CENTRIFUGAL PUMP DATA SHEET FOR HORIZONTAL PUMPS AND VERTICAL IN-LINE PUMPS BY MANUFACTURER OF PUMPS PER ASME B 73.1 OR B 73.2
NOTE:
INDICATES INFORMATION TO BE COMPLETED BY PURCHASER;
APPLICABLE TO:
PROPOSALS
PUMP MFR
/
SIZE & TYPE
/
SERIAL NO.
BI-10-01868-0001
INDOOR
OUTDOOR
ON SHORE
COASTAL
UNDER ROOF OFF SHORE
SAFE
ELECTRICAL AREA CLASS
, DIV.
, GROUP
CP 4x6x9* **
PERFORMANCE DATA
ELECTRIC MOTOR
PUMP MARK NO(S).
PERFORMANCE
THREE (2W+1S) PUMP(S) R83
-G-
1041 A
-
R83
-G-
1041 C
-
R83
1041 B
RPM 3560
/
/
RATED SPEED
-G-
/
/
DRIVER NAME PLATE POWER RATING
/
/
PERFORMANCE AT
-G-
HP 900*
PUMPS OF IDENTICAL TYPE & SIZE IN OPERATION -
-G-
-G-
-
-G-
MIN. CONT.STABLE FLOW
RE-739461 NOT APPLICABLE
TOTAL DIFF. HEAD
Ft
4780*
LUBE OIL SYST DATA SHEET
NOT APPLICABLE
EFFICIENCY
%
49*
SAFETY INSTRUCTION SHEET
NOT APPLICABLE
REQUIRED POWER
HP
374*
LCC
$/kW
NPSH REQ'D FOR: 3% DH 1st STAGE ON H2O
Ft
9*
40,000 HRS LIQ'D PUMPED
Ft
GEAR UNIT DATA SHEET
EF
TBD
03/15/20
OPERATIONS/DATE
/
PRODUCED WATER
CONTINUOUS
INTERMITTENT
ATTENDED
UNATTENDED
INDIVIDUALLY
IN SERIES
03/15/20
TBD IAD
03/15/20
CERTIFIED/DATE
O
140
F
D E O
PPM
180
F
1.085
VISCOSITY AT FLOW TEMP.
1 CP
CS / CP / SSU
VAPOR PRESSURE AT NORMAL FLOW TEMP.
411 mg/l
NONE
U S S I PULPY
CHARACTER OF SOLIDS:
AAN
249200
RELATIVE DENSITY AT NORMAL FLOW TEMP.
V.P. AT MAX. FLOW TEMP.
03/15/20
TDS
GAS IN FLUID:
NONE
PRINCIPAL CORROSIVES:
6.3
pH
2.9
PSIA
7.51
HARD
10-01868-0001-001
725.6*
600.5*
11.5*
12*
14.7*
Ft
4875*
Ft
5580* 562*
3500*
1.155* 1.368*
MINIMUM CONTINUOUS STABLE FLOW
USGPM
187.2*
MINIMUM CONTINUOUS THERMAL FLOW
USGPM
163.8*
MAXIMUM OPERATING TIME AT SHUT-OFF
SEC
**
FIRST CRIT. SPEED; DRY
RPM
**
FIRST CRIT. SPEED; WET
RPM
**
MAX. ALLOWABLE SPEED
RPM
**
MAX. POWER FULL CURVE ACTUAL IMP. DIAM.
HP
**
POWER AT SHUT-OFF HEAD
HP
**
MAX.
MIN.
Ft
4950*
2500*
%
**
**
REQUIRED POWER AT RATED CAP.
HP
**
**
MAX. REQUIRED POWER FULL CURVE
HP
**
**
SOFT INTERMEDIATE TRANSMISSION
UNKNOWN
SALT, H2S 10 PPM 110941
/
GEAR BOX
/
HYDR. COUPL. SPEED RANGE
N/A
RATIO
N/A %
N/A %
OF DRIVER SPEED
PPM
CONSTRUCTION DATA PUMP TYPE HORIZONTAL (BET. BRGS) /
NORMAL USGPM
390
RATED USGPM
410
Ft
23
AT 120% OF RATED CAPACITY
Ft
20 1
1
VISC. CORR. FACTOR CQ; CH; CE
/
OVERHUNG
VERT. IN-LINE
INTEGRAL SHAFT
CASING MOUNT:
CENTERLINE
FLANGE CENTERLINE
FOOT
4219
Ft
AT RATED CAPACITY
VERT. IN-LINE
IN-LINE
CASE SUPPORTED
CASING SPLIT
AXIAL
RADIAL
CASING TYPE
DOUBLE VOLUTE
SINGLE VOLUTE
DIFFUSOR
1
SELF PRIMING
/
RATED SUCTION PRESSURE
PSIA
18.12
DIR. OF ROT.
MAX. SUCT. PR. AT RATED CAP.
