MA’ADEN PROJECTS Ma’aden Aluminum Project

Mine and Refinery

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

Document No: MD-402-1000-EG-PI-SPC-00015 Revision: 0 Date of Issue: 24 October 2011

Ma’aden Aluminum Project MINE AND REFINERY

Issued

24 Oct 2011

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

DOCUMENT NUMBER Revision

Page:

MD-402-1000-EG-PI-SPC-00015 0

Page ii of ii

TABLE OF CONTENTS 1.

Introduction ...................................................................................................................................... 1

2.

Terminology ..................................................................................................................................... 2

3.

Codes, Standards & Local Regulations .......................................................................................... 3 3.1. General ............................................................................................................................... 3 3.2. Government Acts ................................................................................................................ 3 3.3. International Standards ...................................................................................................... 4

4.

Requirements of Regulatory Agencies ............................................................................................ 5

5.

Welding............................................................................................................................................ 6 5.1. Acceptable Welding Processes .......................................................................................... 6 5.2. Welding Procedure Qualification ........................................................................................ 7 5.3. Welder Qualifications .......................................................................................................... 7 5.4. Storage and Handling ......................................................................................................... 7 5.5. Welded Joint Preparation ................................................................................................... 8 5.6. Surface Preparation ............................................................................................................ 8 5.7. Pickling & Passivation of Welds and Heat Affected Zones on Stainless Steel .................. 8 5.8. Joint Backup Requirements ................................................................................................ 8 5.9. Workmanship ...................................................................................................................... 9 5.10. Weld Repairs .................................................................................................................... 10

6.

Thermal Treatment ........................................................................................................................ 11 6.1. Preheat Treatment and Interpass Requirements ............................................................. 11 6.2. Post Weld Heat Treatment (PWHT) Requirements.......................................................... 11

7.

Inspection and Tests ..................................................................................................................... 12 7.1. NDE (Non-Destructive Examination) Requirements ........................................................ 12 7.2. Mechanical Testing of Welding......................................................................................... 12

8.

Piping Welding Data SheetS ......................................................................................................... 14

9.

Standard NDE/HEAT/TEST Symbols ........................................................................................... 24

10. Standard Technical Specifications ................................................................................................ 25

Ma’aden Aluminum Project MINE AND REFINERY

Issued

1.

24 Oct 2011

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

DOCUMENT NUMBER Revision

Page:

MD-402-1000-EG-PI-SPC-00015 0

Page 1 of 25

INTRODUCTION

This specification prescribes requirements for Welding and Inspection of Piping fabrication for the Ma’aden Aluminum Project located in the Kingdom of Saudi Arabia. All works and supplied equipment shall be in accordance with the requirements detailed in this Technical Specification, and in accordance with the reference Documents listed in Section 10 of this Specification.

Ma’aden Aluminum Project MINE AND REFINERY

Issued

2.

24 Oct 2011

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

DOCUMENT NUMBER Revision

Page:

MD-402-1000-EG-PI-SPC-00015 0

Page 2 of 25

TERMINOLOGY

The following terminology applies to this specification:

Terminology

Definition

Employer

Saudi Arabian Mining Company (Ma’aden)

Contractor

The entity carrying out the Scope of Work

Shall

Shall is a compelling requirement to be followed strictly in conformance with this document.

Should

Should is a recommendation.

May

May indicates a course of action permissible.

Can

Can indicates a possibility open to the user of the procedure.

Pipe Welding – Welding of piping, components, and attachments. Employer – Owner’s authorized agent who has been retained to perform the Engineering, Procurement, and Construction Management for this project. Contractor – The party who is responsible to perform welding. This could be a Supplier, Manufacturer, Fabricator, or Construction Contractor as referenced in the Contract or PO (Purchase Order). ASME – American Society of Mechanical Engineers

Ma’aden Aluminum Project MINE AND REFINERY

Issued

24 Oct 2011

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

DOCUMENT NUMBER Revision

Page:

MD-402-1000-EG-PI-SPC-00015 0

Page 3 of 25

3.

CODES, STANDARDS & LOCAL REGULATIONS

3.1.

General Equipment supplied shall conform to the latest revision, addenda and supplements of all relevant approved National Standards, Government Acts, and the Rules and Regulations of the Statutory Authority having jurisdiction in the Kingdom of Saudi Arabia. Equipment manufactured to American, British, ISO, Australian or IEC Standards may be acceptable provided that these Standards can be demonstrated to meet or exceed the requirements of the relevant National Standards. Equipment supplied shall also conform to the EMPLOYER’S Safety requirements, and relevant requirements of the PROJECT’S Standard Technical Specifications. Precedence of Technical Standards shall be as follows: i.)

The relevant National Standards shall have primacy over all others,

ii.)

Customer Standard Technical Specifications,

iii.)

ANSI/ASME Standards for pressure vessels, piping, valves and fittings,

iv.)

API Standards,

v.)

ISO / ASTM Standards for quality and inspection,

vi.)

Hydraulic Institute Standards, and

vii.)

American Gear Manufacturers Association Standards.

The Contractor shall advise of any non-conformances to relevant requirements of the applicable codes and standards, and shall give the Employer’s Representative written notification specifying the reason for the non-conformance, and requesting direction/approval. Design not covered by design codes and this Technical Specification is left to the discretion of a designer reasonably familiar with the plant process to use such information and judgement as will ensure fitness for purpose. 3.2.

Government Acts The work shall comply with the requirements of all applicable Acts, including but not limited to, the following: i.)

