RE739434001-Produced Water Injection Pumps [PDF]

  • 0 0 0
  • Gefällt Ihnen dieses papier und der download? Sie können Ihre eigene PDF-Datei in wenigen Minuten kostenlos online veröffentlichen! Anmelden
Datei wird geladen, bitte warten...
Zitiervorschau

CENTRIFUGAL PUMP DATA SHEET FOR HORIZONTAL PUMPS AND VERTICAL IN-LINE PUMPS BY MANUFACTURER OF PUMPS PER ASME B 73.1 OR B 73.2

NOTE:

INDICATES INFORMATION TO BE COMPLETED BY PURCHASER;

APPLICABLE TO:

PROPOSALS

PUMP MFR

/

SIZE & TYPE

/

SERIAL NO.

BI-10-01868-0001

INDOOR

OUTDOOR

ON SHORE

COASTAL

UNDER ROOF OFF SHORE

SAFE

ELECTRICAL AREA CLASS

, DIV.

, GROUP

CP 4x6x9* **

PERFORMANCE DATA

ELECTRIC MOTOR

PUMP MARK NO(S).

PERFORMANCE

THREE (2W+1S) PUMP(S) R83

-G-

1041 A

-

R83

-G-

1041 C

-

R83

1041 B

RPM 3560

/

/

RATED SPEED

-G-

/

/

DRIVER NAME PLATE POWER RATING

/

/

PERFORMANCE AT

-G-

HP 900*

PUMPS OF IDENTICAL TYPE & SIZE IN OPERATION -

-G-

-G-

-

-G-

MIN. CONT.STABLE FLOW

RE-739461 NOT APPLICABLE

TOTAL DIFF. HEAD

Ft

4780*

LUBE OIL SYST DATA SHEET

NOT APPLICABLE

EFFICIENCY

%

49*

SAFETY INSTRUCTION SHEET

NOT APPLICABLE

REQUIRED POWER

HP

374*

LCC

$/kW

NPSH REQ'D FOR: 3% DH 1st STAGE ON H2O

Ft

9*

40,000 HRS LIQ'D PUMPED

Ft

GEAR UNIT DATA SHEET

EF

TBD

03/15/20

OPERATIONS/DATE

/

PRODUCED WATER

CONTINUOUS

INTERMITTENT

ATTENDED

UNATTENDED

INDIVIDUALLY

IN SERIES

03/15/20

TBD IAD

03/15/20

CERTIFIED/DATE

O

140

F

D E O

PPM

180

F

1.085

VISCOSITY AT FLOW TEMP.

1 CP

CS / CP / SSU

VAPOR PRESSURE AT NORMAL FLOW TEMP.

411 mg/l

NONE

U S S I PULPY

CHARACTER OF SOLIDS:

AAN

249200

RELATIVE DENSITY AT NORMAL FLOW TEMP.

V.P. AT MAX. FLOW TEMP.

03/15/20

TDS

GAS IN FLUID:

NONE

PRINCIPAL CORROSIVES:

6.3

pH

2.9

PSIA

7.51

HARD

10-01868-0001-001

725.6*

600.5*

11.5*

12*

14.7*

Ft

4875*

Ft

5580* 562*

3500*

1.155* 1.368*

MINIMUM CONTINUOUS STABLE FLOW

USGPM

187.2*

MINIMUM CONTINUOUS THERMAL FLOW

USGPM

163.8*

MAXIMUM OPERATING TIME AT SHUT-OFF

SEC

**

FIRST CRIT. SPEED; DRY

RPM

**

FIRST CRIT. SPEED; WET

RPM

**

MAX. ALLOWABLE SPEED

RPM

**

MAX. POWER FULL CURVE ACTUAL IMP. DIAM.

HP

**

POWER AT SHUT-OFF HEAD

HP

**

MAX.

MIN.

Ft

4950*

2500*

%

**

**

REQUIRED POWER AT RATED CAP.

HP

**

**

MAX. REQUIRED POWER FULL CURVE

HP

**

**

SOFT INTERMEDIATE TRANSMISSION

UNKNOWN

SALT, H2S 10 PPM 110941

/

GEAR BOX

/

HYDR. COUPL. SPEED RANGE

N/A

RATIO

N/A %

N/A %

OF DRIVER SPEED

PPM

CONSTRUCTION DATA PUMP TYPE HORIZONTAL (BET. BRGS) /

NORMAL USGPM

390

RATED USGPM

410

Ft

23

AT 120% OF RATED CAPACITY

Ft

20 1

1

VISC. CORR. FACTOR CQ; CH; CE

/

OVERHUNG

VERT. IN-LINE

INTEGRAL SHAFT

CASING MOUNT:

CENTERLINE

FLANGE CENTERLINE

FOOT

4219

Ft

AT RATED CAPACITY

VERT. IN-LINE

IN-LINE

CASE SUPPORTED

CASING SPLIT

AXIAL

RADIAL

CASING TYPE

DOUBLE VOLUTE

SINGLE VOLUTE

DIFFUSOR

1

SELF PRIMING

/

RATED SUCTION PRESSURE

PSIA

18.12

DIR. OF ROT.