PSIA
40.46
(VIEWED FROM DRIVER)
MAX. SUCT. PR. AT SHUT-OFF
PSIA
TOTAL DIFFERENTIAL PRESSURE
65*
553.8*
EFFICIENCY AT RATED CAPACITY
NPSH AVAILABLE AT SUCTION FLG.
DRAWING COMPLETION CERTIFICATE NO.
AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER
IS COVERED, FOR ALL APPROVAL
REVISION VALIDATION
B THIS REVISION NO.
RATED TOTAL DIFFERENTIAL HEAD
3875*
MIN. IMPELLER DIAMETERS
OPERATING CONDITIONS CAPACITY
65.4*
PERFORMANCE WITH MAX. AND
UNKNOWN
PSIA
VOL. %
CI
4219*
62 *
TOT.DIFF. HEAD AT RATED CAPACITY
PSIA
GRITTY
4300*
O F
LIQUID CHARACTERISTICS
120%
OF RATED CAPACITY
RATIO. END OF CURVE CAPACITY/RATED CAP.
-G-
PRODUCED WATER
NORMAL FLOW
Ft
RATIO. SHUT-OFF HEAD/RATED HEAD
-G-
TSS
ENGG./DATE
(DESIGN AGENCY)
IN PARALLEL
100%
USGPM
TOT.DIFF. HEAD AT END OF CURVE
DOWNSTREAM OF PUMP NO(S)
MAX. FLOW TEMPERATURE
R
CAPACITY AT END OF CURVE
-G-
NORMAL FLOW TEMPERATURE
DESIGN CERTIFICATION
STANDY BY
UPSTREAM OF PUMP NO(S)
LIQUID PUMPED
SHUT-OFF HEAD AT ACTUAL IMP. DIAM. AT MAX. IMP. DIAM.
-GCONST. AGENCY/ DATE
REQUIRED (SAUDI ARAMCO)
REVIEW FOR KEY DRAWINGS
SERVICE PUMP FUNCTION
D I B RPM
-G-
/
/
STAGGER
YES
/
CCW
/
/
NO CW
PUMP NOZZLES 1984
SIZE
RATING
FACING
LOCATION
RATED DISCHARGE PRESSURE
PSIA
2002.12
/
SUCTION
8"*
1500#*
RTJ
TOP
MAX. DISCH. PR. AT RATED CAP.
PSIA
2024.46
/
DISCHARGE
6"*
1500#*
RTJ
TOP
DATA SHEET FOR
PSI
PWD PUMPS (R83-G-1041A/B/C)
UPGR. ETHANE FACILITY– JU’AYMAH NGL FRACT. PL.
DWG. TYPE
PLANT NO.
INDEX
DRAWING NO.
SHT.NO.
REV.NO.
R83
G
RE-739434
001
B
DAT
FRACTIONATOR CENTER OFFSITE JU'AYMAH
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B
AS BUILT
SULZER
/
/
SITE CONDITIONS
PURCHASE
DRIVER DATA SHEET
BY/DATE
BY MANUFACTURER OF PUMPS OR PUMPS PER 31-SAMSS-004
PURCHASERS REFERENCES
THIS DATA SHEET COVER
JOB ORDER/EWO NO.
DATE REV. NO. OTHER
SAUDI ARABIAN OIL COMPANY
DRIVER TYPE
03/15/20
REVISION DESCRIPTION
ISSUED FOR 90% REVIEW
THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED AND DATED
Saudi Aramco 2741-ENG (09/2015)
SAUDI ARABIA EKRD/2741-1-0713.XLS
SAUDI ARABIAN OIL COMPANY CENTRIFUGAL PUMP DATA SHEET FOR HORIZONTAL PUMPS AND VERTICAL IN-LINE PUMPS NOTE:
BY MANUFACTURER OF PUMPS PER ASME B 73.1 OR B 73.2
INDICATES INFORMATION TO BE COMPLETED BY PURCHASER;
BY MANUFACTURER OF PUMPS OR PUMPS PER 31-SAMSS-004
CONSTRUCTION DATA (CONT'D)
CONSTRUCTION DATA (CONT'D)
FORCES AND MOMENTS
STUFFING BOX DATA
ALLOWABLE FORCES AND MOMENTS TOP NOZZLE
END NOZZLE
EACH NOZZLE
Fx
**
LB
Fx
SIDE NOZZLE
**
LB
Fx
**
LB
Mx
**
LB.FT
INSIDE DIAMETER
IN
**
Fy
**
LB
Fy
**
LB
Fy
**
LB
My
**
LB.FT
DEPTH
IN
**
Fz
**
LB
Fz
**
LB
Fz
**
LB
Mz
**
LB.FT
DISTANCE FACE OF STUFFING BOX IN
**
MISC CONNECTIONS
INBOARD / OUTBOARD
QTY.