Relevant National Safety, Health and Welfare (General Application) Regulations,

ii.)

Relevant National Rules for Electrical Installations, and

iii.)

Other Relevant National Acts.

Ma’aden Aluminum Project MINE AND REFINERY

Issued

3.3.

24 Oct 2011

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

DOCUMENT NUMBER Revision

Page:

MD-402-1000-EG-PI-SPC-00015 0

Page 4 of 25

International Standards The publication listed below form part of this specification and shall apply as a minimum. Table 3-1: International Standards

Standard

Number

Document Title

ASME

B31.3

ASME

Section IX

NACE

SP0403

ASTM

A967

Chemical Passivation Treatments for Stainless Steel Parts

ASTM

A380

Standard Practice for Cleaning, Descaling, and Passivation of Stainless Steel Parts, Equipment and Systems

Process Piping Welding and Brazing Qualifications Avoiding Caustic Stress Corrosion Cracking of Carbon Steel Refinery Equipment and Piping

Ma’aden Aluminum Project MINE AND REFINERY

Issued

4. a)

24 Oct 2011

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

DOCUMENT NUMBER Revision

Page:

MD-402-1000-EG-PI-SPC-00015 0

Page 5 of 25

REQUIREMENTS OF REGULATORY AGENCIES Welding operations shall be conducted under the quality control system applicable for ASME current certificates of authorization held by the Contractor.

b)

WPSs, PQRs, and Welder's Performance Qualifications shall conform to the requirements of the applicable ASME Code(s) and to the requirements of the local municipality as applicable.

c)

Compliance with this specification and authorization of WPSs, PQRs, and other required documentation shall in no way relieve the Supplier of the responsibility of providing welds which are sound and suited to the services for which they are intended.

d)

The control and handling of welding materials in fabrication shall be an integral part of the Supplier's Quality Plan and Inspection & Test Plan (ITP).

Ma’aden Aluminum Project MINE AND REFINERY

Issued

5.

24 Oct 2011

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

DOCUMENT NUMBER Revision

Page:

MD-402-1000-EG-PI-SPC-00015 0

Page 6 of 25

WELDING

General design and fabrication requirements shall be in accordance with ASME B31.3. 5.1.

Acceptable Welding Processes 5.1.1.

SMAW – Shielded Metal Arc Welding For carbon and low alloy steel, only low hydrogen electrodes shall be used, except E6010 may be used for root passes of single sided welds without backing in carbon steel piping. Electrical characteristics shall be direct current-reverse polarity. No other coated electrodes may be used for root passes in single sided welds without backing. Note: Purge gas is not "backing".

5.1.2.

GTAW – Gas Tungsten Arc Welding Argon purge required, for single sided welds without backing, for all materials except carbon and low alloy steels of nominal 3% alloy or less. ER70S-6 is not permitted. GTAW without addition of filler metal (autogenous) is not allowed.

5.1.3.

FCAW – Flux Core Arc Welding External shielding gas required except for structural steel. Shielding gas shall be per AWS classification. E70T-4 is not permitted. Metal Core welding processes are not permitted.

5.1.4.

SAW – Submerged Arc Welding Only natural fluxes shall be employed. Active fluxes prohibited, flux from re-crushed slag is prohibited. Wire Flux combinations designed for as welded condition shall not be used for welds in PWHT condition and vice versa. Wire Flux combinations shall be clearly recorded on both WPS and PQRs. Change in Flux and/or Wire AWS Class requires requalification.

5.1.5.

GMAW – Gas Metal Arc Welding Short arc transfer limited to uphill progression (except root pass), 150# max flange rating, and 1/2" max material thickness.

a) All manual, machine, and semi-automatic vertical welding shall be uphill. b) Filler materials without specified chemistries shall not be used. For example: ER70S-G.

Ma’aden Aluminum Project MINE AND REFINERY

Issued

5.2.

24 Oct 2011

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

DOCUMENT NUMBER Revision

Page:

MD-402-1000-EG-PI-SPC-00015 0

Page 7 of 25

Welding Procedure Qualification a) All Weld Procedures Specifications must be qualified to ASME Section IX and any additional requirements of B31.3. b) All Weld Procedure specifications with Procedure Qualification Records must be submitted to Employer for approval prior to the start of work. c) Welding Procedures for notch toughness applications shall be prepared separately from nonnotch toughness welding procedures.

5.3.

Welder Qualifications a) Welders to be employed in the fabrication / erection of piping systems covered by this specification shall be qualified by tests in accordance with the requirements of ASME BPV Code, Section IX. b) Welder qualification tests shall be conducted by the Fabricator involved in the Contract or PO referencing this specification. The transfer of performance qualification tests between Contractors is not permitted.

5.4.

Storage and Handling The Contractors' procedures for welding consumable storage and handling shall conform to the following guidelines as a minimum: 5.4.1.

SMAW Electrodes a) Low Hydrogen, Stainless Steel, Nickel Alloy Electrodes shall always be stored in one of the following: b) Unopened and undamaged factory sealed container. c) Separate electrode storage ovens at 121-177 degrees C d) Portable Rod Caddies at 66 degrees C min. may be used for up to ten (10) hours. e) E6010 shall be stored in a warm, dry container at 52 degrees C. or less. f)

5.4.2.

Electrodes shall be properly identified at all times.

