Document Reference

Al Seal Contracting & Trading Co. (WLL)

ALSEAL/HSE/CTS-FORM-020

RISK MANAGEMENT SYSTEM

Rev. No.

Rev. Date

00

MAY-2018 Page

RISK ASSESSMENT Al Seal Contracting Risk Management System Risk Assessment- Installation of Cables in Ducts & Trenches Contract number and title: COMMUNICATIONS TOWERS AT AL RUWAIS, AL GHASHAM AND HALUL ISLAND, Q-406-01

Risk assessment

12 - 25

High

Action required urgently to control the risk, further resources may be required, work must stop immediately

5 – 10

Med

Action required to control the risk, interim measures may be necessary in the short term, able to proceed with work under supervision

1–4

Low

This represents a low risk, although control measures must be maintained

Hazards

Employees Contractors Public Others Environment

Construct ion Site

Activities Ignorance of site rules

All Construction Personnel

How?

Physical & Mental harm from construction activities

5

5

25

What controls are required?

HSE induction to be conducted to all personnel engaged prior to start of any work; Activity Hazard Analysis (AHA) to be furnished including equipment entry permit request, person entry permit Start briefing prior to work activities.

2

5

Risk Rating

Job Steps

Residual risk?

Initial risk?

Who might be harmed?

Likelihood

1 2 3 4 5

Severity

RARE UNLIKELY OFTEN LIKELY EXPECTED

Risk Rating

1 2 3 4 5

Date: 14/05/2018

Evaluation of risk

Likelihood

NO INJURY MINOR MODERATE MAJOR FATALITY

Likelihood

Element of work: Installation of Cables in Ducts & Trenches

Severity

Severity

RA number:

10

Action by

Site Engineers and Supervisors

AL SEAL CONTRACTING HSE PROCEDURES Page 1 of 11

Al Seal Contracting & Trading Co. (WLL) RISK MANAGEMENT SYSTEM

Document Reference ALSEAL/HSE/CTS-FORM-020

Rev. No. 00

Rev. Date MAY-2018 Page

RISK ASSESSMENT Language

All

Non English speakers not being able to understand work instructions or emergency signs etc.

4

5

15

Dust and air debris

Persons involved in site office & lay down area activities and others around the working areas Operatives

Risk of eye injuries

3

3

9

Hand & back injuries, heat stress

4

3

12

House Keeping – material, waste.

Task involved operatives and other workers

Slips, trips & falls Obstruction due to boards, sand, or any other tools that affects onto others passing nearby

4

4

16

Ground Conditions & Access

All

Trips and falls caused by poor, general access around the site and to the facilities and accommodation

4

3

12

Manual Handling

Where this situation exists, cause adequate levels of communication to be achieved through a suitable interpreter. The persons concerned must not commence work until a suitable interpreter is available. Cause the site rules, emergency signs and other relevant signs to be communicated in languages that reflect the site operative’s needs. Workshop facilities to have eye wash facilities in place. Eye wash stations will be placed at strategic points around site. Light eye protection will be mandatory for all staff & operatives. Roads and haul roads will be damped down as and when required

2

5

10

Site Engineers and Supervisors

2

3

6

Site Engineers and Supervisors

Manual handling training, not lifting loads beyond the capabilities of the operative, use of correct hand protection. Supervision Regular housekeeping inspections, keeping area well prepared and free from debris, materials, cables and waste. Clear all workers, any materials, machinery or equipment and normalize the route. All accesses, where people have to walk, to be well defined, properly constructed and maintained in good condition. Suitable steps to be provided and maintained, where appropriate. Where appropriate, because of the need

2

2

4

4

2

8

Site Engineers and Supervisors Site Engineers and Supervisors

1

3

3

Site Engineers and Supervisors

AL SEAL CONTRACTING HSE PROCEDURES Page 2 of 11

Al Seal Contracting & Trading Co. (WLL) RISK MANAGEMENT SYSTEM

Document Reference ALSEAL/HSE/CTS-FORM-020

Rev. No. 00

Rev. Date MAY-2018 Page

RISK ASSESSMENT

Ground Investigat ion

Control of Plant

Plant Operators

Persons

Surveyors, Engineers & other workers on site

Installation and use of temporary electrical supplies

All workforce

Badly designed or defined haul roads or poorly maintained surfaces leading to a loss of operator control and mechanical damage to plant. Being struck by moving plant / equipment

  