SIZE
TYPE
LUBE OIL INLET
**
**
**
FLANGE TO NEAREST OBSTRUCTION
LUBE OIL OUTLET
**
**
**
SEAL LIQUID INLET
**
**
**
SEAL LIQUID DRAIN
**
**
**
CASING DRAIN(S)
**
**
**
VENTS
**
**
**
ACTUAL DIAMETER
COOLING WATER
**
**
**
MAXIMUM DIAMETER
STUFFING BOX
**
**
**
MINIMUM DIAMETER
BALANCE DRUM
**
**
**
SINGLE / DOUBLE SUCTION
IMPELLER DATA NUMBER OF STAGES
11
DRAIN & VENT INDIVIDUALLY PIPED WITH BLOCK VALVES TO TERMINATE
EYE AREA IMPELLER
AT EDGE OF BASE PLATE IN COMMON AREA
VANE ANGLE AT IMP. EXIT
YES
**
FLANGE RATING
NO
1500#*
in CLASS
4500*
JACKETS
PSIG
N/A
N/A
COILS
PSIG
N/A
N/A
TBD
03/15/20 03/15/20
TBD IAD
3000*
PSIG
R
PRECISION CAST
CUT WATER DIAMETER
3000*
SPECIFIC SPEED
SUCTION SPECIFIC SPEED AT 3% DH
O F
UNDER / OVER FILING / V-CUT
CASE
IN
**
SHAFT DIAMETER AT BEARINGS
IN
**
SHAFT DIAMETER AT 1ST STAGE IMPELLER
IN
**
BEARING SPAN
IN
**
IN
**
D E
STATIC SHAFT DEFLECTION
SHAFT SEALING
PACKED STUFFING BOX PACKING MAT'L.
NOT APPLICABLE
PROVIDED WITH LANTERN RING:
YES
10.05*
10.62*
10.62*
IN
8.5*
8.5*
**
**
**
** **
FT/S
156.6*
156.6*
FT/S
**
**
**
**
YES - NO
**
**
IN
**
**
931*
931*
10400*
10400*
IN
**
**
YES / NO
**
**
WEARING RINGS: IMPELLER
SHAFT DIAMETER AT MECH. SEAL SLEEVE
10.05*
IN
**
WIDTH. IMPELLER DISCH.
4500*
SHAFT DATA
CLEARANCE
YES
NO
YES
NO
INBOARD
IN
**
**
OUTBOARD
IN
**
**
1st STAGE IMPELLER INLET GEOMETRY
NO
THROUGH SEALING DEAD ENDED
BLEED OFF ah
C2A3A (3CW-BB)*
**
**
**
**
5TH LETTER
NOT APPLICABLE
PIPING FOR PRIMARY SEAL API FIG. D-2 PLAN PIPING FOR THROTTLE BUSHING OR
53B
10-01868-0001-001
AUXILIARY SEAL API FIG. D-3 PLAN
COMPLETION CERTIFICATE NO.
Dh2
**
4TH LETTER
d
**
3RD LETTER
Dh1
MAKE
GREASE
FOREIGN LIQUID
Dsl
MECHANICAL SEAL API CODE
ap
LIQUID PUMPED
Dp
AAN
03/15/20
U S S I FLUSH WITH
API CODE MAT'L
CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER DRAWING
IS COVERED, FOR ALL APPROVAL AND
B
F
PSIG
MODEL
REVISION VALIDATION
O
180
CASE
DUAL MECH. SEAL
03/15/20
OPERATIONS/DATE CONST. AGENCY/DATE CERTIFIED/DATE
AT
SEALING ARRANGEMENT ENGG./DATE
REVIEW FOR KEY DRAWINGS
REQUIRED (SAUDI ARAMCO) (DESIGN AGENCY)
DESIGN CERTIFICATION
PRESSURES
MANUFACTURER MAT'L CODE
THIS REVISION NO.
PATTERN NUMBER HYDROST. TEST PRESS
IN
O
MAX.ALLOW.PERIPH.SP'D AT FLOW TEMP. MAX. ALLOW. WORK. PRESS.
FOLLOW STAGE
SQ.IN
ACTUAL PERIPHERAL SPEED
PRESSURES
D I B FIRST STAGE
SINGLE* SINGLE*
NUMBER OF VANES
COOLING WATER PIPING, API FIG. D-4 PLAN
NOT APPLICABLE
Dp
=
**
IN
Dsl
=
**
IN (IF APPLICABLE)
Dh1
=
**
IN
Dh2
=
**
IN
CYCLONE SEPARATOR
YES
NO
d
=
**
IN
FLOW ORIFICE IN SEAL FLUSH SUPPLY LINE
YES
NO
ap
=
**
DEGREES
SEAL LEAKAGE PIPING WITH ORIFICE
YES
NO
ah
=
**
DEGREES
BUFFER LIQUID SYSTEM
YES
NO
METHANOL DRIP SYSTEM REQUIRED: PRESSURE CARTRIDGE DESIGN DATA SHEET FOR
YES
**
NO
**
PSIG; FLOW YES
USGPM
NO
PWD PUMPS (R83-G-1041A/B/C)
UPGR. ETHANE FACILITY– JU’AYMAH NGL FRACT. PL.
