SHIMIZU PHILLIPINE CONTRACTORS, INC.

ENGINEERING DEPARTMENT

PRODUCTIVITY OUTPUT MONITORING

Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD)

I. Site Works

Productivity Rate as per Norms

Actual (Max)

Excavation Works

• Manual Excavation

cu.m / MD

• Mechanical Excavation

cu.m / MD

2.80

160.000

1- Excavator (using 0.8 cu.m bucket) 1- Equipment Operator (Bulk Excavation)

Page 1 of 123

80.00







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD)

Backfilling (Compacted)

cu.m / MD

200.000

1- Dozer 1- Roller Compactor 1- Water Tanker 3 - Equipment Operator 1 - Common Labor / Helper (Bulk Backfilling and Compaction)

Soil Poisoning (2 Application)

sq.m / MD

200.000

1- Applicator

20.00

External Paving

sq.m / MD

30.000

1- Tile Mason 1 - Common Labor / Helper

5.33

l.m / MD

70.000

1- Tile Mason 1 - Common Labor / Helper

6.67

Pre- Cast Concrete Kerb

315.00

II. Civil Structural Works

Piling Works

Piles / Day

10.00

Rebar Fabrication

kg. / MD

687.38

Rebar Installation

kg. / MD

267.00

sq.m / MD

9.00

Formwoks Installation

Page 2 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD)

Formworks Stripping

sq.m / MD

13.00

Hollow Core Installation

sq.m / MD

18.00

Speed Deck

sq.m / MD

22.83

• Lean Concrete

cu.m / MD

5.33

• Foundation

cu.m / MD

6.67

• Water Tank

cu.m / MD

2.96

• Column

cu.m / MD

2.76

• Slab & Stair

cu.m / MD

8.60

Duct Tube Fabrication for PC

pcs. /MH

1.83

PC Column Installation

pcs. / MD

0.81

Concreting Works

Page 3 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD)

PC Beam / Girder Installation

pcs. / MD

0.50

Steel Structure

pcs. / MD

0.51

Secondary Ceiling Works

kg. / MD

194.06

• Wire Mesh

sq.m / MD

30.00

• Roof Conncetor

PCS. / MD

17.00

• Aluminum Foil / Fiber Glass

sq.m / MD

30.00

• Roof Installation

sq.m / MD

24.00

• Wire Mesh / Aluminum / Fiber Glass

sq.m / MD

5.00

• Metal Sidings Installation

sq.m / MD

5.00

Roofing Works

Metal Sidings

Page 4 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD)

Waterproofing

1st Layer

sq.m / MD

88.86

2nd Layer

sq.m / MD

41.11

3rd Layer

sq.m / MD

26.25

4th Layer

sq.m / MD

12.38

III. Architectural Works

CHB Works

sq.m / MD

9.000

1- Block Mason 1 - Common Labor / Helper

8.00

Plastering Works

sq.m / MD

20.000

2- Plasterer 1 - Common Labor / Helper

10.28

Skim Coat

sq.m / MD

53.600

1- Painter 1 - Common Labor / Helper

12.00

Drywall Works (General)

sq.m / MD

29.100

1- Finish Carpenter 1 - Common Labor / Helper

3.50

48.000

1- Painter 1 - Common Labor / Helper (as per Planning Planet)

13.55

Painting Works (General)

sq.m / MD

Page 5 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description Ceiling Works (General)

Unit / Man-day (MD) sq.m / MD

8.30

Suspended Gypsum Board Monolithic System

sq.m / MD

13.000

2- Finish Carpenter 2 - Common Labor / Helper

Suspended Gypsum Board Monolithic System Curved

sq.m / MD

4.000

2- Finish Carpenter 2 - Common Labor / Helper

Suspended Demountable Metal Ceiling System

sq.m / MD

20.000

2- Finish Carpenter 2 - Common Labor / Helper

Aluminum Strip Ceiling System

sq.m / MD

10.000

2- Finish Carpenter 2 - Common Labor / Helper

Suspended Acoustic Fibre Board Tile Ceiling System

sq.m / MD

20.000

2- Finish Carpenter 2 - Common Labor / Helper

Ceiling Suspension System - ONLY

sq.m / MD

12.000

1- Finish Carpenter 1 - Common Labor / Helper

Ceiling Gypsum Board Installation - ONLY

sq.m / MD

15.000

1- Finish Carpenter 1 - Common Labor / Helper

Ceiling Metal/Acoustic Installation - ONLY

sq.m / MD

60.000

1- Finish Carpenter 1 - Common Labor / Helper

Ceiling Suspension System - ONLY

sq.m / MD

12.000

1- Finish Carpenter 1 - Common Labor / Helper

Floor Finishing (General)

sq.m / MD

16.50

Page 6 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD)

Ceramic Floor TILES

sq.m / MD

8.000

2- Tile Setter 1 - Common Labor / Helper

Ceramic Wall Tiles

sq.m / MD

10.000

2- Tile Setter 1 - Common Labor / Helper

Stone Wall Finish ( Marble/Granite by Mech. Fixing )

sq.m / MD

3.000

1- Tile Setter 1 - Common Labor / Helper

Natural stone Wall Finish ( Mechanical fixing )

sq.m / MD

3.000

1- Tile Setter 1 - Common Labor / Helper

Terrazzo Tiles

sq.m / MD

7.000

1- Tile Setter 1 - Common Labor / Helper

Vinyl Tiles

sq.m / MD

25.000

1- Tile Setter 1 - Common Labor / Helper

Steel Door Installation

pcs. / MD

9.62

Sandwich Panel

sq.m / MD

2.39

l.m / MD

13.00

IV. Electro Mechanical Works

Conduits / Cable Tray

a) CABLE TRAY LADDER W/ FITTINGS & SUPPORT

Page 7 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD) 1- Electrician

a.1) 152 mm Wide Galvanized Steel Tray

M

10

a.2) 305 mm Wide Galvanized Steel Tray

M

9

a.3) 457 mm Wide Galvanized Steel Tray

M

8

a.4) 610 mm Wide Galvanized Steel Tray

M

8

M

18

1- Electrician

1- Electrician

1- Electrician

b) CONDUITS INCL. TERMINATION & CLAMP 1- Electrician b.1) 15 mm dia. Rigid Galvanized Steel

1- Electrician b.2) 20 mm dia. Rigid Galvanized Steel

M

16

b.3) 25 mm dia. Rigid Galvanized Steel

M

13

b.4) 32 mm dia. Rigid Galvanized Steel

M

12

b.5) 40 mm dia. Rigid Galvanized Steel

M

11

1- Electrician

1- Electrician

1- Electrician

Page 8 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD) 1- Electrician

b.6) 50 mm dia. Rigid Galvanized Steel

M

9

c.1) Outlet Box ,Octagon,102 mm

Nos

13

c.2) Outlet Box, Square,102 mm

Nos

13

c) BOXES 1- Electrician

1- Electrician

1- Electrician c.3) Switch Box,

Nos

17

c.4) Pull Box, 152 mm W x 152 mm H x 102 mm D

Nos

5

1- Electrician

1- Electrician

c.5) Pull Box,203 mm W x 203 mm H x 102 mm D

Nos

5

c.6) Pull Box,254 mm W x 305 mm H x 152 mm D

Nos

3

A/C Duct Works

1- Electrician

l.m / MD

2.00

Page 9 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD) 1- Ductman 1 - Common Labor / Helper

