41 0 1MB
REKAPITULASI ANALISA SATUAN PEKERJAAN Kode Analisa Analisa A.1 Analisa A.2 Analisa A.3 Analisa A.4 Analisa A.5 Analisa A.6 Analisa A.7 Analisa A.8 Analisa A.9 Analisa A.10 Analisa A.11 Analisa A.12 Analisa A.13 Analisa A.14 Analisa A.15 Analisa A.16 Analisa A.17 Analisa A.18 Analisa A.19 Analisa A.20 Analisa A.21 Analisa B.1 Analisa B.2 Analisa B.3 Analisa B.4 Analisa B.5 Analisa B.6 Analisa B.7 Analisa B.8 Analisa B.9 Analisa B.10 Analisa B.11 Analisa B.12 Analisa B.13 Analisa B.14 Analisa B.15 Analisa B.16 Analisa C.1 Analisa C.2 Analisa C.3 Analisa C.4 Analisa C.5 Analisa C.6 Analisa C.7 Analisa C.8 Analisa C.9 Analisa C.10 Analisa C.11 Analisa D.1 Analisa D.2 Analisa D.3 Analisa D.4 Analisa D.5 Analisa D.6 Analisa D.7 Analisa D.8 Analisa D.9 Analisa D.10 Analisa D.11 Analisa D.12 Analisa D.13 Analisa D.14 Analisa D.15 Analisa D.16 Analisa D.17 Analisa D.18 Analisa D.19 Analisa D.20 Analisa D.21 Analisa D.22 Analisa D.23 Analisa E.1 Analisa E.2 Analisa E.3 Analisa E.4 Analisa E.5 Analisa E.6 Analisa E.7 Analisa E.8 Analisa E.9 Analisa E.10 Analisa E.11 Analisa E.12 Analisa E.13 Analisa E.14 Analisa E.15 Analisa E.16 Analisa E.17 Analisa E.18 Analisa E.19 Analisa E.20 Analisa E.21 Analisa E.22
URAIAN PEKERJAAN #N/A #N/A #N/A 1 m' Pek. Pengukuran kembali (site) & Pemasangan Bowplank #N/A #N/A #N/A 1 m2 Membersihkan Lapangan dan Perataan #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Menggali 1 M3 Tanah Biasa sedalam 1 Meter Menggali 1 M3 Tanah Biasa sedalam 2 Meter Menggali 1 M3 Tanah Biasa sedalam 3 Meter Menggali 1 M3 Tanah Keras sedalam 1 Meter #N/A #N/A #N/A Membuang 1 m3 tanah sejauh 15 meter Mengurug kembali 1 M3 galian Memadatkan 1 m 3 tanah (per 20 cm) Mengurug 1 m3 pasir urug Pengangkutan 1 M3 Tanah Keluar Proyek #N/A #N/A #N/A Mengurug 1 m 3 Tanah padat untuk peninggian lantai bangunan #N/A Memasang 1 m 3 pondasi batu belah, campuran 1 PC : 4 PP #N/A #N/A #N/A Memasang 1 m 3 batu kosong (anstamping) #N/A #N/A #N/A #N/A #N/A Memasang 1 m 2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata,campuran spesi 1 PC : 2 PP Memasang 1 m 2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata,campuran spesi 1 PC : 3 PP Memasang 1 m 2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata,campuran spesi 1 PC : 4 PP #N/A #N/A #N/A Memasang 1 m 2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,campuran spesi 1 PC : 2 PP Memasang 1 m 2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,campuran spesi 1 PC : 3 PP Memasang 1 m 2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,campuran spesi 1 PC : 4 PP #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1 m2 Plesteran Dinding 1 Pc : 1 Ps tebal 15 mm 1 m2 Plesteran Dinding 1 Pc : 2 Ps tebal 15 mm 1 m2 Plesteran Dinding 1 Pc : 3 Ps tebal 15 mm 1 m2 Plesteran Dinding 1 Pc : 4 Ps tebal 15 mm 1 m2 Plesteran Dinding 1Pc : 5 Ps tebal 15 mm 1 m2 Plesteran Dinding 1Pc : 6 Ps tebal 15 mm 1 m2 Plesteran Dinding 1Pc : 7 Ps tebal 15 mm 1 m2 Plesteran Dinding 1Pc : 8 Ps tebal 15 mm #N/A #N/A #N/A #N/A #N/A #N/A 1 m2 Plesteran 1 Pc : 4 Ps, tebal 20 mm #N/A #N/A #N/A #N/A #N/A #N/A #N/A
BIAYA
KETERANGAN
46,968.75 7,912.50 35,456.25 43,571.25 51,822.75 47,184.00 15,532.50 11,796.00 25,912.50 128,182.50 43,352.25 102,956.25 502,700.00 262,044.00 137,102.50 127,817.50 121,647.50 65,521.25 61,171.25 58,646.25 41,884.00 32,714.00 44,856.50 -
Halaman 1 dari 35
Kode Analisa Analisa E.23 Analisa E.24 Analisa E.25 Analisa E.26 Analisa E.27 Analisa E.28 Analisa E.29 Analisa E.30 Analisa F.1 Analisa F.2 Analisa F.3 Analisa F.4 Analisa F.5 Analisa F.6 Analisa F.7 Analisa F.8 Analisa F.9 Analisa F.10 Analisa F.11 Analisa F.12 Analisa F.13 Analisa F.14 Analisa F.15 Analisa F.16 Analisa F.17 Analisa F.18 Analisa F.19 Analisa F.20 Analisa F.21 Analisa F.22 Analisa F.23 Analisa F.24 Analisa F.25 Analisa F.26 Analisa F.27 Analisa F.28 Analisa F.29 Analisa F.30 Analisa F.31 Analisa F.32 Analisa F.33 Analisa F.34 Analisa F.35 Analisa F.36 Analisa F.37 Analisa F.38 Analisa F.39 Analisa F.40 Analisa F.41 Analisa G.1 Analisa G.2 Analisa G.3 Analisa G.4 Analisa G.5 Analisa G.6 Analisa G.7 Analisa G.8 Analisa G.9 Analisa G.10 Analisa G.11 Analisa G.12 Analisa G.13 Analisa G.14 Analisa G.15 Analisa G.16 Analisa G.17 Analisa G.18 Analisa G.19 Analisa G.20 Analisa G.21 Analisa G.22 Analisa G.23 Analisa G.24 Analisa G.25 Analisa G.26 Analisa G.27 Analisa G.28 Analisa G.29 Analisa G.30 Analisa G.31 Analisa G.32 Analisa G.33 Analisa G.34 Analisa H.1 Analisa H.2 Analisa H.3 Analisa H.4 Analisa H.5 Analisa H.6 Analisa H.7 Analisa H.8 Analisa H.9 Analisa H.10 Analisa H.11 Analisa H.12 Analisa H.13
URAIAN PEKERJAAN #N/A #N/A #N/A #N/A Membuat 1 m2 Acian 1 m2 Floor lantai PC 1Pc : 5Ps, tebal 5 mm 200 M' Pekerjaan Profil Semen #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Membuat 1 m 3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66 Membuat 1 m 3 beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61 Membuat 1 m 3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 Membuat 1 m 3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 #N/A #N/A #N/A #N/A #N/A Pembesian 10 kg dengan besi ulir Pembesian 10 kg dengan besi polos #N/A #N/A Memasang 1 m 2 bekisting untuk pondasi Memasang 1 m 2 bekisting untuk sloof Memasang 1 m 2 bekisting untuk kolom Memasang 1 m 2 bekisting untuk plat lantai Memasang 1 m 2 bekisting untuk dinding #N/A #N/A #N/A #N/A #N/A #N/A Membuat 1 m3 plat beton bertulang (150 kg besi + bekisting) #N/A #N/A #N/A #N/A 1 m3 Membuat Lantai Kerja Beton Tumbuk 1 Pc : 3 Ps : 5 Kr #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
BIAYA
KETERANGAN
80,334.50 144,574.00 524,960.98 789,564.25 808,119.25 818,529.25 14,144.73 5.00 125,486.00 135,236.00 262,421.33 270,383.45 342,388.00 276,138.00 4,773,027.50 828,182.50 -
Halaman 2 dari 35
Kode Analisa Analisa H.14 Analisa H.15 Analisa H.16 Analisa H.17 Analisa H.18 Analisa H.19 Analisa H.20 Analisa H.21 Analisa H.22 Analisa H.23 Analisa H.24 Analisa H.25 Analisa H.26 Analisa H.27 Analisa H.28 Analisa H.29 Analisa H.30 Analisa H.31 Analisa I.1 Analisa I.2 Analisa I.3 Analisa I.4 Analisa I.5 Analisa I.6 Analisa I.7 Analisa I.8 Analisa I.9 Analisa I.10 Analisa I.11 Analisa I.12 Analisa I.13 Analisa I.14 Analisa J.1 Analisa J.2 Analisa J.3 Analisa J.4 Analisa J.5 Analisa J.6 Analisa J.7 Analisa J.8 Analisa J.9 Analisa J.10 Analisa J.11 Analisa J.12 Analisa J.13 Analisa J.14 Analisa J.15 Analisa J.16 Analisa J.17 Analisa J.18 Analisa J.19 Analisa J.20 Analisa J.21 Analisa J.22 Analisa J.23 Analisa J.24 Analisa J.25 Analisa J.26 Analisa J.27 Analisa J.28 Analisa J.29 Analisa J.30 Analisa K.1 Analisa K.2 Analisa K.3 Analisa K.4 Analisa K.5 Analisa K.6 Analisa K.7 Analisa K.8 Analisa K.9 Analisa K.10 Analisa K.11 Analisa K.12 Analisa K.13 Analisa K.14 Analisa K.15 Analisa K.16 Analisa K.17 Analisa K.18 Analisa K.19 Analisa L.1 Analisa L.2 Analisa L.3 Analisa L.4 Analisa L.5 Analisa L.6 Analisa L.7 Analisa L.8 Analisa L.9 Analisa L.10 Analisa L.11 Analisa L.12 Analisa L.13 Analisa L.14 Analisa L.15
URAIAN PEKERJAAN #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Memasang 1 m' Pipa Galvanis Ø ½" Memasang 1 m' Pipa Galvanis Ø ¾" Memasang 1 m' Pipa Galvanis Ø 1" Memasang 1 m' Pipa Galvanis Ø 1½" Memasang 1 m' Pipa Galvanis Ø 3" Memasang 1 m' Pipa Galvanis Ø 4" Memasang 1 m' Pipa PVC tipe AW Ø ½" Memasang 1 m' Pipa PVC tipe AW Ø ¾" Memasang 1 m' Pipa PVC tipe AW Ø 1" Memasang 1 m' Pipa PVC tipe AW Ø 3" Memasang 1 m' Pipa PVC tipe AW Ø 1½" Memasang 1 m' Pipa PVC tipe AW Ø 2" Memasang 1 m' Pipa PVC tipe AW Ø 2½" Memasang 1 kg besi beton Memasang 1 kg besi siku Memasang 1 kg rangka kuda-kuda baja IWF Mengerjakan 10 cm pengelasan dengan las listrik #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
BIAYA
KETERANGAN
39,345.00 47,482.50 58,720.00 85,060.55 138,923.05 172,688.48 12,336.85 13,499.35 16,599.35 42,174.35 27,664.46 25,092.78 32,874.35 19,831.25 22,706.25 446.44 2,112.20 4,301,115.15 -
Halaman 3 dari 35
Kode Analisa Analisa L.16 Analisa L.17 Analisa L.18 Analisa L.19 Analisa L.20 Analisa L.21 Analisa L.22 Analisa L.23 Analisa M.1 Analisa M.2 Analisa M.3 Analisa M.4 Analisa M.5 Analisa M.6 Analisa M.7 Analisa M.8 Analisa M.9 Analisa M.10 Analisa M.11 Analisa M.12 Analisa M.13 Analisa M.14 Analisa M.15 Analisa M.16 Analisa M.17 Analisa M.18 Analisa M.19 Analisa M.20 Analisa M.21 Analisa M.22 Analisa M.23 Analisa M.24 Analisa M.25 Analisa M.26 Analisa M.27 Analisa M.28 Analisa M.29 Analisa M.30 Analisa M.31 Analisa M.32 Analisa M.33 Analisa M.34 Analisa M.35 Analisa M.36 Analisa M.37 Analisa M.38 Analisa M.39 Analisa M.40 Analisa M.41 Analisa M.42 Analisa M.43 Analisa M.44 Analisa M.45 Analisa M.46 Analisa M.47 Analisa M.48 Analisa M.49 Analisa M.50 Analisa M.51 Analisa M.52 Analisa M.53 Analisa M.54 Analisa M.55 Analisa M.56 Analisa M.57 Analisa M.57 Analisa N.1 Analisa N.2 Analisa N.3 Analisa N.4 Analisa N.5 Analisa N.6 Analisa N.7 Analisa N.8 Analisa N.9 Analisa N.10 Analisa N.11 Analisa N.12 Analisa N.13 Analisa N.14 Analisa N.15 Analisa N.16 Analisa N.17 Analisa N.18 Analisa N.19 Analisa N.20 Analisa N.21 Analisa N.22 Analisa N.23 Analisa N.24 Analisa N.25 Analisa O.1 Analisa O.2 Analisa O.3 Analisa O.4 Analisa O.5
URAIAN PEKERJAAN #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Memasang 1 m2 Iantai keramik ukuran (33 x 33) cm Memasang 1 m2 Iantai keramik ukuran (30 x 30) cm Memasang 1 m2 Iantai keramik ukuran (20 x 20) cm #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1 M2 Pemasangan Paving Block Tebal 8 cm 1 M2 Pemasangan Paving Block Tebal 6 cm 1 M' Pasang Kanstin dari beton tumbuk 1 Pc : 3 Ps : 5 Kr 1 M2 Pemasangan Paving Block Tebal 8 cm Type Segienam 1 M2 Pemasangan Paving Block Tebal 6 cm Type Segienam 1 M2 Pemasangan Paving Block Tebal 6 cm Type Segienam #N/A #N/A #N/A #N/A #N/A 1 m² Mendempul dan Menggosok Kayu 1 m² Mengecatan Bidang Kayu Lama 1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup #N/A #N/A 1 m² Mengecat Tembok baru ( 1 Plamir, 1 lapis cat dasar, 2 Lapis Cat penutup) #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 100 M2 Mengecat besi dengan Cat Mengkilat #N/A 1 Buah Pasang saklar Triple 1 Buah Pasang saklar Double 1 Buah Pasang saklar Single 1 Buah Pasang Stopkontak 1 Titik Instalasi Listrik
BIAYA
KETERANGAN -
#REF! #REF! 113,737.29 123,034.09 122,738.20 117,907.50 103,732.50 31,621.97 110,107.50 97,297.50 97,297.50 7,251.63 18,293.76 22,406.63 13,917.46 21,734.31 103,000.00 63,000.00 53,000.00 53,000.00 164,500.00
Halaman 4 dari 35
Kode Analisa
URAIAN PEKERJAAN
BIAYA
KETERANGAN
Halaman 5 dari 35
ANALISA HARGA SATUAN PEKERJAAN STANDAR NASIONAL INDONESIA ( SNI )
KEBUTUHAN
KODE ANALISA
SATUAN
INDEKS
HARGA SATUAN BAHAN/UPAH ( Rp )
JUMLAH ( Rp)
A. PEKERJAAN PERSIAPAN Analisa A.4
1 m' Pek. Pengukuran kembali (site) & Pemasangan Bowplank Bahan
Tenaga Kerja
Kayu Kelas III ( 5 x 7 cm)
M3
0.0120
1,850,000.00
Paku 5 cm - 12 cm
Kg
0.0200
15,000.00
300.00
Kayu Kelas III ( 3 cm x 20 cm)
M3
0.0070
1,850,000.00
12,950.00
Tukang Kayu
OH
0.1000
60,500.00
6,050.00
Pekerja
OH
0.1000
45,000.00
4,500.00
Kepala Tukang
OH
0.0100
62,750.00
627.50
Mandor
OH
0.0050
68,250.00
Jumlah Harga per Satuan Pekerjaan Analisa A.8
Pekerja
OH
0.1000
45,000.00
4,500.00
Mandor
OH
0.0500
68,250.00
3,412.50
Jumlah Harga per Satuan Pekerjaan B.