DWG. TYPE
JU'AYMAH
PLANT NO.
INDEX
DRAWING NO.
SHT.NO
REV.NO.
R83
G
RE-739434
002
B
DAT
FRACTIONATOR CENTER OFFSITE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED AND DATED JOB ORDER/EWO NO.
BI-10-01868-0001
ISSUED FOR 90% REVIEW 03/15/20 OTHER
BY/DATE
B
REV. NO.
DATE
REVISION DESCRIPTION
Saudi Aramco 2741-ENG (09/2015)
SAUDI ARABIA EKRD/2741-2-0713.XLS
BY MANUFACTURER OF PUMPS PER ASME B 73.1 OR B 73.2
NOTE: INDICATES INFORMATION TO BE COMPLETED BY PURCHASER;
BY MANUFACTURER OF PUMPS OR PUMPS PER 31-SAMSS-004
CONSTRUCTION DATA (CONT'D)
CONSTRUCTION DATA (CONT'D) COUPLING
BEARING TYPE
RADIAL
THRUST
SUPPLIED BY:
ANTI-FRICTION
TYPE
TILTING PAD RADIAL
THRUST
ELASTOMERIC
B
BI-10-01868-0001
HYDRAULIC FIT YES,
FORCED FEED
COUPLING GUARD
PARTIALLY ENCLOSED
OIL MIST
PUMP SHAFT END
LUBE OIL PIPING TO AND
MOUNT COUPLING HALF: PUMP
FROM BEARINGS
YES
NO
DRIVER HALF
LUBE OIL PIPING UP TO L.O. SYSTEM
YES
NO
PILOT BORED
YES
NO
PLANE
MODEL N/A
**
L.O. AND/OR S.O. SYSTEM MOUNTED
N
DESIGNED FOR INSTALLATION ON:
R
TBD TBD
03/15/20
CONCRETE FOUNDATION
As per 26-SAMSS-088
OIL PER 26-SAMSS-045
03/15/20
OPERATIONS/DATE CONST. AGENCY/DATE
IAD
O F
STEEL PLATFORM NO
GEAR
YES
NO
YES
NO
MATERIALS OF CONSTRUCTION
HEAT REMOVAL
GPM/USGAL
PSIG
BTU/MIN
INB. BRG.
N/A
N/A
N/A
N/A
OUTB. BRG.
N/A
N/A
N/A
N/A
1
CASING
ASTM
**
THRUST BRG.
N/A
N/A
N/A
N/A
2
IMPELLER(S)
ASTM
**
3
CASE WEAR RINGS
ASTM
**
4
IMPELLER WEAR RINGS
ASTM
**
5
SHAFT
ASTM
**
6
SHAFT SLEEVES
ASTM
**
7
THROAT BUSHINGS
ASTM
**
8
INTERSTAGE SLEEVES
ASTM
**
9
INTERSTAGE BUSHINGS
ASTM
**
10
LANTERN RING (PACKED PUMPS)
ASTM
**
11
GLAND / MECH. SEAL FLANGE
ASTM
**
12
BEARING BRACKETS
ASTM
**
ASTM
**
ASTM
**
O
F
N/A
D E
PUMP VENDOR
N/A
IN ACCORDANCE WITH DATA SHEET FORM 8004-ENG
NO
YES, DRAWING NO.
U S S I
MATERIALS TO BE IN ACC. WITH CODE
HSZ (NOTE 7)
OF STD. DRAWING AC-036821
VENDOR TO COMPLETE FOLLOWING MAT'L LISTING
13 1 NON-WETTED STUDS / NUTS
NON-CIRCULATING SYSTEM BY:
AAN
OFF BASE
SUPPLY PRESSURE
N/A
MAX. OIL OUTL. TP.
53B
PUMP
ON BASE
FLOW OR CAPACITY
OTHER
03/15/20
YES
GEAR
HORIZONTAL ALIGNMENT JACKSCREWS
GREASE PER 26-SAMSS-054
TOTAL
03/15/20
CERTIFIED/DATE
PUMP MANUFACTURER DRIVER
DRILLED FOR DRIVER
BEARING LUBRICANT
NO
OIL FIELD SKID
N
LUBRICANTS
D I B TAPERED
COMPLETELY MACHINED
TO ACCOMMODATE:
**
NO
NO. IF SHIPPED TO DRIVER SUPPLIER
SUPPLIED BY
THRUST BEARING LOADS:
IN
COMPLETELY ENCLOSED
YES
YES
BASE PLATE
N/A
RETURN BRANCH MAKE
BEARING COOLING
ENGG./DATE
CYLINDRICAL
BASE PLATE
CONNECTIONS AT RADIAL COUPLING
COOLING
2 WETTED FASTENERS 14
PIPING: PIPE / FITTINGS
ASTM
**
15
BASE PLATE
ASTM
**
16
MECH. SEAL SPRINGS
ASTM
**
EXTERNAL CIRCULATING SYSTEM
17
MECH. SEAL OTHER METAL PARTS
ASTM
**
OIL COOLING BY:
18
INNER CASING
ASTM
**
SHAFT MOUNTED FAN
JACKETED BEARING HOUSING
COILS IN BEARING HOUSING
LIQ. PUMPED
FOREIGN LIQ.