SAW Electrodes and Fluxes a) Submerged arc wire shall be stored with Supplier's wrapper intact. Coils that have been partly used shall be protected and identified before being returned to storage. Contaminated or unidentified wire shall not be used. b) Flux used for SAW shall be dry and free from contamination. Flux shall be stored in factory packaging until time of use. Flux from damaged packages shall be dried at 149 degrees C. for one (1) hour before use.

Ma’aden Aluminum Project MINE AND REFINERY

Issued

5.5.

24 Oct 2011

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

DOCUMENT NUMBER Revision

Page:

MD-402-1000-EG-PI-SPC-00015 0

Page 8 of 25

Welded Joint Preparation a) Weld joint preparation may be made by machining, grinding or thermal cutting. b) When thermal cutting or bevelling is permitted, the cut surfaces shall be ground to remove a minimum of 0.8 mm of the heat affected (distressed) metal. c) Double-welded butt joints are preferred and shall be used wherever feasible; pressure boundary or attachments to the pressure boundary shall be a full penetration weld for 600# pressure rating service and greater, unless noted otherwise on project drawings..

5.6.

Surface Preparation a) Surfaces to be welded shall be clean and free from galvanizing, paint, oil, dirt, scale, oxides, and other foreign material detrimental to welding for at least 25 mm from joint preparation. b) Flux, weld spatter, and slag shall be removed from weld beads by chipping, grinding, or both, and wire brushing before starting to deposit a succeeding pass.

5.7.

Pickling & Passivation of Welds and Heat Affected Zones on Stainless Steel a) All welds and heat affected zones on Stainless Steel shall be cleaned by pickling and surface integrity restored by passivation. b) The contractor shall submit to the Employer a pickling and passivation procedure prior to commencing of any works.

5.8.

Joint Backup Requirements a) Permanent backup rings are not permitted without specific written authorization from Employer. b) Pressure retaining components, except those fabricated from carbon or low alloy steel of 3% Cr or less shall be made with a root-back purge. Double-welded butt joints, joints with backing rings, and fillet welds are exempt from purge gas requirements. Purge gas shall follow the requirements listed below as a minimum: i.

Welding grade argon inert gas shall be used as the root purging gas. The use of nitrogen for a purge gas is permitted only for Austenitic Stainless Steel.

ii. While GTAW is to be used for a minimum of 2 weld layers, root shielding shall be continued until the root and such additional passes as may be required to bring the deposited weld metal thickness up to 5 mm (minimum) have been deposited. iii. The materials used for pipe purging dams and the methods employed in their placement, use, and subsequent removal shall be as required to ensure that no damage results to the piping or related components.

Ma’aden Aluminum Project MINE AND REFINERY

Issued

24 Oct 2011

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

DOCUMENT NUMBER Revision

Page:

MD-402-1000-EG-PI-SPC-00015 0

Page 9 of 25

iv. The purge gas shall be verified to contain less than 2 percent oxygen (measured by an oxygen analyzer), or flow for a sufficient amount of time to allow at least 6 purge volume changes, prior to the initiation of welding. 5.9.

Workmanship a) The weld preparations shall be aligned as accurately as is practical, and alignment shall be preserved during welding. In all cases, weld joint alignment shall be sufficient to produce welds meeting the requirements of this specification. b) Surfaces and edges to be welded shall be smooth, uniform, and free from fins, tears, cracks, or other defects which would adversely affect the quality or strength of the weld. c) Tack welds shall be preheated as required for the final weld. d) Tack welds that are to be incorporated into the final weld shall have a profile which can be welded over without adversely affecting the weld quality. e) Tack welds which are not incorporated into the weld shall be removed completely after their need has been fulfilled. f)

Tack welds shall be made by qualified welders, using a qualified procedure comparable to those used for the component weld. The qualification procedure shall be submitted to the Employer for approval prior to the start of work.

g) Temporary attachments such as hold-down fixtures or alignment bars shall be removed; the surface under such welds shall be properly conditioned to eliminate surface stress risers. The attachment material shall be of the same chemical composition as the base material. h) Arc strikes made in areas not to be covered by the finished weld shall be ground and visually inspected to ensure that the pipe surface is restored to its original condition. i)

Weld slag, scale, cracked welds, surface porosity, or gross irregularities shall be removed before welding resumes. Weld craters shall be completely filled before depositing subsequent weld beads.

j)

The use of pneumatic cleaning tools is acceptable and is not considered as peening.

k) Grinding wheels, rotary burrs, and austenitic stainless steel wire brushes, used on austenitic stainless steel or other high nickel and nonferrous alloys, shall not have been used previously on ferrous materials. Metal removal and abrasive tools used on galvanized material shall be segregated from other materials. l)

As welded surfaces are permitted, however, the surfaces of welds shall be sufficiently free from coarse ripples, grooves, overlaps, abrupt ridges, and valleys to allow the proper interpretation of radiographic and other NDE when NDE are required. When an as-welded surface interferes with an examination, the surface shall be ground to permit the proper interpretation of the examination.

m) Weld metal shall be deposited for the full thickness of the joint preparation regardless of minimum wall thickness. Under-fill shall not be permitted.

Ma’aden Aluminum Project MINE AND REFINERY

Issued

5.10.

24 Oct 2011

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

DOCUMENT NUMBER Revision

Page:

MD-402-1000-EG-PI-SPC-00015 0

Page 10 of 25

Weld Repairs All repairs shall be reported to the buyer and approval obtained prior to commencement of repairs. Welds that do not comply with the specified acceptance criteria shall be repaired and reexamined in accordance with the following. a) The defect area shall be excavated and examined to ensure complete removal of defects. The repaired areas shall be re-examined using the same inspection procedures by which the defect was originally detected. b) Repairs to correct weld defects shall be made using the same procedure used for the original weld or other previously approved weld procedures. Inspection of repaired welds shall be performed using the same NDE method(s) which detected the initial indication. c) Requirements of ASME B31.3 shall be met for retesting requirements when a defect has been detected and a weld repair completed.

