36 1 342KB
SHIMIZU PHILLIPINE CONTRACTORS, INC.
ENGINEERING DEPARTMENT
PRODUCTIVITY OUTPUT MONITORING
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD)
I. Site Works
Productivity Rate as per Norms
Actual (Max)
Excavation Works
• Manual Excavation
cu.m / MD
• Mechanical Excavation
cu.m / MD
2.80
160.000
1- Excavator (using 0.8 cu.m bucket) 1- Equipment Operator (Bulk Excavation)
Page 1 of 123
80.00
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD)
Backfilling (Compacted)
cu.m / MD
200.000
1- Dozer 1- Roller Compactor 1- Water Tanker 3 - Equipment Operator 1 - Common Labor / Helper (Bulk Backfilling and Compaction)
Soil Poisoning (2 Application)
sq.m / MD
200.000
1- Applicator
20.00
External Paving
sq.m / MD
30.000
1- Tile Mason 1 - Common Labor / Helper
5.33
l.m / MD
70.000
1- Tile Mason 1 - Common Labor / Helper
6.67
Pre- Cast Concrete Kerb
315.00
II. Civil Structural Works
Piling Works
Piles / Day
10.00
Rebar Fabrication
kg. / MD
687.38
Rebar Installation
kg. / MD
267.00
sq.m / MD
9.00
Formwoks Installation
Page 2 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD)
Formworks Stripping
sq.m / MD
13.00
Hollow Core Installation
sq.m / MD
18.00
Speed Deck
sq.m / MD
22.83
• Lean Concrete
cu.m / MD
5.33
• Foundation
cu.m / MD
6.67
• Water Tank
cu.m / MD
2.96
• Column
cu.m / MD
2.76
• Slab & Stair
cu.m / MD
8.60
Duct Tube Fabrication for PC
pcs. /MH
1.83
PC Column Installation
pcs. / MD
0.81
Concreting Works
Page 3 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD)
PC Beam / Girder Installation
pcs. / MD
0.50
Steel Structure
pcs. / MD
0.51
Secondary Ceiling Works
kg. / MD
194.06
• Wire Mesh
sq.m / MD
30.00
• Roof Conncetor
PCS. / MD
17.00
• Aluminum Foil / Fiber Glass
sq.m / MD
30.00
• Roof Installation
sq.m / MD
24.00
• Wire Mesh / Aluminum / Fiber Glass
sq.m / MD
5.00
• Metal Sidings Installation
sq.m / MD
5.00
Roofing Works
Metal Sidings
Page 4 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD)
Waterproofing
1st Layer
sq.m / MD
88.86
2nd Layer
sq.m / MD
41.11
3rd Layer
sq.m / MD
26.25
4th Layer
sq.m / MD
12.38
III. Architectural Works
CHB Works
sq.m / MD
9.000
1- Block Mason 1 - Common Labor / Helper
8.00
Plastering Works
sq.m / MD
20.000
2- Plasterer 1 - Common Labor / Helper
10.28
Skim Coat
sq.m / MD
53.600
1- Painter 1 - Common Labor / Helper
12.00
Drywall Works (General)
sq.m / MD
29.100
1- Finish Carpenter 1 - Common Labor / Helper
3.50
48.000
1- Painter 1 - Common Labor / Helper (as per Planning Planet)
13.55
Painting Works (General)
sq.m / MD
Page 5 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description Ceiling Works (General)
Unit / Man-day (MD) sq.m / MD
8.30
Suspended Gypsum Board Monolithic System
sq.m / MD
13.000
2- Finish Carpenter 2 - Common Labor / Helper
Suspended Gypsum Board Monolithic System Curved
sq.m / MD
4.000
2- Finish Carpenter 2 - Common Labor / Helper
Suspended Demountable Metal Ceiling System
sq.m / MD
20.000
2- Finish Carpenter 2 - Common Labor / Helper
Aluminum Strip Ceiling System
sq.m / MD
10.000
2- Finish Carpenter 2 - Common Labor / Helper
Suspended Acoustic Fibre Board Tile Ceiling System
sq.m / MD
20.000
2- Finish Carpenter 2 - Common Labor / Helper
Ceiling Suspension System - ONLY
sq.m / MD
12.000
1- Finish Carpenter 1 - Common Labor / Helper
Ceiling Gypsum Board Installation - ONLY
sq.m / MD
15.000
1- Finish Carpenter 1 - Common Labor / Helper
Ceiling Metal/Acoustic Installation - ONLY
sq.m / MD
60.000
1- Finish Carpenter 1 - Common Labor / Helper
Ceiling Suspension System - ONLY
sq.m / MD
12.000
1- Finish Carpenter 1 - Common Labor / Helper
Floor Finishing (General)
sq.m / MD
16.50
Page 6 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD)
Ceramic Floor TILES
sq.m / MD
8.000
2- Tile Setter 1 - Common Labor / Helper
Ceramic Wall Tiles
sq.m / MD
10.000
2- Tile Setter 1 - Common Labor / Helper
Stone Wall Finish ( Marble/Granite by Mech. Fixing )
sq.m / MD
3.000
1- Tile Setter 1 - Common Labor / Helper
Natural stone Wall Finish ( Mechanical fixing )
sq.m / MD
3.000
1- Tile Setter 1 - Common Labor / Helper
Terrazzo Tiles
sq.m / MD
7.000
1- Tile Setter 1 - Common Labor / Helper
Vinyl Tiles
sq.m / MD
25.000
1- Tile Setter 1 - Common Labor / Helper
Steel Door Installation
pcs. / MD
9.62
Sandwich Panel
sq.m / MD
2.39
l.m / MD
13.00
IV. Electro Mechanical Works
Conduits / Cable Tray
a) CABLE TRAY LADDER W/ FITTINGS & SUPPORT
Page 7 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD) 1- Electrician
a.1) 152 mm Wide Galvanized Steel Tray
M
10
a.2) 305 mm Wide Galvanized Steel Tray
M
9
a.3) 457 mm Wide Galvanized Steel Tray
M
8
a.4) 610 mm Wide Galvanized Steel Tray
M
8
M
18
1- Electrician
1- Electrician
1- Electrician
b) CONDUITS INCL. TERMINATION & CLAMP 1- Electrician b.1) 15 mm dia. Rigid Galvanized Steel
1- Electrician b.2) 20 mm dia. Rigid Galvanized Steel
M
16
b.3) 25 mm dia. Rigid Galvanized Steel
M
13
b.4) 32 mm dia. Rigid Galvanized Steel
M
12
b.5) 40 mm dia. Rigid Galvanized Steel
M
11
1- Electrician
1- Electrician
1- Electrician
Page 8 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD) 1- Electrician
b.6) 50 mm dia. Rigid Galvanized Steel
M
9
c.1) Outlet Box ,Octagon,102 mm
Nos
13
c.2) Outlet Box, Square,102 mm
Nos
13
c) BOXES 1- Electrician
1- Electrician
1- Electrician c.3) Switch Box,
Nos
17
c.4) Pull Box, 152 mm W x 152 mm H x 102 mm D
Nos
5
1- Electrician
1- Electrician
c.5) Pull Box,203 mm W x 203 mm H x 102 mm D
Nos
5
c.6) Pull Box,254 mm W x 305 mm H x 152 mm D
Nos
3
A/C Duct Works
1- Electrician
l.m / MD
2.00
Page 9 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD) 1- Ductman 1 - Common Labor / Helper
Duct, Galvanized Steel (Distribution Line)
LM
13 1- Ductman 1 - Common Labor / Helper
