Sl.No
Description
Unit
UNSKILLED LABOUR PRICE
HOUR
SKILLED LABOUR PRICE
HOUR
CHARGE HAND
HOUR
Open Excavation - 150 m3 ( upto 1.50 m Depth ) Soft ,Medium Soil
M3 150
Mechanical Shovel 966
No
Roller Compactor - 20T - 850 Dhs/No (1000 m2 / No)
m2
Unskilled Labour - 2 No
No
Charge Hand
No
Compaction test - 200 Dhs/No (750 m2/Test)
No
Manual Excavation
No
Actual Cost
Open Excavation - 150 m3 ( upto 4.00 m Depth ) Soft ,Medium Soil
M3 150
Mechanical Shovel 966 - 2 No
No
Roller Compactor - 20T - 850 Dhs/No (1000 m2 / No)
m2
Unskilled Labour - 2 No
No
Charge Hand
No
Compaction test - 200 Dhs/No (750 m2/Test)
No
Manual Excavation Actual Cost
Open Excavation - 50 m3
-
Hard Soil
M3 50
Bucket Excavator
No
Excavator with Drilling Hammer
No
Roller Compactor - 20T - 700 Dhs/No (1000 m2/No)
m2
Unskilled Labour - 2 No
No
Charge Hand
No
Compaction test - 200 Dhs/No (750 m2/Test)
No
Hand tool
item
Actual Cost
BACK FILLING - 250 m3
M3 200
Mechanical Shovel 966 - 750 QRs/ No - 2 No
No
Roller Compactor - 20T - 700 Dhs/No (1000 m2/No)
No
Unskilled Labour - 2 No
No
Charge Hand
No
Sweet water 5000 g- 10 g / m2
Trip
Compaction test - 200 Dhs/No (750 m2/Test)
No
Hand tool
item
Actual Cost
CART AWAY - 240 m3 - Upto 50 KM - Bulkage 1.25
M3 200
Mechanical Shovel 966
No
2 No - Dump Truck 35 T - 20 m3-6 trip/day
Trip
Unskilled Labour - 2 No
No
Charge Hand
No
Hand tool
item
Actual Cost
IMPORTED FILLING SAND - 200 m3
M3 200
Imported Filling Sand
No
Mechanical Shovel 966 - 2 No
No
Roller Compactor - 20T
No
Unskilled Labour - 2 No
No
Charge Hand
No
Sweet water 5000 g- 10 g / m2
Trip
Compaction test - 200 Dhs/No (750 m2/Test)
No
Actual Cost
Anti Termite Treatment
M2
Anti Termite Treatment - 3 Layer
m2
Actual Cost
Polythene sheet
M2
Polythene 1000 g (5.00 x 2.00 m = 100 m2 = 156 )
m2
lapping
m2
wastage
%
Labour - 300 M2/ Day
No
Actual Cost
Ruberized Bitumine Paint - 100 m2
M2 80
Bitumen(200L=500Dhs) => 100 m2 of 2 coats
200L
wastage - 10 % Misc./tools
item
Labour - 40 M2/ Per
No
Actual Cost
FOAM CONCRETE - 100 mm - (45 m2)
M3 10
Foam Concrete Subcontract
m2
OP Cement = (1 Bag / 1 m2) & ( 10 Bag/1 m3 )
m3
Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing- 1 hr/m3
No
Sweet water 5000 g- 15 g / m3
Trip
Hand Tools Actual Cost
FOAM CONCRETE - 100 mm - (45 m2)
M2 10
Foam Concrete Subcontract
m2
OP Cement = (1 Bag / 1 m2) & ( 10 Bag/1 m3 )
m3
Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing- 1 hr/m3
No
Sweet water 5000 g- 15 g / m3
Trip
Hand Tools Actual Cost
BLINDING CONCRETE - SRC - C20 - 50 mm THK - (500 m2) 50 mm thk
M2 30
Basic Cost - 5 % wastage
m3
Pump - 5 % wastage
m3
Temp.Control -5 % wastage
m3
Mason - 4 No
No
Unskilled Labour - 6 No
No
Charge Hand
No
Unskilled Labour - for Curing-
No
Carpenter -
No
Sweet water 5000 g- 15 g / m3
Trip
Hand Tools White wood - 0.28 m3 / 5 times ( + 10% wastage )
m3
Nail Actual Cost
BLINDING CONCRETE - SRC - C20 - 75 mm THK - (500 m2)
50 mm thk
M2
75 mm thk
40
Basic Cost - 5 % wastage
m3
Pump - 5 % wastage
m3
Temp.Control -5 % wastage
m3
Mason - 4 No Unskilled Labour - 6 No
No No
Charge Hand
No
Unskilled Labour - for Curing-
No
Carpenter -
No
Sweet water 5000 g- 15 g / m3
Trip
Hand Tools White wood - 0.28 m3 / 5 times ( + 10% wastage )
m3
Nail Actual Cost
BLINDING CONCRETE - SRC - C20 - 100 mm THK - (500 m2)
75 mm thk
M2 40
Basic Cost - 5 % wastage
m3
Pump - 5 % wastage
m3
Temp.Control -5 % wastage
m3
Mason - 4 No
No
Unskilled Labour - 6 No
No
Charge Hand
No
Unskilled Labour - for Curing-
No
Carpenter -
No
Sweet water 5000 g- 15 g / m3
Trip
Hand Tools
White wood - 0.28 m3 / 5 times ( + 10% wastage )
m3
Nail Actual Cost
BLINDING CONCRETE - SRC - C20 - 100 mm THK - (500 m2)
100 mm thk
M3 40
Basic Cost - 5 % wastage
m3
Pump - 5 % wastage
m3
Temp.Control -5 % wastage
m3
Mason - 4 No
No
Unskilled Labour - 6 No
No
Charge Hand
No
Unskilled Labour - for Curing-
No
Carpenter -
No
Sweet water 5000 g- 15 g / m3
Trip
Hand Tools White wood - 0.28 m3 / 5 times ( + 10% wastage )
m3
Nail Actual Cost
CONCRETE - OPC with GGBS - C40 - (200 m3)-SUBSTRUCTURE
100 mm thk
M3 160
Basic Cost - 2 % wastage
m3
Testing - 300 Dhs/ test x 2%
LS
Pump - 2 % wastage
m3
Temp.Control - 2 % wastage
m3
Mason - 8 No
No
Unskilled Labour - 16 No
No
Charge Hand - 2 No
No
Unskilled Labour - for Curing- 1 hr/m3
No
Carpenter - 2 No
No
Steel Fixer - 1 No
No
Sweet water 5000 g- 15 g / m3
Trip
Hand Tools Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs
No
Actual Cost
CONCRETE - OPC with GGBS - C50 - (200 m3)-SUBSTRUCTURE
M3 160
Basic Cost - 2 % wastage
m3
Testing - 300 Dhs/ test x 2%
LS
Pump - 2 % wastage
m3
Temp.Control - 2 % wastage
m3
Mason - 8 No
No
Unskilled Labour - 16 No
No
Charge Hand - 2 No
No
Unskilled Labour - for Curing- 1 hr/m3
No
Carpenter - 2 No
No
Steel Fixer - 1 No
No
Sweet water 5000 g- 15 g / m3
Trip
Hand Tools Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs
No
Actual Cost
CONCRETE - OPC with GGBS - C60 - (200 m3)-SUBSTRUCTURE
M3 160
Basic Cost - 2 % wastage
m3
Testing - 300 Dhs/ test x 2%
LS
Pump - 2 % wastage
m3
Temp.Control - 2 % wastage
m3
Mason - 8 No
No
Unskilled Labour - 16 No
No
Charge Hand - 2 No
No
Unskilled Labour - for Curing- 1 hr/m3
No
Carpenter - 2 No
No
Steel Fixer - 1 No
No
Sweet water 5000 g- 15 g / m3
Trip
Hand Tools Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs
No
Actual Cost
CONCRETE - OPC with GGBS - C40 - (200 m3)-SUPER-STRUCTURE
M3 160
Basic Cost - 2 % wastage
m3
Testing - 300 Dhs/ test x 2%
LS
Pump - 2 % wastage
m3
Temp.Control - 2 % wastage
m3
Mason - 8 No
No
Unskilled Labour - 16 No
No
Charge Hand - 2 No
No
Unskilled Labour - for Curing- 1 hr/m3
No
Carpenter - 2 No
No
Steel Fixer - 1 No
No
Sweet water 5000 g- 15 g / m3
Trip
Hand Tools Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs
No
Actual Cost
CONCRETE - OPC with GGBS - C50 - (200 m3)-SUPER-STRUCTURE
M3 160
Basic Cost - 2 % wastage
m3
Testing - 300 Dhs/ test x 2%
LS
Pump - 2 % wastage
m3
Temp.Control - 2 % wastage
m3
Mason - 8 No
No
Unskilled Labour - 16 No
No
Charge Hand - 2 No
No
Unskilled Labour - for Curing- 1 hr/m3
No
Carpenter - 2 No
No
Steel Fixer - 1 No
No
Sweet water 5000 g- 15 g / m3
Trip
Hand Tools Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs
No
Actual Cost
CONCRETE - OPC with GGBS - C60 - (200 m3)-SUPER-STRUCTURE
M3 160
Basic Cost - 2 % wastage
m3
Testing - 300 Dhs/ test x 2%
LS
Pump - 2 % wastage
m3
Temp.Control - 2 % wastage
m3
Mason - 8 No
No
Unskilled Labour - 16 No
No
Charge Hand - 2 No
No
Unskilled Labour - for Curing- 1 hr/m3
No
Carpenter - 2 No
No
Steel Fixer - 1 No
No
Sweet water 5000 g- 15 g / m3
Trip
Hand Tools Vibrator - 26-50 mm size - 15 Dhs/day + Petrol - 5Gallonx10Dhs Actual Cost
No
FORMWORK ( Substructure ) - 100 m2
M2 100
Material Price( Usage 3 Times)
m2
White wood ( Usage 3 times )
m3
Nail - 32Dhs/ (6kg - Carton), 0.194 kg/ m2
m2
Wastage 5%
(Carp - 2 No+Help - 1 no) - Gang - 6 Nos (Incl Deshutter)
No
Unskilled Labour - 4 No
No
Charge Hand - 1 No
No
Waste Oil
m2
Hand Tool support scaffolding - 15Dhs / m2
m2
Actual Cost
FORMWORK ( Superstructure ) - 100 m2
M2 100
Material Price( Usage 3 Times)
m2
White wood ( Usage 3 times )
m3
Nail - 32 Dhs/ (6kg - Carton), 0.194 kg/ m2
m2
Wastage 5% Waste Oil
(Carp - 2 No+Help - 1 no) - 1 Gang - 7 Nos (Incl Deshutter)
m2
No
Unskilled Labour - 5 No
No
Charge Hand - 1 No
No
Hand Tool support scaffolding - 15Dhs / m2
m2
Actual Cost
REINFORCEMENT ( EMIRATES)
TONNE
Basic Cost ( Cut & Bent )
T
20 Gauge - Binding Wire- 25 kg/Ton
Kg
Steel Fixer - 3 No
No
Unskilled Labour - 3 No
No
Charge Hand - 1 No
No
Wastage 0% Actual Cost
Epoxy coat 650 QRs/T REINFORCEMENT ( EMIRATES)
Kg
Basic Cost ( Cut & Bent )
Kg
20 Gauge - Binding Wire- 25 kg/Ton
Kg
Steel Fixer - 3 No
No
Unskilled Labour - 3 No
No
Charge Hand - 1 No
No
Wastage 0% Actual Cost
Epoxy coat 650 QRs/T
SCREED CONCRETE - SRC - C20 - 75 mm THK - (500 m2)
M2
75 mm thk
40
Basic Cost - 5 % wastage
m3
Pump - 5 % wastage
m3
Temp.Control -5 % wastage
m3
Mason - 4 No
No
Unskilled Labour - 6 No
No
Charge Hand
No
Unskilled Labour - for Curing-
No
Carpenter -
No
Sweet water 5000 g- 15 g / m3
Trip
Hand Tools White wood - 0.28 m3 / 5 times ( + 10% wastage )
m3
Nail Actual Cost
WATER TANK, HOLDING TANK Concrete
75 mm thk
m3 m3
Formwork
m2
Reinforcement
kg
Actual Cost
SWIMMING POOL
m3 Concrete
m3
Formwork
m2
Reinforcement
kg
Actual Cost
PILE CAP
m3 Concrete
m3
Formwork
m2
Reinforcement
kg
Actual Cost
ISOLATED FOOTING
m3 Concrete
m3
Formwork
m2
Reinforcement
kg
Actual Cost
RAFT FOUNDATION
m3 Concrete
m3
Formwork
m2
Reinforcement
kg
Actual Cost
NECK
m3
COLUMN
Concrete
m3
Formwork
m2
Reinforcement
kg
Actual Cost
m3
COLUMN
Concrete
m3
Formwork
m2
Reinforcement
kg
Actual Cost
TIE BEAM
m3 Concrete
m3
Formwork
m2
Reinforcement
kg
Actual Cost
ROOF BEAM
m3 Concrete
m3
Formwork
m2
Reinforcement
kg
Actual Cost
COREWALL ( SUBSTRUCTURE )
m3
Concrete
m3
Formwork
m2
Reinforcement
kg
Actual Cost
COREWALL ( SUPER-STRUCTURE )
m3
Concrete
m3
Formwork
m2
Reinforcement
kg
Actual Cost
RETAINING WALL
m3 Concrete
m3
Formwork ( One Side )
m2
Reinforcement
kg
Actual Cost
STIFFNER COLUMN , COPPING BEAM
m3
Concrete
m3
Formwork
m2
Reinforcement
kg
Actual Cost
SLAB, RAMP - 200 mm thk
m3 Concrete
m3
Formwork
m2
Reinforcement
kg
Actual Cost
SLAB, RAMP - 200 mm thk
m2 Concrete
m3
Formwork
m2
Reinforcement
kg
Actual Cost
SLAB, RAMP - 320 mm thk
m2 Concrete
m3
Formwork
m2
Reinforcement
kg
Actual Cost
SLAB, RAMP - 420 mm thk
m2 Concrete
m3
Formwork
m2
Reinforcement
kg
Actual Cost
STAIRCASE
m3
Concrete
m3
Formwork
m2
Reinforcement
kg
Actual Cost
PARAPET - 150 mm thk
m3
Concrete
m3
Formwork
m2
Reinforcement
kg
Actual Cost
SILL
M
Concrete
m3
Formwork
m2
Reinforcement
kg
Actual Cost
LINTEL ( m3 )
m3
Concrete
m3
Formwork
m2
Reinforcement
kg
Actual Cost
LINTEL ( m )
M Concrete
m3
Formwork
m2
Reinforcement
kg
Actual Cost
A/C EQUIPMENT BASE CONCRETE Concrete
m3
m3
Formwork
m2
Reinforcement
kg
Actual Cost
265 mm thk HOLLOW CORE SLAB
m2
Hollow Core Slab Concrete
m
A393 BRC Mesh
Times
Formwork
m2
Actual Cost
300 mm thk HOLLOW CORE SLAB
m2
Hollow Core Slab Concrete
m
A393 BRC Mesh
Times
Formwork
m2
Actual Cost
320 mm thk HOLLOW CORE SLAB
m2
Hollow Core Slab Concrete
m
A393 BRC Mesh
Times
Formwork
m2
Actual Cost
500 mm thk HOLLOW CORE SLAB
m2
Hollow Core Slab Concrete
m
A393 BRC Mesh
Times
Formwork
m2
Actual Cost
200 mm Grade Slab With A 393 Mesh ( m3 )
m3
Concrete
m
A393 BRC Mesh
Times
Formwork
m2
Flexel Board Actual Cost
200 mm Grade Slab With A 393 Mesh ( m2 )
m2
Concrete
m
A393 BRC Mesh
Times
Formwork
m2
Flexel Board Actual Cost
150 mm Grade Slab With A 393 Mesh
m3
Concrete
m
A393 BRC Mesh
Times
Formwork
m2
Flexel Board Actual Cost
150 mm Grade Slab With A 393 Mesh
m2
Concrete
m
A393 BRC Mesh
Times
Formwork
m2
Flexel Board Actual Cost
120 mm Grade Slab With A 252 Mesh
m3
Concrete
m
A252 BRC Mesh
Times
Formwork
m2
Flexel Board Actual Cost
120 mm Grade Slab With A 252 Mesh
m2
Concrete
m
A252 BRC Mesh
Times
Formwork
m2
Flexel Board Actual Cost
100 mm Grade Slab With A 393 Mesh
m3
Concrete
m
A393 BRC Mesh
Times
Formwork
m2
Flexel Board Actual Cost
100 mm Grade Slab With A 252 Mesh
m2
Concrete
m
A393 BRC Mesh
Times
Formwork
m2
Flexel Board Actual Cost
200 mm POST TENSION SLAB
m3
Concrete
m2
Formwork
m2
Reinforcement
kg
Slab Post Tensioning - 40 / m2 Grouting 10 % of concrete Actual Cost
230 mm POST TENSION SLAB
m2
Concrete
m2
Formwork
m2
Reinforcement
kg
Slab Post Tensioning - 40 / m2 Grouting 10 % of concrete Actual Cost
250 mm POST TENSION SLAB
m3
Concrete
m2
Formwork
m2
Reinforcement
kg
Slab Post Tensioning - 40 / m2
Grouting 10 % of concrete Actual Cost
270 mm POST TENSION SLAB
m2
Concrete
m2
Formwork
m2
Reinforcement
kg
Slab Post Tensioning - 40 / m2 Grouting 10 % of concrete Actual Cost
280 mm POST TENSION SLAB
m3
Concrete
m2
Formwork
m2
Reinforcement
kg
Slab Post Tensioning - 40 / m2 Grouting 10 % of concrete Actual Cost
300 mm POST TENSION SLAB
m3
Concrete
m2
Formwork
m2
Reinforcement
kg
Slab Post Tensioning - 40 / m2 Grouting 10 % of concrete Actual Cost
320 mm POST TENSION SLAB
m3
Concrete
m2
Formwork
m2
Reinforcement
kg
Slab Post Tensioning - 40 / m2 Grouting 10 % of concrete
Actual Cost
POST TENSION
m3
( BEAM )
Concrete
m3
Formwork
m2
Reinforcement
kg
Slab Post Tensioning - 350 / m3 Grouting 10 % of concrete Actual Cost
100 mm DECKING SLAB With A 142 Mesh
M2
Concrete
m2
A393 BRC Mesh
kg
Actual Cost
M2
BRC Mesh 142 ( 230 m2)
230 Cost of materials 4.8*2.4=11.52
m2
Over laps
%
cover block , binding wires
item
Steel Fixer
No
Unskilled Labour
No
Actual Cost
M2
BRC Mesh 193 (230 m2)
230 Cost of materials 4.8*2.4=11.52
m2
Over laps
%
cover block , binding wires
item
Steel Fixer
No
Unskilled Labour
No
Actual Cost
M2
BRC Mesh 252 (230 m2)
230 Cost of materials 4.8*2.4=11.52
m2
Over laps
%
cover block , binding wires
item
Steel Fixer
No
Unskilled Labour
No
Actual Cost
M2
BRC Mesh 393 (230 m2 )
230 Cost of materials 4.8*2.4=11.52
m2
Over laps
%
cover block , binding wires
item
Steel Fixer
No
Unskilled Labour
No
Actual Cost
M2
SOLID BLOCK - 100 mm - 8 m2
8 Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
SOLID BLOCK - 150 mm - 8 m2
M2 8
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
SOLID BLOCK - 200 mm - 8 m2
M2 8
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
SOLID BLOCK - 250 mm - 8 m2
M2 8
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
SOLID BLOCK - 300 mm - 8 m2
M2 8
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
SOLID BLOCK - 100 mm - 8 m2 ( 1 Hr Fire Rated )
M2 8
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
SOLID BLOCK - 150 mm - 8 m2 ( 1 Hr Fire Rated )
M2 8
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
SOLID BLOCK - 200 mm - 8 m2 ( 1 Hr Fire Rated )
M2 8
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
SOLID BLOCK - 250 mm - 8 m2 ( 1 Hr Fire Rated )
M2 8
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
SOLID BLOCK - 300 mm - 8 m2 ( 1 Hr Fire Rated )
M2 8
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc…
Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
SOLID BLOCK - 100 mm - 8 m2 ( 2 Hr Fire Rated )
M2 8
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
SOLID BLOCK - 150 mm - 8 m2 ( 2 Hr Fire Rated )
M2 8
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
SOLID BLOCK - 200 mm - 8 m2 ( 2 Hr Fire Rated )
M2 8
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
HOLLOW BLOCK - 350 mm - 10 m2
M2 10
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
HOLLOW BLOCK - 300 mm - 10 m2
M2 10
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
HOLLOW BLOCK - 250 mm - 10 m2
M2 10
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
HOLLOW BLOCK - 200 mm - 10 m2
M2 10
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
HOLLOW BLOCK - 150 mm - 10 m2
M2
10 Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
HOLLOW BLOCK - 100 mm - 11 m2
M2 9
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
DOUBLE SKIN HOLLOW BLOCK with 50 mm Insulation 100+50+100 mm - 11 m2
M2 11
50 mm Insulation 100 mm Hollow Block 100 mm Hollow Block Actual Cost
HOLLOW BLOCK - 350 mm - 10 m2 ( 1 Hr Fire Rated )
M2
9 Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
HOLLOW BLOCK - 300 mm - 10 m2 ( 1 Hr Fire Rated )
M2 10
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
HOLLOW BLOCK - 250 mm - 10 m2 ( 1 Hr Fire Rated )
M2 10
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
HOLLOW BLOCK - 200 mm - 10 m2 ( 1 Hr Fire Rated )
M2 10
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
HOLLOW BLOCK - 150 mm - 10 m2
(1 Hr Fire Rated )
M2 10
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
HOLLOW BLOCK - 100 mm - 11 m2 (1 Hr Fire Rated )
M2 11
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
HOLLOW BLOCK - 350 mm - 10 m2 ( 2 Hr Fire Rated )
M2 10
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
HOLLOW BLOCK - 300 mm - 10 m2 ( 2 Hr Fire Rated )
M2 10
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
HOLLOW BLOCK - 250 mm - 10 m2 ( 2 Hr Fire Rated )
M2 10
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
HOLLOW BLOCK - 200 mm - 10 m2 ( 2 Hr Fire Rated )
M2 10
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
HOLLOW BLOCK - 150 mm - 10 m2
(2 Hr Fire Rated )
M2 10
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc…
Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
HOLLOW BLOCK - 100 mm - 11 m2 ( 2 Hr Fire Rated )
M2 11
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
INSULATED BLOCK - 200mm - 6 m2
M2 8
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
INSULATED BLOCK - 250mm - 6 m2
M2 8
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
INSULATED BLOCK - 300mm - 6 m2
M2 8
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
INSULATED BLOCK -300mm - 6 m2(2 Hrs Fire Rated)
M2 8
Blocks + 5 % Wastage
No.
Cement
Bags
Sand
Cu.M
wastage Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Sweet water 5000 g - 20 g / m2
Trip
Hand Tools Actual Cost
THERMALITE AAC BLOCK - 100mm - 8 m2
M2 8
Blocks + 5 % Wastage (150 Dhs/m3 )
No.
AAC Mortor - 0.35kg x 40kg/m3
Bags
wastage Sweet water 5000 g - 20 g / m2
Trip
Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
AAC Block Set Tools - 260 Dhs/50m2
m2
Actual Cost
THERMALITE AAC BLOCK - 150mm - 8 m2
M2 8
Blocks + 5 % Wastage (150 Dhs/m3 )
No.
AAC Mortor - 0.35kg x 40kg/m3
Bags
wastage Sweet water 5000 g - 20 g / m2
Trip
Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
AAC Block Set Tools - 260 Dhs/50m2
m2
Actual Cost
THERMALITE AAC BLOCK - 200mm - 8 m2
M2 8
Blocks + 5 % Wastage (150 Dhs/m3 )
No.
AAC Mortor - 0.35kg x 40kg/m3
Bags
wastage Sweet water 5000 g - 20 g / m2
Trip
Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
AAC Block Set Tools - 260 Dhs/50m2
m2
Actual Cost
THERMALITE AAC BLOCK - 250mm - 8 m2
M2 8
Blocks + 5 % Wastage (150 Dhs/m3 )
No.
AAC Mortor - 0.35kg x 40kg/m3
Bags
wastage Sweet water 5000 g - 20 g / m2
Trip
Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
AAC Block Set Tools - 260 Dhs/50m2
m2
Actual Cost
THERMALITE AAC BLOCK - 300mm - 8 m2
M2 8
Blocks + 5 % Wastage (150 Dhs/m3 )
No.
AAC Mortor - 0.35kg x 40kg/m3
Bags
wastage Sweet water 5000 g - 20 g / m2
Trip
Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
AAC Block Set Tools - 260 Dhs/50m2
m2
Actual Cost
THERMALITE AAC BLOCK - 350mm - 8 m2
M2 8
Blocks + 5 % Wastage (150 Dhs/m3 )
No.
AAC Mortor - 0.35kg x 40kg/m3
Bags
wastage Sweet water 5000 g - 20 g / m2
Trip
Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
AAC Block Set Tools - 260 Dhs/50m2
m2
Actual Cost
THERMALITE AAC BLOCK - 100mm - 8 m2 ( 1 Hr Fire rated )
M2 8
Blocks + 5 % Wastage (150 Dhs/m3 )
No.
AAC Mortor - 0.35kg x 40kg/m3
Bags
wastage Sweet water 5000 g - 20 g / m2
Trip
Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
AAC Block Set Tools - 260 Dhs/50m2
m2
Actual Cost
THERMALITE AAC BLOCK - 150mm - 8 m2 ( 1 Hr Fire rated )
M2 8
Blocks + 5 % Wastage (150 Dhs/m3 )
No.