7,912.50
PEKERJAAN TANAH
Menggali 1 M3 Tanah Biasa sedalam 1 Meter Tenaga Kerja
Pekerja
OH
0.7500
45,000.00
Mandor
OH
0.0250
68,250.00
Jumlah Harga per Satuan Pekerjaan Analisa B.2
Pekerja
OH
0.9000
45,000.00
Mandor
OH
0.0450
68,250.00
Pekerja
OH
1.0500
45,000.00
Mandor
OH
0.0670
68,250.00
Pekerja
OH
1.0000
45,000.00
Mandor
OH
0.0320
68,250.00
2,184.00 47,184.00
Pekerja
OH
0.3300
45,000.00
Mandor
OH
0.0100
68,250.00
Jumlah Harga per Satuan Pekerjaan
14,850.00 682.50 15,532.50
Mengurug kembali 1 M3 galian Tenaga Kerja
Pekerja
OH
0.2500
45,000.00
Mandor
OH
0.0080
68,250.00
Jumlah Harga per Satuan Pekerjaan
11,250.00 546.00 11,796.00
Memadatkan 1 m 3 tanah (per 20 cm) Tenaga Kerja
Pekerja
OH
0.5000
45,000.00
Mandor
OH
0.0500
68,250.00
Jumlah Harga per Satuan Pekerjaan
22,500.00 3,412.50 25,912.50
Mengurug 1 m3 pasir urug Bahan Tenaga Kerja
Pasir Urug
M3
1.2000
95,000.00
114,000.00
Pekerja
OH
0.3000
45,000.00
13,500.00
Mandor
OH
0.0100
68,250.00
Jumlah Harga per Satuan Pekerjaan
682.50 128,182.50
Pengangkutan 1 M3 Tanah Keluar Proyek Peralatan Sewa Dump Truck 5 T Tenaga Kerja
Analisa B.16
45,000.00
Membuang 1 m3 tanah sejauh 15 meter Tenaga Kerja
Analisa B.12
4,572.75 51,822.75
Jumlah Harga per Satuan Pekerjaan
Analisa B.11
47,250.00
Menggali 1 M3 Tanah Keras sedalam 1 Meter Tenaga Kerja
Analisa B.10
3,071.25 43,571.25
Jumlah Harga per Satuan Pekerjaan
Analisa B.9
40,500.00
Menggali 1 M3 Tanah Biasa sedalam 3 Meter Tenaga Kerja
Analisa B.8
1,706.25 35,456.25
Jumlah Harga per Satuan Pekerjaan
Analisa B.4
33,750.00
Menggali 1 M3 Tanah Biasa sedalam 2 Meter Tenaga Kerja
Analisa B.3
341.25 46,968.75
1 m2 Membersihkan Lapangan dan Perataan Tenaga kerja
Analisa B.1
22,200.00
Pekerja
Jam
0.2500
128,409.00
32,102.25
OH
0.2500
45,000.00
11,250.00
Jumlah Harga per Satuan Pekerjaan
43,352.25
Mengurug 1 m 3 Tanah padat untuk peninggian lantai bangunan Bahan Tenaga Kerja
Tanah urugan
M3
1.2000
75,000.00
90,000.00
Pekerja
OH
0.2500
45,000.00
11,250.00
Mandor
OH
0.0250
68,250.00
Jumlah Harga per Satuan Pekerjaan
1,706.25 102,956.25
Halaman 6 dari 35
KEBUTUHAN
KODE ANALISA
SATUAN
INDEKS
HARGA SATUAN BAHAN/UPAH ( Rp )
JUMLAH ( Rp)
C. PEKERJAAN PONDASI Analisa C.2
Memasang 1 m 3 pondasi batu belah, campuran 1 PC : 4 PP Bahan
Tenaga Kerja
Batu belah 15 cm/20 cm
M3
1.2000
131,000.00
157,200.00
Semen Portland
Kg
163.0000
1,000.00
163,000.00
Pasir Pasang
M3
0.5200
115,000.00
59,800.00
Pekerja
OH
1.5000
45,000.00
67,500.00
Tukang Batu
OH
0.7500
60,500.00
45,375.00
Kepala Tukang
OH
0.0750
62,750.00
4,706.25
Mandor
OH
0.0750
68,250.00
Jumlah Harga per Satuan Pekerjaan Analisa C.6
5,118.75 502,700.00
Memasang 1 m 3 batu kosong (anstamping) Bahan
Tenaga Kerja
Batu belah 15 cm/20 cm
M3
1.2000
131,000.00
157,200.00
Pasir Urug
M3
0.4320
95,000.00
41,040.00
Pekerja
OH
0.7800
45,000.00
35,100.00
Tukang Batu
OH
0.3900
60,500.00
23,595.00
Kepala Tukang
OH
0.0390
62,750.00
2,447.25
Mandor
OH
0.0390
68,250.00
Jumlah Harga per Satuan Pekerjaan
2,661.75 262,044.00
D. PEKERJAAN DINDING Analisa D.1
Memasang 1 m 2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata,campuran spesi 1 PC : 2 PP Bata Merah Bahan
Tenaga Kerja
Buah
140.0000
300.00
42,000.00
Semen Portland
Kg
43.5000
1,000.00
43,500.00
Pasir Pasang
M3
0.0800
115,000.00
9,200.00
Pekerja
OH
0.6000
45,000.00
27,000.00
Tukang Batu
OH
0.2000
60,500.00
12,100.00
Kepala Tukang
OH
0.0200
62,750.00
1,255.00
Mandor
OH
0.0300
68,250.00
Jumlah Harga per Satuan Pekerjaan Analisa D.2
Memasang 1 m 2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata,campuran spesi 1 PC : 3 PP Bata Merah Bahan
Tenaga Kerja
Buah
140.0000
300.00
42,000.00
Semen Portland
Kg
32.9500
1,000.00
32,950.00
Pasir Pasang
M3
0.0910
115,000.00
10,465.00
Pekerja
OH
0.6000
45,000.00
27,000.00
Tukang Batu
OH
0.2000
60,500.00
12,100.00
Kepala Tukang
OH
0.0200
62,750.00
1,255.00
Mandor
OH
0.0300
68,250.00
Jumlah Harga per Satuan Pekerjaan Analisa D.3
2,047.50 127,817.50
Memasang 1 m 2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata,campuran spesi 1 PC : 4 PP Bata Merah Bahan
Tenaga Kerja
Buah
140.0000
300.00
42,000.00
Semen Portland
Kg
26.5500
1,000.00
26,550.00
Pasir Pasang
M3
0.0930
115,000.00
10,695.00
Pekerja
OH
0.6000
45,000.00
27,000.00
Tukang Batu
OH
0.2000
60,500.00
12,100.00
Kepala Tukang
OH
0.0200
62,750.00
1,255.00
Mandor
OH
0.0300
68,250.00
Jumlah Harga per Satuan Pekerjaan Analisa D.7
2,047.50 137,102.50
2,047.50 121,647.50
Memasang 1 m 2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,campuran spesi 1 PC : 2 PP Bata Merah Bahan
Tenaga Kerja
Buah
70.0000
300.00
21,000.00
Semen Portland
Kg
18.9500
1,000.00
18,950.00
Pasir Pasang
M3
0.0380
115,000.00
4,370.00
Pekerja
OH
0.3000
45,000.00
13,500.00
Tukang Batu
OH
0.1000
60,500.00
6,050.00
Kepala Tukang
OH
0.0100
62,750.00
627.50
Mandor
OH
0.0150
68,250.00
1,023.75
Jumlah Harga per Satuan Pekerjaan
65,521.25
Halaman 7 dari 35
KEBUTUHAN
KODE ANALISA
Analisa D.8
SATUAN
INDEKS
HARGA SATUAN BAHAN/UPAH ( Rp )
JUMLAH ( Rp)
Memasang 1 m 2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,campuran spesi 1 PC : 3 PP Bata Merah Bahan
Tenaga Kerja
Buah
70.0000
300.00
21,000.00
Semen Portland
Kg
14.3700
1,000.00
14,370.00
Pasir Pasang
M3
0.0400
115,000.00
4,600.00
Pekerja
OH
0.3000
45,000.00
13,500.00
Tukang Batu
OH
0.1000
60,500.00
6,050.00
Kepala Tukang
OH
0.0100
62,750.00
627.50
Mandor
OH
0.0150
68,250.00
1,023.75
Jumlah Harga per Satuan Pekerjaan Analisa D.9
61,171.25
Memasang 1 m 2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,campuran spesi 1 PC : 4 PP Bata Merah Bahan
Tenaga Kerja
Buah
70.0000
300.00
21,000.00
Semen Portland
Kg
11.5000
1,000.00
11,500.00
Pasir Pasang
M3
0.0430
115,000.00
4,945.00
Pekerja
OH
0.3000
45,000.00
13,500.00
Tukang Batu
OH
0.1000
60,500.00
6,050.00
Kepala Tukang
OH
0.0100
62,750.00
627.50
Mandor
OH
0.0150
68,250.00
1,023.75
Jumlah Harga per Satuan Pekerjaan
58,646.25
E. PEKERJAAN PLESTERAN Analisa E.1
1 m2 Plesteran Dinding 1 Pc : 1 Ps tebal 15 mm Bahan
Tenaga Kerja
Semen Portland
Kg
15.5040
1,000.00
Pasir pasang
M3
0.0160
115,000.00
1,840.00
Pekerja
OH
0.3000
45,000.00
13,500.00
Tukang Batu
OH
0.1500
60,500.00
9,075.00
Kepala Tukang
OH
0.0150
62,750.00
941.25
Mandor
OH
0.0150
68,250.00
1,023.75
Jumlah Harga per Satuan Pekerjaan Analisa E.2
41,884.00
1 m2 Plesteran Dinding 1 Pc : 2 Ps tebal 15 mm Bahan
Tenaga Kerja
Semen Portland
Kg
10.2240
1,000.00
Pasir pasang
M3
0.0200
115,000.00
2,300.00
Pekerja
OH
0.3000
45,000.00
13,500.00
Tukang Batu
OH
0.1500
60,500.00
9,075.00
Kepala Tukang
OH
0.0150
62,750.00
941.25
Mandor
OH
0.0150
68,250.00
1,023.75
Jumlah Harga per Satuan Pekerjaan Analisa E.3
Tenaga Kerja
37,064.00
Semen Portland
Kg
7.7760
1,000.00
Pasir pasang
M3
0.0230
115,000.00
2,645.00
Pekerja
OH
0.3000
45,000.00
13,500.00
Tukang Batu
OH
0.1500
60,500.00
9,075.00
Kepala Tukang
OH
0.0150
62,750.00
941.25
Mandor
OH
0.0150
68,250.00
1,023.75
Jumlah Harga per Satuan Pekerjaan
7,776.00
34,961.00
1 m2 Plesteran Dinding 1 Pc : 4 Ps tebal 15 mm Bahan
Tenaga Kerja
Semen Portland
Kg
6.2400
1,000.00
Pasir pasang
M3
0.0240
115,000.00
2,760.00
Pekerja
OH
0.3000
45,000.00
13,500.00
Tukang Batu
OH
0.1500
60,500.00
9,075.00
Kepala Tukang
OH
0.0150
62,750.00
941.25
Mandor
OH
0.0150
68,250.00
1,023.75
Jumlah Harga per Satuan Pekerjaan Analisa E.5
10,224.00
1 m2 Plesteran Dinding 1 Pc : 3 Ps tebal 15 mm Bahan
Analisa E.4
15,504.00
6,240.00
33,540.00
1 m2 Plesteran Dinding 1Pc : 5 Ps tebal 15 mm Bahan
Tenaga Kerja
Semen Portland
Kg
5.1840
1,000.00
Pasir pasang
M3
0.0260
115,000.00
2,990.00
Pekerja
OH
0.3000
45,000.00
13,500.00
Tukang Batu
OH
0.1500
60,500.00
9,075.00
Kepala Tukang
OH
0.0150
62,750.00
941.25
Mandor
OH
0.0150
68,250.00
1,023.75
Jumlah Harga per Satuan Pekerjaan
5,184.00
32,714.00
Halaman 8 dari 35
KEBUTUHAN
KODE ANALISA
Analisa E.6
SATUAN
INDEKS
HARGA SATUAN BAHAN/UPAH ( Rp )
1 m2 Plesteran Dinding 1Pc : 6 Ps tebal 15 mm Bahan
Tenaga Kerja
Semen Portland
Kg
4.4160
1,000.00
Pasir pasang
M3
0.0270
115,000.00
3,105.00
Pekerja
OH
0.3000
45,000.00
13,500.00
Tukang Batu
OH
0.1500
60,500.00
9,075.00
Kepala Tukang
OH
0.0150
62,750.00
941.25
Mandor
OH
0.0150
68,250.00
1,023.75
Jumlah Harga per Satuan Pekerjaan Analisa E.7
Tenaga Kerja
32,061.00
Semen Portland
Kg
3.9360
1,000.00
Pasir pasang
M3
0.0280
115,000.00
3,220.00
Pekerja
OH
0.3000
45,000.00
13,500.00
Tukang Batu
OH
0.1500
60,500.00
9,075.00
Kepala Tukang
OH
0.0150
62,750.00
941.25
Mandor
OH
0.0150
68,250.00
1,023.75
Jumlah Harga per Satuan Pekerjaan
Tenaga Kerja
31,696.00
Semen Portland
Kg
3.4560
1,000.00
Pasir pasang
M3
0.0290
115,000.00
3,335.00
Pekerja
OH
0.3000
45,000.00
13,500.00
Tukang Batu
OH
0.1500
60,500.00
9,075.00
Kepala Tukang
OH
0.0150
62,750.00
941.25
Mandor
OH
0.0150
68,250.00
1,023.75
Jumlah Harga per Satuan Pekerjaan
Tenaga Kerja
31,331.00
Semen Portland
Kg
8.3200
1,000.00
Pasir pasang
M3
0.0320
115,000.00
3,680.00
Pekerja
OH
0.4000
45,000.00
18,000.00
Tukang Batu
OH
0.2000
60,500.00
12,100.00
Kepala Tukang
OH
0.0200
62,750.00
1,255.00
Mandor
OH
0.0220
68,250.00
Jumlah Harga per Satuan Pekerjaan
Tenaga Kerja
1,501.50 44,856.50
Semen Portland
Kg
3.2500
1,000.00
3,250.00
Pekerja
OH
0.2000
45,000.00
9,000.00
Tukang Batu
OH
0.1000
60,500.00
6,050.00
Kepala Tukang
OH
0.0100
62,750.00
627.50
Mandor
OH
0.0100
68,250.00
Jumlah Harga per Satuan Pekerjaan
682.50 19,610.00
1 m2 Floor lantai PC 1Pc : 5Ps, tebal 5 mm Bahan
Tenaga Kerja
Semen Portland
Kg
15.8800
1,000.00
Pasir pasang
M3
0.0780
115,000.00
8,970.00
Pekerja
OH
0.6000
45,000.00
27,000.00
Tukang Batu
OH
0.4000
60,500.00
24,200.00
Kepala Tukang
OH
0.0400
62,750.00
2,510.00
Mandor
OH
0.0260
68,250.00
Jumlah Harga per Satuan Pekerjaan Analisa E.29
8,320.00
Membuat 1 m2 Acian Bahan
Analisa E.28
3,456.00
1 m2 Plesteran 1 Pc : 4 Ps, tebal 20 mm Bahan
