26 0 7MB
LANGDON & SEAH VIETNAM CO., LTD 2
1
4
2
Handbook Cover Photos: 1. Harmony Apartment – Hanoi
3
5
2. Hilton Hanoi Hotel – Hanoi 3. The Estella Height 1 – HCMC 4. Mipec Riverside Residence – Hanoi 5. Saigon Center Phase 2&3 – HCMC
Copyright Statement and information caveat Ninth Edition 2016 © Langdon & Seah Vietnam Co., Ltd All rights reserved. No part of this publication may be produced, copied, stored or transmitted in any form without prior written permission from Langdon & Seah Vietnam Co., Ltd. The information contained herein should be regarded as indicative and for general guidance only. Langdon & Seah Vietnam Co., Ltd makes no representation, expressed or implied, with regard to the accuracy of the information herein and cannot accept any responsibility or liability for any errors or omissions that may be made.
handbook are current as at 4th Quarter 2015.
3
TABLE OF CONTENT
Table of Content
4
Calendars Introduction
6 7
1. CONSTRUCTION COST DATA Construction Market 2016 Outlook Major Rates for Selected Asian Cities Construction Cost Specification Construction Costs for Selected Asian Cities M&E Costs for Selected Asian Cities Utility Costs for Selected Asian Cities
10 18 26 28 36 44
2. GENERAL CONSTRUCTION DATA Material Price Indices Import Duties Progress Payments Estimating Rules of Thumb
50 52 53 54
LANGDON & SEAH VIETNAM CO., LTD
3. PROPERTY INVESTMENT
4
Building Control and Procedures Project Closed Out Procedures Typical Submission Flowchart Key Planning Parameter Building Areas Definitions Procurement Strategies Contractor Selection Strategies Property Overview
58 62 63 64 67 72 77 82
4. VIETNAM BUSINESS ENVIRONMENT Language
90
Accounting System Banks
90 91
Government Administration
93 94
Taxation Insurance Workforce
98 104
5. OTHER INFORMATION Vietnam Map Domestic Routes Relevant Websites Public Holidays Prime Rates IDD Codes and Time Differences Conversion Factors Some Interesting Facts Vietnam Key Data Arcadis Asia Leadership Team Arcadis Asia Sectors Arcadis Asia Services Directory of offices Acknowledgement
108 109 110 112 121 122 124 126 128 132 134 137 139 155
5
CALENDARS
2016 1 2 31 3 4 5 6 7 8 9 10 11 12 13 14 15 16
JAN
17 18 19 20 21 22 23 24 25 26 27 28 29 30
3
4
5
6
7
APR
1 8
2 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
31 3
4
5
6
7
1
2
8
9
JUL
7
1 8
2 9
3 4 5 6 10 11 12 13
FEB
6
7
1 8
2 9
3 4 5 10 11 12
MAR
14 15 16 17 18 19 20 21 22 23 24 25 26 27
13 14 15 16 17 18 19 20 21 22 23 24 25 26
28 29
27 28 29 30 31
1 8
2 9
3 4 5 6 7 10 11 12 13 14
MAY
5
6
7
1 8
2 9
3 4 10 11
JUN
15 16 17 18 19 20 21 22 23 24 25 26 27 28
12 13 14 15 16 17 18 19 20 21 22 23 24 25
29 30 31
26 27 28 29 30
7
1 8
2 9
3 4 5 6 10 11 12 13
AUG
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
SEP
10 11 12 13 14 15 16 17 18 19 20 21 22 23
14 15 16 17 18 19 20 21 22 23 24 25 26 27
24 25 26 27 28 29 30
28 29 30 31
18 19 20 21 22 23 24 25 26 27 28 29 30
30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
16 17 18 19 20 21 22 23 24 25 26 27 28 29
20 21 22 23 24 25 26 27 28 29 30
18 19 20 21 22 23 24 25 26 27 28 29 30 31
OCT
NOV
DEC
2017 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
LANGDON & SEAH VIETNAM CO., LTD
JAN
6
22 23 24 25 26 27 28 29 30 31
30 2 3
4
5
6
7
1 8
APR
5
6
7
1 8
2 9
3 4 10 11
FEB
7
1 8
1 5
6
7
JUL
8
2 9
3 4 10 11
MAR
26 27 28 29 30 31
2 9
3 4 5 6 10 11 12 13
MAY
28 29 30 31
4
1 8
26 27 28
23 24 25 26 27 28 29
3
7
12 13 14 15 16 17 18 19 20 21 22 23 24 25
14 15 16 17 18 19 20 21 22 23 24 25 26 27
2
6
12 13 14 15 16 17 18 19 20 21 22 23 24 25
9 10 11 12 13 14 15 16 17 18 19 20 21 22
30 31
5
6
7
1 8
2 9
3 4 5 10 11 12
AUG
4
5
6
7
1 8
2 9
3 10
JUN
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
SEP
9 10 11 12 13 14 15 16 17 18 19 20 21 22
13 14 15 16 17 18 19 20 21 22 23 24 25 26
23 24 25 26 27 28 29
27 28 29 30 31