AAC Mortor - 0.35kg x 40kg/m3
Bags
wastage Sweet water 5000 g - 20 g / m2
Trip
Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
AAC Block Set Tools - 260 Dhs/50m2
m2
Actual Cost
THERMALITE AAC BLOCK - 200mm - 8 m2 ( 1 Hr Fire rated )
M2 8
Blocks + 5 % Wastage (150 Dhs/m3 )
No.
AAC Mortor - 0.35kg x 40kg/m3
Bags
wastage Sweet water 5000 g - 20 g / m2
Trip
Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
AAC Block Set Tools - 260 Dhs/50m2
m2
Actual Cost
THERMALITE AAC BLOCK - 250mm - 8 m2 ( 1 Hr Fire rated )
M2 8
Blocks + 5 % Wastage (150 Dhs/m3 )
No.
AAC Mortor - 0.35kg x 40kg/m3
Bags
wastage Sweet water 5000 g - 20 g / m2
Trip
Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
AAC Block Set Tools - 260 Dhs/50m2
m2
Actual Cost
THERMALITE AAC BLOCK - 300mm - 8 m2 ( 1 Hr Fire rated )
M2 8
Blocks + 5 % Wastage (150 Dhs/m3 )
No.
AAC Mortor - 0.35kg x 40kg/m3
Bags
wastage
Sweet water 5000 g - 20 g / m2
Trip
Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
AAC Block Set Tools - 260 Dhs/50m2
m2
Actual Cost
THERMALITE AAC BLOCK - 350mm - 8 m2 ( 1 Hr Fire rated )
M2 8
Blocks + 5 % Wastage (150 Dhs/m3 )
No.
AAC Mortor - 0.35kg x 40kg/m3
Bags
wastage Sweet water 5000 g - 20 g / m2
Trip
Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
AAC Block Set Tools - 260 Dhs/50m2
m2
Actual Cost
THERMALITE AAC BLOCK - 100mm - 8 m2 ( 2 Hr Fire rated )
M2 8
Blocks + 5 % Wastage (150 Dhs/m3 )
No.
AAC Mortor - 0.35kg x 40kg/m3
Bags
wastage Sweet water 5000 g - 20 g / m2
Trip
Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
AAC Block Set Tools - 260 Dhs/50m2
m2
Actual Cost
THERMALITE AAC BLOCK - 150mm - 8 m2 ( 2 Hr Fire rated )
M2 8
Blocks + 5 % Wastage (150 Dhs/m3 )
No.
AAC Mortor - 0.35kg x 40kg/m3
Bags
wastage Sweet water 5000 g - 20 g / m2
Trip
Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
AAC Block Set Tools - 260 Dhs/50m2
m2
Actual Cost
THERMALITE AAC BLOCK - 200mm - 8 m2 ( 2 Hr Fire rated )
M2 8
Blocks + 5 % Wastage (150 Dhs/m3 )
No.
AAC Mortor - 0.35kg x 40kg/m3
Bags
wastage Sweet water 5000 g - 20 g / m2
Trip
Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
AAC Block Set Tools - 260 Dhs/50m2
m2
Actual Cost
THERMALITE AAC BLOCK - 250mm - 8 m2 ( 2 Hr Fire rated )
M2 8
Blocks + 5 % Wastage (150 Dhs/m3 )
No.
AAC Mortor - 0.35kg x 40kg/m3
Bags
wastage Sweet water 5000 g - 20 g / m2
Trip
Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
AAC Block Set Tools - 260 Dhs/50m2
m2
Actual Cost
THERMALITE AAC BLOCK - 300mm - 8 m2 ( 2 Hr Fire rated )
M2 8
Blocks + 5 % Wastage (150 Dhs/m3 )
No.
AAC Mortor - 0.35kg x 40kg/m3
Bags
wastage Sweet water 5000 g - 20 g / m2
Trip
Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
AAC Block Set Tools - 260 Dhs/50m2
m2
Actual Cost
THERMALITE AAC BLOCK - 350mm - 8 m2 ( 2 Hr Fire rated )
M2 8
Blocks + 5 % Wastage (150 Dhs/m3 )
No.
AAC Mortor - 0.35kg x 40kg/m3
Bags
wastage Sweet water 5000 g - 20 g / m2
Trip
Accessories ,Mesh etc… Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
AAC Block Set Tools - 260 Dhs/50m2
m2
Actual Cost
15 mm INTERNAL PLASTER - 17 m2
M2 17
Cement
Bags
White washed Sand
Cu.M
wastage
Sweet water 5000 g - 25 g / m2
Trip
Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Hand Tools Scaffolding Accessories Actual Cost
20 mm INTERNAL PLASTER - 17 m2
M2 17
Cement
Bags
White washed Sand
Cu.M
wastage Sweet water 5000 g - 25 g / m2
Trip
Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Hand Tools Scaffolding Accessories Actual Cost
15 mm INTERNAL PLASTER - 17 m2 (Above 6 m Height)
M2 16
Cement
Bags
White washed Sand
Cu.M
wastage Sweet water 5000 g - 25 g / m2
Trip
Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Hand Tools Scaffolding Accessories Actual Cost
20 mm INTERNAL PLASTER - 16 m2 ( Above 6 m Height)
M2 16
Cement
Bags
White washed Sand
Cu.M
wastage Sweet water 5000 g - 25 g / m2
Trip
Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Hand Tools Scaffolding Accessories Actual Cost
25 mm EXTERNAL PLASTER - 17 m2
M2 16
Cement
Bags
White washed Sand
Cu.M
wastage Sweet water 5000 g - 25 g / m2
Trip
Mason
No
Unskilled Labour
No
Charge Hand
No
Unskilled Labour - for Curing
No
Hand Tools Scaffolding Accessories Actual Cost
SCREED RMC CONCRETE - OPC - C20 - 150 mm THK - (400 m2)
M2
150 mm thk
40
Basic Cost - 5 % wastage
m3
Pump - 5 % wastage
m3
Temp.Control -5 % wastage
m3
Mason - 4 No
No
Unskilled Labour - 6 No
No
Charge Hand
No
Unskilled Labour - for Curing-
No
Carpenter -
No
Sweet water 5000 g- 15 g / m3
Trip
Hand Tools White wood - 0.28 m3 / 5 times ( + 10% wastage )
m3
Nail Actual Cost
SCREED RMC CONCRETE - OPC - C20 - 100 mm THK - (400 m2)
M2
M2
100 mm thk
40
Basic Cost - 5 % wastage
m3
Pump - 5 % wastage
m3
Temp.Control -5 % wastage
m3
Mason - 4 No
No
Unskilled Labour - 6 No
No
Charge Hand
No
Unskilled Labour - for Curing-
No
Carpenter -
No
Sweet water 5000 g- 15 g / m3
Trip
Hand Tools White wood - 0.28 m3 / 5 times ( + 10% wastage )
m3
Nail Actual Cost
SCREED RMC CONCRETE - OPC - C20 - 90 mm THK - (400 m2)
M2
M2
90 mm thk
40
Basic Cost - 5 % wastage
m3
Pump - 5 % wastage
m3
Temp.Control -5 % wastage
m3
Mason - 4 No
No
Unskilled Labour - 6 No
No
Charge Hand
No
Unskilled Labour - for Curing-
No
Carpenter -
No
Sweet water 5000 g- 15 g / m3
Trip
Hand Tools White wood - 0.28 m3 / 5 times ( + 10% wastage )
m3
Nail Actual Cost
M2
SCREED RMC CONCRETE - OPC - C20 - 75 mm THK - (400 m2)
M2
75 mm thk
40
Basic Cost - 5 % wastage
m3
Pump - 5 % wastage
m3
Temp.Control -5 % wastage
m3
Mason - 4 No
No
Unskilled Labour - 6 No
No
Charge Hand
No
Unskilled Labour - for Curing-
No
Carpenter -
No
Sweet water 5000 g- 15 g / m3
Trip
Hand Tools White wood - 0.28 m3 / 5 times ( + 10% wastage )
m3
Nail Actual Cost
SCREED RMC CONCRETE - OPC - C20 - 50 mm THK - (400 m2)
M2
M2
50 mm thk
40
Basic Cost - 5 % wastage
m3
Pump - 5 % wastage
m3
Temp.Control -5 % wastage
m3
Mason - 4 No
No
Unskilled Labour - 6 No
No
Charge Hand
No
Unskilled Labour - for Curing-
No
Carpenter -
No
Sweet water 5000 g- 15 g / m3
Trip
Hand Tools White wood - 0.28 m3 / 5 times ( + 10% wastage )
m3
Nail Actual Cost
SCREED RMC CONCRETE - OPC - C20 - 40 mm THK - (400 m2)
M2
M2
40 mm thk
40
Basic Cost - 5 % wastage
m3
Pump - 5 % wastage
m3
Temp.Control -5 % wastage
m3
Mason - 4 No
No
Unskilled Labour - 6 No
No
Charge Hand
No
Unskilled Labour - for Curing-
No
Carpenter -
No
Sweet water 5000 g- 15 g / m3
Trip
Hand Tools White wood - 0.28 m3 / 5 times ( + 10% wastage )
m3
Nail Actual Cost
SCREED RMC CONCRETE - OPC - C20 - 25 mm THK - (400 m2)
M2
M2
25 mm thk
40
Basic Cost - 5 % wastage
m3
Pump - 5 % wastage
m3
Temp.Control -5 % wastage
m3
Mason - 4 No
No
Unskilled Labour - 6 No
No
Charge Hand
No
Unskilled Labour - for Curing-
No
Carpenter -
No
Sweet water 5000 g- 15 g / m3
Trip
Hand Tools White wood - 0.28 m3 / 5 times ( + 10% wastage )
m3
Nail Actual Cost
MOSAIC TILES
M2
M2 12 3 Times Polising Misc./Tools Cement Fix Sweet Water Mason
No
Unskilled Labour
No
Charge Hand
No
Actual Cost
CERAMIC / PORCELAIN FLOOR
M2 12 Misc./Tools
Cement Fix + Grout Sweet Water Mason
No
Unskilled Labour
No
Charge Hand
No
Actual Cost
CERAMIC / PORCELAIN FLOOR ( Epoxy Coat )
M2 12
Misc./Tools Epoxy Coat - 110 QR / 18 Litre ( 3 kg/ m2 ) Cement Fix + Grout Sweet Water Mason
No
Unskilled Labour
No
Charge Hand
No
Actual Cost
GRANITE / MARBLE for floor
M2 10
Cement Fix + Grout
m2
Seal Coating for Granite / Marble
m2
Sweet Water Misc./tools/Accessories
m2
Mason
No
Unskilled Labour
No
Charge Hand
No
Actual Cost
GRANITE / MARBLE for floor ( Epoxy Coat )
M2 10
Epoxy Coat - 110 QR / 18 Litre ( 3 kg/ m2 ) Seal Coating for Granite / Marble
m2
Sweet Water Misc./tools/Accessories
LS
Mason
No
Unskilled Labour
No
Charge Hand
No
Actual Cost
CERAMIC / PORCELAIN
FLOOR
CERAMIC FLOOORING
m2
Screed Fixing Adhesive + Labour Charges
CERAMIC FLOOORING
m2
Screed Fixing Adhesive + Labour Charges
PORCELAIN
m2
Screed Fixing Adhesive + Labour Charges
GRANITE / MARBLE
m2
Screed Fixing Adhesive + Labour Charges
SLOPED ROOF CLAY TILE
m2
Plaster Screed Fixing Adhesive + Labour Charges
PORCELAIN
m2
Screed Fixing Adhesive + Labour Charges
GRANITE TREAD & RISER Screed Fixing Adhesive + Labour Charges
m2
MOSAIC
m2
Screed Fixing Adhesive + Labour Charges
MOSAIC TREAD & RISER
m2
Screed Fixing Adhesive + Labour Charges
THRESHOLD - 250 mm
m2
Screed Fixing Adhesive + Labour Charges
THRESHOLD - 100 mm
m2
Fixing Adhesive + Labour Charges
THRESHOLD - 130 mm
m2
Fixing Adhesive + Labour Charges
THRESHOLD - 265 mm
m2
Fixing Adhesive + Labour Charges
CERAMIC WALL
TILES
M2 12 Misc./tools/scaffolding Glue Fix + Grout Sweet Water Mason
No
Unskilled Labour
No
Charge Hand
No
Actual Cost
Granite for walls (wet Fix )
M2
7 Glue
Ls
Seal Coating for Granite / Marble
m2
Sweet Water Misc./tools/scaffolding
LS
Mason
No
Unskilled Labour
No
Charge Hand
No
Actual Cost
Granite for walls (wet Fix - with Epoxy Coat )
M2 7
Epoxy Coat - 110 QR / 18 Litre ( 3 kg/ m2 ) Glue
LS
Seal Coating for Granite / Marble
m2
Sweet Water Misc./tools/scaffolding
LS
Mason
No
Unskilled Labour
No
Charge Hand
No
Actual Cost
STONE / GRANITE FOR WALL (MECH FIX )
M2 6.5
Stainless Steel Fixure for wall tiles
No
Seal Coating for Granite / Marble
m2
Misc./tools/scaffolding
LS
Mason
No
Unskilled Labour
No
Charge Hand
No
Actual Cost
CERAMIC / PORCELAIN
WALL CERAMIC WALL
m2
Plaster Fixing Adhesive + Laying Charges
PORCELAIN / CERAMIC WALL Plaster Fixing Adhesive + Laying Charges
m2
INTERNAL GRANITE / MARBLE WALL
m2
Plaster Fixing Adhesive + Laying Charges
CERAMIC WALL
m2
Plaster Fixing Adhesive + Laying Charges
EXTERNAL GRANITE / MARBLE WALL
m2
Plaster Bitumen Paint Fixing Adhesive + Laying Charges
EXTERNAL STONE CLADDING
m2
Plaster Bitumen Paint Fixing Adhesive + Laying Charges
10 cm High - Ceramic / Porcelain Skirting - 30 m/day
M 30
FIXING - Mortar - Cement
Bags
Sand
Cu.M
wastage Sweet Water Hand Tool Glue Fix + Grout Mason
No
Unskilled Labour
No
Charge Hand
No
Actual Cost 15 cm High - Ceramic / Porcelain Skirting - 30 m/day
M 25
FIXING - Mortar - Cement
Bags
Sand
Cu.M
wastage Sweet Water Hand Tool Glue Fix + Grout Mason
No
Unskilled Labour
No
Charge Hand
No
Actual Cost Mosaic Skirting - 30 m/day
M 30 Morter - Cement
Bags
Sand
Cu.M
wastage Sweet Water Hand Tool Glue Fix + Grout Mason
No
Unskilled Labour
No
Charge Hand
No
Actual Cost
Granite/Marble Skirting - 30 m/day
M 30
Granite / Marble PC Rate-50 Dhs/m
m
Morter - Cement
Bags
Sand
Cu.M
wastage Sweet Water Hand Tool Glue Fix + Grout Mason
No
Unskilled Labour
No
Charge Hand
No
Edging chages Actual Cost
CERAMIC / PORCELAIN
SKIRTING ( 30 m / Day )
10 cm High - PORCELAIN SKIRTING
m
Fixing Adhesive + Laying Charges
10 cm High - TERRAZO SKIRTING
m
Fixing Adhesive + Laying Charges
10 cm High - WOODEN SKIRTING
m
Fixing Adhesive + Laying Charges
10 cm High - CERAMIC
SKIRTING
m
Fixing Adhesive + Laying Charges
10 cm High - GRANITE
SKIRTING
m
Fixing Adhesive + Laying Charges
10 cm High - GRANITE
SKIRTING
m
Fixing Adhesive + Laying Charges
10 cm High - MOSAIC
SKIRTING
m
Fixing Adhesive + Laying Charges
Ceramic Steps - 8 m / Day
M 8
Ceramic Tile PC Rate-30 Dhs/m
m
Screed - 0.75 m2 / 2 Glue Fix + Grout Sweet Water Misc./tools/Accessories
No
Mason
No
Unskilled Labour
No
Charge Hand
No
Actual Cost
Mosaic Steps
M 10 Mosaic Tile PC Rate- 25 Dhs/m
m
Screed - 0.75 m2 / 2 Glue Fix + Grout Sweet Water Misc./tools/Accessories
No
Mason
No
Unskilled Labour
No
Charge Hand
No
Actual Cost
Granite/Marble Steps
M 8
Granite / Marble PC Rate- 150 Dhs/m
m
Screed - 0.75 m2 / 2 Glue Fix + Grout Sweet Water Misc./tools/Accessories
No
Mason
No
Unskilled Labour
No
Charge Hand
No
Actual Cost
CEMENT TILES ( ROOF )
M2 17
Mosaic Tile PC Rate- 25 Dhs/m2 Screed
m2
Misc./Tools Cement Fix Sweet Water Mason
No
Unskilled Labour
No
Charge Hand
No
Actual Cost
CEMENT TILES SKIRTING - 30 m/day ( ROOF )
M 30
Mosaic Tile PC Rate- 10 Dhs/m Morter - Cement
Bags
Sand
Cu.M
wastage Sweet Water Hand Tool Glue Fix + Grout
m
Mason
No
Unskilled Labour
No
Charge Hand
No
Actual Cost
Interlock paving 80 mm - 30 m2
M2 25
compaction & prepration of base
m2
Interlock supply price - 42 Dhs /m2
m2
roadbase 250 mm
m3
compaction of road base
m3
Sweet water 5000 g- 10 g / m2 Sand 50 mm
m3
wastage 5%
%
Mason
No
Unskilled Labour
No
Charge Hand
No
Actual Cost
Interlock paving 60 mm - 30 m2
M2 25
compaction & prepration of base
m2
Interlock supply price - 37 Dhs /m2
m2
roadbase 150 mm
m3
compaction of road base
m3
Sweet water 5000 g- 10 g / m2 Sand 50 mm
m3
wastage 5%
%
Mason
No
Unskilled Labour
No
Charge Hand
No
Actual Cost
Roadbase for Large Area - 250 m3
M3 250
Material cost with Bulkage
m3
Mechanical Shovel 966 - 2 No
m3
Roller Compactor - 20T
m2
compaction test for road base-500 m2/test-75 Dhs
m2
Unskilled Labour - 10 No
No
Charge Hand
No
Sweet water 5000 g- 10 g / m2
Trip
Actual Cost
Roadbase for Footing / Small Area - 40 m3
M3 40
Material cost with Bulkage
m3
Mechanical Shovel 966
m3
Roller Compactor - 20T
m2
Baby Roller 1.5 T
m2
compaction test for road base-500 m2/test-75Dhs
m2
Unskilled Labour - 10 No
No
Charge Hand
No
Sweet water 5000 g- 10 g / m2
Trip
Actual Cost
IMPORTED FILLING SAND - 150 m3
M3 150
Imported Filling Sand + Bulkage
m3
Mechanical Shovel 966 - 1 No
m3
Roller Compactor - 20T
m2
Unskilled Labour
No
Charge Hand
No
Sweet water 5000 g- 10 g / m2
G
Compaction test - 200 Dhs/No (750 m2/Test)
No
Actual Cost
Kerb stone - 10 m 10 kerbstone Price - 27 Dhs / m - ( 914 xx300 x 150 )mm
m
Excavation
m3
compaction of road base
m2
wastage 5%
%
Mason
No
Unskilled Labour
No
Charge Hand
No
concrete Hunching
m3
Sweet water 5000 g- 10 g / m2
G
Actual Cost
ASPHALT ROAD Granular Fill - 150 mm
m2
Bitumen Prime Coat
m2
70 mm Asphalt Base Course
m2
Bitumen Tack Coat
m2
40 mm Asphalt Wearing Course
m2
Actual Cost
SUBCONTRACTING WORK FALSE CEILING Gypsum False ceiling
m2
Decorative Gypsum False ceiling
m2
60 x 60 cm Gypsum Tile False ceiling
m2
Gypsum Bulk Head
m
Gypsum Cove
m
Gypsum Cornice
m
Plain Aluminium Perforated
False ceiling
Aluminium
False ceiling
m2 m2
10 cm Gypsum Partition
m2
Emulsion Paint
m2
External Epoxy Paint
m2
External Acrylic Based Paint
m2
Polyurethene Anti carbonate
m2
Enamel Paint
m2
Floor Epoxy Paint
m2
Floor Hardner
m2
Floor Sealer
m2
Membrane 4 mm SBS
m2
Membrane 4 mm APP
m2
3 mm GRP Lining
m2
6 mm GRP Lining
m2
PAINTING
WATERPROOFING
METAL WORKS Aluminium
Cladding
Aluminium Composite Cladding
m2 m2
POST TENSION SLAB & BEAM S no
Description POST TECH
Unit
Slab Post Tensioning - 80 / m2
m2
Grouting 10 % of concrete ( 5623 m3 x 10% x 1000 )/ Area
m2
Beam Post Tensioning - 350 / m3
m3
Grouting 10 % of concrete ( 10% x 1000 )/ Area
m3
Post Post Post Post
m2
Tensioning Tensioning Tensioning Tensioning
Slab & beams Formwork ( 90+35 ) concrete for Slab & beams Slab Reinforcement Beam Reinforcement
m3 Kg Kg
Su
Main contractor overhead & Pro
Grand
SHORING (Seacant Pile) S no
Description
No
Total length=145 rm Total amount as per the Stromek Add O H & profit-15% Concrete- C40 ( Dia 70 cm )
238
steel
1
Guide beam
1
excavation for the same
1
Capping beam
1
B.W.- 10 % Main contractor overhead & Profit -15%
Guniting Description
Unit
Guniting
m2
B.W - 5% Shotcrete
m3
Reinf - mesh A393
m2
Diesel-5 pumps @ 7 gall per day
gall
Cleaning
m2
scaffolding
m2
Su
Main contractor overhead & Pro
Grand
Guniting
145
Description
Unit
Guniting
m2
B.W - 5% Shotcrete
m3
Reinf - mesh A393
m2
Diesel-5 pumps @ 7 gall per day
gall
Cleaning
m2
scaffolding
m2
Phonix Engineering & M
Amount - AED 3470 per Day Productivity - 15 to 20 m3 per day
Su
Main contractor overhead & Pro
Grand
Dewatering-12 month -365 Days Description
S no
Unit
Dewatering system as per the ETA quotation-SRS/DEW/QUT/840-R1/09 Mobilisation , Installation Including technician ,Diesel, Oil and commisioning
Lumsum
Installation of complete system Hire charges
Day
Hire charges for the diesel generators
Day
Diesel-5 pumps @ 7 gall per day
gall
Bore hole Mobilization No
Sacrificed pumps Diesel Associated civil & builders works - Aggregate , Inject water , Make Trench , civil works , Cranage ,wateranalysis,testing and making installation of dewatering system complete(approximately 10% of above)
Su
Main contractor overhead & Pro
Grand
Dewatering- 4 month -120 Days Description
S no
Unit
Dewatering system as per the ETA quotation-SRS/DEW/QUT/840-R1/09 Mobilisation , Installation Including technician ,Diesel, Oil and commisioning Installation of complete system Hire charges
Lumsum
Hire charges for the diesel generators Diesel-5 pumps @ 7 gall per day Bore hole Mobilization Sacrificed pumps Diesel Days
Daily Maintenance Builders work Associated civil & builders works - Aggregate , Inject water , Make Trench , civil works , Cranage ,wateranalysis,testing and making installation of dewatering system complete(approximately 10% of above)
Su
Main contractor overhead & Pro
Grand
MANHOLE
SIZE - 1.20 X 1.20 X1.4 Description
MANHOLE
Unit
SIZE - 1.20 X 1.20 X1.4
Excavation
1
Cart Away
1
Back Filling Polythene Sheet
1
Blinding Concrete
1
20 cm thk
1
Block work
Plaster
1 1
Man Hole Cover 60 x 60 cm Dia - 850 / no+ 300 Membrane
1 1
GULLY TRAP
SIZE - 0.30 X 0.30 X1.00 Description
GULLY TRAP Excavation
Unit
SIZE - 0.30 X 0.30 X1.00 1
Cart Away
1
Back Filling Polythene Sheet
1
Blinding Concrete
1
20 cm thk
1
Block work
Plaster
1 1
Man Hole Cover 60 x 60 cm Dia - 300 / no+ 50 Membrane
1 1
DUCTED PVC PIPE
SIZE - 0.50 X 0.30 Description
DUCTED PVC PIPE
Unit
SIZE - 0.50 X 0.30
Excavation
1
Cart Away
1
Back Filling Polythene Sheet
1
Blinding Concrete & Shuttering
1
Boundary Wall Footing, Beam
Nos.
Boundary Wall Footing
6
Column
7
Tie Beam
1
Coumn
7
Coping Beam
1
Total =
Description
Unit
Excavation ( 5.0 x 4.0 x 2.80 ) m
6
Cart Away
Back Filling
Road Base Below Footing
6
20 cm thk Block Work
1
Plaster
2
Epoxy paint
2
H BEAM SHORING for 6 m Depth , 315 m Length Sl No
1 2 3 4 5 6
Description
Qty
Mobilisation
1 1 115
Builders Work
H Beam Installation H Beam Prices
Concrete Panel Supply- 4 m Depth Concrete Panel Installation
460 5 Total
Add Overhead & Profit 15% Total
Item
Amount
LIST FOR ALL THE MATERIALS Description
Unit
1
Concrete OPC 250; Grade 20/20 SRC 250; Grade 20/20 OPC 400; Grade 40/20 SRC 400; Grade 40/20 OPC 420 ; Grade 50/20 SRC 420 ; Grade 50/20
Pump Charges Temperature Control Screed Concrete
m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3
Steel Reinforcement Qatari Straight Qatari Cut & Bend
MT MT
BRC Mesh - Size ( 4.80 m x 2.40 m ) A 142 = ( 93QR / 11.52 m2 ) A193 = ( 130 QR / 11.52 m2 ) A252 = ( 159 QR / 11.52 m2 ) A393 = ( 225 QR / 11.52 m2 )
m2 m2 m2 m2
Solid Blocks - 10.5 - 15 N/ mm2 100mm 150mm 200mm 250mm 300mm
No. No. No. No. No.