Duct, Galvanized Steel (Distribution Line)

LM

13 1- Ductman 1 - Common Labor / Helper

Duct, Galvanized Steel (Main Line)

LM

6 1- Ductman 1 - Common Labor / Helper

Duct Insulation

LM

13 1- Ductman 1 - Common Labor / Helper

Diffusers

EA

8 1- Ductman 1 - Common Labor / Helper

Grilles & Registers

EA

17 1- HVAC Technician 1 - Common Labor / Helper

Fan Cool Unit (FCU)

Air Handling Unit (AHU)

Exhaust Fan

EA

EA

EA

4

0.50

3

1- Mobile Crane 1- Mobile Crane Operator 1- HVAC Technician 1 - Common Labor / Helper 1- Electrician 1- HVAC Technician 1 - Common Labor / Helper 1- HVAC Technician 1 - Common Labor / Helper

VAV, CAV, Dampers

EA

7 1- Pipe Fitter 1 - Common Labor / Helper

Chilled Water Pipes

LM

6

Page 10 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD) 1- Pipe Fitter 1 - Common Labor / Helper

Chilled Water Valves (Gate, Isolation..etc)

EA

3 1- Pipe Fitter 1 - Common Labor / Helper

Chilled Water Pipes' Insulation

EA

12 1- Mobile Crane 1- Mobile Crane Operator 1- HVAC Technician 1 - Common Labor / Helper

Chillers Unit

EA

0.33 1- HVAC Technician 1 - Common Labor / Helper

VAV, CAV, Dampers

EA

7 1- HVAC Technician 1 - Common Labor / Helper

A/C Split Unit

EA

3

Piping Works

l.m / MD

3.60

Cabling Works

l.m / MD

27.00

LM

12.000

1- Electrician 1 - Common Helper

LM

18.000

1- Electrician 1 - Common Helper

Cable Trays

Cable Conduits/Trunks

Page 11 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD) LM

159.000

1- Electrician 1 - Common Helper

EA

36.000

1- Electrician 1 - Common Helper

EA

7.000

1- Electrician 1 - Common Helper

Wire Pulling & Cable Laying

Junction Boxes, Outlet Boxes

Grounding (rod/plate copper with excavation) no. / MD Electrical Devices Installation

d) WIRING DEVICES 1- Electrician d.1) Flush Switch, Standard

Nos

26

d.2) Surface Switch, Standard

Nos

26

1- Electrician

1- Electrician d.3) Master Control, 12 Circuit, Manual

Nos

2

d.4) Rectifier, Silicon

Nos

8

d.5) Switch Plates,1 Gang,1,2 or 3 Switch

Nos

52

d.6) Switch Plates, 2 Gang,3 Switch, Stainless

Nos

34

1- Electrician

1- Electrician

1- Electrician

Page 12 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD)

e) BOARDS

e.1) Circuit Breakers ( enclosure ) 1- Electrician e.1.1) Enclosed (Nema 1) 600 V,3 Pole,30 A

Nos

2

e.1.2) 60 A

Nos

2

1- Electrician

1- Electrician e.1.3) 100 A

Nos

2

e.1.4) 225 A

Nos

1

1- Electrician

1- Electrician e.1.5) 400 A

Nos

1

e.1.5) 600 A

Nos

0

1- Electrician

Electrical Devices Installation

4.00

Page 13 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD)

f) LIGHTING FIXTURES

Interior Lighting Fixtures

f.1) Fluorescent, Acrylic Lens, Recess Mounted 1- Electrician f.1.1) 300 mm W x1200 mm L, Two 40 W

Nos

4

f.1.2) 300 mm W x1200 mm L, Three 40 W

Nos

4

1- Electrician

1- Electrician f.1.3) 600 mm W x 600 mm L, Two U 40 W

Nos

4

f.1.4) 600 mm W x1200 mm L, Two 40 W

Nos

3

1- Electrician

1- Electrician f.1.5) 600 mm W x1200 mm L,Three 40 W

Nos

3

f.1.6) 600 mm W x1200 mm L,four 40 W

Nos

3

1- Electrician

Electrical Equipment Installation

no. / MD

0.05

Page 14 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description Machinery & Equipment Installation

Unit / Man-day (MD) no. / MD

0.08

Demolition

sq.m / MD

2.47

Elevated Slabs

cu.m / MD

0.48

Concrete Walls

cu.m / MD

0.56

Remove Concrete Curbs

l.m / MD

5.41

Cut Concrete Openings

cu.m / MD

0.44

Demolition

sq.m / MD

12.90

Elevated Slabs

cu.m / MD

1.33

Building Works

Demolition (Manual)

Demolition (Machine)

Page 15 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description Concrete Walls

Unit / Man-day (MD) cu.m / MD

2.59

Remove Concrete Curbs

l.m / MD

22.22

Cut Concrete Openings

cu.m / MD

1.01

Site Development

Clearing and Grabbing Manual

Clearing Undergrowth & Tree 12" diameter

sq.m / MD

160.000

160.00

Clearing Undergrowth & Shrubs

sq.m / MD

266.670

320.00

Remove of Top Soil

sq.m / MD

32.31

Clearing Undergrowth & Tree 12" diameter

sq.m / MD

4,000.00

Clearing Undergrowth & Shrubs

sq.m / MD

4,000.00

Clearing and Grabbing Machine

Page 16 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD)

Site Works

Gravel Bedding

cu.m / MD

4.52

Hauling & Dispossal of Excess Excavated Materials

cu.m / MD

8.00

Wall Footings

cu.m / MD

3.42

Slab on Fill : 150 mm Thickness

cu.m / MD

3.08

Girder and Beams

cu.m / MD

0.94

Retaining Walls

cu.m / MD

0.63

Wall Footings

cu.m / MD

1.54

Retaining Walls

cu.m / MD

0.74

Concrete Works (Manual)

Concrete Works (Machine)

Page 17 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD)

Reinforcing Bars (Installation)

Wall Footings

kg. / MD

80.00

Columns

kg. / MD

80.00

Slab on Fill : 150 mm Thickness

kg. / MD

80.00

Suspended Slab

kg. / MD

80.00

Girder and Beams

kg. / MD

80.00

Retaining Walls

kg. / MD

80.00

Stiffener Columns

kg. / MD

80.00

Stiffener Beams

kg. / MD

80.00

RC Wall

kg. / MD

80.00

Formworks

Page 18 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD)

