

90.00

9.00

9.00

1.0

0.0

1 0.1 20

135.00 10.00 0.1

2.25

2.25

1.00

1.00

2.00

2.00

1.00

92.0

1.00

30.0

68.0

1.0

0.0

88 Rate 12.5

3.60

47.25

47.25

0.675

13.00

8.78

8.78

0.04

60.00

2.40

2.40

0.56

0.56

2.50

2.50

5% 108.00

10.80

10.80

1

90.00

9.00

9.00

1

135.00

2.25

2.25

1.00

1.00

1

0.1 20

10.00 0.1

2.00

2.00

1.00

87.5

1.00

30.0

63.5

1.0

0.0

70 Rate 12.5

2.40

31.50

31.50

0.5

13.00

6.50

6.50

0.055

60.00

3.30

3.30

0.49

0.49

2.50

2.50

5% 1

108.00

10.80

10.80

1

90.00

9.00

9.00

1

135.00

2.25

2.25

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

70.3

65

1.00

30.0

46.3

1.0

0.0

Rate 12.5

2.20

28.88

28.88

0.375

13.00

4.88

4.88

0.042

60.00

2.52

2.52

0.37

0.37

5%

2.50

2.50

1

108.00

10.80

10.80

1

90.00

9.00

9.00

1

135.00

2.25

2.25

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

65.2

1.00

30.0

41.1

1.0

0.0

63 Rate 12.5

2.00

26.25

26.25

0.3

13.00

3.90

3.90

0.0275

60.00

1.65

1.65

0.28

0.28

2.50

2.50

5% 1

108.00

12.00

12.00

1

90.00

10.00

10.00

1

135.00

2.50

2.50

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

63.1

1.00

30.0

36.6

1.0

0.0

160 Rate 25.00

25

67.58

30.0

36.6

1.0

0.0

67.58

30.0

36.6

1.0

0.0

160.2

60.0

98.2

2.0

0.0

108

Rate 12.5

4.51

59.19

59.19

0.9

13.00

11.70

11.70

0.095

60.00

5.70

5.70

0.87

0.87

5%

2.50

2.50

1

108.00

12.00

12.00

1

90.00

10.00

10.00

1

135.00

2.50

2.50

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

108.5

1.00

30.0

82.0

1.0

0.0

96 Rate 12.5

3.96

51.98

51.98

0.8

13.00

10.40

10.40

0.08

60.00

4.80

4.80

0.76

0.76

2.50

2.50

5% 1

108.00

10.80

10.80

1

90.00

9.00

9.00

1

135.00

2.25

2.25

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

96.5

1.00

30.0

72.4

88 Rate 12.5

3.52

46.20

46.20

0.675

13.00

8.78

8.78

0.06

60.00

3.60

3.60

0.62

0.62

2.50

2.50

5% 1

108.00

10.80

10.80

1

90.00

9.00

9.00

1

135.00

2.25

2.25

1.00

1.00

0.1

10.00

1.0

0.0

20

0.1

2.00

2.00

1.00

87.7

1.00

30.0

63.7

1.0

0.0

73 Rate 12.5

2.64

34.65

34.65

0.5

13.00

6.50

6.50

0.04

60.00

2.40

2.40

0.45

0.45

2.50

2.50

5% 1

108.00

10.80

10.80

1

90.00

9.00

9.00

1

135.00

2.25

2.25

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

72.5

1.00

30.0

48.5

1.0

0.0

68 Rate 12.5

2.42

31.76

31.76

0.375

13.00

4.88

4.88

0.042

60.00

2.52

2.52

0.37

0.37

2.50

2.50

5% 1

108.00

10.80

10.80

1

90.00

9.00

9.00

1

135.00

2.25

2.25

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

68.1

1.00

30.0

44.0

61 Rate 12.5

2.20

28.88

28.88

0.3

13.00

3.90

3.90

1.0

0.0

0.0275

60.00

5%

1.65

1.65

0.28

0.28

2.50

2.50

1

108.00

9.82

9.82

1

90.00

8.18

8.18

1

135.00

2.05

2.05

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

61.2

1.00

30.0

39.2

1.0

0.0

111 Rate 12.5

4.92

64.58

64.58

0.9

13.00

11.70

11.70

0.095

60.00

5.70

5.70

0.87

0.87

2.50

2.50

5% 1

108.00

10.80

10.80

1

90.00

9.00

9.00

1

135.00

2.25

2.25

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

111.4

1.00

30.0

87.3

1.0

0.0

101 Rate 12.5

4.32

56.70

56.70

0.8

13.00

10.40

10.40

0.084

60.00

5.04

5.04

0.77

0.77

2.50

2.50

5% 1

108.00

10.80

10.80

1

90.00

9.00

9.00

1

135.00

2.25

2.25

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

101.5

1.00

30.0

77.4

1.0

0.0

92 Rate 12.5

3.84

50.40

50.40

0.675

13.00

8.78

8.78

0.06

60.00

3.60

3.60

0.62

0.62

2.50

2.50

5% 1

108.00

10.80

10.80

1

90.00

9.00

9.00

1

135.00

2.25

2.25

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

91.9

1.00

30.0

67.9

1.0

0.0

76 Rate 12.5

2.88

37.80

37.80

0.5

13.00

6.50

6.50

0.04

60.00

2.40

2.40

0.45

0.45

2.50

2.50

5% 1

108.00

10.80

10.80

1

90.00

9.00

9.00

1

135.00

2.25

2.25

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

75.7

1.00

30.0

51.6

71 Rate 12.5

2.64

34.65

34.65

0.375

13.00

4.88

4.88

0.042

60.00

2.52

2.52

0.37

0.37

2.50

2.50

5%

1.0

0.0

1

108.00

10.80

10.80

1

90.00

9.00

9.00

1

135.00

2.25

2.25

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

71.0

1.00

30.0

46.9

1.0

0.0

64 Rate 12.5

2.40

31.50

31.50

0.3

13.00

3.90

3.90

0.0275

60.00

1.65

1.65

0.28

0.28

2.50

2.50

5% 1

108.00

9.82

9.82

1

90.00

8.18

8.18

1

135.00

2.05

2.05

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

63.9

1.00

30.0

41.8

1.0

0.0

102 Rate 12.5

4.50

59.06

59.06

0.41

13.00

5.33

5.33

0.045

60.00

2.70

2.70

0.40

0.40

2.50

2.50

5% 1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

101.6

1.00

30.0

72.0

1.0

0.0

113 Rate 12.5

5.20

68.25

68.25

0.515

13.00

6.70

6.70

0.062

60.00

3.72

3.72

0.52

0.52

5%

2.50

2.50

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

113.2

1.00

30.0

83.7

1.0

0.0

130 Rate 12.5

6.20

81.38

81.38

0.78

13.00

10.14

10.14

0.0675

60.00

4.05

4.05

0.71

0.71

2.50

2.50

5% 1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 20

10.00 0.1

2.00

2.00

1.00

130.3

1.00

30.0

100.8

147 Rate 12.5

7.44

97.65

97.65

0.78

13.00

10.14

10.14

0.0675

60.00

4.05

4.05

0.71

0.71

2.50

2.50

5% 1

108.00

13.50

13.50

1

90.00

11.25

11.25

1.0

0.0

1 0.1 20

135.00 10.00 0.1

2.81

2.81

1.00

1.00

2.00

2.00

1.00

146.6

1.00

30.0

117.0

1.0

0.0

57 Rate 1

15.00

15.75

15.75

0.2

13.00

2.60

2.60

0.13

0.13

2.00

2.00

2.50

2.50

5% 20

0.1 108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

1

0.1 50

10.00 260

5.20

56.7

5.20

30.0

23.0

5.2

0.0

65 Rate 1

22.49

23.61

23.61

0.2

13.00

2.60

2.60

0.13

0.13

2.00

2.00

2.50

2.50

5% 20

0.1

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 50

10.00 260

5.20

64.6

5.20

30.0

30.8

72 Rate 1

30.00

31.50

31.50

5.2

0.0

0.2

13.00

5% 20

0.1

2.60

2.60

0.13

0.13

2.00

2.00

2.50

2.50

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

1

0.1 50

10.00 260

5.20

72.5

5.20

30.0

38.7

5.2

0.0

82 Rate 1

37.50

39.38

39.38

0.3

13.00

3.90

3.90

0.20

0.20

2.00

2.00

2.50

2.50

5% 20

0.1

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 50

10.00 260

5.20

81.7

5.20

30.0

48.0

5.2

0.0

90 Rate 1

45.05

47.30

47.30

0.3

13.00

3.90

3.90

0.20

0.20

2.00

2.00

2.50

2.50

5% 20

0.1

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 50

10.00 260

5.20

89.7

5.20

30.0

55.9

5.2

0.0

97 Rate 1

52.45

55.07

55.07

0.3

13.00

3.90

3.90

0.20

0.20 2.00

5% 20

0.1

2.00

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

2.50

0.1 50

10.00 260

5.20

97.4

1.1

2.50

5.20

30.0

63.7

5.2

0.0

60 Rate

1

16.50

19.06

19.06

0.2

13.00

2.86

2.86

0.16

0.16

2.00

2.00

2.50

2.50

5% 20

0.1

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 50

10.00 260

5.20

60.3

1.1

5.20

30.0

26.6

70 Rate

1

24.74

28.57

28.57

0.2

13.00

2.86

2.86

0.16

0.16

2.00

2.00

2.50

2.50

5% 20

0.1

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

5.2

0.0

0.1 50

10.00 260

1.00

69.9

1.1

1.00

5.20

5.20

30.0

36.1

5.2

0.0

79 Rate

1

33.00

38.12

38.12

0.2

13.00

2.86

2.86

0.16

0.16

2.00

2.00

2.50

2.50

5% 20

0.1

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 50

10.00 260

5.20

79.4

1.1

5.20

30.0

45.6

5.2

0.0

90 Rate

1

41.25

47.64

47.64

0.3

13.00

4.29

4.29

0.24

0.24 2.00

5% 20

0.1

2.00

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

2.50

0.1 50

10.00 260

5.20

90.4

1.1

2.50

5.20

30.0

56.7

101 Rate

1

50.00

57.75

57.75

0.3

13.00

4.29

4.29

0.24

0.24

5%

5.2

0.0

20

0.1

2.00

2.00

2.50

2.50

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 50

10.00 260

5.20

100.5

1.1

5.20

30.0

66.8

5.2

0.0

109 Rate

1

57.69

66.63

66.63

0.3

13.00

4.29

4.29

0.24

0.24 2.00

5% 20

0.1

2.00

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

2.50

0.1 50

10.00 260

5.20

109.4

1.2

2.50

5.20

30.0

75.7

5.2

0.0

64 Rate

1

18.00

22.68

22.68

0.2

13.00

3.12

3.12

0.19

0.19

2.00

2.00

2.50

2.50

5% 20

0.1

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 50

10.00 260

5.20

64.2

5.20

30.0

30.5

5.2

0.0

1.2

76 Rate

1

26.99

34.00

34.00

0.2

13.00

3.12

3.12

0.19

0.19 2.00

5% 20

0.1

2.00

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

2.50

0.1 50

10.00 260

5.20

75.6

1.2

2.50

5.20

30.0

41.8

5.2

0.0

87 Rate

1

36.00

45.36

45.36

0.2

13.00

3.12

3.12

0.19

0.19

2.00

2.00

2.50

2.50

5% 20

0.1

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 50

10.00 260

5.20

86.9

1.2

5.20

30.0

53.2

100 Rate

1

45.00

56.70

56.70

0.3

13.00

4.68

4.68

0.28

0.28

2.00

2.00

2.50

2.50

5% 20

0.1

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

5.2

0.0

0.1 50

10.00 260

1.00

99.9

1.2

1.00

5.20

5.20

30.0

66.2

5.2

0.0

112 Rate

1

54.55

68.73

68.73

0.3

13.00

4.68

4.68

0.28

0.28

2.00

2.00

2.50

2.50

5% 20

0.1

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

0.1 50

10.00 260

5.20

112.0

1.2

5.20

30.0

78.2

5.2

0.0

123 Rate

1

62.94

79.30

79.30

0.3

13.00

4.68

4.68

0.28

0.28 2.00

5% 20

0.1

2.00

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

1.00

1.00

2.50

0.1 50

10.00 260

2.50

5.20

122.5

5.20

30.0

88.8

Qty

Rate

34

0.2

13.00

2.60

2.60

0.025

65.00

1.63

1.63

0.42

0.42

10%

5.2

0.0

25

0.1

2.50

1

108.00

6.35

6.35

1

90.00

5.29

5.29

1

135.00

1.59

1.59

1.00

1.00

0.1

10.00

2.50

0.10

0.10

2.00

2.00 0.00

34.2

25.0

7.1

Qty

Rate

36

0.25

13.00

3.25

3.25

0.035

65.00

2.28

2.28

0.55

0.55 2.50

10% 25

0.1

2.50

1

108.00

6.35

6.35

1

90.00

5.29

5.29

1

135.00

1.59

1.59

1.00

1.00

0.1

10.00

0.10

0.1

2.0

0.10

2.00

2.00 0.00

35.7

25.0

8.6

Qty

Rate

34

0.2

13.00

2.60

2.60

0.025

65.00

1.63

1.63

0.42

0.42 2.50

10% 25

0.1

2.50

1

108.00

6.75

6.75

1.5

90.00

8.44

8.44

1

135.00

1.69

1.69

1.00

1.00

0.1

10.00

0.10

0.1

2.0

0.10

2.00

2.00 0.00

34.2

25.0

7.1

0.1

2.0

Qty

Rate

36

0.25

13.00

3.25

3.25

0.035

65.00

2.28

2.28

0.55

0.55 2.50

10% 25

0.1

2.50

1

108.00

6.75

6.75

1.5

90.00

8.44

8.44

1

135.00

2.81

2.81

1.00

1.00

0.1

10.00

0.10

0.10

2.00

2.00 0.00

35.7

25.0

8.6

Qty

Rate

35

0.3

13.00

3.90

3.90

0.04

65.00

2.60

2.60

0.65

0.65 2.50

10% 25

0.1

2.50

1

108.00

6.75

6.75

1.5

90.00

8.44

8.44

1

135.00

2.25

2.25

1.00

1.00

0.1

10.00

0.1

2.0

0.0

0.0

0.50 2.00 0.00

34.7

Qty

Rate/Day

25.0

9.7

46.4

m3 1.05

200

210

210.00

1.05

10

10.5

10.50

1.05

10

10.5

10.50

2

108.00

5.40

5.40

6

90.00

13.50

13.50

1

135.00

2.25

2.25

0.1

90.00

0.23

0.23

1

108.00

2.16

15

0.12

1.80

2.16 1.80

0.50 0.056

850

0.50

52.36

52.36

0.50

46.4

150 mm thk

Qty

Rate/Day

0.50

3.5

42.8

0.1

0.0

31.0

m3 1.05

200

210

210.00

1.05

10

10.5

10.50

1.05

10

10.5

10.50

2

108.00

5.40

5.40

6

90.00

13.50

13.50

1

135.00

2.25

2.25

0.1

90.00

0.23

0.23

1

108.00

2.16

2.16

15

0.12

1.80

1.80

0.50 0.056

850

Qty

52.36

52.36

0.50

0.50

31.0

100 mm thk

Rate/Day

0.50

2.4

28.6

0.1

0.0

28.2

m3 1.05

200

210

210.00

1.05

10

10.5

10.50

1.05

10

10.5

10.50

108.00

5.40

5.40

13.50

13.50

2.25

2.25

0.23

0.23 2.16

2 6 1 0.1

90.00 135.00 90.00

1

108.00

2.16

15

0.12

1.80

0.056

850

52.36

52.36

0.50

0.50

1.80

0.50

90 mm thk

28.2

0.50

2.1

26.0

0.0

0.0

Qty

Rate/Day

25.6

m3 1.05

200

210

210.00

1.05

10

10.5

10.50

1.05

10

10.5

10.50

108.00

5.40

5.40

13.50

13.50

2.25

2.25

0.23

0.23 2.16

2 6 1 0.1

90.00 135.00 90.00

1

108.00

2.16

15

0.12

1.80

0.056

850

52.36

52.36

0.50

0.50

1.80

0.50

25.6

75 mm thk

Qty

Rate/Day

0.50

1.9

23.6

0.0

0.0

17.0

m3 1.05

200

210

210.00

1.05

10

10.5

10.50

1.05

10

10.5

10.50

108.00

5.40

5.40

13.50

13.50

2.25

2.25

0.23

0.23 2.16

2 6 1 0.1

90.00 135.00 90.00

1

108.00

2.16

15

0.12

1.80

1.80

0.50 0.056

850

0.50

52.36

52.36

0.50

17.0

50 mm thk

0.50

1.3

15.7

.