17 18 19 20 21 22 23 24 25 26 27 28 29 30
1 2 3 4 5 6 7 10 11 12 13 14 15 16 17 18 19 20 21
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 2 31 3 4 5 6 7 8 9 10 11 12 13 14 15 16
22 23 24 25 26 27 28 29 30 31
19 20 21 22 23 24 25 26 27 28 29 30
17 18 19 20 21 22 23 24 25 26 27 28 29 30
OCT
NOV
DEC
INTRODUCTION
INTRODUCTION 6 future annually published handbooks, focuses on the major cities in Asia. The handbook is structured to serve as a general reference guide on construction cost indicators in Asia. The information contained in this handbook has been compiled by Langdon & Seah Vietnam Co., Ltd. Any further information and/or if advice relating to particular
Langdon & Seah Vietnam Co., Ltd
INTRODUCTION
7
CONSTRUCTION COST DATA
Construction Market 2016 Outlook Major Rates for Selected Asian Cities
Construction Costs for Selected Asian Cities M&E Costs for Selected Asian Cities Utility Costs for Selected Asian Cities
1
1
CONSTRUCTION COST DATA CONSTRUCTION MARKET 2016 OUTLOOK 2015 was very important year for our business and we witnessed both a change of brand name and an increase in synergies. In 2016 and as ARCADIS we can now deliver global construction and engineering expertise to all areas within the built and natural environments. We all know Vietnam has experienced a difficult time over the past few years but so also has the rest of the world. We at ARCADIS strongly believe that Vietnam is now positioned for better times ahead and we look forward to being involved in Vietnam ongoing development.
LANGDON & SEAH VIETNAM CO., LTD
As in 2015 much of the press has focused more on politics rather than economic growth. The downturn in China, the raising of interest rates in the USA and potential the UK and geo political tensions all provide reasons to expect lower global growth in 2015 than in previous years.
12 10
Although Global GDP will be lower in 2016 we note that Vietnam GDP growth remains quite strong at circa 6% on 2015 and circa 6.6% in 2016 it will remain largely driven by exports and Foreign Direct Investment. THE GLOBAL ECONOMY 2016 Global GDP in 2015 will grow around 2.0% and the fastest growing region will be Asia but few countries in the region will improve upon their 2014 & 2015 growth. Vietnam will likely be one the fastest growing Asian economy at 6.6% growth. The US and UK are likely to remain the best performing developed economies and Japan will continue its own economic and structural reforms. QE has now stopped in USA and UK where interest rate rises are
CONSTRUCTION COST DATA
expected. Europe and Japan will continue their ongoing of QE and China. All commodities will at best be flat in 2016 and this will continue to affect most Emerging Markets. THE VIETNAM ECONOMY 2016 Vietnam will have one of the higher GDP growth rates in the region at circa 6.6% and growth will continue to be fuelled by exports and Foreign Direct Investment (FDI). Low commodity prices will affect Vietnam exports but we note that due to a greater increase of higher value exports than the commodity downturn will not significantly hamper expert grown. In fact Vietnam balance of payments may improve due to the commodity downturn. The banking sectors non performing loans issues are being rectified and as consequence we do expect an improvement in money supply into the domestic economy. THE VIETNAM CONSTRUCTION MARKET 2016 The market will continue to remain flat and due to limited access to credit. We do expect a greater FDI focus into property development including private investment into the residential market, industrial sector and continued Overseas Development Assistance (ODA) into the infrastructure sector. Global commodity prices will at best be flat in 2016 but from a low base and accordingly construction costs will not increase significantly in 2016.