Wall Footings

sq.m / MD

3.20

Columns

sq.m / MD

3.20

Slab on Fill : 150 mm Thickness

sq.m / MD

3.20

Suspended Slab

sq.m / MD

3.20

Roof Slab

sq.m / MD

3.33

Girder and Beams

sq.m / MD

2.40

Retaining Walls

sq.m / MD

2.86

Stairs and Landings

sq.m / MD

3.33

Form Oil Application

sq.m / MD

13.30

sq.m / MD

3.90

Scaffolding

1 to 2 Section Long -1 to 2 Section High

Page 19 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD)

1 to 2 Section Long - more than 2 Section High

sq.m / MD

3.33

3 to 5 Section Long - 1 to 2 Section High

sq.m / MD

6.40

3 to 5 Section Long - more than 2 Section High

sq.m / MD

5.52

6 Section or more Long - 1 to 2 Section High

sq.m / MD

8.42

6 Section or more Long - 2 more than Section High

sq.m / MD

6.96

Masonry Works

CHB 4" Laying

sq.m / MD

9.000

1- Block Mason 1 - Common Labor / Helper

12.00

CHB 6" Laying

sq.m / MD

8.500

1- Block Mason 1 - Common Labor / Helper

10.00

CHB 8" Laying

sq.m / MD

7.500

1- Block Mason 1 - Common Labor / Helper

8.00

Finishing oF CHB Joints

pcs. / Day

420.00

Finishing of Floor, Rough

sq.m / MD

72.00

Page 20 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD)

Structural Steel Works

Anchor Bolt

Fabrication of Anchor Bolts

kg. / MD

80.00

Installation of Anchor Bolts

kg. / MD

24.00

Erection Using Crane

mtrc ton / MD

0.23

Erection using Gin Pole

mtrc ton / MD

0.16

Paint on Structural Steel

mtrc ton / MD

0.40

Installation of Asbestos Roofing

sht. / MD

3.56

Installation of G.I or Aluminum Roofing

sht. / MD

6.40

Erection of Bolts

Roofing Works

Page 21 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD)

Installation of Waterproofing Membrane

sq.m / MD

2.20

G.I Roofing GA. 26

sq.m / MD

6.56

Fabrication of Gutter

sht. / MD

3.48

Gutter Cut and Shape

l.m / MD

50.00

Gutter Installation

l.m / MD

18.00

Downspout Cut and Shape

l.m / MD

27.04

Downspout Installation

l.m / MD

60.00

Fabricate & Install of Gutter, Downspout and Ridgeroll

sht. / MD

40.00

sq.m / MD

0.76

Doors and Windows

Windows

Steel Owning Windows

Page 22 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD)

Steel Casement Windows

sq.m / MD

0.94

Aluminum Sliding Windows

sq.m / MD

1.45

Jalousie Windows on Aluminum Frame

sq.m / MD

3.48

pc. / Day

1.00

Installation of Wooden Windows

sq.m / MD

9.20

Installation of Wooden Jalousie

sq.m / MD

36.36

Wooden Panel Door

sq.m / MD

0.52

Wooden Flush Door

sq.m / MD

0.52

Wooden Sliding Door

sq.m / MD

0.69

Aluminum Sliding Door

sq.m / MD

1.27

Installation of Steel Windows

Doors

Page 23 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD)

Aluminum Door (Single Swing)

sq.m / MD

0.95

Steel Sliding Door

sq.m / MD

0.62

Hollow Metal (Single Swing)

sq.m / MD

0.45

Installation of Door and Door's Jamb

bdft / MD

320.00

Installation of Doors (Complete with Hinges and Knob)

pcs / day

2.00

Door Lockset

set . / MD

5.00

Finishes

Floor Finishes

Epoxy Floor Paint

sq.m / MD

48.800

1- Painter 1 - Common Labor / Helper (as per Planning Planet)

Vinyl Tiles

sq.m / MD

25.000

1- Tile Setter 1 - Common Labor / Helper

Page 24 of 123

27.84

4.79







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD) 8.000

2- Tile Setter 1 - Common Labor / Helper

Ceramic Tiles

sq.m / MD

2.00

Waterproofing

sq.m / MD

Granite Tiles

sq.m / MD

Trowel Finish (Bare)

sq.m / MD

5.33

Floor Hardener

sq.m / MD

2.00

3.63

3.000

1- Tile Setter 1 - Common Labor / Helper

2.80

Wall Finishes

Paint On CHB Wall

sq.m / MD

9.000

1- Block Mason 1 - Common Labor / Helper

29.04

Ceramic Tiles

sq.m / MD

10.000

2- Tile Setter 1 - Common Labor / Helper

2.00

Gypsum Board

sq.m / MD

16.67

Moisture Resistant Board

sq.m / MD

10.53

Wall Papel

unit / MD

61.54

Page 25 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD)

Ceiling Finish

Paint on Exposed Ceiling

sq.m / MD

29.04

Gypsum Board

sq.m / MD

Moisture Resistant Board

sq.m / MD

Acoustic Board (Including Frame)

sq.m / MD

Paint on Gypsum Ceiling

sq.m / MD

29.04

Baseboard

l.m / MD

32.00

Wooden Cornice (Moulding)

l.m / MD

57.14

13.000

2- Finish Carpenter 2 - Common Labor / Helper

16.67

10.53

20.000

2- Finish Carpenter 2 - Common Labor / Helper

3.00

Miscellaneous Finishes

Stainless Hood

Wooden Hand Rails

-

l.m / MD

11.27

Page 26 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD)

Electrical Works

Installation, High Voltage

mtrc ton. / MH

29.00

Instalaltion, Low Voltage

mtrc ton. / MH

19.00

Installation Service Entrance Trap and Conduit

mtrc ton. / MH

0.50 - 1.00

Installation conduit and Fuse Panel

mtrc ton. / MH

0.50 - 1.10

1/2 " & 3/4"

mtrc ton. / MH

5.00 - 10.00

1" & 1 1/4"

mtrc ton. / MH

5.00 - 10.00

1 1/2"

mtrc ton. / MH

3.00 - 13.00

2"

mtrc ton. / MH

12.00 - 17.00

2 1/2"

mtrc ton. / MH

15.00 - 21.00

Install Heavy Rigid Conduit with Outlet Boxes

Page 27 of 123







Ma ⑤



Actutal Pro February 2020 ① Activity /Description

Unit / Man-day (MD)

3"

mtrc ton. / MH

20.00 - 28.30

4"

mtrc ton. / MH

25.00 - 35.00

Page 28 of 123







Ma ⑤



LEGEND OF SHIMIZU'S EXISTING PROJECTS: ①

LRT (Baclaran + Zapote)



EPPI - EPSON



PERSTIMA



TSR - THE SEASON'S RESIDENCE



GMV: a. CBMB - CANNON & b. TERUMO - EB4

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 29 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 30 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 31 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 32 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 33 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 34 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 35 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 36 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 37 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 38 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 39 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 40 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 41 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 42 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 43 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 44 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 45 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 46 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 47 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 48 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 49 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 50 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 51 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 52 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 53 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 54 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 55 of 123

Actutal Productivity Output March 2020 ②





April 2020 ⑤











Page 56 of 123

LEGEND OF SHIMIZU'S EXISTING PROJECTS: ① ② ③ ④ ⑤

SHIMIZU PHILLIPINE CONTRACTORS, INC.

