Test: Oracle ZDLRA Hardware Installation & Software Configuration Online Assessment (2022) Answer the question(s) on this page, and click Next to go to the next test page. Click Summary to see which questions you need to answer before submitting the test. Click Finish Test if you are ready to submit your test.

Exadata X9M TOI – RoCE Mult-Rack Assessment (Answer all questions in this section)

91. We now use patchmgr to apply the Golden Config on the RoCE Network Fabric switches. True False Mark for Review

(1) Points Previous Page 19 of 19 Summary

Test: Oracle ZDLRA Hardware Installation & Software Configuration Online Assessment (2022) Answer the question(s) on this page, and click Next to go to the next test page. Click Summary to see which questions you need to answer before submitting the test. Click Finish Test if you are ready to submit your test.

Exadata X9M TOI – RoCE Mult-Rack Assessment (Answer all questions in this section)

86. Why does Exadata X9M require 7 uplinks from leaf to spine vs 4 uplinks on previous generations? To increase the throughput to 400 gb/s To enable secure fabric between switches There is a significant increase in over-subscription due to Gen4 PCIe speeds on Exadata X9m requiring additional uplinks from leaf to spine.

To eliminate dropped packets Mark for Review

(1) Points 87. How many uplinks per rack are now needed for multi-racking the Exadata X9M? 14 56 7 28 Mark for Review

(1) Points 88. When adding a ZFS Appliance to the RDMA Network Fabric of a multi-racked Exadata X9M, 2 hosts will have to be removed from the rack. False True Mark for Review

(1) Points 89. There are now 3 RoCE X9M Golden Config multi-rack templates. False True Mark for Review

(1) Points 90. What is the primary change to the X9M Golden Config for the RoCE leaf switches? All network ports on the leaf switches are configured as Edge ports The Golden Config is on the leaf switch from the factory One Golden Config for all deployment types.

Port 1-3 and 34-36 are now configured as router ports and connected to the spines.

Mark for Review

(1) Points Previous Page 18 of 19 Next Summary

Test: Oracle ZDLRA Hardware Installation & Software Configuration Online Assessment (2022) Answer the question(s) on this page, and click Next to go to the next test page. Click Summary to see which questions you need to answer before submitting the test. Click Finish Test if you are ready to submit your test.

Exadata X9M TOI – RoCE Mult-Rack Assessment (Answer all questions in this section)

81. Where can you find the multi-rack EIS checklists? https://exadata.us.oracle.com https://docs.oracle.com https://eis.us.oracle.com All of the above Mark for Review

(1) Points 82. If you expand an Exadata X8M quarter rack with Exadata X9M servers to make it a full rack, then you must implement the 7 uplinks from leaf to spine to avoid oversubscription. True False

Mark for Review

(1) Points 83. When multi-racking a new Exadata X9M rack to an existing Exadata X8M rack, additional uplinks will need to be added to the X8M rack. False True Mark for Review

(1) Points 84. What is the maximum number of racks that can be multi-racked with Exadata X9M? 18 16 8 12 Mark for Review

(1) Points 85. What are the new tags used for multi-rack configurations? mleafsw1, mleafsf, mleafsp Leaf1, leaf2, leaf3 mleaf, msleaf, and mleaf23 mrleaf, mrsfleaf, mrleaf28 Mark for Review

(1) Points Previous Page 17 of 19 Next Summary

Test: Oracle ZDLRA Hardware Installation & Software Configuration Online Assessment (2022) Answer the question(s) on this page, and click Next to go to the next test page. Click Summary to see which questions you need to answer before submitting the test. Click Finish Test if you are ready to submit your test.