CONSTRUCTION COST DATA
13 11
16 12
555
808
791
811
970
987 1,544 1,557 1,155 969
919
980 1,175 1588 2,013
285
391
2.47 0.98 1.31 1.71 1.27 1.14 1.22 1.97 4.67 6.04 11.50 10.00 11.00 10.05 10.00 10.55 12.35 14.50
No. of Projects
327
5.10 2.57 2.84 3.14 3.00 3.19 4.55 6.84 12.00 21.30 71.73 22.63 18.60 12.70 12.18 20.82 20.23 22.76
Legal Capital (bn US$)
1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Registered Capital (bn US$)
0
10
20
30
40
50
60
70
80
Annual Foreign Investment (1998-2015)
LANGDON & SEAH VIETNAM CO., LTD
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2,000
2,200
1 CONSTRUCTION COST DATA
CONSTRUCTION COST DATA
CONSTRUCTION COST DATA
13
13.42
523
30.69
2,475
Malaysia
No. of Projects
Taiwan
Registered Capital
0
5
10
15
20
25
30
35
40
45
50
2,883
38.41
Japan
4,944
44.90 1,526
34.72 620
19.21
972
15.69
415
7.36
S. Korea Singapore B.V.Islands Hong Kong Thailand
FDI by countries as of Dec 2015
780
10.78
United States
1,284
9.99
China
0
1,000
2,000
3,000
4,000
5,000
6,000
1
CONSTRUCTION COST DATA FDI BY SECTORS AS OF DECEMBER 2015 1% 5%
94%
1
16,097
260,944
94%
10,697
160,600
Industry and construction Manufacturing Property
492
50,473
Accommodation
442
11,952
1,258
10,834
95
4,388
Electricity, gas and water production and distribution
108
12,662
Information and Communication
1,254
4,209
Wholesale & Retail; Repair
1,708
4,469
43
1,356
Mining
LANGDON & SEAH VIETNAM CO., LTD
Legal Capital (%)
No. of projects
Construction
18 14
Registered Capital (mn US$)
Sector
Water supply & Waste treatment 2
Agriculture & Forestry & Aquaculture
3
Service
522
3,637
1%
3,310
14,457
5%
Art & Entertainment
143
3,622
Logistics
499
3,786
Finance, Banking & Insurance
82
1,334
Health care & Social welfare
108
1,761
Science & Technology
1,920
2,098
Education and Training
239
709
Administration & Supporting services
167
406
2
3.09
Homecare Others Total
150
742.17
19,929
279,039
100%
(Source: Vietnam Investment Review)
CONSTRUCTION COST DATA
CONSTRUCTION COST DATA
1.35
1.65
1.77
2000
(Source: Ministry of Planning and Investment)
1.24
ODA Disbursement
1.50
1998 1999
2.44
0
1
2
ODA Conclusion
Billion US$
3
4
5
6
7
1.50
2.41
1.53
1.81
2001 2002
1.42
1.76
2003
1.65
5.57
2004
1.79
2.52
2005
1.79
2.82
2006
2.18
3.80
2007
2.14
3.46
2008
4.10
5.40
2009
3.54
3.40
2010
3.65
6.80
2011
4.18
5.87
2012
5.13
6.6
2013
5.66
4.38
2014
5.00
3.5
2015
VIETNAM ANNUAL ODA
19 15
5.35
2000
(Source: General Statistics Office)
Construction, % of GDP
-
1
2
3
4
5
6
7
%8
5.80
2001
5.89
2002
6.05
2003
LANGDON & SEAH VIETNAM CO., LTD
6.25
2004
6.36
2005
6.62
2006 6.96
2007 6.49
2008 6.70
2009
7.03
2010
6.41
2011
6.08
2012
5.35
2013
5.33
2014
5.44
2015
1.94
2.07
2.82
3.36
4.03
1.94
5.35
7.51 12.78
Construction, % of GDP
Construction, Real Growth, % y-o-y
5.80
2001
1.63
6.05
2.39
2003
10.57 10.59
5.89
2.07
2002
9.03
6.25
2.82
2004
5.83
10.80
6.36
3.36 6.96
4.95
2007
11.05 12.10
6.62
4.03
2006
2007 2008
4.95
2005