MAX. SUCT. PR. AT RATED CAP.

PSIA

40.46

(VIEWED FROM DRIVER)

MAX. SUCT. PR. AT SHUT-OFF

PSIA

TOTAL DIFFERENTIAL PRESSURE

65*

553.8*

EFFICIENCY AT RATED CAPACITY

NPSH AVAILABLE AT SUCTION FLG.

DRAWING COMPLETION CERTIFICATE NO.

AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER

IS COVERED, FOR ALL APPROVAL

REVISION VALIDATION

B THIS REVISION NO.

RATED TOTAL DIFFERENTIAL HEAD

3875*

MIN. IMPELLER DIAMETERS

OPERATING CONDITIONS CAPACITY

65.4*

PERFORMANCE WITH MAX. AND

UNKNOWN

PSIA

VOL. %

CI

4219*

62 *

TOT.DIFF. HEAD AT RATED CAPACITY

PSIA

GRITTY

4300*

O F

LIQUID CHARACTERISTICS

120%

OF RATED CAPACITY

RATIO. END OF CURVE CAPACITY/RATED CAP.

-G-

PRODUCED WATER

NORMAL FLOW

Ft

RATIO. SHUT-OFF HEAD/RATED HEAD

-G-

TSS

ENGG./DATE

(DESIGN AGENCY)

IN PARALLEL

100%

USGPM

TOT.DIFF. HEAD AT END OF CURVE

DOWNSTREAM OF PUMP NO(S)

MAX. FLOW TEMPERATURE

R

CAPACITY AT END OF CURVE

-G-

NORMAL FLOW TEMPERATURE

DESIGN CERTIFICATION

STANDY BY

UPSTREAM OF PUMP NO(S)

LIQUID PUMPED

SHUT-OFF HEAD AT ACTUAL IMP. DIAM. AT MAX. IMP. DIAM.

-GCONST. AGENCY/ DATE

REQUIRED (SAUDI ARAMCO)

REVIEW FOR KEY DRAWINGS

SERVICE PUMP FUNCTION

D I B RPM

-G-

/

/

STAGGER

YES

/

CCW

/

/

NO CW

PUMP NOZZLES 1984

SIZE

RATING

FACING

LOCATION

RATED DISCHARGE PRESSURE

PSIA

2002.12

/

SUCTION

8"*

1500#*

RTJ

TOP

MAX. DISCH. PR. AT RATED CAP.

PSIA

2024.46

/

DISCHARGE

6"*

1500#*

RTJ

TOP

DATA SHEET FOR

PSI

PWD PUMPS (R83-G-1041A/B/C)

UPGR. ETHANE FACILITY– JU’AYMAH NGL FRACT. PL.

DWG. TYPE

PLANT NO.

INDEX

DRAWING NO.

SHT.NO.

REV.NO.

R83

G

RE-739434

001

B

DAT

FRACTIONATOR CENTER OFFSITE JU'AYMAH

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

B

AS BUILT

SULZER

/

/

SITE CONDITIONS

PURCHASE

DRIVER DATA SHEET

BY/DATE

BY MANUFACTURER OF PUMPS OR PUMPS PER 31-SAMSS-004

PURCHASERS REFERENCES

THIS DATA SHEET COVER

JOB ORDER/EWO NO.

DATE REV. NO. OTHER

SAUDI ARABIAN OIL COMPANY

DRIVER TYPE

03/15/20

REVISION DESCRIPTION

ISSUED FOR 90% REVIEW

THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED AND DATED

Saudi Aramco 2741-ENG (09/2015)

SAUDI ARABIA EKRD/2741-1-0713.XLS

SAUDI ARABIAN OIL COMPANY CENTRIFUGAL PUMP DATA SHEET FOR HORIZONTAL PUMPS AND VERTICAL IN-LINE PUMPS NOTE:

BY MANUFACTURER OF PUMPS PER ASME B 73.1 OR B 73.2

INDICATES INFORMATION TO BE COMPLETED BY PURCHASER;

BY MANUFACTURER OF PUMPS OR PUMPS PER 31-SAMSS-004

CONSTRUCTION DATA (CONT'D)

CONSTRUCTION DATA (CONT'D)

FORCES AND MOMENTS

STUFFING BOX DATA

ALLOWABLE FORCES AND MOMENTS TOP NOZZLE

END NOZZLE

EACH NOZZLE

Fx

**

LB

Fx

SIDE NOZZLE

**

LB

Fx

**

LB

Mx

**

LB.FT

INSIDE DIAMETER

IN

**

Fy

**

LB

Fy

**

LB

Fy

**

LB

My

**

LB.FT

DEPTH

IN

**

Fz

**

LB

Fz

**

LB

Fz

**

LB

Mz

**

LB.FT

DISTANCE FACE OF STUFFING BOX IN

**

MISC CONNECTIONS

INBOARD / OUTBOARD

QTY.