OPC 420Kg; Grade C40/20 (45% OPC + 55% GGBS) OPC 400Kg; Grade C40/20 (70%OPC + 30% GGBS) OPC 400Kg; Grade C40/20 (45%OPC + 55% GGBS + WP) SRC 420Kg; Grade C40/20 (45%OPC + 55% GGBS + WP)
2
3
4
5
6
Hollow Blocks - 7 N/ mm2 100mm 150mm 200mm 250mm 300mm 350mm 200mm - SRC Note - 1, 2 Hours Fire Rated 10% & 20% QR More Hourdy Blocks 150mm 200mm
No. No. No. No. No. No. No.
No. No.
7
8
9
10
11
250mm 300mm 350mm
No. No. No.
Insulated Blocks 200mm 250mm 300mm 350mm
No. No. No. No.
Interlock 60mm (Grey) ( Lime Stone ) 60mm ( Red ) 60mm (Block) 60mm ( Yellow )
m2 m2 m2 m2
80mm (Grey) 80mm ( Red ) 80mm (Block) 80mm ( Yellow )
m2 m2 m2 m2
60mm (Grey) ( Gabbro Aggregate ) 60mm ( Red ) 60mm (Block) 60mm ( Yellow )
m2 m2 m2 m2
80mm (Grey) 80mm ( Red ) 80mm (Block) 80mm ( Yellow )
m2 m2 m2 m2
Kerb Stones (Heel) Kerb Stones (915 x 300 x 150 ) mm Heel Kerb Stones (915 x 300 x 100 ) mm
m m
Cement OPC GGBS SRC GGBS Sand Black Washed Sand White Washed Sand Interlock Sand Sweet Sand Dune Sand Filling Sand
Bags Bags
m3 m3 m3 m3 m3 m3
12
13
14
15
Shuttering Materials 4mm commercial plywood ( 2.40 m x 1.20 m ) 6mm commercial plywood ( 2.40 m x 1.20 m ) 12mm commercial plywood ( 2.40 m x 1.20 m ) 18mm marine ply wood ( 2.40 m x 1.20 m ) White Wood
No. No. No. No. m3
Road Base Road Base ( Natural ) Road Base ( Crushed )
m3 m3
Polythene Sheet 1200G Polythene Sheet ( 50.00 x 2.00 ) 1000G Polythene Sheet ( 50.00 x 2.00 ) 500G Polythene Sheet ( 50.00 x 2.00 ) Flexcell Sheel ( 2.40 m x 1.20 m ) 12mm 18mm 25mm
100 m2 100 m2 100 m2
No. No. No.
16
Bitumen Paint Bituthene 8000 HC Membrane 4 mm SBS Membrane 4 mm APP Roof Anti Root Membrane Protection Board - 3 mm thk Protection Board - 6 mm thk (1 *2 m - 48 QR / 2 m2 )
17
Tiles Adhesive Tiles Adhesive - 42 QR / 25 kg - ( 2 kg / m2 ) Tile Grouting - 69 QR / 25 kg - (1 kg / 4 m2 )
Bag Bag
Painting Internal Emulsion External Epoxy
m2 m2
18
19
200 lts m2 m2 m2 m2 m2 m2
Asphalt Road Granular Fill - 150 mm Bitumen Prime Coat 70 mm Asphalt Base Course Bitumen Tack Coat
m2 m2 m2 m2
20 21 22
40 mm Asphalt Wearing Course
m2
Extruded Polystrene 50 mm thk - 2.00x 1.00 = 25 QR Cast Iron Manhole Cover - India Wooden Nail 4 mm Membrane ( 1.00 x 10.00 = 10 m2 = 125 QR )
m2 No m2
Qty
Rate/Day
Rate ( Dhs ) LABOUR
MATERIAL
PLANT
SUBCONTRACT
10 12 15 Qty
Rate/Day
15
1
900
6.00
6.00
500
850
1.70
1.70
2
90.00
1.20
1.20
0.4
135.00
0.36
0.36
1
0.89
1.00
90
5.00
5
15.3
6.6
8.33
Qty
Rate/Day
1.00
0.0
7.7
21
2
900
12.00
12.00
500
850
1.70
1.70
2
90.00
1.20
1.20
0.4
135.00
0.36
0.36
1
0.89
1.00
90
5.00
5
21.3
6.6
8.33
Qty
Rate/Day
1.00
0.0
13.7
1.0
46
1
900
18.00
18.00
1
1000
20.00
20.00 1.70
850
1.70
2
90.00
3.60
3.60
0.4
135.00
1.08
1.08
1
0.89
1.00
1
0.50
0.50
500
1.0
45.9
1.00 0.50
4.7
0.0
40.2
1.0
Qty
Rate/Day
22
2
900
9.00
9.00
1
850
4.25
4.25
2
90.00
0.90
0.90
0.4
135.00
0.27
0.27
1.5
550.00
4.13
3
200.00
3.00
1
0.50
0.50
22.0
4.13 3.00 0.50
1.2
4.1
13.8
3.0
21 1
900
5.63
5.63
1
2,000.00
12.50
12.50
4
90.00
2.25
2.25
0.4
135.00
0.34
0.34
1
0.50
0.50
21.2
Qty
Rate/Day
0.50
2.6
0.0
18.6
55
1
33
33.00
2
900
9.00
9.00
1
850
4.25
4.25
2
90.00
0.90
0.90
1
135.00
0.23
0.23
7500
0.12
4.50
200.00
3.00
3
54.9
Qty 1
Rate 2.5
0.0
33.00
4.50 3.00
1.1
37.5
13.3
3.0
4.00 4 4.0
4.00 0.0
0.0
2.55
Qty
Rate
1
1.56
1.56
1.56
0.2
1.56
0.312
0.31
0.0
4.0
5%
1.56
0.078
2
90.00
0.60
0.60
2.6
0.6
0.08
2.0
Qty
Rate
12
1
500
6.25
6.25
0.63
0.63
1
20
0.50
5
90.00
4.50
4.50
11.9
4.5
6.9
0.0
0.0
0.0
0.0
0 Qty
Rate/Day
10
10
100
0.1
15
157.5
1
90
9.00
9.00
1.5
90.00
13.50
13.50
1
135.00
2.25
2.25
1
10.00
1.00
1.00
15
0.1
1.50
285.3 100.00 157.50
1.50
0.5
285.3
Qty
Rate/Day
0.50
25.8
159.0
0.5
100.0
28.5
m3 10
10
100
0.1
15
157.5
1
90
9.00
9.00
1.5
90.00
13.50
13.50
1
135.00
2.25
2.25
1
10.00
1.00
1.00
15
0.1
1.50
100.00 157.50
1.50
0.5
28.5
Qty m3
Rate/Day
19.7
0.50
2.6
15.9
0.1
10.0
1.05
220
231
231.00
1.05
15
15.75
15.75
1.05
15
15.75
15.75
4
108.00
14.40
14.40
6
90.00
18.00
18.00
1
135.00
3.00
3.00
0.1
90.00
0.30
0.30
2
108.00
4.32
4.32
15
0.12
1.80
1.80
0.50 0.056
850
Qty
Rate/Day
0.50
52.36
52.36
0.50
0.50
19.7
50 mm thk
Temp.Control -5 % wastage
2.2
17.4
0.028
0.0
29.5
m3 1.05
220
231
231.00
1.05
15
15.75
15.75
1.05
15
15.75
15.75
4 6
108.00 90.00
10.80 13.50
10.80 13.50
1
135.00
2.25
2.25
0.1
90.00
0.23
0.23
2
108.00
4.32
4.32
15
0.12
1.80
1.80
0.50 0.056
850
52.36
52.36
0.50
0.50
29.5
75 mm thk
Qty
Rate/Day
0.50
2.6
26.8
0.042
34.9
m3 1.05
220
231
231.00
1.05
15
15.75
15.75
1.05
15
15.75
15.75
4
108.00
10.80
10.80
6
90.00
13.50
13.50
1
135.00
2.25
2.25
0.1
90.00
0.23
0.23
2
108.00
4.32
4.32
15
0.12
1.80 0.50
1.80 0.50
0.0
0.056
850
52.36
52.36
0.50
0.50
34.9
100 mm thk
Qty
Rate/Day
3.1
31.7
0.1
0.0
0.0
0.0
348
m3 1.05
220
231
231.00
1.05
15
15.75
15.75
1.05
15
15.75
15.75
4
108.00
10.80
10.80
6
90.00
13.50
13.50
1
135.00
2.25
2.25
0.1
90.00
0.23
0.23
2
108.00
4.32
4.32
15
0.12
1.80
1.80
0.056
850
52.36
52.36
0.50
0.50
348.3
100 mm thk
31.1
317.2
310
Qty
Rate/Day
1.02
245
249.9
249.90
2%
300
6.00
6.00
1.02
15
15.3
15.30
1.02
15
15.3
15.30
8
108.00
5.40
5.40
16
90.00
9.00
9.00
2
135.00
3.15
3.15
0.1
10.00
1.00
1.00
2
108.00
1.35
1.35
1
108.00
0.68
0.68
15
0.1
1.50
1.50
0.50 3
65
1.22
310.3
Qty
Rate/Day
0.50
322
1.22
20.6
288.0
1.7
0.0
1.02
256
261.12
261.12
2%
300
6.00
6.00
1.02
15
15.3
15.30
1.02
15
15.3
15.30
108.00
5.40
5.40
16
90.00
9.00
9.00
2
135.00
3.15
3.15
0.1
10.00
1.00
1.00
2
108.00
1.35
1.35
1
108.00
0.68
0.68
15
0.1
1.50
8
3
65
1.50
0.50
0.50
1.22
1.22
321.5
20.6
299.2
Rate/Day
1.02
268
273.36
273.36
2%
300
6.00
6.00
1.02
15
15.3
15.30 15.30
15
15.3
8
108.00
5.40
5.40
16
90.00
9.00
9.00
2
135.00
3.15
3.15
0.1
10.00
1.00
1.00
2
108.00
1.35
1.35
1
108.00
0.68
0.68
15
0.1
1.50
3
65
0.0
334
Qty
1.02
1.7
1.50
0.50
0.50
1.22
1.22
333.8
20.6
311.5
310
Qty
Rate/Day
1.02
245
249.9
249.90
2%
300
6.00
6.00
1.02
15
15.3
15.30
1.02
15
15.3
15.30
8
108.00
5.40
5.40
16
90.00
9.00
9.00
2
135.00
3.15
3.15
0.1
10.00
1.00
1.00
1.7
0.0
2
108.00
1.35
1.35
1
108.00
0.68
0.68
15
0.1
1.50
1.50
0.50 3
65
0.50
1.22
310.3
1.22
20.6
288.0
Rate/Day
1.02
250
255
255.00
2%
300
6.00
6.00
1.02
15
15.3
15.30
1.02
15
15.3
15.30
8
108.00
5.40
5.40
16
90.00
9.00
9.00
2
135.00
3.15
3.15
0.1
10.00
1.00
1.00
2
108.00
1.35
1.35
1
108.00
0.68
0.68
15
0.1
1.50
3
65
1.50
0.50
0.50
1.22
315.4
1.22
20.6
293.1
Rate/Day
1.02
266
271.32
271.32
2%
300
6.00
6.00
1.02
15
15.3
15.30
1.02
15
15.3
15.30
108.00
5.40
5.40
9.00
9.00
3.15
3.15
1.00
1.00
2 0.1
90.00 135.00 10.00
2
108.00
1.35
1.35
1
108.00
0.68
0.68
15
0.1
1.50
65
0.0
1.50
0.50 3
1.7
332
Qty
16
0.0
315
Qty
8
1.7
0.50
1.22
331.7
1.22
20.6
309.4
1.7
0.0
53
Qty
Rate
2.88
90.00
10.42
10.42
0.035
850.00
9.92
9.92
0.194
5.33
1.03
1.03
1.02
1.02
7
5
2
306.00
90.00
108.00
2.5
1.00
0.00
15.00
21.42
21.42
4.50
4.50
2.16
2.16
0.40
0.40
2.00
2.00
0.00
52.9
0.00
28.1
22.8
Rate
2.88
90.00
10.42
10.42
0.035
850.00
9.92
9.92
0.194
5.33
1.03
1.03
1.02
1.02
0.40
0.40
2.5
7 5 1.33
1.00 306.00 90.00 135.00
21.42
21.42
4.50
4.50
1.80
1.80
2.00 1.00
15.00
10.00
.
62.5
2.00 10.00
27.7
22.8
3,116 1 25
5.20
0.0
63
Qty
100.00
2.0
2500
2500.00
130.00
130.00
2.0
10.0
4
108.00
432.00
432.00
0
90.00
0.00
0.00
1
135.00
54.00
54.00
0.00
3116.0
486.0
2630.0
0.0
0.0
0.0
0.0
3.12 1
2500
2500.00 130.00
25
5.20
130.00
4
108.00
432.00
432.00
0
90.00
0.00
0.00
1
135.00
54.00
54.00
0.00
3.12
Qty
Rate/Day
0.5
2.6
26.4
m3 1.05
200
210
210.00
1.05
10
10.5
10.50
1.05
10
10.5
10.50
108.00
5.40
5.40
13.50
13.50
2.25
2.25
0.23
0.23 4.32
2 6 1 0.1
90.00 135.00 90.00
2
108.00
4.32
15
0.12
1.80
1.80
0.50 0.056
850
52.36
52.36
0.50
0.50
26.4
75 mm thk
1
0.50
2.2
24.2
0.042
0.0
20.0
288.0
1.7
0.0
6.5
130.0
148.1
13.0
0.0
100
75.0
263.0
0.0
0.0
225.0
699.1
14.7
0.0
1
20.0
288.0
1.7
0.0
3
130.0
68.4
6.0
0.0
100
75.0
263.0
0.0
0.0
225.0
619.4
7.7
0.0
16.275
20.0
288.0
1.7
0.0
1.50
42.1
34.2
3.0
0.0
80
38.9
210.4
0.0
0.0
101.0
532.6
4.7
0.0
1
20.0
288.0
1.7
0.0
2
56.2
45.6
4.0
0.0
938.8
852.1
638.3
80
38.9
210.4
0.0
0.0
115.0
544.0
5.7
0.0
1
20.0
288.0
1.7
0.0
0.25
7.0
5.7
0.5
0.0
110
53.5
289.3
0.0
0.0
80.5
583.0
2.2
0.0
1.001
20.0
299.2
1.7
0.0
7.722
56.2
175.9
15.4
0.0
250
75.0
657.5
0.0
0.0
151.2
1132.7
17.2
0.0
664.7
665.7
1301.0
1.001
20.0
293.1
1.7
0.0
7.722
130.0
175.9
15.4
77.2
200
75.0
526.0
0.0
0.0
225.0
995.0
17.2
77.2
1.00625
20.0
288.0
1.7
0.0
8.05
56.2
183.4
16.1
0.0
175
75.0
460.3
0.0
0.0
151.2
931.7
17.8
0.0
20.0
288.0
1.7
0.0
8.05
130.0
183.4
16.1
80.5
175
75.0
460.3
0.0
0.0
225.0
931.7
17.8
80.5
1.00
20.0
299.2
1.7
0.0
8
130.0
182.3
16.0
0.0
1314.4
1100.6
1.00625
1.01
1255.0
275
75.0
723.3
0.0
0.0
225.0
1204.7
17.7
0.0
1.00
20.0
293.1
1.7
0.0
8
130.0
182.3
16.0
80.0
225
75.0
591.8
0.0
0.0
225.0
1067.1
17.7
80.0
1
20.0
288.0
1.7
0.0
4
130.0
182.3
16.0
0.0
1447.5
1389.8
175
75.0
460.3
0.0
0.0
225.0
930.5
17.7
0.0
1
20.0
288.0
1.7
0.0
10
130.0
227.8
20.0
100.0
140
75.0
394.5
0.0
0.0
225.0
910.3
21.7
100.0
1
20.0
288.0
1.7
0.0
5
130.0
113.9
10.0
50.0
110
75.0
315.6
0.0
0.0
225.0
717.5
11.7
50.0
1
20.0
288.0
1.7
0.0
5
130.0
113.9
10.0
50.0
110
75.0
315.6
0.0
0.0
45.0
143.5
2.3
10.0
1.04
20.0
288.0
1.7
0.0
3.125
130.0
71.2
6.3
31.3
110
75.0
315.6
0.0
0.0
72.0
215.9
2.6
10.0
1
20.0
288.0
1.7
0.0
2.38
130.0
54.2
4.8
23.8
110
75.0
315.6
0.0
0.0
94.5
276.4
2.7
10.0
1173.2
1257.1
1004.2
200.8
300.5
383.7
1
20.0
288.0
1.7
0.0
6
130.0
136.7
12.0
60.0
110
75.0
315.6
0.0
0.0
225.0
740.3
13.7
60.0
1.005
20.0
288.0
1.7
0.0
10.44
130.0
305.3
26.8
104.4
80
75.0
210.4
0.0
0.0
225.0
803.7
28.5
104.4
1.005
20.0
288.0
1.7
0.0
12
337.0
273.4
24.0
120.0
100
48.6
263.0
0.0
0.0
6.8
13.7
0.4
2.0
1
20.0
288.0
1.7
0.0
12.5
351.0
284.8
25.0
125.0
1039.0
1161.6
22.9
90
43.7
236.7
0.0
0.0
414.7
809.5
26.7
125.0
1
20.0
288.0
1.7
0.0
12.5
351.0
284.8
25.0
125.0
90
43.7
236.7
0.0
0.0
20.7
40.5
1.3
6.3
20.0
288.0
1.7
0.0
1376.0
68.8
1
2
56.2
45.6
4.0
20.0
15
7.3
39.5
0.0
0.0
83.5
373.0
5.7
20.0
12.5
1.7
24.0
0.1
0.0
1
1.7
25.8
0.0
0.0
0.1
2.8
2.3
0.2
6.2
52.1
0.3
482.2
170
228.6
170.0
177 12.5
1.7
24.0
0.1
0.0
1
1.7
25.8
0.0
0.0
0.1
2.8
2.3
0.2
6.2
52.1
0.3
12.5
1.7
24.0
0.1
0.0
1
1.7
25.8
0.0
0.0
0.1
2.8
2.3
0.2
6.2
52.1
0.3
235.6
177.0
180
238.6
180.0
300 12.5
1.7
24.0
0.1
0.0
1
1.7
25.8
0.0
0.0
0.1
2.8
2.3
0.2
6.2
52.1
0.3
300.0
1
20.0
288.0
1.7
0.0
5
8.6
129.1
0.0
0.0
1
28.1
22.8
2.0
0.0
20.0
35.0
76.7
474.9
3.7
0.0
358.6
555.3
1
20.0
288.0
1.7
0.0
5
8.6
129.1
0.0
0.0
1
28.1
22.8
2.0
0.0
20.0
35.0
15.3
95.0
0.7
0.0
1
20.0
288.0
1.7
0.0
7
12.1
180.8
0.0
0.0
1
28.1
22.8
2.0
0.0
20.0
35.0
80.1
526.6
3.7
0.0
1
20.0
288.0
1.7
0.0
7
12.1
180.8
0.0
0.0
1
28.1
22.8
2.0
0.0
20.0
35.0
12.0
78.9
0.6
0.0
1
20.0
288.0
1.7
0.0
10
17.2
188.4
0.0
0.0
1
28.1
22.8
2.0
0.0
20.0
35.0
85.3
534.2
3.7
0.0
1
20.0
288.0
1.7
0.0
10
17.2
188.4
0.0
0.0
1
28.1
22.8
2.0
0.0
20.0
35.0
10.2
64.1
0.4
0.0
111.1
610.4
91.5
623.2
74.8
1
20.0
288.0
1.7
0.0
10
17.2
258.3
0.0
0.0
1
28.1
22.8
2.0
0.0
20.0
35.0
8.5
60.4
0.4
0.0
1
20.0
288.0
1.7
0.0
10
17.2
188.4
0.0
0.0
1
28.1
22.8
2.0
0.0
20.0
35.0
17.1
106.8
0.7
0.0
5.00
20.0
288.0
1.7
0.0
5.10
143.2
116.2
10.2
51.0
60
29.2
157.8
0.0
0.0
69.3
124.6
48.5
242.5 2.0
28.8
0.2
0.0
38.9
118.2
2.4
58.7
4.35
20.0
288.0
1.7
0.0
4.45
124.9
101.3
8.9
44.5
60
29.2
157.8
0.0
0.0
218.2
48.5
210.9 2.0
28.8
0.2
0.0
40.5
132.5
2.5
58.7
4.00
20.0
288.0
1.7
0.0
4.10
115.1
93.4
8.2
41.0
60
29.2
157.8
0.0
0.0
234.2
48.5
194.0
2.0
28.8
0.2
0.0
41.6
142.0
2.5
58.8
3.70
20.0
288.0
1.7
0.0
3.80
106.8
86.7
7.6
38.0
60
29.2
157.8
0.0
0.0
244.8
48.5
179.6 2.0
28.8
0.2
0.0
42.7
151.5
2.6
58.8
3.57
20.0
288.0
1.7
0.0
3.67
103.1
83.7
7.3
36.7
75
36.5
197.3
0.0
0.0
255.5
48.5
173.2 2.0
28.8
0.2
0.0
45.2
167.4
2.6
58.8
3.33
20.0
288.0
1.7
0.0
3.43
96.4
78.2
6.9
34.3
75
36.5
197.3
0.0
0.0
274.0
48.5
161.7 2.0
28.8
0.2
0.0
46.5
177.7
2.6
58.8
3.13
20.0
288.0
1.7
50.0
3.23
90.6
73.5
6.5
32.3
75
36.5
197.3
0.0
0.0
285.6
48.5
151.6 2.0
28.8
0.2
5.0
314.8
47.7
188.0
2.7
1.00
20.0
288.0
1.7
0.0
5.00
130.0
113.9
10.0
50.0
100
75.0
263.0
0.0
0.0
350
350.0
1332.6
0.1
49.6 Qty 11.52
Rate
13.57
93.00
8.07 1.78 2.00 0.94 0.78 13.6
22%
1
1
2
108.00
2
90.00
Qty 11.52
Rate
17.49
130.00
11.28 2.48 2.00 0.94 0.78 17.5
22%
1
1
2
108.00
2
90.00
Qty 11.52 22%
76.4
Rate
20.56
159.00
13.80 3.04
2.0
28.8
0.2
0.0
227.0
693.7
11.9
400.0
2.1
28.8
0.2
5.0
1.7
11.8
0.0
0.0
3.8
40.6
0.2
5.0
0.0
0.0
0.0
0.0
8.07 1.78 2.00 0.94 0.78
1.7
11.8
11.28 2.48 2.00 0.94 0.78
1.7
15.8
13.80 3.04
1
1
2
108.00
2
90.00
Qty 11.52
2.00 0.94 0.78 20.6
Rate
27.55
225.00
19.53 4.30 2.00 0.94 0.78 27.5
22%
1
1
2
108.00
2
90.00
2.00 0.94 0.78
1.7
18.8
0.0
0.0
0.0
0.0
19.53 4.30 2.00 0.94 0.78
1.7
25.8
75 Rate 12.5
2.70
35.44
35.44
0.3
13.00
3.90
3.90
0.0225
60.00
1.35
1.35
0.26
0.26
5%
2.50
2.50
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
0.1
10.00
1.00
1.00
20
0.1
2.00
2.00
1.00
75.0
1.00
30.0
45.5
80 Rate 12.5
2.90
38.06
38.06
0.375
13.00
4.88
4.88
0.039
60.00
2.34
2.34
0.36
0.36
5%
2.50
2.50
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1
10.00
1.0
0.0
20
0.1
2.00
2.00
1.00
79.7
1.00
30.0
50.1
1.0
0.0
84 Rate 12.5
3.10
40.69
40.69
0.5
13.00
6.50
6.50
0.045
60.00
2.70
2.70
0.46
0.46
2.50
2.50
5% 1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
84.4
1.00
30.0
54.8
1.0
0.0
101 Rate 12.5
4.10
53.81
53.81
0.675
13.00
8.78
8.78
0.062
60.00
3.72
3.72
0.62
0.62
2.50
2.50
5% 1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
101.0
1.00
30.0
71.4
121 Rate 12.5
5.50
72.19
72.19
0.8
13.00
10.40
10.40
1.0
0.0
0.0675
60.00
5%
4.05
4.05
0.72
0.72
2.50
2.50
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
121.4
1.00
30.0
91.9
1.0
0.0
79 Rate 12.5
2.97
38.98
38.98
0.3
13.00
3.90
3.90
0.0225
60.00
1.35
1.35
0.26
0.26
2.50
2.50
5% 1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
78.6
1.00
30.0
49.0
1.0
0.0
84 Rate 12.5
3.19
41.87
41.87
0.375
13.00
4.88
4.88
0.04
60.00
2.40
2.40
0.36
0.36
2.50
2.50
5% 1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
83.6
1.00
30.0
54.0
1.0
0.0
88 Rate 12.5
3.41
44.76
44.76
0.5
13.00
6.50
6.50
0.045
60.00
2.70
2.70
0.46
0.46
2.50
2.50
5% 1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
88.5
1.00
30.0
58.9
1.0
0.0
106 Rate 12.5
4.51
59.19
59.19
0.675
13.00
8.78
8.78
0.062
60.00
3.72
3.72
0.62
0.62
2.50
2.50
5% 1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
106.4
1.00
30.0
76.8
129 Rate 12.5
6.05
79.41
79.41
0.8
13.00
10.40
10.40
0.0675
60.00
4.05
4.05
0.72
0.72
3.00
3.00
5%
1.0
0.0
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
129.1
1.00
30.0
99.6
1.0
0.0
82 Rate 12.5
3.24
42.53
42.53
0.3
13.00
3.90
3.90
0.0225
60.00
1.35
1.35
0.26
0.26
2.50
2.50
5% 1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
82.1
1.00
30.0
52.5
1.0
0.0
87 Rate 12.5
3.48
45.68
45.68
0.375
13.00
4.88
4.88
0.039
60.00
2.34
2.34
0.36
0.36
2.50
2.50
5% 1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
87.3
1.00
30.0
57.8
1.0
0.0
93 Rate 12.5
3.72
48.83
48.83
0.5
13.00
6.50
6.50
0.045
60.00
2.70
2.70
0.46
0.46
5%
2.50
2.50
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
92.5
1.00
30.0
63.0
1.0
0.0
101 Rate 12.5
4.10
53.81
53.81
0.9
13.00
11.70
11.70
0.095
60.00
5.70
5.70
0.87
0.87
2.50
2.50
5% 1
108.00
10.80
10.80
1
90.00
9.00
9.00
1
135.00
2.25
2.25
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
100.6
1.00
30.0
76.6
92 Rate 12.5
3.60
47.25
47.25
0.8
13.00
10.40
10.40
0.084
60.00
5.04
5.04
0.77
0.77
2.50
2.50
5% 1
108.00
10.80
10.80
1
90.00
9.00
9.00
1.0
0.0
1 0.1 20
135.00 10.00 0.1
2.25
2.25
1.00
1.00
2.00
2.00
1.00
92.0
1.00
30.0
68.0
1.0
0.0
88 Rate 12.5
3.60
47.25
47.25
0.675
13.00
8.78
8.78
0.04
60.00
2.40
2.40
0.56
0.56
2.50
2.50
5% 108.00
10.80
10.80
1
90.00
9.00
9.00
1
135.00
2.25
2.25
1.00
1.00
1
0.1 20
10.00 0.1
2.00
2.00
1.00
87.5
1.00
30.0
63.5
1.0
0.0
70 Rate 12.5
2.40
31.50
31.50
0.5
13.00
6.50
6.50
0.055
60.00
3.30
3.30
0.49
0.49
2.50
2.50
5% 1
108.00
10.80
10.80
1
90.00
9.00
9.00
1
135.00
2.25
2.25
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
70.3
65
1.00
30.0
46.3
1.0
0.0
Rate 12.5
2.20
28.88
28.88
0.375
13.00
4.88
4.88
0.042
60.00
2.52
2.52
0.37
0.37
5%
2.50
2.50
1
108.00
10.80
10.80
1
90.00
9.00
9.00
1
135.00
2.25
2.25
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
65.2
1.00
30.0
41.1
1.0
0.0
63 Rate 12.5
2.00
26.25
26.25
0.3
13.00
3.90
3.90
0.0275
60.00
1.65
1.65
0.28
0.28
2.50
2.50
5% 1
108.00
12.00
12.00
1
90.00
10.00
10.00
1
135.00
2.50
2.50
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
63.1
1.00
30.0
36.6
1.0
0.0
160 Rate 25.00
25
67.58
30.0
36.6
1.0
0.0
67.58
30.0
36.6
1.0
0.0
160.2
60.0
98.2
2.0
0.0
108
Rate 12.5
4.51
59.19
59.19
0.9
13.00
11.70
11.70
0.095
60.00
5.70
5.70
0.87
0.87
5%
2.50
2.50
1
108.00
12.00
12.00
1
90.00
10.00
10.00
1
135.00
2.50
2.50
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