Analisa E.27
3,936.00
1 m2 Plesteran Dinding 1Pc : 8 Ps tebal 15 mm Bahan
Analisa E.15
4,416.00
1 m2 Plesteran Dinding 1Pc : 7 Ps tebal 15 mm Bahan
Analisa E.8
JUMLAH ( Rp)
15,880.00
1,774.50 80,334.50
200 M' Pekerjaan Profil Semen Bahan
Tenaga Kerja
Semen Portland
Kg
1,350.0000
1,000.00
Pasir pasang
M3
2.3200
115,000.00
266,800.00
Pekerja
OH
120.0000
45,000.00
5,400,000.00
Tukang Batu
OH
12.0000
60,500.00
726,000.00
Kepala Tukang
OH
320.0000
62,750.00
20,080,000.00
OH
16.0000
68,250.00
Mandor
1,350,000.00
1,092,000.00
200 Meter
Jumlah Harga per Satuan Pekerjaan
28,914,800.00
1 Meter
Jumlah Harga per Satuan Pekerjaan
144,574.00
Halaman 9 dari 35
KEBUTUHAN
KODE ANALISA
SATUAN
INDEKS
HARGA SATUAN BAHAN/UPAH ( Rp )
JUMLAH ( Rp)
G. PEKERJAAN BETON Analisa G.5
Membuat 1 m 3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
Bahan
Tenaga Kerja
Semen Portland
Kg
326.0000
1,000.00
326,000.00
Pasir Beton
M3
0.7600
125,000.00
95,000.00
M3
1.0290
-
-
Air
Liter
215.0000
50.00
10,750.00
Pekerja
OH
1.6500
45,000.00
74,250.00
Tukang Batu
OH
0.2750
60,500.00
16,637.50
Kepala Tukang
OH
0.0280
62,750.00
1,757.00
Mandor
OH
0.0083
68,250.00
Jumlah Harga per Satuan Pekerjaan Analisa G.6
Membuat 1 m 3 beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61
Bahan
Tenaga Kerja
Semen Portland
Kg
352.0000
1,000.00
Pasir Beton
M3
0.7310
125,000.00
91,375.00
Batu pecah 2/3 cm
M3
1.0310
230,000.00
237,130.00
Liter
215.0000
50.00
10,750.00
Pekerja
OH
1.6500
45,000.00
74,250.00
Tukang Batu
OH
0.2750
60,500.00
16,637.50
Kepala Tukang
OH
0.0280
62,750.00
1,757.00
Mandor
OH
0.0830
68,250.00
Tenaga Kerja
Semen Portland
Kg
371.0000
1,000.00
Pasir Beton
M3
0.6980
125,000.00
87,250.00
Batu pecah 2/3 cm
M3
1.0470
230,000.00
240,810.00
Liter
215.0000
50.00
10,750.00
Pekerja
OH
1.6500
45,000.00
74,250.00
Tukang Batu
OH
0.2750
60,500.00
16,637.50
Kepala Tukang
OH
0.0280
62,750.00
1,757.00
Mandor
OH
0.0830
68,250.00
5,664.75 808,119.25
Membuat 1 m 3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
Bahan
Tenaga Kerja
Semen Portland
Kg
384.0000
1,000.00
Pasir Beton
M3
0.6920
125,000.00
86,500.00
Batu pecah 2/3 cm
M3
1.0390
230,000.00
238,970.00
384,000.00
Air
Liter
215.0000
50.00
10,750.00
Pekerja
OH
1.6500
45,000.00
74,250.00
Tukang Batu
OH
0.2750
60,500.00
16,637.50
Kepala Tukang
OH
0.0280
62,750.00
1,757.00
Mandor
OH
0.0830
68,250.00
Jumlah Harga per Satuan Pekerjaan
5,664.75 818,529.25
Pembesian 10 kg dengan besi ulir Bahan
Tenaga Kerja
Analisa G.15
371,000.00
Air
Jumlah Harga per Satuan Pekerjaan
Analisa G.14
5,664.75 789,564.25
Membuat 1 m 3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
Bahan
Analisa G.8
352,000.00
Air
Jumlah Harga per Satuan Pekerjaan Analisa G.7
566.48 524,960.98
Besi Beton ulir
Kg
10.5000
12,500.00
131,250.00
Kawat Beton
Kg
0.1500
14,000.00
2,100.00
Pekerja
OH
0.0700
45,000.00
3,150.00
Tukang Besi
OH
0.0700
60,500.00
4,235.00
Kepala Tukang
OH
0.0070
62,750.00
439.25
Mandor
OH
0.0040
68,250.00
273.00
Jumlah Harga per Satuan Pekerjaan
141,447.25
Jumlah Harga per Satuan Pekerjaan
14,144.73
Pembesian 10 kg dengan besi polos Bahan
Tenaga Kerja
Besi Beton polos
Kg
10.5000
11,000.00
115,500.00
Kawat Beton
Kg
0.1500
14,000.00
2,100.00
Pekerja
OH
0.0700
45,000.00
3,150.00
Tukang Besi
OH
0.0700
60,500.00
4,235.00
Kepala Tukang
OH
0.0070
62,750.00
439.25
Mandor
OH
0.0040
68,250.00
273.00
Jumlah Harga per Satuan Pekerjaan
125,697.25
Jumlah Harga per Satuan Pekerjaan
12,569.73
Halaman 10 dari 35
KEBUTUHAN
KODE ANALISA
Analisa G.18
SATUAN
INDEKS
HARGA SATUAN BAHAN/UPAH ( Rp )
Memasang 1 m 2 bekisting untuk pondasi Bahan
Tenaga Kerja
Kayu kelas III (papan)
M3
0.0400
1,950,000.00
78,000.00
Paku 5 cm - 10 cm
Kg
0.3000
15,000.00
4,500.00
Minyak Bekisting
Liter
0.1000
4,500.00
450.00
Pekerja
OH
0.5200
45,000.00
23,400.00
Tukang Kayu
OH
0.2600
60,500.00
15,730.00
Kepala Tukang
OH
0.0260
62,750.00
1,631.50
Mandor
OH
0.0260
68,250.00
Jumlah Harga per Satuan Pekerjaan Analisa G.19
Tenaga Kerja
Kayu kelas III (papan)
M3
0.0450
1,950,000.00
87,750.00
Paku 5 cm - 10 cm
Kg
0.3000
15,000.00
4,500.00
Minyak Bekisting
Liter
0.1000
4,500.00
450.00
Pekerja
OH
0.5200
45,000.00
23,400.00
Tukang Kayu
OH
0.2600
60,500.00
15,730.00
Kepala Tukang
OH
0.0260
62,750.00
1,631.50
Mandor
OH
0.0260
68,250.00
Jumlah Harga per Satuan Pekerjaan
Tenaga Kerja
Kayu kelas III (papan)
M3
0.0400
1,950,000.00
78,000.00
Paku 5 cm - 10 cm
Kg
0.4000
15,000.00
6,000.00
Liter
0.2000
4,500.00
900.00
Kayu Kelas II (Balok)
M3
0.0150
2,650,000.00
39,750.00
Plywood tebal 9 mm
Lembar
0.3500
125,000.00
43,750.00
Dolken Kayu Kelas III Ø 8 - 10/400 cm
Batang
2.0000
20,000.00
40,000.00
Pekerja
OH
0.6600
45,000.00
29,700.00
Tukang Kayu
OH
0.3300
60,500.00
19,965.00
Kepala Tukang
OH
0.0330
62,750.00
2,070.75
Mandor
OH
0.0330
68,250.00
Minyak Bekisting
Jumlah Harga per Satuan Pekerjaan
2,252.25 262,388.00
Memasang 1 m 2 bekisting untuk balok
Bahan
Tenaga Kerja
Kayu kelas III (papan)
M3
0.0400
1,950,000.00
78,000.00
Paku 5 cm - 10 cm
Kg
0.4000
15,000.00
6,000.00
Liter
0.2000
4,500.00
900.00
Kayu Kelas II (Balok)
M3
0.0180
2,650,000.00
47,700.00
Plywood tebal 9 mm
Lembar
0.3500
125,000.00
43,750.00
Dolken Kayu Kelas III Ø 8 - 10/400 cm
Batang
2.0000
20,000.00
40,000.00
Pekerja
OH
0.6600
45,000.00
29,700.00
Tukang Kayu
OH
0.3300
60,500.00
19,965.00
Kepala Tukang
OH
0.0330
62,750.00
2,070.75
Mandor
OH
0.0330
68,250.00
Minyak Bekisting
Jumlah Harga per Satuan Pekerjaan Analisa G.21
1,774.50 135,236.00
Memasang 1 m 2 bekisting untuk kolom
Bahan
Analisa G.20
1,774.50 125,486.00
Memasang 1 m 2 bekisting untuk sloof Bahan
Analisa G.20
JUMLAH ( Rp)
2,252.25 270,338.00
Memasang 1 m 2 bekisting untuk plat lantai
Bahan
Tenaga Kerja
Kayu kelas III (papan)
M3
0.0400
1,950,000.00
78,000.00
Paku 5 cm - 12 cm
Kg
0.4000
15,000.00
6,000.00
Liter
0.2000
4,500.00
900.00
Kayu Kelas II (Balok)
M3
0.0150
2,650,000.00
39,750.00
Plywood tebal 9 mm
Lembar
0.3500
125,000.00
43,750.00
Dolken Kayu Kelas III Ø 8 - 10/400 cm
Batang
6.0000
20,000.00
120,000.00
Pekerja
OH
0.6600
45,000.00
29,700.00
Tukang Kayu
OH
0.3300
60,500.00
19,965.00
Kepala Tukang
OH
0.0330
62,750.00
2,070.75
Mandor
OH
0.0330
68,250.00
Minyak Bekisting
Jumlah Harga per Satuan Pekerjaan
2,252.25 342,388.00
Halaman 11 dari 35
KEBUTUHAN
KODE ANALISA
Analisa G.22
SATUAN
INDEKS
HARGA SATUAN BAHAN/UPAH ( Rp )
Memasang 1 m 2 bekisting untuk dinding Kayu kelas III (papan)
M3
0.0300
1,950,000.00
58,500.00
Paku 5 cm - 12 cm
Kg
0.4000
15,000.00
6,000.00
Liter
0.2000
4,500.00
900.00
Kayu Kelas II (Balok)
M3
0.0200
2,650,000.00
53,000.00
Plywood tebal 9 mm
Lembar
0.3500
125,000.00
43,750.00
Dolken Kayu Kelas III Ø 8 - 10/400 cm
Batang
3.0000
20,000.00
60,000.00
Buah
4.0000
-
-
Pekerja
OH
0.6600
45,000.00
29,700.00
Tukang Kayu
OH
0.3300
60,500.00
19,965.00
Kepala Tukang
OH
0.0330
62,750.00
2,070.75
Mandor
OH
0.0330
68,250.00
Minyak Bekisting Bahan
Formite/penjaga jarak begisting Tenaga Kerja
Jumlah Harga per Satuan Pekerjaan Analisa G.29
Tenaga Kerja
Kayu kelas III (papan)
M3
0.3200
1,950,000.00
624,000.00
Paku 5 cm - 12 cm
Kg
3.2000
15,000.00
48,000.00
Minyak Bekisting
Liter
1.6000
4,500.00
7,200.00
Besi Beton polos
Kg
157.5000
11,000.00
1,732,500.00
Kawat Beton
Kg
2.2500
14,000.00
31,500.00
Semen Portland
Kg
336.0000
1,000.00
336,000.00
Pasir Beton
M3
0.5400
125,000.00
67,500.00
Batu pecah 2/3 cm
M3
0.8100
230,000.00
186,300.00
Kayu kelas II (balok)
M3
0.1200
2,650,000.00
318,000.00
Plywood tebal 9 mm
Lembar
2.8000
125,000.00
350,000.00
Dolken Kayu Kelas III Ø 8 - 10/400 cm
Batang
32.0000
20,000.00
640,000.00
Pekerja
OH
5.3000
45,000.00
238,500.00
Tukang Batu
OH
0.2750
60,500.00
16,637.50
Tukang Kayu
OH
1.3000
60,500.00
78,650.00
Tukang Besi
OH
1.0500
60,500.00
63,525.00
Kepala Tukang
OH
0.2650
62,750.00
16,628.75
Mandor
OH
0.2650
68,250.00
Jumlah Harga per Satuan Pekerjaan
Tenaga Kerja
Semen Portland
Kg
211.8200
1,000.00
Pasir Beton
M3
0.5000
125,000.00
62,500.00
Batu pecah 2/3 cm
M3
1.0000
230,000.00
230,000.00
Pekerja
OH
6.0000
45,000.00
270,000.00
Tukang Batu
OH
0.5000
60,500.00
30,250.00
Kepala Tukang
OH
0.0500
62,750.00
3,137.50
Mandor
OH
0.3000
68,250.00
20,475.00
Jumlah Harga per Satuan Pekerjaan Analisa G.29 Analisa G.15 Analisa G.7
Membuat Bahan + Tenaga Kerja
Analisa G.19 Analisa G.15 Analisa G.7
Membuat Bahan + Tenaga Kerja
828,182.50
Begesting
M2
2.4000
342,388.00
821,731.20
Pembesian besi polos
Kg
146.1056
12,569.73
1,836,507.94
M3
1.0000
808,119.25
Beton mutu K225
Analisa G.20 Analisa G.15 Analisa G.7
Membuat Bahan + Tenaga Kerja
1 m' Beton Sloof 15/20 Begesting
M2
13.3320
135,236.00
1,802,966.35
Pembesian besi polos
Kg
116.9126
12,569.73
1,469,560.32
Beton mutu K225
M3
1.0000
808,119.25
Analisa G.20 Analisa G.15 Analisa G.7
Membuat Bahan + Tenaga Kerja
808,119.25 4,080,645.92
1 m' Beton Kolom 11/20 Begesting
M2
18.1800
262,388.00
4,770,213.84
Pembesian besi polos
Kg
282.5172
12,569.73
3,551,164.92
Beton mutu K225
M3
1.0000
808,119.25
Jumlah Harga per Satuan Pekerjaan Analisa G.38
808,119.25 3,466,358.39
Jumlah Harga per Satuan Pekerjaan Analisa G.37
211,820.00
1 m' Pondasi plat tb. 20 cm
Jumlah Harga per Satuan Pekerjaan Analisa G.36
18,086.25 4,773,027.50
1 m3 Membuat Lantai Kerja Beton Tumbuk 1 Pc : 3 Ps : 5 Kr Bahan
Analisa G.35
2,252.25 276,138.00
Membuat 1 m3 plat beton bertulang (150 kg besi + bekisting)
Bahan
Analisa G.34
JUMLAH ( Rp)
808,119.25 9,129,498.01
1 m' Beton balok 11/20 Begesting
M2
9.0900
270,338.00
2,457,372.42
Pembesian besi polos
Kg
242.1576
12,569.73
3,043,855.65
Beton mutu K225
M3
1.0000
808,119.25
Jumlah Harga per Satuan Pekerjaan
808,119.25 6,309,347.32
Halaman 12 dari 35
KEBUTUHAN
KODE ANALISA
SATUAN
INDEKS
HARGA SATUAN BAHAN/UPAH ( Rp )
JUMLAH ( Rp)
J. PEKERJAAN SANITASI Analisa J.18
Memasang 1 m' Pipa Galvanis Ø ½" Bahan
Tenaga Kerja