SIZE

TYPE

LUBE OIL INLET

**

**

**

FLANGE TO NEAREST OBSTRUCTION

LUBE OIL OUTLET

**

**

**

SEAL LIQUID INLET

**

**

**

SEAL LIQUID DRAIN

**

**

**

CASING DRAIN(S)

**

**

**

VENTS

**

**

**

ACTUAL DIAMETER

COOLING WATER

**

**

**

MAXIMUM DIAMETER

STUFFING BOX

**

**

**

MINIMUM DIAMETER

BALANCE DRUM

**

**

**

SINGLE / DOUBLE SUCTION

IMPELLER DATA NUMBER OF STAGES

11

DRAIN & VENT INDIVIDUALLY PIPED WITH BLOCK VALVES TO TERMINATE

EYE AREA IMPELLER

AT EDGE OF BASE PLATE IN COMMON AREA

VANE ANGLE AT IMP. EXIT

YES

**

FLANGE RATING

NO

1500#*

in CLASS

4500*

JACKETS

PSIG

N/A

N/A

COILS

PSIG

N/A

N/A

TBD

03/15/20 03/15/20

TBD IAD

3000*

PSIG

R

PRECISION CAST

CUT WATER DIAMETER

3000*

SPECIFIC SPEED

SUCTION SPECIFIC SPEED AT 3% DH

O F

UNDER / OVER FILING / V-CUT

CASE

IN

**

SHAFT DIAMETER AT BEARINGS

IN

**

SHAFT DIAMETER AT 1ST STAGE IMPELLER

IN

**

BEARING SPAN

IN

**

IN

**

D E

STATIC SHAFT DEFLECTION

SHAFT SEALING

PACKED STUFFING BOX PACKING MAT'L.

NOT APPLICABLE

PROVIDED WITH LANTERN RING:

YES

10.05*

10.62*

10.62*

IN

8.5*

8.5*

**

**

**

** **

FT/S

156.6*

156.6*

FT/S

**

**

**

**

YES - NO

**

**

IN

**

**

931*

931*

10400*

10400*

IN

**

**

YES / NO

**

**

WEARING RINGS: IMPELLER

SHAFT DIAMETER AT MECH. SEAL SLEEVE

10.05*

IN

**

WIDTH. IMPELLER DISCH.

4500*

SHAFT DATA

CLEARANCE

YES

NO

YES

NO

INBOARD

IN

**

**

OUTBOARD

IN

**

**

1st STAGE IMPELLER INLET GEOMETRY

NO

THROUGH SEALING DEAD ENDED

BLEED OFF ah

C2A3A (3CW-BB)*

**

**

**

**

5TH LETTER

NOT APPLICABLE

PIPING FOR PRIMARY SEAL API FIG. D-2 PLAN PIPING FOR THROTTLE BUSHING OR

53B

10-01868-0001-001

AUXILIARY SEAL API FIG. D-3 PLAN

COMPLETION CERTIFICATE NO.

Dh2

**

4TH LETTER

d

**

3RD LETTER

Dh1

MAKE

GREASE

FOREIGN LIQUID

Dsl

MECHANICAL SEAL API CODE

ap

LIQUID PUMPED

Dp

AAN

03/15/20

U S S I FLUSH WITH

API CODE MAT'L

CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER DRAWING

IS COVERED, FOR ALL APPROVAL AND

B

F

PSIG

MODEL

REVISION VALIDATION

O

180

CASE

DUAL MECH. SEAL

03/15/20

OPERATIONS/DATE CONST. AGENCY/DATE CERTIFIED/DATE

AT

SEALING ARRANGEMENT ENGG./DATE

REVIEW FOR KEY DRAWINGS

REQUIRED (SAUDI ARAMCO) (DESIGN AGENCY)

DESIGN CERTIFICATION

PRESSURES

MANUFACTURER MAT'L CODE

THIS REVISION NO.

PATTERN NUMBER HYDROST. TEST PRESS

IN

O

MAX.ALLOW.PERIPH.SP'D AT FLOW TEMP. MAX. ALLOW. WORK. PRESS.

FOLLOW STAGE

SQ.IN

ACTUAL PERIPHERAL SPEED

PRESSURES

D I B FIRST STAGE

SINGLE* SINGLE*

NUMBER OF VANES

COOLING WATER PIPING, API FIG. D-4 PLAN

NOT APPLICABLE

Dp

=

**

IN

Dsl

=

**

IN (IF APPLICABLE)

Dh1

=

**

IN

Dh2

=

**

IN

CYCLONE SEPARATOR

YES

NO

d

=

**

IN

FLOW ORIFICE IN SEAL FLUSH SUPPLY LINE

YES

NO

ap

=

**

DEGREES

SEAL LEAKAGE PIPING WITH ORIFICE

YES

NO

ah

=

**

DEGREES

BUFFER LIQUID SYSTEM

YES

NO

METHANOL DRIP SYSTEM REQUIRED: PRESSURE CARTRIDGE DESIGN DATA SHEET FOR

YES

**

NO

**

PSIG; FLOW YES

USGPM

NO

PWD PUMPS (R83-G-1041A/B/C)

UPGR. ETHANE FACILITY– JU’AYMAH NGL FRACT. PL.