Qty

Rate/Day

13.6

m3 1.05

200

210

210.00

1.05

10

10.5

10.50

1.05

10

10.5

10.50

108.00

5.40

2

5.40

0.0

0.0

6 1 0.1

90.00 135.00 90.00

13.50

13.50

2.25

2.25

0.23

0.23 2.16

1

108.00

2.16

15

0.12

1.80

1.80

0.50 0.056

850

52.36

52.36

0.50

0.50

13.6

40 mm thk

0.50

1.0

12.6

0.0

0.0

.

Qty

Rate/Day

8.5

m3 1.05

200

210

210.00

1.05

10

10.5

10.50

1.05

10

10.5

10.50

108.00

5.40

5.40

13.50

13.50

2.25

2.25

0.23

0.23 2.16

2 6 1 0.1

90.00 135.00 90.00

1

108.00

2.16

15

0.12

1.80

1.80

0.50 0.056

850

52.36

52.36

0.50

0.50

8.5

25 mm thk

0.50

0.6

7.9

0.0

0.0

.

Qty

Rate

41

10.00

1 2 1

108.00 90.00 135.00

5.00

5.00

0.50

0.50

4.00

4.00

0.50

0.50

9.00

9.00

15.00

15.00

1.50

1.50

40.5

30.5

5.0

5.0

0.0

Qty

Rate

29

0.50

0.50

4.00

4.00

0.50

0.50

1

108.00

9.00

9.00

1.5

90.00

11.25

11.25

1

135.00

3.75

3.75

29.0

24.0

Qty

Rate

5.0

0.50

0.50

18.33

18.33

4.00

4.00

0.50

0.50

108.00

9.00

9.00

1.5

90.00

11.25

11.25

1

135.00

3.75

3.75

47.3

24.0

23.3

Qty

Rate

53

1

2.00

2.00

2.00

1

4.00

4.00

4.00

0.50

0.50

2.00

2.00

2

108.00

21.60

21.60

2

90.00

18.00

18.00

1

135.00

4.50

4.50

52.6

44.1

Qty

1 1

Rate

4.00

0.0

0.0

0.0

0.0

0.0

47

1

1

0.0

8.5

85

18.33

18.33

4.00

4.00

0.50

0.50

0.50

0.50

2

108.00

21.60

21.60

4

90.00

36.00

36.00

1

135.00

4.50

4.50

85.4

62.1

1

1

1

1

1

1

1

35.00

100.00

40.00

400.00

70.00

60.00

120.00

37.45

23.3

0.0

0.0

37.45

28.15

2.1

26.0

0.0

0.0

29.00

24.00

5.00

-

-

94.6

26.1

68.4

0.0

0.0

107.00

107.00

28.15

2.1

26.0

0.0

0.0

29.00

24.00

5.00

-

-

164.2

26.1

138.0

0.0

0.0

0.0

0.0

42.80

42.80

28.15

2.1

29.00

24.00

5.00

-

-

100.0

26.1

73.8

0.0

0.0

440.00

26.0

440.00

25.61

1.9

23.6

0.0

0.0

52.60

44.10

8.50

-

-

518.2

46.0

472.1

0.0

0.0

74.90

74.90

34.65

25.0

9.7

0.0

0.0

25.61

1.9

23.6

0.0

0.0

29.00

24.00

5.00

-

-

164.2

50.9

113.2

0.0

0.0

64.20

64.20

28.15

2.1

26.0

0.0

0.0

29.00

24.00

5.00

-

-

121.4

26.1

95.2

0.0

0.0

128.40

128.40

25.61

1.9

23.6

0.0

0.0

52.60

44.10

8.50

-

-

206.6

46.0

160.5

0.0

0.0

1

1

1

1

1

1

Qty

20.00

25.00

81.00

100.00

130.00

250.00

Rate

21.40

21.40

25.61

1.9

23.6

0.0

40.50

30.50

5.00

5.00

87.5

32.4

50.0

5.0

0.0

26.75 25.61

1.9

23.6

0.0

0.0

29.00

24.00

5.00

-

-

81.4

25.9

55.4

0.0

0.0

0.0

0.0

81.00

81.00

6.40

0.5

5.9

7.25

6.00

1.25

-

-

94.7

6.5

88.2

0.0

0.0

100.00

100.00

7.25

6.00

1.25

-

-

107.3

6.0

101.3

0.0

0.0

130.00

130.00

7.26

6.00

1.25

0.01

137.3

6.0

131.3

0.0

0.0

250.00

-

250.00

7.25

6.00

1.25

-

-

257.3

6.0

251.3

0.0

0.0

0.0

0.0

33 2.00

2.00

6.00

6.00

0.50

0.50

108.00

9.00

9.00

1.5

90.00

11.25

11.25

1

135.00

3.75

3.75

32.5

24.0

Rate

-

26.75

1

Qty

0.0

90

8.5

1

6.00

6.00

6.00

1

6.00

6.00

6.00

0.50

0.50

2.00

2.00

1 2

108.00

30.86

30.86

3

90.00

38.57

38.57

1

135.00

6.43

6.43

90.4

75.9

Qty

Rate

14.5

18.33

18.33

6.00

6.00

6.00

1

6.00

6.00

6.00

0.50

0.50

2.00

2.00

2

108.00

30.86

30.86

3

90.00

38.57

38.57

1

135.00

Qty

6.43

6.43

108.7

75.9

32.8

Rate

156

6

10.00

60.00

60.00

1

12.00

12.00

12.00

1

2.00

2.00

2.00

2

108.00

33.23

33.23

3

90.00

41.54

41.54

1

135.00

6.92

6.92

155.7

81.7

1

1

35.00

40.00

0.0

0.0

0.0

0.0

0.0

109

1

1

0.0

37.45

74.0

37.45

34.25

25.00

7.15

0.10

2.00

32.50

24.00

8.50

-

-

104.2

49.0

53.1

0.1

2.0

42.80

42.80

34.25

25.00

7.15

0.10

2.00

32.50

24.00

8.50

-

-

109.5 1

250.00

267.50 34.25

1

1

20.00

250.00

300.00

58.4

2.0

267.50 25.00

7.15

0.10

2.00

90.36

75.86

14.50

-

-

100.9

289.1

0.1

2.0

21.40

21.40

34.25

25.00

7.15

0.10

2.00

32.50

24.00

8.50

-

-

88.1

49.0

37.0

0.1

2.0

267.50

267.50 25.00

7.15

5.00

5.00

155.69

81.69

457.4

111.7

321.00 34.25

0.10

2.00

74.00

-

-

353.6

0.1

2.0

321.00 25.00

7.15

5.00

5.00

0.10

2.00

155.69

81.69

74.00

-

-

510.9

111.7

407.1

0.1

2.0

0.0

0.0

Qty

Rate

13

0.07

13.00

0.91

0.91

0.01

65.00

0.65

0.65

0.08

0.08

0.50

0.50

0.50

0.50

2.00

2.00

5%

0.1

392.1

34.25

1

49.0

1

108.00

3.60

3.60

1

90.00

3.00

3.00

1

135.00

1.50

1.50

12.7

8.1

Qty

Rate

15

0.07

13.00

1.37

4.6

1.37

0.01

65.00

5%

0.98

0.98

0.18

0.18

0.75

0.75

0.50

0.50

2.00

2.00

1

108.00

4.32

4.32

1

90.00

3.60

3.60

1

135.00

1.80

1.80

15.5

9.7

5.8

Qty

Rate

13

0.07

13.00

0.91

0.91

0.01

65.00

0.65

0.65

0.16

0.16

0.50

0.50

0.50

0.50

2.00

2.00

10%

108.00

3.60

3.60

1

90.00

3.00

3.00

1

135.00

1.50

1.50

12.8

8.1

1

Qty

4.7

Rate

79

1

50.00

51.00

51.00

0.07

13.00

0.91

0.91

0.01

65.00

0.65

0.65

0.31

0.31

0.50

0.50

0.50

0.50

2.00

2.00

20%

1

108.00

3.60

3.60

1

90.00

3.00

3.00

1

135.00

1.50

1.50

15%

15.00

15.00

79.0

23.1

1

15.00

15.45

55.9

15.45

0.0

0.0

0.0

0.0

0.0

0.0

1

1

1

1

1

1

Qty 1

10.00

25.00

10.00

50.00

50.00

10.00

12.7

8.1

4.6

0.0

0.0

28.2

8.1

20.1

0.0

0.0

10.30

10.30

12.7

8.1

4.6

0.0

0.0

23.0

8.1

14.9

0.0

0.0

25.75

25.75

12.7

8.1

4.6

0.0

0.0

38.5

8.1

30.4

0.0

0.0

10.30

10.30

12.7

8.1

4.6

0.0

0.0

23.0

8.1

14.9

0.0

0.0

51.50

51.50

12.7

8.1

4.6

0.0

0.0

64.2

8.1

56.1

0.0

0.0

51.50

51.50

12.7

8.1

4.6

0.0

0.0

64.2

8.1

56.1

0.0

0.0

10.30

10.30

12.7

8.1

4.6

0.0

0.0

23.0

8.1

14.9

0.0

0.0

0.0

0.0

Rate

107

30.00

30.00

30.00

28.15

28.15

6.00

6.00

0.50

0.50

3

5

15.00

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

2.81

2.81

107.2

27.6

Qty 1

Rate

94

25.00

25.00

15.00

79.7

25.00

25.61

25.61

6.00

6.00

0.50

0.50 15.00

3

5

15.00

1

108.00

10.80

10.80

1

90.00

9.00

9.00

1

135.00

2.25

2.25

94.2

22.1

Qty 1

Rate

225.24

150.00

150.00

150.00

25.61

25.61

6.00

6.00

0.50

0.50 15.00

3

5

15.00

1

108.00

13.50

13.50

1

90.00

11.25

11.25

1

135.00

Qty 1

3.38

3.38

225.2

28.1

Rate

75

25.00

26.75 25.61

197.1

1.95

23.63

2.00

2.00

2.00

2.00

0.50

0.50

108.00

6.35

6.35

2

90.00

10.59

10.59

1

135.00

1.06

1.06

74.9

19.9

54.9

Rate

28

1

15.00

15.00

15.00

0.07

13.00

0.91

0.91

0.01

65.00

0.65

0.65

0.31

0.31

0.50

0.50

0.50

0.50

2.00

2.00

20%

0.0

0.0

0.0

0.0

26.75

1

Qty

72.1

0.04

0.0

-

0.0

1

108.00

3.60

3.60

1

90.00

3.00

3.00

1

135.00

1.50

1.50

28.0

8.1

19.9

Qty

Rate

86

1

2.75

2.75

2.75

1.03

42

43.26

43.26

0.25

48

15

15.00

0.25

20

5

5.00

1.00

1.00

62

3.1

3.10

5%

3.068

3.07

1

108.00

4.32

4.32

2

90.00

7.20

7.20

1

135.00

1.26

1.26

86.0

12.8

0.05

73.2

Qty

Rate

72

1

2.75

2.75

2.75

1.03

37

38.11

38.11

0.15

48

7.2

7.20

0.25

20

5

5.00

1.00

1.00

62

3.1

3.10

5%

2.4205

2.42

1

108.00

4.32

4.32

2

90.00

7.20

7.20

1

135.00

1.26

1.26

72.4

12.8

0.05

59.6

0.0

0.0

0.0

0.0

0.0

0.0

Qty

Rate

65

1.15

40

46

250

1500

6

6

250

700

2.8

2.8

5

75

1.5

10

90.00

3.60

3.60

1

135.00

0.36

0.36

2.5

500.00

5.0

65.3

46.00

1.5

5.00

4.0

51.0

8.8

1.5

Qty

Rate

102

1.15

40

46

40

750

18.75

18.75

40

700

17.5

17.5

40

100

2.5

2.5

1

75

1.875

4

90.00

9.00

9.00

1

135.00

0.90

0.90

2000

0.10

5.0

101.5

Qty

46.00

1.875

5.00

9.9

51.0

38.8

Rate/Day

60

1

40

42.00

1

750

5.00

5.0

1

700

4.67

4.7

4

90.00

2.40

2.40

1

135.00

0.30

0.30

3750

0.11

2.75

2.75

200.00

2.67

2.67

2

59.8

Qty

Rate

93

1.094

27

29.54

0.2

15

3.00

42.00

2.7

47.4

9.7

3.00 3.00

27

2.70

108.00

10.80

10.80

1.25

90.00

11.25

11.25

1

135.00

3.15

3.15

300

28.50

28.50

1.00

1.00

1

0.095

92.9

Qty

0.0

29.54

3.00 10%

1.9

2.70

28.2

61.7

0.0

3.0

Rate

123

1

18

18.00

18.00

1

4

4.00

4.00

1

61

61.00

61.00

1

4

4.00

4.00

1

36

36.00

36.00

123.0

75.00 170.00 80.00 60.00 90.00 45.00 125.00 175.00 100.00

18.00 40.00 20.00 65.00 30.00 40.00 20.00 20.00

40.00 40.00 150.00 250.00 350.00 400.00

Qty

Rate

Amount

0.0

0.0

0.0

123.0

21868

80

1,749,440

21868

25.7

69,830

40

350

14,000

40

100.0

4,000

21868

125

2,733,500

4373.6

5623

400

2,249,200

394737

4

1,578,948

90.254481434

8000

4

32,000

200

Sub Total=

8,430,918.00

contractor overhead & Profit -15%

843,091.80

Grand Total=

9,274,009.80

L

B

D

Rate

Amount 25,000.00

8500 13.2

#VALUE!

3.14

0.1225

330.3

#REF!

#VALUE!

145

0.2

1

900.0

#VALUE!

145

1.5

1

20

#VALUE!

145

0.7

0.6

900

#VALUE!

3.12

#VALUE! #VALUE! #VALUE! #VALUE!

Qty

Rate

725

115

Amount 83,375 4,169

145

270

39,150

725

28

20,300

70

15

1,050

725

5

3,625

725

10

7,250

Sub Total=

158,919.00

contractor overhead & Profit -15%

23,837.85

Grand Total=

182,756.85 128.70

#VALUE!

#VALUE!

302 M Qty

Rate

42.64706

3500

Amount 149,265 7,463

145

270

39,150

725

28

20,300

70

20

1,400

725

5

3,625

725

10

7,250

Phonix Engineering & Marine Co Sub Total=

228,453.00

contractor overhead & Profit -15%

34,267.95

Grand Total=

262,720.95 185.01 302

Qty

Rate

Amount 4,950 69,830

121.7

980

119,233

121.7

225

27,375

4258.33

10

42,583 72,600

4

4500

18,000

35,457 Sub Total=

390,029.00

contractor overhead & Profit -10%

39,002.90

Grand Total=

429,031.90

Qty

Rate

Amount 98,000

90

3460

311,400

9,800 Sub Total=

419,200.00

contractor overhead & Profit -15%

62,880.00

Grand Total=

482,080.00

L

B

H

Rate

Amount Dhs

3

3

1.5

15.00

#VALUE!