Ma’aden Aluminum Project MINE AND REFINERY

Issued

24 Oct 2011

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

DOCUMENT NUMBER Revision

Page:

6.

THERMAL TREATMENT

6.1.

Preheat Treatment and Interpass Requirements

MD-402-1000-EG-PI-SPC-00015 0

Page 11 of 25

The minimum preheating temperatures for welding, thermal cutting, and tack welding including bridge tacks shall be as specified by the Piping Welding Data Sheet in Section 8, or the appropriate code section, whichever is greater. Wherever preheats are listed in the Codes as recommend, these shall be used as minimums. 6.2.

Post Weld Heat Treatment (PWHT) Requirements a) Post Weld Heat Treatment shall be as specified in ASME B31.3. for general services and NACE SP0403 for lines subject to Caustic Stress Corrosion Cracking as nominated by the line list and piping specification . b) Components that are to have localized heat treatment shall have procedures approved by Employer prior to use. Procedures must include evidence by calculations that thermal stresses will not be introduced into the piping from localized heat. Oxy-fuel post weld heat treatment is prohibited. Thermocouples and charts are required.

Ma’aden Aluminum Project MINE AND REFINERY

Issued

24 Oct 2011

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

DOCUMENT NUMBER Revision

Page:

7.

INSPECTION AND TESTS

7.1.

NDE (Non-Destructive Examination) Requirements

MD-402-1000-EG-PI-SPC-00015 0

Page 12 of 25

The extent of non-destructive examination requirements for each piping line class is specified on the Piping Welding Data Sheet located in Section 8. a) NDE procedures, personnel qualifications and certifications and acceptance criteria shall be in accordance with the applicable Code. b) NDE procedures and personnel certifications shall be submitted to Employer for approval prior to the start of work. c) Additional requirements for radiographic examination shall be as follows: i.

Type 1 film (fine grain) shall be used unless approved by Employer.

ii. Lead screens shall be used. iii. Approval from Employer is required for use of penetrameters other than those specified in the applicable Code. iv. Whenever 5 percent volumetric examination is specified, the following rule shall be applied: At least 5 percent of the number of welds within the specified material group or line class shall be 100 percent radiographed (or UT if Code permitted) around their total circumference. Each welder shall have the first 2 welds radiographed (or UT if Code permitted). d) Refer to ASME B31.3 for retesting requirements when a defect has been detected. 7.2.

Mechanical Testing of Welding Mechanical tests shall be conducted as required by ASME B31.3 and this specification. Employer shall have the option to witness the mechanical testing as specified. 7.2.1.

Charpy Impact Testing Procedure qualifications for low temperature service shall include Charpy V-Notch impact tests in accordance with ASME B31.3 of the weld metal and of the HAZ (heat affected zone) at the minimum metal design temperature. A change in the electrode or wire classification from that qualified in the PQR (Procedure Qualification Record) shall require requalification.

Ma’aden Aluminum Project MINE AND REFINERY

Issued

24 Oct 2011

7.2.2.

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

DOCUMENT NUMBER Revision

Page:

MD-402-1000-EG-PI-SPC-00015 0

Page 13 of 25

Brinell Hardness Testing The extent of production hardness testing for each piping line class is specified in the Piping Welding Data Sheet in Section 8.

7.2.3.

Ferrite Testing The extent of production ferrite testing for each piping line class is specified in the Piping welding Data Sheet in Section 8. Ferrite shall fall within the following range: 3-10FN except 347 weld metal shall be 5-10FN.

Ma’aden Aluminum Project

DOCUMENT NUMBER

MINE AND REFINERY Issued

8.

Revision

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

24 Oct 2011

Page:

MD-402-1000-EG-PI-SPC-00015 0

Page 14 of 25

PIPING WELDING DATA SHEETS

Design Code:

ASME B31.3

Fluid Service: Normal Fluid Service

Line Class(es):

1A, 1B, 1G, 1J, 1M, 1R, 1S

ANSI Class: 150

Service Description(s): AIR, BXS, CC, CGM, CW, DEF, DGS, DW, DWA, EFF, FLC, FW, HYF, HYS, HW, IA, LS, MDS, OXS, PA, PL, PWL, PRW, QKL, RDS, SL, TCA, VAC, WOF, XST Piping Material: Carbon Steel (A106-B, A53-B, API-5L-B) P Number: P-No. 1

Attachment Material: Carbon Steel P Number: P-No. 1

Valve Body Material: Carbon Steel P Number: P-No. 1

CVN Requirements: None

PMI Requirements: None

Ferrite Requirements: None

Pipe Dia

Max Wall

Joint

DN

Thickness (mm)

Type

Preheat (°C)

PWHT (°C)

RT

MT

20 – 40

7.14

SW

10

N/A

--

20%

50 – 600

12.70

BW

10

N/A

5%

750 - 1200

12.70

BW

10

N/A

1350

12.70

BW

10

1800

14.27

BW

Fillet Attachment

Heat Treatment (Note A)

NDE (Note B) PT

HT (Note C) VT

%

Max Value

100%

N/A

--

--

100%

N/A

--

5%

--

100%

N/A

--

N/A

5%

--

100%

N/A

--

10

N/A

5%

--

100%

N/A

--

10

N/A

--

10%

100%

N/A

--

General Notes:

Table Notes:

A.

