JOB CARD
Rev. C01
STEP OF WORK Cable Pulling at E05 – South Interconnecting Preparation 1. 2. 3. 4.
This work is part of the cable pulling from L03 – Central Interconnecting (Green Field Area) to L02 – South Interconnecting (Green Field Area) All cable ladder at pipe rack shall be installed and all cable ladders had been inspected by QC before each step of work commencement. All required materials and tools shall be available at site before each step of work commencement. Before beginning installation, examine all parts of the adjoining work onto which applicable work is to be placed. Should any condition be found which will prevent the proper execution of the work, installation shall not proceed in that area until such conditions are corrected by the contractor. Execution
1. 2.
PTW has been signed. Tool Box meeting. Pull 6,6kV & 11kV Power Cable from cable trench at L03 – Central Interconnecting (Green Field Area) to pipe rack 070-PRK-31002C column-04 in the cable ladder first layer (BOT. EL. +23.100) with arrangement refer to dwg. No. TEP-900-LAY-EL-BP4-2205-014 (section N-N):
BOT. EL. +23.100
From Electrical Cable Trench (L-03) to Electrical Cable Trench (L-02) Section Cable No. Type Cable From No. 1.
017-TRF-31201A-1P
6,6kV, 3-185
2.
017-TRF-31201B-1P
6,6kV, 3-185
3.
017-TRFE-31201-1P
6,6kV, 3-50
4.
1300-DPN-1101-1P
11kV, 3C-150
5.
1400-DPN-1101-1P
11kV, 3C-150
160-MCCE-31101A in Main Substation 160-MCCE-31101B in Main Substation 160-MCCE-31101C in Main Substation 240-TRF-31101C in Utility Area 240-TRF-31101D in Utility Area
To 017-TRF-31201A in ORF Substation 017-TRF-31201B in ORF Substation 017-TRFE-31201 in ORF Substation 1300-DPN-1101 - Splitter Box to Offshore 1400-DPN-1101 - Splitter Box to Offshore
JOB CARD
3.
Rev. C01
Pull 380V Power Cable, Fiber Optic & Main Grounding Cable from cable trench at L03 – Central Interconnecting (Green Field Area) to pipe rack 070-PRK-31002C column-04 in the cable ladder second layer (BOT. EL. +23.600) with arrangement refer to dwg. No. TEP-900-LAY-EL-BP4-2205-014 (section N-N): BOT. EL. +23.600
From Electrical Cable Trench (L-03) to Electrical Cable Trench (L-02) Section Cable No. Type Cable From No.
6.
017-F00001 (TELECOM) 017-F00005 (TELECOM) 017-F02003 (ELECTRICAL) 017-F02004 (ELECTRICAL) 017-F02001 (ELECTRICAL) 017-F02007 (ELECTRICAL) Grounding Cable
FO Cable 48 cores
300-IBI-37901 in New MCB
FO Cable 48 cores
300-IBI-37901 in New MCB
FO Cable 12 cores FO Cable 12 cores FO Cable 6 cores
160-IBI-37802 in Main Substation 160-IBI-37802 in Main Substation 099-IBI-37801 in Existing Substation
FO Cable 12 cores
300-IBI-37801 in New MCB
70 sqmm PVC insulated
Utility Main Loop
To 017-IBI-36001 in LCR-21 1400-DPN-1101 in ORFSplitter Box-ROA 1400-DPN-1101 in ORFSplitter Box-ROA 1300-DPN-1101 in ORFSplitter Box-WDA 017-IBI-37801 in ORF Substation 017-IBI-37801 in ORF Substation Earthing Pit 900-EP-31101 in L-02
From Electrical Cable Trench (L-03) to Instrument Cable Tray at pipe rack 070-PRK-31204 Section Cable No. Type Cable From No.
6.
200-F00001 (TELECOM) 300-F00002 (TELECOM) 340-F00002 (TELECOM)
FO Cable 48 cores FO Cable 48 cores FO Cable 48 cores
099-IBI-36001 in Existing MCB 300-IBI-37903 in New MCB 099-IBI-36001 in Existing MCB
From Electrical Cable Trench (L-03) to Heat Tracing Panel 093-EHT-31202 Section Cable No. Type Cable From No. 13.