1.2

1.2

1.5

15.00

#VALUE!

15.00

#VALUE!

4.00

#VALUE!

350

#VALUE!

1.2

1.2

1.2

1.2

0.1

4

1

90.00

#VALUE!

3.2

1

40.00

#VALUE!

0.8

0.8

40.00

4.8

1,150

#VALUE!

35

#VALUE!

35

#VALUE!

1.5

1.2

1.2

#VALUE!

L

B

H

Rate

Amount Dhs

2

2

1

15.00

#VALUE!

Dhs

0.7

0.7

0.9

0.9

0.9

0.9

1

15.00

#VALUE!

15.00

#VALUE!

5.00

#VALUE!

350

#VALUE!

0.1

2

1

90.00

#VALUE!

1.6

1

40.00

#VALUE!

0.3

0.3

40.00

2.8

1

0.7

0.7

300

350

35

#VALUE!

35

#VALUE! #VALUE!

L

B

H

Rate

Dhs

Amount Dhs

10

1

1

20.00

#VALUE!

10

0.5

0.3

20.00

#VALUE!

20.00

#VALUE!

5.00

#VALUE!

550

#VALUE!

10

0.5

10

0.5

0.3

#VALUE!

L

W

H

Dhs / m

RCC

Shutter

Blind

Steel Ratio

m3

m2

m2

Kg/m3

1.1

1.1

0.35

#VALUE!

#VALUE!

0.2

0.2

0.85

#VALUE!

#VALUE!

#VALUE!

70 300

16

0.2

0.4

#VALUE!

13

0.2

0.2

2.2

#VALUE!

#VALUE!

16

0.2

0.2

#VALUE!

6

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

348.00

60.00

28.00

#VALUE!

#VALUE!

#VALUE!

Rate

6

200 200 200

#VALUE!

Amount #VALUE! Dhs

L

B 3

H 3

Rate 25

#VALUE!

20

#VALUE!

20

#VALUE!

0.25

75

#VALUE!

16

2

90

#VALUE!

16

2.3

35

#VALUE!

16

2.3

35

#VALUE!

1.5

1.45

Amount

1.5

Length

#VALUE!

QR

16

m Unit

LS LS m Nos m2 Days

Rate

25000 15000 2500 3000 150 2500

Amount

25,000.00 15,000.00 287,500.00 69,000.00 12,500.00 409,000.00

409,000.00

Unit Rate

3,556.52

m

240 270 265 280 290 280

270 15 15 255

2600 2600

8.07 11.28 13.80 19.53

2.7 2.9 3.1 4.1 5.5

1.8 2 2.2 3.2 4.2 4.7 2.5

3.5 3

4.5 5 5.5

4.5 5.2 6.2 7

25 26 27 35 35 36 37 45 35 36 36 45 45 46 46 55

27 18

13 13

35 35 60 25 35 24

25 31 70 90 1250

55 65

175 156 78

33 49 63

500 45 40 35 65 17 30

42 69

18 35

18 4 61 4

36 12.5 175 12.5

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/m3)

Unskilled

2.00

18.63%

1.20

0.12

Charge hand

0.40

3.73%

0.36

0.02

Unskilled

8.33

77.64%

5.00

0.50

Crew

10.73

100.00%

6.56

0.64

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/m3)

Unskilled

2.00

18.63%

1.20

0.12

Charge hand

0.40

3.73%

0.36

0.02

Unskilled

8.33

77.64%

5.00

0.50

Crew

10.73

100.00%

6.56

0.64

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/m3)

Unskilled

2.00

83.33%

3.60

0.36

Charge hand

0.40

16.67%

1.08

0.07

Crew

2.40

100.00%

4.68

0.43

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/m3)

Unskilled

2.00

83.33%

0.90

0.09

Charge hand

0.40

16.67%

0.27

0.02

Crew

2.40

100.00%

1.17

0.11

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/m3)

Unskilled

4.00

90.91%

2.25

0.23

Charge hand

0.40

9.09%

0.34

0.02

Crew

4.40

100.00%

2.59

0.25

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/m3)

Unskilled

2.00

66.67%

0.90

0.09

Charge hand

1.00

33.33%

0.23

0.02

Crew

3.00

100.00%

1.13

0.11

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/m3)

Mason

1.00

22.22%

9.00

0.75

Unskilled

1.50

33.33%

13.50

1.35

Charge hand

1.00

22.22%

2.25

0.15

Unskilled

1.00

22.22%

1.00

0.10

Crew

4.50

100.00%

25.75

2.35

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

22.22%

0.90

0.08

Unskilled

1.50

33.33%

1.35

0.14

Charge hand

1.00

22.22%

0.23

0.02

Unskilled

1.00

22.22%

0.10

0.01

Crew

4.50

100.00%

2.58

0.24

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

l -5 % wastage Mason - 4 No

4.00

30.53%

0.72

0.06

Unskilled

6.00

45.80%

0.90

0.09

Charge hand

1.00

7.63%

0.15

0.01

Unskilled

0.10

0.76%

0.02

0.00

Carpenter -

2.00

15.27%

0.22

0.02

Crew 500m2/day

13.10

100.00%

2.00

0.18

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason - 4 No Unskilled

4.00 6.00

30.53% 45.80%

0.81 1.01

0.07 0.10

Charge hand

1.00

7.63%

0.17

0.01

Unskilled

0.10

0.76%

0.02

0.00

Carpenter -

2.00

15.27%

0.32

0.03

Crew 500m2/day

13.10

100.00%

2.33

0.21

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason - 4 No

4.00

30.53%

1.08

0.09

Unskilled

6.00

45.80%

1.35

0.14

Charge hand

1.00

7.63%

0.23

0.02

Unskilled

0.10

0.76%

0.02

0.00

Carpenter -

2.00

15.27%

0.43

0.04

Crew 500m2/day

13.10

100.00%

3.11

0.28

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/m3)

Mason - 4 No

4.00

30.53%

10.80

0.90

Unskilled

6.00

45.80%

13.50

1.35

Charge hand

1.00

7.63%

2.25

0.15

Unskilled

0.10

0.76%

0.23

0.02

Carpenter -

2.00

15.27%

4.32

0.36

Crew 500m2/day

13.10

100.00%

31.10

2.78

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/m3)

Mason - 8 No

8.00

27.49%

5.40

0.45

Unskilled

16.00

54.98%

9.00

0.90

Charge hand

2.00

6.87%

3.15

0.21

Unskilled

0.10

0.34%

1.00

0.10

Carpenter - 2 No

2.00

6.87%

1.35

0.11

Steel Fixer - 1 No

1.00

3.44%

0.68

0.06

Crew 200m3/day

29.10

100%

20.58

1.83

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/m3)

Mason - 8 No

8.00

27.49%

5.40

0.45

Unskilled

16.00

54.98%

9.00

0.90

Charge hand

2.00

6.87%

3.15

0.21

Unskilled

0.10

0.34%

1.00

0.10

Carpenter - 2 No

2.00

6.87%

1.35

0.11

Steel Fixer - 1 No

1.00

3.44%

0.68

0.06

Crew 200m3/day

29.10

100%

20.58

1.83

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/m3)

Mason - 8 No

8.00

27.49%

5.40

0.45

Unskilled

16.00

54.98%

9.00

0.90

Charge hand

2.00

6.87%

3.15

0.21

Unskilled

0.10

0.34%

1.00

0.10

Carpenter - 2 No

2.00

6.87%

1.35

0.11

Steel Fixer - 1 No

1.00

3.44%

0.68

0.06

Crew 200m3/day

29.10

100%

20.58

1.83

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/m3)

Mason - 8 No

8.00

27.49%

5.40

0.45

Unskilled

16.00

54.98%

9.00

0.90

Charge hand

2.00

6.87%

3.15

0.21

Unskilled

0.10

0.34%

1.00

0.10

Carpenter - 2 No

2.00

6.87%

1.35

0.11

Steel Fixer - 1 No

1.00

3.44%

0.68

0.06

Crew 200m3/day

29.10

100%

20.58

1.83

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/m3)

Mason - 8 No

8.00

27.49%

5.40

0.45

Unskilled

16.00

54.98%

9.00

0.90

Charge hand

2.00

6.87%

3.15

0.21

Unskilled

0.10

0.34%

1.00

0.10

Carpenter - 2 No

2.00

6.87%

1.35

0.11

Steel Fixer - 1 No

1.00

3.44%

0.68

0.06

Crew 200m3/day

29.10

100%

20.58

1.83

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/m3)

Mason - 8 No

8.00

27.49%

5.40

0.45

Unskilled Labour - 16 No

16.00

54.98%

9.00

0.90

Charge Hand - 2 No

2.00

6.87%

3.15

0.21

Unskilled Labour - for Curing- 1 hr/m3

0.10

0.34%

1.00

0.10

Carpenter - 2 No

2.00

6.87%

1.35

0.11

Steel Fixer - 1 No

1.00

3.44%

0.68

0.06

Crew 200m3/day

29.10

100%

20.58

1.83

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

(Carp - 2 No+Help - 1 no) - Gang - 6 Nos (Incl Deshutter)

7.00

50.00%

21.42

1.79

Unskilled Labour - 4 No

5.00

35.71%

4.50

0.45

Charge Hand - 1 No

2.00

14.29%

2.16

0.14

Crew 100m2/day

14.00

100%

28.08

2.38

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

(Carp - 2 No+Help - 1 no) - 1 Gang - 7 Nos (Incl Deshutter)

7.00

52.50%

21.42

2.14

Unskilled Labour - 5 No

5.00

37.50%

4.50

0.30

Charge Hand - 1 No

1.33

10.00%

1.80

0.18

Crew 100m2/day

13.33

100%

27.72

2.62

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/T)

Productivit y (MHr/T)

Labour Category

Steel Fixer - 3 No

4.00

80.00%

432.00

36.00

Charge Hand - 1 No

1.00

20.00%

54.00

3.60

Crew/Tonne

5.00

100%

486.00

39.60

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/KG)

Productivit y (MHr/KG)

Steel Fixer - 3 No

4.00

80.00%

0.43

0.04

Charge Hand - 1 No

1.00

20.00%

0.05

0.00

Crew / KG

5.00

100%

0.49

0.04

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason - 4 No

2.00

18.02%

0.41

0.03

Unskilled Labour - 6 No

6.00

54.05%

1.01

0.10

Charge Hand

1.00

9.01%

0.17

0.01

Unskilled Labour - for Curing-

0.10

0.90%

0.02

0.00

Carpenter -

2.00

18.02%

0.32

0.03

Crew 500m2/day

11.10

100.00%

1.93

0.17

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew 100m2/day

13.33

100%

130.00

2.62

Crew / KG

5.00

100%

75.00

0.04

225.00

AED/m3

Amount (AED/m3)

Productivit y (MHr/unit)

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Crew 200m3/day

29.10

100%

20.00

1.83

Crew 100m2/day

13.33

100%

130.00

2.62

Crew / KG

5.00

100%

75.00

0.04

225.00

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew 100m2/day

13.33

100%

42.12

2.62

Crew / KG

5.00

100%

38.88

0.04

101.00

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew 100m2/day

13.33

100%

56.16

2.62

Crew / KG

5.00

100%

38.88

0.04

115.04

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew 100m2/day

13.33

100%

7.02

2.62

Crew / KG

5.00

100%

53.46

0.04

80.48

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew 100m2/day

13.33

100%

56.16

2.62

Crew / KG

5.00

100%

75.00

0.04

151.16

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew 100m2/day

13.33

100%

130.00

2.62

Crew / KG

5.00

100%

75.00

0.04

225.00

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew 100m2/day

13.33

100%

56.16

2.62

Crew / KG

5.00

100%

75.00

0.04

151.16

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew 100m2/day

13.33

100%

130.00

2.62

Crew / KG

5.00

100%

75.00

0.04

225.00

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew 100m2/day

13.33

100%

130.00

2.62

Crew / KG

5.00

100%

75.00

0.04

225.00

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew 100m2/day

13.33

100%

130.00

2.62

Crew / KG

5.00

100%

75.00

0.04

225.00

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew 100m2/day

13.33

100%

130.00

2.62

Crew / KG

5.00

100%

75.00

0.04

225.00

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew 100m2/day

13.33

100%

130.00

2.62

Crew / KG

5.00

100%

75.00

0.04

225.00

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew 100m2/day

13.33

100%

130.00

2.62

Crew / KG

5.00

100%

75.00

0.04

225.00

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

4.00

1.83

Crew 100m2/day

13.33

100%

26.00

2.62

Crew / KG

5.00

100%

15.00

0.04

45.00

AED/m2

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

6.40

1.83

Crew 100m2/day

13.33

100%

41.60

2.62

Crew / KG

5.00

100%

24.00

0.04

72.00

AED/m2

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

8.40

1.83

Crew 100m2/day

13.33

100%

54.60

2.62

Crew / KG

5.00

100%

31.50

0.04

94.50

AED/m2

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew 100m2/day

13.33

100%

130.00

2.62

Crew / KG

5.00

100%

75.00

0.04

225.00

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew 100m2/day

13.33

100%

130.00

2.62

Crew / KG

5.00

100%

75.00

0.04

225.00

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/M)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

0.33

1.83

Crew 100m2/day

13.33

100%

5.62

2.62

Crew / KG

5.00

100%

0.81

0.04

6.76

AED/M

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew 100m2/day

13.33

100%

351.00

2.62

Crew / KG

5.00

100%

43.74

0.04

414.74

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

1.00

1.83

Crew 100m2/day

13.33

100%

17.55

2.62

Crew / KG

5.00

100%

2.19

0.04

20.74

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew 100m2/day

13.33

100%

56.16

2.62

Crew / KG

5.00

100%

7.29

0.04

83.45

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew / KG

5.00

100%

28.08

0.04

Crew 100m2/day

13.33

100%

8.61

2.62

Crew / M

5.00

100%

20.00

6.00

76.69

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

4.00

1.83

Crew / KG

5.00

100%

5.62

0.04

Crew 100m2/day

13.33

100%

1.72

2.62

Crew / M

5.00

100%

4.00

6.00

15.34

AED/m2

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew / KG

5.00

100%

12.05

0.04

Crew 100m2/day

13.33

100%

28.08

2.62

Crew / M

5.00

100%

20.00

6.00

80.13

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

3.00

1.83

Crew / KG

5.00

100%

1.81

0.04

Crew 100m2/day

13.33

100%

4.21

2.62

Crew / M

5.00

100%

3.00

6.00

12.02

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew / KG

5.00

100%

17.22

0.04

Crew 100m2/day

13.33

100%

28.08

2.62

Crew / M

5.00

100%

20.00

6.00

85.30

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

2.40

1.83

Crew / KG

5.00

100%

2.07

0.04

Crew 100m2/day

13.33

100%

3.37

2.62

Crew / M

5.00

100%

2.40

6.00

10.24

AED/m2

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

2.00

1.83

Crew / KG

5.00

100%

1.72

0.04

Crew 100m2/day

13.33

100%

2.81

2.62

Crew / M

5.00

100%

2.00

6.00

8.53

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

4.00

1.83

Crew / KG

5.00

100%

3.44

0.04

Crew 100m2/day

13.33

100%

5.62

2.62

Crew / M

5.00

100%

4.00

6.00

17.06

AED/m2

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

4.00

1.83

Crew / KG

5.00

100%

28.64

0.04

Crew 100m2/day

13.33

100%

5.83

2.62

Crew / M

5.00

100%

0.00

6.00

38.47

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew / KG

5.00

100%

124.89

0.04

Crew 100m2/day

13.33

100%

29.16

2.62

Crew / M

5.00

100%

2.00

6.00

40.49

AED/m2

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew / KG

5.00

100%

115.13

0.04

Crew 100m2/day

13.33

100%

29.16

2.62

Crew / M

5.00

100%

2.00

6.00

41.57

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew / KG

5.00

100%

106.81

0.04

Crew 100m2/day

13.33

100%

29.16

2.62

Crew / M

5.00

100%

2.00

6.00

42.65

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew / KG

5.00

100%

103.09

0.04

Crew 100m2/day

13.33

100%

36.45

2.62

Crew / M

5.00

100%

2.00

6.00

45.23

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew / KG

5.00

100%

96.41

0.04

Crew 100m2/day

13.33

100%

36.45

2.62

Crew / M

5.00

100%

2.00

6.00

46.46

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m3)