1.

Preheat and PWHT requirements shall be in accordance with Section 6 of this specification.

B.

The evaluation of indications and acceptance criteria shall be in accordance with Section 7

Hardness requirements shall be in accordance with Section 7 of this specification.

D.

See Section 9 of this attachment for definitions of abbreviations, joint type, heat treatment, NDE and test symbols.

WPS No.`

The seal weld shall cover all exposed threads. For specific application refer to SP-50-3, Paragraph 2.7.

2.

of this specification. C.

UT

Welding Procedures

PWHT welds when the thickness through the weld in any plane (as specified in ASME B31.3, Paragraph 331.1.3) exceeds 19 mm..

3.

X% RT or MT or PT means X% of total number of welds with 100% coverage of the entire weld (not just spot).

Ma’aden Aluminum Project

DOCUMENT NUMBER

MINE AND REFINERY Issued

Revision

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

24 Oct 2011

Design Code:

ASME B31.3

Line Class(es):

1L

Page:

Fluid Service: Normal Fluid Service

MD-402-1000-EG-PI-SPC-00015 0

Page 15 of 25

ANSI Class: 150

Service Description(s): CON, DFO, FLS, GWL, NCV, PRW, LO, LPS, NG Piping Material: Carbon Steel (A106-B, A53-B, API-5L-B) P Number: P-No. 1

Attachment Material: Carbon Steel P Number: P-No. 1

Valve Body Material: Carbon Steel P Number: P-No. 1

CVN Requirements: None

PMI Requirements: None

Ferrite Requirements: None

Pipe Dia

Max Wall

Joint

DN

Thickness (mm)

Type

Preheat (°C)

PWHT (°C)

RT

MT

20 – 40

7.14

SW

10

N/A

--

20%

50 – 600

12.70

BW

10

N/A

10%

750 - 1200

12.70

BW

10

N/A

1350

12.70

BW

10

1800

14.27

BW

Fillet Attachment

Heat Treatment (Note A)

NDE (Note B) PT

HT (Note C) VT

%

Max Value

100%

N/A

--

--

100%

N/A

--

10%

--

100%

N/A

--

N/A

10%

--

100%

N/A

--

10

N/A

10%

--

100%

N/A

--

10

N/A

--

10%

100%

N/A

--

General Notes:

Table Notes:

A.

1.

Preheat and PWHT requirements shall be in accordance with Section 6 of this specification.

B.

The evaluation of indications and acceptance criteria shall be in accordance with Section 7

Hardness requirements shall be in accordance with Section 7 of this specification.

D.

See Section 9 of this attachment for definitions of abbreviations, joint type, heat treatment, NDE and test symbols.

WPS No.`

The seal weld shall cover all exposed threads. For specific application refer to SP-50-3, Paragraph 2.7.

2.

of this specification. C.

UT

Welding Procedures

PWHT welds when the thickness through the weld in any plane (as specified in ASME B31.3, Paragraph 331.1.3) exceeds 19 mm..

3.

X% RT or MT or PT means X% of total number of welds with 100% coverage of the entire weld (not just spot).

Ma’aden Aluminum Project

DOCUMENT NUMBER

MINE AND REFINERY Issued

Revision

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

24 Oct 2011

Design Code:

MD-402-1000-EG-PI-SPC-00015 0

Page:

ASME B31.3

Fluid Service: Normal Fluid Service

Page 16 of 25

ANSI Class: 150

1D (PWHT to NACE SP0403-2008), 1E (PWHT to NACE SP0403-2008)), 1W (PWHT to NACE SP0403-2008)

Line Class(es):

Service Description(s): BXS, CC, CSA, DGS, FC, HYF, HYS, LS, MDS, OXS, PL, SL, WOF Piping Material: Carbon Steel (A106-B, API-5L-B) P Number: P-No. 1

Attachment Material: Carbon Steel P Number: P-No. 1

Valve Body Material: Carbon Steel P Number: P-No. 1

CVN Requirements: None

PMI Requirements: None

Ferrite Requirements: None

Pipe Dia

Max Wall

Joint

DN

Thickness (mm)

Type

Preheat (°C)

20 – 40

7.14

SW

10

50 – 600 750 - 900

12.70 12.70

BW BW

Heat Treatment (Note A)

10 10

PWHT (°C)

NDE (Note B) RT

MT

PT

HT (Note C) VT

Max Value

(3)

--

20%

100%

N/A

--

635 ± 14

(3)

5%

--

100%

N/A

--

635 ± 14

(3)

5%

--

100%

N/A

--

Table Notes:

A.

1.

Preheat and PWHT requirements shall be in accordance with Section 6 of this specification. The evaluation of indications and acceptance criteria shall be in accordance with Section 7

C.

Hardness requirements shall be in accordance with Section 7 of this specification.

D.

See Section 9 of this attachment for definitions of abbreviations, joint type, heat treatment,

WPS No.`

The seal weld shall cover all exposed threads. For specific application refer to SP-50-3, Paragraph 2.7.

2.

of this specification.

NDE and test symbols.

%

635 ± 14

General Notes:

B.

UT

Welding Procedures

X% RT or MT or PT means X% of total number of welds with 100% coverage of the entire weld (not just spot).

3.