108.5
1.00
30.0
82.0
1.0
0.0
96 Rate 12.5
3.96
51.98
51.98
0.8
13.00
10.40
10.40
0.08
60.00
4.80
4.80
0.76
0.76
2.50
2.50
5% 1
108.00
10.80
10.80
1
90.00
9.00
9.00
1
135.00
2.25
2.25
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
96.5
1.00
30.0
72.4
88 Rate 12.5
3.52
46.20
46.20
0.675
13.00
8.78
8.78
0.06
60.00
3.60
3.60
0.62
0.62
2.50
2.50
5% 1
108.00
10.80
10.80
1
90.00
9.00
9.00
1
135.00
2.25
2.25
1.00
1.00
0.1
10.00
1.0
0.0
20
0.1
2.00
2.00
1.00
87.7
1.00
30.0
63.7
1.0
0.0
73 Rate 12.5
2.64
34.65
34.65
0.5
13.00
6.50
6.50
0.04
60.00
2.40
2.40
0.45
0.45
2.50
2.50
5% 1
108.00
10.80
10.80
1
90.00
9.00
9.00
1
135.00
2.25
2.25
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
72.5
1.00
30.0
48.5
1.0
0.0
68 Rate 12.5
2.42
31.76
31.76
0.375
13.00
4.88
4.88
0.042
60.00
2.52
2.52
0.37
0.37
2.50
2.50
5% 1
108.00
10.80
10.80
1
90.00
9.00
9.00
1
135.00
2.25
2.25
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
68.1
1.00
30.0
44.0
61 Rate 12.5
2.20
28.88
28.88
0.3
13.00
3.90
3.90
1.0
0.0
0.0275
60.00
5%
1.65
1.65
0.28
0.28
2.50
2.50
1
108.00
9.82
9.82
1
90.00
8.18
8.18
1
135.00
2.05
2.05
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
61.2
1.00
30.0
39.2
1.0
0.0
111 Rate 12.5
4.92
64.58
64.58
0.9
13.00
11.70
11.70
0.095
60.00
5.70
5.70
0.87
0.87
2.50
2.50
5% 1
108.00
10.80
10.80
1
90.00
9.00
9.00
1
135.00
2.25
2.25
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
111.4
1.00
30.0
87.3
1.0
0.0
101 Rate 12.5
4.32
56.70
56.70
0.8
13.00
10.40
10.40
0.084
60.00
5.04
5.04
0.77
0.77
2.50
2.50
5% 1
108.00
10.80
10.80
1
90.00
9.00
9.00
1
135.00
2.25
2.25
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
101.5
1.00
30.0
77.4
1.0
0.0
92 Rate 12.5
3.84
50.40
50.40
0.675
13.00
8.78
8.78
0.06
60.00
3.60
3.60
0.62
0.62
2.50
2.50
5% 1
108.00
10.80
10.80
1
90.00
9.00
9.00
1
135.00
2.25
2.25
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
91.9
1.00
30.0
67.9
1.0
0.0
76 Rate 12.5
2.88
37.80
37.80
0.5
13.00
6.50
6.50
0.04
60.00
2.40
2.40
0.45
0.45
2.50
2.50
5% 1
108.00
10.80
10.80
1
90.00
9.00
9.00
1
135.00
2.25
2.25
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
75.7
1.00
30.0
51.6
71 Rate 12.5
2.64
34.65
34.65
0.375
13.00
4.88
4.88
0.042
60.00
2.52
2.52
0.37
0.37
2.50
2.50
5%
1.0
0.0
1
108.00
10.80
10.80
1
90.00
9.00
9.00
1
135.00
2.25
2.25
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
71.0
1.00
30.0
46.9
1.0
0.0
64 Rate 12.5
2.40
31.50
31.50
0.3
13.00
3.90
3.90
0.0275
60.00
1.65
1.65
0.28
0.28
2.50
2.50
5% 1
108.00
9.82
9.82
1
90.00
8.18
8.18
1
135.00
2.05
2.05
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
63.9
1.00
30.0
41.8
1.0
0.0
102 Rate 12.5
4.50
59.06
59.06
0.41
13.00
5.33
5.33
0.045
60.00
2.70
2.70
0.40
0.40
2.50
2.50
5% 1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
101.6
1.00
30.0
72.0
1.0
0.0
113 Rate 12.5
5.20
68.25
68.25
0.515
13.00
6.70
6.70
0.062
60.00
3.72
3.72
0.52
0.52
5%
2.50
2.50
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
113.2
1.00
30.0
83.7
1.0
0.0
130 Rate 12.5
6.20
81.38
81.38
0.78
13.00
10.14
10.14
0.0675
60.00
4.05
4.05
0.71
0.71
2.50
2.50
5% 1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 20
10.00 0.1
2.00
2.00
1.00
130.3
1.00
30.0
100.8
147 Rate 12.5
7.44
97.65
97.65
0.78
13.00
10.14
10.14
0.0675
60.00
4.05
4.05
0.71
0.71
2.50
2.50
5% 1
108.00
13.50
13.50
1
90.00
11.25
11.25
1.0
0.0
1 0.1 20
135.00 10.00 0.1
2.81
2.81
1.00
1.00
2.00
2.00
1.00
146.6
1.00
30.0
117.0
1.0
0.0
57 Rate 1
15.00
15.75
15.75
0.2
13.00
2.60
2.60
0.13
0.13
2.00
2.00
2.50
2.50
5% 20
0.1 108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
1
0.1 50
10.00 260
5.20
56.7
5.20
30.0
23.0
5.2
0.0
65 Rate 1
22.49
23.61
23.61
0.2
13.00
2.60
2.60
0.13
0.13
2.00
2.00
2.50
2.50
5% 20
0.1
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 50
10.00 260
5.20
64.6
5.20
30.0
30.8
72 Rate 1
30.00
31.50
31.50
5.2
0.0
0.2
13.00
5% 20
0.1
2.60
2.60
0.13
0.13
2.00
2.00
2.50
2.50
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
1
0.1 50
10.00 260
5.20
72.5
5.20
30.0
38.7
5.2
0.0
82 Rate 1
37.50
39.38
39.38
0.3
13.00
3.90
3.90
0.20
0.20
2.00
2.00
2.50
2.50
5% 20
0.1
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 50
10.00 260
5.20
81.7
5.20
30.0
48.0
5.2
0.0
90 Rate 1
45.05
47.30
47.30
0.3
13.00
3.90
3.90
0.20
0.20
2.00
2.00
2.50
2.50
5% 20
0.1
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 50
10.00 260
5.20
89.7
5.20
30.0
55.9
5.2
0.0
97 Rate 1
52.45
55.07
55.07
0.3
13.00
3.90
3.90
0.20
0.20 2.00
5% 20
0.1
2.00
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
2.50
0.1 50
10.00 260
5.20
97.4
1.1
2.50
5.20
30.0
63.7
5.2
0.0
60 Rate
1
16.50
19.06
19.06
0.2
13.00
2.86
2.86
0.16
0.16
2.00
2.00
2.50
2.50
5% 20
0.1
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 50
10.00 260
5.20
60.3
1.1
5.20
30.0
26.6
70 Rate
1
24.74
28.57
28.57
0.2
13.00
2.86
2.86
0.16
0.16
2.00
2.00
2.50
2.50
5% 20
0.1
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
5.2
0.0
0.1 50
10.00 260
1.00
69.9
1.1
1.00
5.20
5.20
30.0
36.1
5.2
0.0
79 Rate
1
33.00
38.12
38.12
0.2
13.00
2.86
2.86
0.16
0.16
2.00
2.00
2.50
2.50
5% 20
0.1
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 50
10.00 260
5.20
79.4
1.1
5.20
30.0
45.6
5.2
0.0
90 Rate
1
41.25
47.64
47.64
0.3
13.00
4.29
4.29
0.24
0.24 2.00
5% 20
0.1
2.00
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
2.50
0.1 50
10.00 260
5.20
90.4
1.1
2.50
5.20
30.0
56.7
101 Rate
1
50.00
57.75
57.75
0.3
13.00
4.29
4.29
0.24
0.24
5%
5.2
0.0
20
0.1
2.00
2.00
2.50
2.50
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 50
10.00 260
5.20
100.5
1.1
5.20
30.0
66.8
5.2
0.0
109 Rate
1
57.69
66.63
66.63
0.3
13.00
4.29
4.29
0.24
0.24 2.00
5% 20
0.1
2.00
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
2.50
0.1 50
10.00 260
5.20
109.4
1.2
2.50
5.20
30.0
75.7
5.2
0.0
64 Rate
1
18.00
22.68
22.68
0.2
13.00
3.12
3.12
0.19
0.19
2.00
2.00
2.50
2.50
5% 20
0.1
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 50
10.00 260
5.20
64.2
5.20
30.0
30.5
5.2
0.0
1.2
76 Rate
1
26.99
34.00
34.00
0.2
13.00
3.12
3.12
0.19
0.19 2.00
5% 20
0.1
2.00
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
2.50
0.1 50
10.00 260
5.20
75.6
1.2
2.50
5.20
30.0
41.8
5.2
0.0
87 Rate
1
36.00
45.36
45.36
0.2
13.00
3.12
3.12
0.19
0.19
2.00
2.00
2.50
2.50
5% 20
0.1
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 50
10.00 260
5.20
86.9
1.2
5.20
30.0
53.2
100 Rate
1
45.00
56.70
56.70
0.3
13.00
4.68
4.68
0.28
0.28
2.00
2.00
2.50
2.50
5% 20
0.1
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
5.2
0.0
0.1 50
10.00 260
1.00
99.9
1.2
1.00
5.20
5.20
30.0
66.2
5.2
0.0
112 Rate
1
54.55
68.73
68.73
0.3
13.00
4.68
4.68
0.28
0.28
2.00
2.00
2.50
2.50
5% 20
0.1
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
0.1 50
10.00 260
5.20
112.0
1.2
5.20
30.0
78.2
5.2
0.0
123 Rate
1
62.94
79.30
79.30
0.3
13.00
4.68
4.68
0.28
0.28 2.00
5% 20
0.1
2.00
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
1.00
1.00
2.50
0.1 50
10.00 260
2.50
5.20
122.5
5.20
30.0
88.8
Qty
Rate
34
0.2
13.00
2.60
2.60
0.025
65.00
1.63
1.63
0.42
0.42
10%
5.2
0.0
25
0.1
2.50
1
108.00
6.35
6.35
1
90.00
5.29
5.29
1
135.00
1.59
1.59
1.00
1.00
0.1
10.00
2.50
0.10
0.10
2.00
2.00 0.00
34.2
25.0
7.1
Qty
Rate
36
0.25
13.00
3.25
3.25
0.035
65.00
2.28
2.28
0.55
0.55 2.50
10% 25
0.1
2.50
1
108.00
6.35
6.35
1
90.00
5.29
5.29
1
135.00
1.59
1.59
1.00
1.00
0.1
10.00
0.10
0.1
2.0
0.10
2.00
2.00 0.00
35.7
25.0
8.6
Qty
Rate
34
0.2
13.00
2.60
2.60
0.025
65.00
1.63
1.63
0.42
0.42 2.50
10% 25
0.1
2.50
1
108.00
6.75
6.75
1.5
90.00
8.44
8.44
1
135.00
1.69
1.69
1.00
1.00
0.1
10.00
0.10
0.1
2.0
0.10
2.00
2.00 0.00
34.2
25.0
7.1
0.1
2.0
Qty
Rate
36
0.25
13.00
3.25
3.25
0.035
65.00
2.28
2.28
0.55
0.55 2.50
10% 25
0.1
2.50
1
108.00
6.75
6.75
1.5
90.00
8.44
8.44
1
135.00
2.81
2.81
1.00
1.00
0.1
10.00
0.10
0.10
2.00
2.00 0.00
35.7
25.0
8.6
Qty
Rate
35
0.3
13.00
3.90
3.90
0.04
65.00
2.60
2.60
0.65
0.65 2.50
10% 25
0.1
2.50
1
108.00
6.75
6.75
1.5
90.00
8.44
8.44
1
135.00
2.25
2.25
1.00
1.00
0.1
10.00
0.1
2.0
0.0
0.0
0.50 2.00 0.00
34.7
Qty
Rate/Day
25.0
9.7
46.4
m3 1.05
200
210
210.00
1.05
10
10.5
10.50
1.05
10
10.5
10.50
2
108.00
5.40
5.40
6
90.00
13.50
13.50
1
135.00
2.25
2.25
0.1
90.00
0.23
0.23
1
108.00
2.16
15
0.12
1.80
2.16 1.80
0.50 0.056
850
0.50
52.36
52.36
0.50
46.4
150 mm thk
Qty
Rate/Day
0.50
3.5
42.8
0.1
0.0
31.0
m3 1.05
200
210
210.00
1.05
10
10.5
10.50
1.05
10
10.5
10.50
2
108.00
5.40
5.40
6
90.00
13.50
13.50
1
135.00
2.25
2.25
0.1
90.00
0.23
0.23
1
108.00
2.16
2.16
15
0.12
1.80
1.80
0.50 0.056
850
Qty
52.36
52.36
0.50
0.50
31.0
100 mm thk
Rate/Day
0.50
2.4
28.6
0.1
0.0
28.2
m3 1.05
200
210
210.00
1.05
10
10.5
10.50
1.05
10
10.5
10.50
108.00
5.40
5.40
13.50
13.50
2.25
2.25
0.23
0.23 2.16
2 6 1 0.1
90.00 135.00 90.00
1
108.00
2.16
15
0.12
1.80
0.056
850
52.36
52.36
0.50
0.50
1.80
0.50
90 mm thk
28.2
0.50
2.1
26.0
0.0
0.0
Qty
Rate/Day
25.6
m3 1.05
200
210
210.00
1.05
10
10.5
10.50
1.05
10
10.5
10.50
108.00
5.40
5.40
13.50
13.50
2.25
2.25
0.23
0.23 2.16
2 6 1 0.1
90.00 135.00 90.00
1
108.00
2.16
15
0.12
1.80
0.056
850
52.36
52.36
0.50
0.50
1.80
0.50
25.6
75 mm thk
Qty
Rate/Day
0.50
1.9
23.6
0.0
0.0
17.0
m3 1.05
200
210
210.00
1.05
10
10.5
10.50
1.05
10
10.5
10.50
108.00
5.40
5.40
13.50
13.50
2.25
2.25
0.23
0.23 2.16
2 6 1 0.1
90.00 135.00 90.00
1
108.00
2.16
15
0.12
1.80
1.80
0.50 0.056
850
0.50
52.36
52.36
0.50
17.0
50 mm thk
0.50
1.3
15.7
.
Qty
Rate/Day
13.6
m3 1.05
200
210
210.00
1.05
10
10.5
10.50
1.05
10
10.5
10.50
108.00
5.40
2
5.40
0.0
0.0
6 1 0.1
90.00 135.00 90.00
13.50
13.50
2.25
2.25
0.23
0.23 2.16
1
108.00
2.16
15
0.12
1.80
1.80
0.50 0.056
850
52.36
52.36
0.50
0.50
13.6
40 mm thk
0.50
1.0
12.6
0.0
0.0
.
Qty
Rate/Day
8.5
m3 1.05
200
210
210.00
1.05
10
10.5
10.50
1.05
10
10.5
10.50
108.00
5.40
5.40
13.50
13.50
2.25
2.25
0.23
0.23 2.16
2 6 1 0.1
90.00 135.00 90.00
1
108.00
2.16
15
0.12
1.80
1.80
0.50 0.056
850
52.36
52.36
0.50
0.50
8.5
25 mm thk
0.50
0.6
7.9
0.0
0.0
.
Qty
Rate
41
10.00
1 2 1
108.00 90.00 135.00
5.00
5.00
0.50
0.50
4.00
4.00
0.50
0.50
9.00
9.00
15.00
15.00
1.50
1.50
40.5
30.5
5.0
5.0
0.0
Qty
Rate
29
0.50
0.50
4.00
4.00
0.50
0.50
1
108.00
9.00
9.00
1.5
90.00
11.25
11.25
1
135.00
3.75
3.75
29.0
24.0
Qty
Rate
5.0
0.50
0.50
18.33
18.33
4.00
4.00
0.50
0.50
108.00
9.00
9.00
1.5
90.00
11.25
11.25
1
135.00
3.75
3.75
47.3
24.0
23.3
Qty
Rate
53
1
2.00
2.00
2.00
1
4.00
4.00
4.00
0.50
0.50
2.00
2.00
2
108.00
21.60
21.60
2
90.00
18.00
18.00
1
135.00
4.50
4.50
52.6
44.1
Qty
1 1
Rate
4.00
0.0
0.0
0.0
0.0
0.0
47
1
1
0.0
8.5
85
18.33
18.33
4.00
4.00
0.50
0.50
0.50
0.50
2
108.00
21.60
21.60
4
90.00
36.00
36.00
1
135.00
4.50
4.50
85.4
62.1
1
1
1
1
1
1
1
35.00
100.00
40.00
400.00
70.00
60.00
120.00
37.45
23.3
0.0
0.0
37.45
28.15
2.1
26.0
0.0
0.0
29.00
24.00
5.00
-
-
94.6
26.1
68.4
0.0
0.0
107.00
107.00
28.15
2.1
26.0
0.0
0.0
29.00
24.00
5.00
-
-
164.2
26.1
138.0
0.0
0.0
0.0
0.0
42.80
42.80
28.15
2.1
29.00
24.00
5.00
-
-
100.0
26.1
73.8
0.0
0.0
440.00
26.0
440.00
25.61
1.9
23.6
0.0
0.0
52.60
44.10
8.50
-
-
518.2
46.0
472.1
0.0
0.0
74.90
74.90
34.65
25.0
9.7
0.0
0.0
25.61
1.9
23.6
0.0
0.0
29.00
24.00
5.00
-
-
164.2
50.9
113.2
0.0
0.0
64.20
64.20
28.15
2.1
26.0
0.0
0.0
29.00
24.00
5.00
-
-
121.4
26.1
95.2
0.0
0.0
128.40
128.40
25.61
1.9
23.6
0.0
0.0
52.60
44.10
8.50
-
-
206.6
46.0
160.5
0.0
0.0
1
1
1
1
1
1
Qty
20.00
25.00
81.00
100.00
130.00
250.00
Rate
21.40
21.40
25.61
1.9
23.6
0.0
40.50
30.50
5.00
5.00
87.5
32.4
50.0
5.0
0.0
26.75 25.61
1.9
23.6
0.0
0.0
29.00
24.00
5.00
-
-
81.4
25.9
55.4
0.0
0.0
0.0
0.0
81.00
81.00
6.40
0.5
5.9
7.25
6.00
1.25
-
-
94.7
6.5
88.2
0.0
0.0
100.00
100.00
7.25
6.00
1.25
-
-
107.3
6.0
101.3
0.0
0.0
130.00
130.00
7.26
6.00
1.25
0.01
137.3
6.0
131.3
0.0
0.0
250.00
-
250.00
7.25
6.00
1.25
-
-
257.3
6.0
251.3
0.0
0.0
0.0
0.0
33 2.00
2.00
6.00
6.00
0.50
0.50
108.00
9.00
9.00
1.5
90.00
11.25
11.25
1
135.00
3.75
3.75
32.5
24.0
Rate
-
26.75
1
Qty
0.0
90
8.5
1
6.00
6.00
6.00
1
6.00
6.00
6.00
0.50
0.50
2.00
2.00
1 2
108.00
30.86
30.86
3
90.00
38.57
38.57
1
135.00
6.43
6.43
90.4
75.9
Qty
Rate
14.5
18.33
18.33
6.00
6.00
6.00
1
6.00
6.00
6.00
0.50
0.50
2.00
2.00
2
108.00
30.86
30.86
3
90.00
38.57
38.57
1
135.00
Qty
6.43
6.43
108.7
75.9
32.8
Rate
156
6
10.00
60.00
60.00
1
12.00
12.00
12.00
1
2.00
2.00
2.00
2
108.00
33.23
33.23
3
90.00
41.54
41.54
1
135.00
6.92
6.92
155.7
81.7
1
1
35.00
40.00
0.0
0.0
0.0
0.0
0.0
109
1
1
0.0
37.45
74.0
37.45
34.25
25.00
7.15
0.10
2.00
32.50
24.00
8.50
-
-
104.2
49.0
53.1
0.1
2.0
42.80
42.80
34.25
25.00
7.15
0.10
2.00
32.50
24.00
8.50
-
-
109.5 1
250.00
267.50 34.25
1
1
20.00
250.00
300.00
58.4
2.0
267.50 25.00
7.15
0.10
2.00
90.36
75.86
14.50
-
-
100.9
289.1
0.1
2.0
21.40
21.40
34.25
25.00
7.15
0.10
2.00
32.50
24.00
8.50
-
-
88.1
49.0
37.0
0.1
2.0
267.50
267.50 25.00
7.15
5.00
5.00
155.69
81.69
457.4
111.7
321.00 34.25
0.10
2.00
74.00
-
-
353.6
0.1
2.0
321.00 25.00
7.15
5.00
5.00
0.10
2.00
155.69
81.69
74.00
-
-
510.9
111.7
407.1
0.1
2.0
0.0
0.0
Qty
Rate
13
0.07
13.00
0.91
0.91
0.01
65.00
0.65
0.65
0.08
0.08
0.50
0.50
0.50
0.50
2.00
2.00
5%
0.1
392.1
34.25
1
49.0
1
108.00
3.60
3.60
1
90.00
3.00
3.00
1
135.00
1.50
1.50
12.7
8.1
Qty
Rate
15
0.07
13.00
1.37
4.6
1.37
0.01
65.00
5%
0.98
0.98
0.18
0.18
0.75
0.75
0.50
0.50
2.00
2.00
1
108.00
4.32
4.32
1
90.00
3.60
3.60
1
135.00
1.80
1.80
15.5
9.7
5.8
Qty
Rate
13
0.07
13.00
0.91
0.91
0.01
65.00
0.65
0.65
0.16
0.16
0.50
0.50
0.50
0.50
2.00
2.00
10%
108.00
3.60
3.60
1
90.00
3.00
3.00
1
135.00
1.50
1.50
12.8
8.1
1
Qty
4.7
Rate
79
1
50.00
51.00
51.00
0.07
13.00
0.91
0.91
0.01
65.00
0.65
0.65
0.31
0.31
0.50
0.50
0.50
0.50
2.00
2.00
20%
1
108.00
3.60
3.60
1
90.00
3.00
3.00
1
135.00
1.50
1.50
15%
15.00
15.00
79.0
23.1
1
15.00
15.45
55.9
15.45
0.0
0.0
0.0
0.0
0.0
0.0
1
1
1
1
1
1
Qty 1
10.00
25.00
10.00
50.00
50.00
10.00
12.7
8.1
4.6
0.0
0.0
28.2
8.1
20.1
0.0
0.0
10.30
10.30
12.7
8.1
4.6
0.0
0.0
23.0
8.1
14.9
0.0
0.0
25.75
25.75
12.7
8.1
4.6
0.0
0.0
38.5
8.1
30.4
0.0
0.0
10.30
10.30
12.7
8.1
4.6
0.0
0.0
23.0
8.1
14.9
0.0
0.0
51.50
51.50
12.7
8.1
4.6
0.0
0.0
64.2
8.1
56.1
0.0
0.0
51.50
51.50
12.7
8.1
4.6
0.0
0.0
64.2
8.1
56.1
0.0
0.0
10.30
10.30
12.7
8.1
4.6
0.0
0.0
23.0
8.1
14.9
0.0
0.0
0.0
0.0
Rate
107
30.00
30.00
30.00
28.15
28.15
6.00
6.00
0.50
0.50
3
5
15.00
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
2.81
2.81
107.2
27.6
Qty 1
Rate
94
25.00
25.00
15.00
79.7
25.00
25.61
25.61
6.00
6.00
0.50
0.50 15.00
3
5
15.00
1
108.00
10.80
10.80
1
90.00
9.00
9.00
1
135.00
2.25
2.25
94.2
22.1
Qty 1
Rate
225.24
150.00
150.00
150.00
25.61
25.61
6.00
6.00
0.50
0.50 15.00
3
5
15.00
1
108.00
13.50
13.50
1
90.00
11.25
11.25
1
135.00
Qty 1
3.38
3.38
225.2
28.1
Rate
75
25.00
26.75 25.61
197.1
1.95
23.63
2.00
2.00
2.00
2.00
0.50
0.50
108.00
6.35
6.35
2
90.00
10.59
10.59
1
135.00
1.06
1.06
74.9
19.9
54.9
Rate
28
1
15.00
15.00
15.00
0.07
13.00
0.91
0.91
0.01
65.00
0.65
0.65
0.31
0.31
0.50
0.50
0.50
0.50
2.00
2.00
20%
0.0
0.0
0.0
0.0
26.75
1
Qty
72.1
0.04
0.0
-
0.0
1
108.00
3.60
3.60
1
90.00
3.00
3.00
1
135.00
1.50
1.50
28.0
8.1
19.9
Qty
Rate
86
1
2.75
2.75
2.75
1.03
42
43.26
43.26
0.25
48
15
15.00
0.25
20
5
5.00
1.00
1.00
62
3.1
3.10
5%
3.068
3.07
1
108.00
4.32
4.32
2
90.00
7.20
7.20
1
135.00
1.26
1.26
86.0
12.8
0.05
73.2
Qty
Rate
72
1
2.75
2.75
2.75
1.03
37
38.11
38.11
0.15
48
7.2
7.20
0.25
20
5
5.00
1.00
1.00
62
3.1
3.10
5%
2.4205
2.42
1
108.00
4.32
4.32
2
90.00
7.20
7.20
1
135.00
1.26
1.26
72.4
12.8
0.05
59.6
0.0
0.0
0.0
0.0
0.0
0.0
Qty
Rate
65
1.15
40
46
250
1500
6
6
250
700
2.8
2.8
5
75
1.5
10
90.00
3.60
3.60
1
135.00
0.36
0.36
2.5
500.00
5.0
65.3
46.00
1.5
5.00
4.0
51.0
8.8
1.5
Qty
Rate
102
1.15
40
46
40
750
18.75
18.75
40
700
17.5
17.5
40
100
2.5
2.5
1
75
1.875
4
90.00
9.00
9.00
1
135.00
0.90
0.90
2000
0.10
5.0
101.5
Qty
46.00
1.875
5.00
9.9
51.0
38.8
Rate/Day
60
1
40
42.00
1
750
5.00
5.0
1
700
4.67
4.7
4
90.00
2.40
2.40
1
135.00
0.30
0.30
3750
0.11
2.75
2.75
200.00
2.67
2.67
2
59.8
Qty
Rate
93
1.094
27
29.54
0.2
15
3.00
42.00
2.7
47.4
9.7
3.00 3.00
27
2.70
108.00
10.80
10.80
1.25
90.00
11.25
11.25
1
135.00
3.15
3.15
300
28.50
28.50
1.00
1.00
1
0.095
92.9
Qty
0.0
29.54
3.00 10%
1.9
2.70
28.2
61.7
0.0
3.0
Rate
123
1
18
18.00
18.00
1
4
4.00
4.00
1
61
61.00
61.00
1
4
4.00
4.00
1
36
36.00
36.00
123.0
75.00 170.00 80.00 60.00 90.00 45.00 125.00 175.00 100.00
18.00 40.00 20.00 65.00 30.00 40.00 20.00 20.00
40.00 40.00 150.00 250.00 350.00 400.00
Qty
Rate
Amount
0.0
0.0
0.0
123.0
21868
80
1,749,440
21868
25.7
69,830
40
350
14,000
40
100.0
4,000
21868
125
2,733,500
4373.6
5623
400
2,249,200
394737
4
1,578,948
90.254481434
8000
4
32,000
200
Sub Total=
8,430,918.00
contractor overhead & Profit -15%
843,091.80
Grand Total=
9,274,009.80
L
B
D
Rate
Amount 25,000.00
8500 13.2
#VALUE!