Electrocution Fire Damage to equipment

4

4

16

5

3

15

5

5

25

of access during darkness, cause suitable levels of lighting to be provided and maintained. Haul road construction to avoid unnecessary cambers or bends and the line of the road to be well defined, where appropriate. Running surface to be maintained in good condition. Competent & certificated plant operators to operate all items of plant. Plant certification to be provided prior to commencing on site, segregation of plant & operatives with barriers & signage, operatives briefed not to walk / stand around rear of machinery or items of plant. Operatives instructed to maintain eye contact with plant operators at all times.Operatives to wear high visibility vests & safety helmets, safety footwear, light eye protection, overalls.mobile phones not to be used whilst operating equipment. Planning:Temporary supplies will be planned to take into account foreseen load requirements, environmental conditions, and progress of work and compatibility/maintenance of equipment. Competence of electrical sub-contractors will be checked before contracting work. The installation will be certified before being brought into use. Locked supply cabinets will form part of the system. Offices, stores, drying rooms and

1

4

4

Site Engineers and Supervisors

5

2

10

Site Engineers and Supervisors

2

5

10

Site Engineers and Supervisors

AL SEAL CONTRACTING HSE PROCEDURES Page 3 of 11

Al Seal Contracting & Trading Co. (WLL) RISK MANAGEMENT SYSTEM

Document Reference ALSEAL/HSE/CTS-FORM-020

Rev. No. 00

Rev. Date MAY-2018 Page

RISK ASSESSMENT

Use of portable electrical equipment

Operatives and Helpers

  

Electrocution Fire Damage to equipment

4

4

16

canteens will be regarded as permanent installations. Physical:Supply and distribution units will be lockable and the keys controlled. Signs warning of electrical hazard will be displayed on supply units. Fire extinguishers (carbon dioxide) will be available adjacent to distribution units. Rubber gloves and rubber mats to an appropriate standard are to be used for live work. All cables will be routed so as to prevent damage to cables and avoid tripping hazards. Managerial/Supervisory:Permit to work system or other suitable means of control to be used when work on live systems is foreseen. Operatives will not be permitted to work alone on live systems. Only competent electricians are authorised to install or modify temporary supplies; certification will be obtained after modification. Systems will be monitored for physical damage and will be checked and recertified every 4 months. Training:Electricians will receive additional training in the above standards and HSE guidance material, toolbox talks will be given at regular intervals. Planning: All portable electrical equipment will be identified individually and is subject to planned maintenance. Equipment supplied to site will be fit for its purpose with regard to voltage, power and environmental conditions.

2

2

4

Site Engineers and Supervisors

AL SEAL CONTRACTING HSE PROCEDURES Page 4 of 11

Al Seal Contracting & Trading Co. (WLL) RISK MANAGEMENT SYSTEM

Document Reference ALSEAL/HSE/CTS-FORM-020

Rev. No. 00

Rev. Date MAY-2018 Page

RISK ASSESSMENT Physical: All equipment found to be defective will be switched off and reported immediately. Visual inspection of equipment will be carried out before use. Leads and extension cables are to be routed so as to minimise the likelihood of damage and trip hazards. Damaged lamps on festoon leads will be replaced, and only moulded socket holders will be used on sites. Only equipment operating at a safe voltage will be permitted on site; higher voltages must be authorised in writing by management prior to use. Managerial/Supervisory: Subcontractors will be made aware of the above policy concerning use of electrical equipment. Trained first-aider(s) will be available on site at all times when electrical equipment is in use. Management are responsible for ensuring that attention is paid to site electrical requirements, including arrangements for design, testing and installation of circuits and their protection by fuses, residual current devices or similar. The use of electrical equipment will be monitored to ensure safe use. Management will ensure that only trained and competent persons test, repair and maintain portable electrical equipment. Operatives will be trained in the precautions and safe use of portable electrical equipment. Site first-aiders will receive training in electric shock AL SEAL CONTRACTING HSE PROCEDURES Page 5 of 11

Al Seal Contracting & Trading Co. (WLL)

Document Reference ALSEAL/HSE/CTS-FORM-020

Rev. No. 00

RISK MANAGEMENT SYSTEM

Rev. Date MAY-2018 Page

RISK ASSESSMENT treatment. Use of angle grinder

Pre-use inspection

Operatives and inspectors

Possible electrocution, faulty cutting / grinding disks

4

4

16

Wear appropriate Personal Protective Equipment (i.e. eye protection)