Duct, Galvanized Steel (Main Line)
LM
6 1- Ductman 1 - Common Labor / Helper
Duct Insulation
LM
13 1- Ductman 1 - Common Labor / Helper
Diffusers
EA
8 1- Ductman 1 - Common Labor / Helper
Grilles & Registers
EA
17 1- HVAC Technician 1 - Common Labor / Helper
Fan Cool Unit (FCU)
Air Handling Unit (AHU)
Exhaust Fan
EA
EA
EA
4
0.50
3
1- Mobile Crane 1- Mobile Crane Operator 1- HVAC Technician 1 - Common Labor / Helper 1- Electrician 1- HVAC Technician 1 - Common Labor / Helper 1- HVAC Technician 1 - Common Labor / Helper
VAV, CAV, Dampers
EA
7 1- Pipe Fitter 1 - Common Labor / Helper
Chilled Water Pipes
LM
6
Page 10 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD) 1- Pipe Fitter 1 - Common Labor / Helper
Chilled Water Valves (Gate, Isolation..etc)
EA
3 1- Pipe Fitter 1 - Common Labor / Helper
Chilled Water Pipes' Insulation
EA
12 1- Mobile Crane 1- Mobile Crane Operator 1- HVAC Technician 1 - Common Labor / Helper
Chillers Unit
EA
0.33 1- HVAC Technician 1 - Common Labor / Helper
VAV, CAV, Dampers
EA
7 1- HVAC Technician 1 - Common Labor / Helper
A/C Split Unit
EA
3
Piping Works
l.m / MD
3.60
Cabling Works
l.m / MD
27.00
LM
12.000
1- Electrician 1 - Common Helper
LM
18.000
1- Electrician 1 - Common Helper
Cable Trays
Cable Conduits/Trunks
Page 11 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD) LM
159.000
1- Electrician 1 - Common Helper
EA
36.000
1- Electrician 1 - Common Helper
EA
7.000
1- Electrician 1 - Common Helper
Wire Pulling & Cable Laying
Junction Boxes, Outlet Boxes
Grounding (rod/plate copper with excavation) no. / MD Electrical Devices Installation
d) WIRING DEVICES 1- Electrician d.1) Flush Switch, Standard
Nos
26
d.2) Surface Switch, Standard
Nos
26
1- Electrician
1- Electrician d.3) Master Control, 12 Circuit, Manual
Nos
2
d.4) Rectifier, Silicon
Nos
8
d.5) Switch Plates,1 Gang,1,2 or 3 Switch
Nos
52
d.6) Switch Plates, 2 Gang,3 Switch, Stainless
Nos
34
1- Electrician
1- Electrician
1- Electrician
Page 12 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD)
e) BOARDS
e.1) Circuit Breakers ( enclosure ) 1- Electrician e.1.1) Enclosed (Nema 1) 600 V,3 Pole,30 A
Nos
2
e.1.2) 60 A
Nos
2
1- Electrician
1- Electrician e.1.3) 100 A
Nos
2
e.1.4) 225 A
Nos
1
1- Electrician
1- Electrician e.1.5) 400 A
Nos
1
e.1.5) 600 A
Nos
0
1- Electrician
Electrical Devices Installation
4.00
Page 13 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD)
f) LIGHTING FIXTURES
Interior Lighting Fixtures
f.1) Fluorescent, Acrylic Lens, Recess Mounted 1- Electrician f.1.1) 300 mm W x1200 mm L, Two 40 W
Nos
4
f.1.2) 300 mm W x1200 mm L, Three 40 W
Nos
4
1- Electrician
1- Electrician f.1.3) 600 mm W x 600 mm L, Two U 40 W
Nos
4
f.1.4) 600 mm W x1200 mm L, Two 40 W
Nos
3
1- Electrician
1- Electrician f.1.5) 600 mm W x1200 mm L,Three 40 W
Nos
3
f.1.6) 600 mm W x1200 mm L,four 40 W
Nos
3
1- Electrician
Electrical Equipment Installation
no. / MD
0.05
Page 14 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description Machinery & Equipment Installation
Unit / Man-day (MD) no. / MD
0.08
Demolition
sq.m / MD
2.47
Elevated Slabs
cu.m / MD
0.48
Concrete Walls
cu.m / MD
0.56
Remove Concrete Curbs
l.m / MD
5.41
Cut Concrete Openings
cu.m / MD
0.44
Demolition
sq.m / MD
12.90
Elevated Slabs
cu.m / MD
1.33
Building Works
Demolition (Manual)
Demolition (Machine)
Page 15 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description Concrete Walls
Unit / Man-day (MD) cu.m / MD
2.59
Remove Concrete Curbs
l.m / MD
22.22
Cut Concrete Openings
cu.m / MD
1.01
Site Development
Clearing and Grabbing Manual
Clearing Undergrowth & Tree 12" diameter
sq.m / MD
160.000
160.00
Clearing Undergrowth & Shrubs
sq.m / MD
266.670
320.00
Remove of Top Soil
sq.m / MD
32.31
Clearing Undergrowth & Tree 12" diameter
sq.m / MD
4,000.00
Clearing Undergrowth & Shrubs
sq.m / MD
4,000.00
Clearing and Grabbing Machine
Page 16 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD)
Site Works
Gravel Bedding
cu.m / MD
4.52
Hauling & Dispossal of Excess Excavated Materials
cu.m / MD
8.00
Wall Footings
cu.m / MD
3.42
Slab on Fill : 150 mm Thickness
cu.m / MD
3.08
Girder and Beams
cu.m / MD
0.94
Retaining Walls
cu.m / MD
0.63
Wall Footings
cu.m / MD
1.54
Retaining Walls
cu.m / MD
0.74
Concrete Works (Manual)
Concrete Works (Machine)
Page 17 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD)
Reinforcing Bars (Installation)
Wall Footings
kg. / MD
80.00
Columns
kg. / MD
80.00
Slab on Fill : 150 mm Thickness
kg. / MD
80.00
Suspended Slab
kg. / MD
80.00
Girder and Beams
kg. / MD
80.00
Retaining Walls
kg. / MD
80.00
Stiffener Columns
kg. / MD
80.00
Stiffener Beams
kg. / MD
80.00
RC Wall
kg. / MD
80.00
Formworks
Page 18 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD)
Wall Footings
sq.m / MD
3.20
Columns
sq.m / MD
3.20
Slab on Fill : 150 mm Thickness
sq.m / MD
3.20
Suspended Slab
sq.m / MD
3.20
Roof Slab
sq.m / MD
3.33
Girder and Beams
sq.m / MD
2.40
Retaining Walls
sq.m / MD
2.86
Stairs and Landings
sq.m / MD
3.33
Form Oil Application
sq.m / MD
13.30
sq.m / MD
3.90
Scaffolding
1 to 2 Section Long -1 to 2 Section High
Page 19 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD)
1 to 2 Section Long - more than 2 Section High
sq.m / MD
3.33
3 to 5 Section Long - 1 to 2 Section High
sq.m / MD
6.40
3 to 5 Section Long - more than 2 Section High
sq.m / MD
5.52
6 Section or more Long - 1 to 2 Section High
sq.m / MD
8.42
6 Section or more Long - 2 more than Section High
sq.m / MD
6.96
Masonry Works
CHB 4" Laying
sq.m / MD
9.000
1- Block Mason 1 - Common Labor / Helper
12.00
CHB 6" Laying
sq.m / MD
8.500
1- Block Mason 1 - Common Labor / Helper
10.00
CHB 8" Laying
sq.m / MD
7.500
1- Block Mason 1 - Common Labor / Helper
8.00
Finishing oF CHB Joints
pcs. / Day