3.14
0.1225
330.3
#REF!
#VALUE!
145
0.2
1
900.0
#VALUE!
145
1.5
1
20
#VALUE!
145
0.7
0.6
900
#VALUE!
3.12
#VALUE! #VALUE! #VALUE! #VALUE!
Qty
Rate
725
115
Amount 83,375 4,169
145
270
39,150
725
28
20,300
70
15
1,050
725
5
3,625
725
10
7,250
Sub Total=
158,919.00
contractor overhead & Profit -15%
23,837.85
Grand Total=
182,756.85 128.70
#VALUE!
#VALUE!
302 M Qty
Rate
42.64706
3500
Amount 149,265 7,463
145
270
39,150
725
28
20,300
70
20
1,400
725
5
3,625
725
10
7,250
Phonix Engineering & Marine Co Sub Total=
228,453.00
contractor overhead & Profit -15%
34,267.95
Grand Total=
262,720.95 185.01 302
Qty
Rate
Amount 4,950 69,830
121.7
980
119,233
121.7
225
27,375
4258.33
10
42,583 72,600
4
4500
18,000
35,457 Sub Total=
390,029.00
contractor overhead & Profit -10%
39,002.90
Grand Total=
429,031.90
Qty
Rate
Amount 98,000
90
3460
311,400
9,800 Sub Total=
419,200.00
contractor overhead & Profit -15%
62,880.00
Grand Total=
482,080.00
L
B
H
Rate
Amount Dhs
3
3
1.5
15.00
#VALUE!
1.2
1.2
1.5
15.00
#VALUE!
15.00
#VALUE!
4.00
#VALUE!
350
#VALUE!
1.2
1.2
1.2
1.2
0.1
4
1
90.00
#VALUE!
3.2
1
40.00
#VALUE!
0.8
0.8
40.00
4.8
1,150
#VALUE!
35
#VALUE!
35
#VALUE!
1.5
1.2
1.2
#VALUE!
L
B
H
Rate
Amount Dhs
2
2
1
15.00
#VALUE!
Dhs
0.7
0.7
0.9
0.9
0.9
0.9
1
15.00
#VALUE!
15.00
#VALUE!
5.00
#VALUE!
350
#VALUE!
0.1
2
1
90.00
#VALUE!
1.6
1
40.00
#VALUE!
0.3
0.3
40.00
2.8
1
0.7
0.7
300
350
35
#VALUE!
35
#VALUE! #VALUE!
L
B
H
Rate
Dhs
Amount Dhs
10
1
1
20.00
#VALUE!
10
0.5
0.3
20.00
#VALUE!
20.00
#VALUE!
5.00
#VALUE!
550
#VALUE!
10
0.5
10
0.5
0.3
#VALUE!
L
W
H
Dhs / m
RCC
Shutter
Blind
Steel Ratio
m3
m2
m2
Kg/m3
1.1
1.1
0.35
#VALUE!
#VALUE!
0.2
0.2
0.85
#VALUE!
#VALUE!
#VALUE!
70 300
16
0.2
0.4
#VALUE!
13
0.2
0.2
2.2
#VALUE!
#VALUE!
16
0.2
0.2
#VALUE!
6
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
348.00
60.00
28.00
#VALUE!
#VALUE!
#VALUE!
Rate
6
200 200 200
#VALUE!
Amount #VALUE! Dhs
L
B 3
H 3
Rate 25
#VALUE!
20
#VALUE!
20
#VALUE!
0.25
75
#VALUE!
16
2
90
#VALUE!
16
2.3
35
#VALUE!
16
2.3
35
#VALUE!
1.5
1.45
Amount
1.5
Length
#VALUE!
QR
16
m Unit
LS LS m Nos m2 Days
Rate
25000 15000 2500 3000 150 2500
Amount
25,000.00 15,000.00 287,500.00 69,000.00 12,500.00 409,000.00
409,000.00
Unit Rate
3,556.52
m
240 270 265 280 290 280
270 15 15 255
2600 2600
8.07 11.28 13.80 19.53
2.7 2.9 3.1 4.1 5.5
1.8 2 2.2 3.2 4.2 4.7 2.5
3.5 3
4.5 5 5.5
4.5 5.2 6.2 7
25 26 27 35 35 36 37 45 35 36 36 45 45 46 46 55
27 18
13 13
35 35 60 25 35 24
25 31 70 90 1250
55 65
175 156 78
33 49 63
500 45 40 35 65 17 30
42 69
18 35
18 4 61 4
36 12.5 175 12.5
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/m3)
Unskilled
2.00
18.63%
1.20
0.12
Charge hand
0.40
3.73%
0.36
0.02
Unskilled
8.33
77.64%
5.00
0.50
Crew
10.73
100.00%
6.56
0.64
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/m3)
Unskilled
2.00
18.63%
1.20
0.12
Charge hand
0.40
3.73%
0.36
0.02
Unskilled
8.33
77.64%
5.00
0.50
Crew
10.73
100.00%
6.56
0.64
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/m3)
Unskilled
2.00
83.33%
3.60
0.36
Charge hand
0.40
16.67%
1.08
0.07
Crew
2.40
100.00%
4.68
0.43
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/m3)
Unskilled
2.00
83.33%
0.90
0.09
Charge hand
0.40
16.67%
0.27
0.02
Crew
2.40
100.00%
1.17
0.11
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/m3)
Unskilled
4.00
90.91%
2.25
0.23
Charge hand
0.40
9.09%
0.34
0.02
Crew
4.40
100.00%
2.59
0.25
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/m3)
Unskilled
2.00
66.67%
0.90
0.09
Charge hand
1.00
33.33%
0.23
0.02
Crew
3.00
100.00%
1.13
0.11
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/m3)
Mason
1.00
22.22%
9.00
0.75
Unskilled
1.50
33.33%
13.50
1.35
Charge hand
1.00
22.22%
2.25
0.15
Unskilled
1.00
22.22%
1.00
0.10
Crew
4.50
100.00%
25.75
2.35
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
22.22%
0.90
0.08
Unskilled
1.50
33.33%
1.35
0.14
Charge hand
1.00
22.22%
0.23
0.02
Unskilled
1.00
22.22%
0.10
0.01
Crew
4.50
100.00%
2.58
0.24
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
l -5 % wastage Mason - 4 No
4.00
30.53%
0.72
0.06
Unskilled
6.00
45.80%
0.90
0.09
Charge hand
1.00
7.63%
0.15
0.01
Unskilled
0.10
0.76%
0.02
0.00
Carpenter -
2.00
15.27%
0.22
0.02
Crew 500m2/day
13.10
100.00%
2.00
0.18
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason - 4 No Unskilled
4.00 6.00
30.53% 45.80%
0.81 1.01
0.07 0.10
Charge hand
1.00
7.63%
0.17
0.01
Unskilled
0.10
0.76%
0.02
0.00
Carpenter -
2.00
15.27%
0.32
0.03
Crew 500m2/day
13.10
100.00%
2.33
0.21
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason - 4 No
4.00
30.53%
1.08
0.09
Unskilled
6.00
45.80%
1.35
0.14
Charge hand
1.00
7.63%
0.23
0.02
Unskilled
0.10
0.76%
0.02
0.00
Carpenter -
2.00
15.27%
0.43
0.04
Crew 500m2/day
13.10
100.00%
3.11
0.28
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/m3)
Mason - 4 No
4.00
30.53%
10.80
0.90
Unskilled
6.00
45.80%
13.50
1.35
Charge hand
1.00
7.63%
2.25
0.15
Unskilled
0.10
0.76%
0.23
0.02
Carpenter -
2.00
15.27%
4.32
0.36
Crew 500m2/day
13.10
100.00%
31.10
2.78
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/m3)
Mason - 8 No
8.00
27.49%
5.40
0.45
Unskilled
16.00
54.98%
9.00
0.90
Charge hand
2.00
6.87%
3.15
0.21
Unskilled
0.10
0.34%
1.00
0.10
Carpenter - 2 No
2.00
6.87%
1.35
0.11
Steel Fixer - 1 No
1.00
3.44%
0.68
0.06
Crew 200m3/day
29.10
100%
20.58
1.83
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/m3)
Mason - 8 No
8.00
27.49%
5.40
0.45
Unskilled
16.00
54.98%
9.00
0.90
Charge hand
2.00
6.87%
3.15
0.21
Unskilled
0.10
0.34%
1.00
0.10
Carpenter - 2 No
2.00
6.87%
1.35
0.11
Steel Fixer - 1 No
1.00
3.44%
0.68
0.06
Crew 200m3/day
29.10
100%
20.58
1.83
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/m3)
Mason - 8 No
8.00
27.49%
5.40
0.45
Unskilled
16.00
54.98%
9.00
0.90
Charge hand
2.00
6.87%
3.15
0.21
Unskilled
0.10
0.34%
1.00
0.10
Carpenter - 2 No
2.00
6.87%
1.35
0.11
Steel Fixer - 1 No
1.00
3.44%
0.68
0.06
Crew 200m3/day
29.10
100%
20.58
1.83
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/m3)
Mason - 8 No
8.00
27.49%
5.40
0.45
Unskilled
16.00
54.98%
9.00
0.90
Charge hand
2.00
6.87%
3.15
0.21
Unskilled
0.10
0.34%
1.00
0.10
Carpenter - 2 No
2.00
6.87%
1.35
0.11
Steel Fixer - 1 No
1.00
3.44%
0.68
0.06
Crew 200m3/day
29.10
100%
20.58
1.83
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/m3)
Mason - 8 No
8.00
27.49%
5.40
0.45
Unskilled
16.00
54.98%
9.00
0.90
Charge hand
2.00
6.87%
3.15
0.21
Unskilled
0.10
0.34%
1.00
0.10
Carpenter - 2 No
2.00
6.87%
1.35
0.11
Steel Fixer - 1 No
1.00
3.44%
0.68
0.06
Crew 200m3/day
29.10
100%
20.58
1.83
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/m3)
Mason - 8 No
8.00
27.49%
5.40
0.45
Unskilled Labour - 16 No
16.00
54.98%
9.00
0.90
Charge Hand - 2 No
2.00
6.87%
3.15
0.21
Unskilled Labour - for Curing- 1 hr/m3
0.10
0.34%
1.00
0.10
Carpenter - 2 No
2.00
6.87%
1.35
0.11
Steel Fixer - 1 No
1.00
3.44%
0.68
0.06
Crew 200m3/day
29.10
100%
20.58
1.83
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
(Carp - 2 No+Help - 1 no) - Gang - 6 Nos (Incl Deshutter)
7.00
50.00%
21.42
1.79
Unskilled Labour - 4 No
5.00
35.71%
4.50
0.45
Charge Hand - 1 No
2.00
14.29%
2.16
0.14
Crew 100m2/day
14.00
100%
28.08
2.38
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
(Carp - 2 No+Help - 1 no) - 1 Gang - 7 Nos (Incl Deshutter)
7.00
52.50%
21.42
2.14
Unskilled Labour - 5 No
5.00
37.50%
4.50
0.30
Charge Hand - 1 No
1.33
10.00%
1.80
0.18
Crew 100m2/day
13.33
100%
27.72
2.62
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/T)
Productivit y (MHr/T)
Labour Category
Steel Fixer - 3 No
4.00
80.00%
432.00
36.00
Charge Hand - 1 No
1.00
20.00%
54.00
3.60
Crew/Tonne
5.00
100%
486.00
39.60
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/KG)
Productivit y (MHr/KG)
Steel Fixer - 3 No
4.00
80.00%
0.43
0.04
Charge Hand - 1 No
1.00
20.00%
0.05
0.00
Crew / KG
5.00
100%
0.49
0.04
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason - 4 No
2.00
18.02%
0.41
0.03
Unskilled Labour - 6 No
6.00
54.05%
1.01
0.10
Charge Hand
1.00
9.01%
0.17
0.01
Unskilled Labour - for Curing-
0.10
0.90%
0.02
0.00
Carpenter -
2.00
18.02%
0.32
0.03
Crew 500m2/day
11.10
100.00%
1.93
0.17
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew 100m2/day
13.33
100%
130.00
2.62
Crew / KG
5.00
100%
75.00
0.04
225.00
AED/m3
Amount (AED/m3)
Productivit y (MHr/unit)
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Crew 200m3/day
29.10
100%
20.00
1.83
Crew 100m2/day
13.33
100%
130.00
2.62
Crew / KG
5.00
100%
75.00
0.04
225.00
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew 100m2/day
13.33
100%
42.12
2.62
Crew / KG
5.00
100%
38.88
0.04
101.00
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew 100m2/day
13.33
100%
56.16
2.62
Crew / KG
5.00
100%
38.88
0.04
115.04
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew 100m2/day
13.33
100%
7.02
2.62
Crew / KG
5.00
100%
53.46
0.04
80.48
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew 100m2/day
13.33
100%
56.16
2.62
Crew / KG
5.00
100%
75.00
0.04
151.16
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew 100m2/day
13.33
100%
130.00
2.62
Crew / KG
5.00
100%
75.00
0.04
225.00
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew 100m2/day
13.33
100%
56.16
2.62
Crew / KG
5.00
100%
75.00
0.04
151.16
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew 100m2/day
13.33
100%
130.00
2.62
Crew / KG
5.00
100%
75.00
0.04
225.00
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew 100m2/day
13.33
100%
130.00
2.62
Crew / KG
5.00
100%
75.00
0.04
225.00
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew 100m2/day
13.33
100%
130.00
2.62
Crew / KG
5.00
100%
75.00
0.04
225.00
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew 100m2/day
13.33
100%
130.00
2.62
Crew / KG
5.00
100%
75.00
0.04
225.00
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew 100m2/day
13.33
100%
130.00
2.62
Crew / KG
5.00
100%
75.00
0.04
225.00
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew 100m2/day
13.33
100%
130.00
2.62
Crew / KG
5.00
100%
75.00
0.04
225.00
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
4.00
1.83
Crew 100m2/day
13.33
100%
26.00
2.62
Crew / KG
5.00
100%
15.00
0.04
45.00
AED/m2
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
6.40
1.83
Crew 100m2/day
13.33
100%
41.60
2.62
Crew / KG
5.00
100%
24.00
0.04
72.00
AED/m2
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
8.40
1.83
Crew 100m2/day
13.33
100%
54.60
2.62
Crew / KG
5.00
100%
31.50
0.04
94.50
AED/m2
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew 100m2/day
13.33
100%
130.00
2.62
Crew / KG
5.00
100%
75.00
0.04
225.00
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew 100m2/day
13.33
100%
130.00
2.62
Crew / KG
5.00
100%
75.00
0.04
225.00
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/M)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
0.33
1.83
Crew 100m2/day
13.33
100%
5.62
2.62
Crew / KG
5.00
100%
0.81
0.04
6.76
AED/M
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew 100m2/day
13.33
100%
351.00
2.62
Crew / KG
5.00
100%
43.74
0.04
414.74
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
1.00
1.83
Crew 100m2/day
13.33
100%
17.55
2.62
Crew / KG
5.00
100%
2.19
0.04
20.74
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew 100m2/day
13.33
100%
56.16
2.62
Crew / KG
5.00
100%
7.29
0.04
83.45
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew / KG
5.00
100%
28.08
0.04
Crew 100m2/day
13.33
100%
8.61
2.62
Crew / M
5.00
100%
20.00
6.00
76.69
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
4.00
1.83
Crew / KG
5.00
100%
5.62
0.04
Crew 100m2/day
13.33
100%
1.72
2.62
Crew / M
5.00
100%
4.00
6.00
15.34
AED/m2
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew / KG
5.00
100%
12.05
0.04
Crew 100m2/day
13.33
100%
28.08
2.62
Crew / M
5.00
100%
20.00
6.00
80.13
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
3.00
1.83
Crew / KG
5.00
100%
1.81
0.04
Crew 100m2/day
13.33
100%
4.21
2.62
Crew / M
5.00
100%
3.00
6.00
12.02
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew / KG
5.00
100%
17.22
0.04
Crew 100m2/day
13.33
100%
28.08
2.62
Crew / M
5.00
100%
20.00
6.00
85.30
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
2.40
1.83
Crew / KG
5.00
100%
2.07
0.04
Crew 100m2/day
13.33
100%
3.37
2.62
Crew / M
5.00
100%
2.40
6.00
10.24
AED/m2
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
2.00
1.83
Crew / KG
5.00
100%
1.72
0.04
Crew 100m2/day
13.33
100%
2.81
2.62
Crew / M
5.00
100%
2.00
6.00
8.53
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
4.00
1.83
Crew / KG
5.00
100%
3.44
0.04
Crew 100m2/day
13.33
100%
5.62
2.62
Crew / M
5.00
100%
4.00
6.00
17.06
AED/m2
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
4.00
1.83
Crew / KG
5.00
100%
28.64
0.04
Crew 100m2/day
13.33
100%
5.83
2.62
Crew / M
5.00
100%
0.00
6.00
38.47
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew / KG
5.00
100%
124.89
0.04
Crew 100m2/day
13.33
100%
29.16
2.62
Crew / M
5.00
100%
2.00
6.00
40.49
AED/m2
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew / KG
5.00
100%
115.13
0.04
Crew 100m2/day
13.33
100%
29.16
2.62
Crew / M
5.00
100%
2.00
6.00
41.57
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew / KG
5.00
100%
106.81
0.04
Crew 100m2/day
13.33
100%
29.16
2.62
Crew / M
5.00
100%
2.00
6.00
42.65
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew / KG
5.00
100%
103.09
0.04
Crew 100m2/day
13.33
100%
36.45
2.62
Crew / M
5.00
100%
2.00
6.00
45.23
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew / KG
5.00
100%
96.41
0.04
Crew 100m2/day
13.33
100%
36.45
2.62
Crew / M
5.00
100%
2.00
6.00
46.46
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m3)
Productivit y (MHr/unit)
Crew 200m3/day
29.10
100%
20.00
1.83
Crew / KG
5.00
100%
90.56
0.04
Crew 100m2/day
13.33
100%
36.45
2.62
Crew / M
5.00
100%
2.00
6.00
47.68
AED/m3
Amount (AED/m3)
Productivit y (MHr/unit)
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Crew 200m3/day
29.10
100%
20.00
1.83
Crew / KG
5.00
100%
130.00
0.04
Crew 100m2/day
13.33
100%
75.00
2.62
Crew / M
5.00
100%
2.00
6.00
227.00
AED/m3
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
ChargeLabour Hand - for Unskilled Curing
1.00
32.26%
2.81
0.19
0.10
3.23%
1.00
0.10
Crew 8m2/day
3.10
100%
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8m2/day
3.10
100%
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8m2/day
3.10
100%
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8m2/day
3.10
100%
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8m2/day
3.10
100%
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8m2/day
3.10
100%
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8m2/day
3.10
100%
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8m2/day
3.10
100%
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8m2/day
3.10
100%
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8m2/day
3.10
100%
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8m2/day
3.10
100%
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8m2/day
3.10
100%
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8m2/day
3.10
100%
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
10.80
0.90
Unskilled Labour
1.00
32.26%
9.00
0.90
Charge Hand
1.00
32.26%
2.25
0.15
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 10 m2/day
3.10
100%
23.05
2.05
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
10.80
0.90
Unskilled Labour
1.00
32.26%
9.00
0.90
Charge Hand Unskilled Labour - for Curing
1.00
32.26%
2.25
0.15
0.10
3.23%
1.00
0.10
Crew 10 m2/day
3.10
100%
23.05
2.05
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
10.80
0.90
Unskilled Labour
1.00
32.26%
9.00
0.90
Charge Hand Unskilled Labour - for Curing
1.00
32.26%
2.25
0.15
0.10
3.23%
1.00
0.10
Crew 10 m2/day
3.10
100%
23.05
2.05
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
10.80
0.90
Unskilled Labour
1.00
32.26%
9.00
0.90
Charge Hand Unskilled Labour - for Curing
1.00
32.26%
2.25
0.15
0.10
3.23%
1.00
0.10
Crew 10 m2/day
3.10
100%
23.05
2.05
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
10.80
0.90
Unskilled Labour
1.00
32.26%
9.00
0.90
Charge Hand
1.00
32.26%
2.25
0.15
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 10 m2/day
3.10
100%
23.05
2.05
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
12.00
1.00
Unskilled Labour
1.00
32.26%
10.00
1.00
Charge Hand
1.00
32.26%
2.50
0.17
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 11 m2/day
3.10
100%
25.50
2.27
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
12.00
1.00
Unskilled Labour
1.00
32.26%
10.00
1.00
Charge Hand
1.00
32.26%
2.50
0.17
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 10 m2/day
3.10
100%
25.50
2.27
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
10.80
0.90
Unskilled Labour
1.00
32.26%
9.00
0.90
Charge Hand
1.00
32.26%
2.25
0.15
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 10 m2/day
3.10
100%
23.05
2.05
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
10.80
0.90
Unskilled Labour
1.00
32.26%
9.00
0.90
Charge Hand
1.00
32.26%
2.25
0.15
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 10 m2/day
3.10
100%
23.05
2.05
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
10.80
0.90
Unskilled Labour
1.00
32.26%
9.00
0.90
Charge Hand
1.00
32.26%
2.25
0.15
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 10 m2/day
3.10
100%
23.05
2.05
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
10.80
0.90
Unskilled Labour
1.00
32.26%
9.00
0.90
Charge Hand
1.00
32.26%
2.25
0.15
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 10 m2/day
3.10
100%
23.05
2.05
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
9.82
0.82
Unskilled Labour
1.00
32.26%
8.18
0.82
Charge Hand
1.00
32.26%
2.05
0.14
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 11 m2/day
3.10
21.05
1.87
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
10.80
0.90
Unskilled Labour
1.00
32.26%
9.00
0.90
Charge Hand
1.00
32.26%
2.25
0.15
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 10 m2/day
3.10
23.05
2.05
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
10.80
0.90
Unskilled Labour
1.00
32.26%
9.00
0.90
Charge Hand
1.00
32.26%
2.25
0.15
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 10 m2/day
3.10
23.05
2.05
1.00
1.00
1.00
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
10.80
0.90
Unskilled Labour
1.00
32.26%
9.00
0.90
Charge Hand
1.00
32.26%
2.25
0.15
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 10 m2/day
3.10
23.05
2.05
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
10.80
0.90
Unskilled Labour
1.00
32.26%
9.00
0.90
Charge Hand
1.00
32.26%
2.25
0.15
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 10 m2/day
3.10
23.05
2.05
Labour Category
No of Labour (No.)