ZDLRA Software Configuration (Answer all questions in this section)

76. Before performing the SW configuration, what tasks should be done? (Choose all correct answers)

Walk through the install plan and expectations with the customer Execute preinstall_check.pl Go through config.sh with the customer Execute ra_preinstall.pl Mark for Review

(1) Points

ZDLRA RA21 Assessment (Answer all questions in this section)

77. RA21 has better performance and more capacity than the ZDLRA X9M. False True Mark for Review

(1) Points 78. RA21 reserves which PCIe Slot for the optional Qlogic Fiber Channel Card? PCIe 2 PCIe 1 PCIe 3 PCIe 4

Mark for Review

(1) Points 79. How many Storage Servers are allowed in the RA21 Full Rack? 18 12 22 9 Mark for Review

(1) Points 80. What rack configurations are valid for the RA21? Choose all that apply. (Choose all correct answers)

RA21 will not intermix X8 and X9 Database servers from the factory. RA21 will not intermix X8 and X9 Storage servers from the factory. RA21 will intermix a variety of X8 and X9 Database servers from the factory. RA21 will allow intermixing of Storage servers post install per upgrade/expansion process. RA21 will intermix a variety of X8 and X9 Storage servers from the factory. Mark for Review

(1) Points Previous Page 16 of 19 Next Summary

Test: Oracle ZDLRA Hardware Installation & Software Configuration Online Assessment (2022)

Answer the question(s) on this page, and click Next to go to the next test page. Click Summary to see which questions you need to answer before submitting the test. Click Finish Test if you are ready to submit your test.

ZDLRA Software Configuration (Answer all questions in this section)

71. Which installation software script uses files generated by OEDA on the recovery appliance? ra_preinstall.pl oeda_check.sh ra_install.pl install.sh Mark for Review

(1) Points 72. Which installation software script performs additional configuration steps on the recovery appliance? ra_preinstall.pl oeda_check.sh ra_install.pl install.sh Mark for Review

(1) Points 73. Which installation software script enables the ZDLRA services on the recovery appliance? ra_install.pl ra_preinstall.pl install.sh oeda_check.sh Mark for Review

(1) Points 74. Where should the enterprise manager agents be installed on the Recovery Appliance? On each storage node disk On the compute nodes On the compute and storage nodes On the storage nodes Mark for Review

(1) Points 75. Which installation software script performs initial checks on the recovery appliance? ra_install.pl ra_preinstall.pl oeda_check.sh install.sh Mark for Review

(1) Points Previous Page 15 of 19 Next Summary

Test: Oracle ZDLRA Hardware Installation & Software Configuration Online Assessment (2022) Answer the question(s) on this page, and click Next to go to the next test page. Click Summary to see which questions you need to answer before submitting the test. Click Finish Test if you are ready to submit your test.

ZDLRA Software Configuration (Answer all questions in this section)

66. What step in ra_install.pl gets the system prepped to become a ZDLRA? Tape Backup configuration OS Setup Validation and Configuration Prep DBFS Setup Mark for Review

(1) Points 67. Which installation software script configures the networks on the recovery appliance? install.sh ra_install.pl ra_preinstall.pl oeda_check.sh Mark for Review

(1) Points 68. What targets can be managed by the Recovery Appliance? (Choose all correct answers)

Cluster Backup Pool Database Automatic Storage Management Mark for Review

(1) Points 69. Which installation software script creates the cell and grid disks on the recovery appliance? install.sh

oeda_check.sh ra_preinstall.pl ra_install.pl Mark for Review

(1) Points 70. Where can you find information on configuring and administering the ZDLRA? ZDLRA Administrator's Guide ZDLRA Owner's Guide ZDLRA Configuration and Administration Guide MOS Note 238134.1 Mark for Review

(1) Points Previous Page 14 of 19 Next Summary

Test: Oracle ZDLRA Hardware Installation & Software Configuration Online Assessment (2022) Answer the question(s) on this page, and click Next to go to the next test page. Click Summary to see which questions you need to answer before submitting the test. Click Finish Test if you are ready to submit your test.