Productivit y (MHr/unit)

Crew 200m3/day

29.10

100%

20.00

1.83

Crew / KG

5.00

100%

90.56

0.04

Crew 100m2/day

13.33

100%

36.45

2.62

Crew / M

5.00

100%

2.00

6.00

47.68

AED/m3

Amount (AED/m3)

Productivit y (MHr/unit)

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Crew 200m3/day

29.10

100%

20.00

1.83

Crew / KG

5.00

100%

130.00

0.04

Crew 100m2/day

13.33

100%

75.00

2.62

Crew / M

5.00

100%

2.00

6.00

227.00

AED/m3

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

ChargeLabour Hand - for Unskilled Curing

1.00

32.26%

2.81

0.19

0.10

3.23%

1.00

0.10

Crew 8m2/day

3.10

100%

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8m2/day

3.10

100%

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8m2/day

3.10

100%

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8m2/day

3.10

100%

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8m2/day

3.10

100%

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8m2/day

3.10

100%

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8m2/day

3.10

100%

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8m2/day

3.10

100%

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8m2/day

3.10

100%

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8m2/day

3.10

100%

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8m2/day

3.10

100%

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8m2/day

3.10

100%

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8m2/day

3.10

100%

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

10.80

0.90

Unskilled Labour

1.00

32.26%

9.00

0.90

Charge Hand

1.00

32.26%

2.25

0.15

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 10 m2/day

3.10

100%

23.05

2.05

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

10.80

0.90

Unskilled Labour

1.00

32.26%

9.00

0.90

Charge Hand Unskilled Labour - for Curing

1.00

32.26%

2.25

0.15

0.10

3.23%

1.00

0.10

Crew 10 m2/day

3.10

100%

23.05

2.05

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

10.80

0.90

Unskilled Labour

1.00

32.26%

9.00

0.90

Charge Hand Unskilled Labour - for Curing

1.00

32.26%

2.25

0.15

0.10

3.23%

1.00

0.10

Crew 10 m2/day

3.10

100%

23.05

2.05

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

10.80

0.90

Unskilled Labour

1.00

32.26%

9.00

0.90

Charge Hand Unskilled Labour - for Curing

1.00

32.26%

2.25

0.15

0.10

3.23%

1.00

0.10

Crew 10 m2/day

3.10

100%

23.05

2.05

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

10.80

0.90

Unskilled Labour

1.00

32.26%

9.00

0.90

Charge Hand

1.00

32.26%

2.25

0.15

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 10 m2/day

3.10

100%

23.05

2.05

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

12.00

1.00

Unskilled Labour

1.00

32.26%

10.00

1.00

Charge Hand

1.00

32.26%

2.50

0.17

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 11 m2/day

3.10

100%

25.50

2.27

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

12.00

1.00

Unskilled Labour

1.00

32.26%

10.00

1.00

Charge Hand

1.00

32.26%

2.50

0.17

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 10 m2/day

3.10

100%

25.50

2.27

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

10.80

0.90

Unskilled Labour

1.00

32.26%

9.00

0.90

Charge Hand

1.00

32.26%

2.25

0.15

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 10 m2/day

3.10

100%

23.05

2.05

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

10.80

0.90

Unskilled Labour

1.00

32.26%

9.00

0.90

Charge Hand

1.00

32.26%

2.25

0.15

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 10 m2/day

3.10

100%

23.05

2.05

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

10.80

0.90

Unskilled Labour

1.00

32.26%

9.00

0.90

Charge Hand

1.00

32.26%

2.25

0.15

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 10 m2/day

3.10

100%

23.05

2.05

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

10.80

0.90

Unskilled Labour

1.00

32.26%

9.00

0.90

Charge Hand

1.00

32.26%

2.25

0.15

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 10 m2/day

3.10

100%

23.05

2.05

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

9.82

0.82

Unskilled Labour

1.00

32.26%

8.18

0.82

Charge Hand

1.00

32.26%

2.05

0.14

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 11 m2/day

3.10

21.05

1.87

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

10.80

0.90

Unskilled Labour

1.00

32.26%

9.00

0.90

Charge Hand

1.00

32.26%

2.25

0.15

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 10 m2/day

3.10

23.05

2.05

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

10.80

0.90

Unskilled Labour

1.00

32.26%

9.00

0.90

Charge Hand

1.00

32.26%

2.25

0.15

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 10 m2/day

3.10

23.05

2.05

1.00

1.00

1.00

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

10.80

0.90

Unskilled Labour

1.00

32.26%

9.00

0.90

Charge Hand

1.00

32.26%

2.25

0.15

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 10 m2/day

3.10

23.05

2.05

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

10.80

0.90

Unskilled Labour

1.00

32.26%

9.00

0.90

Charge Hand

1.00

32.26%

2.25

0.15

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 10 m2/day

3.10

23.05

2.05

Labour Category

No of Labour (No.)

Amount (AED/m2)

Productivit y (MHr/m2)

1.00

1.00

% OF LABOUR CATEG

Mason

1.00

32.26%

10.80

0.90

Unskilled Labour

1.00

32.26%

9.00

0.90

Charge Hand

1.00

32.26%

2.25

0.15

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 10 m2/day

3.10

23.05

2.05

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

1.00

Mason

1.00

32.26%

9.82

0.82

Unskilled Labour

1.00

32.26%

8.18

0.82

Charge Hand

1.00

32.26%

2.05

0.14

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 11 m2/day

3.10

21.05

1.87

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 6 m2/day

3.10

28.56

2.54

1.00

1.00

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 6 m2/day

3.10

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 6 m2/day

3.10

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

1.00

1.00

Charge Hand Unskilled Labour - for Curing

1.00

32.26%

2.81

0.19

0.10

3.23%

1.00

0.10

Crew 6 m2/day

3.10

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand Unskilled Labour - for Curing

1.00

32.26%

2.81

0.19

0.10

3.23%

1.00

0.10

Crew 8 m2/day

3.10

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8 m2/day

3.10

28.56

2.54

Labour Category

No of Labour (No.)

Amount (AED/m2)

Productivit y (MHr/m2)

1.00

1.00

1.00

% OF LABOUR CATEG

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8 m2/day

3.10

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8 m2/day

3.10

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8 m2/day

3.10

28.56

2.54

1.00

1.00

1.00

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8 m2/day

3.10

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8 m2/day

3.10

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

1.00

1.00

Unskilled Labour - for Curing

0.10

Crew 8 m2/day

3.10

Labour Category

No of Labour (No.)

Mason

3.23%

1.00

0.10

28.56

2.54

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

1.00

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8 m2/day

3.10

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand Unskilled Labour - for Curing

1.00

32.26%

2.81

0.19

0.10

3.23%

1.00

0.10

Crew 8 m2/day

3.10

28.56

2.54

Labour Category

No of Labour (No.)

Amount (AED/m2)

Productivit y (MHr/m2)

1.00

1.00

% OF LABOUR CATEG

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8 m2/day

3.10

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8 m2/day

3.10

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8 m2/day

3.10

28.56

2.54

1.00

1.00

1.00

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8 m2/day

3.10

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8 m2/day

3.10

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand

1.00

32.26%

2.81

0.19

1.00

1.00

Unskilled Labour - for Curing

0.10

Crew 8 m2/day

3.10

Labour Category

No of Labour (No.)

Mason

3.23%

1.00

0.10

28.56

2.54

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

1.00

Charge Hand

1.00

32.26%

2.81

0.19

Unskilled Labour - for Curing

0.10

3.23%

1.00

0.10

Crew 8 m2/day

3.10

28.56

2.54

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

32.26%

13.50

1.13

Unskilled Labour

1.00

32.26%

11.25

1.13

Charge Hand Unskilled Labour - for Curing

1.00

32.26%

2.81

0.19

0.10

3.23%

1.00

0.10

Crew 8 m2/day

3.10

28.56

2.54

Labour Category

No of Labour (No.)

Amount (AED/m2)

Productivit y (MHr/m2)

1.00

1.00

% OF LABOUR CATEG

Mason

1.00

32.26%

9.53

0.79

Unskilled Labour

1.00

32.26%

7.94

0.79

Charge Hand

1.00

32.26%

2.38

0.16

Unskilled Labour - for Curing

0.10

3.23%

1.50

0.15

Crew 17 m2/day

3.10

21.35

1.90

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

1.00

Mason

1.00

32.26%

10.16

0.85

Unskilled Labour

1.00

32.26%

8.47

0.85

Charge Hand

1.00

32.26%

2.54

0.17

Unskilled Labour - for Curing

0.10

3.23%

1.60

0.16

Crew 17 m2/day

3.10

22.78

2.02

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

27.78%

9.45

0.79

Unskilled Labour

1.50

41.67%

11.81

1.18

Charge Hand

1.00

27.78%

2.36

0.16

Unskilled Labour - for Curing

0.10

2.78%

1.35

0.14

Crew 17 m2/day

3.60

24.98

2.26

1.00

1.00

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

27.78%

8.78

0.73

Unskilled Labour

1.50

41.67%

10.97

1.10

Charge Hand

1.00

27.78%

3.66

0.24

Unskilled Labour - for Curing

0.10

2.78%

1.30

0.13

Crew 16 m2/day

3.60

24.70

2.20

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

27.78%

8.78

0.73

Unskilled Labour

1.50

41.67%

10.97

1.10

Charge Hand

1.00

27.78%

2.93

0.20

Unskilled Labour - for Curing

0.10

2.78%

1.30

0.13

Crew 17 m2/day

3.60

23.97

2.15

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason - 4 No

2.00

19.80%

0.81

0.07

Unskilled Labour - 6 N

6.00

59.41%

2.03

0.20

Charge Hand

1.00

9.90%

0.34

0.02

Unskilled Labour - for

0.10

0.99%

0.03

0.00

1.00

1.00

Carpenter -

1.00

9.90%

0.32

0.03

Crew 400 m2/day

10.10

100.00%

3.53

0.32

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

MasonLabour - 4 No - 6 Unskilled No

2.00

19.80%

0.54

0.05

6.00

59.41%

1.35

0.11

Charge Hand

1.00

9.90%

0.23

0.02

Unskilled Labour - for Curing-

0.10

0.99%

0.02

0.00

Carpenter -

1.00

9.90%

0.22

0.02

Crew 400 m2/day

10.10

100.00%

2.35

0.20

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason - 4 No

2.00

19.80%

0.54

0.05

Unskilled Labour - 6 No

6.00

59.41%

1.35

0.11

Charge Hand Unskilled Labour - for Curing-

1.00

9.90%

0.23

0.02

0.10

0.99%

0.02

0.00

Carpenter -

1.00

9.90%

0.22

0.02

Crew 400 m2/day

10.10

100.00%

2.35

0.20

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason - 4 No

2.00

19.80%

0.41

0.03

Unskilled Labour - 6 No

6.00

59.41%

1.01

0.08

Charge Hand

1.00

9.90%

0.17

0.02

Unskilled Labour - for Curing-

0.10

0.99%

0.02

0.00

Carpenter -

1.00

9.90%

0.16

0.02

Crew 400 m2/day

10.10

100.00%

1.77

0.15

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason - 4 No

2.00

19.80%

0.30

0.02

Unskilled Labour - 6 No

6.00

59.41%

0.75

0.06

Charge Hand

1.00

9.90%

0.12

0.01

Unskilled Labour - for Curing-

0.10

0.99%

0.01

0.00

Carpenter -

1.00

9.90%

0.12

0.01

Crew 400 m2/day

10.10

100.00%

1.31

0.11

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason - 4 No

2.00

19.80%

0.24

0.02

Unskilled Labour - 6 No

6.00

59.41%

0.59

0.05

Charge Hand

1.00

9.90%

0.10

0.01

Unskilled Labour - for Curing-

0.10

0.99%

0.01

0.00

Carpenter -

1.00

9.90%

0.10

0.01

Crew 400 m2/day

10.10

100.00%

1.04

0.09

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason - 4 No Unskilled Labour - 6 No

2.00

19.80%

0.14

0.01

6.00

59.41%

0.34

0.03

Charge Hand

1.00

9.90%

0.06

0.01

Unskilled Labour - for Curing-

0.10

0.99%

0.01

0.00

Carpenter -

1.00

9.90%

0.05

0.01

Crew 400 m2/day

10.10

100.00%

0.59

0.05

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

3 Times Polising

3.00

42.86%

5.00

0.42

Mason

1.00

14.29%

9.00

0.75

Unskilled Labour

2.00

28.57%

15.00

1.50

Charge Hand

1.00

14.29%

1.50

0.10

Crew 12 m2/day

7.00

100.00%

30.50

2.77

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

Err:522

9.00

0.75

Unskilled Labour

1.50

Err:522

11.25

1.13

Charge Hand

1.00

Err:522

3.75

0.25

Crew 12 m2/day

Err:522

Err:522

Err:522

Err:522

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

1.00

28.57%

9.00

0.75

Unskilled Labour

1.50

42.86%

11.25

1.13

Charge Hand

1.00

28.57%

3.75

0.25

Crew 12 m2/day

3.50

100.00%

24.00

2.13

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

2.00

40.00%

21.60

1.80

Unskilled Labour

2.00

40.00%

18.00

1.80

Charge Hand

1.00

20.00%

4.50

0.30

Crew 12 m2/day

5.00

100.00%

44.10

3.90

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Mason

2.00

28.57%

21.60

1.80

Unskilled Labour

4.00

57.14%

36.00

3.60

Charge Hand

1.00

14.29%

4.50

0.30

Crew 10 m2/day

7.00

100.00%

62.10

5.70

Labour Category

No of Labour (No.)

% OF LABOUR CATEG

Amount (AED/m2)

Productivit y (MHr/m2)

Crew 10 m2/day

#VALUE!

#VALUE!

#VALUE!

#VALUE!

Steel

WP (Hor)

Poly. Sheet

WP (Ver)

Kg

m2

m2

Ver

#VALUE!

#REF!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#REF!

6

49

#VALUE!

#REF!

#VALUE!

#VALUE!

#VALUE!

#REF!

#VALUE!

#VALUE!

3.50

10.00

1.60

10.00

#VALUE!

#REF!

#VALUE!

#VALUE!

#VALUE! #VALUE!

#VALUE!