LRT (Baclaran + Zapote) EPPI - EPSON PERSTIMA TSR - THE SEASON'S RESIDENCE GMV: a. CBMB - CANNON & b. TERUMO

ENGINEERING DEPARTMENT PRODUCTIVITY RATE MONITORING

NO.

ACTIVITY DESCRIPTION

DIVISION 2

SITE WORKS

2.1

EARTHWORKS Clearing & Grubbing

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)

M2

1,000

No.

Trade

1.00

Dozer

0.012

1.00

Equipment Operator

0.012

1.00

Common Labor/Helper

1.00

Large Excavator

1.00

Equipment Operator

1.00

Medium Excavator

0.480

1.00

Equipment Operator

0.480

1.00

Common Labor/Helper

0.093

1.00

Dozer

0.093

1.00

Roller Compactor

0.093

1.00

Water Tanker

0.210

3.00

Equipment Operator

0.070

1.00

Common Labor/Helper

0.024 0.024

Excavation - Bulk

M3

160

0.100 0.100 0.100

Excavation - Isolated Footings

M3

25

0.960 0.960

Backfill & Compaction - Bulk

M3

200

MONTHS

Crew Composition

0.280

Page 57 of 123

February 2020 ①







March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

ACTIVITY DESCRIPTION

Backfill & Compaction

2.2

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit) M3

25

No.

Trade

0.800

1.00

Backhoe Loader

0.800

1.00

Plate Compactor

1.067

2.00

Equipment Operator

0.533

1.00

Common Labor/Helper

1.00

Anti - Termite Applicator

0.615

1.00

Concrete Mason

0.615

1.00

Steel Fixer

0.615

1.00

Shuttering Carpenter

0.615

1.00

Scaffolder

0.615

1.00

Common Labor/Helper

0.800

1.00

Concrete Mason

0.800

1.00

Steel Fixer

0.800

1.00

Shuttering Carpenter

0.800

1.00

Scaffolder

0.800

1.00

Common Labor/Helper

1.050

1.00

Concrete Mason

1.050

1.00

Steel Fixer

1.050

1.00

Shuttering Carpenter

1.050

1.00

Scaffolder

1.050

1.00

Common Labor/Helper

1.600

SOIL TREATMENT Anti-Termite Treatment

M2

200

0.040 0.040

2.3

PAVING & SURFACING Concrete Paving - 100mm thick

Concrete Paving - 150mm thick

Pedestrian/Handicap ramp

M2

M2

M2

13

10

8

MONTHS

Crew Composition

3.077

4.000

5.250

Page 58 of 123

February 2020 ①







March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

ACTIVITY DESCRIPTION

Interlocking concrete pavers (400X400mm)

Interlocking concrete pavers (200X200X80mm)

Interlocking concrete pavers, 60mm thick

2.4

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit) M2

M2

M2

30

30

30

No.

Trade

0.533

2.00

Tile Mason

0.533

2.00

Common Labor/Helper

0.533

2.00

Tile Mason

0.533

2.00

Common Labor/Helper

0.533

2.00

Tile Mason

0.533

2.00

Common Labor/Helper

0.020

1.00

Dump Truck

0.020

1.00

Loader

0.020

1.00

Backhoe

0.020

1.00

Equipment Operator

1.00

Common Labor/Helper

0.020

1.00

Dump Truck

0.020

1.00

Loader

0.020

1.00

Backhoe

0.020

1.00

Equipment Operator

1.00

Common Labor/Helper

0.020

1.00

Dump Truck

0.020

1.00

Loader

0.020

1.00

Backhoe

1.067

1.067

1.067

ROCK FORMATION & BOULDERS BOULDER SCHEDULE 1M3 =15%

M3

500

0.080

0.080 0.25 M3 = 40%

M3

500

0.080

0.080 < 0.25M3 = 45%

M3

500

MONTHS

Crew Composition

0.080

Page 59 of 123

February 2020 ①







March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

ACTIVITY DESCRIPTION

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)

No.

Trade

1.00

Equipment Operator

1.00

Common Labor/Helper

0.114

1.00

Tile Mason

0.114

1.00

Common Labor/Helper

0.114

1.00

Tile Mason

0.114

1.00

Common Labor/Helper

0.250

1.00

Backhoe/Loader

0.250

1.00

Equipment Operator

0.125

1.00

Tile Mason

0.125

1.00

Common Labor/Helper

0.000

1.00

Steel Structure Crew

0.131

1.00

Welder/Fabricator

0.131

1.00

Common Labor/Helper

0.020 0.080 2.5

ROAD CURB Precast concrete curb

2.6

LM

70

0.229

No.

64

0.500

STEEL CHAIN LINK FENCES Galvanized steel fence 3000 mm height

2.9

0.229

PRECAST CONCRETE WHEEL STOPPERS Precast Concrete Wheel Stoppers

2.8

70

MOWING EDGE Concrete Mowing Edge ( Type 1/2)

2.7

LM

LM

61

0.393

PRECAST CONCRETE BOLLARD Precast concrete bollard 400 mm Dia. And 1000 mm hieght

No.

20

MONTHS

Crew Composition

1.200

Page 60 of 123

February 2020 ①







March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

2.10

ACTIVITY DESCRIPTION

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)

No.

Trade

0.000

1.00

Shuttering Carpenter

0.400

1.00

Concrete Mason

0.400

1.00

Common Labor/Helper

1.00

Common Labor/Helper

2.000

1.00

Shuttering Carpenter

2.000

1.00

Concrete Mason

2.000

1.00

Common Labor/Helper

1.00

Bobcat

0.267

1.00

Welder/Fabricator

0.267

1.00

Common Labor/Helper

SUNDRIES Trash Bin

No.

70

0.114 0.114

2.11

CONCRETE SEAT Concrete seat with 100 X 100mm ceramic tile band

2.12

No.

4

6.000

GRAVEL Gravel 50mm thickness

M2

30

0.800 #DIV/0!

DIVISION 3

CONCRETE WORKS

3.1

CONCRETE (CAST IN PLACE) Concrete Placing Blinding

m3

2.000

Isolated Footings

m3

2.250

Raft Footings

m3

2.100

Columns

m3

2.500

Shear Walls

m3

3.500

MONTHS

Crew Composition

Page 61 of 123

February 2020 ①







March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

ACTIVITY DESCRIPTION

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)

Core Walls

m3

3.500

Grade Beams

m3

2.500

Slab on Grade

m3

3.300

Isolated Beams

m3

3.250

Suspended Slabs

m3

3.300

Stairs

m3

5.000

Parapet Walls / Upstands

m3

4.000

Screed

m3

6.000

Blinding

T

0.000

Isolated Footings

T

35.000

Raft Footings

T

35.000

Columns

T

35.000

Shear Walls

T

50.000

Core Walls

T

50.000

Grade Beams

T

30.000

Slab on Grade

T

35.000

Isolated Beams

T

40.000

Suspended Slabs

T

40.000

Stairs

T

50.000

Parapet Walls / Upstands

T

40.000

Screed

T

15.000

Blinding

m2

0.150

Isolated Footings

m2

2.000

Raft Footings

m2

1.250

Columns

m2

3.500

Shear Walls

m2

4.000

Core Walls

m2

4.000

Grade Beams

m2

2.100

Slab on Grade

m2

1.000

MONTHS

Crew Composition No.