Exadata X9M TOI - Hardware Overview Assessment (Answer all questions in this section)

61. The Exadata X9M platform increases the RDMA Network Fabric speeds from 100 Gb/s to 200 Gb/s. True False

Mark for Review

(1) Points

ZDLRA Software Configuration (Answer all questions in this section)

62. Select some of the prerequisites for installing the software on the Recovery Appliance. (Choose all correct answers)

OEDA was used to generate the config files checkip script ran successfully OEDA was used to perform the Exadata portion of the install All components of all new racks are configured Mark for Review

(1) Points 63. Select 2 files created from the inputs of the OEDA. (Choose all correct answers)

customer_name-rack_name.xml customer_name-rack_name.zip Mark for Review

(1) Points 64. What systems can be configured with OEDA? (Choose all correct answers)

Recovery Appliance Exadata Oracle Cloud Machine Exalogic SuperCluster Mark for Review

(1) Points

65. What does reclaiming disk space do on the Recovery Appliance? Defragments the storage nodes to ensure optimal storage usage Connect to the network and update the firmware Defragments the compute nodes to ensure optimal storage usage Converts the Linux system to four disks in a RAID-5 configuration Deletes all the install files Mark for Review

(1) Points Previous Page 13 of 19 Next Summary

Test: Oracle ZDLRA Hardware Installation & Software Configuration Online Assessment (2022) Answer the question(s) on this page, and click Next to go to the next test page. Click Summary to see which questions you need to answer before submitting the test. Click Finish Test if you are ready to submit your test.

Exadata X9M TOI - Hardware Overview Assessment (Answer all questions in this section)

56. What is the primary reason the X9M racks now use standard-length 3 meter cables, versus the mixed-length cables on previous platforms? The extra cable length is required to attach to the neighboring rack. Higher power draw of X9 servers required more flexibility in PDU group balancing, resulting in the need to increase from 2M to 3M.

Because having extra slack of power cables, in the side-panels and rear of the cabinet, is attractive. Mark for Review

(1) Points 57. On an Exadata X9M multi-rack, the RoCE leaf interlinks have increased from four to seven when compared to the X8M. True False Mark for Review

(1) Points 58. The Exadata or ZDLRA X9M platforms allow RoCE Fabric Switches to be replaced from the front of the rack. True False Mark for Review

(1) Points 59. Which of the following are true for the Exadata X9M Storage Servers? Select all that apply. (Choose all correct answers)

Contains 36-core Ice Lake Intel processors Contains new DDR4-3200 memory, in increased capacity of 256GB NVMe flash – F320v3 (capacity – 3.2 TB) Persistent memory – Intel Optane PMem Series 200 (same capacity – 1.5 TB) All of the above Mark for Review

(1) Points

60. Which two of the following are true, in respect to how Linux Ethernet device enumeration occurs between the three Exadata X9M PCIe slots? Select two answers. (Choose all correct answers)

The devices are always enumerated with eth1 – eth4, for PCIe slot 1 network ports, eth5 – eth8, for PCIe slot2 ports, and eth9 – eth12 for PCIe slot3 ports. The devices for PCIe slots 1 through 3 will be in a mixed enumeration, depending on what dual-port SFP28 25Gb and quad-port RJ45 10Gb cards are selected, and how they are mixed-and-matched between the slots. The quad-port RJ45 10Gb ports are enumerated from top-to-bottom, right-to-left when installed in an X9M-2. The dual-port SFP28 25Gb ports are enumerated from top-to-bottom when installed in an X9M-8, and right-to-left when installed in an X9M-2. Mark for Review

(1) Points Previous Page 12 of 19 Next Summary

Test: Oracle ZDLRA Hardware Installation & Software Configuration Online Assessment (2022) Answer the question(s) on this page, and click Next to go to the next test page. Click Summary to see which questions you need to answer before submitting the test. Click Finish Test if you are ready to submit your test.