QR/m

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1) BILL NO. 1 - TOWN HOUSE INNER UNIT SITE WORKS Site Exploration Generally Generally A

Allow for keeping records of site observations, providing samples, performing site tests, performing laboratory tests and for preparing analysis and technical reports, strictly in b

item

1

115

115

Allow for excavating trial holes as necessary commencing from existing ground level include all necessary earthwork supports strictly in accordance with specifications

item

1

115

115

Allow for hand excavating of a trench across the service corridor to determine exact depth and location of existing services

item

1

115

115

item

1

1150

1150

item

1

115

115

Trial Holes / Trenches B

C

Site Preparation Clearance D

Allow for the removal and disposal off-site all vegetation and loose materials including (but not limited to) undergrowth, bushes, shrubs, debris, plants and any other organic materials, strictly in accordance with the specifications Protection

E

Protect existing services, road and adjacent building structure and make good damaged areas

To Collection P2/S1/B1/SW/1

1,610.00

QTY

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) SITE WORKS, Cont'd Excavation and earthworks A

Excavation to reduce levels as shown on the drawings

m3

64

18

1152

B

Trenching for the service pipes or the like for all diameters any depth

item

1

115

115

Backfill with selected excavated material in layers to make up levels

m3

33

25

825

Backfill and well compact in layers with imported materials

m3

68

63

4284

m2

64

12

768

m2

31

24

744

Filling C

D

Compaction E

Allow for compaction of the natural foundation all in accordance with the specification and drawings Disposal

E

Cartaway surplus excavated material off site to Municipal yard as directed by the Engineer

Anti-termite treatment F

To horizontal surfaces

m2

157

5

785

G

To vertical surfaces

m

28

5

140

To Collection P2/S1/B1/SW/2/PTC1

8,813.00

QTY

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) SITE WORKS, Cont'd Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included. A

To Collection P2/S1/B1/SW/3

AMOUNT (AED)

QTY

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) SITE WORKS, Cont'd

COLLECTION

Page P2/S1/B1/SW/1

1,610.00

Page P2/S1/B1/SW/2

8,813.00

Page P2/S1/B1/SW/3

Total for Site Works - Carried to Bill No. 1 Summary P2/S1/B1/SW/4/R1

10,423.00

QTY

1.15

MARK UP SPLITTED AMOUNT

LABOUR

MATERIAL

PLANT

LABOUR

MATERIAL

PLANT

DHS

DHS

DHS

SUBCONTRAC TOTAL T

100.00

100.00

100

100.00

100.00

100

100.00

100.00

100

1,000.00

1,000.00

500

100.00

100.00

100

500

SUB CONTRACT DHS

1.15

MARK UP SPLITTED AMOUNT

LABOUR

6.56

MATERIAL

-

PLANT

7.70

LABOUR

MATERIAL

PLANT

DHS

DHS

DHS

SUB CONTRACT DHS

SUBCONTRAC TOTAL T

1.00

15.26

100.00

100.00

419.84

-

492.80

64.00

100

1.17

4.13

13.75

3.00

22.05

38.61

136.13

453.75

99.00

1.13

37.50

13.25

3.00

54.88

76.50

2,550.00

901.00

204.00

5.00

10.00

320.00

10.00

10.00

310.00

4.00

4.00

628.00

4.00

4.00

112.00

5.00

320.00

1.15

MARK UP SPLITTED AMOUNT

LABOUR

MATERIAL

PLANT

SUBCONTRAC TOTAL T

LABOUR

MATERIAL

PLANT

DHS

DHS

DHS

SUB CONTRACT DHS

1.15

MARK UP SPLITTED AMOUNT

LABOUR

MATERIAL

PLANT

LABOUR

MATERIAL

PLANT

DHS

DHS

DHS

1,854.95

2,686.13

2,347.55

SUB CONTRACT DHS

SUBCONTRAC TOTAL T 1,737.00

LABOUR DETAIL MASON HRS

CARPENTER HRS

STEEL FIXTURE HRS

UNSKILLED CHARGE LABOUR HAND HRS HRS

0.64

LABOUR DETAIL MASON HRS

CARPENTER HRS

STEEL FIXTURE HRS

UNSKILLED CHARGE LABOUR HAND HRS HRS

-

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) CONCRETE WORKS Substructure Note:-Upto and including Ground Floor Grade slab Plain in situ concrete with SRC, grade as required A

50 mm thick blinding

m2

64

B

100 mm thick blinding

m2

56

m3

1

363

363

20

1280 Deleted

Reinforced in situ concrete, grade 50 N/mm2 C

Neck columns

Reinforced in situ concrete, grade 40 N/mm2 D

Footings

m3

20

357

7140

E

Tie beams

m3

4

357

1428

m3

10

797

7970

Reinforced in situ concrete, grade 20 N/mm2 F

Grade slab, 100 mm thick

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2) ITEM RATE AMOUNT ITEM DESCRIPTION UNIT QTY. (AED) (AED) NO. To Collection 18,181.00 P2/S1/B1/CW/1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) CONCRETE WORKS, Cont'd Substructure, Cont'd Note:-Upto and including Ground Floor Grade slab High yield steel bar reinforcement, characteristic strength (FY) = 460 N/mm2 and comply with BS 4449 A

Various diameters

kg

2,860

B

A-252 mesh reinforcement

m2

100

3.6

10296 INCLUDED

Formwork to C

Sides of neck columns

m2

13

61

793

D

Sides of footing

m2

22

61

1342

E

Sides of tie beams

m2

34

61

2074

Sundries F

Isolation joint including filler, sealant, mastic, etc.

item

1

575

575

G

Construction joints, control joints, and the like including filler, sealant, mastic, etc.

item

1

575

575

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

To Collection

AMOUNT (AED)

15,655.00

P2/S1/B1/CW/2/PTC1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) CONCRETE WORKS, Cont'd Superstructure Reinforced in situ concrete, grade 50 N/mm2 A

Columns

m3

4

363

1452

Reinforced in situ concrete, grade 40 N/mm2 B

Beams

m3

7

357

2499

C

Staircase

m3

3

357

1071

D

Suspended solid slab, 175 mm thick

m3

30

357

10710

E

Sections, upstands and parapets

m3

6

357

2142

F

Lintels

m3

1

357

357

kg

7,080

3.6

25488

High yield steel bar reinforcement, characteristic strength (FY) = 460 N/mm2 and comply with BS 4449 G

Various diameters

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

To Collection

AMOUNT (AED)

43,719.00

P2/S1/B1/CW/3 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) CONCRETE WORKS, Cont'd Superstructure, Cont'd Formwork to A

Sides of columns

m2

51

72

3672

B

Sides and soffits of beams

m2

62

72

4464

C

Sides and soffits of staircases

m2

21

72

1512

D

Sides and soffits of slab

m2

178

72

12816

E

Sides of sections, upstands and parapets

m2

55

72

3960

F

Sides of lintels

m2

6

72

432

Sundries G

Control joints including filler, sealant, mastic, etc.

item

1

575

575

H

AHU, AC condensing units, water tank base, etc. including upstands, connecting beams all as specified and in coordination with MEP drawings

item

1

575

575

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

To Collection P2/S1/B1/CW/4/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) CONCRETE WORKS, Cont'd Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included. A

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

28,006.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

To Collection P2/S1/B1/CW/5 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) CONCRETE WORKS, Cont'd COLLECTION

Page P2/S1/B1/CW/1/PTC1

18,181

Page P2/S1/B1/CW/2/PTC1

15,655

Page P2/S1/B1/CW/3

43,719

Page P2/S1/B1/CW/4/R1

28,006

Page P2/S1/B1/CW/5

-

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

Total for Concrete Works - Carried to Bill No. 1 Summary P2/S1/B1/CW/6/R1

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

105,561

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MASONRY Substructure (in contact with soil) Solid concrete blockwork bedded, jointed and pointed in cement and sand mortar including all crack control joints, anchors, joints, wall ties, stiffener beams and columns, reinforcement, formworks, etc., complete A

200 mm thick walls

m2

21

99

2079

B

Entrance steps

m3

1

494

494

Internal Solid concrete blockwork bedded, jointed and pointed in cement and sand mortar including all crack control joints, anchors, metal laths, safing insulation fire rated walls compressible filler, control joints, wall ties, stiffener beams and columns, reinforcement, formworks, sound transmission, etc., complete C

100 mm thick walls

m2

71

88

6248

C1

150 mm thick walls

m2

36

93

3348

D

200 mm thick walls

m2

92

99

9108

m2

55

78

4290

Hollow blockwork bedded, jointed and pointed in cement and sand mortar including all crack control joints, anchors, metal laths, safing insulation fire rated walls compressible filler, control joints, wall ties, stiffener beams and columns, reinforcement, formworks, sound transmission, etc., complete E

100 mm thick walls

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2) ITEM RATE AMOUNT ITEM DESCRIPTION UNIT QTY. (AED) (AED) NO. To Collection 25,567.00 P2/S1/B1/MA/1/PTC1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MASONRY, Cont'd External Solid concrete blockwork bedded, jointed and pointed in cement and sand mortar including all crack control joints, anchors, metal laths, safing insulation fire rated walls compressible filler, control joints, wall ties, stiffener beams and columns, reinforcement, formworks, sound transmission, etc., complete A

200 mm thick walls

m2

7

99

693

B

300 mm thick walls

m2

10

141

1410

Thermalite blockwork bedded, jointed and pointed in cement and sand mortar including all crack control joints, anchors, metal laths, safing insulation fire rated walls compressible filler, control joints, wall ties, stiffener beams and columns, reinforcement, formworks, sound transmission, etc., complete C

250 mm thick walls

m2

39

96

3744

D

300 mm thick walls

m2

12

105

1260

item

1

575

575

Sundries E

Extra-over for fire rating of blockwork

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

To Collection P2/S1/B1/MA/2 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MASONRY, Cont'd Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included. A

AMOUNT (AED)

7,682.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

To Collection P2/S1/B1/MA/3 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MASONRY, Cont'd

COLLECTION

Page P2/S1/B1/MA/1/PTC1 Page P2/S1/B1/MA/2 Page P2/S1/B1/MA/3

25,567 7,682.00 -

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED) 0

Total for Masonry - Carried to Bill No. 1 Summary P2/S1/B1/MA/4

33,249

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) METAL WORK Staircase railings including balustrade, handrail, glazing, plates, bolts, nuts, fittings, special features, finishes, accessories, etc., complete A

1000 mm high

m

12

518

6216

Steel profile B

150 mm high Powder coated proprietary cold steel profile

m

5

Deleted

C

300 mm high Powder coated proprietary cold steel profile

m

2

Deleted

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

To Collection P2/S1/B1/MW/1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) METAL WORK, Cont'd Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included. A

AMOUNT (AED) 6,216.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

To Collection P2/S1/B1/MW/2 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) METAL WORK, Cont'd

COLLECTION

Page P2/S1/B1/MW/1/PTC1 Page P2/S1/B1/MW/2

6,216.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

Total for Metal Work - Carried to Bill No. 1 Summary P2/S1/B1/MW/3

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

6,216

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ALUMINIUM AND GLAZING WORKS Glass railing including balustrade, Aluminium handrail, steel sleeve, fixing, fittings, bolts, screw, nuts, plates, special feature, finishes, accessories, etc., complete A

1275 mm high frameless glass balustrade

m

7

518

3626

B

Railings including balustrade, handrail, glazing, plates, bolts, nuts, fittings, special features, finishes, accessories, etc., complete 1275 mm high frameless glass balustrade

m

2

805

1610

900 mm high railing to porch

m

2

518

1036

Trellis Parking Shade Trellis above car parking including 50x 150mm Powder coated aluminium trellis including 75 x150mm aluminium frame, extruded aluminium profile, steel post, aluminium/metal support fixed to boundary wall fixing, special feature, supports system, accessories, fittings, fixtures, etc.,complete as detailed on drg A-R-402

m2

30

345

10350

Trellis above balcony including 50x 150mm Powder coated aluminium trellis including 150 x150mm aluminium frame, special feature, supports system, accessories, fittings, fixtures, etc.,complete as detailed on drg A-R-405

m2

3

Railings including balustrade, handrail, glazing, plates, bolts, nuts, fittings, special features, finishes, accessories, etc., complete Aluminium railing including balustrade, handrail, steel sleeve, fixing, fittings, bolts, screw, nuts, plates, special feature, finishes, accessories, etc., complete C

D

E

DELETED

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

To Collection

AMOUNT (AED)

16,622.00

P2/S1/B1/AG/1/PTC1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ALUMINIUM AND GLAZING WORKS, Cont'd Aluminium doors and windows including subframes, frames, architraves, glazing, spandrel panel, transom, mullion, supports, fasteners, gaskets, separator, insulation, sill, joints, fittings, ironmongery, special features, accessories, tests, etc. complete as detailed on drawings and specifications A

Type GL-01, overall size 600 x5300 mm

no.

1

2560

2560

B

Type GL-02, overall size 800 x 1500 mm

no.

1

966

966

C

Type GL-03, overall size 3300 x 2400 mm

no.

1

6376

6376

D

Type GL-04, overall size 1000 x 2400 mm

no.

1

E

Type GL-05, overall size 1100 x 2400 mm

no.

1

2581

2581

F

Type GL-06, overall size 2200 x 2800 mm

no.

2

4959

9918

G

Type GL-07, overall size 1850 x 2800 mm

no.

1

4170

4170

H

Type GL-08, overall size 1400 x 2200 mm

no.

1

2479

2479

no.

2

Deleted

Powder coated aluminium louvers including subframes, frames, ironmongery, holdfast, special features, paint, fittings, accessories, etc., complete J

Type LV-01, overall size 1100 x 3725 mm

Deleted

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

To Collection P2/S1/B1/AG/2/PTC1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ALUMINIUM AND GLAZING WORKS, Cont'd Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included. A

AMOUNT (AED)

29,050.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

To Collection P2/S1/B1/AG/3 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ALUMINIUM AND GLAZING WORKS, Cont'd

COLLECTION

Page P2/S1/B1/AG/1/PTC1

16,622

Page P2/S1/B1/AG/2/PTC1

29,050

Page P2/S1/B1/AG/3

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

Total for Aluminium & Glazing - Carried to Bill No. 1 Summary P2/S1/B1/AG/4

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

45,672

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) CARPENTRY & JOINERY WORKS Sub frames for timber doors A

Subframes to doors as specified in particular specifications including fixing with accessories as shown complete

m

61

17

1037

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2) ITEM RATE AMOUNT ITEM DESCRIPTION UNIT QTY. (AED) (AED) NO. To Collection 1,037.00 P2/S1/B1/CJ/1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) CARPENTRY & JOINERY WORKS, Cont'd Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included. A

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

To Collection P2/S1/B1/CJ/2 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) CARPENTRY & JOINERY WORKS, Cont'd

COLLECTION

Page P2/S1/B1/CJ/1 Page P2/S1/B1/CJ/2

1,037.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

Total for Carpentry & Joinery - Carried to Bill No. 1 Summary P2/S1/B1/CJ/3/R1

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

1,037.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM NO.

ITEM DESCRIPTION

MAIN WORKS (PART 2)

UNIT QTY.

RATE (AED)

AMOUNT (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) INTERNAL AND EXTERNAL FINISHES Floor finishes (Internal) A

Cement and sand screed to receive tile

m2

146

INCLUDED

600 x 600 mm porcelain floor tiles A, type TL-01 (P.C. rate for supply only of tile is Dhs. 25/- per m2)

m2

14

96

1344

600 x 600 mm porcelain floor tiles, type TL-02 (P.C. rate for supply only of tile is Dhs. 25/- per m2)

m2

1

96

96

1200 x 200 mm wood look porcelain floor tiles A, type TL-04 (P.C. rate for supply only of tile is Dhs. 25/- per m2)

m2

119

96

11424

Marble stone, type ST-01 (P.C. rate for supply only of tile is Dhs. 180/- per m2)

m2

2

318

636

Ditto to steps and risers (P.C. rate for supply only of tile is Dhs. 120/- per m)

m

23

238

5474

Stone/Tiles including polishing, joint, grouting, pointing, sealant, etc.,complete B

C

D

E

F

Floor finishes (External) G

Cement and sand screed to receive tile

m2

10

H

500 x 500 x 50 mm white cement tiles (hydraulic type) (at roof) laid including, pedestals, spacers, etc., complete, type TR-1

m2

79

86

6794

300 x 300 mm porcelain floor tiles, type CT-7 (P.C. rate for supply only of tile is Dhs. 25/- per m2)

m2

10

96

960

J

0 INCLUDED

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM

ITEM DESCRIPTION

NO.

MAIN WORKS (PART 2)

UNIT QTY.