093-EHT-31202-2P01
380V, 3C-185
14.
093-EHT-31202-2P02
380V, 3C-185
093-MCCE-31203 in Train-3 Substation 093-MCCE-31203 in Train-3 Substation
To
215-IBI-37901 in LCR-24 099-IBI-36001 in Existing MCB 340-IBI-37902 in OperationConstruction Camp
To 093-EHT-31202 093-EHT-31202
JOB CARD
4.
Rev. C01
Pull 380V Power Cable from cable trench at L02 – South Interconnecting (Green Field Area) to pipe rack 070PRK-31210 MODUL E43 in the cable ladder second layer (BOT. EL. +23.600) with arrangement refer to dwg. No. TEP-900-LAY-EL-BP4-2205-014 (section N-N):
BOT. EL. +23.600
From Electrical Cable Trench (L-02) to Heat Tracing Panel 017-EHT-31204 Section Location Cable No. Type Cable From No.
5. 6. 7.
8. 9.
13.
017-EHT-31204-2P01
380V, 3C-120
14.
017-EHT-31204-2P02
380V, 3C-120
017-MCC-31201A in ORF Substation 017-MCC-31201A in ORF Substation
To 017-EHT-31204 017-EHT-31204
Install bonding earthing cable from main grounding cable inside cable ladder to the cable ladder refer to dwg. No. TEP-900-STD-EL-BP4-2301-016 & TEP-900-LAY-EL-BP4-2305-002. Install bonding earthing cable from main grounding cable inside cable ladder to the structural beam refer to dwg. No. TEP-900-STD-EL-BP4-2301-006 & TEP-900-LAY-EL-BP4-2305-002. After the cable being pulled and laid on the cable ladder, the cable shall be properly secured with cable-tie to the rung of cable ladder at the distance as required. Install cable marker for each cable refer to SPTEP-900SPE-EL-BP4-0080 Project Specification for Electrical Installation. Cable should be fitted with indestructible identification bands at: a. Ends. b. 30 m intervals over entire route length. c. Changes in direction. Inspect and test cable refer to QCP Install cover ladder and attach to cable ladder by cover clamp set and tighten the hex head bolt refer to dwg. No. TEP-900-STD-EL-BP4-2201-021.
Finalize 1.
Walkthrough and close punch list-A
2.
ITRs Sign by QC
3.
Close PTW
JOB CARD
Rev. C01
Technical information is attached herein. Attachment Drawing/Doc No. Attachment-1 TEP-900-LAY-EL-BP4-2205-002
Attachment-2
TEP-900-LAY-EL-BP4-2205-014
Attachment-3
TEP-160-SCM-EL-BP4-0061
Attachment-4
TEP-112-LAY-IT-BP4-0096
Attachment-5
TEP-112-LAY-IT-BP4-0096
Attachment-6
TEP-112-LAY-IT-BP4-0096
Attachment-7
TEP-112-SCM-IT-BP4-0001
Attachment-8
TEP-900-LAY-EL-BP4-2305-002
Attachment-9
TEP-900-STD-EL-BP4-2301-006
Attachment-10
TEP-900-STD-EL-BP4-2301-016
Attachment-11
TEP-1178982-D99-0001
Attachment-12
TEP-1178982-C06-0001
Attachment-13
TEP-1192945-D99-0001
Attachment-14
TEP-1192945-C06-0001
Attachment-15
TEP-1208784-C06-0001_04
Attachment-16
TEP-900-SPE-EL-BP4-0080
Attachment-17 Attachment-18
Title Main Cable Routing Layout & Sections Details (33kV & 6.6kV Building Interconnecting) Main Cable Routing Layout & Sections Details (33kV & 6.6kV Building Interconnecting) Electrical Cable Schedule - Filter
Revision C02.1
FO Network Main Cable Routing Layout (sheet 12 of 27) FO Network Main Cable Routing Layout (sheet 25 of 27) - FO Network Telecom FO Network Main Cable Routing Layout (sheet 26 of 27) - FO Network Electrical Telecommunication Cable Schedule - Filter
C02
Main Grounding Layout (33kV & 6.6kV Building Interconnecting) Typical Installation Details for Grounding & Lightning Grounding Connection for Metallic Structure Building Typical Installation Details for Grounding & Lightning Grounding Connection for Cable Ladder / Tray HV Cable Catalogue (KMI)
C02.2
B06
C02 C02 B03.1 C03 C03 C01.1 01
HV Cable - Data Sheet and Composition Drawings LV Cable - Supplier Catalogue (Jembo)
05
LV Cable - Data Sheet and Composition Drawings Technical Specification Datasheets
09
B05
TEP-1178982-R06-0001
Project Specification for Electrical Installation (page 27 of 40) HV Cable - Installation Instructions
03A
TEP-1208784-R06-0001
HV Cable - Installation Instructions
Z01
05
04
JOB CARD
Rev. C01
MTO No 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16.