DWG. TYPE

JU'AYMAH

PLANT NO.

INDEX

DRAWING NO.

SHT.NO

REV.NO.

R83

G

RE-739434

002

B

DAT

FRACTIONATOR CENTER OFFSITE

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED AND DATED JOB ORDER/EWO NO.

BI-10-01868-0001

ISSUED FOR 90% REVIEW 03/15/20 OTHER

BY/DATE

B

REV. NO.

DATE

REVISION DESCRIPTION

Saudi Aramco 2741-ENG (09/2015)

SAUDI ARABIA EKRD/2741-2-0713.XLS

BY MANUFACTURER OF PUMPS PER ASME B 73.1 OR B 73.2

NOTE: INDICATES INFORMATION TO BE COMPLETED BY PURCHASER;

BY MANUFACTURER OF PUMPS OR PUMPS PER 31-SAMSS-004

CONSTRUCTION DATA (CONT'D)

CONSTRUCTION DATA (CONT'D) COUPLING

BEARING TYPE

RADIAL

THRUST

SUPPLIED BY:

ANTI-FRICTION

TYPE

TILTING PAD RADIAL

THRUST

ELASTOMERIC

B

BI-10-01868-0001

HYDRAULIC FIT YES,

FORCED FEED

COUPLING GUARD

PARTIALLY ENCLOSED

OIL MIST

PUMP SHAFT END

LUBE OIL PIPING TO AND

MOUNT COUPLING HALF: PUMP

FROM BEARINGS

YES

NO

DRIVER HALF

LUBE OIL PIPING UP TO L.O. SYSTEM

YES

NO

PILOT BORED

YES

NO

PLANE

MODEL N/A

**

L.O. AND/OR S.O. SYSTEM MOUNTED

N

DESIGNED FOR INSTALLATION ON:

R

TBD TBD

03/15/20

CONCRETE FOUNDATION

As per 26-SAMSS-088

OIL PER 26-SAMSS-045

03/15/20

OPERATIONS/DATE CONST. AGENCY/DATE

IAD

O F

STEEL PLATFORM NO

GEAR

YES

NO

YES

NO

MATERIALS OF CONSTRUCTION

HEAT REMOVAL

GPM/USGAL

PSIG

BTU/MIN

INB. BRG.

N/A

N/A

N/A

N/A

OUTB. BRG.

N/A

N/A

N/A

N/A

1

CASING

ASTM

**

THRUST BRG.

N/A

N/A

N/A

N/A

2

IMPELLER(S)

ASTM

**

3

CASE WEAR RINGS

ASTM

**

4

IMPELLER WEAR RINGS

ASTM

**

5

SHAFT

ASTM

**

6

SHAFT SLEEVES

ASTM

**

7

THROAT BUSHINGS

ASTM

**

8

INTERSTAGE SLEEVES

ASTM

**

9

INTERSTAGE BUSHINGS

ASTM

**

10

LANTERN RING (PACKED PUMPS)

ASTM

**

11

GLAND / MECH. SEAL FLANGE

ASTM

**

12

BEARING BRACKETS

ASTM

**

ASTM

**

ASTM

**

O

F

N/A

D E

PUMP VENDOR

N/A

IN ACCORDANCE WITH DATA SHEET FORM 8004-ENG

NO

YES, DRAWING NO.

U S S I

MATERIALS TO BE IN ACC. WITH CODE

HSZ (NOTE 7)

OF STD. DRAWING AC-036821

VENDOR TO COMPLETE FOLLOWING MAT'L LISTING

13 1 NON-WETTED STUDS / NUTS

NON-CIRCULATING SYSTEM BY:

AAN

OFF BASE

SUPPLY PRESSURE

N/A

MAX. OIL OUTL. TP.

53B

PUMP

ON BASE

FLOW OR CAPACITY

OTHER

03/15/20

YES

GEAR

HORIZONTAL ALIGNMENT JACKSCREWS

GREASE PER 26-SAMSS-054

TOTAL

03/15/20

CERTIFIED/DATE

PUMP MANUFACTURER DRIVER

DRILLED FOR DRIVER

BEARING LUBRICANT

NO

OIL FIELD SKID

N

LUBRICANTS

D I B TAPERED

COMPLETELY MACHINED

TO ACCOMMODATE:

**

NO

NO. IF SHIPPED TO DRIVER SUPPLIER

SUPPLIED BY

THRUST BEARING LOADS:

IN

COMPLETELY ENCLOSED

YES

YES

BASE PLATE

N/A

RETURN BRANCH MAKE

BEARING COOLING

ENGG./DATE

CYLINDRICAL

BASE PLATE

CONNECTIONS AT RADIAL COUPLING

COOLING

2 WETTED FASTENERS 14

PIPING: PIPE / FITTINGS

ASTM

**

15

BASE PLATE

ASTM

**

16

MECH. SEAL SPRINGS

ASTM

**

EXTERNAL CIRCULATING SYSTEM

17

MECH. SEAL OTHER METAL PARTS

ASTM

**

OIL COOLING BY:

18

INNER CASING

ASTM

**

SHAFT MOUNTED FAN

JACKETED BEARING HOUSING

COILS IN BEARING HOUSING

LIQ. PUMPED

FOREIGN LIQ.