Rebar

Formwork (Make, erect, strip, clean, and move)

Page 62 of 123

Trade

February 2020 ①







March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

ACTIVITY DESCRIPTION

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)

No.

Trade

1.340

1.00

Concrete Mason

0.000

1.00

Steel Fixer

0.215

1.00

Shuttering Carpenter

0.000

1.00

Scaffolder

0.732

1.00

Common Labor/Helper

1.508

1.00

Concrete Mason

3.465

1.00

Steel Fixer

1.333

1.00

Shuttering Carpenter

0.000

1.00

Scaffolder

1.187

1.00

Common Labor/Helper

1.407

1.00

Concrete Mason

4.725

1.00

Steel Fixer

0.183

1.00

Shuttering Carpenter

0.000

1.00

Scaffolder

0.754

1.00

Common Labor/Helper

1.675

1.00

Concrete Mason

8.750

1.00

Steel Fixer

11.156

1.00

Shuttering Carpenter

1.969

1.00

Scaffolder

5.200

1.00

Common Labor/Helper

Isolated Beams

m2

5.000

Suspended Slabs

m2

3.500

Stairs

m2

4.850

Parapet Walls / Upstands

m2

4.000

Blinding

m3

2.286

Isolated Footings

Raft Footings

Columns

m3

m3

m3

MONTHS

Crew Composition

7.492

7.069

28.750

Page 63 of 123

February 2020 ①







March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

ACTIVITY DESCRIPTION

Shear Walls

Core Walls

Grade Beams

Slab on Grade

Isolated Beams

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)

m3

m3

m3

m3

m3

MONTHS

Crew Composition No.

Trade

2.345

1.00

Concrete Mason

8.350

1.00

Steel Fixer

7.975

1.00

Shuttering Carpenter

1.407

1.00

Scaffolder

4.282

1.00

Common Labor/Helper

2.345

1.00

Concrete Mason

8.350

1.00

Steel Fixer

8.791

1.00

Shuttering Carpenter

1.551

1.00

Scaffolder

4.603

1.00

Common Labor/Helper

1.675

1.00

Concrete Mason

5.610

1.00

Steel Fixer

7.875

1.00

Shuttering Carpenter

0.000

1.00

Scaffolder

3.450

1.00

Common Labor/Helper

2.211

1.00

Concrete Mason

3.861

1.00

Steel Fixer

0.006

1.00

Shuttering Carpenter

0.000

1.00

Scaffolder

1.091

1.00

Common Labor/Helper

2.178

1.00

Concrete Mason

6.680

1.00

Steel Fixer

9.228

1.00

Shuttering Carpenter

24.360

25.640

18.610

7.169

28.859

Page 64 of 123

February 2020 ①







March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

ACTIVITY DESCRIPTION

Suspended Slabs

Stairs

Parapet Walls / Upstands

Screed

3.2

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)

m3

m3

m3

m3

MONTHS

Crew Composition No.

Trade

4.969

1.00

Scaffolder

5.805

1.00

Common Labor/Helper

2.211

1.00

Concrete Mason

4.000

1.00

Steel Fixer

7.109

1.00

Shuttering Carpenter

3.828

1.00

Scaffolder

4.735

1.00

Common Labor/Helper

3.350

1.00

Concrete Mason

11.500

1.00

Steel Fixer

16.139

1.00

Shuttering Carpenter

0.000

1.00

Scaffolder

7.030

1.00

Common Labor/Helper

2.680

1.00

Concrete Mason

6.680

1.00

Steel Fixer

7.975

1.00

Shuttering Carpenter

1.407

1.00

Scaffolder

4.447

1.00

Common Labor/Helper

4.020

1.00

Concrete Mason

1.800

1.00

Steel Fixer

0.000

1.00

Shuttering Carpenter

0.000

1.00

Scaffolder

1.980

1.00

Common Labor/Helper

21.883

38.018

23.190

7.800

CONCRETE (PRECAST)

Page 65 of 123

February 2020 ①







March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

ACTIVITY DESCRIPTION

Hollow Core Slabs

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit) m2

336

No.

Trade

0.048

2.00

Concrete Mason

0.027

4.00

Common Labor/Helper

0.004

1.00

Equipment Operator

1.00

Mobile Crane

0.038

3.00

Concrete Mason

0.023

6.00

Common Labor/Helper

0.002

1.00

Equipment Operator

1.00

Mobile Crane

0.889

2.00

Concrete Mason

0.593

6.00

Common Labor/Helper

0.066

1.00

Equipment Operator

1.00

Mobile Crane

0.800

2.00

Concrete Mason

0.533

6.00

Common Labor/Helper

0.059

1.00

Equipment Operator

1.00

Mobile Crane

0.800

8.00

Façade Crew

0.089

1.00

Equipment Operator

1.00

Mobile Crane

0.167

m2

630

0.127

no

18

4.000

no

20

3.600

m2

80

0.900

0.100

0.100 4.1



0.400

0.400 Precast Concrete Cladding (Architectural)



0.444

0.444 Precast Beam



0.013

0.013 Precast Column

February 2020

0.024

0.024 Double Tee Slabs

MONTHS

Crew Composition

MORTAR & MASONRY 10 cm Block

m2

90

1.778 0.889

9 10.00

Page 66 of 123

Block Mason



March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

ACTIVITY DESCRIPTION

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)

No.

Trade

10.00

Common Labor/Helper

0.941

10.00

Block Mason

0.941

10.00

Common Labor/Helper

1.067

10.00

Block Mason

1.067

10.00

Common Labor/Helper

1.143

10.00

Block Mason

1.143

10.00

Common Labor/Helper

1.905

10.00

Block Mason

1.905

10.00

Common Labor/Helper

5.00

Steel Structure Crew

6.00

Steel Structure Crew

2.00

Common Labor/Helper

4.00

Common Labor/Helper

0.889 15cm Block

20cm Block

Solid Blocks

Cavity Wall with Insulation

DIVISION 5

METALS

5.1

METALS Railing (Aluminium/Steel)

m2

m2

m2

m2

LM

85

75

70

42

36

1.882

2.133

2.286

3.810

1.111 0.000

Space Frame

m2

27

1.778 1.778

Expansion Joint Cover (aluminium, bronze or steel)

LM

9.0

1.778 1.778

Steel Ladders, Bolted to Concrete

LM

13.0

2.462 2.462

MONTHS

Crew Composition

Page 67 of 123

February 2020 ①







March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

ACTIVITY DESCRIPTION

DIVISION 7

Thermal & Moisture Protection

7.1

DAMPROOFING Bitominous Coating Below Grade, 1 coat

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)

m2

41

Bituminous Coating Below Grade, 2 coat

m2

31

1.00

Common Labor/Helper

1.00

Common Labor/Helper

6.00

Waterproofing Crew

6.00

Waterproofing Crew

4.00

Waterproofing Crew

1.00

Waterproofing Crew

WATERPROOFING ON SLAB

Membrane waterproofing on slab, felt paper

m2

172

0.279 0.279

Membrane waterproofing on slab, glass fiber fabric

m2

107

0.449 0.449

7.3

Trade

0.258 0.258

7.2

No.