420.00
Finishing of Floor, Rough
sq.m / MD
72.00
Page 20 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD)
Structural Steel Works
Anchor Bolt
Fabrication of Anchor Bolts
kg. / MD
80.00
Installation of Anchor Bolts
kg. / MD
24.00
Erection Using Crane
mtrc ton / MD
0.23
Erection using Gin Pole
mtrc ton / MD
0.16
Paint on Structural Steel
mtrc ton / MD
0.40
Installation of Asbestos Roofing
sht. / MD
3.56
Installation of G.I or Aluminum Roofing
sht. / MD
6.40
Erection of Bolts
Roofing Works
Page 21 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD)
Installation of Waterproofing Membrane
sq.m / MD
2.20
G.I Roofing GA. 26
sq.m / MD
6.56
Fabrication of Gutter
sht. / MD
3.48
Gutter Cut and Shape
l.m / MD
50.00
Gutter Installation
l.m / MD
18.00
Downspout Cut and Shape
l.m / MD
27.04
Downspout Installation
l.m / MD
60.00
Fabricate & Install of Gutter, Downspout and Ridgeroll
sht. / MD
40.00
sq.m / MD
0.76
Doors and Windows
Windows
Steel Owning Windows
Page 22 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD)
Steel Casement Windows
sq.m / MD
0.94
Aluminum Sliding Windows
sq.m / MD
1.45
Jalousie Windows on Aluminum Frame
sq.m / MD
3.48
pc. / Day
1.00
Installation of Wooden Windows
sq.m / MD
9.20
Installation of Wooden Jalousie
sq.m / MD
36.36
Wooden Panel Door
sq.m / MD
0.52
Wooden Flush Door
sq.m / MD
0.52
Wooden Sliding Door
sq.m / MD
0.69
Aluminum Sliding Door
sq.m / MD
1.27
Installation of Steel Windows
Doors
Page 23 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD)
Aluminum Door (Single Swing)
sq.m / MD
0.95
Steel Sliding Door
sq.m / MD
0.62
Hollow Metal (Single Swing)
sq.m / MD
0.45
Installation of Door and Door's Jamb
bdft / MD
320.00
Installation of Doors (Complete with Hinges and Knob)
pcs / day
2.00
Door Lockset
set . / MD
5.00
Finishes
Floor Finishes
Epoxy Floor Paint
sq.m / MD
48.800
1- Painter 1 - Common Labor / Helper (as per Planning Planet)
Vinyl Tiles
sq.m / MD
25.000
1- Tile Setter 1 - Common Labor / Helper
Page 24 of 123
27.84
4.79
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD) 8.000
2- Tile Setter 1 - Common Labor / Helper
Ceramic Tiles
sq.m / MD
2.00
Waterproofing
sq.m / MD
Granite Tiles
sq.m / MD
Trowel Finish (Bare)
sq.m / MD
5.33
Floor Hardener
sq.m / MD
2.00
3.63
3.000
1- Tile Setter 1 - Common Labor / Helper
2.80
Wall Finishes
Paint On CHB Wall
sq.m / MD
9.000
1- Block Mason 1 - Common Labor / Helper
29.04
Ceramic Tiles
sq.m / MD
10.000
2- Tile Setter 1 - Common Labor / Helper
2.00
Gypsum Board
sq.m / MD
16.67
Moisture Resistant Board
sq.m / MD
10.53
Wall Papel
unit / MD
61.54
Page 25 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD)
Ceiling Finish
Paint on Exposed Ceiling
sq.m / MD
29.04
Gypsum Board
sq.m / MD
Moisture Resistant Board
sq.m / MD
Acoustic Board (Including Frame)
sq.m / MD
Paint on Gypsum Ceiling
sq.m / MD
29.04
Baseboard
l.m / MD
32.00
Wooden Cornice (Moulding)
l.m / MD
57.14
13.000
2- Finish Carpenter 2 - Common Labor / Helper
16.67
10.53
20.000
2- Finish Carpenter 2 - Common Labor / Helper
3.00
Miscellaneous Finishes
Stainless Hood
Wooden Hand Rails
-
l.m / MD
11.27
Page 26 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD)
Electrical Works
Installation, High Voltage
mtrc ton. / MH
29.00
Instalaltion, Low Voltage
mtrc ton. / MH
19.00
Installation Service Entrance Trap and Conduit
mtrc ton. / MH
0.50 - 1.00
Installation conduit and Fuse Panel
mtrc ton. / MH
0.50 - 1.10
1/2 " & 3/4"
mtrc ton. / MH
5.00 - 10.00
1" & 1 1/4"
mtrc ton. / MH
5.00 - 10.00
1 1/2"
mtrc ton. / MH
3.00 - 13.00
2"
mtrc ton. / MH
12.00 - 17.00
2 1/2"
mtrc ton. / MH
15.00 - 21.00
Install Heavy Rigid Conduit with Outlet Boxes
Page 27 of 123
②
③
④
Ma ⑤
①
Actutal Pro February 2020 ① Activity /Description
Unit / Man-day (MD)
3"
mtrc ton. / MH
20.00 - 28.30
4"
mtrc ton. / MH
25.00 - 35.00
Page 28 of 123
②
③
④
Ma ⑤
①
LEGEND OF SHIMIZU'S EXISTING PROJECTS: ①
LRT (Baclaran + Zapote)
②
EPPI - EPSON
③
PERSTIMA
④
TSR - THE SEASON'S RESIDENCE
⑤
GMV: a. CBMB - CANNON & b. TERUMO - EB4
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 29 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 30 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 31 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 32 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 33 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 34 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 35 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 36 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 37 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 38 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 39 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 40 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 41 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 42 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 43 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 44 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 45 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 46 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 47 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 48 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 49 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 50 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 51 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 52 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 53 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 54 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 55 of 123
Actutal Productivity Output March 2020 ②
③
④
April 2020 ⑤
①
②
③
④
⑤
Page 56 of 123
LEGEND OF SHIMIZU'S EXISTING PROJECTS: ① ② ③ ④ ⑤
SHIMIZU PHILLIPINE CONTRACTORS, INC.
