35 0 74KB
Name of organisation completing the work: KQC Task:
Construction & Erection of Formwork
Principal contractor:
Job name:
MESAIEED POWER PLANT PROJECT
Job number:
Kettaneh Construction W.L.L Health, Safety & Environmental Management System Kettaneh Construction W.L.L Job location: GT 1/ GT 2/ GT 3 (SMS)
Job Safety Analysis - CONSTRUCTION & ERECTION OF FORMWORK 29.09.07 Number of pages in this JSA: 7 PAGES
Date the JSA was prepared:
This JSA has been reviewed by:
Barry Joyce; Tony Dagher
Contractor or Representative (signature) Position Item Number
Break the job down into steps
Hazard What could harm someone?
Collision with Plant Vehicles
1
Site Engineer; Site Supervisor; Site Foremen; Site Operatives
Employee (signature) Date
Work activity
This JSA has been discussed with:
Access to Workplace Trip Hazards
Falling Materials
Position
Date
Control Measures What can be done to make
Persons responsible Who will make sure it
the job safe?
happens?
A high level of personal awareness is required from all employees whilst transiting around site. Where possible personnel are to adhere to designated walkways. In addition to the above, all personnel will be issued with and wear Hi-Viz jackets or waistcoats, as a part of the Mandatory Site PPE Requirements All personnel are to maintain a high degree of vigilance whilst moving around site. All Kettaneh work areas are required to be kept free, as far is reasonably practicable, of trailing cables, timber packing etc. and all tools, equipment and waste cleared away as soon as possible. All personnel are to maintain a safe working distance from others working overhead. Personnel are not to work under suspended loads. If working at height all tools and equipment are to be secured from displacement. All personnel are to maintain a
Site Engineer Supervisor
Site Engineer Supervisor
Site Engineer Supervisor
Completion Date and signoff