40 0 105KB
5S Audit Report Mills South - Oct 2009 Audit Criteria 5S Process 1 Is there a 5S training Plan 2 Is the Plan on Target 3 Does the Plan include Implementation Training 4 Does the Plan identify 5S Facilitators 5 Have the Champions Run 5S events
Total 5S Process Sort 1 Is the pre-cleaning stage recorded (5S Work Sheets) before pictures etc 2 Does the area have a Red Tag Zone 3 Does the Area have a 5S Map 4 Are there Responsible Team Members Identified for each area 5 Have all unnecessary items been removed from Area
Have the Necessary Items been identified and a Place identified for storage Are the Necessary items stored in relation to frequency of use. Is the Set criteria reflected within the 5S Standards Does the Local Induction Training include the Set Criteria Are the Area H&S requirements complied with
100% No
75%
Sort
50% 25% 0%
15
60%
Yes
No 3 3
Standardise
Set
3 3
10 1
Shine
40% 2
3 3
4
5 Result Analysis
3 3
15
3 Subtotal
Total Shine Standardise 1 Are there Area 5S Standards available 2 Are abnormalities identified and dealt with. Subtotal
3 1
2
13
52%
Yes
No 3 3
0 1
How effective are the Corrective actions taken on abnormalities. Are all the necessary Operating Procedures available at the workplace. Standards exist and everyone knows what they are There are sufficient standards in place with plans to improve on and introduce more. Visual standards are fully integrated into the daily activities
6
4
0
10 5 0
2
3 3
4
5 Results
Yes
No
1
2
3
4
5
13
8
0
1
4
5
0
3 3 3 Subtotal
Total Standardise Sustain 1 Are there 5S Audits Conducted 2 Are there improvement plans based on these Audits Subtotal People are aware of 5S and behave accordingly Local 5S facilitators are delivering training to the local teams 5S Improvements have driven the implementation of TPM activities There is visual management at the workplace with "up-to-date" information on Performance versus targets There is an "up-to-date" Improvement plan in place which is discussed with team regularly Subtotal
0
3 2
11
43%
Yes 3 3 10 1
No
Performance
9
4
0 100 80 60
2
3
4 3 3
5
0
0
3
3 3 16
40 20
3
Total Sustain 20.7 83% Total 63 80 Target Doc No - CI 001-01
Sustain
3
Shine 1 The main work areas are Clean & Tidy with no evidence of Dust, Dirt and Rubbish 2 Equipment Storage and surrounding areas are Clean & Tidy 3 The Building fabric, facilities & equipment are maintained in line with 5S standards 4 The Area has regular reviews with improvement plans in place. 5 Root Cause analysis is used to identify and eliminate causes of contamination
1 2 3 4 5
25 Yes 3 3
5S Process 100%
3
Total Set
1 2 3 4 5
No
3 3
Total Sort Set 1 2 3 4 5
Yes 3 3 3 3 3
0 Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
0 Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Performance
17
24
27
22
28
36
59
59
62
63
Target
80
80
80
80
80
80
80
80
80
80
Nov
Dec
80
80
1 = No Evidence 2 = Little Evidence 3 = Some Evidence 4 = High degree Evidence 5 = Fully Implemented