AIR
NONE
STUFFING BOX COOLING
YES
NO
PEDESTAL COOLING
YES
NO
ASTM
19
NOISE SPECIFICATION
COOLING PIPING FOR BEARINGS
STUF. BOX
PEDESTALS
10-01868-0001-001
SEAL COOLER
N/A
IN ACCORDANCE WITH API-610. FIG. D-4. PLAN
DRAWING COMPLETION CERTIFICATE NO.
AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER
**
SPACER:
TERMINATION WITH FLANGED
BY/DATE
OTHER REVIEW FOR KEY DRAWINGS
REQUIRED (SAUDI ARAMCO) (DESIGN AGENCY)
DESIGN CERTIFICATION
KEYED
OIL BATH WITH EXT'L CIRCULATION
LUBE OIL SYSTEM SUPPLIED BY:
IS COVERED, FOR ALL APPROVAL
DISC PACK
RIGID ADJUSTABLE
**
LUBRICATOR, MAKE
DESIGN AXIAL FORCE:
B
**
SIZE
PUMP MANUFACTURER
CLOSE COUPLED
MAX. ALLOWABLE AXIAL FORCE:
REVISION VALIDATION
**
MODEL
DIAPHRAGM
LUBRICATION METHOD
SIGHT FLOW INDICATOR IN EACH
THIS REVISION NO.
**
MAKE
SLEEVE
MAXIMUM ALLOWABLE SOUND LEVEL
≤90
dBA
PUMP
**
dBA
DRIVER
**
dBA
BY PURCHASER AT 3 FT. DISTANCE
COOLANT DATA
MANUFACTURER GUARANTEED BRG HSG
STUF BOX
PEDESTAL
SEAL COOLER
TOTAL FLOW
USGPM
N/A
N/A
N/A
N/A
OTHER
**
dBA
INLET PRESS.
PSIG
N/A
N/A
N/A
N/A
COMPLETE TRAIN
**
dBA
TEMP. INLET
O
N/A
N/A
N/A
N/A
TEMP. OUTLET
O
N/A
N/A
N/A
N/A
N/A
N/A
N/A
F F
COOLING MEDUIM DATA SHEET FOR
PWD PUMPS (R83-G-1041A/B/C)
N/A DWG. TYPE
UPGR. ETHANE FACILITY– JU’AYMAH NGL FRACT. PL.
JU'AYMAH
PLANT NO.
INDEX
DRAWING NO.
SHT.NO.
REV.NO
R83
G
RE-739434
003
B
DAT
FRACTIONATOR CENTER OFFSITE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
BEARINGS AND LUBRICATION
RING-OIL CONSTANT LEVEL
JOB ORDER/EWO NO.
DATE REV. NO.
SAUDI ARABIAN OIL COMPANY CENTRIFUGAL PUMP DATA SHEET FOR HORIZONTAL PUMPS AND VERTICAL IN-LINE PUMPS
GREASE
03/15/20
REVISION DESCRIPTION
ISSUED FOR 90% REVIEW
THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED AND DATED
Saudi Aramco 2741-ENG (09/2015)
SAUDI ARABIA EKRD/2741-3-0713.XLS
DC
AC AC
BI-10-01868-0001
JOB ORDER/EWO NO.
4160 120
3/60 1/60
HYDROSTATIC TEST WATER
PERFORMANCE TEST AIR
AVAILABLE
MEASURE DP ACROSS STUFFING BOX
PSIG
NPSH TEST
125
DISMANTLING
CONTROLS AND PROTECTION
RADIOGRAPHIC INSPECTION IMPELLER DYE PENETRANT EXAMINATION IMPELLER INLET
AVAIL PSIG
AVAIL COOLING
O
OUTLET O
F
REQ'D O
F
DYNAMIC BALANCE IMPELLER(S) F
WATER
DYNAMIC BALANCE ROTOR DYNAMIC BALANCE COUPLING VIBRATION, MEASUREMENTS
WELL WATER
TREATED WATER
ONCE THROUGH SYSTEM
SEA WATER
TESTS TO BE CARRIED WITH:
CLOSED LOOP SYSTEM
ACTUAL DRIVER
DERATED SPEED:
03/15/20
INSTRUMENTATION & CONTROLS TBD
OPERATIONS/DATE
D I B
MANUFACTURER'S DRIVER
RATED SPEED
RPM
DRAWINGS AND OTHER DATA TEMPERATURE MONITORING
RADIAL BEARINGS
THRUST BEARINGS
CASING THERMOWELL
R
MANUFACTURER'S DRAWING OR DOCUMENT
YES PROVISIONS ONLY
REQUIRED
YES
NO
O F
03/15/20
TBD
DIMENSIONAL DRAWING OF
CONST. AGENCY/DATE
REQUIRED (SAUDI ARAMCO)
KEROSENE
RUNNING TEST
AT
REVIEW FOR KEY DRAWINGS
NONE
AS FOLLOWS HZ
CERT'D
INSPECTION AND TESTS
VENDOR'S STANDARD SHOP TEST PHASE
VOLTS
BY MANUFACTURER OF PUMPS OR PUMPS PER 31-SAMSS-004
OBSER'D
AVAILABLE AC
BY MANUFACTURER OF PUMPS PER ASME B 73.1 OR B 73.2
WITN'D
ELECTRIC POWER
D
ALARM SETTING
O
F
SHUTDOWN SETTING
O
F
** **
** **
N/A N/A
COMPLETELY ASSEMBLED UNIT OPER. & MAINT. INSTRUCTIONS
CROSS SECT. DRW. WITH PART NO'S.