2003 2004 2005 2006
2000
2000 2001 2002
1.63
2.39
Construction Value, US$bn
-
2
4
6
8
10
12
0.02
6.49
5.83
2008
11.36
6.70
6.19
2009
2009 2010
6.19
7.26
Construction Value, US$bn
8.59
6.41
7.86
2011
10.06 (0.97)
7.03
7.26
2010
2.09
6.08
8.59
2012
5.83
5.35
9.14
2013
2011 2012 2013
7.86
9.14
7.07
5.33
9.80
2014
2014
9.80
10.82
5.44
10.39
2015
2015
10.39
22 18
350,000 - 386,900
m3
m3 1,377,900 - 1,522,900
4. Hardcore bed blinded with fine materials
5. Mass concrete grade 15
17,600 - 19,500
16,000 - 17,700
184,000 - 203,300
235,300 - 260,000
198,000 - 218,800
m
kg
kg
m2
m2
m2
6. Reinforced concrete grade 30
7. Mild steel rod reinforcement
8. High tensile rod reinforcement
9. Sawn formwork to soffits of suspended slabs
10. Sawn formwork to columns and walls
11. 112.5mm thick brick walls
1,787,400 - 1,975,500
70,400 - 77,800
m3
3. Remove excavated materials off site
3
76,400 - 84,500
m
2. Excavating for footings not exceeding 1.5m deep
68,300 - 75,400
VND
HO CHI MINH#
m3
Unit
3
1. Excavating basement not exceeding 2m deep
DESCRIPTION
LANGDON & SEAH VIETNAM CO., LTD
45 - 50
38 - 45
38 - 45
3.00 - 3.30
3.00 - 3.30
260 - 320
240 - 280
60 - 70
20 - 25
15 - 20
15 - 20
RM
KUALA LUMPUR
700
420
420
22
23
2,600
2,200
650
120
120
120
BAHT
BANGKOK#
17.50
15.00
15.00
0.65
0.65
130.00
124.00
43.00
3.00
3.00
3.50
B$
BRUNEI
1 CONSTRUCTION COST DATA
MAJOR RATES FOR SELECTED ASIAN CITIES
CONSTRUCTION COST DATA
CONSTRUCTION COST DATA
23 19
283,500 - 313,300
77,700 - 85,800
m2
%
20. Two coats of emulsion paint to plastered surfaces
Average expected preliminaries
55 - 60
6 - 12
3.50 - 4.50
35 - 45
50 - 70
15 - 22
15 - 22
6.00 - 8.00
6.00 - 8.00
350 - 500
12 - 18
120
800
1,200
220
200
55
55
7,000
1,200
The above cost are at 4th Quarter 2015 levels, exclusive of preliminaries and contingencies unless otherwise stated. # Rates are nett of VAT
8 - 12
239,500 - 264,700
m2
17. 20mm Cement and sand (1:4) plaster to walls
m2
82,000 - 90,600
m2
16. 25mm Cement and sand (1:3) paving
m
57,400 - 63,500
kg
15. Steelwork - angles, channels, flats and the like
19. 12mm fibrous plasterboard ceiling lining
28,500 - 31,500
kg
14. Structural steelwork - beams, stanchions and the like
18. Ceramic tiles bedded to floor screed (m/s)
26,000 - 28,700
m2
13. Aluminium casement windows, single glazed
2
494,200 - 546,200
2,660,000 - 2,940,000
m2
12. "Kliplok Colorbond" 0.64mm profiled steel sheeting
58.00
5-8
5.00
28.00
33.00
8.00
9.00
3.20
3.50
160 - 210
22 20
3,500 42 43
1,050
1,200
10
m3
3
11. 112.5mm thick brick walls
170
170
2
m2
m
10
190
8. High tensile rod reinforcement
kg
kg
7. Mild steel rod reinforcement
m2
m
6. Reinforced concrete grade 30
5. Mass concrete grade 15
370
m3
N/A
850
900
2,750
784
145
38
m3
250
45
m
3. Remove excavated materials off site
220
PHP
MANILA
2. Excavating for footings not exceeding 1.5m deep
35
RP’000
JAKARTA#
m3
Unit
3
1. Excavating basement not exceeding 2m deep
DESCRIPTION
LANGDON & SEAH VIETNAM CO., LTD
