INTERIM REPORT-PENDING ATTESTATION BY CUSTOMER'S INSPECTION AGENCY

SC

ULTRASONIC TEST REPORT HYDERABAD INDENT NO: HYQC/6021/3615/17/041

DRAWING NO:

WORK ORDER NO:

PART NO: 16235100

1032327400

MATERIAL: SA516-70 NAME OF PART: PROJECT:

UT/534/03/2017 09-03-18

TIME:

9.30

SHELL SEGMENT-04

CUSTOMER:

18 TANGEDCO

Applicable STD ASME SEC V

WELDER NO: 158,,,

Acceptance STD: HY0850169

WELD METHOD: SMAW,,,

SURFACE CONDITION:

GROUND

TO: 11.30

31623500005

THICKNESS in (mm):

TANGEDCO

NDT

REPORT NO: DATE:

WELD TYPE:

BRAND NAME OF COUPLANT:

"V " JOINT,,,

SERVO WAY 68

EQUIPMENT:

MODSONIC

EQUIP SERIAL NO: 14190208

LAST CALIBRATION DATE:

FREQUENCY:

4

PROBE ANGLE: 70

PROBE TYPE&SNO:

PROBE SIZE: DIA10& 8X9MM

PROBE INDEX: 12DIV

BEAM DIVERGENCE: ---

WAVE MODE: LONG&SHEAR

SCANNING METHOD: CONTACT

CABLE USED & TYPE &LENGTH: LEMO- 2MTRS

MHZ

CALIBRATION BLOCK IDENTIFICATION:

AS PER SPEC

IDENTITY/LOCATION OF WELD/VOLUME SCANNED:

PARENT MATL SCANNING:

02467 L3A

START

PROBE DESCRI PTION

YES

INTERNAL

CALIBRATION(D.A.C)

TIME

TR&ANGLE

SURFACE FROM WHICH EXAMINATION CONDUCTED:

20MM BLOCK ( 2.5MM SDH

INSPECTION AGENCY:

25-SEP-17

CALIBRATION(SWEEP RANGE) PERCENTAGE

GAIN SETTING (DB)

1/4T

1/2T

dB ADDED FOR 3/4T TRANSFER

dB ADDED FOR SCANNING

SCAN SENSI TIVITY

POSITION

1/4T

1/2T

3/4T

FULL

ETRM-4L

68

60

80

40

---

6

74

2

4

6

8

FINISH ETRM-4L

68

60

80

40

---

---

68

2

4

6

8

START

MBW-70

59

80

40

20

---

6

65

2

4

6

8

FINISH MBW-70

59

80

40

20

---

---

59

2

4

6

8

EXAMINATION RESULTS/MAP OR RECORD OF INDIC 02467 L3A- UT CARRIED OUT AND FOUND ACCEPTABLE. NO RECORDABLE INDICATION

Y

OPERATOR'S NAME:

SEE ENCLOSED INDICATION RECORD

ACCEPTED

APPROVED BY (BHEL NDT):

Y

DEFECT NOTICED

WITNESSED BY

G RAJU CUSTOMER/THIRD PARTY/AI LEVEL: DATE OF EXAMINATION:

II

09-MAR-18

LEVEL: III

DATE:09-MAR-18

INSP-0160 REV 06