Operatives

Injuries to employees due to not wearing of PPE

4 4

4 4

16 16

Only and

Unskilled operators

Untrained operators will cause injuries to themselves

4

4

16

use trained competent

To ensure that safe working conditions and the proper use of angle grinders and equipment prevails. Faulty equipment to be repaired or replaced Enforce the use of Personal Protective Equipment Disconnect mains plug when changing accessories. Ensure switch is “OFF” before plugging into power supply. Ensure cable and plug is not damaged. Use the guard – ensure it is correctly fitted and undamaged. Ensure you are using the correct disc for the task. Ensure that the disc, wire brush or sanding accessories used are suitable for the angle grinder speed. Use both hands to hold grinder against work piece. Secure work piece with clamps / vice. Allow a newly assembled wheel to idle for 30 seconds before starting any operation. Wear eye protection and protective clothing. Do not stretch the cable. Do not over-reach. Keep your footing. Do not leave the tool unattended while it is still plugged in. Ensure that only trained competent operators use grinders

2

4

8

Site Engineers and Supervisors

2 2

4 4

8 8

Site Engineers and Supervisors

2

4

8

Site Engineers

AL SEAL CONTRACTING HSE PROCEDURES Page 6 of 11

Document Reference

Al Seal Contracting & Trading Co. (WLL) RISK MANAGEMENT SYSTEM

ALSEAL/HSE/CTS-FORM-020

Rev. No. 00

Rev. Date MAY-2018 Page

RISK ASSESSMENT

Installatio n

operators

and others

or other employees

Secure material firmly in vice or clamp

Operatives and others

Loos material will cause injuries to persons and or property damage

4

4

16

Operator to ensure clamping of material

2

4

8

Use the correct disc, grinding for grinding and cutting for cutting

Operatives and others

4

4

16

Ensure the use of correct disc for the task in hand

2

4

8

Never force the grinder on to the material be grind or cut

Operatives and others

4

4

16

Operator must never force the grinder

2

4

8

Site Engineers and Supervisors

Remove all flammable material in close vicinity of the grinding operations On completion of the task disconnect the grinder from power supply Installation

Operatives and others

The use of the incorrect disc can cause the disc to shutter or brake resulting in injuries to employees and or property damage. Forcing the grinder will cause the disc to shutter resulting in injuries to employees and or property damage Failure will result in fires

4

4

16

Ensure no flammables in area of operations

2

4

8

Site Engineers and Supervisors

Unattended, connected grinders will be used by wrong persons

4

4

16

Ensure disconnecting of the grinders

2

4

8

Persons injured due to damaging of tools/ grinder or cutter during working. Vehicle incident, Hearing damage, Spillage

4

4

16

All the tools should be tested before use at site. All drivers /operators will adhere to the site speed limit. Wear ear /eye protection & all vehicles /equipment will be inspected prior to site entry. All heavy vehicles / equipment will have reverse light / siren fitted /rotating light.

2

2

4

Site Engineers and Supervisors Site Engineers and Supervisors

TrenchExcavation for Cables in Ducts

Task involved operatives

Personal injury from trip or fall on uneven ground

4

4

20

Care to be taken when climbing into or leaving machinery.

2

2

4

of

Other workers

Operatives and others

Cables in Ducts

&

Trenches

and Supervisors Site Engineers and Supervisors Site Engineers and Supervisors

Site Engineers

AL SEAL CONTRACTING HSE PROCEDURES Page 7 of 11

Al Seal Contracting & Trading Co. (WLL) RISK MANAGEMENT SYSTEM

Document Reference ALSEAL/HSE/CTS-FORM-020

Rev. No. 00

Rev. Date MAY-2018 Page

RISK ASSESSMENT & Trenches

and other workers

Oil Spillage. Injury from overturning machinery on unstable or uneven ground. Person too close to machine struck /crushed by excavator. Eye injury from dust. Hearing damage from prolonged noise of machinery.

Installing ductwork

Task involved operatives and other workers

Inhalation/absorption hazardous substances Manual handling, Falls from heights

of

4

5

20

Always wear proper PPE. One vehicle will be made available for the emergencies Do not operate machinery on ground conditions not suitable for that particular equipment or task. Supervisor to ensure all personnel & onlookers are clear of machine prior to starting excavation/ boring work. Only certified operators to operate machinery. Operators & others to wear hearing & eye protection when machinery in use. An adequate means of access must be provided for operatives and their materials. Where possible, mechanical means of lifting will be provided. The area directly below the work will be kept clear by use of barriers and signs warning of overhead working. Use of Mobile Elevating Working Platforms or Scaffold Towers to use for high level works. Personal protective equipment will be provided as required by the relevant COSHH assessment(s). Site management will ensure that access equipment has been correctly erected by competent persons. Access equipment will only be adapted or altered by competent persons. Liaison with building occupants or other workers will take place to ensure there is no risk to third parties, and that they cannot affect the safety of operatives. The progress of the work will be monitored

and Supervisors

2

4

8

Site Engineers and Supervisors

AL SEAL CONTRACTING HSE PROCEDURES Page 8 of 11

Al Seal Contracting & Trading Co. (WLL)

Document Reference ALSEAL/HSE/CTS-FORM-020

Rev. No. 00

RISK MANAGEMENT SYSTEM

Rev. Date MAY-2018 Page

RISK ASSESSMENT

Handling Equipment

Cable Pulling/ Laying/Dressing Works

of

Task involved operatives and other workers

Heavy loads, Heavy equipment’s

5

4

20

Task involved operatives and other workers.