RATE (AED)

To Collection

AMOUNT (AED) 26,728.00

P2/S1/B1/FIN/1/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) INTERNAL AND EXTERNAL FINISHES, Cont'd Skirting A

Cement and sand plaster to receive Skirting

m2

11

39

429

100 mm high wood look porcelain skirting tile A, type TL-05 (P.C. rate for supply only of skirting tile is Dhs. 10/- per m)

m

112

26

2912

Skirting (External) Cement and sand plaster to receive Skirting

m2

1

39

39

100 mm high skirting tile, type CT-8 (P.C. rate for supply only of skirting tile is Dhs. 8/- per m)

m

10

24

240

E

100 mm high Terrazo skirting, type TR-3

m

51

24

1224

F

Threshold / Sill Cement and sand plaster to receive Threshold

m2

6

29

174

Thresholds including grouting, fixing, etc. 100 mm wide marble thresholds, ST-01 (P.C. rate for supply only of marble is Dhs. 50/- per m)

m

1

66

66

130 mm wide marble thresholds, ST-01 (P.C. rate for supply only of marble is Dhs. 55/- per m)

m

5

72

360

265 mm wide marble thresholds, ST-01 (P.C. rate for supply only of marble is Dhs. 80/- per m)

m

2

100

200

75 mm high porcelain tile TL-02 (P.C. rate for supply only of tile is Dhs. 8/- per m)

m

2

24

48

150mm wide 1200mm high wc ledge finish type SF-01 including support & framing system to wc cistern m

4

302

1208

Skirtings including fixing with adhesive, grouting, angles, etc., complete B

C

Skirtings including fixing with adhesive, grouting, angles, etc., complete D

G

H

J

K

L

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM NO. M Cills

ITEM DESCRIPTION

MAIN WORKS (PART 2)

UNIT QTY. item

RATE (AED)

1

435

To Collection

AMOUNT (AED) 435 7,335.00

P2/S1/B1/FIN/2/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) INTERNAL AND EXTERNAL FINISHES, Cont'd Walls finishes (Internal) A

Cement and sand plaster to receive paint

m2

406

40

16240

B

Cement and sand plaster to receive tile

m2

39

39

1521

C

Emulsion paint RAL 9010,type PT-01

m2

347

18

6246

D

Hygiene moisture resistant emulsion paint RAL 9010, type PT-02

m2

59

21

1239

E

Anti fungal paint to shaft

m2

45

14

630

m2

39

101

3939

m2

4

251

1004

item

1

288

288

m2

240

39

9360

Wall tiles including grouting, pointing, polishing, etc., as required complete F

300 x 600 mm porcelain tiles A, type TL-03 (P.C. rate for supply only of tile is Dhs. 20/- per m2)

Glass including backing, framing system, fixing, accessories, fittings, trims, special features etc. complete. G

Back painted glass, type GL-01 100 mm thick Hollow Block walls, Both side Plaster, One Side Paint & One side Ceramic Sundries

H

PU paint , type PT-07 for ac grills

Wall finishes (External) J

K

Cement and sand render including accessories to receive paint at concrete / block walls as per drawing External paint to walls & soffit of ceiling over sand cement plaster

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM

ITEM DESCRIPTION

NO.

L

MAIN WORKS (PART 2)

UNIT QTY.

RATE (AED)

AMOUNT (AED)

including pvc grooves

m2

173

32

5536

White epoxy paint over cement sand plaster to parapet internal side

m2

67

32

2144

To Collection

48,147.00

P2/S1/B1/FIN/3/PTC1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) INTERNAL AND EXTERNAL FINISHES, Cont'd Ceiling finishes (Internal) A

Cement and sand plaster to receive paint

m2

67

41

2747

B

Emulsion paint underslab RAL 9003 , type PT-03

m2

67

18

1206

Suspended gypsum board ceiling painted with emulsion paint RAL 9003, type PT-03

m2

51

86

4386

Suspended gypsum board ceiling painted with hygiene moisture resistant emulsion paint RAL 9003, type PT-04

m2

19

86

1634

E

600 x 600 mm gypsum ceiling tiles, type TL-06

m2

6

75

450

F

1200 x 600 mm gypsum ceiling tiles, type TL-07

m2

2

75

150

G

Bulkhead, 50 mm high including finishes

m

17

29

493

H

Ditto to 500 mm high

m

3

35

105

J

Ditto to 550 mm high

m

4

35

140

K

Ditto to 700 mm high

m

5

35

175

L

Access panels

item

1

115

115

m2

8

75

600

Suspended ceilings including suspension system, shadow gap, fittings, fixing, finishes, accessories, access panels, etc., complete C

D

Ceiling finishes (External) M

Calcium silicate board lining

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM

ITEM DESCRIPTION

NO.

MAIN WORKS (PART 2)

UNIT QTY.

RATE (AED)

To Collection

AMOUNT (AED)

12,201.00

P2/S1/B1/FIN/4/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) INTERNAL AND EXTERNAL FINISHES, Cont'd Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included. A

Anti Fungul Paint Above False Ceiling ( Wall, Ceiling ) - As per addendum - Tender Queries & Response No- 6

m2

86

12

1032

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM

ITEM DESCRIPTION

NO.

UNIT QTY.

MAIN WORKS (PART 2) RATE (AED)

To Collection

AMOUNT (AED)

1,032.00

P2/S1/B1/FIN/5 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) INTERNAL AND EXTERNAL FINISHES, Cont'd

COLLECTION

Page P2/S1/B1/FIN/1/R1

26,728.00

Page P2/S1/B1/FIN/2/R1

7,335.00

Page P2/S1/B1/FIN/3/PTC1

48,147.00

Page P2/S1/B1/FIN/4/R1

12,201.00

Page P2/S1/B1/FIN/5

1,032.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM NO.

ITEM DESCRIPTION

UNIT QTY.

Total for Internal & External Finishes - Carried to Bill No. 1 Summary P2/S1/B1/FIN/6/R1

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

95,443.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM

ITEM DESCRIPTION

NO.

MAIN WORKS (PART 2)

UNIT QTY.

RATE (AED)

AMOUNT (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) THERMAL AND MOISTURE PROTECTION Substructure waterproofing A

1000 gauge polythelein sheet

m2

93

5

465

B

1 x 4mm thick S.B.S membrane laid horizontally

m2

112

B1

2 Coats of cold applied liquid bituminous paint laid horizontally

m2

112

12

1344

C

Ditto applied vertically

m2

69

12

828

173

13667

Deleted

Roof Water proofing D

Lightweight concrete screed (thickness as per details) laid to slope of density 600 to 800 Kg/m3 ( CONSIDERED COMBO ROOF )

m2

79

E

Bituminous primer coat

m2

79

0 INCLUDED

F

5mm thick torch applied modified bitumen waterproofing membrane

m2

79

0 INCLUDED

G

Ditto at upstand

m

51

0 INCLUDED

H

2 layer of filter membrane

m2

79

0 INCLUDED

J

100 mm thick polystyrene rigid insulation board with density of 35 kg/m

m2

79

0 INCLUDED

K

50 mm thick loose gravel

m2

79

0 INCLUDED

L

Bitumen impregnated protection board

m

51

INCLUDED

M

Aluminium flashing/skirting fixed to parapet wall as per specification

m

51

0 INCLUDED

N

Sealant with back rod

m

51

0 INCLUDED

P

Finish waterproofing around rainwater outlets

item

1

INCLUDED

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM

ITEM DESCRIPTION

NO.

MAIN WORKS (PART 2)

UNIT QTY.

RATE (AED)

To Collection

AMOUNT (AED) 16,304.00

P2/S1/B1/TM/1/PTC1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) THERMAL AND MOISTURE PROTECTION, Cont'd Terrace/Balcony Water proofing A

Lightweight concrete screed (thickness as per details) laid to slope of density 600Kg/m3

m2

7

B

Bituminous primer coat

m2

7

0 INCLUDED

C

Filter membrane

m2

7

0 INCLUDED

D

4mm thick torch applied modified bitumen water proofing membrane 2 Coat of Liquid Bitumen Paint Ditto at upstand

m2

7

0 INCLUDED

m

23

INCLUDED

E

57

399

Wet areas waterproofing F

Waterproofing laid horizontally including leveling screed

m2

27

40

1080

G

Ditto, to upstands

m

43

40

1720

92

184

Waterproofing to shafts H

Waterproofing laid horizontally

m2

2

J

Ditto, to upstands

m

12

INCLUDED

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM

ITEM DESCRIPTION

NO.

MAIN WORKS (PART 2)

UNIT QTY.

RATE (AED)

To Collection

AMOUNT (AED)

3,383.00

P2/S1/B1/TM/2/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) THERMAL AND MOISTURE PROTECTION, Cont'd AHU, duct and pipe penetration A

Waterproofing to base of AHU, duct and pipe penetration

item

1

575

575

item

1

575

575

item

1

575

575

Damp proof course B

Damp proof course laid in layers as specified to periphery of building, wet areas, service rooms, OTS, etc., as specified

At internal wall as specified C

Thermal insulation with gypsum board lining to structures as per specifications and Authorities requirements

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM

ITEM DESCRIPTION

NO.

UNIT QTY.

MAIN WORKS (PART 2) RATE (AED)

To Collection P2/S1/B1/TM/3 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) THERMAL AND MOISTURE PROTECTION, Cont'd Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included. A

AMOUNT (AED)

1,725.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM

ITEM DESCRIPTION

NO.

UNIT QTY.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

To Collection P2/S1/B1/TM/4 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) THERMAL AND MOISTURE PROTECTION, Cont'd

COLLECTION

Page P2/S1/B1/TM/1/PTC1

16,304

Page P2/S1/B1/TM/2/R1

3,383

Page P2/S1/B1/TM/3

1,725

Page P2/S1/B1/TM/4

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM NO.

ITEM DESCRIPTION

UNIT QTY.

Total for Thermal & Moisture Protection - Carried to Bill No. 1 Summary P2/S1/B1/TM/5/R1

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

21,412

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT

MAIN WORKS

ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM

ITEM DESCRIPTION

NO.

(PART 2)

UNIT QTY.

RATE (AED)

AMOUNT (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ACCESSORIES AND SPECIAL CONSTRUCTION Mirrors including framing, backing, fittings, accessories, with splayed edges and concealed fixing etc., complete A B

Full counter width full height mirror overall height 1550 mm Full counter width full height mirror overall height 900 mm 500 x 1040 mm mirror

m

4

345

1380

no.

1

288

288

no.

2

288

576

86

86

230

230

Garbage disposal C

Recycle garbage bins for glass, plastics, paper, metal, cardboard

Access Panels D

Allow for finishes to access panel to ducts and shafts as shown on mechanical drawings

1

item

Statutory Signage's E

Allow for statutory signage's as per Local Authorities requirement and as per the drawings and specifications

item

1

To Collection

2,560.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT

MAIN WORKS

ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM

ITEM DESCRIPTION

NO.

(PART 2)

UNIT QTY.

RATE (AED)

AMOUNT (AED)

P2/S1/B1/AES/1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ACCESSORIES AND SPECIAL CONSTRUCTION, Cont'd Sanitarywares & accessories Take, delivery, store and fixing, testing and providing guarantee for the following including incidental material, labour etc. complete as shown on drawings and as per specifications A

Wall hung water closet, BA-01

no.

3

138

414

B

Flush plate, BA-02

no.

3

C

Trigger spray, BA-03

no.

3

12

36

D

Concealed cistern, BA-04

no.

3

138

414

E

Semi-recessed wash basin, BA-05

no.

3

138

414

F

Wash basin mixer, BA-06

no.

3

57

171

G

Shower column, BA-07

no.

2

57

114

H

Shower mixer, BA-08

no.

2

12

24

J

Bathtub, BA-09

no.

1

253

253

K

Bathtub mixer, BA-10

no.

1

57

57

L

Floor mounted water closet, BA-11

no.

1

138

138

M

Trigger spray, BA-12

no.

1

12

12

N

Wall mounted wash basin, BA-13

no.

1

138

138

P

Wash basin mixer, BA-14

no.

1

57

57

Q

Shower, BA-15

no.

1

57

57

0 INCLUDED

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT

MAIN WORKS

ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM

ITEM DESCRIPTION

NO.

(PART 2)

UNIT QTY.

RATE (AED)

To Collection

AMOUNT (AED) 2,299.00

P2/S1/B1/AES/2 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ACCESSORIES AND SPECIAL CONSTRUCTION, Cont'd Sanitarywares & accessories Take, delivery, store and fixing, testing and providing guarantee for the following including incidental material, labour etc. complete as shown on drawings and as per specifications, cont'd A

Shower mixer, BA-16

no.

1

57

57

B

Shower tray, BA-17

no.

1

23

23

C

Tissue paper holder with cover, BA-18

no.

4

12

48

D

Towel rail, BA-19

no.

2

12

24

E

Towel ring, BA-20

no.

4

12

48

F

Robe hook, BA-21

no.

4

12

48

G

Soap & shampoo tray, BA-22

no.

2

12

24

H

Kitchen sink

no.

1

138

138

Note: Supply of all Sanitary wares& accessories is a Provisional sum

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT

MAIN WORKS

ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM

ITEM DESCRIPTION

NO.

(PART 2)

UNIT QTY.

RATE (AED)

To Collection P2/S1/B1/AES/3 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ACCESSORIES AND SPECIAL CONSTRUCTION, Cont'd Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included. A

AMOUNT (AED)

410.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT

MAIN WORKS

ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM

ITEM DESCRIPTION

NO.

(PART 2)

UNIT QTY.

RATE (AED)

AMOUNT (AED)

To Collection P2/S1/B1/AES/4 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ACCESSORIES AND SPECIAL CONSTRUCTION, Cont'd

COLLECTION

Page P2/S1/B1/AES/1

2,560.00

Page P2/S1/B1/AES/2

2,299.00

Page P2/S1/B1/AES/3

410.00

Page P2/S1/B1/AES/4

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM NO.

ITEM DESCRIPTION

UNIT QTY.

Total for Accessories, Equipment, etc - Carried to Bill No. 1 Summary P2/S1/B1/AES/5

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

5,269

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS Include for the supply & complete installation as detailed in the Specifications and on the Drawings and to the complete satisfaction and approval of the Engineer and all concerned Statutory Authorities and under the following sections DRAINAGE INSTALLATIONS Pipe work of any kind (waste, soil, condensate, vent, rainwater) including fittings, rodding eyes, protection barriers, supports, accessories, etc., complete A

32 mm dia.

m

8

33.00

264.00

B

40 mm dia.

m

7

34.00

238.00

C

50 mm dia.

m

20

37.00

740.00

D

82 mm dia.

m

18

53.00

954.00

E

110 mm dia.

m

36

72.00

2,592.00

F

Connections to sanitary ware with pipes

item

1

847.00

847.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2) ITEM RATE AMOUNT ITEM DESCRIPTION UNIT QTY. (AED) (AED) NO. To Collection 5,635.00 P2/S1/B1/ME/1/PTC1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) DRAINAGE INSTALLATIONS, (cont'd.) Underground pipework including protection, fittings, protection barriers, supports, accessories, etc., complete A

82 mm dia.

m

11

92.00

1,012.00

B

110 mm dia.

m

52

111.00

5,772.00

B

160 mm dia.

m

2

144.00

288.00

C

Connection from FIC to Main network

item

1

1,650.00

1,650.00

The following including all fittings, fixings, accessories, cover frame, etc., complete D

Floor clean out, type FCO - 110 mm dia.

no.

4

145.00

580.00

E

Clean out, type CO - 110 mm dia.

no.

1

145.00

145.00

F

Floor drain, type FD - 82 mm dia.

no.

5

107.00

535.00

G

Balcony drain, type BD - 50 mm dia.

no.

2

449.00

898.00

H

Rain water outlet, type RWO

no.

1

539.00

539.00

J

Vent cowl

no.

2

55.00

110.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

To Collection

AMOUNT (AED)

11,529.00

P2/S1/B1/ME/2/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) DRAINAGE INSTALLATIONS, (cont'd.) Connection to GT, MH including valves, fixing, fittings, etc, complete A

Gully trap, type GT

no.

1

781.00

781.00

B

Manhole, type MH, size 600 x 600

no.