Amount (AED/m2)
Productivit y (MHr/m2)
1.00
1.00
% OF LABOUR CATEG
Mason
1.00
32.26%
10.80
0.90
Unskilled Labour
1.00
32.26%
9.00
0.90
Charge Hand
1.00
32.26%
2.25
0.15
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 10 m2/day
3.10
23.05
2.05
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
1.00
Mason
1.00
32.26%
9.82
0.82
Unskilled Labour
1.00
32.26%
8.18
0.82
Charge Hand
1.00
32.26%
2.05
0.14
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 11 m2/day
3.10
21.05
1.87
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 6 m2/day
3.10
28.56
2.54
1.00
1.00
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 6 m2/day
3.10
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 6 m2/day
3.10
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
1.00
1.00
Charge Hand Unskilled Labour - for Curing
1.00
32.26%
2.81
0.19
0.10
3.23%
1.00
0.10
Crew 6 m2/day
3.10
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand Unskilled Labour - for Curing
1.00
32.26%
2.81
0.19
0.10
3.23%
1.00
0.10
Crew 8 m2/day
3.10
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8 m2/day
3.10
28.56
2.54
Labour Category
No of Labour (No.)
Amount (AED/m2)
Productivit y (MHr/m2)
1.00
1.00
1.00
% OF LABOUR CATEG
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8 m2/day
3.10
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8 m2/day
3.10
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8 m2/day
3.10
28.56
2.54
1.00
1.00
1.00
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8 m2/day
3.10
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8 m2/day
3.10
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
1.00
1.00
Unskilled Labour - for Curing
0.10
Crew 8 m2/day
3.10
Labour Category
No of Labour (No.)
Mason
3.23%
1.00
0.10
28.56
2.54
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
1.00
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8 m2/day
3.10
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand Unskilled Labour - for Curing
1.00
32.26%
2.81
0.19
0.10
3.23%
1.00
0.10
Crew 8 m2/day
3.10
28.56
2.54
Labour Category
No of Labour (No.)
Amount (AED/m2)
Productivit y (MHr/m2)
1.00
1.00
% OF LABOUR CATEG
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8 m2/day
3.10
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8 m2/day
3.10
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8 m2/day
3.10
28.56
2.54
1.00
1.00
1.00
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8 m2/day
3.10
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8 m2/day
3.10
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand
1.00
32.26%
2.81
0.19
1.00
1.00
Unskilled Labour - for Curing
0.10
Crew 8 m2/day
3.10
Labour Category
No of Labour (No.)
Mason
3.23%
1.00
0.10
28.56
2.54
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
1.00
Charge Hand
1.00
32.26%
2.81
0.19
Unskilled Labour - for Curing
0.10
3.23%
1.00
0.10
Crew 8 m2/day
3.10
28.56
2.54
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
32.26%
13.50
1.13
Unskilled Labour
1.00
32.26%
11.25
1.13
Charge Hand Unskilled Labour - for Curing
1.00
32.26%
2.81
0.19
0.10
3.23%
1.00
0.10
Crew 8 m2/day
3.10
28.56
2.54
Labour Category
No of Labour (No.)
Amount (AED/m2)
Productivit y (MHr/m2)
1.00
1.00
% OF LABOUR CATEG
Mason
1.00
32.26%
9.53
0.79
Unskilled Labour
1.00
32.26%
7.94
0.79
Charge Hand
1.00
32.26%
2.38
0.16
Unskilled Labour - for Curing
0.10
3.23%
1.50
0.15
Crew 17 m2/day
3.10
21.35
1.90
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
1.00
Mason
1.00
32.26%
10.16
0.85
Unskilled Labour
1.00
32.26%
8.47
0.85
Charge Hand
1.00
32.26%
2.54
0.17
Unskilled Labour - for Curing
0.10
3.23%
1.60
0.16
Crew 17 m2/day
3.10
22.78
2.02
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
27.78%
9.45
0.79
Unskilled Labour
1.50
41.67%
11.81
1.18
Charge Hand
1.00
27.78%
2.36
0.16
Unskilled Labour - for Curing
0.10
2.78%
1.35
0.14
Crew 17 m2/day
3.60
24.98
2.26
1.00
1.00
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
27.78%
8.78
0.73
Unskilled Labour
1.50
41.67%
10.97
1.10
Charge Hand
1.00
27.78%
3.66
0.24
Unskilled Labour - for Curing
0.10
2.78%
1.30
0.13
Crew 16 m2/day
3.60
24.70
2.20
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
27.78%
8.78
0.73
Unskilled Labour
1.50
41.67%
10.97
1.10
Charge Hand
1.00
27.78%
2.93
0.20
Unskilled Labour - for Curing
0.10
2.78%
1.30
0.13
Crew 17 m2/day
3.60
23.97
2.15
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason - 4 No
2.00
19.80%
0.81
0.07
Unskilled Labour - 6 N
6.00
59.41%
2.03
0.20
Charge Hand
1.00
9.90%
0.34
0.02
Unskilled Labour - for
0.10
0.99%
0.03
0.00
1.00
1.00
Carpenter -
1.00
9.90%
0.32
0.03
Crew 400 m2/day
10.10
100.00%
3.53
0.32
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
MasonLabour - 4 No - 6 Unskilled No
2.00
19.80%
0.54
0.05
6.00
59.41%
1.35
0.11
Charge Hand
1.00
9.90%
0.23
0.02
Unskilled Labour - for Curing-
0.10
0.99%
0.02
0.00
Carpenter -
1.00
9.90%
0.22
0.02
Crew 400 m2/day
10.10
100.00%
2.35
0.20
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason - 4 No
2.00
19.80%
0.54
0.05
Unskilled Labour - 6 No
6.00
59.41%
1.35
0.11
Charge Hand Unskilled Labour - for Curing-
1.00
9.90%
0.23
0.02
0.10
0.99%
0.02
0.00
Carpenter -
1.00
9.90%
0.22
0.02
Crew 400 m2/day
10.10
100.00%
2.35
0.20
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason - 4 No
2.00
19.80%
0.41
0.03
Unskilled Labour - 6 No
6.00
59.41%
1.01
0.08
Charge Hand
1.00
9.90%
0.17
0.02
Unskilled Labour - for Curing-
0.10
0.99%
0.02
0.00
Carpenter -
1.00
9.90%
0.16
0.02
Crew 400 m2/day
10.10
100.00%
1.77
0.15
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason - 4 No
2.00
19.80%
0.30
0.02
Unskilled Labour - 6 No
6.00
59.41%
0.75
0.06
Charge Hand
1.00
9.90%
0.12
0.01
Unskilled Labour - for Curing-
0.10
0.99%
0.01
0.00
Carpenter -
1.00
9.90%
0.12
0.01
Crew 400 m2/day
10.10
100.00%
1.31
0.11
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason - 4 No
2.00
19.80%
0.24
0.02
Unskilled Labour - 6 No
6.00
59.41%
0.59
0.05
Charge Hand
1.00
9.90%
0.10
0.01
Unskilled Labour - for Curing-
0.10
0.99%
0.01
0.00
Carpenter -
1.00
9.90%
0.10
0.01
Crew 400 m2/day
10.10
100.00%
1.04
0.09
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason - 4 No Unskilled Labour - 6 No
2.00
19.80%
0.14
0.01
6.00
59.41%
0.34
0.03
Charge Hand
1.00
9.90%
0.06
0.01
Unskilled Labour - for Curing-
0.10
0.99%
0.01
0.00
Carpenter -
1.00
9.90%
0.05
0.01
Crew 400 m2/day
10.10
100.00%
0.59
0.05
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
3 Times Polising
3.00
42.86%
5.00
0.42
Mason
1.00
14.29%
9.00
0.75
Unskilled Labour
2.00
28.57%
15.00
1.50
Charge Hand
1.00
14.29%
1.50
0.10
Crew 12 m2/day
7.00
100.00%
30.50
2.77
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
Err:522
9.00
0.75
Unskilled Labour
1.50
Err:522
11.25
1.13
Charge Hand
1.00
Err:522
3.75
0.25
Crew 12 m2/day
Err:522
Err:522
Err:522
Err:522
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
1.00
28.57%
9.00
0.75
Unskilled Labour
1.50
42.86%
11.25
1.13
Charge Hand
1.00
28.57%
3.75
0.25
Crew 12 m2/day
3.50
100.00%
24.00
2.13
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
2.00
40.00%
21.60
1.80
Unskilled Labour
2.00
40.00%
18.00
1.80
Charge Hand
1.00
20.00%
4.50
0.30
Crew 12 m2/day
5.00
100.00%
44.10
3.90
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Mason
2.00
28.57%
21.60
1.80
Unskilled Labour
4.00
57.14%
36.00
3.60
Charge Hand
1.00
14.29%
4.50
0.30
Crew 10 m2/day
7.00
100.00%
62.10
5.70
Labour Category
No of Labour (No.)
% OF LABOUR CATEG
Amount (AED/m2)
Productivit y (MHr/m2)
Crew 10 m2/day
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Steel
WP (Hor)
Poly. Sheet
WP (Ver)
Kg
m2
m2
Ver
#VALUE!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
6
49
#VALUE!
#REF!
#VALUE!
#VALUE!
#VALUE!
#REF!
#VALUE!
#VALUE!
3.50
10.00
1.60
10.00
#VALUE!
#REF!
#VALUE!
#VALUE!
#VALUE! #VALUE!
#VALUE!
QR/m
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1) BILL NO. 1 - TOWN HOUSE INNER UNIT SITE WORKS Site Exploration Generally Generally A
Allow for keeping records of site observations, providing samples, performing site tests, performing laboratory tests and for preparing analysis and technical reports, strictly in b
item
1
115
115
Allow for excavating trial holes as necessary commencing from existing ground level include all necessary earthwork supports strictly in accordance with specifications
item
1
115
115
Allow for hand excavating of a trench across the service corridor to determine exact depth and location of existing services
item
1
115
115
item
1
1150
1150
item
1
115
115
Trial Holes / Trenches B
C
Site Preparation Clearance D
Allow for the removal and disposal off-site all vegetation and loose materials including (but not limited to) undergrowth, bushes, shrubs, debris, plants and any other organic materials, strictly in accordance with the specifications Protection
E
Protect existing services, road and adjacent building structure and make good damaged areas
To Collection P2/S1/B1/SW/1
1,610.00
QTY
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) SITE WORKS, Cont'd Excavation and earthworks A
Excavation to reduce levels as shown on the drawings
m3
64
18
1152
B
Trenching for the service pipes or the like for all diameters any depth
item
1
115
115
Backfill with selected excavated material in layers to make up levels
m3
33
25
825
Backfill and well compact in layers with imported materials
m3
68
63
4284
m2
64
12
768
m2
31
24
744
Filling C
D
Compaction E
Allow for compaction of the natural foundation all in accordance with the specification and drawings Disposal
E
Cartaway surplus excavated material off site to Municipal yard as directed by the Engineer
Anti-termite treatment F
To horizontal surfaces
m2
157
5
785
G
To vertical surfaces
m
28
5
140
To Collection P2/S1/B1/SW/2/PTC1
8,813.00
QTY
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) SITE WORKS, Cont'd Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included. A
To Collection P2/S1/B1/SW/3
AMOUNT (AED)
QTY
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) SITE WORKS, Cont'd
COLLECTION
Page P2/S1/B1/SW/1
1,610.00
Page P2/S1/B1/SW/2
8,813.00
Page P2/S1/B1/SW/3
Total for Site Works - Carried to Bill No. 1 Summary P2/S1/B1/SW/4/R1
10,423.00
QTY
1.15
MARK UP SPLITTED AMOUNT
LABOUR
MATERIAL
PLANT
LABOUR
MATERIAL
PLANT
DHS
DHS
DHS
SUBCONTRAC TOTAL T
100.00
100.00
100
100.00
100.00
100
100.00
100.00
100
1,000.00
1,000.00
500
100.00
100.00
100
500
SUB CONTRACT DHS
1.15
MARK UP SPLITTED AMOUNT
LABOUR
6.56
MATERIAL
-
PLANT
7.70
LABOUR
MATERIAL
PLANT
DHS
DHS
DHS
SUB CONTRACT DHS
SUBCONTRAC TOTAL T
1.00
15.26
100.00
100.00
419.84
-
492.80
64.00
100
1.17
4.13
13.75
3.00
22.05
38.61
136.13
453.75
99.00
1.13
37.50
13.25
3.00
54.88
76.50
2,550.00
901.00
204.00
5.00
10.00
320.00
10.00
10.00
310.00
4.00
4.00
628.00
4.00
4.00
112.00
5.00
320.00
1.15
MARK UP SPLITTED AMOUNT
LABOUR
MATERIAL
PLANT
SUBCONTRAC TOTAL T
LABOUR
MATERIAL
PLANT
DHS
DHS
DHS
SUB CONTRACT DHS
1.15
MARK UP SPLITTED AMOUNT
LABOUR
MATERIAL
PLANT
LABOUR
MATERIAL
PLANT
DHS
DHS
DHS
1,854.95
2,686.13
2,347.55
SUB CONTRACT DHS
SUBCONTRAC TOTAL T 1,737.00
LABOUR DETAIL MASON HRS
CARPENTER HRS
STEEL FIXTURE HRS
UNSKILLED CHARGE LABOUR HAND HRS HRS
0.64
LABOUR DETAIL MASON HRS
CARPENTER HRS
STEEL FIXTURE HRS
UNSKILLED CHARGE LABOUR HAND HRS HRS
-
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) CONCRETE WORKS Substructure Note:-Upto and including Ground Floor Grade slab Plain in situ concrete with SRC, grade as required A
50 mm thick blinding
m2
64
B
100 mm thick blinding
m2
56
m3
1
363
363
20
1280 Deleted
Reinforced in situ concrete, grade 50 N/mm2 C
Neck columns
Reinforced in situ concrete, grade 40 N/mm2 D
Footings
m3
20
357
7140
E
Tie beams
m3
4
357
1428
m3
10
797
7970
Reinforced in situ concrete, grade 20 N/mm2 F
Grade slab, 100 mm thick
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2) ITEM RATE AMOUNT ITEM DESCRIPTION UNIT QTY. (AED) (AED) NO. To Collection 18,181.00 P2/S1/B1/CW/1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) CONCRETE WORKS, Cont'd Substructure, Cont'd Note:-Upto and including Ground Floor Grade slab High yield steel bar reinforcement, characteristic strength (FY) = 460 N/mm2 and comply with BS 4449 A
Various diameters
kg
2,860
B
A-252 mesh reinforcement
m2
100
3.6
10296 INCLUDED
Formwork to C
Sides of neck columns
m2
13
61
793
D
Sides of footing
m2
22
61
1342
E
Sides of tie beams
m2
34
61
2074
Sundries F
Isolation joint including filler, sealant, mastic, etc.
item
1
575
575
G
Construction joints, control joints, and the like including filler, sealant, mastic, etc.
item
1
575
575
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
To Collection
AMOUNT (AED)
15,655.00
P2/S1/B1/CW/2/PTC1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) CONCRETE WORKS, Cont'd Superstructure Reinforced in situ concrete, grade 50 N/mm2 A
Columns
m3
4
363
1452
Reinforced in situ concrete, grade 40 N/mm2 B
Beams
m3
7
357
2499
C
Staircase
m3
3
357
1071
D
Suspended solid slab, 175 mm thick
m3
30
357
10710
E
Sections, upstands and parapets
m3
6
357
2142
F
Lintels
m3
1
357
357
kg
7,080
3.6
25488
High yield steel bar reinforcement, characteristic strength (FY) = 460 N/mm2 and comply with BS 4449 G
Various diameters
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
To Collection
AMOUNT (AED)
43,719.00
P2/S1/B1/CW/3 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) CONCRETE WORKS, Cont'd Superstructure, Cont'd Formwork to A
Sides of columns
m2
51
72
3672
B
Sides and soffits of beams
m2
62
72
4464
C
Sides and soffits of staircases
m2
21
72
1512
D
Sides and soffits of slab
m2
178
72
12816
E
Sides of sections, upstands and parapets
m2
55
72
3960
F
Sides of lintels
m2
6
72
432
Sundries G
Control joints including filler, sealant, mastic, etc.
item
1
575
575
H
AHU, AC condensing units, water tank base, etc. including upstands, connecting beams all as specified and in coordination with MEP drawings
item
1
575
575
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
To Collection P2/S1/B1/CW/4/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) CONCRETE WORKS, Cont'd Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included. A
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
28,006.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
To Collection P2/S1/B1/CW/5 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) CONCRETE WORKS, Cont'd COLLECTION
Page P2/S1/B1/CW/1/PTC1
18,181
Page P2/S1/B1/CW/2/PTC1
15,655
Page P2/S1/B1/CW/3
43,719
Page P2/S1/B1/CW/4/R1
28,006
Page P2/S1/B1/CW/5
-
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
Total for Concrete Works - Carried to Bill No. 1 Summary P2/S1/B1/CW/6/R1
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
105,561
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MASONRY Substructure (in contact with soil) Solid concrete blockwork bedded, jointed and pointed in cement and sand mortar including all crack control joints, anchors, joints, wall ties, stiffener beams and columns, reinforcement, formworks, etc., complete A
200 mm thick walls
m2
21
99
2079
B
Entrance steps
m3
1
494
494
Internal Solid concrete blockwork bedded, jointed and pointed in cement and sand mortar including all crack control joints, anchors, metal laths, safing insulation fire rated walls compressible filler, control joints, wall ties, stiffener beams and columns, reinforcement, formworks, sound transmission, etc., complete C
100 mm thick walls
m2
71
88
6248
C1
150 mm thick walls
m2
36
93
3348
D
200 mm thick walls
m2
92
99
9108
m2
55
78
4290
Hollow blockwork bedded, jointed and pointed in cement and sand mortar including all crack control joints, anchors, metal laths, safing insulation fire rated walls compressible filler, control joints, wall ties, stiffener beams and columns, reinforcement, formworks, sound transmission, etc., complete E
100 mm thick walls
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2) ITEM RATE AMOUNT ITEM DESCRIPTION UNIT QTY. (AED) (AED) NO. To Collection 25,567.00 P2/S1/B1/MA/1/PTC1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MASONRY, Cont'd External Solid concrete blockwork bedded, jointed and pointed in cement and sand mortar including all crack control joints, anchors, metal laths, safing insulation fire rated walls compressible filler, control joints, wall ties, stiffener beams and columns, reinforcement, formworks, sound transmission, etc., complete A
200 mm thick walls
m2
7
99
693
B
300 mm thick walls
m2
10
141
1410
Thermalite blockwork bedded, jointed and pointed in cement and sand mortar including all crack control joints, anchors, metal laths, safing insulation fire rated walls compressible filler, control joints, wall ties, stiffener beams and columns, reinforcement, formworks, sound transmission, etc., complete C
250 mm thick walls
m2
39
96
3744
D
300 mm thick walls
m2
12
105
1260
item
1
575
575
Sundries E
Extra-over for fire rating of blockwork
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
To Collection P2/S1/B1/MA/2 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MASONRY, Cont'd Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included. A
AMOUNT (AED)
7,682.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
To Collection P2/S1/B1/MA/3 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MASONRY, Cont'd
COLLECTION
Page P2/S1/B1/MA/1/PTC1 Page P2/S1/B1/MA/2 Page P2/S1/B1/MA/3
25,567 7,682.00 -
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED) 0
Total for Masonry - Carried to Bill No. 1 Summary P2/S1/B1/MA/4
33,249
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) METAL WORK Staircase railings including balustrade, handrail, glazing, plates, bolts, nuts, fittings, special features, finishes, accessories, etc., complete A
1000 mm high
m
12
518
6216
Steel profile B
150 mm high Powder coated proprietary cold steel profile
m
5
Deleted
C
300 mm high Powder coated proprietary cold steel profile
m
2
Deleted
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
To Collection P2/S1/B1/MW/1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) METAL WORK, Cont'd Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included. A
AMOUNT (AED) 6,216.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
To Collection P2/S1/B1/MW/2 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) METAL WORK, Cont'd
COLLECTION
Page P2/S1/B1/MW/1/PTC1 Page P2/S1/B1/MW/2
6,216.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
Total for Metal Work - Carried to Bill No. 1 Summary P2/S1/B1/MW/3
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
6,216
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ALUMINIUM AND GLAZING WORKS Glass railing including balustrade, Aluminium handrail, steel sleeve, fixing, fittings, bolts, screw, nuts, plates, special feature, finishes, accessories, etc., complete A
1275 mm high frameless glass balustrade
m
7
518
3626
B
Railings including balustrade, handrail, glazing, plates, bolts, nuts, fittings, special features, finishes, accessories, etc., complete 1275 mm high frameless glass balustrade
m
2
805
1610
900 mm high railing to porch
m
2
518
1036
Trellis Parking Shade Trellis above car parking including 50x 150mm Powder coated aluminium trellis including 75 x150mm aluminium frame, extruded aluminium profile, steel post, aluminium/metal support fixed to boundary wall fixing, special feature, supports system, accessories, fittings, fixtures, etc.,complete as detailed on drg A-R-402
m2
30
345
10350
Trellis above balcony including 50x 150mm Powder coated aluminium trellis including 150 x150mm aluminium frame, special feature, supports system, accessories, fittings, fixtures, etc.,complete as detailed on drg A-R-405
m2
3
Railings including balustrade, handrail, glazing, plates, bolts, nuts, fittings, special features, finishes, accessories, etc., complete Aluminium railing including balustrade, handrail, steel sleeve, fixing, fittings, bolts, screw, nuts, plates, special feature, finishes, accessories, etc., complete C
D
E
DELETED
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
To Collection
AMOUNT (AED)
16,622.00
P2/S1/B1/AG/1/PTC1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ALUMINIUM AND GLAZING WORKS, Cont'd Aluminium doors and windows including subframes, frames, architraves, glazing, spandrel panel, transom, mullion, supports, fasteners, gaskets, separator, insulation, sill, joints, fittings, ironmongery, special features, accessories, tests, etc. complete as detailed on drawings and specifications A
Type GL-01, overall size 600 x5300 mm
no.
1
2560
2560
B
Type GL-02, overall size 800 x 1500 mm
no.
1
966
966
C
Type GL-03, overall size 3300 x 2400 mm
no.
1
6376
6376
D
Type GL-04, overall size 1000 x 2400 mm
no.
1
E
Type GL-05, overall size 1100 x 2400 mm
no.
1
2581
2581
F
Type GL-06, overall size 2200 x 2800 mm
no.
2
4959
9918
G
Type GL-07, overall size 1850 x 2800 mm
no.
1
4170
4170
H
Type GL-08, overall size 1400 x 2200 mm
no.
1
2479
2479
no.