Exadata X9M TOI – ZDLRA X9M Updates Assessment (Answer all questions in this section)

51. Which add-in PCIe card is newly supported on the ZDLRA X9M? Quad-port 10 Gigabit RJ-45 Copper (Fort Pond) Network PCIe Card

Dual 10/25 Gigabit SFP28 Ethernet Qlogic 16gb Fiber Channel PCIe card 8-Port 12Gbps SAS-3 HBA (External) Mark for Review

(1) Points 52. The usable space for ZDLRA X9M Full Rack High Redundancy is _____? 794TB 395TB 628TB 1260TB Mark for Review

(1) Points 53. What size disk drive is used in the ZDLRA X9M Storage server? 8TB 14TB 18TB 10TB Mark for Review

(1) Points

Exadata X9M TOI - Hardware Overview Assessment (Answer all questions in this section)

54. Like the Exadata X8M, the Exadata X9M platform database servers contain two onboard SFP28 and RJ45 ports, giving customers the choice between either pair. True False Mark for Review

(1) Points 55. Which of the following are true of the Exadata X9M Database Server? Select all that apply. Contains 32-core Ice Lake Intel processors Increased Memory Capacity – 512 GB standard, 1 TB, and 2 TB-DDR4-3200MT/s 2x 3.84 TB NVMe Disks expandable to 4x 3.84 TB NVMe Disks Based on PCIe Gen4 architecture All of the above Mark for Review

(1) Points Previous Page 11 of 19 Next Summary

Test: Oracle ZDLRA Hardware Installation & Software Configuration Online Assessment (2022) Answer the question(s) on this page, and click Next to go to the next test page. Click Summary to see which questions you need to answer before submitting the test. Click Finish Test if you are ready to submit your test.

ZDLRA Hardware Installation (Answer all questions in this section)

46. Where can you go to find documentation related to the hardware installation? DB Backup and Recovery Guide ZDLRA Owner's Guide MOS Note 238134.1 ZDLRA Hardware Installation Guide Mark for Review

(1) Points 47. When should you connect the Recovery Appliane rack to the customer's network? At any time during the install As soon as the rack is delivered Before the initial config After the initial config Mark for Review

(1) Points 48. What are the maximum number of database nodes in a ZDLRA rack? 6 4 There is no max 2 Mark for Review

(1) Points

Exadata X9M TOI – ZDLRA X9M Updates Assessment (Answer all questions in this section)

49. Which General Expansion Rules still apply to ZDLRA X9M? Min of 3 storage servers to leverage full usable capacity If adding < 3, they are added to existing disk group (+Delta) Disk size of new servers must align with (+Delta) All of the above Mark for Review

(1) Points 50. Which document lists the details of the supported software versions of ZDLRA? ZDLRA Release and Patching Policy (Doc ID 2410137.1)

Release Schedule of Current Database Releases (Doc ID 742060.1) Zero Data Loss Recovery Appliance Supported Versions (Doc ID 1927416.1) All of the above Mark for Review

(1) Points Previous Page 10 of 19 Next Summary

Test: Oracle ZDLRA Hardware Installation & Software Configuration Online Assessment (2022) Answer the question(s) on this page, and click Next to go to the next test page. Click Summary to see which questions you need to answer before submitting the test. Click Finish Test if you are ready to submit your test.

ZDLRA Hardware Installation (Answer all questions in this section)

41. What do Recovery Appliance systems come configured with upon delivery? (Choose all correct answers)

IP Address RMAN Configuration Name Enterprise Manager Agents Mark for Review

(1) Points 42. What items do you verify when performing initial activities on the storage cells?

(Choose all correct answers)

Use DBMCLI for MS Service startup Verify infiniband conections Use CellCLI for MS Service startup Verify NVMe logical devices Verify all 16 disks Mark for Review

(1) Points 43. What is the default password for most users on the ZDLRA? manager oracle welcome1 zdlra1 Mark for Review

(1) Points 44. How many database nodes are included in the base rack configuration? 3 4 6 2 1 Mark for Review

(1) Points 45. When working with the PDU, how can you verify that you are running the current version? Connect to each PDU's webpage cellcli -version all

dbmcli pdu -version verify-pdu -version Mark for Review

(1) Points Previous Page 9 of 19 Next Summary

Test: Oracle ZDLRA Hardware Installation & Software Configuration Online Assessment (2022) Answer the question(s) on this page, and click Next to go to the next test page. Click Summary to see which questions you need to answer before submitting the test. Click Finish Test if you are ready to submit your test.