Pipa Galvanis Ø ½"
M'
1.2000
18,750.00
22,500.00
Perlengkapan dihitung 35% dari bahan
Set
0.3500
18,750.00
6,562.50
Pekerja
OH
0.0540
45,000.00
2,430.00
Tukang Batu
OH
0.0900
60,500.00
5,445.00
Kepala Tukang
OH
0.0090
62,750.00
564.75
Mandor
OH
0.0270
68,250.00
1,842.75
Jumlah Harga per Satuan Pekerjaan Analisa J.19
39,345.00
Memasang 1 m' Pipa Galvanis Ø ¾" Bahan
Tenaga Kerja
Pipa Galvanis Ø ¾"
M'
1.2000
24,000.00
28,800.00
Perlengkapan dihitung 35% dari bahan
Set
0.3500
24,000.00
8,400.00
Pekerja
OH
0.0540
45,000.00
2,430.00
Tukang Batu
OH
0.0900
60,500.00
5,445.00
Kepala Tukang
OH
0.0090
62,750.00
564.75
Mandor
OH
0.0270
68,250.00
1,842.75
Jumlah Harga per Satuan Pekerjaan Analisa J.20
47,482.50
Memasang 1 m' Pipa Galvanis Ø 1" Bahan
Tenaga Kerja
Pipa Galvanis Ø 1"
M'
1.2000
31,250.00
37,500.00
Perlengkapan dihitung 35% dari bahan
Set
0.3500
31,250.00
10,937.50
Pekerja
OH
0.0540
45,000.00
2,430.00
Tukang Batu
OH
0.0900
60,500.00
5,445.00
Kepala Tukang
OH
0.0090
62,750.00
564.75
Mandor
OH
0.0270
68,250.00
1,842.75
Jumlah Harga per Satuan Pekerjaan Analisa J.21
58,720.00
Memasang 1 m' Pipa Galvanis Ø 1½" Bahan
Tenaga Kerja
Pipa Galvanis Ø 1½"
M'
1.2000
43,750.00
52,500.00
Perlengkapan dihitung 35% dari bahan
Set
0.3500
43,750.00
15,312.50
Pekerja
OH
0.1080
45,000.00
4,860.00
Tukang Batu
OH
0.1800
60,500.00
10,890.00
Kepala Tukang
OH
0.0180
62,750.00
1,129.50
Mandor
OH
0.0054
68,250.00
Jumlah Harga per Satuan Pekerjaan Analisa J.22
Memasang 1 m' Pipa Galvanis Ø 3" Bahan
Tenaga Kerja
Pipa Galvanis Ø 3"
M'
1.2000
78,500.00
94,200.00
Perlengkapan dihitung 35% dari bahan
Set
0.3500
78,500.00
27,475.00
Pekerja
OH
0.1080
45,000.00
4,860.00
Tukang Batu
OH
0.1800
60,500.00
10,890.00
Kepala Tukang
OH
0.0180
62,750.00
1,129.50
Mandor
OH
0.0054
68,250.00
Jumlah Harga per Satuan Pekerjaan Analisa J.23
368.55 138,923.05
Memasang 1 m' Pipa Galvanis Ø 4" Bahan
Tenaga Kerja
Pipa Galvanis Ø 4"
M'
1.2000
97,500.00
117,000.00
Perlengkapan dihitung 35% dari bahan
Set
0.3500
97,500.00
34,125.00
Pekerja
OH
0.1350
45,000.00
6,075.00
Tukang Batu
OH
0.2250
60,500.00
13,612.50
Kepala Tukang
OH
0.0225
62,750.00
1,411.88
Mandor
OH
0.0068
68,250.00
Jumlah Harga per Satuan Pekerjaan Analisa J.24
368.55 85,060.55
464.10 172,688.48
Memasang 1 m' Pipa PVC tipe AW Ø ½" Bahan
Tenaga Kerja
Pipa PVC tipe AW Ø ½"
M'
1.2000
4,250.00
5,100.00
Perlengkapan dihitung 35% dari bahan
Set
0.3500
4,250.00
1,487.50
Pekerja
OH
0.0360
45,000.00
1,620.00
Tukang Batu
OH
0.0600
60,500.00
3,630.00
Kepala Tukang
OH
0.0060
62,750.00
376.50
Mandor
OH
0.0018
68,250.00
Jumlah Harga per Satuan Pekerjaan
122.85 12,336.85
Halaman 13 dari 35
KEBUTUHAN
KODE ANALISA
Analisa J.25
SATUAN
INDEKS
HARGA SATUAN BAHAN/UPAH ( Rp )
Memasang 1 m' Pipa PVC tipe AW Ø ¾" Bahan
Tenaga Kerja
Pipa PVC tipe AW Ø ¾"
M'
1.2000
5,000.00
6,000.00
Perlengkapan dihitung 35% dari bahan
Set
0.3500
5,000.00
1,750.00
Pekerja
OH
0.0360
45,000.00
1,620.00
Tukang Batu
OH
0.0600
60,500.00
3,630.00
Kepala Tukang
OH
0.0060
62,750.00
376.50
Mandor
OH
0.0018
68,250.00
Jumlah Harga per Satuan Pekerjaan Analisa J.26
Tenaga Kerja
Pipa PVC tipe AW Ø 1"
M'
1.2000
7,000.00
8,400.00
Perlengkapan dihitung 35% dari bahan
Set
0.3500
7,000.00
2,450.00
Pekerja
OH
0.0360
45,000.00
1,620.00
Tukang Batu
OH
0.0600
60,500.00
3,630.00
Kepala Tukang
OH
0.0060
62,750.00
376.50
Mandor
OH
0.0018
68,250.00
Jumlah Harga per Satuan Pekerjaan
Tenaga Kerja
Pipa PVC tipe AW Ø 3"
M'
1.2000
23,500.00
28,200.00
Perlengkapan dihitung 35% dari bahan
Set
0.3500
23,500.00
8,225.00
Pekerja
OH
0.0360
45,000.00
1,620.00
Tukang Batu
OH
0.0600
60,500.00
3,630.00
Kepala Tukang
OH
0.0060
62,750.00
376.50
Mandor
OH
0.0018
68,250.00
Jumlah Harga per Satuan Pekerjaan
Tenaga Kerja
Pipa PVC tipe AW Ø 1½"
M'
1.2000
9,500.00
11,400.00
Perlengkapan dihitung 35% dari bahan
Set
0.3500
9,500.00
3,325.00
Pekerja
OH
0.0810
45,000.00
3,645.00
Tukang Batu
OH
0.1350
60,500.00
8,167.50
Kepala Tukang
OH
0.0135
62,750.00
847.13
Mandor
OH
0.0041
68,250.00
Jumlah Harga per Satuan Pekerjaan
279.83 27,664.46
Memasang 1 m' Pipa PVC tipe AW Ø 2" Bahan
Tenaga Kerja
Pipa PVC tipe AW Ø 2"
M'
1.2000
10,625.00
12,750.00
Perlengkapan dihitung 35% dari bahan
Set
0.3500
10,625.00
3,718.75
Pekerja
OH
0.0540
45,000.00
2,430.00
Tukang Batu
OH
0.0900
60,500.00
5,445.00
Kepala Tukang
OH
0.0090
62,750.00
564.75
Mandor
OH
0.0027
68,250.00
Jumlah Harga per Satuan Pekerjaan Analisa J.30
122.85 42,174.35
Memasang 1 m' Pipa PVC tipe AW Ø 1½" Bahan
Analisa J.29
122.85 16,599.35
Memasang 1 m' Pipa PVC tipe AW Ø 3" Bahan
Analisa J.28
122.85 13,499.35
Memasang 1 m' Pipa PVC tipe AW Ø 1" Bahan
Analisa J.27
JUMLAH ( Rp)
184.28 25,092.78
Memasang 1 m' Pipa PVC tipe AW Ø 2½" Bahan
Tenaga Kerja
Pipa PVC tipe AW Ø 2½"
M'
1.2000
17,500.00
21,000.00
Perlengkapan dihitung 35% dari bahan
Set
0.3500
17,500.00
6,125.00
Pekerja
OH
0.0360
45,000.00
1,620.00
Tukang Batu
OH
0.0600
60,500.00
3,630.00
Kepala Tukang
OH
0.0060
62,750.00
376.50
Mandor
OH
0.0018
68,250.00
Jumlah Harga per Satuan Pekerjaan
122.85 32,874.35
K. PEKERJAAN BESI DAN ALLUMINIUM Analisa K.1
Memasang 1 kg besi beton Bahan Tenaga Kerja
Besi beton polos
Kg
1.1500
11,000.00
12,650.00
Pekerja
OH
0.0600
45,000.00
2,700.00
Tukang Las Konstruksi
OH
0.0600
65,000.00
3,900.00
Kepala tukang
OH
0.0060
62,750.00
376.50
Mandor
OH
0.0030
68,250.00
204.75
Jumlah Harga per Satuan Pekerjaan
19,831.25
Jumlah Harga per Satuan Pekerjaan
20,275.69
Biaya perakitan 1Kg
444.44
Halaman 14 dari 35
KEBUTUHAN
KODE ANALISA
Analisa K.2
SATUAN
INDEKS
HARGA SATUAN BAHAN/UPAH ( Rp )
Memasang 1 kg besi siku Bahan Tenaga Kerja
Besi siku
Kg
1.1500
12,500.00
14,375.00
Pekerja
OH
0.0600
45,000.00
2,700.00
Tukang Las Konstruksi
OH
0.0600
65,000.00
3,900.00
Kepala tukang
OH
0.0060
62,750.00
376.50
Mandor
OH
0.0030
68,250.00
21,556.25
Jumlah Harga per Satuan Pekerjaan
22,000.69
444.44
Memasang 1 kg rangka kuda-kuda baja IWF Bahan Tenaga Kerja
Besi Profil WF
Kg
1.1500
13,500.00
15,525.00
Pekerja
OH
0.0600
45,000.00
2,700.00
Tukang Las Konstruksi
OH
0.0600
65,000.00
3,900.00
Kepala tukang
OH
0.0060
62,750.00
376.50
Mandor
OH
0.0030
68,250.00
22,706.25
Jumlah Harga per Satuan Pekerjaan
23,150.69
444.44
Mengerjakan 100 kg pekerjaan perakitan Bahan
Tenaga Kerja Alat
Analisa K.4
204.75
Jumlah Harga per Satuan Pekerjaan Biaya perakitan 1Kg Analisa K.3
204.75
Jumlah Harga per Satuan Pekerjaan Biaya perakitan 1Kg Analisa K.3
JUMLAH ( Rp)
Minyak Solar Industri
Liter
1.0000
10,900.00
10,900.00
Minyak pelumas
Liter
0.1000
27,500.00
2,750.00
Pekerja
OH
0.1000
45,000.00
4,500.00
Tukang Besi Konstruksi
OH
0.1000
60,500.00
6,050.00
Kepala tukang
OH
0.0010
62,750.00
62.75
Mandor
OH
0.0050
68,250.00
341.25
Jam
0.8000
24,800.00
19,840.00
Sewa Alat Perakitan besi 100 Kg
Jumlah Harga per Satuan Pekerjaan
44,444.00
1 Kg
Jumlah Harga per Satuan Pekerjaan
444.44
Mengerjakan 10 cm pengelasan dengan las listrik Kawat las listrik Bahan
Tenaga Kerja Alat
Kg
0.4000
15,000.00
6,000.00
Minyak Solar Industri
Liter
0.3000
10,900.00
3,270.00
Minyak pelumas
Liter
0.0400
27,500.00
1,100.00
Pekerja
OH
0.0400
45,000.00
1,800.00
Tukang Besi Konstruksi
OH
0.0200
60,500.00
1,210.00
Kepala tukang
OH
0.0020
62,750.00
125.50
Mandor
OH
0.0020
68,250.00
136.50
Sewa Alat Las Listrik
Jam
0.1700
44,000.00
7,480.00
10 Cm
Jumlah Harga per Satuan Pekerjaan
21,122.00
1 Cm
Jumlah Harga per Satuan Pekerjaan
2,112.20
M. PEKERJAAN PENUTUP LANTAI DAN DINDING Analisa M.24
Memasang 1 m2 Iantai keramik ukuran (33 x 33) cm Ubin Keramik 33 x 33 cm Bahan
Tenaga Kerja
Buah
10.0000
4,090.91
40,909.09
Semen Portland
Kg
8.1900
1,000.00
8,190.00
Pasir Pasang
M3
0.0450
115,000.00
5,175.00
Semen Nat
Kg
1.6200
1,360.00
2,203.20
Pekerja
OH
0.7000
45,000.00
31,500.00
Tukang Batu
OH
0.3500
60,500.00
21,175.00
Kepala Tukang
OH
0.0350
62,750.00
2,196.25
Mandor
OH
0.0350
68,250.00
Jumlah Harga per Satuan Pekerjaan Analisa M.25
2,388.75 113,737.29
Memasang 1 m2 Iantai keramik ukuran (30 x 30) cm Ubin Keramik 30 X 30 cm Bahan
Tenaga Kerja
Buah
11.8700
4,090.91
48,559.09
Semen Portland
Kg
10.0000
1,000.00
10,000.00
Pasir Pasang
M3
0.0450
115,000.00
5,175.00
Semen Nat
Kg
1.5000
1,360.00
2,040.00
Pekerja
OH
0.7000
45,000.00
31,500.00
Tukang Batu
OH
0.3500
60,500.00
21,175.00
Kepala Tukang
OH
0.0350
62,750.00
2,196.25
Mandor
OH
0.0350
68,250.00
Jumlah Harga per Satuan Pekerjaan
2,388.75 123,034.09
Halaman 15 dari 35
KEBUTUHAN
KODE ANALISA
Analisa M.26
SATUAN
INDEKS
HARGA SATUAN BAHAN/UPAH ( Rp )
Memasang 1 m2 Iantai keramik ukuran (20 x 20) cm Ubin Keramik 20 x 20 cm Bahan
Tenaga Kerja
Buah
26.5000
1,800.00
47,700.00
Semen Portland
Kg
10.4000
1,000.00
10,400.00
Pasir Pasang
M3
0.0450
115,000.00
5,175.00
Semen Nat
Kg
1.6200
1,360.00
2,203.20
Pekerja
OH
0.7000
45,000.00
31,500.00
Tukang Batu
OH
0.3500
60,500.00
21,175.00
Kepala Tukang
OH
0.0350
62,750.00
2,196.25
Mandor
OH
0.0350
68,250.00
Jumlah Harga per Satuan Pekerjaan Analisa M.53
2,388.75 122,738.20
1 M2 Pemasangan Paving Block Tebal 8 cm Bahan
Tenaga Kerja
Paving Block Tebal 8 cm
Buah
40.5000
2,000.00
81,000.00
Pasir Urug
M3
0.1000
95,000.00
9,500.00
Tukang Batu
OH
0.1000
60,500.00
6,050.00
Kepala Tukang
OH
0.0100
62,750.00
627.50
Pekerja
OH
0.4000
45,000.00
18,000.00
OH
0.0400
68,250.00
Mandor
Jumlah Harga per Satuan Pekerjaan Analisa M.54
JUMLAH ( Rp)
2,730.00 117,907.50
1 M2 Pemasangan Paving Block Tebal 6 cm Bahan
Tenaga Kerja
Paving Block Tebal 6 cm
Buah
40.5000
1,650.00
66,825.00
Pasir Urug
M3
0.1000
95,000.00
9,500.00
Tukang Batu
OH
0.1000
60,500.00
6,050.00
Kepala Tukang
OH
0.0100
62,750.00
627.50
Pekerja
OH
0.4000
45,000.00
18,000.00
OH
0.0400
68,250.00
Mandor
Jumlah Harga per Satuan Pekerjaan
2,730.00 103,732.50 27,407.50
Analisa M.55
1 M' Pasang Kanstin dari beton tumbuk 1 Pc : 3 Ps : 5 Kr Bahan
Beton Tumbuk 1 Pc : 3 Ps : 5 Kr