PWHT as per NACE SP0403-2008

Ma’aden Aluminum Project

DOCUMENT NUMBER

MINE AND REFINERY Issued

Revision

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

24 Oct 2011

Design Code:

Page:

ASME B31.3

Fluid Service: Normal Fluid Service

MD-402-1000-EG-PI-SPC-00015 0

Page 17 of 25

ANSI Class: 150

1U

Line Class(es):

Service Description(s): CGM, DEF, DWA, FLC, XST Piping Material: Stainless Steel (304 SS (A312)) P Number: P-No. 8

Attachment Material: Stainless Steel P Number: P-No. 8

Valve Body Material: Stainless Steel P Number: P-No. 8

CVN Requirements: None

PMI Requirements: None

Ferrite Requirements: None

Pipe Dia

Max Wall

Joint

DN

Thickness (mm)

Type

Preheat (°C)

PWHT (°C)

RT

20 – 40

3.68

SW

10

N/A

50 – 600

6.35

BW

10 10

Fillet Attachment

Heat Treatment (Note A)

NDE (Note B) MT

HT (Note C)

PT

VT

--

20%

N/A

20%

N/A

--

%

Max Value

100%

N/A

--

--

100%

N/A

--

20%

--

N/A

--

General Notes:

Table Notes:

A.

1.

Preheat and PWHT requirements shall be in accordance with Section 6 of this specification.

B.

The evaluation of indications and acceptance criteria shall be in accordance with Section 7

Hardness requirements shall be in accordance with Section 7 of this specification.

D.

See Section 9 of this attachment for definitions of abbreviations, joint type, heat treatment, NDE and test symbols.

E.

Pickle & Passivation of welds required

WPS No.`

The seal weld shall cover all exposed threads. For specific application refer to SP-50-3, Paragraph 2.7.

2.

of this specification. C.

UT

Welding Procedures

PWHT welds when the thickness through the weld in any plane (as specified in ASME B31.3, Paragraph 331.1.3) exceeds 19 mm..

3.

X% RT or MT or PT means X% of total number of welds with 100% coverage of the entire weld (not just spot).

Ma’aden Aluminum Project

DOCUMENT NUMBER

MINE AND REFINERY Issued

Revision

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

24 Oct 2011

Design Code: Line Class(es):

Page:

ASME B31.3

Fluid Service: Normal Fluid Service

MD-402-1000-EG-PI-SPC-00015 0

Page 18 of 25

ANSI Class: 150

1Y

Service Description(s): DSA Piping Material: Stainless Steel (A790 (S32750)) P Number: P-No. 10 H

Attachment Material: Stainless Steel P Number: P-No. 10H

Valve Body Material: Stainless Steel P Number: P-No. 10H

CVN Requirements: None

PMI Requirements: None

Ferrite Requirements: None

Pipe Dia

Max Wall

Joint

Heat Treatment (Note A)

NDE (Note B)

DN

Thickness (mm)

Type

Preheat (°C)

PWHT (°C)

RT

20 – 40

3.68

SW

Note F

N/A

50 – 600

6.35

BW

Note F

750

7.92

BW

Note F

MT

HT (Note C)

PT

VT

--

20%

N/A

20%

N/A

20%

%

Max Value

100%

N/A

--

--

100%

N/A

--

--

100%

N/A

--

General Notes:

Table Notes:

A.

Preheat and PWHT requirements shall be in accordance with Section 6 of this specification.

1.

B.

The evaluation of indications and acceptance criteria shall be in accordance with Section 7 of this specification.

C.

Hardness requirements shall be in accordance with Section 7 of this specification.

D.

See Section 9 of this attachment for definitions of abbreviations, joint type, heat treatment, NDE and test symbols.

E.

Pickle & Passivation of welds required

F.

Preheat as per Piping material manufactures recommendations.

G. Interpass maximum temperature 150°C

UT

Welding Procedures WPS No.`

The seal weld shall cover all exposed threads. For specific application refer to SP50-3, Paragraph 2.7.

2.

PWHT welds when the thickness through the weld in any plane (as specified in ASME B31.3, Paragraph 331.1.3) exceeds 19 mm..

3.

X% RT or MT or PT means X% of total number of welds with 100% coverage of the entire weld (not just spot).

Ma’aden Aluminum Project

DOCUMENT NUMBER

MINE AND REFINERY Issued

Revision

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

24 Oct 2011

Page:

Design Code:

ASME B31.3

Fluid Service: Normal Fluid Service

Line Class(es):

3B, 3D, 3H, 3L

MD-402-1000-EG-PI-SPC-00015 0

Page 19 of 25

ANSI Class: 300

Service Description(s): BXS, CON, DGS, FLS, HFO, LPS, NCV Piping Material: Carbon Steel (A106-B, A53-B, API-5L-B) P Number: P-No. 1

Attachment Material: Carbon Steel P Number: P-No. 1

Valve Body Material: Carbon Steel P Number: P-No. 1

CVN Requirements: None

PMI Requirements: None

Ferrite Requirements: None

Pipe Dia

Max Wall

Joint

Heat Treatment (Note A)

NDE (Note B)

DN

Thickness (mm)

Type

Preheat (°C)

PWHT (°C)

RT

MT

20 – 40

5.08

SW

10

N/A

--

20%

50 – 600

17.48

BW

10

N/A

20%

750

20.62

BW

79

593–649

20%

PT

HT (Note C) VT

%

Max Value

100%

N/A

--

--

100%

N/A

--

--

100%

N/A

--

General Notes:

Table Notes:

A.

1.