0.195 0.195

WATERPROOFING ON ROOF DECK

Built-Up Roofing, Asphalt coating with Gravel

m2

50

0.640 0.640

Roof deck insulation,Extruded Polystyrene

m2

111

0.072 0.072

DIVISION 8

DOORS & WINDOWS

8.1

DOORS Wooden Doors Frame

EA

6

MONTHS

Crew Composition

4.000

Page 68 of 123

February 2020 ①







March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

ACTIVITY DESCRIPTION

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit) 4.000

Steel Doors Frame

EA

6

Wooden Door Leaf & Hardware Set

EA

3

EA

3

EA

9

3.00

Joinery Crew

2.00

Joinery Crew

2.00

Joinery Crew

3.00

Joinery Crew

4.00

Joinery Crew

1.00

Façade Crew

2.00

Plasterer

1.00

Labourer

2.00

Plasterer

1.00

Labourer

2.00

Plasterer

2.667 2.667

GLAZING WORKS Glazed Partition Wall

m2

16

2.000 2.000

Glazed Curtain Wall (Façade)

m2

2

4.000 4.000

DIVISION 9

Joinery Crew

WINDOWS Aluminium Windows with Glazing

8.3

3.00

5.333 5.333

8.2

Trade

5.333 5.333

Metal Door Leaf & Hardware Set

No.

4.000 4.000

FINISHES

Portland Cement Plaster on Wall

Portland Cement Plaster to Soffit Portland Cement Plaster to Suspended metal lath.

M2 M2

M2

20 12

6

MONTHS

Crew Composition

Page 69 of 123

February 2020 ①







March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

ACTIVITY DESCRIPTION

Gypsum Plaster on Wall

Gypsum Plaster on Suspended metal lath

Gypsum board 10 to 13mm on walls/ceiling with thin coat of plaster finish.

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)

M2 M2

M2

Partition wall on metal stud, 2.4 to 3.7m high M2

Painting Preparation

Painting Works

Ceramic Wall Tiles

Ceramic Floor Tiles

Stone Wall Finish ( Marble/Granite by Mech. Fixing )

M2 M2 M2 M2

M2

Natural stone Wall Finish ( Mechanical fixing M2 )

Terrazzo tiles

Vinyl tiles

M2 M2

18 6

85

29

40 40 10 8

3

3

7 25

No.

Trade

1.00

Labourer

2.00

Plasterer

1.00

Labourer

2.00

Plasterer

1.00

Labourer

0.13

Lab. Foreman

1.00

Fin. Carpenter

1.00

Labourer

0.13

Lab. Foreman

1.00

Fin. Carpenter

1.00

Painter

1.00

Labourer

1.00

Painter

1.00

Labourer

2.00

Tile Setter

1.00

Labourer

2.00

Tile Setter

1.00

Labourer

1.00

Marble Setter

1.00

Labourer

1.00

Stone Fixer

1.00

Labourer

1.00

Tile Setter

1.00

Labourer

1.00

Tile Setter

1.00

Labourer

CEILING WORKS

Suspended Gypsum Board Monolithic System

m2

13

MONTHS

Crew Composition

2.462

Page 70 of 123

February 2020 ①







March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

ACTIVITY DESCRIPTION

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)

(including suspension, boards, taping, sanding)

Suspended Gypsum Board Monolithic System Curved

m2

4

(including suspension, boards, taping, sanding)

Suspended Demountable Metal Ceiling System

Suspended Acoustic Fibre Board Tile Ceiling System

Aluminum Strip Ceiling System

Ceiling Suspension System - ONLY

Ceiling Gypusm Board Installation - ONLY

m2

m2

m2

m2

m2

20

20

10

12

15

(including boards, taping, sanding)

Ceiling Metal/Acoustic Installation - ONLY

m2

60

MONTHS

Crew Composition No.

Trade

1.231

2.00

Finishing Carpenter

1.231

2.00

Common Labor/Helper

4.000

2.00

Finishing Carpenter

4.000

2.00

Common Labor/Helper

0.800

2.00

Finishing Carpenter

0.800

2.00

Common Labor/Helper

0.800

2.00

Finishing Carpenter

0.800

2.00

Common Labor/Helper

1.600

2.00

Finishing Carpenter

1.600

2.00

Common Labor/Helper

0.667

1.00

Finishing Carpenter

0.667

1.00

Common Labor/Helper

0.533

1.00

Finishing Carpenter

0.533

1.00

Common Labor/Helper

0.133

1.00

Finishing Carpenter

0.133

1.00

Common Labor/Helper

8.000

1.600

1.600

3.200

1.333

1.067

0.267

Page 71 of 123

February 2020 ①







March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

ACTIVITY DESCRIPTION

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)

MONTHS

Crew Composition No.

Trade

DIVISION 10 SPECIALTIES

a) Demountable Partition

M2

10

2.00

Finishing Carp

b) Plastic Laminate Toilet Cubicle

Nos.

3

2.00

Finishing Carp

c) Access Flooring

M2

27

2.00

Finishing Carp

d) Toilet Paper Dispenser ( Surface Mounted )

Nos.

19

1.00

Finishing Carp

e) Soap Dispenser ( Surface Mounted )

Nos.

6

1.00

Finishing Carp

f) Towel Bar Holder - 457 mm Long

Nos.

15

1.00

Finishing Carp

g) Towel Bar Holder - 762 mm Long

Nos.

13

1.00

Finishing Carp

DIVISION 15 MECHANICAL WORKS

a) Cast Iron Pipes ( on Hangers 1.50 m. on center ) a.1) 50 mm dia.

M

13

1 1

Plumber Plumber Helper

a.2) 80 mm dia.

M

12

1 1

Plumber Plumber Helper

a.3) 100 mm dia.

M

11

1 1

Plumber Plumber Helper

a.4) 125 mm dia.

M

15

2 1

Plumber Plumber Helper

a.5) 150 mm dia.

M

14

2 1

Plumber Plumber Helper

a.6) 200 mm dia.

M

12

2 1

Plumber Plumber Helper

b.1) 50 mm dia.

M

12

1 1

Plumber Plumber Helper

b.2) 65 mm dia.

M

11

1 1

Plumber Plumber Helper

b.3) 80 mm dia.

M

10

1 1

Plumber Plumber Helper

b.4) 100 mm dia.