Personal injury due to fall on even ground/trenches. Oil Spillage by other machines while excavating. Injury from overturning machinery/ rolling pads on unstable or uneven ground. Persons too close to cable pulling/ Winch machine or rolling pads. Eye injury from dust. Hearing damage from prolonged noise of machinery.

5

4

20

to ensure safe systems of work are used. Where the presence of hazardous dust is suspected, work will stop until the substance has been analysed and a means of control agreed. Training of operatives will include the use of access equipment and PPE, and information on the contents of COSHH assessments. Toolbox talks given at regular intervals. Use of Flagmen / Bank men is recommended when machines are reverse mode. All the rigging / boring equipment will be tested & certified prior to use and colour coded. Riggers & flag men will be deployed to strictly monitor the movement of the equipment.Barricading of the excavation/ boring area will be done to avoid the entry of unauthorized persons with proper signage’s are provided. Care to be taken while pulling the cables.

3

2

6

4

2

8

Site Engineers and Supervisors

Always wear proper PPE. One vehicle will be made available for the emergencies Do not operate machinery on ground conditions not suitable for that particular equipment or task. Supervisor to ensure all personnel & onlookers are clear of machine prior to starting excavation work. Only certified operators to operate

AL SEAL CONTRACTING HSE PROCEDURES Page 9 of 11

Al Seal Contracting & Trading Co. (WLL) RISK MANAGEMENT SYSTEM

Document Reference ALSEAL/HSE/CTS-FORM-020

Rev. No. 00

Rev. Date MAY-2018 Page

RISK ASSESSMENT

Crane Operatio n

Handling-Loading/ Unloading of cable drum

Task involved operatives and other workers

Heavy loads like cable drums. Fallieres of the lifting equipment and lifting gears.

5

5

20

Failure to do preuse inspection. Not using required personal protective equipment. Using uncertified equipment. Using non competent employees. Failure to sling correctly and unbalanced loads. Failure to barricade placing of watchman, slewing over persons and not warning workers. Making use of uncertified cranes. The absence of the responsible person

Task involved operatives and other workers

Using of faulty equipment resulting in injuries to persons and / or property damage. Injuries to employees. Injuries to employees and / or property damage when equipment fails. Injuries to employees and / or property damage. Falling of material resulting in injuries to person and or property damage. Injuries to persons and / or property damage. Injuries to persons and / or property damage. Failure will result in injuries to persons and or property damage. Failure will result in injuries to persons and or property damage

5

5

25

machinery. Provide proper access and ladders for deep excavation. Wear hearing & eye protection when adjacent machineries are in use. All the lifting equipment will be tested & certified prior to use. And colour coded. Riggers & flag men will be deployed to strictly monitor the movement of the equipment. Barrication of the lifting area will be done to avoid the entry of unauthorized persons with proper signage’s are provided Enforce pre-use inspections against approved register. Enforce the correct use of personal protective equipment. Ensure the use of certified equipment only. Never allow the using of untrained employees. Ensure correct slinging. Ensure adhering to procedures. Ensure the use of certified equipment only. Before starting make sure the supervision of all activities, no safety officer , no engineer to supervise all the activities no work will be allowed at any time, day shift or night shift. Before starting night shift make sure that the lighting in the area of erection, offloading is sufficiently light up for safe offloading and erection purposes, and make sure the fall protection erectors also has sufficient lighting for completing their

3

3

9

3

3

9

AL SEAL CONTRACTING HSE PROCEDURES Page 10 of 11

Al Seal Contracting & Trading Co. (WLL)

Document Reference ALSEAL/HSE/CTS-FORM-020

Rev. No. 00

RISK MANAGEMENT SYSTEM

Rev. Date MAY-2018 Page

RISK ASSESSMENT during all erection activities. No sufficient lighting at night for erection of cable drum and for erection of fall protection prevention devices.

job.

AL SEAL CONTRACTING HSE PROCEDURES Page 11 of 11