Preheat and PWHT requirements shall be in accordance with Section 6 of this specification.

B.

The evaluation of indications and acceptance criteria shall be in accordance with Section 7

Hardness requirements shall be in accordance with Section 7 of this specification.

D.

See Section 9 of this attachment for definitions of abbreviations, joint type, heat treatment, NDE and test symbols.

WPS No.`

The seal weld shall cover all exposed threads. For specific application refer to SP-50-3, Paragraph 2.7.

2.

of this specification. C.

UT

Welding Procedures

PWHT welds when the thickness through the weld in any plane (as specified in ASME B31.3, Paragraph 331.1.3) exceeds 19 mm..

3.

X% RT or MT or PT means X% of total number of welds with 100% coverage of the entire weld (not just spot).

Ma’aden Aluminum Project

DOCUMENT NUMBER

MINE AND REFINERY Issued

Revision

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

24 Oct 2011

Page:

Design Code:

ASME B31.3

Fluid Service: Normal Fluid Service

Line Class(es):

6A (PWHT to NACE SP0403-2008)

MD-402-1000-EG-PI-SPC-00015 0

Page 20 of 25

ANSI Class: 600

Service Description(s): DGS Piping Material: Carbon Steel (A106-B) P Number: P-No. 1

Attachment Material: Carbon Steel P Number: P-No. 1

Valve Body Material: Carbon Steel P Number: P-No. 1

CVN Requirements: None

PMI Requirements: None

Ferrite Requirements: None

Pipe Dia

Max Wall

Joint

DN

Thickness (mm)

Type

Preheat (°C)

20 – 40

5.08

SW

10

50 – 250 300 – 350 400 – 450 500 – 600 750

12.70 19.05 23.83 30.96 31.75

Fillet Attachment

BW BW BW BW BW

Heat Treatment (Note A) PWHT (°C)

NDE (Note B) RT

MT

PT

HT (Note C) VT

Max Value

(3)

--

100%

100%

N/A

--

635 ± 14

(3)

20%

--

100%

N/A

--

635 ± 14

(3)

20%

--

100%

N/A

--

635 ± 14

(3)

20%

--

100%

N/A

--

635 ± 14

(3)

20%

--

100%

N/A

--

79

635 ± 14

(3)

20%

--

100%

N/A

--

79

635 ± 14

(3)

--

100%

100%

10 10 10 79

Table Notes:

A.

1.

Preheat and PWHT requirements shall be in accordance with Section 6 of this specification. The evaluation of indications and acceptance criteria shall be in accordance with Section 7

C.

Hardness requirements shall be in accordance with Section 7 of this specification.

D.

See Section 9 of this attachment for definitions of abbreviations, joint type, heat treatment,

N/A

WPS No.`

--

The seal weld shall cover all exposed threads. For specific application refer to SP-50-3, Paragraph 2.7.

2.

of this specification.

NDE and test symbols.

%

635 ± 14

General Notes:

B.

UT

Welding Procedures

X% RT or MT or PT means X% of total number of welds with 100% coverage of the entire weld (not just spot).

3.

PWHT as per NACE SP0403-2008

Ma’aden Aluminum Project

DOCUMENT NUMBER

MINE AND REFINERY Issued

Revision

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

24 Oct 2011

Design Code:

ASME B31.3

Line Class(es):

6B, 6L

Page:

Fluid Service: Normal Fluid Service

MD-402-1000-EG-PI-SPC-00015 0

Page 21 of 25

ANSI Class: 600

Service Description(s): CON, DGS, FLS, GWH, HPS, LS, NCV, PWH Piping Material: Carbon Steel (A106-B, A53-B, API-5L-B) P Number: P-No. 1

Attachment Material: Carbon Steel P Number: P-No. 1

Valve Body Material: Carbon Steel P Number: P-No. 1

CVN Requirements: None

PMI Requirements: None

Ferrite Requirements: None

Pipe Dia

Max Wall

Joint

DN

Thickness (mm)

Type

Preheat (°C)

PWHT (°C)

RT

MT

20 – 40

5.08

SW

10

N/A

--

100%

50 – 250

15.09

BW

10

N/A

20%

300 – 350

19.05

BW

10

593–649

400 – 450

23.83

BW

10

500 – 600

30.96

BW

250 – 600

31.75

BW

Fillet Attachment

Heat Treatment (Note A)

NDE (Note B) PT

HT (Note C) VT

%

Max Value

100%

N/A

--

--

100%

N/A

--

20%

--

100%

N/A

--

593–649

20%

--

100%

N/A

--

79

593–649

20%

--

100%

N/A

--

79

593–649

20%

--

100%

N/A

--

79

593-649

--

100%

100%

General Notes:

Table Notes:

A.

1.

Preheat and PWHT requirements shall be in accordance with Section 6 of this specification.

B.

The evaluation of indications and acceptance criteria shall be in accordance with Section 7

Hardness requirements shall be in accordance with Section 7 of this specification.

D.

See Section 9 of this attachment for definitions of abbreviations, joint type, heat treatment, NDE and test symbols.

WPS No.`

N/A

The seal weld shall cover all exposed threads. For specific application refer to SP-50-3, Paragraph 2.7.

2.

of this specification. C.

UT

Welding Procedures

PWHT welds when the thickness through the weld in any plane (as specified in ASME B31.3, Paragraph 331.1.3) exceeds 19 mm..

3.

X% RT or MT or PT means X% of total number of welds with 100% coverage of the entire weld (not just spot).