35.00-40.00
42.00
42.00
1.20-1.30
1.20-1.30
130.00-135.00
190.00-200.00
50.00
15.00-20.00
20.00
20.00
S$
SINGAPORE**
420
420
420
9.50
9.50
1,400
1,200
950
280
205
225
HK$
HONGKONG
72
73
85
4.00
4.00
517
433
170
37
31
26
RMB
BEIJING
1 CONSTRUCTION COST DATA
MAJOR RATES FOR SELECTED ASIAN CITIES
CONSTRUCTION COST DATA
CONSTRUCTION COST DATA
21 25
m2 m2
m2 m2
%
17. 20mm Cement and sand (1:4) plaster to walls
19. 12mm fibrous plasterboard ceiling lining
20. Two coats of emulsion paint to plastered surfaces
Average expected preliminaries
6 - 10
12 - 18
250 275 1,600 965 220
95 95
25 25
60 75 160 150 25
1,100 10,500
250 1,200
13 - 17
21.00 22.00 74.00 30.00 3.50-4.00
4.80-5.80 4.80-5.80
43.00 290.00
10 - 15
140 145 380 570 60
38 42
880 2,950
The above cost are at 4th Quarter 2015 levels, exclusive of preliminaries and contingencies unless otherwise stated. # Rates are nett of VAT ** Rates are nett of GST Jakarta - Item 19 - 9 mm gypsum board Manila - Item 13 - Aluminium with anodized finish; 6mm thick Singapore - Item 5 - Rate for lean concrete blinding Hong Kong - Item 3 - Rate including dumping charges Beijing - Item 13 - rate for double glazed window
18. Ceramic tiles bedded to floor screed (m/s)
m2
m2 m2 kg kg
16. 25mm Cement and sand (1:3) paving
15. Steelwork - angles, channels, flats and the like
14. Structural steelwork - beams, stanchions and the like
13. Aluminium casement windows, single glazed
12. "Kliplok Colorbond" 0.64mm profiled steel sheeting
7 - 10
27 28 140 162 32
9.35 8.50
N/A 815
22
3.40
84
84
85
kg
m2
m2
10. Sawn formwork to columns and walls
11. 112.5mm thick brick walls
3.40
kg
7. Mild steel rod reinforcement
m2
420
m3
6. Reinforced concrete grade 30
9. Sawn formwork to soffits of suspended slabs
320
m3
8. High tensile rod reinforcement
165
m
5. Mass concrete grade 15
98
m3
3. Remove excavated materials off site
4. Hardcore bed blinded with fine materials
30
3
30
m3
2. Excavating for footings not exceeding 1.5m deep
RMB
m3
Unit
SHANGHAI
1. Excavating basement not exceeding 2m deep
DESCRIPTION
LANGDON & SEAH VIETNAM CO., LTD
60
80
80
5.00
5.00
484
449
180
65
25
30
RMB
SHENZHEN /GUANG-ZHOU
65
50
50
3.50
3.50
360
340
150
52
25
18
RMB
CHONGQING / CHENGDU
70
90
90
4.20
4.20
500
410
150
35
25
22
RMB
SHENYANG
1 CONSTRUCTION COST DATA
MAJOR RATES FOR SELECTED ASIAN CITIES
CONSTRUCTION COST DATA
CONSTRUCTION COST DATA
23
150
39
m2
%
20. Two coats of emulsion paint to plastered surfaces
Average expected preliminaries
N/A
5 - 10
30
180
150
25
30
8.00
10.00
525
N/A
5 - 10
35
120
120
32
28
8.50
8.50
700
The above cost are at 4th Quarter 2015 levels, exclusive of preliminaries and contingencies unless otherwise stated. Shanghai - Item 11 - Rate for 120mm thick concrete block walls Chongqing/Chengdu, Shenyang - Item 13 - rate for double glazed window
5 - 10
155
m2
17. 20mm Cement and sand (1:4) plaster to walls
m2
26
m2
16. 25mm Cement and sand (1:3) paving
