43 1 162KB
OTIS - SIGMA FIELD ENGINEERING
FIM
6
IRIS1 NV
Date : 2011. 04. 10 Page : 0 - 1 / 3
High Speed Adjustment
6.1. Start compensation adjustment 1. Following mechanic work should be finished thoroughly. No. Relevant content Detailed technology 1 Guide rail flatness Whether guide rail state is correct? 2 Guide rail washing Whether guide rail surface is clean? 3 Guide rail joint Whether guide rail joint deforms or joint is with steepness? adjustment 4 Guide shoe state Whether the condition of that the guide shoe is clamped occurs? 5 Roping state Whether rope tension force is conformable? 6 Over-balance Whether over-balance of car and counterweight device is within standard range? 7 Car components Whether assembly state of car components and panel is assembly state excellent? 2. Determine whether PTM runs normally in the system. -. In Para. setup mode, change F187 into “14”. No. Relevant content Detailed technology 187 Leveling induction 0: running times 1: ENC conflict (above 1000is Calibration running not good) 2,3: CAN communication (96 4: rotary speed of the motor exceed is not good) 5: bus voltage 6: output current 7: output rotating moment 8: magnetic pole position 9,10: ENC position 11: spare moment 12,13: radiator temperature 14: load marking 15: PTM #1 mark 16: PTM #2 mark -.Load which is same with the right side shown on primary menu. -.0 means 0%, 1024 means 100% load. Normal Simplex === 00000088 === Eg.: if load is 50%, 512 should be shown. 1 Floor 0.00m/s -.If F187 is changed into 15, PTM #1 will appear. If it is changed into 16, PTM #2 will appear. Door Locked 3. Conduct constant-speed running within hoistway full area, and after determining start and stop state, conduct adjustment. -. Conduct adjustment after passing Para.setup mode. F No. Relevant content Detailed technology 245 0% start compensation Start compensation adjustment on DN direction adjustment 248 Start compensation adjustment on UP direction 241 50% start If value of F247 is larger than 512, adjust DN direction. compensation 242 If value of F247 is larger than 512, adjust UP direction. adjustment 245 If value of F247 is less than 512, adjust DN direction. 248 If value of F247 is less than 512, adjust UP direction. Unpublished Work Copyright © OTIS Elevator Company
IRIS1 NV
OTIS - SIGMA FIELD ENGINEERING
FIM
6 241 242
Date : 2011. 04. 10 Page : 0 - 2 / 3
High Speed Adjustment 100% start compensation adjustment
Adjust DN direction Adjust UP direction
6.2. Implantation adjustment -. After finishing start compensation adjustment, implement implantation adjustment. code Content Adjust Description range F56 Leveling adj. 0~100 Up-direction height adjustment parameter up -.default value is 50mm, adjustment range is 0~100 - the value when it stops (exceeds) after decreasing adjustment height, the value when it stops (comes short) before increasing adjustment height. F57 Leveling adj. 0~100 Down-direction height adjustment parameter down -. default value is 50mm, adjustment range is 0~100 the value when it stops (exceeds) after decreasing adjustment height, the value when it stops (comes short) before increasing adjustment height.
Unpublished Work Copyright © OTIS Elevator Company
IRIS1 NV
OTIS - SIGMA FIELD ENGINEERING
FIM
6
Date : 2011. 04. 10 Page : 0 - 3 / 3
High Speed Adjustment
6.3. Indicator setup 1) Shown as following figure, conduct line connecting work on indicator on hoistway side. (PCB name: SM-04V12/A) MIC name JP1 JP2 JP3 JP4 JP5 JP6 S1 SW1
Function Power supply and CAN communication 1: Output 2: 24V 3: GND 4: Input For SPI communication For floor setup CAN communication terminal impedance
Remark
4P
3P 2P
(PCB Name: SM-04V12/B) MIC name JP1 JP2 SW1
Function Power supply and CAN communication For SPI communication CAN communication terminal impedance
Remark
4P 2P
2) Floor No. setup is as follows. -.Utilize umper pin jumperSI(3P)’s 1 and 2. -.IND phase will appear F00 -.Utilize Hall button’s UP (floor increasing), Down (floor decreasing), set absolute floor of the building. Eg.) F01=front 1 floor, R01=back1 floor, M01=wheelchair 1 floor. -After finishing floor setup, remove Jumper pin. Note) Setup methods for car indicator Please utilize S01 to conduct setup.
Unpublished Work Copyright © OTIS Elevator Company