ZDLRA Hardware Installation (Answer all questions in this section)

36. Once the hardware installation is complete what should be done next? Handoff the system to the engineer for OEDA configuration Disconnect the systems from the customer network Connect the systems to the customers network Handoff the system to the customer to begin database protection Mark for Review

(1) Points 37. What activities are done during network updates? (Choose all correct answers)

Delete the default NTP server Configure the NTP servers

Set the clock and timezone Connect to the network and update the firmware Check the spanning tree on the uplink port Mark for Review

(1) Points 38. What does PDU stand for? Power Delivery Unit Plain Deconstruction Unit Performance Distribution Unit Performance Delivery Unit Mark for Review

(1) Points 39. How do you prevent duplicate IP conflicts? Assign every 3rd IP address in sequence to the ZDLRA Connect to the customer network after IPs have been re-configured Use IPv6 instead of IPv4 Use the IP addresses suggested by Oracle Mark for Review

(1) Points 40. How many storage nodes are included in the base rack configuration? 4 3 6 2 1 Mark for Review

(1) Points Previous Page 8 of 19 Next Summary

Test: Oracle ZDLRA Hardware Installation & Software Configuration Online Assessment (2022) Answer the question(s) on this page, and click Next to go to the next test page. Click Summary to see which questions you need to answer before submitting the test. Click Finish Test if you are ready to submit your test.

EIS Installation Best Practices Online Assessment (Answer all questions in this section)

31. What three typical activities are done during the Project Initiation phase of the EIS Methodology? (Choose all correct answers)

System configuration details are documented. System delivery occurs, and the project commences Details about the customer are determined and documented The EIS Site-Audit is scheduled Details about the project are identified and documented, for example, is this a single system installation or a complex, multi-product installation Mark for Review

(1) Points 32. For safety awareness with respect to grounding, if a system has been modified after the manufacturer's assembly process, what three recommendations does the EIS Grounding Standard make? (Choose all correct answers)

If qualified personnel did not test the safety of the modified system then proper testing should be requested before Oracle and/or partner personnel will work on the equipment Determine whether the local electrician can support the installation process If the temperature is below 60 degrees F., warm the room first before power ON

Check whether the modification involved any power supplies, distribution units or wiring? If modifications involved any power supplies, distribution units or wiring, did qualified personnel verify that the modification was was correct and did they test the system to ensure that it doesn't pose any safety hazard? Mark for Review

(1) Points

ZDLRA Hardware Installation (Answer all questions in this section)

33. What steps should be performed when unpacking the ZDLRA for the first time? (Choose all correct answers)

Open up an Installation SR Assemble the spare parts Verify all parts have arrived Collect the Customer Information Sheets Mark for Review

(1) Points 34. What command do you use to check the infiniband topology? verify-toplogy cellcli dbmcli check-ib Mark for Review

(1) Points 35. What is the major difference between the Fiber cards on Exadata and fiber cards on ZDLRA? Fiber cards cannot be connected to Exadata or ZDLRA Fiber cards are installed on ZDLRA Storage Nodes

Fiber cards can be connected to ZDLRA only Fiber cards can be connected to Exadata only Fiber cards are used to connect the ZDLRA to the protected databases Mark for Review

(1) Points Previous Page 7 of 19 Next Summary

Test: Oracle ZDLRA Hardware Installation & Software Configuration Online Assessment (2022) Answer the question(s) on this page, and click Next to go to the next test page. Click Summary to see which questions you need to answer before submitting the test. Click Finish Test if you are ready to submit your test.