AIR

NONE

STUFFING BOX COOLING

YES

NO

PEDESTAL COOLING

YES

NO

ASTM

19

NOISE SPECIFICATION

COOLING PIPING FOR BEARINGS

STUF. BOX

PEDESTALS

10-01868-0001-001

SEAL COOLER

N/A

IN ACCORDANCE WITH API-610. FIG. D-4. PLAN

DRAWING COMPLETION CERTIFICATE NO.

AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER

**

SPACER:

TERMINATION WITH FLANGED

BY/DATE

OTHER REVIEW FOR KEY DRAWINGS

REQUIRED (SAUDI ARAMCO) (DESIGN AGENCY)

DESIGN CERTIFICATION

KEYED

OIL BATH WITH EXT'L CIRCULATION

LUBE OIL SYSTEM SUPPLIED BY:

IS COVERED, FOR ALL APPROVAL

DISC PACK

RIGID ADJUSTABLE

**

LUBRICATOR, MAKE

DESIGN AXIAL FORCE:

B

**

SIZE

PUMP MANUFACTURER

CLOSE COUPLED

MAX. ALLOWABLE AXIAL FORCE:

REVISION VALIDATION

**

MODEL

DIAPHRAGM

LUBRICATION METHOD

SIGHT FLOW INDICATOR IN EACH

THIS REVISION NO.

**

MAKE

SLEEVE

MAXIMUM ALLOWABLE SOUND LEVEL

≤90

dBA

PUMP

**

dBA

DRIVER

**

dBA

BY PURCHASER AT 3 FT. DISTANCE

COOLANT DATA

MANUFACTURER GUARANTEED BRG HSG

STUF BOX

PEDESTAL

SEAL COOLER

TOTAL FLOW

USGPM

N/A

N/A

N/A

N/A

OTHER

**

dBA

INLET PRESS.

PSIG

N/A

N/A

N/A

N/A

COMPLETE TRAIN

**

dBA

TEMP. INLET

O

N/A

N/A

N/A

N/A

TEMP. OUTLET

O

N/A

N/A

N/A

N/A

N/A

N/A

N/A

F F

COOLING MEDUIM DATA SHEET FOR

PWD PUMPS (R83-G-1041A/B/C)

N/A DWG. TYPE

UPGR. ETHANE FACILITY– JU’AYMAH NGL FRACT. PL.

JU'AYMAH

PLANT NO.

INDEX

DRAWING NO.

SHT.NO.

REV.NO

R83

G

RE-739434

003

B

DAT

FRACTIONATOR CENTER OFFSITE

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

BEARINGS AND LUBRICATION

RING-OIL CONSTANT LEVEL

JOB ORDER/EWO NO.

DATE REV. NO.

SAUDI ARABIAN OIL COMPANY CENTRIFUGAL PUMP DATA SHEET FOR HORIZONTAL PUMPS AND VERTICAL IN-LINE PUMPS

GREASE

03/15/20

REVISION DESCRIPTION

ISSUED FOR 90% REVIEW

THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED AND DATED

Saudi Aramco 2741-ENG (09/2015)

SAUDI ARABIA EKRD/2741-3-0713.XLS

DC

AC AC

BI-10-01868-0001

JOB ORDER/EWO NO.

4160 120

3/60 1/60

HYDROSTATIC TEST WATER

PERFORMANCE TEST AIR

AVAILABLE

MEASURE DP ACROSS STUFFING BOX

PSIG

NPSH TEST

125

DISMANTLING

CONTROLS AND PROTECTION

RADIOGRAPHIC INSPECTION IMPELLER DYE PENETRANT EXAMINATION IMPELLER INLET

AVAIL PSIG

AVAIL COOLING

O

OUTLET O

F

REQ'D O

F

DYNAMIC BALANCE IMPELLER(S) F

WATER

DYNAMIC BALANCE ROTOR DYNAMIC BALANCE COUPLING VIBRATION, MEASUREMENTS

WELL WATER

TREATED WATER

ONCE THROUGH SYSTEM

SEA WATER

TESTS TO BE CARRIED WITH:

CLOSED LOOP SYSTEM

ACTUAL DRIVER

DERATED SPEED:

03/15/20

INSTRUMENTATION & CONTROLS TBD

OPERATIONS/DATE

D I B

MANUFACTURER'S DRIVER

RATED SPEED

RPM

DRAWINGS AND OTHER DATA TEMPERATURE MONITORING

RADIAL BEARINGS

THRUST BEARINGS

CASING THERMOWELL

R

MANUFACTURER'S DRAWING OR DOCUMENT

YES PROVISIONS ONLY

REQUIRED

YES

NO

O F

03/15/20

TBD

DIMENSIONAL DRAWING OF

CONST. AGENCY/DATE

REQUIRED (SAUDI ARAMCO)

KEROSENE

RUNNING TEST

AT

REVIEW FOR KEY DRAWINGS

NONE

AS FOLLOWS HZ

CERT'D

INSPECTION AND TESTS

VENDOR'S STANDARD SHOP TEST PHASE

VOLTS

BY MANUFACTURER OF PUMPS OR PUMPS PER 31-SAMSS-004

OBSER'D

AVAILABLE AC

BY MANUFACTURER OF PUMPS PER ASME B 73.1 OR B 73.2

WITN'D

ELECTRIC POWER

D

ALARM SETTING

O

F

SHUTDOWN SETTING

O

F

** **

** **

N/A N/A

COMPLETELY ASSEMBLED UNIT OPER. & MAINT. INSTRUCTIONS

CROSS SECT. DRW. WITH PART NO'S.

VIBRATION / DISPLACEMENT MONITORING

MECHANICAL SEAL DRAWING BILLS OF MATERIALS

POSITION

RADIAL BRG'S PROXIMITY

TYPE

THRUST BRG. PROXIMITY

BRG. HSG SEISMIC

COMPLETED PUMP DATA SHEET AUXILIARY PIPING DWG. CERTIFIED TEST CURVE & DATA

D E

03/15/20

PROVISIONS ONLY

IAD

CERTIFIED/DATE

(DESIGN AGENCY)

ALARM / SHUTDOWN

N/A /

SETTING: MILS P-P MILS P-P IN / SEC RMS

U S S I 03/15/20

AAN

PROXIMITY

ELECTRICAL

10-01868-0001-001

DRAWING COMPLETION CERTIFICATE NO.

AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER

IS COVERED, FOR ALL APPROVAL

B

REVISION VALIDATION

THIS REVISION NO.

COLD ALIGNMENT CURVE DATA L. & T. VIBR. ANALYSIS

N/A

YES

** /

** MISCELLANEOUS PAINTING

NO

PNEUMATIC

**

N/A N/A

**

PSIG MODEL N/A

CONTR.ORIFICE N/A

IN

SPECIFICATION PUMPS TO BE IN ACCORDANCE WITH:

MASSES

31-AMSS-004

PUMP

LBS

PUMP ROTATING ASSEMBLY

LBS

CASING (UPPER HALF)

LBS

BASEPLATE

LBS

COUPLING

LBS

DRIVER

LBS

DRIVER ROTATING ASSEMBLY

LBS

TOTAL MASS

LBS

** ** ** ** ** ** ** **

PWD PUMPS (R83-G-1041A/B/C)

ASME B 73.1

ASME B 73.2

TECHNICAL SPECIFICATION FOR PWD PUMPS (RE-MEC004)

DWG. TYPE

UPGR. ETHANE FACILITY– JU’AYMAH NGL FRACT. PL.

PLANT NO.

INDEX

DRAWING NO.

SHT.NO.

REV.NO.

R83

G

RE-739434

004

B

DAT

FRACTIONATOR CENTER OFFSITE JU'AYMAH

SAES-H-001 & SAES-H-004, APCS-1A

BUYER'S PAINT SPECIFICATION: VENDOR'S STANDARD:

MODEL **

LEVEL SWITCH MAKE

DATA SHEET FOR

SPEED TORQUE CURVE

ELECTRICAL

PRESSURE SETTING *SHUTDOWN* TIME DELAY SETTING

INSTR. WIRING DIAGRAM

PNEUMATIC

SHAFT SEAL LEAKAGE CONTROL: PRES. SWITCH MAKE

RECOMMENDED SPARES LIST

N/A

N/A /

SEISMIC

ENGG./DATE

DESIGN CERTIFICATION

YES

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

CENTRIFUGAL PUMP DATA SHEET FOR HORIZONTAL PUMPS AND VERTICAL IN-LINE PUMPS NOTE: INDICATES INFORMATION TO BE COMPLETED BY PURCHASER; UTILITIES

CONTROLS AND PROTECTION

BY/DATE

OTHER

SAUDI ARABIAN OIL COMPANY

MAIN ELECTRIC DRIVER

B

REV. NO.

DATE

REVISION DESCRIPTION

03/15/20 ISSUED FOR 90% REVIEW

THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED AND DATED

Saudi Aramco 2741-ENG (09/2015)

SAUDI ARABIA EKRD/2741-4-0713.XLS

GENERAL NOTES 1

Mechanical seals shall comply with the requirements of 31-SAMSS-012 / API 682. Plan 53B shall be furnish with centralized fixed make up unit as per AA-036777.001, Rev.1 for new Pumps (R83-G-1041A/B/C) and future Pumps (R83-G-1041 D/E).