2
Deleted
Powder coated aluminium louvers including subframes, frames, ironmongery, holdfast, special features, paint, fittings, accessories, etc., complete J
Type LV-01, overall size 1100 x 3725 mm
Deleted
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
To Collection P2/S1/B1/AG/2/PTC1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ALUMINIUM AND GLAZING WORKS, Cont'd Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included. A
AMOUNT (AED)
29,050.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
To Collection P2/S1/B1/AG/3 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ALUMINIUM AND GLAZING WORKS, Cont'd
COLLECTION
Page P2/S1/B1/AG/1/PTC1
16,622
Page P2/S1/B1/AG/2/PTC1
29,050
Page P2/S1/B1/AG/3
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
Total for Aluminium & Glazing - Carried to Bill No. 1 Summary P2/S1/B1/AG/4
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
45,672
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) CARPENTRY & JOINERY WORKS Sub frames for timber doors A
Subframes to doors as specified in particular specifications including fixing with accessories as shown complete
m
61
17
1037
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2) ITEM RATE AMOUNT ITEM DESCRIPTION UNIT QTY. (AED) (AED) NO. To Collection 1,037.00 P2/S1/B1/CJ/1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) CARPENTRY & JOINERY WORKS, Cont'd Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included. A
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
To Collection P2/S1/B1/CJ/2 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) CARPENTRY & JOINERY WORKS, Cont'd
COLLECTION
Page P2/S1/B1/CJ/1 Page P2/S1/B1/CJ/2
1,037.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
Total for Carpentry & Joinery - Carried to Bill No. 1 Summary P2/S1/B1/CJ/3/R1
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
1,037.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM NO.
ITEM DESCRIPTION
MAIN WORKS (PART 2)
UNIT QTY.
RATE (AED)
AMOUNT (AED)
SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) INTERNAL AND EXTERNAL FINISHES Floor finishes (Internal) A
Cement and sand screed to receive tile
m2
146
INCLUDED
600 x 600 mm porcelain floor tiles A, type TL-01 (P.C. rate for supply only of tile is Dhs. 25/- per m2)
m2
14
96
1344
600 x 600 mm porcelain floor tiles, type TL-02 (P.C. rate for supply only of tile is Dhs. 25/- per m2)
m2
1
96
96
1200 x 200 mm wood look porcelain floor tiles A, type TL-04 (P.C. rate for supply only of tile is Dhs. 25/- per m2)
m2
119
96
11424
Marble stone, type ST-01 (P.C. rate for supply only of tile is Dhs. 180/- per m2)
m2
2
318
636
Ditto to steps and risers (P.C. rate for supply only of tile is Dhs. 120/- per m)
m
23
238
5474
Stone/Tiles including polishing, joint, grouting, pointing, sealant, etc.,complete B
C
D
E
F
Floor finishes (External) G
Cement and sand screed to receive tile
m2
10
H
500 x 500 x 50 mm white cement tiles (hydraulic type) (at roof) laid including, pedestals, spacers, etc., complete, type TR-1
m2
79
86
6794
300 x 300 mm porcelain floor tiles, type CT-7 (P.C. rate for supply only of tile is Dhs. 25/- per m2)
m2
10
96
960
J
0 INCLUDED
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM
ITEM DESCRIPTION
NO.
MAIN WORKS (PART 2)
UNIT QTY.
RATE (AED)
To Collection
AMOUNT (AED) 26,728.00
P2/S1/B1/FIN/1/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) INTERNAL AND EXTERNAL FINISHES, Cont'd Skirting A
Cement and sand plaster to receive Skirting
m2
11
39
429
100 mm high wood look porcelain skirting tile A, type TL-05 (P.C. rate for supply only of skirting tile is Dhs. 10/- per m)
m
112
26
2912
Skirting (External) Cement and sand plaster to receive Skirting
m2
1
39
39
100 mm high skirting tile, type CT-8 (P.C. rate for supply only of skirting tile is Dhs. 8/- per m)
m
10
24
240
E
100 mm high Terrazo skirting, type TR-3
m
51
24
1224
F
Threshold / Sill Cement and sand plaster to receive Threshold
m2
6
29
174
Thresholds including grouting, fixing, etc. 100 mm wide marble thresholds, ST-01 (P.C. rate for supply only of marble is Dhs. 50/- per m)
m
1
66
66
130 mm wide marble thresholds, ST-01 (P.C. rate for supply only of marble is Dhs. 55/- per m)
m
5
72
360
265 mm wide marble thresholds, ST-01 (P.C. rate for supply only of marble is Dhs. 80/- per m)
m
2
100
200
75 mm high porcelain tile TL-02 (P.C. rate for supply only of tile is Dhs. 8/- per m)
m
2
24
48
150mm wide 1200mm high wc ledge finish type SF-01 including support & framing system to wc cistern m
4
302
1208
Skirtings including fixing with adhesive, grouting, angles, etc., complete B
C
Skirtings including fixing with adhesive, grouting, angles, etc., complete D
G
H
J
K
L
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM NO. M Cills
ITEM DESCRIPTION
MAIN WORKS (PART 2)
UNIT QTY. item
RATE (AED)
1
435
To Collection
AMOUNT (AED) 435 7,335.00
P2/S1/B1/FIN/2/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) INTERNAL AND EXTERNAL FINISHES, Cont'd Walls finishes (Internal) A
Cement and sand plaster to receive paint
m2
406
40
16240
B
Cement and sand plaster to receive tile
m2
39
39
1521
C
Emulsion paint RAL 9010,type PT-01
m2
347
18
6246
D
Hygiene moisture resistant emulsion paint RAL 9010, type PT-02
m2
59
21
1239
E
Anti fungal paint to shaft
m2
45
14
630
m2
39
101
3939
m2
4
251
1004
item
1
288
288
m2
240
39
9360
Wall tiles including grouting, pointing, polishing, etc., as required complete F
300 x 600 mm porcelain tiles A, type TL-03 (P.C. rate for supply only of tile is Dhs. 20/- per m2)
Glass including backing, framing system, fixing, accessories, fittings, trims, special features etc. complete. G
Back painted glass, type GL-01 100 mm thick Hollow Block walls, Both side Plaster, One Side Paint & One side Ceramic Sundries
H
PU paint , type PT-07 for ac grills
Wall finishes (External) J
K
Cement and sand render including accessories to receive paint at concrete / block walls as per drawing External paint to walls & soffit of ceiling over sand cement plaster
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM
ITEM DESCRIPTION
NO.
L
MAIN WORKS (PART 2)
UNIT QTY.
RATE (AED)
AMOUNT (AED)
including pvc grooves
m2
173
32
5536
White epoxy paint over cement sand plaster to parapet internal side
m2
67
32
2144
To Collection
48,147.00
P2/S1/B1/FIN/3/PTC1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) INTERNAL AND EXTERNAL FINISHES, Cont'd Ceiling finishes (Internal) A
Cement and sand plaster to receive paint
m2
67
41
2747
B
Emulsion paint underslab RAL 9003 , type PT-03
m2
67
18
1206
Suspended gypsum board ceiling painted with emulsion paint RAL 9003, type PT-03
m2
51
86
4386
Suspended gypsum board ceiling painted with hygiene moisture resistant emulsion paint RAL 9003, type PT-04
m2
19
86
1634
E
600 x 600 mm gypsum ceiling tiles, type TL-06
m2
6
75
450
F
1200 x 600 mm gypsum ceiling tiles, type TL-07
m2
2
75
150
G
Bulkhead, 50 mm high including finishes
m
17
29
493
H
Ditto to 500 mm high
m
3
35
105
J
Ditto to 550 mm high
m
4
35
140
K
Ditto to 700 mm high
m
5
35
175
L
Access panels
item
1
115
115
m2
8
75
600
Suspended ceilings including suspension system, shadow gap, fittings, fixing, finishes, accessories, access panels, etc., complete C
D
Ceiling finishes (External) M
Calcium silicate board lining
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM
ITEM DESCRIPTION
NO.
MAIN WORKS (PART 2)
UNIT QTY.
RATE (AED)
To Collection
AMOUNT (AED)
12,201.00
P2/S1/B1/FIN/4/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) INTERNAL AND EXTERNAL FINISHES, Cont'd Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included. A
Anti Fungul Paint Above False Ceiling ( Wall, Ceiling ) - As per addendum - Tender Queries & Response No- 6
m2
86
12
1032
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM
ITEM DESCRIPTION
NO.
UNIT QTY.
MAIN WORKS (PART 2) RATE (AED)
To Collection
AMOUNT (AED)
1,032.00
P2/S1/B1/FIN/5 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) INTERNAL AND EXTERNAL FINISHES, Cont'd
COLLECTION
Page P2/S1/B1/FIN/1/R1
26,728.00
Page P2/S1/B1/FIN/2/R1
7,335.00
Page P2/S1/B1/FIN/3/PTC1
48,147.00
Page P2/S1/B1/FIN/4/R1
12,201.00
Page P2/S1/B1/FIN/5
1,032.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM NO.
ITEM DESCRIPTION
UNIT QTY.
Total for Internal & External Finishes - Carried to Bill No. 1 Summary P2/S1/B1/FIN/6/R1
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
95,443.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM
ITEM DESCRIPTION
NO.
MAIN WORKS (PART 2)
UNIT QTY.
RATE (AED)
AMOUNT (AED)
SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) THERMAL AND MOISTURE PROTECTION Substructure waterproofing A
1000 gauge polythelein sheet
m2
93
5
465
B
1 x 4mm thick S.B.S membrane laid horizontally
m2
112
B1
2 Coats of cold applied liquid bituminous paint laid horizontally
m2
112
12
1344
C
Ditto applied vertically
m2
69
12
828
173
13667
Deleted
Roof Water proofing D
Lightweight concrete screed (thickness as per details) laid to slope of density 600 to 800 Kg/m3 ( CONSIDERED COMBO ROOF )
m2
79
E
Bituminous primer coat
m2
79
0 INCLUDED
F
5mm thick torch applied modified bitumen waterproofing membrane
m2
79
0 INCLUDED
G
Ditto at upstand
m
51
0 INCLUDED
H
2 layer of filter membrane
m2
79
0 INCLUDED
J
100 mm thick polystyrene rigid insulation board with density of 35 kg/m
m2
79
0 INCLUDED
K
50 mm thick loose gravel
m2
79
0 INCLUDED
L
Bitumen impregnated protection board
m
51
INCLUDED
M
Aluminium flashing/skirting fixed to parapet wall as per specification
m
51
0 INCLUDED
N
Sealant with back rod
m
51
0 INCLUDED
P
Finish waterproofing around rainwater outlets
item
1
INCLUDED
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM
ITEM DESCRIPTION
NO.
MAIN WORKS (PART 2)
UNIT QTY.
RATE (AED)
To Collection
AMOUNT (AED) 16,304.00
P2/S1/B1/TM/1/PTC1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) THERMAL AND MOISTURE PROTECTION, Cont'd Terrace/Balcony Water proofing A
Lightweight concrete screed (thickness as per details) laid to slope of density 600Kg/m3
m2
7
B
Bituminous primer coat
m2
7
0 INCLUDED
C
Filter membrane
m2
7
0 INCLUDED
D
4mm thick torch applied modified bitumen water proofing membrane 2 Coat of Liquid Bitumen Paint Ditto at upstand
m2
7
0 INCLUDED
m
23
INCLUDED
E
57
399
Wet areas waterproofing F
Waterproofing laid horizontally including leveling screed
m2
27
40
1080
G
Ditto, to upstands
m
43
40
1720
92
184
Waterproofing to shafts H
Waterproofing laid horizontally
m2
2
J
Ditto, to upstands
m
12
INCLUDED
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM
ITEM DESCRIPTION
NO.
MAIN WORKS (PART 2)
UNIT QTY.
RATE (AED)
To Collection
AMOUNT (AED)
3,383.00
P2/S1/B1/TM/2/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) THERMAL AND MOISTURE PROTECTION, Cont'd AHU, duct and pipe penetration A
Waterproofing to base of AHU, duct and pipe penetration
item
1
575
575
item
1
575
575
item
1
575
575
Damp proof course B
Damp proof course laid in layers as specified to periphery of building, wet areas, service rooms, OTS, etc., as specified
At internal wall as specified C
Thermal insulation with gypsum board lining to structures as per specifications and Authorities requirements
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM
ITEM DESCRIPTION
NO.
UNIT QTY.
MAIN WORKS (PART 2) RATE (AED)
To Collection P2/S1/B1/TM/3 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) THERMAL AND MOISTURE PROTECTION, Cont'd Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included. A
AMOUNT (AED)
1,725.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM
ITEM DESCRIPTION
NO.
UNIT QTY.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
To Collection P2/S1/B1/TM/4 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) THERMAL AND MOISTURE PROTECTION, Cont'd
COLLECTION
Page P2/S1/B1/TM/1/PTC1
16,304
Page P2/S1/B1/TM/2/R1
3,383
Page P2/S1/B1/TM/3
1,725
Page P2/S1/B1/TM/4
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM NO.
ITEM DESCRIPTION
UNIT QTY.
Total for Thermal & Moisture Protection - Carried to Bill No. 1 Summary P2/S1/B1/TM/5/R1
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
21,412
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT
MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM
ITEM DESCRIPTION
NO.
(PART 2)
UNIT QTY.
RATE (AED)
AMOUNT (AED)
SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ACCESSORIES AND SPECIAL CONSTRUCTION Mirrors including framing, backing, fittings, accessories, with splayed edges and concealed fixing etc., complete A B
Full counter width full height mirror overall height 1550 mm Full counter width full height mirror overall height 900 mm 500 x 1040 mm mirror
m
4
345
1380
no.
1
288
288
no.
2
288
576
86
86
230
230
Garbage disposal C
Recycle garbage bins for glass, plastics, paper, metal, cardboard
Access Panels D
Allow for finishes to access panel to ducts and shafts as shown on mechanical drawings
1
item
Statutory Signage's E
Allow for statutory signage's as per Local Authorities requirement and as per the drawings and specifications
item
1
To Collection
2,560.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT
MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM
ITEM DESCRIPTION
NO.
(PART 2)
UNIT QTY.
RATE (AED)
AMOUNT (AED)
P2/S1/B1/AES/1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ACCESSORIES AND SPECIAL CONSTRUCTION, Cont'd Sanitarywares & accessories Take, delivery, store and fixing, testing and providing guarantee for the following including incidental material, labour etc. complete as shown on drawings and as per specifications A
Wall hung water closet, BA-01
no.
3
138
414
B
Flush plate, BA-02
no.
3
C
Trigger spray, BA-03
no.
3
12
36
D
Concealed cistern, BA-04
no.
3
138
414
E
Semi-recessed wash basin, BA-05
no.
3
138
414
F
Wash basin mixer, BA-06
no.
3
57
171
G
Shower column, BA-07
no.
2
57
114
H
Shower mixer, BA-08
no.
2
12
24
J
Bathtub, BA-09
no.
1
253
253
K
Bathtub mixer, BA-10
no.
1
57
57
L
Floor mounted water closet, BA-11
no.
1
138
138
M
Trigger spray, BA-12
no.
1
12
12
N
Wall mounted wash basin, BA-13
no.
1
138
138
P
Wash basin mixer, BA-14
no.
1
57
57
Q
Shower, BA-15
no.
1
57
57
0 INCLUDED
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT
MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM
ITEM DESCRIPTION
NO.
(PART 2)
UNIT QTY.
RATE (AED)
To Collection
AMOUNT (AED) 2,299.00
P2/S1/B1/AES/2 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ACCESSORIES AND SPECIAL CONSTRUCTION, Cont'd Sanitarywares & accessories Take, delivery, store and fixing, testing and providing guarantee for the following including incidental material, labour etc. complete as shown on drawings and as per specifications, cont'd A
Shower mixer, BA-16
no.
1
57
57
B
Shower tray, BA-17
no.
1
23
23
C
Tissue paper holder with cover, BA-18
no.
4
12
48
D
Towel rail, BA-19
no.
2
12
24
E
Towel ring, BA-20
no.
4
12
48
F
Robe hook, BA-21
no.
4
12
48
G
Soap & shampoo tray, BA-22
no.
2
12
24
H
Kitchen sink
no.
1
138
138
Note: Supply of all Sanitary wares& accessories is a Provisional sum
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT
MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM
ITEM DESCRIPTION
NO.
(PART 2)
UNIT QTY.
RATE (AED)
To Collection P2/S1/B1/AES/3 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ACCESSORIES AND SPECIAL CONSTRUCTION, Cont'd Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included. A
AMOUNT (AED)
410.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT
MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM
ITEM DESCRIPTION
NO.
(PART 2)
UNIT QTY.
RATE (AED)
AMOUNT (AED)
To Collection P2/S1/B1/AES/4 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ACCESSORIES AND SPECIAL CONSTRUCTION, Cont'd
COLLECTION
Page P2/S1/B1/AES/1
2,560.00
Page P2/S1/B1/AES/2
2,299.00
Page P2/S1/B1/AES/3
410.00
Page P2/S1/B1/AES/4
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM NO.
ITEM DESCRIPTION
UNIT QTY.
Total for Accessories, Equipment, etc - Carried to Bill No. 1 Summary P2/S1/B1/AES/5
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
5,269
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS Include for the supply & complete installation as detailed in the Specifications and on the Drawings and to the complete satisfaction and approval of the Engineer and all concerned Statutory Authorities and under the following sections DRAINAGE INSTALLATIONS Pipe work of any kind (waste, soil, condensate, vent, rainwater) including fittings, rodding eyes, protection barriers, supports, accessories, etc., complete A
32 mm dia.
m
8
33.00
264.00
B
40 mm dia.
m
7
34.00
238.00
C
50 mm dia.
m
20
37.00
740.00
D
82 mm dia.
m
18
53.00
954.00
E
110 mm dia.
m
36
72.00
2,592.00
F
Connections to sanitary ware with pipes
item
1
847.00
847.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2) ITEM RATE AMOUNT ITEM DESCRIPTION UNIT QTY. (AED) (AED) NO. To Collection 5,635.00 P2/S1/B1/ME/1/PTC1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) DRAINAGE INSTALLATIONS, (cont'd.) Underground pipework including protection, fittings, protection barriers, supports, accessories, etc., complete A
82 mm dia.
m
11
92.00
1,012.00
B
110 mm dia.
m
52
111.00
5,772.00
B
160 mm dia.
m
2
144.00
288.00
C
Connection from FIC to Main network
item
1
1,650.00
1,650.00
The following including all fittings, fixings, accessories, cover frame, etc., complete D
Floor clean out, type FCO - 110 mm dia.
no.
4
145.00
580.00
E
Clean out, type CO - 110 mm dia.
no.
1
145.00
145.00
F
Floor drain, type FD - 82 mm dia.
no.
5
107.00
535.00
G
Balcony drain, type BD - 50 mm dia.
no.
2
449.00
898.00
H
Rain water outlet, type RWO
no.
1
539.00
539.00
J
Vent cowl
no.
2
55.00
110.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
To Collection
AMOUNT (AED)
11,529.00
P2/S1/B1/ME/2/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) DRAINAGE INSTALLATIONS, (cont'd.) Connection to GT, MH including valves, fixing, fittings, etc, complete A
Gully trap, type GT
no.
1
781.00
781.00
B
Manhole, type MH, size 600 x 600
no.
1
2,000.00
2,000.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
To Collection
AMOUNT (AED)
2,781.00
P2/S1/B1/ME/3 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) Generally for the complete Drainage installation A
Drawings, manuals, approvals & instruction books
item
included
B
Testing and commissioning
item
C
Training
item
D
Labels, special tools, etc.
item
E
Protective and decorative painting
item
included
F
Liaison and co-ordination with Local Authorities
item
included
G
All civil works related to Drainage works (e.g. Equipment base etc.)
item
1
-
included included
1
1
651.00
550.00
651.00
550.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
To Collection
AMOUNT (AED)
1,201.00
P2/S1/B1/ME/4 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) PLUMBING INSTALLATIONS Cold water pipe work including puddle flange, fittings, supports, accessories, etc., complete A
15 mm dia.
m
53
20.00
1,060.00
B
20 mm dia.
m
16
21.00
336.00
C
25 mm dia.
m
21
26.00
546.00
D
32 mm dia
m
38
33.00
1,254.00
E
Connection to dewa water meter
item
1
1,100.00
1,100.00
F
Connection to sanitary ware/ sinks including angle valves etc.
item
1
942.00
942.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
To Collection
AMOUNT (AED)
5,238.00
P2/S1/B1/ME/5/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) PLUMBING INSTALLATIONS, (cont'd.) Pexpipe work including fittings, conduit, supports, accessories, etc. complete A
15 mm dia. pipe
m
24
29.00
696.00
m
6
73.00
438.00
Underground Cold water pipe work including valves, fittings, supports, accessories, etc., complete B
32 mm dia pipe (from Main water meter chamber)
Hot water pipe work including fittings, supports, accessories, insulation etc., complete C
15 mm dia.
m
31
34.00
1,054.00
D
20 mm dia.
m
15
34.00
510.00
E
25 mm dia.
m
4
36.00
144.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. F Connection to sanitary ware/ sinks including angle valves, etc. item
MAIN WORKS (PART 2) RATE (AED)
To Collection
AMOUNT (AED) included
2,842.00
P2/S1/B1/ME/6/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)
Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) PLUMBING INSTALLATIONS, (cont'd.) Pexpipe work including fittings, supports, accessories, etc. complete A
15 mm dia. with 20 mm conduit
m
18
31.00
558.00
The following including all fittings, fixings, cover, valves frame accessories, etc., complete B
Bibtap -15 mm dia.
no.
1
112.00
112.00
C
Isolating valve, type IV - 15 mm dia.
no.
16
48.00
768.00
D
Isolating valve, type IV - 20 mm dia.
no.
1
59.00
59.00
E
Isolating valve, type IV - 25 mm dia.
no.
2
75.00
150.00
F
Isolating valve, type IV - 32 mm dia.
no.
1
96.00
96.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
G
Non return valve, type NRV - 15 mm dia.
no.
6
63.00
378.00
H
Non return valve, type NRV - 25 mm dia.
no.
1
90.00
90.00
To Collection
2,211.00
P2/S1/B1/ME/7 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) PLUMBING INSTALLATIONS, (cont'd.) The liaisoning, coordination with DEWA, collection and storage will be done by the Contractor. A
Fixing of main water meter including incidental labour & material
no.
1
B
Supply and installation of main water meter cabinet including all fittings, fixtures, accessories etc. complete
no.
1
Note: The cost of only supply of meters will be paid by the Employer, The liaisoning, coordination with DEWA, collection and storage will be done by the Contractor.
GRP water tank and connection with fittings, float valves, vent pipes, accessories, valves, supports, warning pipes, ladders, partition low and high level float switches, etc., complete
1,155.00
1,155.00
included
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. C
Overhead insulated GRP panel water tank, size 1000 x 1000 x 1000 mm (Capacity = 1 cum.)
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
set
1
3,157.00
3,157.00
item
1
662.00
662.00
Connections only including incidental labour and material D
Connection to GRP water tanks including inlet, outlet, drainage, backwash line, overflow pipe, etc., complete
To Collection
4,974.00
P2/S1/B1/ME/8 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) PLUMBING INSTALLATIONS, (cont'd.) Pump set including all controls, wiring, valves, piping, accessories, vibration isolators, etc., complete A
B
C
D
Circulation pump set(cwcp-1) (1-duty/1-stand by) 0.2 l/s @ 0.5 bar, 0.4 kw each
set
1
5,896.00
5,896.00
Water heat pump cooling capacity= 9.3 kw/hr. electrical load= 4.5 kw.
set
1
8,316.00
8,316.00
Cooled cold water boosting pump set (bp-01) 1-duty/1-standby 0.8 l/s @1.80 bar, 0.5 kw. Each + pressure vessel
set
1
12,496.00
12,496.00
Circulating pump (hwcp-01) (1-duty/1-stand by) 0.6 l/s@ 1.75 bar, 0.5 kw each
set
1
5,896.00
5,896.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
6,600.00
6,600.00
Solar system including solar panels, pumps, wiring, pipework, connections, valves, fittings, fixtures, controls, control panels, isolators, accessories etc. complete E
Solar panel thermosiphone system with electrical back up of 2.0 kw tank capacity=200 ltr
no.
1
To Collection
39,204.00
P2/S1/B1/ME/9/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) PLUMBING INSTALLATIONS, (cont'd.) Generally for the complete Plumbing installation A
Drawings, manuals, approvals & instruction books
item
included
B
Testing and commissioning
item
C
Training
item
D
Labels, special tools, etc.
item
E
Protective and decorative painting
item
included
F
Liaison and co-ordination with Local Authorities
item
included
1
1,492.00
1,492.00 included
1
994.00
994.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. G
All civil works related to Plumbing works (e.g. Equipment base etc.) item
MAIN WORKS (PART 2) RATE (AED)
1
550.00
To Collection
AMOUNT (AED) 550.00
3,036.00
P2/S1/B1/ME/10 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) FIRE FIGHTING INSTALLATIONS The following items including accessories, supports, etc. complete A
6 kg dcp extinguisher -kitemark/lpcb approved
no.
1
Deleted
B
2 kg co2 extinguisher -kitemark/lpcb approved
no.
1
Deleted
B1
2.5 kg multipurpose dcp -kitemark/lpcb approved
no.
1
154.00
154.00
C
1200 x 1200 mm Fire blanket
no.
1
132.00
132.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
To Collection
AMOUNT (AED)
286.00
P2/S1/B1/ME/11 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) FIRE FIGHTING INSTALLATIONS, (cont'd.) Generally for the complete Fire fighting installation A
Drawings, manuals, approvals & instruction books
item
included
B
Testing and commissioning
item
included
C
Training
item
included
D
Labels, special tools, etc.
item
included
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
E
Protective and decorative painting
item
included
F
Liaison and co-ordination with Local Authorities
item
included
G
All civil works related to Fire fighting works (e.g. Equipment base etc.)
item
included
To Collection
-
P2/S1/B1/ME/12 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) AIR-CONDITIONING INSTALLATIONS Fan coil units including controls, control valves, sensors, filters, wiring, fixing, accessories, vibration isolators, etc., complete, (cont'd.) A
FCU-GF-01 / CU-GF-01
no.