LRT (Baclaran + Zapote) EPPI - EPSON PERSTIMA TSR - THE SEASON'S RESIDENCE GMV: a. CBMB - CANNON & b. TERUMO
ENGINEERING DEPARTMENT PRODUCTIVITY RATE MONITORING
NO.
ACTIVITY DESCRIPTION
DIVISION 2
SITE WORKS
2.1
EARTHWORKS Clearing & Grubbing
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)
M2
1,000
No.
Trade
1.00
Dozer
0.012
1.00
Equipment Operator
0.012
1.00
Common Labor/Helper
1.00
Large Excavator
1.00
Equipment Operator
1.00
Medium Excavator
0.480
1.00
Equipment Operator
0.480
1.00
Common Labor/Helper
0.093
1.00
Dozer
0.093
1.00
Roller Compactor
0.093
1.00
Water Tanker
0.210
3.00
Equipment Operator
0.070
1.00
Common Labor/Helper
0.024 0.024
Excavation - Bulk
M3
160
0.100 0.100 0.100
Excavation - Isolated Footings
M3
25
0.960 0.960
Backfill & Compaction - Bulk
M3
200
MONTHS
Crew Composition
0.280
Page 57 of 123
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
ACTIVITY DESCRIPTION
Backfill & Compaction
2.2
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit) M3
25
No.
Trade
0.800
1.00
Backhoe Loader
0.800
1.00
Plate Compactor
1.067
2.00
Equipment Operator
0.533
1.00
Common Labor/Helper
1.00
Anti - Termite Applicator
0.615
1.00
Concrete Mason
0.615
1.00
Steel Fixer
0.615
1.00
Shuttering Carpenter
0.615
1.00
Scaffolder
0.615
1.00
Common Labor/Helper
0.800
1.00
Concrete Mason
0.800
1.00
Steel Fixer
0.800
1.00
Shuttering Carpenter
0.800
1.00
Scaffolder
0.800
1.00
Common Labor/Helper
1.050
1.00
Concrete Mason
1.050
1.00
Steel Fixer
1.050
1.00
Shuttering Carpenter
1.050
1.00
Scaffolder
1.050
1.00
Common Labor/Helper
1.600
SOIL TREATMENT Anti-Termite Treatment
M2
200
0.040 0.040
2.3
PAVING & SURFACING Concrete Paving - 100mm thick
Concrete Paving - 150mm thick
Pedestrian/Handicap ramp
M2
M2
M2
13
10
8
MONTHS
Crew Composition
3.077
4.000
5.250
Page 58 of 123
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
ACTIVITY DESCRIPTION
Interlocking concrete pavers (400X400mm)
Interlocking concrete pavers (200X200X80mm)
Interlocking concrete pavers, 60mm thick
2.4
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit) M2
M2
M2
30
30
30
No.
Trade
0.533
2.00
Tile Mason
0.533
2.00
Common Labor/Helper
0.533
2.00
Tile Mason
0.533
2.00
Common Labor/Helper
0.533
2.00
Tile Mason
0.533
2.00
Common Labor/Helper
0.020
1.00
Dump Truck
0.020
1.00
Loader
0.020
1.00
Backhoe
0.020
1.00
Equipment Operator
1.00
Common Labor/Helper
0.020
1.00
Dump Truck
0.020
1.00
Loader
0.020
1.00
Backhoe
0.020
1.00
Equipment Operator
1.00
Common Labor/Helper
0.020
1.00
Dump Truck
0.020
1.00
Loader
0.020
1.00
Backhoe
1.067
1.067
1.067
ROCK FORMATION & BOULDERS BOULDER SCHEDULE 1M3 =15%
M3
500
0.080
0.080 0.25 M3 = 40%
M3
500
0.080
0.080 < 0.25M3 = 45%
M3
500
MONTHS
Crew Composition
0.080
Page 59 of 123
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
ACTIVITY DESCRIPTION
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)
No.
Trade
1.00
Equipment Operator
1.00
Common Labor/Helper
0.114
1.00
Tile Mason
0.114
1.00
Common Labor/Helper
0.114
1.00
Tile Mason
0.114
1.00
Common Labor/Helper
0.250
1.00
Backhoe/Loader
0.250
1.00
Equipment Operator
0.125
1.00
Tile Mason
0.125
1.00
Common Labor/Helper
0.000
1.00
Steel Structure Crew
0.131
1.00
Welder/Fabricator
0.131
1.00
Common Labor/Helper
0.020 0.080 2.5
ROAD CURB Precast concrete curb
2.6
LM
70
0.229
No.
64
0.500
STEEL CHAIN LINK FENCES Galvanized steel fence 3000 mm height
2.9
0.229
PRECAST CONCRETE WHEEL STOPPERS Precast Concrete Wheel Stoppers
2.8
70
MOWING EDGE Concrete Mowing Edge ( Type 1/2)
2.7
LM
LM
61
0.393
PRECAST CONCRETE BOLLARD Precast concrete bollard 400 mm Dia. And 1000 mm hieght
No.
20
MONTHS
Crew Composition
1.200
Page 60 of 123
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
2.10
ACTIVITY DESCRIPTION
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)
No.
Trade
0.000
1.00
Shuttering Carpenter
0.400
1.00
Concrete Mason
0.400
1.00
Common Labor/Helper
1.00
Common Labor/Helper
2.000
1.00
Shuttering Carpenter
2.000
1.00
Concrete Mason
2.000
1.00
Common Labor/Helper
1.00
Bobcat
0.267
1.00
Welder/Fabricator
0.267
1.00
Common Labor/Helper
SUNDRIES Trash Bin
No.
70
0.114 0.114
2.11
CONCRETE SEAT Concrete seat with 100 X 100mm ceramic tile band
2.12
No.
4
6.000
GRAVEL Gravel 50mm thickness
M2
30
0.800 #DIV/0!
DIVISION 3
CONCRETE WORKS
3.1
CONCRETE (CAST IN PLACE) Concrete Placing Blinding
m3
2.000
Isolated Footings
m3
2.250
Raft Footings
m3
2.100
Columns
m3
2.500
Shear Walls
m3
3.500
MONTHS
Crew Composition
Page 61 of 123
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
ACTIVITY DESCRIPTION
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)
Core Walls
m3
3.500
Grade Beams
m3
2.500
Slab on Grade
m3
3.300
Isolated Beams
m3
3.250
Suspended Slabs
m3
3.300
Stairs
m3
5.000
Parapet Walls / Upstands
m3
4.000
Screed
m3
6.000
Blinding
T
0.000
Isolated Footings
T
35.000
Raft Footings
T
35.000
Columns
T
35.000
Shear Walls
T
50.000
Core Walls
T
50.000
Grade Beams
T
30.000
Slab on Grade
T
35.000
Isolated Beams
T
40.000
Suspended Slabs
T
40.000
Stairs
T
50.000
Parapet Walls / Upstands
T
40.000
Screed
T
15.000
Blinding
m2
0.150
Isolated Footings
m2
2.000
Raft Footings
m2
1.250
Columns
m2
3.500
Shear Walls
m2
4.000
Core Walls
m2
4.000
Grade Beams
m2
2.100
Slab on Grade
m2
1.000
MONTHS
Crew Composition No.