1

2,000.00

2,000.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

To Collection

AMOUNT (AED)

2,781.00

P2/S1/B1/ME/3 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) Generally for the complete Drainage installation A

Drawings, manuals, approvals & instruction books

item

included

B

Testing and commissioning

item

C

Training

item

D

Labels, special tools, etc.

item

E

Protective and decorative painting

item

included

F

Liaison and co-ordination with Local Authorities

item

included

G

All civil works related to Drainage works (e.g. Equipment base etc.)

item

1

-

included included

1

1

651.00

550.00

651.00

550.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

To Collection

AMOUNT (AED)

1,201.00

P2/S1/B1/ME/4 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) PLUMBING INSTALLATIONS Cold water pipe work including puddle flange, fittings, supports, accessories, etc., complete A

15 mm dia.

m

53

20.00

1,060.00

B

20 mm dia.

m

16

21.00

336.00

C

25 mm dia.

m

21

26.00

546.00

D

32 mm dia

m

38

33.00

1,254.00

E

Connection to dewa water meter

item

1

1,100.00

1,100.00

F

Connection to sanitary ware/ sinks including angle valves etc.

item

1

942.00

942.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

To Collection

AMOUNT (AED)

5,238.00

P2/S1/B1/ME/5/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) PLUMBING INSTALLATIONS, (cont'd.) Pexpipe work including fittings, conduit, supports, accessories, etc. complete A

15 mm dia. pipe

m

24

29.00

696.00

m

6

73.00

438.00

Underground Cold water pipe work including valves, fittings, supports, accessories, etc., complete B

32 mm dia pipe (from Main water meter chamber)

Hot water pipe work including fittings, supports, accessories, insulation etc., complete C

15 mm dia.

m

31

34.00

1,054.00

D

20 mm dia.

m

15

34.00

510.00

E

25 mm dia.

m

4

36.00

144.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. F Connection to sanitary ware/ sinks including angle valves, etc. item

MAIN WORKS (PART 2) RATE (AED)

To Collection

AMOUNT (AED) included

2,842.00

P2/S1/B1/ME/6/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) PLUMBING INSTALLATIONS, (cont'd.) Pexpipe work including fittings, supports, accessories, etc. complete A

15 mm dia. with 20 mm conduit

m

18

31.00

558.00

The following including all fittings, fixings, cover, valves frame accessories, etc., complete B

Bibtap -15 mm dia.

no.

1

112.00

112.00

C

Isolating valve, type IV - 15 mm dia.

no.

16

48.00

768.00

D

Isolating valve, type IV - 20 mm dia.

no.

1

59.00

59.00

E

Isolating valve, type IV - 25 mm dia.

no.

2

75.00

150.00

F

Isolating valve, type IV - 32 mm dia.

no.

1

96.00

96.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

G

Non return valve, type NRV - 15 mm dia.

no.

6

63.00

378.00

H

Non return valve, type NRV - 25 mm dia.

no.

1

90.00

90.00

To Collection

2,211.00

P2/S1/B1/ME/7 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) PLUMBING INSTALLATIONS, (cont'd.) The liaisoning, coordination with DEWA, collection and storage will be done by the Contractor. A

Fixing of main water meter including incidental labour & material

no.

1

B

Supply and installation of main water meter cabinet including all fittings, fixtures, accessories etc. complete

no.

1

Note: The cost of only supply of meters will be paid by the Employer, The liaisoning, coordination with DEWA, collection and storage will be done by the Contractor.

GRP water tank and connection with fittings, float valves, vent pipes, accessories, valves, supports, warning pipes, ladders, partition low and high level float switches, etc., complete

1,155.00

1,155.00

included

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. C

Overhead insulated GRP panel water tank, size 1000 x 1000 x 1000 mm (Capacity = 1 cum.)

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

set

1

3,157.00

3,157.00

item

1

662.00

662.00

Connections only including incidental labour and material D

Connection to GRP water tanks including inlet, outlet, drainage, backwash line, overflow pipe, etc., complete

To Collection

4,974.00

P2/S1/B1/ME/8 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) PLUMBING INSTALLATIONS, (cont'd.) Pump set including all controls, wiring, valves, piping, accessories, vibration isolators, etc., complete A

B

C

D

Circulation pump set(cwcp-1) (1-duty/1-stand by) 0.2 l/s @ 0.5 bar, 0.4 kw each

set

1

5,896.00

5,896.00

Water heat pump cooling capacity= 9.3 kw/hr. electrical load= 4.5 kw.

set

1

8,316.00

8,316.00

Cooled cold water boosting pump set (bp-01) 1-duty/1-standby 0.8 l/s @1.80 bar, 0.5 kw. Each + pressure vessel

set

1

12,496.00

12,496.00

Circulating pump (hwcp-01) (1-duty/1-stand by) 0.6 l/s@ 1.75 bar, 0.5 kw each

set

1

5,896.00

5,896.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

6,600.00

6,600.00

Solar system including solar panels, pumps, wiring, pipework, connections, valves, fittings, fixtures, controls, control panels, isolators, accessories etc. complete E

Solar panel thermosiphone system with electrical back up of 2.0 kw tank capacity=200 ltr

no.

1

To Collection

39,204.00

P2/S1/B1/ME/9/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) PLUMBING INSTALLATIONS, (cont'd.) Generally for the complete Plumbing installation A

Drawings, manuals, approvals & instruction books

item

included

B

Testing and commissioning

item

C

Training

item

D

Labels, special tools, etc.

item

E

Protective and decorative painting

item

included

F

Liaison and co-ordination with Local Authorities

item

included

1

1,492.00

1,492.00 included

1

994.00

994.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. G

All civil works related to Plumbing works (e.g. Equipment base etc.) item

MAIN WORKS (PART 2) RATE (AED)

1

550.00

To Collection

AMOUNT (AED) 550.00

3,036.00

P2/S1/B1/ME/10 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) FIRE FIGHTING INSTALLATIONS The following items including accessories, supports, etc. complete A

6 kg dcp extinguisher -kitemark/lpcb approved

no.

1

Deleted

B

2 kg co2 extinguisher -kitemark/lpcb approved

no.

1

Deleted

B1

2.5 kg multipurpose dcp -kitemark/lpcb approved

no.

1

154.00

154.00

C

1200 x 1200 mm Fire blanket

no.

1

132.00

132.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

To Collection

AMOUNT (AED)

286.00

P2/S1/B1/ME/11 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) FIRE FIGHTING INSTALLATIONS, (cont'd.) Generally for the complete Fire fighting installation A

Drawings, manuals, approvals & instruction books

item

included

B

Testing and commissioning

item

included

C

Training

item

included

D

Labels, special tools, etc.

item

included

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

E

Protective and decorative painting

item

included

F

Liaison and co-ordination with Local Authorities

item

included

G

All civil works related to Fire fighting works (e.g. Equipment base etc.)

item

included

To Collection

-

P2/S1/B1/ME/12 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) AIR-CONDITIONING INSTALLATIONS Fan coil units including controls, control valves, sensors, filters, wiring, fixing, accessories, vibration isolators, etc., complete, (cont'd.) A

FCU-GF-01 / CU-GF-01

no.

1

6,061.00

6,061.00

B

FCU-GF-02 / CU-GF-02

no.

1

3,166.00

3,166.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. C FCU-GF-03 / CU-GF-03 no. 1

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED) Omitted

D

FCU-1F-01 / CU-1F-01

no.

1

3,166.00

3,166.00

E

FCU-1F-02 / CU-1F-02

no.

1

5,751.00

5,751.00

m

90

45.00

4,050.00

no.

5

605.00

3,025.00

Refrigeration pipe work including insulation, supports, accessories, fixing, refrigerant metering etc. complete as specified F

Refrigeration pipe (all size)

The following items including accessories, supports, etc., complete G

Thermostat

To Collection

25,219.00

P2/S1/B1/ME/13 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) AIR-CONDITIONING INSTALLATIONS, (cont'd.) Grilles, diffusers, dampers, louvers including all accessories A

Supply air grille, type SAG - 750 x 150 mm

no.

1

174.00

174.00

B

Supply air grille, type SAG - 600 x 150 mm

no.

2

135.00

270.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. C Return air grille, type RAG - 750 x 150 mm no. 1 D

Return air grille, type RAG - 600 x 150 mm

MAIN WORKS (PART 2) RATE (AED) 123.00

AMOUNT (AED) 123.00

no.

1

100.00

100.00

Supply air diffuser E

SD 150 x 150 mm

no.

1

97.00

97.00

F

SD 225 x 225 mm

no.

3

120.00

360.00

G

SD 300 x 300 mm

no.

1

156.00

156.00

Return air diffuser H

RD 150x150 mm

no.

1

79.00

79.00

J

RD 225x225 mm

no.

3

95.00

285.00

K

RD 300 x 300 mm

no.

1

114.00

114.00

Extract square diffuser L

ED-1, 150 x 150 mm, 15 L/s air flow rate

no.

4

79.00

316.00

M

ED-3, 150 x 150 mm, 10 L/s air flow rate

no.

1

79.00

79.00

N

ED-4, 225 x 225 mm, 50 L/s air flow rate

no.

1

95.00

95.00

To Collection

2,248.00

P2/S1/B1/ME/14/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) AIR-CONDITIONING INSTALLATIONS, (cont'd.) Grilles, diffusers, dampers, louvers including all accessories, (cont'd.) A

Fresh air louver 0.1 m2

no.

1

188.00

188.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

B

Extract air louver 0.1 m2

no.

1

188.00

188.00

C

Volume control dampers , VCD

no.

7

193.00

1,351.00

D

Dampers (all types and size)

item

1

793.00

793.00

E

Flexible connections (all sizes)

item

1

977.00

977.00

To Collection P2/S1/B1/ME/15/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) AIR-CONDITIONING INSTALLATIONS, (cont'd.) The following including acoustic lining, joints, supports, sensors,

3,497.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. mesh, access cover, plenum, flexible etc., complete

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

A

Air conditioning ductwork

m2

34

140.00

4,760.00

B

Fresh air ductwork

m2

15

140.00

2,100.00

C

General extract air ductwork

m2

3

140.00

420.00

D

Staircase pressurization ductwork

item

E

Insulation to ductwork as specified / required

item

1

3,089.00

3,089.00

F

Aluminium cladding to ductwork, externally

item

1

1,815.00

1,815.00

deleted

To Collection P2/S1/B1/ME/16/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) AIR-CONDITIONING INSTALLATIONS, (cont'd.)

12,184.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

Generally for the complete Air-conditioning installations A

Drawings, manuals, approvals & instruction books

item

included

B

Testing and commissioning

item

C

Training

item

D

Labels, special tools, etc.

item

E

Protective and decorative painting

item

included

F

Liaison and co-ordination with Local Authorities

item

included

G

All civil works related to HVAC works (e.g. Equipment base etc.)

item

1

1,440.00

included 1

1

To Collection P2/S1/B1/ME/17 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.)

1,440.00

779.00

550.00

779.00

550.00

2,769.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

LPG INSTALLATIONS LPG gas pipe work including fittings, supports, accessories, protection, leak detectors etc., complete A

1/2" gas pipe (with pipe in pipe)

B

Connection to main pipe

m

7

item

1

included 12,485.00

12,485.00

Note:LPG tank and all other fittings are included in Adjustment Bills

To Collection P2/S1/B1/ME/18 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

12,485.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.)

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

LPG INSTALLATIONS., (cont'd.) The following including all accessories, fittings, controls, valves, fire proof wiring , etc complete A

Gas Meter

no.

1

included

B

Gas leak detector

no.

1

included

C

Emergency on/off switch

no.

1

included

D

Quick close valve

no.

1

included

E

Solenoid valve

no.

1

included

F

Pressure regulator

no.

1

included

G

Hose pipe 6mm dia

no.

1

included

To Collection P2/S1/B1/ME/19/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

-

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) LPG SYSTEM INSTALLATIONS, (Cont'd.) Generally for the complete LPG installations A

Drawings, manuals, approvals & instruction books

item

included

B

Testing and commissioning

item

included

C

Training

item

included

D

Labels, special tools, etc.

item

included

E

Protective and decorative painting

item

included

F

Liaison and co-ordination with Local Authorities

item

included

G

All civil works related to LPG works (e.g. Equipment base etc.)

item

included

To Collection P2/S1/B1/ME/20 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

-

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

4,690.00

4,690.00

MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included in his o1Fer. VENTILATOR

no.

1

To Collection P2/S1/B1/ME/21

4,690.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) COLLECTION Page P2/S1/B1/ME/1 Page P2/S1/B1/ME/2/R1

5,635.00 11,529.00

Page P2/S1/B1/ME/3

2,781.00

Page P2/S1/B1/ME/4

1,201.00

Page P2/S1/B1/ME/5/R1

5,238.00

Page P2/S1/B1/ME/6/R1

2,842.00

Page P2/S1/B1/ME/7

2,211.00

Page P2/S1/B1/ME/8

4,974.00

Page P2/S1/B1/ME/9/R1

39,204.00

Page P2/S1/B1/ME/10

3,036.00

Page P2/S1/B1/ME/11

286.00

Page P2/S1/B1/ME/12 Page P2/S1/B1/ME/13

25,219.00

Page P2/S1/B1/ME/14/R1

2,248.00

Page P2/S1/B1/ME/15/R1

3,497.00

Page P2/S1/B1/ME/16/R1

12,184.00

Carried Forward

122,085.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. P2/S1/B1/ME/22/R1

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) COLLECTION, (cont'd.) Brought Forward

122,085.00

Page P2/S1/B1/ME/17

2,769.00

Page P2/S1/B1/ME/18

12,485.00

Page P2/S1/B1/ME/19/R1

-

Page P2/S1/B1/ME/20

-

Page P2/S1/B1/ME/21

4,690.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. Total for Mechanical Engg. Installations - Carried to Bill No. 1 Summary P2/S1/B1/ME/23/R1

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED) 142,029.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS Include for the complete supply & installation as detailed in the Specifications and on the Drawings and to the complete satisfaction and approval of the Engineer and all concerned Statutory Authorities and under the following sections LIGHTING AND POWER Distribution boards including MCCB's, breakers, terminations, isolators, supports, accessories, etc., complete A

DB - GR

no.

1

2,368

2,368.00

B

DB - FR

no.

1

2,576

2,576.00

Control panel including MCCB's, ELCB's, Starter, VFD's, breakers, terminations, supports, accessories, etc., complete C

CP- Cooled water boosting pump

no.

1

INCLUDED

D

CP-Circulating pump

no.

2

INCLUDED

E

CP-Ventilator

no.

1

1,571

1,571.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2) ITEM RATE AMOUNT ITEM DESCRIPTION UNIT QTY. (AED) (AED) NO. To Collection 6,515.00 P2/S1/B1/EE/1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) LIGHTING AND POWER, (Cont'd.) Isolator panel including isolator, bus bar, enclosure terminations, supports etc., complete A

20A SP isolator W/P

no.

4

183

732.00

B

20A TP isolator W/P

no.

1

191

191.00

C

32A TP isolator W/P

no.

1

192

192.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

To Collection

AMOUNT (AED)

1,115.00

P2/S1/B1/EE/2 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) LIGHTING AND POWER, (Cont'd.) Cabling works including, accessories, support, termination glanding, surge protection, cable tie, etc. complete A

4C 35mm2 XLPE/SWA/PVC + 1C 16mm2 ECC

m

10

69

B

From DB's to Isolators and equipments

690.00

item

1

3,106

B1 From meter to DB-GR, 1x100mm dia. uPVC duct

item

1

186

186.00

B2 From meter to DB-FR, 1x75mm dia. uPVC duct

item

1

296

296.00

C

Glanding & termination works for DEWA incoming cable

item

1

225

225.00

D

Control cables as required

item

1

674

674.00

3,106.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

To Collection

AMOUNT (AED)

5,177.00

P2/S1/B1/EE/3/R4 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) LIGHTING AND POWER, (Cont'd.) The following including fittings, fixing accessories, etc. as per DEWA regulations and requirement with all associated costs complete A

kWH meter

no.