VIBRATION / DISPLACEMENT MONITORING
MECHANICAL SEAL DRAWING BILLS OF MATERIALS
POSITION
RADIAL BRG'S PROXIMITY
TYPE
THRUST BRG. PROXIMITY
BRG. HSG SEISMIC
COMPLETED PUMP DATA SHEET AUXILIARY PIPING DWG. CERTIFIED TEST CURVE & DATA
D E
03/15/20
PROVISIONS ONLY
IAD
CERTIFIED/DATE
(DESIGN AGENCY)
ALARM / SHUTDOWN
N/A /
SETTING: MILS P-P MILS P-P IN / SEC RMS
U S S I 03/15/20
AAN
PROXIMITY
ELECTRICAL
10-01868-0001-001
DRAWING COMPLETION CERTIFICATE NO.
AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER
IS COVERED, FOR ALL APPROVAL
B
REVISION VALIDATION
THIS REVISION NO.
COLD ALIGNMENT CURVE DATA L. & T. VIBR. ANALYSIS
N/A
YES
** /
** MISCELLANEOUS PAINTING
NO
PNEUMATIC
**
N/A N/A
**
PSIG MODEL N/A
CONTR.ORIFICE N/A
IN
SPECIFICATION PUMPS TO BE IN ACCORDANCE WITH:
MASSES
31-AMSS-004
PUMP
LBS
PUMP ROTATING ASSEMBLY
LBS
CASING (UPPER HALF)
LBS
BASEPLATE
LBS
COUPLING
LBS
DRIVER
LBS
DRIVER ROTATING ASSEMBLY
LBS
TOTAL MASS
LBS
** ** ** ** ** ** ** **
PWD PUMPS (R83-G-1041A/B/C)
ASME B 73.1
ASME B 73.2
TECHNICAL SPECIFICATION FOR PWD PUMPS (RE-MEC004)
DWG. TYPE
UPGR. ETHANE FACILITY– JU’AYMAH NGL FRACT. PL.
PLANT NO.
INDEX
DRAWING NO.
SHT.NO.
REV.NO.
R83
G
RE-739434
004
B
DAT
FRACTIONATOR CENTER OFFSITE JU'AYMAH
SAES-H-001 & SAES-H-004, APCS-1A
BUYER'S PAINT SPECIFICATION: VENDOR'S STANDARD:
MODEL **
LEVEL SWITCH MAKE
DATA SHEET FOR
SPEED TORQUE CURVE
ELECTRICAL
PRESSURE SETTING *SHUTDOWN* TIME DELAY SETTING
INSTR. WIRING DIAGRAM
PNEUMATIC
SHAFT SEAL LEAKAGE CONTROL: PRES. SWITCH MAKE
RECOMMENDED SPARES LIST
N/A
N/A /
SEISMIC
ENGG./DATE
DESIGN CERTIFICATION
YES
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CENTRIFUGAL PUMP DATA SHEET FOR HORIZONTAL PUMPS AND VERTICAL IN-LINE PUMPS NOTE: INDICATES INFORMATION TO BE COMPLETED BY PURCHASER; UTILITIES
CONTROLS AND PROTECTION
BY/DATE
OTHER
SAUDI ARABIAN OIL COMPANY
MAIN ELECTRIC DRIVER
B
REV. NO.
DATE
REVISION DESCRIPTION
03/15/20 ISSUED FOR 90% REVIEW
THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED AND DATED
Saudi Aramco 2741-ENG (09/2015)
SAUDI ARABIA EKRD/2741-4-0713.XLS
GENERAL NOTES 1
Mechanical seals shall comply with the requirements of 31-SAMSS-012 / API 682. Plan 53B shall be furnish with centralized fixed make up unit as per AA-036777.001, Rev.1 for new Pumps (R83-G-1041A/B/C) and future Pumps (R83-G-1041 D/E).