Rebar
Formwork (Make, erect, strip, clean, and move)
Page 62 of 123
Trade
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
ACTIVITY DESCRIPTION
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)
No.
Trade
1.340
1.00
Concrete Mason
0.000
1.00
Steel Fixer
0.215
1.00
Shuttering Carpenter
0.000
1.00
Scaffolder
0.732
1.00
Common Labor/Helper
1.508
1.00
Concrete Mason
3.465
1.00
Steel Fixer
1.333
1.00
Shuttering Carpenter
0.000
1.00
Scaffolder
1.187
1.00
Common Labor/Helper
1.407
1.00
Concrete Mason
4.725
1.00
Steel Fixer
0.183
1.00
Shuttering Carpenter
0.000
1.00
Scaffolder
0.754
1.00
Common Labor/Helper
1.675
1.00
Concrete Mason
8.750
1.00
Steel Fixer
11.156
1.00
Shuttering Carpenter
1.969
1.00
Scaffolder
5.200
1.00
Common Labor/Helper
Isolated Beams
m2
5.000
Suspended Slabs
m2
3.500
Stairs
m2
4.850
Parapet Walls / Upstands
m2
4.000
Blinding
m3
2.286
Isolated Footings
Raft Footings
Columns
m3
m3
m3
MONTHS
Crew Composition
7.492
7.069
28.750
Page 63 of 123
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
ACTIVITY DESCRIPTION
Shear Walls
Core Walls
Grade Beams
Slab on Grade
Isolated Beams
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)
m3
m3
m3
m3
m3
MONTHS
Crew Composition No.
Trade
2.345
1.00
Concrete Mason
8.350
1.00
Steel Fixer
7.975
1.00
Shuttering Carpenter
1.407
1.00
Scaffolder
4.282
1.00
Common Labor/Helper
2.345
1.00
Concrete Mason
8.350
1.00
Steel Fixer
8.791
1.00
Shuttering Carpenter
1.551
1.00
Scaffolder
4.603
1.00
Common Labor/Helper
1.675
1.00
Concrete Mason
5.610
1.00
Steel Fixer
7.875
1.00
Shuttering Carpenter
0.000
1.00
Scaffolder
3.450
1.00
Common Labor/Helper
2.211
1.00
Concrete Mason
3.861
1.00
Steel Fixer
0.006
1.00
Shuttering Carpenter
0.000
1.00
Scaffolder
1.091
1.00
Common Labor/Helper
2.178
1.00
Concrete Mason
6.680
1.00
Steel Fixer
9.228
1.00
Shuttering Carpenter
24.360
25.640
18.610
7.169
28.859
Page 64 of 123
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
ACTIVITY DESCRIPTION
Suspended Slabs
Stairs
Parapet Walls / Upstands
Screed
3.2
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)
m3
m3
m3
m3
MONTHS
Crew Composition No.
Trade
4.969
1.00
Scaffolder
5.805
1.00
Common Labor/Helper
2.211
1.00
Concrete Mason
4.000
1.00
Steel Fixer
7.109
1.00
Shuttering Carpenter
3.828
1.00
Scaffolder
4.735
1.00
Common Labor/Helper
3.350
1.00
Concrete Mason
11.500
1.00
Steel Fixer
16.139
1.00
Shuttering Carpenter
0.000
1.00
Scaffolder
7.030
1.00
Common Labor/Helper
2.680
1.00
Concrete Mason
6.680
1.00
Steel Fixer
7.975
1.00
Shuttering Carpenter
1.407
1.00
Scaffolder
4.447
1.00
Common Labor/Helper
4.020
1.00
Concrete Mason
1.800
1.00
Steel Fixer
0.000
1.00
Shuttering Carpenter
0.000
1.00
Scaffolder
1.980
1.00
Common Labor/Helper
21.883
38.018
23.190
7.800
CONCRETE (PRECAST)
Page 65 of 123
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
ACTIVITY DESCRIPTION
Hollow Core Slabs
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit) m2
336
No.
Trade
0.048
2.00
Concrete Mason
0.027
4.00
Common Labor/Helper
0.004
1.00
Equipment Operator
1.00
Mobile Crane
0.038
3.00
Concrete Mason
0.023
6.00
Common Labor/Helper
0.002
1.00
Equipment Operator
1.00
Mobile Crane
0.889
2.00
Concrete Mason
0.593
6.00
Common Labor/Helper
0.066
1.00
Equipment Operator
1.00
Mobile Crane
0.800
2.00
Concrete Mason
0.533
6.00
Common Labor/Helper
0.059
1.00
Equipment Operator
1.00
Mobile Crane
0.800
8.00
Façade Crew
0.089
1.00
Equipment Operator
1.00
Mobile Crane
0.167
m2
630
0.127
no
18
4.000
no
20
3.600
m2
80
0.900
0.100
0.100 4.1
③
0.400
0.400 Precast Concrete Cladding (Architectural)
②
0.444
0.444 Precast Beam
①
0.013
0.013 Precast Column
February 2020
0.024
0.024 Double Tee Slabs
MONTHS
Crew Composition
MORTAR & MASONRY 10 cm Block
m2
90
1.778 0.889
9 10.00
Page 66 of 123
Block Mason
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
ACTIVITY DESCRIPTION
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)
No.
Trade
10.00
Common Labor/Helper
0.941
10.00
Block Mason
0.941
10.00
Common Labor/Helper
1.067
10.00
Block Mason
1.067
10.00
Common Labor/Helper
1.143
10.00
Block Mason
1.143
10.00
Common Labor/Helper
1.905
10.00
Block Mason
1.905
10.00
Common Labor/Helper
5.00
Steel Structure Crew
6.00
Steel Structure Crew
2.00
Common Labor/Helper
4.00
Common Labor/Helper
0.889 15cm Block
20cm Block
Solid Blocks
Cavity Wall with Insulation
DIVISION 5
METALS
5.1
METALS Railing (Aluminium/Steel)
m2
m2
m2
m2
LM
85
75
70
42
36
1.882
2.133
2.286
3.810
1.111 0.000
Space Frame
m2
27
1.778 1.778
Expansion Joint Cover (aluminium, bronze or steel)
LM
9.0
1.778 1.778
Steel Ladders, Bolted to Concrete
LM
13.0
2.462 2.462
MONTHS
Crew Composition
Page 67 of 123
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
ACTIVITY DESCRIPTION
DIVISION 7
Thermal & Moisture Protection
7.1
DAMPROOFING Bitominous Coating Below Grade, 1 coat
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)
m2
41
Bituminous Coating Below Grade, 2 coat
m2
31
1.00
Common Labor/Helper
1.00
Common Labor/Helper
6.00
Waterproofing Crew
6.00
Waterproofing Crew
4.00
Waterproofing Crew
1.00
Waterproofing Crew
WATERPROOFING ON SLAB
Membrane waterproofing on slab, felt paper
m2
172
0.279 0.279
Membrane waterproofing on slab, glass fiber fabric
m2
107
0.449 0.449
7.3
Trade
0.258 0.258
7.2
No.