m
25
kg
15. Steelwork - angles, channels, flats and the like
19. 12mm fibrous plasterboard ceiling lining
8.00
kg
14. Structural steelwork - beams, stanchions and the like
18. Ceramic tiles bedded to floor screed (m/s)
10.00
m2
13. Aluminium casement windows, single glazed
2
N/A
690
m2
12. "Kliplok Colorbond" 0.64mm profiled steel sheeting
N/A
5 - 10
30
120
165
26
25
9.80
9.80
700
22 24
4.20
92
92
70
kg
m2
m2
m2
9. Sawn formwork to soffits of suspended slabs
10. Sawn formwork to columns and walls
11. 112.5mm thick brick walls
4.20
8. High tensile rod reinforcement
500
3
kg
420
m3
5. Mass concrete grade 15
m
170
m3
4. Hardcore bed blinded with fine materials
7. Mild steel rod reinforcement
30
3. Remove excavated materials off site
6. Reinforced concrete grade 30
33
m
m3
2. Excavating for footings not exceeding 1.5m deep
28
RMB
DALIAN
m3
Unit
3
1. Excavating basement not exceeding 2m deep
DESCRIPTION
LANGDON & SEAH VIETNAM CO., LTD
500
280
280
8.00
8.00
1,300
1,400
1,100
90
140
120
MOP
MACAU
940
650
600
65
63
6,850
5,650
4,025
NA
195
175
Rs
INDIA@
44,700
29,400
29,400
1,280
1,240
78,000
64,400
29,200
9,900
1,930
1,930
KRW
SEOUL^^
1 CONSTRUCTION COST DATA
MAJOR RATES FOR SELECTED ASIAN CITIES
CONSTRUCTION COST DATA
CONSTRUCTION COST DATA
29 25
140
32
m2
%
20. Two coats of emulsion paint to plastered surfaces
Average expected preliminaries
N/A
6 - 12
200
650
500
150
120
43
38
4,000
8 - 12
210
1,100
1,450
340
400
103
103
5,250
1,425
39,300
6 - 11
7,870
26,500
64,400
9,300
3,160
1,660
1,660
321,000
The above cost are at 4th Quarter 2015 levels, exclusive of preliminaries and contingencies unless otherwise stated. @ All rates above are Supply & Fix based on projects in Bangalore and are nett of VAT and Service Tax. Mumbai costs are generally 8% higher ^^ Rates include labour costs and are nett of VAT Dalian - Item 13 - rate for double glazed window
5 -10
140
m2
17. 20mm Cement and sand (1:4) plaster to walls
m2
40
m2
16. 25mm Cement and sand (1:3) paving
m
37
kg
15. Steelwork - angles, channels, flats and the like
19. 12mm fibrous plasterboard ceiling lining
9.80
kg
14. Structural steelwork - beams, stanchions and the like
18. Ceramic tiles bedded to floor screed (m/s)
9.80
m2
13. Aluminium casement windows, single glazed
2
N/A
700
m2
12. "Kliplok Colorbond" 0.64mm profiled steel sheeting
30 26
Detached houses, high end
Terraced houses, average standard
Apartments, high rise, high end
HOTELS
INDUSTRIAL
OUTLINE SPECIFICATION
RC structure with steel roof and M&E to main distribution, but excluding a/c, heating and lighting
Including public area fit-out and M&E, but excluding shop fit-out
RC structure, curtain wall, including public area fit-out, tenant area with raised floor/carpet, painted wall and false ceiling