1
6,061.00
6,061.00
B
FCU-GF-02 / CU-GF-02
no.
1
3,166.00
3,166.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. C FCU-GF-03 / CU-GF-03 no. 1
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED) Omitted
D
FCU-1F-01 / CU-1F-01
no.
1
3,166.00
3,166.00
E
FCU-1F-02 / CU-1F-02
no.
1
5,751.00
5,751.00
m
90
45.00
4,050.00
no.
5
605.00
3,025.00
Refrigeration pipe work including insulation, supports, accessories, fixing, refrigerant metering etc. complete as specified F
Refrigeration pipe (all size)
The following items including accessories, supports, etc., complete G
Thermostat
To Collection
25,219.00
P2/S1/B1/ME/13 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) AIR-CONDITIONING INSTALLATIONS, (cont'd.) Grilles, diffusers, dampers, louvers including all accessories A
Supply air grille, type SAG - 750 x 150 mm
no.
1
174.00
174.00
B
Supply air grille, type SAG - 600 x 150 mm
no.
2
135.00
270.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. C Return air grille, type RAG - 750 x 150 mm no. 1 D
Return air grille, type RAG - 600 x 150 mm
MAIN WORKS (PART 2) RATE (AED) 123.00
AMOUNT (AED) 123.00
no.
1
100.00
100.00
Supply air diffuser E
SD 150 x 150 mm
no.
1
97.00
97.00
F
SD 225 x 225 mm
no.
3
120.00
360.00
G
SD 300 x 300 mm
no.
1
156.00
156.00
Return air diffuser H
RD 150x150 mm
no.
1
79.00
79.00
J
RD 225x225 mm
no.
3
95.00
285.00
K
RD 300 x 300 mm
no.
1
114.00
114.00
Extract square diffuser L
ED-1, 150 x 150 mm, 15 L/s air flow rate
no.
4
79.00
316.00
M
ED-3, 150 x 150 mm, 10 L/s air flow rate
no.
1
79.00
79.00
N
ED-4, 225 x 225 mm, 50 L/s air flow rate
no.
1
95.00
95.00
To Collection
2,248.00
P2/S1/B1/ME/14/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) AIR-CONDITIONING INSTALLATIONS, (cont'd.) Grilles, diffusers, dampers, louvers including all accessories, (cont'd.) A
Fresh air louver 0.1 m2
no.
1
188.00
188.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
B
Extract air louver 0.1 m2
no.
1
188.00
188.00
C
Volume control dampers , VCD
no.
7
193.00
1,351.00
D
Dampers (all types and size)
item
1
793.00
793.00
E
Flexible connections (all sizes)
item
1
977.00
977.00
To Collection P2/S1/B1/ME/15/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) AIR-CONDITIONING INSTALLATIONS, (cont'd.) The following including acoustic lining, joints, supports, sensors,
3,497.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. mesh, access cover, plenum, flexible etc., complete
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
A
Air conditioning ductwork
m2
34
140.00
4,760.00
B
Fresh air ductwork
m2
15
140.00
2,100.00
C
General extract air ductwork
m2
3
140.00
420.00
D
Staircase pressurization ductwork
item
E
Insulation to ductwork as specified / required
item
1
3,089.00
3,089.00
F
Aluminium cladding to ductwork, externally
item
1
1,815.00
1,815.00
deleted
To Collection P2/S1/B1/ME/16/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) AIR-CONDITIONING INSTALLATIONS, (cont'd.)
12,184.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
Generally for the complete Air-conditioning installations A
Drawings, manuals, approvals & instruction books
item
included
B
Testing and commissioning
item
C
Training
item
D
Labels, special tools, etc.
item
E
Protective and decorative painting
item
included
F
Liaison and co-ordination with Local Authorities
item
included
G
All civil works related to HVAC works (e.g. Equipment base etc.)
item
1
1,440.00
included 1
1
To Collection P2/S1/B1/ME/17 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.)
1,440.00
779.00
550.00
779.00
550.00
2,769.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
LPG INSTALLATIONS LPG gas pipe work including fittings, supports, accessories, protection, leak detectors etc., complete A
1/2" gas pipe (with pipe in pipe)
B
Connection to main pipe
m
7
item
1
included 12,485.00
12,485.00
Note:LPG tank and all other fittings are included in Adjustment Bills
To Collection P2/S1/B1/ME/18 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)
12,485.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.)
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
LPG INSTALLATIONS., (cont'd.) The following including all accessories, fittings, controls, valves, fire proof wiring , etc complete A
Gas Meter
no.
1
included
B
Gas leak detector
no.
1
included
C
Emergency on/off switch
no.
1
included
D
Quick close valve
no.
1
included
E
Solenoid valve
no.
1
included
F
Pressure regulator
no.
1
included
G
Hose pipe 6mm dia
no.
1
included
To Collection P2/S1/B1/ME/19/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)
-
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D)
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
Include for the supply & complete installation as detailed in the Specifications and on the ….etc., (cont'd.) LPG SYSTEM INSTALLATIONS, (Cont'd.) Generally for the complete LPG installations A
Drawings, manuals, approvals & instruction books
item
included
B
Testing and commissioning
item
included
C
Training
item
included
D
Labels, special tools, etc.
item
included
E
Protective and decorative painting
item
included
F
Liaison and co-ordination with Local Authorities
item
included
G
All civil works related to LPG works (e.g. Equipment base etc.)
item
included
To Collection P2/S1/B1/ME/20 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)
-
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
4,690.00
4,690.00
MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included in his o1Fer. VENTILATOR
no.
1
To Collection P2/S1/B1/ME/21
4,690.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D)
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) COLLECTION Page P2/S1/B1/ME/1 Page P2/S1/B1/ME/2/R1
5,635.00 11,529.00
Page P2/S1/B1/ME/3
2,781.00
Page P2/S1/B1/ME/4
1,201.00
Page P2/S1/B1/ME/5/R1
5,238.00
Page P2/S1/B1/ME/6/R1
2,842.00
Page P2/S1/B1/ME/7
2,211.00
Page P2/S1/B1/ME/8
4,974.00
Page P2/S1/B1/ME/9/R1
39,204.00
Page P2/S1/B1/ME/10
3,036.00
Page P2/S1/B1/ME/11
286.00
Page P2/S1/B1/ME/12 Page P2/S1/B1/ME/13
25,219.00
Page P2/S1/B1/ME/14/R1
2,248.00
Page P2/S1/B1/ME/15/R1
3,497.00
Page P2/S1/B1/ME/16/R1
12,184.00
Carried Forward
122,085.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. P2/S1/B1/ME/22/R1
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) MECHANICAL ENGINEERING INSTALLATIONS, (CONT'D) COLLECTION, (cont'd.) Brought Forward
122,085.00
Page P2/S1/B1/ME/17
2,769.00
Page P2/S1/B1/ME/18
12,485.00
Page P2/S1/B1/ME/19/R1
-
Page P2/S1/B1/ME/20
-
Page P2/S1/B1/ME/21
4,690.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. Total for Mechanical Engg. Installations - Carried to Bill No. 1 Summary P2/S1/B1/ME/23/R1
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED) 142,029.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS Include for the complete supply & installation as detailed in the Specifications and on the Drawings and to the complete satisfaction and approval of the Engineer and all concerned Statutory Authorities and under the following sections LIGHTING AND POWER Distribution boards including MCCB's, breakers, terminations, isolators, supports, accessories, etc., complete A
DB - GR
no.
1
2,368
2,368.00
B
DB - FR
no.
1
2,576
2,576.00
Control panel including MCCB's, ELCB's, Starter, VFD's, breakers, terminations, supports, accessories, etc., complete C
CP- Cooled water boosting pump
no.
1
INCLUDED
D
CP-Circulating pump
no.
2
INCLUDED
E
CP-Ventilator
no.
1
1,571
1,571.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT MAIN WORKS ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E (PART 2) ITEM RATE AMOUNT ITEM DESCRIPTION UNIT QTY. (AED) (AED) NO. To Collection 6,515.00 P2/S1/B1/EE/1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) LIGHTING AND POWER, (Cont'd.) Isolator panel including isolator, bus bar, enclosure terminations, supports etc., complete A
20A SP isolator W/P
no.
4
183
732.00
B
20A TP isolator W/P
no.
1
191
191.00
C
32A TP isolator W/P
no.
1
192
192.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
To Collection
AMOUNT (AED)
1,115.00
P2/S1/B1/EE/2 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) LIGHTING AND POWER, (Cont'd.) Cabling works including, accessories, support, termination glanding, surge protection, cable tie, etc. complete A
4C 35mm2 XLPE/SWA/PVC + 1C 16mm2 ECC
m
10
69
B
From DB's to Isolators and equipments
690.00
item
1
3,106
B1 From meter to DB-GR, 1x100mm dia. uPVC duct
item
1
186
186.00
B2 From meter to DB-FR, 1x75mm dia. uPVC duct
item
1
296
296.00
C
Glanding & termination works for DEWA incoming cable
item
1
225
225.00
D
Control cables as required
item
1
674
674.00
3,106.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
To Collection
AMOUNT (AED)
5,177.00
P2/S1/B1/EE/3/R4 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) LIGHTING AND POWER, (Cont'd.) The following including fittings, fixing accessories, etc. as per DEWA regulations and requirement with all associated costs complete A
kWH meter
no.
1
3,079
item
1
186
3,079.00
Note: The cost of only supply of meters will be paid by the Employer, The liaisoning, coordination with DEWA, collection and storage will be done by the contractor.
Miscellaneous item B
uPVC underground sleeves
186.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
To Collection
AMOUNT (AED)
3,265.00
P2/S1/B1/EE/4/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) LIGHTING AND POWER, (Cont'd.) Wiring including trunking and conduits in final sub circuits to light fittings : A
Circular downlight-1, Type DL1
no.
7
113
791.00
B
Circular downlight-2, Type DL2
no.
15
113
1,695.00
C
Spot light, Type SL
no.
7
113
791.00
D
Pendent light, Type PL1
no.
2
113
226.00
E
Pendent light, Type PL2
no.
2
113
226.00
F
Pendent light, Type PL3
no.
1
113
113.00
G
1 x 30 W, led lamp with die-cast aluminum body and glass diffuser ip65, Type W1 no.
3
113
339.00
1 x 18 W led surface mounted lighting fixture with die-cast aluminum body and glass diffuser to ip65 (decorative type), Type W2
no.
5
113
565.00
1 x 18 W led lamp recessed down light fixture to architect approval ip44, Type D1
no.
1
113
113.00
H
J
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
To Collection
AMOUNT (AED)
4,859.00
P2/S1/B1/EE/5 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) LIGHTING AND POWER, (Cont'd.) Wiring including trunking and conduits in final sub circuits to wiring accessories A
One gang one way switch
no.
8
94
752.00
B
One gang two way switch
no.
10
94
940.00
C
Two gang one way switch
no.
3
94
282.00
D
Two gang two way switch
no.
1
94
94.00
E
Three gang one way switch
no.
2
94
188.00
F
Bell Push button
no.
1
94
94.00
G
Bell
no.
1
94
94.00
H
Intermediate switch
no.
1
94
94.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
To Collection
AMOUNT (AED)
2,538.00
P2/S1/B1/EE/6/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.)
Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) LIGHTING AND POWER, (Cont'd.) Wiring including trunking and conduits in final sub circuits to following wiring accessories / Equipment A
13A 230v 50 hz 2 pole & earth bs 1363 switch socket outlet
no.
18
138
2,484.00
B
2 gang 13A 230v 50 hz 2 pole & earth bs 1363 switch socket outlet
no.
5
138
690.00
C
13A, spur outlet, switched
no.
6
138
828.00
D
Flex outlet
no.
4
138
552.00
E
weather proof tp+n isolator to ip-65
no.
2
138
276.00
F
weather proof sp isolator to ip-65
no.
1
138
138.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
To Collection
AMOUNT (AED)
4,968.00
P2/S1/B1/EE/7 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) LIGHTING AND POWER, (Cont'd.) Take delivery, store and fix only the following light fittings and accessories including any incidental materials, labour, coordination with the supplier, etc. complete A
Circular downlight-1, Type DL1
no.
7
31
217.00
B
Circular downlight-2, Type DL2
no.
15
31
465.00
C
Spot light, Type SL
no.
7
31
217.00
D
Pendent light, Type PL1
no.
2
31
62.00
E
Pendent light, Type PL2
no.
2
31
62.00
F
Pendent light, Type PL3
no.
1
31
31.00
G
1 x 30 W, led lamp with die-cast aluminum body and glass diffuser ip65, Type W1 no.
3
31
93.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. H
J
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
1 x 18 W led surface mounted lighting fixture with die-cast aluminum body and glass diffuser to ip65 (decorative type), Type W2
no.
5
31
155.00
1 x 18 W led lamp recessed down light fixture to architect approval ip44, Type D1
no.
1
31
31.00
Note: Supply of all Light fittings is a Provisional Sum.
To Collection
1,333.00
P2/S1/B1/EE/8 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) LIGHTING AND POWER, (Cont'd.) Equipment and accessories including trays, terminations, supports, fittings, complete (P.C. rate for supply only of switches is Dhs. 20/- per no.) A
One gang one way switch
no.
8
38
304.00
B
One gang two way switch
no.
10
38
380.00
C
Two gang one way switch
no.
3
38
114.00
D
Two gang two way switch
no.
1
38
38.00
E
Three gang one way switch
no.
2
38
76.00
F
Bell Push button
no.
1
38
38.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. G Bell no. 1 H
Intermediate switch
no.
MAIN WORKS (PART 2) RATE (AED) 115
1
38
To Collection
AMOUNT (AED) 115.00 38.00
1,103.00
P2/S1/B1/EE/9/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) LIGHTING AND POWER, (Cont'd.) Equipment and accessories including trays, terminations, supports, fittings, complete, cont'd A
13A 230v 50 hz 2 pole & earth bs 1363 switch socket outlet
no.
18
35
630.00
B
2 gang 13A 230v 50 hz 2 pole & earth bs 1363 switch socket outlet
no.
5
55
275.00
C
13A, spur outlet, switched
no.
6
51
306.00
D
Flex outlet
no.
4
106
424.00
E
weather proof tp+n isolator to ip-65
no.
2
192
384.00
F
weather proof sp isolator to ip-65
no.
1
191
191.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
To Collection
AMOUNT (AED)
2,210.00
P2/S1/B1/EE/10 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) TELEPHONE SYSTEM Tray and trunking, accessories, supports and conduits in final sub-circuits to following as per "Etisalat / Du Design Guidelines for 'Fiber to Home' requirement in New Building" A
12u cabinet
no.
1
86
86.00
B
RJ-45 telephone outlet
no.
7
86
602.00
C
RJ-45 dual / telephone outlet
no.
4
86
344.00
uPVC ducts laid and jointed in trenches including warning tape,
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. marker tape, draw ropes, end caps etc. complete D
2 x 50 mm uPVC duct for Authority incoming line
item
MAIN WORKS (PART 2) RATE (AED)
1
213
To Collection
AMOUNT (AED)
213.00
1,245.00
P2/S1/B1/EE/11 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) TELEPHONE SYSTEM, (cont'd.) Equipment and accessories including cabling, terminations, supports etc., complete as per "Etisalat / Du Design Guidelines for Fiber to Home' requirement in New Building" A
12u cabinet
no.
1
3,341
3,341.00
B
RJ-45 telephone outlet
no.
7
232
1,624.00
C
RJ-45 dual / telephone outlet
no.
4
251
1,004.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
EARTHING SYSTEM The following including all cables, earth rods, pits, cover down conductor, air terminals, test link, cad welding, accessories, earth bar etc., complete D
Earth pits
item
1
3,937
3,937.00
E
25 x 3 mm bare copper tape
item
1
Included
F
Bonding points
item
1
Included
G
Earthing system for telephone system
item
1
Included
To Collection
9,906.00
P2/S1/B1/EE/12/R1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) FIRE ALARM SYSTEM Fire proof cable with tray, trunking, conduits accessories complete with supports including communications cable etc. in final sub-circuit A
Main fire alarm control panel, FACP
no.
1
550
550.00
B
Speacker with flasher W/P
no.
1
186
186.00
C
Addressable smoke detector with built in isolator base
no.
3
118
354.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
D
Addressable smoke detector with sounder
no.
4
118
472.00
E
Addressable combination detector with sounder
no.
1
118
118.00
F
Power point for fire alarm control
no.
1
deleted
To Collection
1,680.00
P2/S1/B1/EE/13/R4 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) FIRE ALARM SYSTEM, (Cont'd.) Equipment and accessories including terminations, supports, etc. complete A
Main fire alarm control panel, FACP
no.
1
5,789
B
Speacker with flasher W/P
no.
1
542
5,789.00 542.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
C
Addressable smoke detector with built in isolator base
no.
3
477
1,431.00
D
Addressable smoke detector with sounder
no.
4
828
3,312.00
E
Addressable combination detector with sounder
no.
1
377
377.00
F
Power point for fire alarm control
no.
1
To Collection P2/S1/B1/EE/14/R4 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) SMATV SYSTEM (CONTAINMENT ONLY) Following including containment tray, trunking, junction box and conduits complete with accessories, supports in final sub-circuits to A
SMATV outlet
no.
3
deleted
11,451.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. B
IP65 PVC box for conduit termination
no.
1
C
Metal cabinet flush mounted with 1 no. 13A socket
no.
1
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED) 855.00
To Collection
855.00
P2/S1/B1/EE/15/R4 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Include for the complete supply & installation as detailed in the Specifications and on the Drawings ….etc., (Cont'd.) Generally for the complete Electrical installations A
Drawings, manuals, approvals & instruction books
item
1
1,347
1,347.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. B Testing and commissioning item
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED) Included
C
Training
item
Included
D
Labels, special tools, etc.
item
Included
E
Protective and decorative painting
item
Included
F
Liaison and co-ordination with Local Authorities
item
Included
To Collection P2/S1/B1/EE/16 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and
1,347.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO. satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
A
To Collection
-
P2/S1/B1/EE/17 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) ELECTRICAL ENGINEERING INSTALLATIONS, (Cont'd.) COLLECTION Page P2/S1/B1/EE/1
6,515.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM ITEM DESCRIPTION UNIT QTY. NO.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
Page P2/S1/B1/EE/2
1,115.00
Page P2/S1/B1/EE/3/R4
5,177.00
Page P2/S1/B1/EE/4/R1
3,265.00
Page P2/S1/B1/EE/5
4,859.00
Page P2/S1/B1/EE/6/R1
2,538.00
Page P2/S1/B1/EE/7
4,968.00
Page P2/S1/B1/EE/8
1,333.00
Page P2/S1/B1/EE/9/R1
1,103.00
Page P2/S1/B1/EE/10
2,210.00
Page P2/S1/B1/EE/11
1,245.00
Page P2/S1/B1/EE/12/R1
9,906.00
Page P2/S1/B1/EE/13/R4
1,680.00
Page P2/S1/B1/EE/14/R4
11,451.00
Page P2/S1/B1/EE/15/R4
855.00
Page P2/S1/B1/EE/16 Page P2/S1/B1/EE/17
Total for Electrical Engg. installations - Carried to Bill No. 1 Summary P2/S1/B1/EE/18/R4
1,347.00 -
59,567.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT
MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM
ITEM DESCRIPTION
(PART 2)
UNIT QTY.
NO.
RATE (AED)
AMOUNT (AED)
SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) EXTERNAL WORKS Site clearance A
Site clearance including removal of rubbish, vegetation, undergrowth, bushes, trees, existing tiling, curbs, etc. complete
item
1
115
115
item
1
1150
1150
Earthworks B
Cut / fill to required levels including use of imported fill and compacting in layers as per drawings, specifications and as directed by the Engineer
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT
MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM
ITEM DESCRIPTION
(PART 2)
UNIT QTY.
NO.
RATE (AED)
To Collection
AMOUNT (AED) 1,265.00
P2/S1/B1/EW/1 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) EXTERNAL WORKS, Cont'd Pavements to pattern and colour including subgrade, sub-base, sand filling, etc. complete A
Hard landscaping (rear side entrance)
m2
11
83
913
B
Hard landscaping (Parking area)
m2
28
99
2772
C
Hard landscaping (front side entrance)
m2
15
83
1245
Boundary wall Following including but not limited to all earth works, civil works, blockwork, jointed and pointed in cement including all air gaps, crack control joints, anchors, dowel bars, metal laths, joints, wall ties, stiffener beams and columns, reinforcement, waterproofing, expansion joints, plaster, finishes, special features, fittings, accessories, MEP etc., complete as per drawings and specifications D
200 mm wide 2100 mm high boundary wall
m
11
862
9482
E
300 mm wide 2100 mm high boundary wall
m
6
977
5862
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT
MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM
ITEM DESCRIPTION
(PART 2)
UNIT QTY.
NO.
RATE (AED)
To Collection P2/S1/B1/EW/2 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) EXTERNAL WORKS, Cont'd Generally The Contractor shall list and price below, the items and quantities of addition or deduction for any Bill of Quantity Item(s) and or any omitted items that in his opinion are necessary for the full and satisfactory completion of the work as described in the Specifications or shown on the Drawings and for which either expressed or implied provision is required and which are not covered by the items or the rates in the Bill of Quantities. Any such items not listed below shall be deemed to be included. A
AMOUNT (AED)
20,274.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT
MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM
ITEM DESCRIPTION
(PART 2)
UNIT QTY.
NO.
RATE (AED)
AMOUNT (AED)
To Collection P2/S1/B1/EW/3 SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D) EXTERNAL WORKS, Cont'd
COLLECTION
Page P2/S1/B1/EW1
1,265.00
Page P2/S1/B1/EW2
20,274.00
Page P2/S1/B1/EW3
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM
ITEM DESCRIPTION
NO.
Total for External Works - Carried to Bill No. 1 Summary P2/S1/B1/EW/4
UNIT QTY.
MAIN WORKS (PART 2) RATE (AED)
AMOUNT (AED)
21,539
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT
MAIN WORKS
ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM DESCRIPTION
Page No.
(PART 2) AMOUNT (AED)
SECTION. 1 - RESIDENTIAL TOWNHOUSE (BLOCK-R1), (CONT'D) BILL NO. 1 - TOWN HOUSE INNER UNIT (CONT'D)
SUMMARY
P2/S1/B1/SW/1 - P2/S1/B1/SW/4/PTC1
10,423.00
P2/S1/B1/CW/1/PTC1 - P2/S1/B1/CW/6/R1/PTC1
105,561.00
MASONRY
P2/S1/B1/MA/1/PTC1 - P2/S1/B1/MA/4/PTC1
33,249.00
METAL WORK
P2/S1/B1/MW/1/PTC1 - P2/S1/B1/MW/3/PTC1
6,216.00
P2/S1/B1/AG/1/PTC1 - P2/S1/B1/AG/4/PTC1
45,672.00
P2/S1/B1/CJ/1 - P2/S1/B1/CJ/3/R1
1,037.00
P2/S1/B1/FIN/1/R1 - P2/S1/B1/FIN/6/PTC1
95,443.00
P2/S1/B1/TM/1/PTC1 - P2/S1/B1/TM/5/R1/PTC1
21,412.00
SITE WORKS CONCRETE WORKS
ALUMINIUM AND GLAZING WORKS CARPENTRY & JOINERY WORKS INTERNAL AND EXTERNAL FINISHES THERMAL AND MOISTURE PROTECTION
ACCESSORIES AND SPECIAL CONSTRUCTION
P2/S1/B1/AES/1 - P2/S1/B1/AES/5
MECHANICAL ENGINEERING INSTALLATIONSP2/S1/B1/ME/1/PTC1 - P2/S1/B1/ME/23/R1 ELECTRICAL ENGINEERING INSTALLATIONS EXTERNAL WORKS
5,269.00 142,029.00
P2/S1/B1/EE/1 - P2/S1/B1/EE/18/R4
59,567.00
P2/S1/B1/EW/1 - P2/S1/B1/EW/4
21,539.00
GHOROOB MIRDIF INTERNAL AND EXTERNAL PLOTS DEVELOPMENT ON PLOT NO. 2514756 AND PLOT MIF-01-002, MIRDIF, DUBAI, U.A.E ITEM DESCRIPTION Total for Bill No. 1 - Carried to General Summary
Page No.
MAIN WORKS (PART 2) AMOUNT (AED) 547,417.00
`
DRY COST SPLITTED AMOUNTS
LABOUR
MATERIA L
PLANT
1,854.95
2,686.13
2,347.55
CONCRET WORKS
###
###
1,053.57
MASONRY
###
###
558.20
ITEM
SITE WORKS
METAL WORK
-
-
-
ALUMINIUM AND GLAZING WORKS
-
-
-
CARPENTRY & JOINERY WORKS
-
-
-
FINISHES
###
###
71.46
THERMAL AND MOISTURE PROTECTION
-
-
-
ACCESSORIES AND SPECIAL CONSTRUCTION
-
-
-
EXTERNAL WORKS
TOTALS
690.12
3,598.08
-
NO OF VILLAS
LABOUR
MATERIAL
PLANT
SUBCONTRACT
1,737.00
39
72,343
104,759
91,554
67,743
5,730.00
39
764,690
2,541,537
41,089
223,470
500.00
39
402,480
668,475
21,770
19,500
5,400.00
39
0
0
0
210,600
41,250.00
39
0
0
0
1,608,750
915.00
39
0
0
0
35,685
27,984.00
39
1,136,386
1,307,240
2,787
1,091,376
26,022.00
39
0
0
0
1,014,858
4,515.00
39
0
0
0
176,085
14,450.00
39
26,915
140,325
0
563,550
2,402,814
4,762,335
157,201
5,011,617
SUBCONTRACT
TOTAL DRY COST