Ma’aden Aluminum Project

DOCUMENT NUMBER

MINE AND REFINERY Issued

Revision

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

24 Oct 2011

Design Code:

ASME B31.11

Line Class(es):

9C

Page:

Fluid Service: Normal Fluid Service

MD-402-1000-EG-PI-SPC-00015 0

Page 22 of 25

ANSI Class: 900

Service Description(s): DGS, LS Piping Material: Carbon Steel (A106-B, A53-B, API-5L-B) P Number: P-No. 1

Attachment Material: Carbon Steel P Number: P-No. 1

Valve Body Material: Carbon Steel P Number: P-No. 1

CVN Requirements: None

PMI Requirements: None

Ferrite Requirements: None

Pipe Dia

Max Wall

Joint

Heat Treatment (Note A)

NDE (Note B)

DN

Thickness (mm)

Type

Preheat (°C)

PWHT (°C)

RT

20 – 40

5.08

SW

10

N/A

--

50 – 350

19.05

BW

10

N/A

400 – 450

23.83

BW

10

500 – 600

30.96

BW

79

MT

PT

HT (Note C) VT

%

Max Value

100%

N/A

--

10%

100%

N/A

--

593-649

10%

100%

N/A

593-649

10%

100%

N/A

General Notes:

Table Notes:

A.

1.

Preheat and PWHT requirements shall be in accordance with Section 6 of this specification.

B.

The evaluation of indications and acceptance criteria shall be in accordance with Section 7

Hardness requirements shall be in accordance with Section 7 of this specification.

D.

See Section 9 of this attachment for definitions of abbreviations, joint type, heat treatment, NDE and test symbols.

WPS No.`

--

The seal weld shall cover all exposed threads. For specific application refer to SP-50-3, Paragraph 2.7.

2.

of this specification. C.

UT

Welding Procedures

PWHT welds when the thickness through the weld in any plane (as specified in ASME B31.3, Paragraph 331.1.3) exceeds 19 mm..

3.

X% RT or MT or PT means X% of total number of welds with 100% coverage of the entire weld (not just spot).

Ma’aden Aluminum Project

DOCUMENT NUMBER

MINE AND REFINERY Issued

Revision

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

24 Oct 2011

Design Code:

ASME B31.3

Line Class(es):

9L

Page:

Fluid Service: Normal Fluid Service

MD-402-1000-EG-PI-SPC-00015 0

Page 23 of 25

ANSI Class: 900

Service Description(s): HPA, HPS. Piping Material: Carbon Steel (A106-B) P Number: P-No. 1

Attachment Material: Carbon Steel P Number: P-No. 1

Valve Body Material: Carbon Steel P Number: P-No. 1

CVN Requirements: None

PMI Requirements: None

Ferrite Requirements: None

Pipe Dia

Max Wall

Joint

DN

Thickness (mm)

Type

Preheat (°C)

PWHT (°C)

RT

MT

20 – 80

7.62

BW

10

N/A

20%

--

100 – 200

18.26

BW

10

N/A

20%

250

21.44

BW

10

593–649

300 - 400

30.96

BW

79

593–649

Fillet Attachment

Heat Treatment (Note A)

NDE (Note B) PT

HT (Note C) VT

%

Max Value

100%

N/A

--

--

100%

N/A

--

20%

--

100%

N/A

--

20%

--

100%

N/A

--

--

100%

100%

N/A

--

General Notes:

Table Notes:

A.

1.

Preheat and PWHT requirements shall be in accordance with Section 6 of this specification.

B.

The evaluation of indications and acceptance criteria shall be in accordance with Section 7

Hardness requirements shall be in accordance with Section 7 of this specification.

D.

See Section 9 of this attachment for definitions of abbreviations, joint type, heat treatment, NDE and test symbols.

WPS No.`

The seal weld shall cover all exposed threads. For specific application refer to SP-50-3, Paragraph 2.7.

2.

of this specification. C.

UT

Welding Procedures

PWHT welds when the thickness through the weld in any plane (as specified in ASME B31.3, Paragraph 331.1.3) exceeds 19 mm..

3.

X% RT or MT or PT means X% of total number of welds with 100% coverage of the entire weld (not just spot).

Ma’aden Aluminum Project MINE AND REFINERY

Issued

9.

24 Oct 2011

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

DOCUMENT NUMBER Revision

Page:

MD-402-1000-EG-PI-SPC-00015 0

Page 24 of 25

STANDARD NDE/HEAT/TEST SYMBOLS

ABBR

TYPE OF OPERATION

PWHT

Post Weld Heat Treatment

RT

Radiography Examination

MT

Magnetic Particle Examination

PT

Liquid Penetration Examination

VT

Visual Examination

UT

Ultrasonic Examination

HT

Hardness Test

CVN

Charpy V-Notch

PMI

Positive Material Identification

Ma’aden Aluminum Project MINE AND REFINERY

Issued

10.

24 Oct 2011

TECHNICAL SPECIFICATION FOR WELDING PIPING SHOP / FIELD FABRICATION

DOCUMENT NUMBER Revision

Page:

MD-402-1000-EG-PI-SPC-00015 0

Page 25 of 25

STANDARD TECHNICAL SPECIFICATIONS

The specific technical specifications listed below shall apply as a minimum: Table 10-1: Standard Technical Specifications Title

Project Document Number

Site Conditions

MD-402-1000-EG-ME-SPC-00008

Equipment Identification and tag Numbering Procedure

MD-402-1999-EG-GE-PRO-00001