EIS Installation Best Practices Online Assessment (Answer all questions in this section)

26. What are three factors that influence how long a system (server, storage, engineered system) will require to be acclimatized after delivery to a customer, before power can be applied without causing damage? (Choose all correct answers)

data center space timezone temperature cleanliness humidity Mark for Review

(1) Points

27. What are the four key points covered in each test topic of the Test Procedures Plan? (Choose all correct answers)

Prerequisites Method Outcome Conclusion Objective Test Result Mark for Review

(1) Points 28. What four tasks are typically happening at the EIS Planning and Preparation stage in the installation process? (Choose all correct answers)

Notification of Customer Installation project Unpack and power ON systems Begin work on Project Schedule Cable and install systems into custom rack Identify Installation team – Oracle Installation Coordinator, Project Manager, Customer Point of Contact, others as needed Compile EIS planning documents Mark for Review

(1) Points 29. What is the purpose for the Operational Handover step in the EIS Methodology? Used to negate responsibility for any ongoing System issues Documents the installation and configuration of Customer's system(s) Perform system testing and diagnostics Documents how to use the EIS documentation and standards Mark for Review

(1) Points 30. What are the two primary objectives for the Installation Configuration Planning step of the EIS methodology? (Choose all correct answers)

Oracle/Partner confirms power and cooling requirements for system installation Customer provides walk-through of installation site Tests that will be performed during the Systems Testing will be defined. Oracle/Partner and Customer will determine and mutually agree upon the hardware and software installation requirements which will be documented in the Installation and Configuration Plan Mark for Review

(1) Points Previous Page 6 of 19 Next Summary

Test: Oracle ZDLRA Hardware Installation & Software Configuration Online Assessment (2022) Answer the question(s) on this page, and click Next to go to the next test page. Click Summary to see which questions you need to answer before submitting the test. Click Finish Test if you are ready to submit your test.

EIS Installation Best Practices Online Assessment (Answer all questions in this section)

21. Name two functions for the EIS-DVD during the Installation and Configuration of Oracle Hardware and Software step in the EIS methodology? (Choose all correct answers)

Contains required patches and firmware for most installations Provides an excellent tool as a leave behind utility for customers

Provides installation assessment and diagnostic tools Used as a back-up for complete documentation sets that are on http://docs.oracle.com Mark for Review

(1) Points 22. Which four documents are included as part of the Operational Handover? (Choose all correct answers)

Test Procedures Plan EIS Checklist for the System installed Site Audit Report System Documentation Installation and Configuration Plan MOS Internal Documentation Mark for Review

(1) Points 23. You are assigned to an installation project in France in February to install 5 new SPARC T5 servers. The servers, in their original packaging, are sitting in the customer’s loading dock with a temperature of 8 degrees C (46 degrees F). The customer’s data center is 20 degrees C (68 degrees F). What is the recommended next step in acclimating these systems? Unpack the servers and store in the loading dock Move the systems (still packed) into a room with a similar environment to the data center Move the systems (still packed) into the data center Unpack the servers and store in the data center Mark for Review

(1) Points 24. Why is the rate of temperature change when acclimatizing systems such an important factor as described in the EIS methodology?

It is actually not relevant or important Systems should be warmed up and powered ON as quickly as possible to optimize the installation project timeline Variations in temperature should not exceed the approved gradient of approximately 2° C (4° F) per hour, because ignoring this may could lead to longterm damage (hair-cracks) on the boards Variations in temperature do not have as big an impact as do Service contract considerations for how long an installation will take Mark for Review

(1) Points 25. If the customer has asked for some customization of their installation, how is testing for that accomplished? Choose all responses that apply. (Choose all correct answers)

Testing above and beyond the Covered System Tests are at the sole discretion of Oracle and/or the Partner installer Oracle is automatically responsible for any non-standard installation procedure, regardless of whether they were agree to as part of the Installation and Configuration Plan Not all installation actions need testing Additional tests can be inserted into the Test Procedures plan Mark for Review

(1) Points Previous Page 5 of 19 Next Summary

Test: Oracle ZDLRA Hardware Installation & Software Configuration Online Assessment (2022)

Answer the question(s) on this page, and click Next to go to the next test page. Click Summary to see which questions you need to answer before submitting the test. Click Finish Test if you are ready to submit your test.

