Table of Content  1. Testing & Commissioning Plan and Schedule 2. Testing & Commissioning Checklist / Form 3. Pre‐Testing & Commissioning Checklist / Form 3.1 Intake Plant 3.2 Treated Water Pumping Plant 3.3 Water Treatment Plant 3.4 Chemical Plant

1.

Testing & Commissioning Plan and Schedule

Schedule for Equipment Functional Test (Pre-test) No. Description

1

2

3

Days 4 5

6

7

8

9

10

11

12

13

Remark

14

1 Funtional Test of Equipment at Raw Water 

Intake 2 Funtional Test of Equipment at Aerator and  Flocculation Tank 3 Funtional Test of Equipment at Filteration  Tank 4 Sequence Test of the Filter Backwash System 5 Functional Test of Equipment at Chemical 

6 7

8 9

10 11

-

House Sequence Test of the Chemical Preparation  System Functional Test of Equipment for Chlorine  System Setting of Scada and Instrmentation  Equipments Setting of On‐line Monitoring Equipment Pump Performance Test for Treated Water  Pump at Pumping Station Setting of Electromagnectic Flowmeter

Test can be carried out only when  continuos supply of raw water is  Test can be carried out only when  continuos supply of raw water is  available

Remarks: All the equipment functional test can be carried out only after the power supply is available. Pre-commisioning will be taken 2 week and actual commisioning will be taken 1 week time after the raw water supply is available.

2.

Testing & Commissioning Checklist / Form

Project

:

Employer Service License Consultant Quantity Surveyor : Contractor METHOD OF STATEMENT Title Location Equipment Objective

: Performance test of all pumps : Loji Air Pemanis, Segamat, Johor : All new pumps installed : To do the performance test of the pumps installed

Measuring Apparatus:

1.Voltmeter tester 2. Ammeter tester 3. Pressure Gauge

Methods: Performance test of the pump 1. Check the pipeline to ensure no leaking and that pump suction pipe is fully primed. 2. Suction valve is fully open and delivery valve is fully close. 3. Check incoming three phase power supply by voltmeter. The supply voltage shall be 400V to 440V. 4. Start the pump motor and check motor rotation. 5. When the motor runs to full speed, open the delivery valve slowly until fully open. 6. Allow the pump run for a few minutes until the flow reading is steady. 7. Record the pump flow (m3/hr), suction and discharge gauge pressure (m), voltage (V), ampere (I) and power factor (ρ). 8. Throttle the delivery valve to 75% opened position, then repeat 6 & 7. 9. Repeat step 7 by throttle the delivery valve to 50% opened position, 25% opened position and fully closed position. 10. Stop the pump. 11. Plot the performance curves H-Q and verifies the pump efficiency at duty point.