Description 3 x 185 mm2 - 6/10kV XP AS CU FT 3Ph (Material Code : EM01A05LFXPASCUT0318) 3 x 150 mm2 - 6/10kV XP AS CU FT 3Ph (Material Code : EM01A05LFXPASCUT0317) 3 x 50 mm2 - 6/10kV XP AS CU FT 3Ph (Material Code : EM01A05LFXPASCUT0313) 3 x 185 mm2 + 1 x 95 mm2 - 0.6/1kV XP AR CU FT 3Ph+N (Material Code : EM01A02MCXPARCUT27) 3 x 120 mm2 + 1 x 70 mm2 - 0.6/1kV XP AR CU FT 3Ph+N (Material Code : EM01A02MCXPARCUT22) FO Cable 48 cores Fire Resistant, Armoured Cable (FO Cable Code : FO-48FR-A) FO Cable 12 cores Fire Resistant, Armoured Cable (FO Cable Code : FO-12FL-A) FO Cable 6 cores Fire Resistant, Armoured Cable (FO Cable Code : FO-06FL-A) Insulated Earthing Conductor, U0/U = 450/750V, PVC Insulation, Copper Material, Section 1x70mm2 (MC : EM07A02HCPVCU0214) Insulated Earthing Conductor, U0/U = 450/750V, PVC Insulation, Copper Material, Section 1x16mm2 (MC : EM07A02HCPVCU0210) 70mm2 Cable Lug Tinned Compression type (M10 Clearance Hole) to suite the cable size c/w Nut, Bolt & Washer. 16mm2 Cable Lug Tinned Compression type (M10 Clearance Hole) to suite the cable size c/w Nut, Bolt & Washer. 16mm2 Cable Lug Tinned Compression type (M8 Clearance Hole) to suite the cable size c/w Nut, Bolt & Washer. Connection plate 1 Hole, Stainless Steel Galvanized steel fastening clip for copper conductor Cable ties S/S Size 4.6mm (W) x 200mm (L)
QTY 900
Unit m
Remark Total Length 10.188 m
900
m
Total Length 16.370 m
450
m
Total Length 2.570 m
400
m
Total Length 1.720 m
320
m
Total Length 2.400 m
2250
m
Total Length 13.950 m
1350
m
Total Length 5.600 m
450
m
Total Length 870 m
600
m
@ 450 m
As Req As Req As Req As Req As Req As Req As Req
JOB CARD
Rev. C01
Tools No 1. 2. 3. 4. 5.
Description Hand Tools Cable Jack Cable Roller Electrical Winch Machine Manila Rope
Unit LOT SET LOT SET LOT
Remark
1 1 1 1 1
QTY
QTY 1 1 1 3 1 5 20
Unit Person Person Person Person Person Person Person
Remark
Manpower No 1. 2. 3. 4. 5. 6. 7.
Description Permit Authority (PA) Supervisor Safety Officer QA/QC Foreman E&I Technician Carpenter/Helper