M3
0.0200
828,182.50
16,563.65
Begisting Pondasi
M3
0.1200
125,486.00
15,058.32
Jumlah Harga per Satuan Pekerjaan Analisa M.56
31,621.97
1 M2 Pemasangan Paving Block Tebal 8 cm Type Segienam Bahan
Tenaga Kerja
Paving Block Tebal 8 cm Type Segienam
Buah
36.6000
2,000.00
73,200.00
Pasir Urug
M3
0.1000
95,000.00
9,500.00
Tukang Batu
OH
0.1000
60,500.00
6,050.00
Kepala Tukang
OH
0.0100
62,750.00
627.50
Pekerja
OH
0.4000
45,000.00
18,000.00
OH
0.0400
68,250.00
Mandor
Jumlah Harga per Satuan Pekerjaan Analisa M.57
2,730.00 110,107.50
1 M2 Pemasangan Paving Block Tebal 6 cm Type Segienam Bahan
Tenaga Kerja
Paving Block Tebal 6 cm Type Segienam
Buah
36.6000
1,650.00
60,390.00
Pasir Urug
M3
0.1000
95,000.00
9,500.00
Tukang Batu
OH
0.1000
60,500.00
6,050.00
Kepala Tukang
OH
0.0100
62,750.00
627.50
Pekerja
OH
0.4000
45,000.00
18,000.00
OH
0.0400
68,250.00
Mandor
Jumlah Harga per Satuan Pekerjaan
2,730.00 97,297.50
N. PEKERJAAN PENGECATAN Analisa N.6
1 m² Mendempul dan Menggosok Kayu Bahan
Tenaga Kerja
Dempul Jadi
Kg
0.0800
25,000.00
2,000.00
Minyak Cat
Liter
0.0200
18,000.00
360.00
Batu Apung
Kg
0.0100
25,000.00
250.00
Pekerja
OH
0.0400
45,000.00
1,800.00
Tukang Cat
OH
0.0400
60,500.00
2,420.00
Kepala Tukang
OH
0.0040
62,750.00
251.00
Mandor
OH
0.0025
68,250.00
Jumlah Harga per Satuan Pekerjaan
170.63 7,251.63
Halaman 16 dari 35
KEBUTUHAN
KODE ANALISA
Analisa N.7
SATUAN
INDEKS
HARGA SATUAN BAHAN/UPAH ( Rp )
1 m² Mengecatan Bidang Kayu Lama Bahan
Tenaga Kerja
Plamir
Kg
0.1500
7,500.00
1,125.00
Cat Dasar
Kg
0.1700
36,000.00
6,120.00
Cat Penutup
Kg
0.1700
16,000.00
2,720.00
Pekerja
OH
0.0700
45,000.00
3,150.00
Tukang Cat
OH
0.0750
60,500.00
4,537.50
Kepala Tukang
OH
0.0075
62,750.00
470.63
Mandor
OH
0.0025
68,250.00
Jumlah Harga per Satuan Pekerjaan Analisa N.8
Tenaga Kerja
Cat Meni
Kg
0.2000
6,500.00
1,300.00
Plamir
Kg
0.1500
7,500.00
1,125.00
Cat Dasar
Kg
0.1700
36,000.00
6,120.00
Cat Kayu
Kg
0.2600
37,000.00
9,620.00
Pekerja
OH
0.0700
45,000.00
3,150.00
Tukang Cat
OH
0.0090
60,500.00
544.50
Kepala Tukang
OH
0.0060
62,750.00
376.50
Mandor
OH
0.0025
68,250.00
Jumlah Harga per Satuan Pekerjaan
170.63 22,406.63
1 m² Mengecat Tembok baru ( 1 Plamir, 1 lapis cat dasar, 2 Lapis Cat penutup) Bahan
Tenaga Kerja
Plamir
Kg
0.1000
7,500.00
750.00
Cat Dasar
Kg
0.1000
36,000.00
3,600.00
Cat Tembok
Kg
0.2600
16,500.00
4,290.00
Pekerja
OH
0.0200
45,000.00
900.00
Tukang Cat
OH
0.0630
60,500.00
3,811.50
Kepala Tukang
OH
0.0063
62,750.00
395.33
Mandor
OH
0.0025
68,250.00
Jumlah Harga per Satuan Pekerjaan Analisa N.24
170.63 18,293.76
1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
Bahan
Analisa N.11
JUMLAH ( Rp)
170.63 13,917.46
100 M2 Mengecat besi dengan Cat Mengkilat Bahan
Tenaga Kerja
Cat Meni besi
Kg
14.2000
15,000.00
213,000.00
Cat Besi
Kg
28.4000
37,500.00
1,065,000.00
Ampelas
Lembar
5.0000
3,800.00
19,000.00
Tukang Cat
OH
2.2500
60,500.00
136,125.00
Kepala Tukang
OH
0.2250
62,750.00
14,118.75
Pekerja
OH
15.0000
45,000.00
675,000.00
OH
0.7500
68,250.00
Mandor
51,187.50
100 M2
Jumlah Harga per Satuan Pekerjaan
2,173,431.25
1 M2
Jumlah Harga per Satuan Pekerjaan
21,734.31
O. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL Analisa O.1
1 Buah Pasang saklar Triple Bahan Tenaga Kerja
Saklar triple kualitas baik
Buah
1.0000
75,000.00
75,000.00
Instalatur Listrik
OH
0.3200
65,000.00
20,800.00
Asisten Instalatur Listrik
OH
0.1600
45,000.00
Jumlah Harga per Satuan Pekerjaan Analisa O.2
1 Buah Pasang saklar Double Bahan Tenaga Kerja
Saklar Double kualitas baik
Buah
1.0000
35,000.00
35,000.00
Instalatur Listrik
OH
0.3200
65,000.00
20,800.00
Asisten Instalatur Listrik
OH
0.1600
45,000.00
Jumlah Harga per Satuan Pekerjaan Analisa O.3
7,200.00 63,000.00
1 Buah Pasang saklar Single Bahan Tenaga Kerja
Saklar Single kualitas baik
Buah
1.0000
25,000.00
25,000.00
Instalatur Listrik
OH
0.3200
65,000.00
20,800.00
Asisten Instalatur Listrik
OH
0.1600
45,000.00
Jumlah Harga per Satuan Pekerjaan Analisa O.4
7,200.00 103,000.00
7,200.00 53,000.00
1 Buah Pasang Stopkontak Bahan Tenaga Kerja
Stop Kontak
Buah
1.0000
25,000.00
25,000.00
Instalatur Listrik
OH
0.3200
65,000.00
20,800.00
Asisten Instalatur Listrik
OH
0.1600
45,000.00
Jumlah Harga per Satuan Pekerjaan
7,200.00 53,000.00
Halaman 17 dari 35
KEBUTUHAN
KODE ANALISA
Analisa O.5
SATUAN
INDEKS
HARGA SATUAN BAHAN/UPAH ( Rp )
1 Titik Instalasi Listrik Bahan Tenaga Kerja
Kabel NYY 2,5 mm ( 3 x 2,5 )
M'
15.0000
7,000.00
105,000.00
Assecories dihitung 30% dari Bahan
Titik
1.0000
31,500.00
31,500.00
Instalatur Listrik
OH
0.3200
65,000.00
20,800.00
Asisten Instalatur Listrik
OH
0.1600
45,000.00
Jumlah Harga per Satuan Pekerjaan SUPL Analisa K.1
Analisa K.2 Analisa K.3 Analisa K.3
Bahan + Tenaga kerja
Besi baja UNP12 (12 x 55 x 5 )
Kg
92.4600
23,150.69
Besi beton Ø 16 mm
Kg
4.2660
20,275.69
86,496.09
Besi siku L. 40.40.4
Kg
22.9615
22,000.69
505,168.84
Plat tb. 4 mm
Kg
57.1553
23,150.69
1,323,183.97
Engsel, grendel dll
Kg
5.0000
23,150.69
115,753.45
Gembok besar
Bh
2.0000
65,000.00
Jumlah Harga per Satuan Pekerjaan SUPL Analisa K.2 Analisa K.3 Analisa K.1
Memasang 1 Unit Bauven besi BV1 Bahan Besi baja UNP12 (12 x 55 x 5 ) + Tenaga Besi beton Ø 16 mm kerja
Analisa K.3 Analisa K.1
2,140,512.80
130,000.00 4,301,115.15
Kg
40.8700
23,150.69
Kg
3.7920
20,275.69
Jumlah Harga per Satuan Pekerjaan SUPL Analisa K.3
7,200.00 164,500.00
Memasang 1 Unit Pintu besi P1
Analisa K.3 Analisa K.1
JUMLAH ( Rp)
946,168.70 76,885.42 1,023,054.12
Memasang 1 Unit Bauven besi BV1 Bahan + Tenaga kerja
Besi baja UNP12 (12 x 55 x 5 ) Besi beton Ø 16 mm
Kg
40.2000
23,150.69
Kg
5.5300
20,275.69
Jumlah Harga per Satuan Pekerjaan
930,657.74 112,124.57 1,042,782.31
Halaman 18 dari 35
DAFTAR HARGA SATUAN PEKERJAAN ( ANALISA SUMUR BOR ) Kode Analis
URAIAN PEKERJAAN
SATUAN (Rp)
UPAH (Rp)
BAHAN (Rp)
ALAT (Rp)
TOLAL (Rp)
1
2
3
4
5
6
8
SB.1
SB.2
SB.3
SB.4
SB.5
SB.6
SB.7
SB.8
SB.9
M'
1 M'
1 M'
1 M'
1 M'
1 M'
1 M'
1 M'
1 M'
PEMASANGAN PIPA PVC 0.4000 Oh Tukang Pipa 0.2250 Oh Pekerja 0.0110 Oh Mandor
PENGADAAN DAN PEMASANGAN PIPA BUTA GALVANIS Dia. 1" 0.1455 Oh Pekerja 0.1182 Oh Mandor 0.0073 Oh Tukang Pipa 0.0119 Oh Kepala Tukang 0.1667 Btg Pipa Galvanis Diameter 1" PENGADAAN DAN PEMASANGAN PIPA NAIK GALVANIS Dia. 2" 0.3638 Oh Pekerja 0.2955 Oh Mandor 0.0183 Oh Tukang Pipa 0.0298 Oh Kepala Tukang 0.2625 Btg Pipa Galvanis Diameter 2" 0.2500 Set Alat Bantu untuk Pek.Pengeboran PENGADAAN DAN PEMASANGAN PIPA NAIK GALVANIS Dia. 6" 0.3638 Oh Pekerja 0.2955 Oh Mandor 0.0183 Oh Tukang Pipa 0.0298 Oh Kepala Tukang 0.2625 Btg Pipa Galvanis Diameter 6" 0.1667 Alat Bantu untuk Pek.Pengeboran PENGADAAN DAN PEMASANGAN PIPA JAMBANG GALVANIS. ( 6" ) 0.3638 Oh Pekerja 0.2955 Oh Mandor 0.0183 Oh Tukang Pipa 0.0298 Oh Kepala Tukang 0.2625 Btg Pipa Galvanis Diameter 6" 0.2500 Alat Bantu untuk Pek.Pengeboran PENGADAAN DAN PEMASANGAN PIPA JAMBANG GALVANIS. ( 2" ) 0.2425 Oh Pekerja 0.1970 Oh Mandor 0.0122 Oh Tukang Pipa 0.0198 Oh Kepala Tukang 0.1667 Btg Pipa Galvanis Diameter 2" 0.1667 Jam Alat Bantu untuk Pek.Pengeboran PENGADAAN DAN PEMASANGAN PIPA SCREEN ( 4" ) 0.3638 Oh Pekerja 0.2955 Oh Mandor 0.0183 Oh Tukang Pipa 0.0298 Oh Kepala Tukang 1.0000 M' Pipa Screen Diameter 4" 0.2500 Alat Bantu untuk Pek.Pengeboran
PENGADAAN DAN PEMASANGAN PIPA SCREEN ( 6" ) 0.2425 Oh Pekerja 0.1970 Oh Mandor 0.0122 Oh Tukang Pipa 0.0198 Oh Kepala Tukang 0.1667 Btg Pipa Screen Diameter 6" 0.2500 Jam Alat Bantu untuk Pek.Pengeboran
PENGADAAN DAN PEMASANGAN PIPA PVC Dia. 8" 1.4550 Oh Pekerja 1.1820 Oh Mandor 0.0730 Oh Tukang Pipa 0.1190 Oh Kepala Tukang 0.1667 Btg Pipa PVC Diameter 8" 0.2500 Jam Alat Bantu untuk Pek.Pengeboran
60,500.00 45,000.00 68,250.00
45,000.00 68,250.00 60,500.00 62,750.00 125,000.00
45,000.00 68,250.00 60,500.00 62,750.00 321,000.00 75,000.00
45,000.00 68,250.00 60,500.00 62,750.00 1,000,000.00 75,000.00
45,000.00 68,250.00 60,500.00 62,750.00 1,000,000.00 75,000.00
45,000.00 68,250.00 60,500.00 62,750.00 321,000.00 75,000.00
45,000.00 68,250.00 60,500.00 62,750.00 532,000.00 75,000.00
45,000.00 68,250.00 60,500.00 62,750.00 1,312,500.00 75,000.00
45,000.00 68,250.00 60,500.00 62,750.00 450,000.00 75,000.00
24,200.00 10,125.00 750.75 35,075.75
-
-
6,547.50 8,067.15 441.65 746.73 15,803.03
20,837.50 20,837.50
16,368.75 20,167.88 1,104.13 1,866.81 39,507.57
84,262.50 84,262.50
18,750.00 18,750.00
142,520.07
16,368.75 20,167.88 1,104.13 1,866.81 39,507.57
262,500.00 262,500.00
12,500.00 12,500.00
314,507.57
16,368.75 20,167.88 1,104.13 1,866.81 39,507.57
262,500.00 262,500.00
18,750.00 18,750.00
320,757.57
10,912.50 13,445.25 736.08 1,244.54 26,338.37
53,510.70 53,510.70
12,500.00 12,500.00
92,349.07
16,368.75 20,167.88 1,104.13 1,866.81 39,507.57
532,000.00 532,000.00
18,750.00 18,750.00
590,257.57
10,912.50 13,445.25 736.08 1,244.54 26,338.37
218,793.75 218,793.75
18,750.00 18,750.00
263,882.12
65,475.00 80,671.50 4,416.50 7,467.25 158,030.25
75,015.00 75,015.00
18,750.00 18,750.00
251,795.25
35,075.75
36,640.53
Halaman 19 dari 35
Kode Analis 1
SB.10
SB.11
SB.12
SB.13
SB.14
SB.15
SB.16
1 M'
1 M'
1 M3
1 M'
1 M'
1 M'
1 M'
URAIAN PEKERJAAN
SATUAN (Rp)
UPAH (Rp)
BAHAN (Rp)
ALAT (Rp)
TOLAL (Rp)
2
3
4
5
6
8
PENGADAAN DAN PEMASANGAN PIPA PVC Dia. 6" 0.3638 Oh Pekerja 0.2955 Oh Mandor 0.0183 Oh Tukang Pipa 0.0298 Oh Kepala Tukang 0.2500 Btg Pipa PVC Diameter 6" 0.2500 Alat Bantu untuk Pek.Pengeboran PENGADAAN DAN PEMASANGAN PIPA PVC Dia. 4" 0.3638 Oh Pekerja 0.2955 Oh Mandor 0.0183 Oh Tukang Pipa 0.0298 Oh Kepala Tukang 0.1667 Btg Pipa PVC Diameter 4" 0.2500 Alat Bantu untuk Pek.Pengeboran
PENGADAAN DAN PEMASANGAN GREFEL PACK DIA. 3,00 - 6,00 MM 0.7270 Oh Pekerja 1.1820 Oh Mandor 0.0730 Oh Tukang Pipa 0.1180 Oh Kepala Tukang 1.0000 M3 Grafel Pak 3 - 6 mm 1.0000 Alat Bantu.