0.195 0.195
WATERPROOFING ON ROOF DECK
Built-Up Roofing, Asphalt coating with Gravel
m2
50
0.640 0.640
Roof deck insulation,Extruded Polystyrene
m2
111
0.072 0.072
DIVISION 8
DOORS & WINDOWS
8.1
DOORS Wooden Doors Frame
EA
6
MONTHS
Crew Composition
4.000
Page 68 of 123
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
ACTIVITY DESCRIPTION
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit) 4.000
Steel Doors Frame
EA
6
Wooden Door Leaf & Hardware Set
EA
3
EA
3
EA
9
3.00
Joinery Crew
2.00
Joinery Crew
2.00
Joinery Crew
3.00
Joinery Crew
4.00
Joinery Crew
1.00
Façade Crew
2.00
Plasterer
1.00
Labourer
2.00
Plasterer
1.00
Labourer
2.00
Plasterer
2.667 2.667
GLAZING WORKS Glazed Partition Wall
m2
16
2.000 2.000
Glazed Curtain Wall (Façade)
m2
2
4.000 4.000
DIVISION 9
Joinery Crew
WINDOWS Aluminium Windows with Glazing
8.3
3.00
5.333 5.333
8.2
Trade
5.333 5.333
Metal Door Leaf & Hardware Set
No.
4.000 4.000
FINISHES
Portland Cement Plaster on Wall
Portland Cement Plaster to Soffit Portland Cement Plaster to Suspended metal lath.
M2 M2
M2
20 12
6
MONTHS
Crew Composition
Page 69 of 123
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
ACTIVITY DESCRIPTION
Gypsum Plaster on Wall
Gypsum Plaster on Suspended metal lath
Gypsum board 10 to 13mm on walls/ceiling with thin coat of plaster finish.
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)
M2 M2
M2
Partition wall on metal stud, 2.4 to 3.7m high M2
Painting Preparation
Painting Works
Ceramic Wall Tiles
Ceramic Floor Tiles
Stone Wall Finish ( Marble/Granite by Mech. Fixing )
M2 M2 M2 M2
M2
Natural stone Wall Finish ( Mechanical fixing M2 )
Terrazzo tiles
Vinyl tiles
M2 M2
18 6
85
29
40 40 10 8
3
3
7 25
No.
Trade
1.00
Labourer
2.00
Plasterer
1.00
Labourer
2.00
Plasterer
1.00
Labourer
0.13
Lab. Foreman
1.00
Fin. Carpenter
1.00
Labourer
0.13
Lab. Foreman
1.00
Fin. Carpenter
1.00
Painter
1.00
Labourer
1.00
Painter
1.00
Labourer
2.00
Tile Setter
1.00
Labourer
2.00
Tile Setter
1.00
Labourer
1.00
Marble Setter
1.00
Labourer
1.00
Stone Fixer
1.00
Labourer
1.00
Tile Setter
1.00
Labourer
1.00
Tile Setter
1.00
Labourer
CEILING WORKS
Suspended Gypsum Board Monolithic System
m2
13
MONTHS
Crew Composition
2.462
Page 70 of 123
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
ACTIVITY DESCRIPTION
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)
(including suspension, boards, taping, sanding)
Suspended Gypsum Board Monolithic System Curved
m2
4
(including suspension, boards, taping, sanding)
Suspended Demountable Metal Ceiling System
Suspended Acoustic Fibre Board Tile Ceiling System
Aluminum Strip Ceiling System
Ceiling Suspension System - ONLY
Ceiling Gypusm Board Installation - ONLY
m2
m2
m2
m2
m2
20
20
10
12
15
(including boards, taping, sanding)
Ceiling Metal/Acoustic Installation - ONLY
m2
60
MONTHS
Crew Composition No.
Trade
1.231
2.00
Finishing Carpenter
1.231
2.00
Common Labor/Helper
4.000
2.00
Finishing Carpenter
4.000
2.00
Common Labor/Helper
0.800
2.00
Finishing Carpenter
0.800
2.00
Common Labor/Helper
0.800
2.00
Finishing Carpenter
0.800
2.00
Common Labor/Helper
1.600
2.00
Finishing Carpenter
1.600
2.00
Common Labor/Helper
0.667
1.00
Finishing Carpenter
0.667
1.00
Common Labor/Helper
0.533
1.00
Finishing Carpenter
0.533
1.00
Common Labor/Helper
0.133
1.00
Finishing Carpenter
0.133
1.00
Common Labor/Helper
8.000
1.600
1.600
3.200
1.333
1.067
0.267
Page 71 of 123
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
ACTIVITY DESCRIPTION
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)
MONTHS
Crew Composition No.
Trade
DIVISION 10 SPECIALTIES
a) Demountable Partition
M2
10
2.00
Finishing Carp
b) Plastic Laminate Toilet Cubicle
Nos.
3
2.00
Finishing Carp
c) Access Flooring
M2
27
2.00
Finishing Carp
d) Toilet Paper Dispenser ( Surface Mounted )
Nos.
19
1.00
Finishing Carp
e) Soap Dispenser ( Surface Mounted )
Nos.
6
1.00
Finishing Carp
f) Towel Bar Holder - 457 mm Long
Nos.
15
1.00
Finishing Carp
g) Towel Bar Holder - 762 mm Long
Nos.
13
1.00
Finishing Carp
DIVISION 15 MECHANICAL WORKS
a) Cast Iron Pipes ( on Hangers 1.50 m. on center ) a.1) 50 mm dia.
M
13
1 1
Plumber Plumber Helper
a.2) 80 mm dia.
M
12
1 1
Plumber Plumber Helper
a.3) 100 mm dia.
M
11
1 1
Plumber Plumber Helper
a.4) 125 mm dia.
M
15
2 1
Plumber Plumber Helper
a.5) 150 mm dia.
M
14
2 1
Plumber Plumber Helper
a.6) 200 mm dia.
M
12
2 1
Plumber Plumber Helper
b.1) 50 mm dia.
M
12
1 1
Plumber Plumber Helper
b.2) 65 mm dia.
M
11
1 1
Plumber Plumber Helper
b.3) 80 mm dia.
M
10
1 1
Plumber Plumber Helper
b.4) 100 mm dia.
M
10
1 1
Plumber Plumber Helper
b.5) 125 mm dia.
M
9
1 1
Plumber Plumber Helper
b) PVC Pipes ( on Hangers 1-Meter on center )
Page 72 of 123
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
ACTIVITY DESCRIPTION
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)
No.