M

10

1 1

Plumber Plumber Helper

b.5) 125 mm dia.

M

9

1 1

Plumber Plumber Helper

b) PVC Pipes ( on Hangers 1-Meter on center )

Page 72 of 123

February 2020 ①







March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

ACTIVITY DESCRIPTION

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)

No.

Trade

M

8

1 1

Plumber Plumber Helper

c.1) 10 mm dia.

M

13

1 1

Plumber Plumber Helper

c.2) 15 mm dia.

M

12

1 1

Plumber Plumber Helper

c.3) 20 mm dia.

M

12

1 1

Plumber Plumber Helper

c.4) 25 mm dia.

M

10

1 1

Plumber Plumber Helper

c.5) 32 mm dia.

M

18

1 1

Plumber Plumber Helper

c.6) 40 mm dia.

M

16

1 1

Plumber Plumber Helper

c.7) 50 mm dia.

M

13

1 1

Plumber Plumber Helper

c.8) 65 mm dia.

M

10

1 1

Plumber Plumber Helper

c.9) 80 mm dia.

M

9

1 1

Plumber Plumber Helper

1 1

Plumber Plumber Helper

b.6) 150 mm dia.

c.) Black Steel Pipe Schedule 40 (on Clevis hanger)

d) COPPER PIPES & TUBING ( Solder Joints )

MONTHS

Crew Composition

d.1) 8 mm dia. including Clevis Hangers

M

17

1 1

Plumber Plumber Helper

d.2) 25 mm dia. including Clevis Hangers

M

13

1 1

Plumber Plumber Helper

d.3) 50 mm dia. including Clevis Hangers

M

8

1 1

Plumber Plumber Helper

a) Western Type Water Closet

Nos

3

1 1

Plumber Plumber Helper

b) Western Type Water Closet

Nos

4

1 1

Plumber Plumber Helper

c) Lavatory Wall Hung Type

Nos

5

1 1

Plumber Plumber Helper

d) Urinals Wall Hung

Nos

2

1 1

Plumber Plumber Helper

PLUMBING FIXTURES

Page 73 of 123

February 2020 ①







March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

ACTIVITY DESCRIPTION

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)

No.

Trade

AIR-CONDITIONING / VENTILATING a) Fan Coil Unit a.1) Fan Coil Unit - 1.8 KW Cooling

Nos

5

1 1

AC Technician Helper

a.2) Fan Coil Unit - 3.5 KW Cooling

Nos

4

1 1

AC Technician Helper

a.3) Fan Coil Unit - 10.5 KW Cooling

Nos

3

1 1

AC Technician Helper

a.4) Fan Coil Unit - 35 KW Cooling

Nos

2

2 1

AC Technician Helper

a.5) Fan Coil Unit - 53 KW Cooling

Nos

1

2 1

AC Technician Helper

b.1) Ductwork - Galv. Steel under 90 kg

Kg

70

2.00

Ductman

b.2) Ductwork - Galv. Steel 91 to 227 kg

Kg

72

2.00

Ductman

b.3) Ductwork - Galv. Steel 227 to 454 kg

Kg

75

2.00

Ductman

b.4) Ductwork - Galv. Steel 454 to 907 kg

Kg

78

2.00

Ductman

b.5) Ductwork - Galv. Steel 908 to 2268

Kg

81

2.00

Ductman

c.1) Perforated, 610 mm x 610 mm

Nos

10

1.00

Ductman

c.2) Perforated, 203 mm x 203 mm

Nos

9

1.00

Ductman

c.3) Perforated, 229 mm x 229 mm

Nos

8

1.00

Ductman

c.4) Perforated, 254 mm x 254 mm

Nos

8

1.00

Ductman

c.5) Perforated, 305 mm x 305 mm

Nos

7

1.00

Ductman

c.6) Perforated, 406 mm x 406 mm

Nos

7

1.00

Ductman

LM

13

0.615

1.00

Ductman

0.615

1.00

Common Labor/Helper

b) Ductwork

c) Diffusers

15.3

HVAC Duct, Galvanized Steel (Distribution Line)

Duct, Galvanized Steel (Main Line)

LM

6

MONTHS

Crew Composition

1.231

2.667

Page 74 of 123

February 2020 ①







March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

ACTIVITY DESCRIPTION

Duct Insulation

Diffusers

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)

LM

EA

13

8

No.

Trade

1.333

1.00

Ductman

1.333

1.00

Common Labor/Helper

0.615

1.00

Ductman

0.615

1.00

Common Labor/Helper

1.00

Ductman

1.00

Ductman

2.000

1.00

HVAC Technician

4.000

2.00

Common Labor/Helper

1.00

Mobile Crane

16.000

1.00

Equipment Operator

16.000

1.00

HVAC Technician

32.000

2.00

Common Labor/Helper

2.667

1.00

HVAC Technician

2.667

1.00

Electrician

2.667

1.00

Common Labor/Helper

1.143

1.00

HVAC Technician

1.143

1.00

Common Labor/Helper

1.231

1.000 1.000

Grilles & Registers

EA

17

0.471 0.471

Fan Cool Unit (FCU)

Air Handling Unit (AHU)

EA

EA

4

0.50

6.000

64.000

16.000 16.000

Exhaust Fan

VAV, CAV, Dampers

Chilled Water Pipes

EA

EA

LM

3

7

6

MONTHS

Crew Composition

8.000

2.286

2.667

Page 75 of 123

February 2020 ①







March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

ACTIVITY DESCRIPTION

Chilled Water Valves (Gate, Isolation..etc)

Chilled Water Pipes' Insulation

Chillers Unit

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)

EA

EA

EA

3

12

0.33

No.

Trade

1.333

1.00

Pipe Fitter

1.333

1.00

Common Labor/Helper

2.667

1.00

Pipe Fitter

2.667

1.00

Common Labor/Helper

0.667

1.00

Pipe Fitter

0.667

1.00

Common Labor/Helper

1.00

Mobile Crane

24.242

1.00

Equipment Operator

48.485

2.00

HVAC Technician

72.727

3.00

Common Labor/Helper

1.143

1.00

HVAC Technician

1.143

1.00

Common Labor/Helper

2.667

1.00

HVAC Technician

2.667

1.00

Common Labor/Helper

5.333

1.333

145.455

24.242 24.242

VAV, CAV, Dampers

A/C Split Unit

EA

EA

7

3

MONTHS

Crew Composition

2.286

5.333

DIVISION 16 ELECTRICAL WORKS a) CABLE TRAY LADDER W/ FITTINGS & SUPPORT a.1) 152 mm Wide Galvanized Steel Tray

M

10

1.00

Electrician

a.2) 305 mm Wide Galvanized Steel Tray

M

9

1.00

Electrician

a.3) 457 mm Wide Galvanized Steel Tray

M

8

1.00

Electrician

a.4) 610 mm Wide Galvanized Steel Tray

M

8

1.00

Electrician

Page 76 of 123

February 2020 ①







March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

ACTIVITY DESCRIPTION

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)

MONTHS

Crew Composition No.