2

The centralized make up system shall be designed for 5 Pumps (Total ten (10) Plan 53B system)

3

The interconnecting piping between centralized Seal fluid make up skid and Pump skid shall be engineered by others.

4

Pump Tags number ar R83-G-1041A/B/C and R83-G-1041 D/E shall be installed in future.

5

Electric Motor shall be as per 17-SAMSS-502/API 541 Fourth Ed.

6

Deleted.

7

Vendor shall review and confirm material selection based on liquid characteristic and operating condition. Vendor shall propose superior material, if required for Client review and approval.

8

Deleted.

9

Pumps shall be capable of at least a 5 % head increase at rated conditions by replacement of the impeller(s) with one(s) of larger dia.

D I B

R

03/15/20

TBD

11 Pumps shall have a continuous head rise from the rated head to shutoff. The head rise shall not be less than 10% of the rated head.

12 The NPSH3 shall not exceed the specified NPSHA over the range of minimum continuous stable capacity to 120% of the rated capacity. At rated capacity, the NPSHA shall also exceed the NPSH3 by a minimum margin of 1 meter (3.3 ft).

O F

03/15/20

TBD

13 The suction specific speed, based on the NPSH required for 3% first stage head drop at best efficiency capacity, shall not exceed 12,000 in U.S. units. 14 For pumps with rated power per stage up to 300 HP, the cut water clearance shall be at least 3% of the rated impeller blade radius for diffuser designs and at least 6% of the rated impeller blade radius for volute designs.

CERTIFIED/DATE

IAD

03/15/20

AAN

03/15/20

15 The pump efficiency at rated point shall not be less than the efficiency value ( Pɳ ) calculated as per the following equation;

D E

10-01868-0001-001

16 Pump shall have a preferred operating region of 70 % to 120 % of best efficiency point flow rate of the pump as furnished.

DRAWING COMPLETION CERTIFICATE NO.

AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER

IS COVERED, FOR ALL APPROVAL

B THIS REVISION NO.

REVISION VALIDATION

U S S I

The normal operating flow rate shall be within the region of 80% and 100% of the pump best efficiency point flow rate of the pump as furnished. The flow rate at the end of the curve shall not be less than 120% of the rated flow rate. The minimum continuous stable flow rate shall not exceed 50% of the rated flow rate for pumps.

17 Electric motor shall be sized for 110% of pump rated power and power required at end of curve operation including losses in coupling/s and gear box. 18 Pump, coupling and driver train shall be designed so that first lateral and torsional critical speeds occur above the maximum operating speed.

DATA SHEET FOR PWD PUMPS (R83-G-1041A/B/C)

DWG. TYPE

UPGRADE ETHANE FACILITY JU’AYMAH NGL FRANCTIONATION

PLANT NO.

INDEX

DRAWING NO.

SHT.NO

REV.NO.

R83

G

RE-739434

005

B

DAT

FRACTIONATOR CENTER OFFSITE JU'AYMAH

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

JOB ORDER/EWO NO.

B

SAUDI ARABIAN OIL COMPANY

10 For these pumps the maximum allowable working pressure shall apply to all parts referred to in the definition of pressure casing, including seal glands and seal chambers.

ENGG./DATE

CONST. AGENCY/DATE

OPERATIONS/DATE

BY/DATE

10-01868-0001

ISSUED FOR 90% REVIEW 03/15/20

REVISION DESCRIPTION DATE REV. NO. OTHER REVIEW FOR KEY DRAWINGS

REQUIRED (SAUDI ARAMCO) (DESIGN AGENCY)

DESIGN CERTIFICATION

THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED AND DATED

Saudi Aramco 2616-ENG (11/2010)

SAUDI ARABIA EKRD/2616-1110.XLS

GENERAL NOTES 19

Pump should be dismantled if one of the test is failed, to investigate the cause of any unsatisfactory performance, NPSH or running test.

20

The speed, head per stage and power per stage shall not exceed 4,000 RPM, 457 m (1,500 ft) and 4,477 kW (6,000 HP), respectively

21

The suction and Discharge Nozzle shall be designed for 2 times API 610 table 5 values.

22

Vendor to provide vibration probes complying to BN3500 by considering distance of approx. 700m between machine and VMS rack. Vendor to inform, if reliable measurement is not possible due to any distance or noise or specified .

23

Water Analysis

03/15/20 03/15/20 03/15/20

TBD TBD IAD

OPERATIONS/DATE CONST. AGENCY/DATE CERTIFIED/DATE

D I B

O F

D E

24 Maximum data provided by vendor has been filled based on TBE stage. "* / **" data shall be confirmed/filled after receipt of NMRs

90% Package is issuing without vendor inputs as per PMT instructions. 03/15/20

Legends AAN

ENGG./DATE

REQUIRED (SAUDI ARAMCO) (DESIGN AGENCY)

OTHER REVIEW FOR KEY DRAWINGS DESIGN CERTIFICATION

R

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

10-01868-0001

JOB ORDER/EWO NO.