PENGEBORAN DARI 0 S/D. 30 M 0.0030 Oh Ahli Bor 0.0230 Oh Operator Bor 0.0570 Oh Pembantu Operator Bor 0.0030 Oh Mandor 0.5000 Kg Bentonit 0.9090 Jam Sewa Mesin Bor Tanah 0.9090 Jam Sewa Pompa 0.2270 Jam Sewa Generator 0.0090 Jam Mata Bor Diameter 6" PENGEBORAN DARI 30 S/D. 60 M 0.0030 Oh Ahli Bor 0.0230 Oh Operator Bor 0.0570 Oh Pembantu Operator Bor 0.0030 Oh Mandor 0.7500 Kg Bentonit 0.9090 Jam Sewa Mesin Bor Tanah 0.9090 Jam Sewa Pompa 0.2270 Jam Sewa Generator 0.0090 Bh Mata Bor Diameter 6" PENGEBORAN DARI 60 S/D. 90 M 0.0030 Oh Ahli Bor 0.0230 Oh Operator Bor 0.0570 Oh Pembantu Operator Bor 0.0030 Oh Mandor 1.0000 Kg Bentonit 0.9090 Jam Sewa Mesin Bor Tanah 0.9090 Jam Sewa Pompa 0.2270 Jam Sewa Generator 0.0090 Bh Mata Bor Diameter 6"
PENGEBORAN DARI 90 S/D. 120 M 0.0030 Oh Ahli Bor 0.0230 Oh Operator Bor 0.0570 Oh Pembantu Operator Bor 0.0030 Oh Mandor 1.2500 Kg Bentonit 0.9090 Jam Sewa Mesin Bor Tanah 0.9090 Jam Sewa Pompa 0.2270 Jam Sewa Generator 0.0090 Bh Mata Bor Diameter 6"
45,000.00 68,250.00 60,500.00 62,750.00 375,000.00 75,000.00
45,000.00 68,250.00 60,500.00 62,750.00 152,000.00 75,000.00
45,000.00 68,250.00 60,500.00 62,750.00 202,012.00 100,000.00
85,000.00 60,500.00 46,250.00 68,250.00 26,000.00 66,500.00 98,000.00 5,250.00 28,000,000.00
85,000.00 60,500.00 46,250.00 68,250.00 26,000.00 66,500.00 98,000.00 5,250.00 28,000,000.00
85,000.00 60,500.00 46,250.00 68,250.00 26,000.00 66,500.00 98,000.00 5,250.00 28,000,000.00
85,000.00 60,500.00 46,250.00 68,250.00 26,000.00 66,500.00 98,000.00 5,250.00 28,000,000.00
16,368.75 20,167.88 1,104.13 1,866.81 39,507.57
93,750.00 93,750.00
18,750.00 18,750.00
152,007.57
16,368.75 20,167.88 1,104.13 1,866.81 39,507.57
25,338.40 25,338.40
18,750.00 18,750.00
83,595.97
32,715.00 80,671.50 4,416.50 7,404.50 125,207.50
202,012.00 202,012.00
100,000.00 100,000.00
427,219.50
255.00 1,391.50 2,636.25 204.75 4,487.50
13,000.00 13,000.00
60,448.50 89,082.00 1,191.75 252,000.00 402,722.25
420,209.75
255.00 1,391.50 2,636.25 204.75 4,487.50
19,500.00 252,000.00 271,500.00
60,448.50 89,082.00 1,191.75 150,722.25
426,709.75
255.00 1,391.50 2,636.25 204.75 4,487.50
26,000.00 252,000.00 278,000.00
60,448.50 89,082.00 1,191.75 150,722.25
433,209.75
255.00 1,391.50 2,636.25 204.75 4,487.50
32,500.00 252,000.00 284,500.00
60,448.50 89,082.00 1,191.75 150,722.25
439,709.75
Halaman 20 dari 35
Kode Analis
URAIAN PEKERJAAN
SATUAN (Rp)
UPAH (Rp)
BAHAN (Rp)
ALAT (Rp)
TOLAL (Rp)
1
2
3
4
5
6
8
SB.17
SB.18
SB.19
SB.20
SB.21
SB.22
SB.23
SB.24
SB.25
1 M'
1 M'
1 M'
1 M'
1 M'
1 M'
1 M'
1 M'
1 M'
REAMING DIA 0.0030 Oh 0.0230 Oh 0.0570 Oh 0.0030 Oh 1.2500 Kg 0.9100 Jam 0.9100 Jam 0.2270 Jam 0.0090 Bh
10-12" DARI 0 S/D 30 M Ahli Bor Operator Bor Pembantu Operator Bor Mandor Bentonit Sewa Mesin Bor Tanah Sewa Pompa Sewa Generator Mata Bor Diameter 12"
REAMING DIA 0.0030 Oh 0.0230 Oh 0.0570 Oh 0.0030 Oh 1.5000 Kg 0.9090 Jam 0.9090 Jam 0.2270 Jam 0.0090 Bh
10-12" DARI 30 S/D 60 M Ahli Bor Operator Bor Pembantu Operator Bor Mandor Bentonit Sewa Mesin Bor Tanah Sewa Pompa Sewa Generator Mata Bor Diameter 12"
REAMING DIA 0.0030 Oh 0.0230 Oh 0.0570 Oh 0.0030 Oh 1.7500 Kg 0.9090 Jam 0.9090 Jam 0.2270 Jam 0.0090 Bh
10-12" DARI 60 S/D 90 M Ahli Bor Operator Bor Pembantu Operator Bor Mandor Bentonit Sewa Mesin Bor Tanah Sewa Pompa Sewa Generator Mata Bor Diameter 12"
REAMING DIA 0.0030 Oh 0.0230 Oh 0.0570 Oh 0.0030 Oh 2.0000 Kg 0.9090 Jam 0.9090 Jam 0.2270 Jam 0.0090 Bh
10-12" DARI 90 S/D 120 M Ahli Bor Operator Bor Pembantu Operator Bor Mandor Bentonit Sewa Mesin Bor Tanah Sewa Pompa Sewa Generator Mata Bor Diameter 12"
ELECTRICAL LONGING TEST 0.0030 Oh Ahli Bor 0.0230 Oh Operator Bor 0.0570 Oh Pembantu Operator Bor 0.0030 Oh Mandor 0.9090 Jam Sewa Alat Longingtest PUMPING TEST 0.0030 Oh 0.0230 Oh 0.0570 Oh 0.0030 Oh 0.9090 Jam 0.2270 Jam
Ahli Bor Operator Bor Pembantu Operator Bor Mandor Sewa Pompa Sewa Generator
ELECTRICAL LONGING TEST 0.0030 Oh Ahli Bor 0.0230 Oh Operator Bor 0.0570 Oh Pembantu Operator Bor 0.0030 Oh Mandor 0.9090 Jam Sewa Alat Longingtest PENGADAAN DAN PEMASANGAN PIPA PVC Dia. 1" 0.0146 Oh Pekerja 0.0118 Oh Mandor 0.0007 Oh Tukang Pipa 0.0012 Oh Kepala Tukang 0.2625 Btg Pipa PVC Diameter 1" 0.0100 Ls Alat Bantu untuk Pek.Pengeboran PENGADAAN DAN PEMASANGAN PIPA PVC Dia. 3/4" 0.0146 Oh Pekerja 0.0118 Oh Mandor 0.0007 Oh Tukang Pipa 0.0012 Oh Kepala Tukang 0.2625 Btg Pipa PVC Diameter 3/4"
85,000.00 60,500.00 46,250.00 68,250.00 26,000.00 66,500.00 98,000.00 5,250.00 45,000,000.00
85,000.00 60,500.00 46,250.00 68,250.00 26,000.00 66,500.00 98,000.00 5,250.00 45,000,000.00
85,000.00 60,500.00 46,250.00 68,250.00 26,000.00 66,500.00 98,000.00 5,250.00 45,000,000.00
85,000.00 60,500.00 46,250.00 68,250.00 26,000.00 66,500.00 98,000.00 5,250.00 45,000,000.00
85,000.00 60,500.00 46,250.00 68,250.00 147,000.00
85,000.00 60,500.00 46,250.00 68,250.00 98,000.00 5,250.00
85,000.00 60,500.00 46,250.00 68,250.00 147,000.00
45,000.00 68,250.00 60,500.00 62,750.00 28,000.00 75,000.00
45,000.00 68,250.00 60,500.00 62,750.00 20,000.00
255.00 1,391.50 2,636.25 204.75 4,487.50
32,500.00 405,000.00 437,500.00
255.00 1,391.50 2,636.25 204.75 4,487.50
60,515.00 89,180.00 1,191.75 150,886.75
592,874.25
39,000.00 405,000.00 444,000.00
60,448.50 89,082.00 1,191.75 150,722.25
599,209.75
255.00 1,391.50 2,636.25 204.75 4,487.50
45,500.00 405,000.00 450,500.00
60,448.50 89,082.00 1,191.75 150,722.25
605,709.75
255.00 1,391.50 2,636.25 204.75 4,487.50
52,000.00 405,000.00 457,000.00
60,448.50 89,082.00 1,191.75
255.00 1,391.50 2,636.25 204.75 4,232.50
-
255.00 1,391.50 2,636.25 204.75 4,487.50
-
255.00 1,391.50 2,636.25 204.75 4,232.50
-
654.75 806.72 44.17 74.67 1,580.31 654.75 806.72 44.17 74.67 -
-
7,350.00 7,350.00 5,250.00
150,722.25
612,209.75
133,623.00 133,623.00
137,855.50
89,082.00 1,191.75 90,273.75
94,761.25
133,623.00 133,623.00
137,855.50
750.00 750.00
9,680.31
-
Halaman 21 dari 35
Kode Analis
URAIAN PEKERJAAN
1
2
0.0100
Ls
Alat Bantu untuk Pek.Pengeboran
SATUAN (Rp)
UPAH (Rp)
BAHAN (Rp)
ALAT (Rp)
TOLAL (Rp)
3
4
5
6
8
75,000.00
1,580.31
5,250.00
750.00 750.00
7,580.31
Halaman 22 dari 35
Kode Analis
URAIAN PEKERJAAN
SATUAN (Rp)
UPAH (Rp)
BAHAN (Rp)
ALAT (Rp)
TOLAL (Rp)
1
2
3
4
5
6
8
SB.26
1 M'
PEKERJAAN PENEMPATAN DAN PENYAMBUNGAN PIPA PVC PADA TANAH KERAS / BATU 1 M 'GALIAN TANAH PIPA Ø 1" 0.0600 M3 Galian Tanah ( SNI B.4) 47,184.00 0.0200 M3 Urugan tanah (SNI B.9) 11,796.00 0.0100 M3 Pasir Urug ( SNI B.11) 128,182.50 1 M 'PEMASANGAN PIPA PVC Ø 1" 1.0500 M' Pipa PVC Ø 1" 0.0117 Hr Mandor 0.0333 Hr Tukang pipa 0.1283 Hr Pekerja 0.0385 set Alat bantu perpipaan
7,000.00 68,250.00 60,500.00 45,000.00 75,000.00
2,831.04 235.92 1,281.83 4,348.79 7,350.00 796.25 2,016.67 5,775.00
8,587.92
7,350.00
2,884.62 2,884.62
1 M ' PEMASANGAN PIPA PVC Ø 1" (PIPA TERTANAM) SB.27
1 BH PAS. Teen Ø 2" 1.0000 Bh Tee PE Ø 2" x 50 MM 1.0000 Hr Pekerja 0.9200 Hr Tukang pipa 0.2300 Hr Mandor 0.0385 Set Alat bantu baja
115,000.00 45,000.00 60,500.00 68,250.00 75,000.00
115,000.00 45,000.00 55,660.00 15,697.50 116,357.50
SB.28
1 M PENGADAAN 1.0000 Bh 1.0000 Hr 0.9200 Hr 0.2300 Hr 0.0385 Set
/PEMASANGAN BEND LAS 90º Ø 6" Bend las 90" Ø 6" Pekerja Tukang pipa Mandor Alat bantu baja
235,000.00 45,000.00 60,500.00 68,250.00 75,000.00
1 BH PENGADAAN /PEMASANGAN FLANGE LAS Ø 6" 1.0000 Bh Flamge Ø 6" 1.0000 Hr Pekerja 0.9200 Hr Tukang pipa 0.2300 Hr Mandor 0.0385 Set Alat bantu baja
250,000.00 45,000.00 60,500.00 68,250.00 75,000.00
1BH PENGADAAN /PEMASANGAN WATER MUR Ø 2" 1.0000 Bh Water mur Ø 2" 0.5000 Hr Pekerja 0.4600 Hr Tukang pipa 0.1150 Hr Mandor 0.0192 Set Alat bantu baja
135,000.00 45,000.00 60,500.00 68,250.00 75,000.00
1BH PENGADAAN /PEMASANGAN SCOK Ø 2" 1.0000 Bh Scok Giv Ø 2" 0.2500 Hr Pekerja 0.2300 Hr Tukang pipa 0.0575 Hr Mandor 0.0096 Set Alat bantu baja
40,000.00 45,000.00 60,500.00 68,250.00 75,000.00
1BH PENGADAAN /PEMASANGAN DAUBEL LEVEL GIV Ø 2" 1.0000 Bh Daubel Level Ø 2" 0.5000 Hr Pekerja 0.4600 Hr Tukang pipa 0.1150 Hr Mandor 0.0192 Set Alat bantu baja
65,000.00 45,000.00 60,500.00 68,250.00 75,000.00
1BH PENGADAAN /PEMASANGAN KNEE SCOK DRAT DALAM Ø 2" 1.0000 Bh Knee Scok drat Giv Ø 2" 0.2500 Hr Pekerja 0.2300 Hr Tukang pipa 0.0575 Hr Mandor 0.0096 Set Alat bantu baja
25,000.00 45,000.00 60,500.00 68,250.00 75,000.00
SB.35
1 Bh
1 Bh
354,242.12
250,000.00
2,884.62 2,884.62
369,242.12
1,442.31 1,442.31
194,621.06
721.15 721.15
69,810.53
1,442.31 1,442.31
124,621.06
721.15 721.15
54,810.53
-
32,556.25
135,000.00
135,000.00
40,000.00 11,250.00 13,915.00 3,924.38 40,000.00
65,000.00 22,500.00 27,830.00 7,848.75 65,000.00
25,000.00 11,250.00 13,915.00 3,924.38 29,089.38
SB.34
2,884.62 2,884.62
22,500.00 27,830.00 7,848.75
58,178.75 SB.33
235,000.00
250,000.00
29,089.38 SB.32
234,242.12
45,000.00 55,660.00 15,697.50
58,178.75 SB.31
2,884.62 2,884.62
235,000.00
116,357.50 SB.30
115,000.00
45,000.00 55,660.00 15,697.50 116,357.50
SB.29
18,822.53 23,171.32
25,000.00
Pasang kran Ø 3/4" 1.0000
Bh
Kran Ø 3/4"
0.0250
Bh
0.0100 0.1000 0.0100 0.0050
Oh Oh Oh Oh
Seal tape Pekerja Tukang pipa Kepala tukang Mandor
25,000.00
25,000.00
3,500.00 45,000.00 60,500.00 62,750.00 68,250.00
87.50 450.00 6,050.00 627.50 341.25 7,468.75
25,087.50
Pasang Stop kran Ø 2"
Halaman 23 dari 35
Kode Analis
URAIAN PEKERJAAN
1
2
SATUAN (Rp)
UPAH (Rp)
3
4
Bh
Stop Kran Ø 2"
245,000.00
0.0250
Bh
0.0100 0.1000 0.0100 0.0050
Oh Oh Oh Oh
Seal tape Pekerja Tukang pipa Kepala tukang Mandor
45,000.00 60,500.00 62,750.00 68,250.00
1.0000
BAHAN (Rp)
ALAT (Rp)
TOLAL (Rp)
5
6
8
245,000.00
3,500.00
87.50 450.00 6,050.00 627.50 341.25 7,468.75
245,087.50
-
252,556.25
Halaman 24 dari 35
HARGA SATUAN UPAH, BAHAN DAN SEWA PERALATAN KABUPATEN LAMPUNG BARAT TAHUN 2013
NO
JENIS UPAH
HARGA UPAH ( Rp )
SATUAN ( Rp )
1
Pekerja
45,000.00
Oh
2
Tukang Batu
60,500.00
Oh
3
Tukang Besi
60,500.00
Oh
4
Tukang Besi Konstruksi
60,500.00
Oh
5
Tukang Cat
60,500.00
Oh
6
Tukang Gali
47,500.00
Oh
7
Tukang Kayu
60,500.00
Oh
8
Tukang Khusus Aluminium
65,000.00
Oh
9
Tukang Las Konstruksi
65,000.00
Oh
10
Tukang Las Biasa
53,500.00
Oh
11
Kepala Tukang
62,750.00
Oh
12
Instalatur Listrik
65,000.00
Oh
13
Asisten Instalatur Listrik
45,000.00
Oh
14
Ahli Bor
85,000.00
Oh
15
Operator Bor
60,500.00
Oh
16
Pembantu Operator Bor
46,250.00
Oh
17
Tukang Pipa
60,500.00
Oh
18
Mandor
68,250.00
Oh
19
Pekerja Terampil
42,500.00
Oh
20
Surveyor Geodesi
75,000.00
Oh
NO
JENIS BAHAN
1
Air
2
Alat Bantu ( set @ 3 alat)
3
Alat Bantu bantu pengeboran
4
Ampelas
5
Badkip
6
Bahan Bakar Minyak
7
Bak Fiberglass Volume 3,00 M3
8
Bata Merah
9
Batacote
HARGA BAHAN
SATUAN
Rp.
Rp. 50.00
Liter
100,000.00
Set
75,000.00
Set
3,800.00
Lbr
1,500,000.00
bh
4,500.00
Ltr
5,500,000.00
bh
300.00
bh
3,500.00
Kg
10
Batu Apung
25,000.00
Kg
11
Batu belah 15 cm/20 cm
131,000.00
m3
12
Batu belah 10 cm/15 cm
135,000.00
m3
13
Batu Belah 5 / 20
131,000.00
m3
14
Batu pecah 2/3 cm
230,000.00
m3
15
Batu Kerikil
202,012.00
m3
16
Batu Koral
202,012.00
m3
17
Bentonit
26,000.00
Kg
18
Besi beton ulir
12,500.00
Kg
19
Besi beton polos
11,000.00
Kg
20
Besi plat baja
13,500.00
Kg
21
Besi Profil
13,000.00
Kg
22
Besi Profil WF
13,500.00
Kg
23
12,500.00
Kg
24
Besi siku Bend las 90" Ø 6"
25
Box panel komplit untuk pompa
26
Cat Tembok
16,500.00
Kg
27
Cat Antara
16,500.00
Kg
28
Cat Dasar
36,000.00
Kg
29
Cat Kayu
37,000.00
Kg
30
Cat Meni
6,500.00
Kg
31
Cat Meni besi
15,000.00
Kg
32
Cat Penutup
16,000.00
Kg
33
Cat Besi
37,500.00
Kg
34
Dempul
9,000.00
Kg
35
Dempul Jadi
25,000.00
Kg
36
20,000.00
btg
37
Dolken Kayu Kelas III Ø 8 - 10/400 cm Daubel Level Ø 2"
65,000.00
Bh
38
Engsel Angin
12,000.00
Bh
39
Engsel Jendela
18,000.00
Bh
40
Engsel Pintu
25,000.00
Bh
235,000.00 5,500,000.00
KETERANGAN
Keterangan
Bh Unit
Halaman 25 dari 35
NO
JENIS BAHAN
HARGA BAHAN
SATUAN
Rp.
Rp.