Trade

b) CONDUITS INCL. TERMINATION & CLAMP b.1) 15 mm dia. Rigid Galvanized Steel

M

18

1.00

Electrician

b.2) 20 mm dia. Rigid Galvanized Steel

M

16

1.00

Electrician

b.3) 25 mm dia. Rigid Galvanized Steel

M

13

1.00

Electrician

b.4) 32 mm dia. Rigid Galvanized Steel

M

12

1.00

Electrician

b.5) 40 mm dia. Rigid Galvanized Steel

M

11

1.00

Electrician

b.6) 50 mm dia. Rigid Galvanized Steel

M

9

1.00

Electrician

c.1) Outlet Box ,Octagon,102 mm

Nos

13

1.00

Electrician

c.2) Outlet Box, Square,102 mm

Nos

13

1.00

Electrician

c.3) Switch Box,

Nos

17

1.00

Electrician

c.4) Pull Box, 152 mm W x 152 mm H x 102 mm D

Nos

5

1.00

Electrician

c.5) Pull Box,203 mm W x 203 mm H x 102 mm D

Nos

5

1.00

Electrician

c.6) Pull Box,254 mm W x 305 mm H x 152 mm D

Nos

3

1.00

Electrician

d.1) Flush Switch, Standard

Nos

26

1.00

Electrician

d.2) Surface Switch, Standard

Nos

26

1.00

Electrician

d.3) Master Control, 12 Circuit, Manual

Nos

2

1.00

Electrician

d.4) Rectifier, Silicon

Nos

8

1.00

Electrician

d.5) Switch Plates,1 Gang,1,2 or 3 Switch

Nos

52

1.00

Electrician

d.6) Switch Plates, 2 Gang,3 Switch, Stainless

Nos

34

1.00

Electrician

e.1.1) Enclosed (Nema 1) 600 V,3 Pole,30 A

Nos

2

1.00

Electrician

e.1.2) 60 A

Nos

2

1.00

Electrician

e.1.3) 100 A

Nos

2

1.00

Electrician

e.1.4) 225 A

Nos

1

1.00

Electrician

e.1.5) 400 A

Nos

1

1.00

Electrician

e.1.5) 600 A

Nos

0

1.00

Electrician

c) BOXES

d) WIRING DEVICES

e) BOARDS e.1) Circuit Breakers ( enclosure )

Page 77 of 123

February 2020 ①







March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

ACTIVITY DESCRIPTION

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)

No.

Trade

f) LIGHTING FIXTURES Interior Lighting Fixtures f.1) Fluorescent, Acrylic Lens, Recess Mounted

16.1

f.1.1) 300 mm W x1200 mm L, Two 40 W

Nos

4

1.00

Electrician

f.1.2) 300 mm W x1200 mm L, Three 40 W

Nos

4

1.00

Electrician

f.1.3) 600 mm W x 600 mm L, Two U 40 W

Nos

4

1.00

Electrician

f.1.4) 600 mm W x1200 mm L, Two 40 W

Nos

3

1.00

Electrician

f.1.5) 600 mm W x1200 mm L,Three 40 W

Nos

3

1.00

Electrician

f.1.6) 600 mm W x1200 mm L,four 40 W

Nos

3

1.00

Electrician

LM

12

0.667

1.00

Electrician

0.667

1.00

Common Labor/Helper

0.444

1.00

Electrician

0.444

1.00

Common Labor/Helper

0.050

1.00

Electrician

0.101

2.00

Common Labor/Helper

1.00

Electrician

1.143

1.00

Electrician

1.143

1.00

Common Labor/Helper

Cables & Accessories Cable Trays

Cable Conduits/Trunks

Wire Pulling & Cable Laying

Junction Boxes, Outlet Boxes

LM

LM

EA

18

159

36

1.333

0.889

0.151

0.222 0.222

Grounding (rod/plate copper with excavation)

EA

7

MONTHS

Crew Composition

2.286

Page 78 of 123

February 2020 ①







March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

16.2

ACTIVITY DESCRIPTION

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)

No.

Trade

0.667

1.00

Electrician

0.667

1.00

Common Labor/Helper

0.400

1.00

Electrician

0.400

1.00

Common Labor/Helper

1.00

Electrician

5.333

1.00

Electrician

5.333

1.00

Common Labor/Helper

4.000

1.00

Electrician

4.000

1.00

Common Labor/Helper

11.429

1.00

Electrician

11.429

1.00

Common Labor/Helper

16.000

1.00

Electrician

32.000

2.00

Common Labor/Helper

Electrical Fixtures Lighting Fixtures

Fire Alarm Devices

Receptacles & Switches

EA

EA

EA

12

20

18

1.333

0.800

0.444 0.444

Public Address System

16.3

EA

1.5

10.667

Power Distribution & Transformers Circuit Breakers

Panel Boards

Switchboards

Dry Type Transformer, less than 150 kVA

EA

EA

EA

EA

2

0.7

0.5

1

MONTHS

Crew Composition

8.000

22.857

48.000

24.000

Page 79 of 123

February 2020 ①







March 2020 ⑤







April 20 ④







PRODUCTIVITY RATE MONITORING

NO.

ACTIVITY DESCRIPTION

Dry Type Transformer,larger than 300 kVA

16.4

LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)

EA

0.6

No.

Trade

8.000

1.00

Electrician

16.000

2.00

Common Labor/Helper

13.333

1.00

Electrician

26.667

2.00

Common Labor/Helper

1.00

Medium Excavator

0.889

1.00

Equipment Operator

0.889

1.00

Electrician

0.889

1.00

Common Labor/Helper

40.000

ELECTRIC UTILITIES Duct Bank

LM

12

2.667

0.667 0.667

MONTHS

Crew Composition

Page 80 of 123

February 2020 ①







March 2020 ⑤







April 20 ④







ECTS:

CE . TERUMO - EB4

April 2020 ③





Page 81 of 123

April 2020 ③





Page 82 of 123

April 2020 ③





Page 83 of 123

April 2020 ③





Page 84 of 123

April 2020 ③





Page 85 of 123

April 2020 ③





Page 86 of 123

April 2020 ③





Page 87 of 123

April 2020 ③





Page 88 of 123

April 2020 ③





Page 89 of 123

April 2020 ③





Page 90 of 123

April 2020 ③





Page 91 of 123

April 2020 ③





Page 92 of 123

April 2020 ③





Page 93 of 123

April 2020 ③





Page 94 of 123

April 2020 ③





Page 95 of 123

April 2020 ③





Page 96 of 123

April 2020 ③





Page 97 of 123

April 2020 ③





Page 98 of 123

April 2020 ③





Page 99 of 123

April 2020 ③





Page 100 of 123

April 2020 ③





Page 101 of 123

April 2020 ③





Page 102 of 123

April 2020 ③





Page 103 of 123

April 2020 ③





Page 104 of 123

A. Bored Pile Bored Pile Construction As-Builts Depth (m) =>