2
The centralized make up system shall be designed for 5 Pumps (Total ten (10) Plan 53B system)
3
The interconnecting piping between centralized Seal fluid make up skid and Pump skid shall be engineered by others.
4
Pump Tags number ar R83-G-1041A/B/C and R83-G-1041 D/E shall be installed in future.
5
Electric Motor shall be as per 17-SAMSS-502/API 541 Fourth Ed.
6
Deleted.
7
Vendor shall review and confirm material selection based on liquid characteristic and operating condition. Vendor shall propose superior material, if required for Client review and approval.
8
Deleted.
9
Pumps shall be capable of at least a 5 % head increase at rated conditions by replacement of the impeller(s) with one(s) of larger dia.
D I B
R
03/15/20
TBD
11 Pumps shall have a continuous head rise from the rated head to shutoff. The head rise shall not be less than 10% of the rated head.
12 The NPSH3 shall not exceed the specified NPSHA over the range of minimum continuous stable capacity to 120% of the rated capacity. At rated capacity, the NPSHA shall also exceed the NPSH3 by a minimum margin of 1 meter (3.3 ft).
O F
03/15/20
TBD
13 The suction specific speed, based on the NPSH required for 3% first stage head drop at best efficiency capacity, shall not exceed 12,000 in U.S. units. 14 For pumps with rated power per stage up to 300 HP, the cut water clearance shall be at least 3% of the rated impeller blade radius for diffuser designs and at least 6% of the rated impeller blade radius for volute designs.
CERTIFIED/DATE
IAD
03/15/20
AAN
03/15/20
15 The pump efficiency at rated point shall not be less than the efficiency value ( Pɳ ) calculated as per the following equation;
D E
10-01868-0001-001
16 Pump shall have a preferred operating region of 70 % to 120 % of best efficiency point flow rate of the pump as furnished.
DRAWING COMPLETION CERTIFICATE NO.
AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER
IS COVERED, FOR ALL APPROVAL
B THIS REVISION NO.
REVISION VALIDATION
U S S I
The normal operating flow rate shall be within the region of 80% and 100% of the pump best efficiency point flow rate of the pump as furnished. The flow rate at the end of the curve shall not be less than 120% of the rated flow rate. The minimum continuous stable flow rate shall not exceed 50% of the rated flow rate for pumps.
17 Electric motor shall be sized for 110% of pump rated power and power required at end of curve operation including losses in coupling/s and gear box. 18 Pump, coupling and driver train shall be designed so that first lateral and torsional critical speeds occur above the maximum operating speed.
DATA SHEET FOR PWD PUMPS (R83-G-1041A/B/C)
DWG. TYPE
UPGRADE ETHANE FACILITY JU’AYMAH NGL FRANCTIONATION
PLANT NO.
INDEX
DRAWING NO.
SHT.NO
REV.NO.
R83
G
RE-739434
005
B
DAT
FRACTIONATOR CENTER OFFSITE JU'AYMAH
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
JOB ORDER/EWO NO.
B
SAUDI ARABIAN OIL COMPANY
10 For these pumps the maximum allowable working pressure shall apply to all parts referred to in the definition of pressure casing, including seal glands and seal chambers.
ENGG./DATE
CONST. AGENCY/DATE
OPERATIONS/DATE
BY/DATE
10-01868-0001
ISSUED FOR 90% REVIEW 03/15/20
REVISION DESCRIPTION DATE REV. NO. OTHER REVIEW FOR KEY DRAWINGS
REQUIRED (SAUDI ARAMCO) (DESIGN AGENCY)
DESIGN CERTIFICATION
THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED AND DATED
Saudi Aramco 2616-ENG (11/2010)
SAUDI ARABIA EKRD/2616-1110.XLS
GENERAL NOTES 19
Pump should be dismantled if one of the test is failed, to investigate the cause of any unsatisfactory performance, NPSH or running test.
20
The speed, head per stage and power per stage shall not exceed 4,000 RPM, 457 m (1,500 ft) and 4,477 kW (6,000 HP), respectively
21
The suction and Discharge Nozzle shall be designed for 2 times API 610 table 5 values.
22
Vendor to provide vibration probes complying to BN3500 by considering distance of approx. 700m between machine and VMS rack. Vendor to inform, if reliable measurement is not possible due to any distance or noise or specified .
23
Water Analysis
03/15/20 03/15/20 03/15/20
TBD TBD IAD
OPERATIONS/DATE CONST. AGENCY/DATE CERTIFIED/DATE
D I B
O F
D E
24 Maximum data provided by vendor has been filled based on TBE stage. "* / **" data shall be confirmed/filled after receipt of NMRs
90% Package is issuing without vendor inputs as per PMT instructions. 03/15/20
Legends AAN
ENGG./DATE
REQUIRED (SAUDI ARAMCO) (DESIGN AGENCY)
OTHER REVIEW FOR KEY DRAWINGS DESIGN CERTIFICATION
R
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
10-01868-0001
JOB ORDER/EWO NO.