1

3,079

item

1

186

3,079.00

Note: The cost of only supply of meters will be paid by the Employer, The liaisoning, coordination with DEWA, collection and storage will be done by the contractor.

Miscellaneous item B

uPVC underground sleeves

186.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

To Collection

AMOUNT (AED)

3,265.00

P2/S1/B1/EE/4/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) LIGHTING AND POWER, (Cont'd.) Wiring including trunking and conduits in final sub circuits to light fittings : A

Circular downlight-1, Type DL1

no.

7

113

791.00

B

Circular downlight-2, Type DL2

no.

15

113

1,695.00

C

Spot light, Type SL

no.

7

113

791.00

D

Pendent light, Type PL1

no.

2

113

226.00

E

Pendent light, Type PL2

no.

2

113

226.00

F

Pendent light, Type PL3

no.

1

113

113.00

G

1 x 30 W, led lamp with die-cast aluminum body and glass diffuser ip65, Type W1 no.

3

113

339.00

1 x 18 W led surface mounted lighting fixture with die-cast aluminum body and glass diffuser to ip65 (decorative type), Type W2

no.

5

113

565.00

1 x 18 W led lamp recessed down light fixture to architect approval ip44, Type D1

no.

1

113

113.00

H

J

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

To Collection

AMOUNT (AED)

4,859.00

P2/S1/B1/EE/5 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) LIGHTING AND POWER, (Cont'd.) Wiring including trunking and conduits in final sub circuits to wiring accessories A

One gang one way switch

no.

8

94

752.00

B

One gang two way switch

no.

10

94

940.00

C

Two gang one way switch

no.

3

94

282.00

D

Two gang two way switch

no.

1

94

94.00

E

Three gang one way switch

no.

2

94

188.00

F

Bell Push button

no.

1

94

94.00

G

Bell

no.

1

94

94.00

H

Intermediate switch

no.

1

94

94.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

To Collection

AMOUNT (AED)

2,538.00

P2/S1/B1/EE/6/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.)

Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) LIGHTING AND POWER, (Cont'd.) Wiring including trunking and conduits in final sub circuits to following wiring accessories / Equipment A

13A 230v 50 hz 2 pole & earth bs 1363 switch socket outlet

no.

18

138

2,484.00

B

2 gang 13A 230v 50 hz 2 pole & earth bs 1363 switch socket outlet

no.

5

138

690.00

C

13A, spur outlet, switched

no.

6

138

828.00

D

Flex outlet

no.

4

138

552.00

E

weather proof tp+n isolator to ip-65

no.

2

138

276.00

F

weather proof sp isolator to ip-65

no.

1

138

138.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

To Collection

AMOUNT (AED)

4,968.00

P2/S1/B1/EE/7 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) LIGHTING AND POWER, (Cont'd.) Take delivery, store and fix only the following light fittings and accessories including any incidental materials, labour, coordination with the supplier, etc. complete A

Circular downlight-1, Type DL1

no.

7

31

217.00

B

Circular downlight-2, Type DL2

no.

15

31

465.00

C

Spot light, Type SL

no.

7

31

217.00

D

Pendent light, Type PL1

no.

2

31

62.00

E

Pendent light, Type PL2

no.

2

31

62.00

F

Pendent light, Type PL3

no.

1

31

31.00

G

1 x 30 W, led lamp with die-cast aluminum body and glass diffuser ip65, Type W1 no.

3

31

93.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. H

J

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

1 x 18 W led surface mounted lighting fixture with die-cast aluminum body and glass diffuser to ip65 (decorative type), Type W2

no.

5

31

155.00

1 x 18 W led lamp recessed down light fixture to architect approval ip44, Type D1

no.

1

31

31.00

Note: Supply of all Light fittings is a Provisional Sum.

To Collection

1,333.00

P2/S1/B1/EE/8 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) LIGHTING AND POWER, (Cont'd.) Equipment and accessories including trays, terminations, supports, fittings, complete (P.C. rate for supply only of switches is Dhs. 20/- per no.) A

One gang one way switch

no.

8

38

304.00

B

One gang two way switch

no.

10

38

380.00

C

Two gang one way switch

no.

3

38

114.00

D

Two gang two way switch

no.

1

38

38.00

E

Three gang one way switch

no.

2

38

76.00

F

Bell Push button

no.

1

38

38.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. G Bell no. 1 H

Intermediate switch

no.

MAIN WORKS (PART 2) RATE (AED) 115

1

38

To Collection

AMOUNT (AED) 115.00 38.00

1,103.00

P2/S1/B1/EE/9/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) LIGHTING AND POWER, (Cont'd.) Equipment and accessories including trays, terminations, supports, fittings, complete, cont'd A

13A 230v 50 hz 2 pole & earth bs 1363 switch socket outlet

no.

18

35

630.00

B

2 gang 13A 230v 50 hz 2 pole & earth bs 1363 switch socket outlet

no.

5

55

275.00

C

13A, spur outlet, switched

no.

6

51

306.00

D

Flex outlet

no.

4

106

424.00

E

weather proof tp+n isolator to ip-65

no.

2

192

384.00

F

weather proof sp isolator to ip-65

no.

1

191

191.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

To Collection

AMOUNT (AED)

2,210.00

P2/S1/B1/EE/10 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) TELEPHONE SYSTEM Tray and trunking, accessories, supports and conduits in final sub-circuits to following as per "Etisalat / Du Design Guidelines for 'Fiber to Home' requirement in New Building" A

12u cabinet

no.

1

86

86.00

B

RJ-45 telephone outlet

no.

7

86

602.00

C

RJ-45 dual / telephone outlet

no.

4

86

344.00

uPVC ducts laid and jointed in trenches including warning tape,

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. marker tape, draw ropes, end caps etc. complete D

2 x 50 mm uPVC duct for Authority incoming line

item

MAIN WORKS (PART 2) RATE (AED)

1

213

To Collection

AMOUNT (AED)

213.00

1,245.00

P2/S1/B1/EE/11 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) TELEPHONE SYSTEM, (cont'd.) Equipment and accessories including cabling, terminations, supports etc., complete as per "Etisalat / Du Design Guidelines for Fiber to Home' requirement in New Building" A

12u cabinet

no.

1

3,341

3,341.00

B

RJ-45 telephone outlet

no.

7

232

1,624.00

C

RJ-45 dual / telephone outlet

no.

4

251

1,004.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

EARTHING SYSTEM The following including all cables, earth rods, pits, cover down conductor, air terminals, test link, cad welding, accessories, earth bar etc., complete D

Earth pits

item

1

3,937

3,937.00

E

25 x 3 mm bare copper tape

item

1

Included

F

Bonding points

item

1

Included

G

Earthing system for telephone system

item

1

Included

To Collection

9,906.00

P2/S1/B1/EE/12/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) FIRE ALARM SYSTEM Fire proof cable with tray, trunking, conduits accessories complete with supports including communications cable etc. in final sub-circuit A

Main fire alarm control panel, FACP

no.

1

550

550.00

B

Speacker with flasher W/P

no.

1

186

186.00

C

Addressable smoke detector with built in isolator base

no.

3

118

354.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

D

Addressable smoke detector with sounder

no.

4

118

472.00

E

Addressable combination detector with sounder

no.

1

118

118.00

F

Power point for fire alarm control

no.

1

deleted

To Collection

1,680.00

P2/S1/B1/EE/13/R4 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) FIRE ALARM SYSTEM, (Cont'd.) Equipment and accessories including terminations, supports, etc. complete A

Main fire alarm control panel, FACP

no.

1

5,789

B

Speacker with flasher W/P

no.

1

542

5,789.00 542.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

C

Addressable smoke detector with built in isolator base

no.

3

477

1,431.00

D

Addressable smoke detector with sounder

no.

4

828

3,312.00

E

Addressable combination detector with sounder

no.

1

377

377.00

F

Power point for fire alarm control

no.

1

To Collection P2/S1/B1/EE/14/R4 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) SMATV SYSTEM (CONTAINMENT ONLY) Following including containment tray, trunking, junction box and conduits complete with accessories, supports in final sub-circuits to A

SMATV outlet

no.

3

deleted

11,451.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. B

IP65 PVC box for conduit termination

no.

1

C

Metal cabinet flush mounted with 1 no. 13A socket

no.

1

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED) 855.00

To Collection

855.00

P2/S1/B1/EE/15/R4 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) Generally for the complete Electrical installations A

Drawings, manuals, approvals & instruction books

item

1

1,347

1,347.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. B Testing and commissioning item

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED) Included

C

Training

item

Included

D

Labels, special tools, etc.

item

Included

E

Protective and decorative painting

item

Included

F

Liaison and co-ordination with Local Authorities

item

Included

To Collection P2/S1/B1/EE/16 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and

1,347.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

A

To Collection

-

P2/S1/B1/EE/17 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) COLLECTION Page P2/S1/B1/EE/1

6,515.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

Page P2/S1/B1/EE/2

1,115.00

Page P2/S1/B1/EE/3/R4

5,177.00

Page P2/S1/B1/EE/4/R1

3,265.00

Page P2/S1/B1/EE/5

4,859.00

Page P2/S1/B1/EE/6/R1

2,538.00

Page P2/S1/B1/EE/7

4,968.00

Page P2/S1/B1/EE/8

1,333.00

Page P2/S1/B1/EE/9/R1

1,103.00

Page P2/S1/B1/EE/10

2,210.00

Page P2/S1/B1/EE/11

1,245.00

Page P2/S1/B1/EE/12/R1

9,906.00

Page P2/S1/B1/EE/13/R4

1,680.00

Page P2/S1/B1/EE/14/R4

11,451.00

Page P2/S1/B1/EE/15/R4

855.00

Page P2/S1/B1/EE/16 Page P2/S1/B1/EE/17

Total for Electrical Engg. installations - Carried to Bill No. 1 Summary P2/S1/B1/EE/18/R4

1,347.00 -

59,567.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT

MAIN WORKS

ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM

ITEM DESCRIPTION

(PART 2)

UNIT QTY.

NO.

RATE (AED)

AMOUNT (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) EXTERNAL WORKS Site clearance A

Site clearance including removal of rubbish, vegetation, undergrowth, bushes, trees, existing tiling, curbs, etc. complete

item

1

115

115

item

1

1150

1150

Earthworks B

Cut / fill to required levels including use of imported fill and compacting in layers as per drawings, specifications and as directed by the Engineer

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT

MAIN WORKS

ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM

ITEM DESCRIPTION

(PART 2)

UNIT QTY.

NO.

RATE (AED)

To Collection

AMOUNT (AED) 1,265.00

P2/S1/B1/EW/1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) EXTERNAL WORKS, Cont'd Pavements to pattern and colour including subgrade, sub-base, sand filling, etc. complete A

Hard landscaping (rear side entrance)

m2

11

83

913

B

Hard landscaping (Parking area)

m2

28

99

2772

C

Hard landscaping (front side entrance)

m2

15

83

1245

Boundary wall Following including but not limited to all earth works, civil works, blockwork, jointed and pointed in cement including all air gaps, crack control joints, anchors, dowel bars, metal laths, joints, wall ties, stiffener beams and columns, reinforcement, waterproofing, expansion joints, plaster, finishes, special features, fittings, accessories, MEP etc., complete as per drawings and specifications D

200 mm wide 2100 mm high boundary wall

m

11

862

9482

E

300 mm wide 2100 mm high boundary wall

m

6

977

5862

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT

MAIN WORKS

ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM

ITEM DESCRIPTION

(PART 2)

UNIT QTY.

NO.

RATE (AED)

To Collection P2/S1/B1/EW/2 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) EXTERNAL WORKS, Cont'd Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included. A

AMOUNT (AED)

20,274.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT

MAIN WORKS

ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM

ITEM DESCRIPTION

(PART 2)

UNIT QTY.

NO.

RATE (AED)

AMOUNT (AED)

To Collection P2/S1/B1/EW/3 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) EXTERNAL WORKS, Cont'd

COLLECTION

Page P2/S1/B1/EW1

1,265.00

Page P2/S1/B1/EW2

20,274.00

Page P2/S1/B1/EW3

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM

ITEM DESCRIPTION

NO.

Total for External Works - Carried to Bill No. 1 Summary P2/S1/B1/EW/4

UNIT QTY.

MAIN WORKS (PART 2) RATE (AED)

AMOUNT (AED)

21,539

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT

MAIN WORKS

ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM DESCRIPTION

Page No.

(PART 2) AMOUNT (AED)

SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)

SUMMARY

P2/S1/B1/SW/1 - P2/S1/B1/SW/4/PTC1

10,423.00

P2/S1/B1/CW/1/PTC1 - P2/S1/B1/CW/6/R1/PTC1

105,561.00

MASONRY

P2/S1/B1/MA/1/PTC1 - P2/S1/B1/MA/4/PTC1

33,249.00

METAL WORK

P2/S1/B1/MW/1/PTC1 - P2/S1/B1/MW/3/PTC1

6,216.00

P2/S1/B1/AG/1/PTC1 - P2/S1/B1/AG/4/PTC1

45,672.00

P2/S1/B1/CJ/1 - P2/S1/B1/CJ/3/R1

1,037.00

P2/S1/B1/FIN/1/R1 - P2/S1/B1/FIN/6/PTC1

95,443.00

P2/S1/B1/TM/1/PTC1 - P2/S1/B1/TM/5/R1/PTC1

21,412.00

SITE WORKS CONCRETE WORKS

ALUMINIUM AND GLAZING WORKS CARPENTRY & JOINERY WORKS INTERNAL AND EXTERNAL FINISHES THERMAL AND MOISTURE PROTECTION

ACCESSORIES AND SPECIAL CONSTRUCTION

P2/S1/B1/AES/1 - P2/S1/B1/AES/5

MECHANICAL ENGINEERING INSTALLATIONSP2/S1/B1/ME/1/PTC1 - P2/S1/B1/ME/23/R1 ELECTRICAL ENGINEERING INSTALLATIONS EXTERNAL WORKS

5,269.00 142,029.00

P2/S1/B1/EE/1 - P2/S1/B1/EE/18/R4

59,567.00

P2/S1/B1/EW/1 - P2/S1/B1/EW/4

21,539.00

GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM DESCRIPTION Total for Bill No. 1 - Carried to General Summary

Page No.

MAIN WORKS (PART 2) AMOUNT (AED) 547,417.00

`

DRY COST SPLITTED AMOUNTS

LABOUR

MATERIA L

PLANT

1,854.95

2,686.13

2,347.55

CONCRET WORKS

###

###

1,053.57

MASONRY

###

###

558.20

ITEM

SITE WORKS

METAL WORK

-

-

-

ALUMINIUM AND GLAZING WORKS

-

-

-

CARPENTRY & JOINERY WORKS

-

-

-

FINISHES

###

###

71.46

THERMAL AND MOISTURE PROTECTION

-

-

-

ACCESSORIES AND SPECIAL CONSTRUCTION

-

-

-

EXTERNAL WORKS

TOTALS

690.12

3,598.08

-

NO OF VILLAS

LABOUR

MATERIAL

PLANT

SUBCONTRACT

1,737.00

39

72,343

104,759

91,554

67,743

5,730.00

39

764,690

2,541,537

41,089

223,470

500.00

39

402,480

668,475

21,770

19,500

5,400.00

39

0

0

0

210,600

41,250.00

39

0

0

0

1,608,750

915.00

39

0

0

0

35,685

27,984.00

39

1,136,386

1,307,240

2,787

1,091,376

26,022.00

39

0

0

0

1,014,858

4,515.00

39

0

0

0

176,085

14,450.00

39

26,915

140,325

0

563,550

2,402,814

4,762,335

157,201

5,011,617

SUBCONTRACT

TOTAL DRY COST

12,333,966