Trade
M
8
1 1
Plumber Plumber Helper
c.1) 10 mm dia.
M
13
1 1
Plumber Plumber Helper
c.2) 15 mm dia.
M
12
1 1
Plumber Plumber Helper
c.3) 20 mm dia.
M
12
1 1
Plumber Plumber Helper
c.4) 25 mm dia.
M
10
1 1
Plumber Plumber Helper
c.5) 32 mm dia.
M
18
1 1
Plumber Plumber Helper
c.6) 40 mm dia.
M
16
1 1
Plumber Plumber Helper
c.7) 50 mm dia.
M
13
1 1
Plumber Plumber Helper
c.8) 65 mm dia.
M
10
1 1
Plumber Plumber Helper
c.9) 80 mm dia.
M
9
1 1
Plumber Plumber Helper
1 1
Plumber Plumber Helper
b.6) 150 mm dia.
c.) Black Steel Pipe Schedule 40 (on Clevis hanger)
d) COPPER PIPES & TUBING ( Solder Joints )
MONTHS
Crew Composition
d.1) 8 mm dia. including Clevis Hangers
M
17
1 1
Plumber Plumber Helper
d.2) 25 mm dia. including Clevis Hangers
M
13
1 1
Plumber Plumber Helper
d.3) 50 mm dia. including Clevis Hangers
M
8
1 1
Plumber Plumber Helper
a) Western Type Water Closet
Nos
3
1 1
Plumber Plumber Helper
b) Western Type Water Closet
Nos
4
1 1
Plumber Plumber Helper
c) Lavatory Wall Hung Type
Nos
5
1 1
Plumber Plumber Helper
d) Urinals Wall Hung
Nos
2
1 1
Plumber Plumber Helper
PLUMBING FIXTURES
Page 73 of 123
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
ACTIVITY DESCRIPTION
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)
No.
Trade
AIR-CONDITIONING / VENTILATING a) Fan Coil Unit a.1) Fan Coil Unit - 1.8 KW Cooling
Nos
5
1 1
AC Technician Helper
a.2) Fan Coil Unit - 3.5 KW Cooling
Nos
4
1 1
AC Technician Helper
a.3) Fan Coil Unit - 10.5 KW Cooling
Nos
3
1 1
AC Technician Helper
a.4) Fan Coil Unit - 35 KW Cooling
Nos
2
2 1
AC Technician Helper
a.5) Fan Coil Unit - 53 KW Cooling
Nos
1
2 1
AC Technician Helper
b.1) Ductwork - Galv. Steel under 90 kg
Kg
70
2.00
Ductman
b.2) Ductwork - Galv. Steel 91 to 227 kg
Kg
72
2.00
Ductman
b.3) Ductwork - Galv. Steel 227 to 454 kg
Kg
75
2.00
Ductman
b.4) Ductwork - Galv. Steel 454 to 907 kg
Kg
78
2.00
Ductman
b.5) Ductwork - Galv. Steel 908 to 2268
Kg
81
2.00
Ductman
c.1) Perforated, 610 mm x 610 mm
Nos
10
1.00
Ductman
c.2) Perforated, 203 mm x 203 mm
Nos
9
1.00
Ductman
c.3) Perforated, 229 mm x 229 mm
Nos
8
1.00
Ductman
c.4) Perforated, 254 mm x 254 mm
Nos
8
1.00
Ductman
c.5) Perforated, 305 mm x 305 mm
Nos
7
1.00
Ductman
c.6) Perforated, 406 mm x 406 mm
Nos
7
1.00
Ductman
LM
13
0.615
1.00
Ductman
0.615
1.00
Common Labor/Helper
b) Ductwork
c) Diffusers
15.3
HVAC Duct, Galvanized Steel (Distribution Line)
Duct, Galvanized Steel (Main Line)
LM
6
MONTHS
Crew Composition
1.231
2.667
Page 74 of 123
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
ACTIVITY DESCRIPTION
Duct Insulation
Diffusers
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)
LM
EA
13
8
No.
Trade
1.333
1.00
Ductman
1.333
1.00
Common Labor/Helper
0.615
1.00
Ductman
0.615
1.00
Common Labor/Helper
1.00
Ductman
1.00
Ductman
2.000
1.00
HVAC Technician
4.000
2.00
Common Labor/Helper
1.00
Mobile Crane
16.000
1.00
Equipment Operator
16.000
1.00
HVAC Technician
32.000
2.00
Common Labor/Helper
2.667
1.00
HVAC Technician
2.667
1.00
Electrician
2.667
1.00
Common Labor/Helper
1.143
1.00
HVAC Technician
1.143
1.00
Common Labor/Helper
1.231
1.000 1.000
Grilles & Registers
EA
17
0.471 0.471
Fan Cool Unit (FCU)
Air Handling Unit (AHU)
EA
EA
4
0.50
6.000
64.000
16.000 16.000
Exhaust Fan
VAV, CAV, Dampers
Chilled Water Pipes
EA
EA
LM
3
7
6
MONTHS
Crew Composition
8.000
2.286
2.667
Page 75 of 123
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
ACTIVITY DESCRIPTION
Chilled Water Valves (Gate, Isolation..etc)
Chilled Water Pipes' Insulation
Chillers Unit
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)
EA
EA
EA
3
12
0.33
No.
Trade
1.333
1.00
Pipe Fitter
1.333
1.00
Common Labor/Helper
2.667
1.00
Pipe Fitter
2.667
1.00
Common Labor/Helper
0.667
1.00
Pipe Fitter
0.667
1.00
Common Labor/Helper
1.00
Mobile Crane
24.242
1.00
Equipment Operator
48.485
2.00
HVAC Technician
72.727
3.00
Common Labor/Helper
1.143
1.00
HVAC Technician
1.143
1.00
Common Labor/Helper
2.667
1.00
HVAC Technician
2.667
1.00
Common Labor/Helper
5.333
1.333
145.455
24.242 24.242
VAV, CAV, Dampers
A/C Split Unit
EA
EA
7
3
MONTHS
Crew Composition
2.286
5.333
DIVISION 16 ELECTRICAL WORKS a) CABLE TRAY LADDER W/ FITTINGS & SUPPORT a.1) 152 mm Wide Galvanized Steel Tray
M
10
1.00
Electrician
a.2) 305 mm Wide Galvanized Steel Tray
M
9
1.00
Electrician
a.3) 457 mm Wide Galvanized Steel Tray
M
8
1.00
Electrician
a.4) 610 mm Wide Galvanized Steel Tray
M
8
1.00
Electrician
Page 76 of 123
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
ACTIVITY DESCRIPTION
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)
MONTHS
Crew Composition No.