SAUDI ARABIAN OIL COMPANY

BY/DATE

B

REV. NO.

DATE

03/15/20

REVISION DESCRIPTION

ISSUED FOR 90% REVIEW

THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED AND DATED

Saudi Aramco 2616-ENG (11/2010)

* Vendor to confirm ** Vendor to advise N/A Not applicable

10-01868-0001-001

DRAWING COMPLETION CERTIFICATE NO.

AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER

IS COVERED, FOR ALL APPROVAL

B THIS REVISION NO.

REVISION VALIDATION

U S S I

DATA SHEET FOR PWD PUMPS (R83-G-1041A/B/C)

DWG. TYPE

UPGRADE ETHANE FACILITY JU’AYMAH NGL FRANCTIONATION

FRACTIONATOR CENTER OFFSITE JU'AYMAH

PLANT NO.

INDEX

DRAWING NO.

SHT.NO

REV.NO.

R83

G

RE-739434

006

B

DAT

SAUDI ARABIA EKRD/2616-1110.XLS

EQUIPMENT NOISE DATA SHEET GENERAL INFORMATION

BI-10-01868-0001

JOB ORDER/EWO NO.

B BY/DATE

Location:

Equipment Serial No.:

50% load

120% load

VTA

≤90

03/15/20

TBD

Center Frequency (Hz)

D E

03/15/20

63

20 - 75 75 - 150 150 - 300 300 - 600

03/15/20

O F

Special Design:

With Acoustic Treatment:

VTA

VTA

VTA

Octave Band Sound Pressure Levels, dBA (Ref. 0.02 mPA) (Supplier's Guaranteed Maximum Sound Pressure Level at One Meter) Octave Band (Hz)

600 - 1200

1200 - 2400 2400 - 4800

Description of Special Design: Description of Acoustic Treatment:

10-01868-0001-001

R

Other load

VTA

SUPPLIER, MANUFACTURER OR VENDOR INFORMATION

Standard Design:

AAN

D I B

This form shall be completed for each piece of equipment (or integrated unit) that is likely to generate noise in excess of 85 dBA at a distance of one meter. If the noise level is greater than 90 dBA, the cost of special design and/or acoustic treatment should be supplied. Measurements are to be made in accordance with ANSI S1.13 and at full design load, unless otherwise indicated. For rotating electric machinery, use points defined in IEEE Standard 85.

Sound Pressure Level, dBA

DRAWING COMPLETION CERTIFICATE NO.

SULZER CP 4x6x9

PURCHASER'S REQUIREMENTS

03/15/20

TBD

Model No.:

TO BE ADVISED

VTA

U S S I ENGG./DATE

Manufacturer:

PRODUCED WATER DISPOSAL PUMPS

4800 - 9600

AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER

Inquiry/Purchase Order No.:

JU’AYMAH, SAUDI ARABIA

Also measure at:

IAD

OPERATIONS/DATE CONST. AGENCY/DATE CERTIFIED/DATE

UPGRADE ETHANE FACILITY – JU’AYMAH NGL

Project Designation:

Supplier, Manufacturer or Vendor: Represented by:

Standard Design

Special Design

With Acoustic Treatment

VTA

VTA

VTA

125

VTA

VTA

VTA

250

VTA

VTA

VTA

500

VTA

VTA

VTA

1000

VTA

VTA

VTA

2000

VTA

VTA

VTA

4000

VTA

VTA

VTA

8000

VTA

VTA

VTA

Added Cost: VTA

VTA

Added Cost: VTA

VTA

VTA

Title: VTA

VTA

Signature:

Date: VTA

"VTA" data shall be filled after receiving NMR documents. 90% Package is issuing without vendor inputs as per PMT instructions. NOISE DATA FOR PRODUCED WATER PUMPS R83-G-1041-A/B/C

DWG. TYPE

UPGRADE ETHANE FACILITY – JU’AYMAH NGL FRACTIONATION PLANT

DAT

FRACTIONATOR CENTER OFFSITE

JU’AYMAH

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ISSUED FOR 90% REVIEW

SAUDI ARABIAN OIL COMPANY

Equipment Type:

03/15/20

REVISION DESCRIPTION DATE REV. NO. OTHER REQUIRED (SAUDI ARAMCO)

REVIEW FOR KEY DRAWINGS DESIGN CERTIFICATION

(DESIGN AGENCY) IS COVERED, FOR ALL APPROVAL

B THIS REVISION NO.

REVISION VALIDATION

THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL CERTIFIED AND DATED

Saudi Aramco 7305-ENG (11/2010)

PLANT NO.

INDEX

DRAWING NO.

SHT.NO.

REV.NO.

R83

G

RE-739434

007

B

SAUDI ARABIA EKRD/7305-1110.XLS