EIS Installation Best Practices Online Assessment (Answer all questions in this section)

16. What is the primary purpose of the”Basic Solaris” standard? Defines a method for achieving a consistent installation for Oracle Servers with Solaris OS Differentiates between Linux and Solaris installation processes on dual-boot systems Specifically describes how to install Solaris on non-SPARC hardware Describes how to install legacy versions of Solaris on systems that need to support backward compatible applications Mark for Review

(1) Points 17. Why it is important to do Installation planning, rather than just asking the customer as you work through the installation process? (Select three) (Choose all correct answers)

Pricing for Installation Services is less expensive if planning in not included Continuing interruptions can detract from the professionalism of your work, and lead to customer dissatisfaction Support Services will not engage on services requests if no installation planning was done Customer technical contact may not be readily available Planning leads to more thoughtful consideration for a predictable outcome of the installation process Mark for Review

(1) Points 18. According to the EIS methodology, when issues are uncovered during the SiteAudit, who should be notified? (Choose all correct answers)

Customer point of contact Oracle Premier Support Installation coordinator if applicable Oracle sales management Mark for Review

(1) Points 19. When should you review deliverables and why? EIS deliverables are used as a last step in the installation process to ensure the installer provided everything that is required EIS deliverables are included in the Oracle system shipping and packaging documents near the start of an installation Ideally EIS deliverables would be reviewed at the very start of an installation project, as they clearly define scope, roles and responsibilities, and project deliverables EIS deliverables are an interim checklist to ensure that at the mid-way point of an installation the project remains on track. Mark for Review

(1) Points 20. What two activities are accomplished during Installation Task Planning step in the EIS Methodology? (Choose all correct answers)

Organization of the team who will actively work the Installation Networking and system component cabling Communicate schedule for installation to the customer Review the timeframe options for delivery of the service System unpacking and acclimatization Mark for Review

(1) Points Previous Page 4 of 19 Next Summary

Test: Oracle ZDLRA Hardware Installation & Software Configuration Online Assessment (2022) Answer the question(s) on this page, and click Next to go to the next test page. Click Summary to see which questions you need to answer before submitting the test. Click Finish Test if you are ready to submit your test.

EIS Installation Best Practices Online Assessment (Answer all questions in this section)

11. Who is involved in the Project Initiation phase? (Choose all correct answers)

Customer point of contact Oracle Financing contact Oracle Installation Coordinator or Project Manager (if applicable) Partner point of contact 3rd party Service Provider Mark for Review

(1) Points 12. Which two EIS documents are most useful during the Installation and Configuration of Oracle Hardware and Software step? (Choose all correct answers)

EIS Checklist DVD Operational Handover Agreement Site-Audit Report Installation Configuration Plan Mark for Review

(1) Points

13. Why should you typically complete the Installation Configuration Plan and create your Test Procedures Plan at the same time? You should create the Test Procedures Plan after you have completed the system installation and configuration. As you work through the system configuration process with your customer, you should state how you will test key items in the system’s configuration for having been successfully completed. Test Procedures plan is a standard document used in all generic system installations. Mark for Review

(1) Points 14. When should the Site-Audit be performed? As soon as the product has been delivered to the customer As soon as possible, and certainly prior to delivery of the system After the system has been acclimatized and is ready for unpacking at the customer site Prior to the completion of the sale, in order to ensure that the customer’s location is viable Mark for Review

(1) Points 15. Why do the EIS Standards recommend that external cables between Oracle hardware, such as servers, storage devices, network devices and ports be clearly labeled? Service requests for field diagnostics will not be accepted unless cables are labeled Labeling is not an EIS best practice Cable routing should be done with rubber bands for ease of reconfiguration For ease of maintenance it should be unambiguously clear from the label on each cable, where the cable has to be attached Mark for Review

(1) Points Previous Page 3 of 19 Next Summary

Test: Oracle ZDLRA Hardware Installation & Software Configuration Online Assessment (2022) Answer the question(s) on this page, and click Next to go to the next test page. Click Summary to see which questions you need to answer before submitting the test. Click Finish Test if you are ready to submit your test.