Apartment units with fit-out, including air-conditioning, kitchen cabinets and home appliances, but excluding decorative light fittings and loose furniture Apartment units with good quality fit-out, including air-conditioning, kitchen cabinets and home appliances, but excluding decorative light fittings and loose furniture Houses with fit-out, including air-conditioning, kitchen cabinets and home appliances, but excluding decorative light fittings, loose furniture, garden and parking Houses with good quality fit-out, including air-conditioning, kitchen cabinets and home appliances, but excluding decorative light fittings, loose furniture, garden and parking
Luxury hotels - 5-star
Business hotels - 4/5-star
Budget hotels - 3-star, mid market
1) Interior decoration 2) Furniture (fixed and movable) 3) Special light fittings (chandeliers, etc.) 4) Operating Supplies and Equipment (OS&E) excluded
Owner operated factories, low rise, light weight industry RC structure, including small office with simple fit-out and M&E, but excluding a/c and heating
Medium/high rise offices, average standard High rise offices, prestige quality OFFICE / COMMERCIAL Out-of-town shopping centre, average standard Retail malls, high end Industrial units, shell only (Conventional single storey framed units)
DOMESTIC
Apartments, high rise, average standard
BUILDING
LANGDON & SEAH VIETNAM CO., LTD
1 CONSTRUCTION COST DATA
CONSTRUCTION COST SPECIFICATION
CONSTRUCTION COST DATA
CONSTRUCTION COST DATA
31 27
Including fit-out and a/c, but excluding educational equipment
Including fit-out, loose furniture and a/c
Dry sports (no swimming pool) and are for 'leisure centre' type schemes including main sports hall, ancillary sports facilities, changing and showers, restaurant / cafe, bar, etc. Costs include a/c, Furniture, Fittings and Equipment (FF&E).
Excluding medical and operating equipment
Schools (primary and secondary)
Students' residences
Sports clubs, multi purpose sports/leisure centres (dry sports)
General hospitals - public sector
5. All costs are in US$/m2 CFA. Fluctuation in exchange rates may lead to changes in construction costs expressed in U.S. dollars.
4. The standard for each category of building varies from region to region and do not necessary follow that of each other.
The cost excludes site formation works, external works, land cost, professional fees, finance and legal expenses.
3. All bulidings are assumed to have no basements (except otherwise stated) and are built on flat ground, with normal soil and site condition.
lift shafts, stairwells, balconies, plant rooms, water tanks and the like.
2. The costs per square metre are based on Construction Floor Areas (CFA) measured to the outside face of the external walls / external perimeter including
building will depend upon the design and many other factors and may vary from the figures shown.
1. The costs for the respective categories given above are averages based on fixed price competitive tenders. It must be understood that the actual cost of a
Notes:
OTHERS
RC structure
Multi storey car parks, above ground (