41
Elextroda
42
Flamge Ø 6"
250,000.00
35,000.00
Bh
43
Grafel Pak 3 - 6 mm
175,000.00
Buah
44
Gymfloor
150,000.00
m2
45
Ijuk
7,000.00
m3
46
Kabel NYY 2,5 mm ( 2 x 2,5 )
6,000.00
Meter
47
Kabel NYY 2,5 mm ( 3 x 2,5 )
7,000.00
Meter
48
Kanstin
15,000.00
Buah
49
Kawat Beton
14,000.00
Kg
50
Kawat las listrik
15,000.00
Kg
51
Kayu Kelas II ( 2 x 3 Cm)
2,650,000.00
m3
52
Kayu Kelas II ( 3 x 4 Cm)
2,650,000.00
m3
53
Kayu Kelas II ( 5 x 7 cm)
2,650,000.00
m3
54
Kayu kelas II (balok)
2,650,000.00
m3
55
Kayu Kelas II (Papan)
3,400,000.00
m3
56
Kayu Kelas III ( 3 cm x 20 cm)
1,850,000.00
m3
57
Kayu Kelas III ( 5 x 7 cm)
1,850,000.00
m3
58
Kayu Kelas III (Balok)
1,850,000.00
m3
59
Kayu kelas III (papan)
1,950,000.00
m3
60
Kayu Kelas IV
1,750,000.00
m3
61
Kabel NYYHY 3 x 4 x 100 mm
1,100,000.00
Rol
62
Kabel NYYHY 3 x 1 1/5 x 100 mm
1,450,000.00
Rol
63
Keramik 10 x 20 cm
3,200.00
Bh
64
Keramik 15 x 20 cm
1,200.00
Bh
65
1,800.00
Bh
66
Keramik 20 x 20 cm Knee Scok drat Giv Ø 2"
25,000.00
Bh
67
Kran Air Ø 3/4"
25,000.00
bh
68
Kuas
10,000.00
Bh
69
Klem Pipa PVC Diameter 1"
475.00
Bh
70
Klem Pipa PVC Diameter 1/2"
350.00
Bh
71
Klem Pipa PVC Diameter 3"
750.00
Bh
72
Klem Pipa PVC Diameter 3/4"
375.00
Bh
73
Klem Pipa PVC Diameter 4"
850.00
Bh
74
Knee "L" PVC Diameter 1"
3,500.00
Bh
75
Knee "L" PVC Diameter 1/2"
2,500.00
Bh
76
Knee "L" PVC Diameter 3"
27,500.00
Bh
77
Knee "L" PVC Diameter 3/4"
3,000.00
Bh
78
Knee "L" PVC Diameter 4"
56,000.00
Bh
79
Knee Gip dia 3/4"
4,000.00
Bh
80
Lampu Pijar 25 Watt
7,500.00
Bh
81
Lampu SL 18 watt
82
Mata Bor Diameter 4"
17,000,000.00
Buah
83
Mata Bor Diameter 6"
28,000,000.00
Buah
84
Mata Bor Diameter 8"
35,000,000.00
Buah
85
Mata Bor Diameter 12"
45,000,000.00
Buah
86
Minyak Bekisting
87
40,250.00
Keterangan
Bh
Bh
4,500.00
lt
Minyak Cat
18,000.00
Liter
88
Minyak Pelumas
27,500.00
Liter
89
Minyak Solar Industri
10,900.00
Kg
90
Paku 1 cm - 2,5 cm
15,000.00
Kg
91
Paku 12 cm
15,000.00
Kg
92
Paku 5 cm - 10 cm
15,000.00
Kg
93
Paku 5 cm - 12 cm
15,000.00
Kg
94
Paku 5 cm - 7 cm
15,000.00
Kg
95
Paku 7 cm - 10 cm
15,000.00
Kg
96
Paku Biasa ½" - 1"
15,000.00
Kg
97
Paku Biasa 1/2" - 1"
15,000.00
Kg
98
Paku Biasa 2" - 5"
15,000.00
Kg
99
Pasir Beton
125,000.00
m3
100
Pasir Pasang
115,000.00
m3
101
Pasir Silika
15,000.00
Kg
102
Pasir Urug
95,000.00
m3
103
Paving Block Tebal 6 cm
1,650.00
Buah
104
Paving Block Tebal 8 cm
2,000.00
Buah
105
Paving Block Tebal 6 cm Type Segienam
1,650.00
Buah
106
Paving Block Tebal 8 cm Type Segienam
2,000.00
Buah
107
Pengencer
6,000.00
Ltr
108
Perancah Kayu
1,200,000.00
m3
109
Perekat
50,000.00
Kg
Halaman 26 dari 35
NO
JENIS BAHAN
HARGA BAHAN
SATUAN
Rp.
Rp.
Keterangan
110
Pipa Galvanis Diameter 4"
97,500.00
m'
390,000.00
Btg
111
Pipa Galvanis Diameter 2.5"
56,500.00
m'
226,000.00
Btg
112
Pipa Galvanis Diameter 6"
250,000.00
m'
1,000,000.00
Btg
113
Pipa Galvanis Diameter 8"
300,000.00
m'
1,200,000.00
Btg
114
Pipa Galvanis Ø ½"
18,750.00
m'
75,000.00
Btg
115
Pipa Galvanis Ø ¾"
24,000.00
m'
96,000.00
Btg
116
Pipa Galvanis Ø 1"
31,250.00
m'
125,000.00
Btg
117
Pipa Galvanis Ø 1½"
43,750.00
m'
175,000.00
Btg
118
Pipa Galvanis Ø 2"
80,250.00
m'
321,000.00
Btg
119
Pipa Galvanis Ø 3"
78,500.00
m'
314,000.00
Btg
120
Pipa Galvanis Ø 4"
97,500.00
m'
390,000.00
Btg
121
Pipa PVC Diameter 2,5"
27,500.00
m'
110,000.00
Btg
122
Pipa PVC Diameter 4"
30,250.00
m'
121,000.00
Btg
123
Pipa PVC Diameter 6"
93,750.00
m'
375,000.00
Btg
124
Pipa PVC Diameter 8"
112,500.00
m'
450,000.00
Btg
125
Pipa PVC tipe AW Ø ½"
4,250.00
m'
17,000.00
Btg
126
Pipa PVC tipe AW Ø ¾"
5,000.00
m'
20,000.00
Btg
127
Pipa PVC tipe AW Ø 1"
7,000.00
m'
28,000.00
Btg
128
Pipa PVC tipe AW Ø 1½"
9,500.00
m'
38,000.00
Btg
129
Pipa PVC tipe AW Ø 2"
10,625.00
m'
42,500.00
Btg
130
Pipa PVC tipe AW Ø 2½"
17,500.00
m'
70,000.00
Btg
131
Pipa PVC tipe AW Ø 3"
23,500.00
m'
94,000.00
Btg
132
Pipa PVC tipe AW Ø 4"
38,000.00
m'
152,000.00
Btg
133
Pipa Screen Diameter 4"
133,000.00
m'
532,000.00
Btg
134
Pipa Screen Diameter 6"
328,125.00
m'
1,312,500.00
Btg
135
Plamir
7,500.00
Kg
136
Plamuur Tembok
12,800.00
Kg
137
Plywood tebal 9 mm
125,000.00
lbr
138
Porselen 20 x 20 cm warna
139
Pompa Air Jet Pump
140
Pompa Summersible kap 2-3 Liter/Detik 3 PK
18,500,000.00
Unit
141
Saklar Double kualitas baik
35,000.00
Buah
142
Saklar Single kualitas baik
25,000.00
Buah
143
Saklar Triple kualitas baik
75,000.00
Buah
144
Seal tape
145
Sealant
146
Semen Abu -abu
1,360.00
Kg
147
Semen Merah
1,360.00
M3
148
Semen Nat
1,360.00
Kg
149
Semen Portland
1,000.00
Kg
150
Shock lurus PVC Diameter 3"
45,000.00
Buah
151
Shockdrat dalam Gip Diameter 1"
17,500.00
Buah
152
Shockdrat dalam Gip Diameter 1/2"
13,800.00
Buah
153
Shockdrat dalam Gip Diameter 4"
55,000.00
Buah
154
Shockdrat dalam PVC Diameter 3"
22,500.00
Buah
155
Shockdrat dalam PVC Diameter 3/4"
2,500.00
Buah
156
Shockdrat dalam PVC Diameter 4"
27,500.00
Buah
157
Shockdrat luar Gip Diameter 1"
17,500.00
Buah
158
Shockdrat luar Gip Diameter 1/2"
13,800.00
Buah
159
Shockdrat luar Gip Diameter 4"
55,000.00
Buah
160
Shockdrat luar PVC Diameter 3"
22,500.00
Buah
161
Shockdrat luar PVC Diameter 3/4"
2,500.00
Buah
162
Shockdrat luar PVC Diameter 4"
27,500.00
Buah
163
Shower air
450,000.00
Buah
164
500.00
Buah
165
Skrup fixer Scok Giv Ø 2"
40,000.00
166
Stop kran Ø 2"
245,000.00
Bh
167
Stop Kontak
25,000.00
Buah
168
Strorox - 100
55,000.00
Kg
169
75,000.00
M3
170
Tanah urugan Tali seling baja Ø 8 mm
171
Tee PE Ø 2" x 50 MM
172 173
1,500.00 3,500,000.00
Bh Unit
3,500.00
bh
20,000.00
Tube
Bh
45,000.00
M'
115,000.00
Bh
Ubin Keramik 20 x 20 cm
1,800.00
bh
Ubin Keramik 25 x 25 cm
2,450.00
bh
174
Ubin Keramik 30 X 30 cm
4,090.91
bh
175
Ubin Keramik 33 x 33 cm
4,090.91
bh
176
Ubin Keramik 33 x 33 cm anti slip
8,000.00
bh
177
Water Drain + Asesories Water mur Ø 2"
75,000.00
set
135,000.00
Bh
63,300.00
Jam
178
SEWA PERALATAN 1
Alat Bantu untuk Pek.Pengeboran
Halaman 27 dari 35
NO
JENIS BAHAN 2
Alat Bantu.
3
Sewa Alat Longingtest
4
Sewa Generator
5
HARGA BAHAN
SATUAN
Rp.
Rp.
49,500.00
Jam
147,000.00
Jam
5,250.00
Jam
Sewa Mesin Bor Tanah
66,500.00
Jam
6
Sewa Pompa
98,000.00
Jam
7
Sewa Alat Las Listrik
44,000.00
Jam
8
Sewa Alat Perakitan besi
24,800.00
Jam
9
Kompresor, Blasting Pot , Selang Dan Nozzle
85,000.00
Jam
10
Sewa Dump Truck 5 T
128,409.00
Jam
11
Sewa Alat Water Pass/Theodolit
300,000.00
Hari
12
Compressor
62,016.00
Jam
13
Dump Truck
128,409.00
Jam
Keterangan
Halaman 28 dari 35
ESTIMATE ENGINEERING (EE) KEGIATAN PEKERJAAN LOKASI T. ANGGARAN
: : : :
PENGEMBANGAN SARANA DAN PRASARANA PERTANIAN PEMBUATAN SUMUR BOR DAN SARANANYA LAMPUNG BARAT 2013
NO.
URAIAN PEKERJAAN
I
KODE ANALISA
SAT.
VOLUME
HARGA SATUAN ( Rp )
JUMLAH HARGA ( Rp )
PEKERJAN PERSIAPAN 1
Mobolisasi alat
Ls
1.00
2,500,000.00
2,500,000.00
2
Sewa Direksi keet dan gudang
Ls
1.00
1,500,000.00
1,500,000.00
3
Dokumentasi dan laporan kegiatan
Ls
1.00
350,000.00
350,000.00
4
P3K
Ls
1.00
300,000.00
300,000.00
5
Papan nama kegiatan
Ls
1.00
250,000.00 Jumlah
II
250,000.00 4,900,000.00
PEKERJAN PEMBUATAN SUMUR BOR
A 1
2
PEKERJAAN PENGEBORAN Pekerjaan Pengeboran Kedalaman 120 M mata bor Ø 8" Termasuk Pengadaan Bentonit dan lain - lain - Dari 0 M ke 30 M - Dari 30 M ke 60 M - Dari 60 M ke 90 M - Dari 90 M ke 120 M Pembesaran Lubang Bor / Reaming untuk sumur Ø 10" - Ø 12"
SB.13 SB.14 SB.15 SB.16
M M M M
30.00 30.00 30.00 30.00
420,209.75 426,709.75 433,209.75 439,709.75
12,606,292.50 12,801,292.50 12,996,292.50 13,191,292.50
- Dari
0 M ke 30 M
SB.17
M
30.00
592,874.25
17,786,227.50
- Dari
30 M ke 60 M
SB.18
M
30.00
599,209.75
17,976,292.50
- Dari
60 M ke 90 M
SB.19
M
30.00
605,709.75
18,171,292.50
- Dari
90 M ke 120 M
SB.20
M
30.00
612,209.75 Jumlah
B
18,366,292.50 123,895,275.00
PENGADAAN / PEMASANGAN INSTALASI PIPA SARINGAN 1
2
3
4
5
Pipa Jambang / Pump Housing/hisap
SB.6
M
94.00
92,349.07
8,680,812.580
SB.10
M
104.00
152,007.57
15,808,787.280
SB.8
M
16.00
263,882.12
4,222,113.920
SB.2
M
104.00
36,640.53
3,810,615.12
- Tee PE Ø 2" x 50 MM
SB.27
Bh
1.00
234,242.12
234,242.12
- Bend las 90º GIV Ø 2"
SB.28
Bh
1.00
354,242.12
354,242.12
- Flange las Ø 6"
SB.29
Bh
1.00
369,242.12
369,242.12
- Water mur Ø 2"
SB.30
Bh
1.00
194,621.06
194,621.06
- Knee Ø 2"
SB.33
Bh
1.00
54,810.53
54,810.53
- Daubel level
SB.32
Bh
4.00
124,621.06
498,484.23
- Scok giv Ø 2"
SB.31
Bh
12.00
69,810.53
837,726.35
SB.21
Hr
15.00
137,855.50
2,067,832.50
Ls
1.00
2,500,000.00
2,500,000.00
SB.12
M3
6.56
316,559.00
2,077,766.58
6.5
M3
0.48
668,976.85
321,945.11
LS
1.00
1,200,000.00
1,200,000.00
Jenis - Pipa
: Galvanis
Klas- Pipa
: Medium
Diameter -
: 2"
Pipa Casing Jenis - Pipa
: PVC
Klas- Pipa
: AW 1
Diameter -
: 6"
Buat Pipa Saringan ( Screen ) Jenis - Pipa
: PVC
Klas- Pipa
: AW 1
Diameter -
: 6"
Pipa Butu untuk Pizzo meter Jenis - Pipa
: Galvanis
Klas- Pipa
: Medium
Diameter -
: 1"
Pengadaan / Pemasangan Pipa GI dan accessories untuk sumur bor
6
Logging Test/Bore Hole logging SP Resistivity, Gamma
7
Test Geolistrik
8
Pengadaan / Pemasangan Gravel Pack/Filter Gravel
9
Peek. Plat beton sdk. 1:2:3 tebal 15 cm
10
Wall Head Grouting dan lain-lain
11
Pek. Box Pelindung sumur bor pas, bata adk.1:4
Analisa D.9
M2
3.02
58,646.25
177,346.26
12
Pek. Box Pelindung sumur bor Pek. Plesteran adk.1:4
Analisa E.4
M2
4.16
33,540.00
139,459.32
13
Pek. Box Pelindung sumur bor Pek. Aci adk.1:4
Analisa E.27
M2
4.16
19,610.00
81,538.38
14
Pek. Tutup besi siku L.40.40.4 dan plat tb. 4 mm
6.15+6.16
Kg
63.56
23,599.17
1,499,929.14
15
Pas. Tali seling baja Ø 8 mm penahan pompa
M'
100.00
45,000.00 Jumlah
4,500,000.00 49,631,514.703
NO.
URAIAN PEKERJAAN
C
HARGA SATUAN ( Rp )
KODE ANALISA
SAT.