EIS Installation Best Practices Online Assessment (Answer all questions in this section)

6. What is the primary goal of the Installation and Configuration of Oracle Hardware and Software step in the EIS methodology? Managing transition from Installation phase to Field Service issue recording Troubleshooting software configuration issues System acclimatization, installation, and basic configuration Hardware cabling , wiring and Power ON Mark for Review

(1) Points 7. Which four objectives are primary goals for an EIS Site Audit? (Choose all correct answers)

Determine the floor weight load capacity at the location where the System will be installed Determine how frequently system backups will be completed Determine installation needs for the System, including such assessments as: the suitability of access routes to the installation location, such as doors, elevators, floor strengths and ramps

Determine how many logical domains need to be configured on the system Determine the environmental conditions at Customer's site including temperature, humidity, cleanliness and such other assessments as are determined to be necessary in Oracle's sole discretion Determine the availability of required electrical power to run and maintain the System Mark for Review

(1) Points 8. Why should you use the EIS methodology to guide your installation process? Larry Ellison has mandated using EIS The EIS methodology provides a 20% discount on Support Services if you install your customers’ hardware or software using it Installation processes are very lengthy, the EIS methodology is quick and dirty Using the proven EIS methodology will provide step-by-step installation guidelines, help guarantee a quality installation, make your life easier, and ensure customer satisfaction Mark for Review

(1) Points 9. What should you do with the EIS checklist when an installation project is complete? Leave the EIS checklist with the customer so that they can re-install when they need to Crumple the checklist and throw it in the customer wastepaper bin Post the EIS checklist and Test Procedures Plan to My Oracle Support under your customer’s account Remove the EIS checklist and other confidential Oracle Intellectual Property from the customer datacenter Mark for Review

(1) Points

10. What are two activities that take place during the System Test step of the EIS methodology? (Choose all correct answers)

Electrical grounding and environmental assessment On Solaris-based systems, Oracle's Explorer Data Collector will be run and the results evaluated with ORAS/CLI from the EIS-DVD Application installation, configuration, and testing Tests specified in the Test Procedures Plan Plan will be carried performed Mark for Review

(1) Points Previous Page 2 of 19 Next Summary

Test: Oracle ZDLRA Hardware Installation & Software Configuration Online Assessment (2022) Answer the question(s) on this page, and click Next to go to the next test page. Click Summary to see which questions you need to answer before submitting the test. Click Finish Test if you are ready to submit your test.

EIS Installation Best Practices Online Assessment (Answer all questions in this section)

1. What three documents are typically used as part of the EIS Planning and Preparation stage in the installation process? (Choose all correct answers)

Test Procedures Plan Operational Hand-off Form Site Audit Report Acclimatization Report Installation and Configuration Plan Project Schedule

Mark for Review

(1) Points 2. What are two cautions that should be acknowledged when acclimatizing a system? (Choose all correct answers)

Powering ON the system will speed the acclimatization process as the heat from the system will accelerate its warming Once powered on the temperature is no longer an issue, as internal cooling systems commence The maximum positive or negative temperature gradient that is permitted for multi-layer boards is approximately 2° C (4° F) per hour. Avoid unpacking items inside the computer centre (dust/dirt contaminating filters etc.) Mark for Review

(1) Points 3. What should you do if you believe you have found an error in an EIS checklist? Email Larry Ellison and recommend changes Assume that the EIS team is already aware and the next version of the checklist will be updated Submit your concerns to My Oracle Support Follow the feedback method on the last page of every checklist: email [email protected] Mark for Review

(1) Points 4. What are three items in the EIS Site-Audit Report are documented for all Oracle hardware? (Choose all correct answers)

Access Route requirements Facility Power requirements Operating System requirements

IP Address requirements Operating Environment and Cooling requirements Mark for Review

(1) Points 5. What if the customer has their own labeling methodology that differs from the recommended one from EIS? Redo cabling throughout the datacenter to meet the EIS standard Follow the customer's standard for cable labeling provided it meets with EIS requirements for identification and port location. Submit a Service Request for Oracle approval on use of the customer labeling and routing methods Ignore the customer’s standard and use the EIS standard Mark for Review