Trade
b) CONDUITS INCL. TERMINATION & CLAMP b.1) 15 mm dia. Rigid Galvanized Steel
M
18
1.00
Electrician
b.2) 20 mm dia. Rigid Galvanized Steel
M
16
1.00
Electrician
b.3) 25 mm dia. Rigid Galvanized Steel
M
13
1.00
Electrician
b.4) 32 mm dia. Rigid Galvanized Steel
M
12
1.00
Electrician
b.5) 40 mm dia. Rigid Galvanized Steel
M
11
1.00
Electrician
b.6) 50 mm dia. Rigid Galvanized Steel
M
9
1.00
Electrician
c.1) Outlet Box ,Octagon,102 mm
Nos
13
1.00
Electrician
c.2) Outlet Box, Square,102 mm
Nos
13
1.00
Electrician
c.3) Switch Box,
Nos
17
1.00
Electrician
c.4) Pull Box, 152 mm W x 152 mm H x 102 mm D
Nos
5
1.00
Electrician
c.5) Pull Box,203 mm W x 203 mm H x 102 mm D
Nos
5
1.00
Electrician
c.6) Pull Box,254 mm W x 305 mm H x 152 mm D
Nos
3
1.00
Electrician
d.1) Flush Switch, Standard
Nos
26
1.00
Electrician
d.2) Surface Switch, Standard
Nos
26
1.00
Electrician
d.3) Master Control, 12 Circuit, Manual
Nos
2
1.00
Electrician
d.4) Rectifier, Silicon
Nos
8
1.00
Electrician
d.5) Switch Plates,1 Gang,1,2 or 3 Switch
Nos
52
1.00
Electrician
d.6) Switch Plates, 2 Gang,3 Switch, Stainless
Nos
34
1.00
Electrician
e.1.1) Enclosed (Nema 1) 600 V,3 Pole,30 A
Nos
2
1.00
Electrician
e.1.2) 60 A
Nos
2
1.00
Electrician
e.1.3) 100 A
Nos
2
1.00
Electrician
e.1.4) 225 A
Nos
1
1.00
Electrician
e.1.5) 400 A
Nos
1
1.00
Electrician
e.1.5) 600 A
Nos
0
1.00
Electrician
c) BOXES
d) WIRING DEVICES
e) BOARDS e.1) Circuit Breakers ( enclosure )
Page 77 of 123
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
ACTIVITY DESCRIPTION
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)
No.
Trade
f) LIGHTING FIXTURES Interior Lighting Fixtures f.1) Fluorescent, Acrylic Lens, Recess Mounted
16.1
f.1.1) 300 mm W x1200 mm L, Two 40 W
Nos
4
1.00
Electrician
f.1.2) 300 mm W x1200 mm L, Three 40 W
Nos
4
1.00
Electrician
f.1.3) 600 mm W x 600 mm L, Two U 40 W
Nos
4
1.00
Electrician
f.1.4) 600 mm W x1200 mm L, Two 40 W
Nos
3
1.00
Electrician
f.1.5) 600 mm W x1200 mm L,Three 40 W
Nos
3
1.00
Electrician
f.1.6) 600 mm W x1200 mm L,four 40 W
Nos
3
1.00
Electrician
LM
12
0.667
1.00
Electrician
0.667
1.00
Common Labor/Helper
0.444
1.00
Electrician
0.444
1.00
Common Labor/Helper
0.050
1.00
Electrician
0.101
2.00
Common Labor/Helper
1.00
Electrician
1.143
1.00
Electrician
1.143
1.00
Common Labor/Helper
Cables & Accessories Cable Trays
Cable Conduits/Trunks
Wire Pulling & Cable Laying
Junction Boxes, Outlet Boxes
LM
LM
EA
18
159
36
1.333
0.889
0.151
0.222 0.222
Grounding (rod/plate copper with excavation)
EA
7
MONTHS
Crew Composition
2.286
Page 78 of 123
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
16.2
ACTIVITY DESCRIPTION
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)
No.
Trade
0.667
1.00
Electrician
0.667
1.00
Common Labor/Helper
0.400
1.00
Electrician
0.400
1.00
Common Labor/Helper
1.00
Electrician
5.333
1.00
Electrician
5.333
1.00
Common Labor/Helper
4.000
1.00
Electrician
4.000
1.00
Common Labor/Helper
11.429
1.00
Electrician
11.429
1.00
Common Labor/Helper
16.000
1.00
Electrician
32.000
2.00
Common Labor/Helper
Electrical Fixtures Lighting Fixtures
Fire Alarm Devices
Receptacles & Switches
EA
EA
EA
12
20
18
1.333
0.800
0.444 0.444
Public Address System
16.3
EA
1.5
10.667
Power Distribution & Transformers Circuit Breakers
Panel Boards
Switchboards
Dry Type Transformer, less than 150 kVA
EA
EA
EA
EA
2
0.7
0.5
1
MONTHS
Crew Composition
8.000
22.857
48.000
24.000
Page 79 of 123
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
PRODUCTIVITY RATE MONITORING
NO.
ACTIVITY DESCRIPTION
Dry Type Transformer,larger than 300 kVA
16.4
LABOR EQUIPMENT AVERAGE PRODUCTIVITY UNIT DAILY PRODUCTIVITY PRODUCTION (mh/unit) (eh/unit)
EA
0.6
No.
Trade
8.000
1.00
Electrician
16.000
2.00
Common Labor/Helper
13.333
1.00
Electrician
26.667
2.00
Common Labor/Helper
1.00
Medium Excavator
0.889
1.00
Equipment Operator
0.889
1.00
Electrician
0.889
1.00
Common Labor/Helper
40.000
ELECTRIC UTILITIES Duct Bank
LM
12
2.667
0.667 0.667
MONTHS
Crew Composition
Page 80 of 123
February 2020 ①
②
③
④
March 2020 ⑤
①
②
③
April 20 ④
⑤
①
②
ECTS:
CE . TERUMO - EB4
April 2020 ③
④
⑤
Page 81 of 123
April 2020 ③
④
⑤
Page 82 of 123
April 2020 ③
④
⑤
Page 83 of 123
April 2020 ③
④
⑤
Page 84 of 123
April 2020 ③
④
⑤
Page 85 of 123
April 2020 ③
④
⑤
Page 86 of 123
April 2020 ③
④
⑤
Page 87 of 123
April 2020 ③
④
⑤
Page 88 of 123
April 2020 ③
④
⑤
Page 89 of 123
April 2020 ③
④
⑤
Page 90 of 123
April 2020 ③
④
⑤
Page 91 of 123
April 2020 ③
④
⑤
Page 92 of 123
April 2020 ③
④
⑤
Page 93 of 123
April 2020 ③
④
⑤
Page 94 of 123
April 2020 ③
④
⑤
Page 95 of 123
April 2020 ③
④
⑤
Page 96 of 123
April 2020 ③
④
⑤
Page 97 of 123
April 2020 ③
④
⑤
Page 98 of 123
April 2020 ③
④
⑤
Page 99 of 123
April 2020 ③
④
⑤
Page 100 of 123
April 2020 ③
④
⑤
Page 101 of 123
April 2020 ③
④
⑤
Page 102 of 123
April 2020 ③
④
⑤
Page 103 of 123
April 2020 ③
④
⑤
Page 104 of 123
A. Bored Pile Bored Pile Construction As-Builts Depth (m) =>