SB.22
Jam
24.00
94,761.25
Spl
2.00
1,350,000.00
VOLUME
JUMLAH HARGA ( Rp )
PENCUCIAN / PEMBERSIHAN LUBANG BOR TERMASUK UJI COBA 1
Pemompaan Uji termasuk Steep Draw Test Long, Period Test,
2,274,270.000
Reconvery Test. 2
Test samping Air Bersih pada Laboratorium Depkes
Jumlah III
2,700,000.000 4,974,270.000
PASANG POMPA DAN TOWER 1
Pas. Pompa Samersible 3 PK setara Grundfos
2
Pek. Pas. Tower
Unit
1.00
18,500,000.00
18,500,000.000 165,047.426
- Pek.Galian tanah pondasi
Analisa B.1
M3
4.65
35,456.25
- Pek.Urugan tanah kembali bekas galian
Analisa B.9
M3
1.16
11,796.00
13,727.477
- Pek. Timbunan tanah
Analisa B.16
M3
1.00
102,956.25
102,965.516
- Pek. Urugan pasir tb. 5 cm
Analisa B.11
M3
2.15
128,182.50
275,984.453
- Pek. Lantai kerja beton K175. tb. 3 cm
Analisa G.5
M3
0.86
524,960.98
452,665.060
- Pek. Beton pondasi plat K 225 tb. 20 cm
Analisa G.35
M3
0.69
3,466,358.39
2,400,002.558
- Pek. Pondasi batu belah adk.1:4
Analisa C.2
M3
2.08
502,700.00
1,044,163.197
- Pek. Batu kosong
Analisa C.6
M3
0.79
262,044.00
207,350.176
- Pek. Lantai pelataran beton K225 tb. 7 cm
Analisa G.7
M3
1.65
808,119.25
1,332,184.584
- Pek. Batu bata adk.1:4 drainase
Analisa D.9
M2
23.13
58,646.25
1,356,487.763
- Pek. Plesteran adk.1:4 dinding, lantai dan drainase
Analisa E.4
M2
45.10
33,540.00
1,512,595.305
- Pek. Acian
Analisa E.27
M2
45.10
19,610.00
884,376.683
3
Pas. Pelampung otamatis
Bh
1.00
75,000.00
75,000.000
4
Pas. Bak resovoir kap. 3 M3
Bh
1.00
5,500,000.00
5,500,000.000
5
Pas. Pipa Giv Ø 2" Pompa ke tower dan Kolam
SB.3
M'
15.00
142,520.07
2,137,801.050
6
Pas. Pipa PVC Ø 3/4" pipa untuk kran
SB.25
M'
2.00
7,580.31
15,160.620
7
Pas. Pipa PVC Ø 1" air limpah
SB.26
M'
6.00
18,822.53
112,935.192
8
Pas. Stop Kran Ø 2"
SB.35
Bh
1.00
252,556.25
252,556.250
9
Pas. Kran Ø 3/4"
SB.34
Bh
8.00
32,556.25
260,450.000
10
Pas. Box Panel komplit
Bh
1.00
5,500,000.00
5,500,000.000
11
Pas. Kabel NYYHY 3 x 4 x 100 mm
Rol
1.00
1,100,000.00
1,100,000.000
12
Pas. Kabel NYYHY 3 x 1 1/5 x 100 mm
Rol
1.00
1,450,000.00
1,450,000.000
13
Pas. Elextroda
Bh
5.00
35,000.00
175,000.000
14
Kabel Tis untuk ikan kabel
M'
5.00
35,000.00 Jumlah
Jumlah Pekerjaan Sumur Bor IV
175,000.000 45,001,453.310 228,402,513.013
PEKERJAAN RUMAH GENZET
IV.I
PEKERJAAN PERSIAPAN 1
Pek. Bauwplang
Analisa A.4
M'
12.00
46,968.75 Jumlah
IV.II
563,625.000 563,625.000
PEKERJAAN TANAH 1
Pek. Galian tanah
Analisa B.1
M3
6.75
35,456.25
2
Pek. Urugan kembali bekas galian
Analisa B.9
M3
1.69
11,796.00
19,905.750
3
Pek. Urugan pasir dibawah pondasi dan lantai
Analisa B.11
M3
1.45
128,182.50
185,864.625
4
Pek. Timbunan peninggian lantai
Analisa B.16
M3
1.60
102,956.25 Jumlah
IV.III
239,329.688
164,730.000 609,830.063
PEKERJAAN BETON 1
Pek, Beton Sloof 15/20
Analisa G.36
M3
0.30
4,080,645.92
1,224,193.777
2
Pek. Beton kolom 11/20
Analisa G.37
M3
0.26
9,129,498.01
2,370,017.683
3
Pek, Beton balok 11/20
Analisa G.38
M3
0.11
6,309,347.32
694,028.205
4
Pek. Plat dak beton tb. 10 cm
Analisa G.29
M3
2.00
4,773,027.50
9,546,055.000
5
Pek. Lisplang beton tb. 8/40 cm
Analisa G.29
M3
0.58
4,773,027.50
2,749,263.840
6
Pek. Beton pondasi genzet
Analisa G.29
M3
0.32
4,773,027.50 Jumlah
IV.IV
1,527,368.800 18,110,927.305
PEKERJAAN PASANGAN 1
Pek, Pondasi batu kali adk.1:4
Analisa C.2
M3
3.50
502,700.00
1,759,450.000
2
Pek. Dinding batu bata adk.1:4
Analisa D.9
M2
24.57
58,646.25
1,440,762.424
3
Pek. Plesteran adk.1:4
Analisa E.4
M2
51.83
33,540.00
1,738,512.360
4
Pek. Plesteran beton adk.1:2
Analisa E.2
M2
57.28
37,064.00
2,123,025.920
5
Pek. Acian
Analisa E.27
M2
109.11
19,610.00
2,139,725.540
6
Pek. Line batu bata adk,1:4 rabat
Analisa D.9
M2
5.40
58,646.25 Jumlah
IV.V
316,689.750 9,518,165.994
PEKERJAAN LANTAI 1
Pek. Lantai dalam beton K225 tb. 10 cm
Analisa G.7
M3
0.60
808,119.25
2
Pek. Rabat beton K175 tb. 5 cm
Analisa G.5
M3
0.70
524,960.98 Jumlah
484,871.550 367,472.686 852,344.236
NO.
URAIAN PEKERJAAN
IV.VI
KODE ANALISA
SAT.
VOLUME
HARGA SATUAN ( Rp )
JUMLAH HARGA ( Rp )
PEKERJAAN KUSEN 1
Pek. Kusen pintu besi P1 lengkap
SUPL Analisa K.1
Unit
1.00
4,301,115.15
4,301,115.150
2
Pek. Kusen Bauven besi BV1
SUPL Analisa K.2
Unit
2.00
1,023,054.12
2,046,108.240
3
Pek. Kusen Bauven besi BV2
SUPL Analisa K.3
Unit
1.00
1,042,782.31 Jumlah
IV.VII
1,042,782.310 7,390,005.700
PEKERJAAN PENGECATAN 1
Pek. Pengecatan tembok
Analisa N.11
M2
106.41
13,917.46
2
Pek. pengecatan besi
Analisa N.24
M2
9.89
21,734.31 Jumlah
IV.VIII
1,481,012.588 215,053.173 1,696,065.762
PEKERJAAN INSTALASI LISTRIK
1
Pek. Titik api lampu dan stop kontak
Titik
4.00
164,500.00
658,000.000
2
Pas. Box termis
Analisa O.5
Bh
1.00
75,000.00
75,000.000
3
Pas. Lampu SL 18 watt
Bh
2.00
40,250.00
80,500.000
4
Pas, Stop kontak
Analisa O.4
Bh
2.00
53,000.00
106,000.000
5
Pas. Saklar daubel
Analisa O.2
Bh
1.00
63,000.00 Jumlah
IV.IX
63,000.000 982,500.000
PEKERJAAN LAIN-LAIN 1
Pengadaan mesin genzet 5000 Watt lengkap
Unit
1.00
7,500,000.00 Jumlah
Jumlah Pekerjaan Rumah Genzet Total
7,500,000.000 7,500,000.000 47,223,464.059 275,625,977.072
REKAPlTULASl KEGIATAN
:
PENGEMBANGAN SARANA DAN PRASARANA PERTANIAN
PEKERJAAN
:
PEMBUATAN SUMUR BOR DAN SARANANYA
LOKASl
:
LAMPUNG BARAT
T.ANGGARAN
:
2013
No
URAIAN PEKERJAAN
I
PEKERJAN PERSIAPAN
II
PEKERJAN PEMBUATAN SUMUR BOR
A
TOTAL
Rp.
4,900,000.00
PEKERJAAN PENGEBORAN
Rp.
123,895,275.00
B
PENGADAAN / PEMASANGAN INSTALASI PIPA SARINGAN
Rp.
49,631,514.70
C
PENCUCIAN / PEMBERSIHAN LUBANG BOR TERMASUK UJI COBA
Rp.
4,974,270.00
III
PASANG POMPA DAN TOWER
Rp.
45,001,453.31
IV
PEKERJAAN RUMAH GENZET
IV.I
PEKERJAAN PERSIAPAN
Rp.
563,625.00
IV.II
PEKERJAAN TANAH
Rp.
609,830.06
IV.III
PEKERJAAN BETON
Rp.
18,110,927.31
IV.IV
PEKERJAAN PASANGAN
Rp.
9,518,165.99
IV.V
PEKERJAAN LANTAI
Rp.
852,344.24
IV.VI
PEKERJAAN KUSEN
Rp.
7,390,005.70
IV.VII
PEKERJAAN PENGECATAN
Rp.
1,696,065.76
IV.VIII
PEKERJAAN INSTALASI LISTRIK
Rp.
982,500.00
PEKERJAAN LAIN-LAIN
Rp.
7,500,000.00
JUMLAH
Rp.
275,625,977.07
P P N 10 %
Rp.
27,562,597.71
TOTAL
Rp.
303,188,574.78
DIBULATKAN
Rp.
303,100,000.00
IV.IX
TERBILANG :
Lampung barat, April 2013 KONSULTAN PERENCANA CV. ...............................
.................................. DIREKTUR
URAIAN PEKERJAAN
NO I 1 2 3 4 5 II A 1
2
B 1
2
3
4
5
6 7 8 9 10 11 12 13 14
C 1 2 III 1 2
KET
KET
PANJANG
LEBAR
TINGGI
Pondasi Drainase
6.59 18.09 10.00
0.80 0.50 0.50
Pondasi Drainase Lantai plat Lantai
1.54 6.59 18.09 3.46 15.70
Lantai plat Lantai
JML
SISI
ISI
VOLUME
SAT
0.35 0.20 0.20
1.85 1.81 1.00 4.65
4.65
m3
0.65 0.80 0.50 1.50 1.50
0.05 0.05 0.05 0.05
0.26 0.45 0.26 1.18 2.15
1.16 1.00 2.15
m3 m3 m3
3.46 15.70
1.50 1.50
0.03 0.03
0.16 0.71 0.86
0.86
m3
0.69 2.08
m3 m3
0.79 1.65
m3 m3
PEKERJAN PERSIAPAN Mobolisasi alat Sewa Direksi keet dan gudang Dokumentasi dan laporan kegiatan P3K Papan nama kegiatan PEKERJAN PEMBUATAN SUMUR BOR PEKERJAAN PENGEBORAN Pekerjaan Pengeboran Kedalaman 120 M mata bor Ø 8" Termasuk Pengadaan Bentonit dan lain - lain - Dari 0 M ke 30 M - Dari 30 M ke 60 M - Dari 60 M ke 90 M - Dari 90 M ke 120 M Pembesaran Lubang Bor / Reaming untuk sumur Ø 10" - Ø 12" - Dari 0 M ke 30 M - Dari 30 M ke 60 M - Dari 60 M ke 90 M - Dari 90 M ke 120 M PENGADAAN / PEMASANGAN INSTALASI PIPA SARINGAN Pipa Jambang / Pump Housing/hisap J-enis Pipa : Galvanis K - las Pipa : Medium D - iameter : 2" Pipa Casing J-enis Pipa : PVC K - las Pipa : AW 1 D - iameter : 6" Buat Pipa Saringan ( Screen ) J-enis Pipa : PVC K - las Pipa : AW 1 D - iameter : 6" Pipa Butu untuk Pizzo meter J-enis Pipa : Galvanis K - las Pipa : Medium D - iameter : 1" Pengadaan / Pemasangan Pipa GI dan accessories untuk sumur bor Tee PE Ø 2" x 50 MM Bend las 90º GIV Ø 2" Flange las Ø 6" Water mur Ø 2" Knee Ø 2" Daubel level Scok giv Ø 2" Logging Test/Bore Hole logging SP Resistivity, Gamma Test Geolistrik Pengadaan / Pemasangan Gravel Pack/Filter Gravel Peek. Plat beton sdk. 1:2:3 tebal 15 cm Wall Head Grouting dan lain-lain Pek. Box Pelindung sumur bor pas, bata adk.1:4 Pek. Box Pelindung sumur bor Pek. Plesteran + Aci adk.1:4 Pek. Tutup besi siku L.40.40.4 dan plat tb. 4 mm Pas. Tali seling baja Ø 10 mm penahan pompa
PENCUCIAN / PEMBERSIHAN LUBANG BOR TERMASUK UJI COBA Pemompaan Uji termasuk Steep Draw Test Long, Period Test, Reconvery Test. Test samping Air Bersih pada Laboratorium Depkes PASANG POMPA DAN TOWER Pas. Pompa Samersible 3 PK setara Grundfos Pek. Pas. Tower Pek.Galian tanah pondasi
-
Pek. Urugan tanah kembali bekas galian Pek. Timbunan tanah Pek. Urugan pasir tb. 5 cm
-
Pek. Lantai kerja tb. 3 cm
-
Pek. Beton pondasi plat K 225 Pek. Pondasi batu belah adk.1:4
3.46 6.59 6.59
0.35 0.18
0.20 0.80 0.20
-
Pek. Batu kosong Pek. Lantai pelataran beton K225 tb. 7 cm
6.59 15.70
0.60 1.50
0.20 0.07
1.85 0.23 2.08
-
Pek. Batu bata adk.1:4 drainase
-
Pek. Plesteran adk.1:4 dinding, lantai dan drainase
15.70 10.00 Pondasi Drainase Lantai
3 4 5 6 7 8 9 10 11 12 13 14
PEKERJAAN RUMAH GENZET PEKERJAAN PERSIAPAN Pek. Bauwplang
IV.II 1 2 3
PEKERJAAN TANAH Pek. Galian tanah Pek. Urugan kembvali bekas galian Pek. Urugan pasir dibawah pondasi dan lantai
Pek. Timbunan peninggian lantai
IV.III 1 2 3 4 5 6
PEKERJAAN BETON Pek, Beton Sloof 15/20 Pek. Beton kolom 11/20 Pek, Beton balok 11/20 Pek. Plat dak beton tb. 10 cm Pek. Lisplang beton tb. 8/40 cm Pek. Beton pondasi genzet
IV.IV 1 2
PEKERJAAN PASANGAN Pek, Pondasi batu kali adk.1:4 Pek. Dinding batu bata adk.1:4
3
0.60 0.90 1.50
1.50
8.00
10.00
0.90
0.75
Lantai Rabat
10.00 3.00 14.00
0.90 2.00 1.00
0.05 0.05 0.05
Lantai Rabat
3.00 14.00
2.00 1.00
0.15 0.05
10.00 2.95 10.00 5.00 18.00 1.60
0.15 0.11 0.11 4.00 0.08 1.00
0.20 0.20 0.10 0.10 0.40 0.20
10.00 10.00 2.36 1.05 0.67
0.50 2.85 1.06 0.42 0.82
0.70
P1 BV1 BV2
3.93
Rabat
28.50 24.57 18.00
Dak Lisplang
5.00 18.00
4.00 0.96
Pek. Plesteran adk.1:4
5 6
Pek. Acian Pek. Line batu bata adk,1:4 rabat
18.00
0.30
IV.V 1 2
PEKERJAAN LANTAI Pek. Lantai dalam beton K225 tb. 10 cm Pek. Rabat beton K175 tb. 5 cm
3.00 14.00
2.00 1.00
IV.VI 1 2 3
PEKERJAAN KUSEN Pek. Kusen pintu besi P1 lengkap Pek. Kusen Bauven besi BV1 Pek. Kusen Bauven besi BV2
IV.VII 1
PEKERJAAN PENGECATAN Pek. Pengecatan tembok
Pek. pengecatan besi
P1
BV1 BV2
IV.VIII 1 2 3 4 5
PEKERJAAN INSTALASI LISTRIK Pek. Titik api lampu dan stop kontak Pas. Box termis Pas. Lampu SL 18 watt Pas, Stop kontak Pas. Saklar daubel
4.00
1.00 2.00 1.00
2.00
Pek. Plesteran beton adk.1:2
49.13 57.28 106.41 4.24 1.94 2.70 2.70 2.40 2.74 3.50
0.45 0.30 0.70 1.45 0.90 0.70 1.60
0.15
4
2
14.13 9.00 23.13 3.96 3.46 14.13 23.55 45.10
Pek. Acian Pas. Pelampung otamatis Pas. Bak resovoir kap. 3 M3 Pas. Pipa Giv Ø 2" Pompa ke tower dan Kolam Pas. Pipa PVC Ø 3/4" pipa untuk kran Pas. Pipa PVC Ø 1" air limpah Pas. Stop Kran Ø 2" Pas. Kran Ø 3/4" Pas. Box Panel komplit Pas. Kabel NYYHY 3 x 4 x 100 mm Pas. Kabel NYYHY 3 x 1 1/5 x 100 mm Pas. Elextroda Kabel Tis untuk ikan kabel
IV IV.I 1
4
6.59 3.46 15.70 15.70
0.90 0.90
0.46 0.94 0.05 0.46 0.05 0.46 0.05
2.00
28.50 2.50 0.88 0.55 3.93 24.57 49.13 2.70 51.83 40.00 17.28 57.28
0.10 0.05
2.00 2.00 2.00 1.00 1.00
1.95 3.65 0.14 2.48 0.24 1.26 0.18 9.89
23.13
m2
45.10
m2
45.10
m2
12.00
M'
6.75 1.69 1.45
m3 m3 m3
1.60
m3
0.30 0.26 0.11 2.00 0.58 0.32
m3 m3 m3 m3 m3 m3
3.50 24.57
m3
51.83
M2
57.28
m2
109.11 5.40
M2 m2
0.60 0.70
m3 m3
1.00 2.00 1.00
Unit Unit Unit
106.41
m2
9.89
M2