SAUDI ARABIAN OIL COMPANY
BY/DATE
B
REV. NO.
DATE
03/15/20
REVISION DESCRIPTION
ISSUED FOR 90% REVIEW
THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED AND DATED
Saudi Aramco 2616-ENG (11/2010)
* Vendor to confirm ** Vendor to advise N/A Not applicable
10-01868-0001-001
DRAWING COMPLETION CERTIFICATE NO.
AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER
IS COVERED, FOR ALL APPROVAL
B THIS REVISION NO.
REVISION VALIDATION
U S S I
DATA SHEET FOR PWD PUMPS (R83-G-1041A/B/C)
DWG. TYPE
UPGRADE ETHANE FACILITY JU’AYMAH NGL FRANCTIONATION
FRACTIONATOR CENTER OFFSITE JU'AYMAH
PLANT NO.
INDEX
DRAWING NO.
SHT.NO
REV.NO.
R83
G
RE-739434
006
B
DAT
SAUDI ARABIA EKRD/2616-1110.XLS
EQUIPMENT NOISE DATA SHEET GENERAL INFORMATION
BI-10-01868-0001
JOB ORDER/EWO NO.
B BY/DATE
Location:
Equipment Serial No.:
50% load
120% load
VTA
≤90
03/15/20
TBD
Center Frequency (Hz)
D E
03/15/20
63
20 - 75 75 - 150 150 - 300 300 - 600
03/15/20
O F
Special Design:
With Acoustic Treatment:
VTA
VTA
VTA
Octave Band Sound Pressure Levels, dBA (Ref. 0.02 mPA) (Supplier's Guaranteed Maximum Sound Pressure Level at One Meter) Octave Band (Hz)
600 - 1200
1200 - 2400 2400 - 4800
Description of Special Design: Description of Acoustic Treatment:
10-01868-0001-001
R
Other load
VTA
SUPPLIER, MANUFACTURER OR VENDOR INFORMATION
Standard Design:
AAN
D I B
This form shall be completed for each piece of equipment (or integrated unit) that is likely to generate noise in excess of 85 dBA at a distance of one meter. If the noise level is greater than 90 dBA, the cost of special design and/or acoustic treatment should be supplied. Measurements are to be made in accordance with ANSI S1.13 and at full design load, unless otherwise indicated. For rotating electric machinery, use points defined in IEEE Standard 85.
Sound Pressure Level, dBA
DRAWING COMPLETION CERTIFICATE NO.
SULZER CP 4x6x9
PURCHASER'S REQUIREMENTS
03/15/20
TBD
Model No.:
TO BE ADVISED
VTA
U S S I ENGG./DATE
Manufacturer:
PRODUCED WATER DISPOSAL PUMPS
4800 - 9600
AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER
Inquiry/Purchase Order No.:
JU’AYMAH, SAUDI ARABIA
Also measure at:
IAD
OPERATIONS/DATE CONST. AGENCY/DATE CERTIFIED/DATE
UPGRADE ETHANE FACILITY – JU’AYMAH NGL
Project Designation:
Supplier, Manufacturer or Vendor: Represented by:
Standard Design
Special Design
With Acoustic Treatment
VTA
VTA
VTA
125
VTA
VTA
VTA
250
VTA
VTA
VTA
500
VTA
VTA
VTA
1000
VTA
VTA
VTA
2000
VTA
VTA
VTA
4000
VTA
VTA
VTA
8000
VTA
VTA
VTA
Added Cost: VTA
VTA
Added Cost: VTA
VTA
VTA
Title: VTA
VTA
Signature:
Date: VTA
"VTA" data shall be filled after receiving NMR documents. 90% Package is issuing without vendor inputs as per PMT instructions. NOISE DATA FOR PRODUCED WATER PUMPS R83-G-1041-A/B/C
DWG. TYPE
UPGRADE ETHANE FACILITY – JU’AYMAH NGL FRACTIONATION PLANT
DAT
FRACTIONATOR CENTER OFFSITE
JU’AYMAH
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ISSUED FOR 90% REVIEW
SAUDI ARABIAN OIL COMPANY
Equipment Type:
03/15/20
REVISION DESCRIPTION DATE REV. NO. OTHER REQUIRED (SAUDI ARAMCO)
REVIEW FOR KEY DRAWINGS DESIGN CERTIFICATION
(DESIGN AGENCY) IS COVERED, FOR ALL APPROVAL
B THIS REVISION NO.
REVISION VALIDATION
THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED AND DATED
Saudi Aramco 7305-ENG (11/2010)
PLANT NO.
INDEX
DRAWING NO.
SHT.NO.
REV.NO.
R83
G
RE-739434
007
B
SAUDI ARABIA EKRD/7305-1110.XLS