DOCUMENT NO:
GSCC-ZS-PV-ITP-005-2014
REV.01
ITEM DESCRIPTION
PRESSURE VESSELS
ITEM NO / DRAWING NO:
PED-0246 & 0242 REV.1
PROJECT
RABIGH II REFINIG & PETROCHEMICALS (CP3 & CP4)
JOB NO: GSCC-MD-2014-356
INSPECTION TEST PLAN (ITP) REV.00
1
Revised to incorporate client and PIM comments
QA/QC ENGG GSCC
QA/QC MANAGER GSCC
ZS
AI
GS E&C
SA
0
For Approval
QA/QC ENGG GSCC
QA/QC MANAGER GSCC
ZS
AI
GS E&C
SA
ISSUENCE
PREPARED By
REVIEWED By
ACCEPTED By
ACCEPTED By
REV:
DATE:
DOC.NO. OPR08-01
REV. No: 00
PAGE 1
APPROVED BY CLIENT
GULF SKY CRANES & CONT. CO. LTD INSPECTION TEST PLAN ( ITP) No:
GSCC-ZS-PV-ITP-005-2014
CLIENT : ZAMIL STEEL CO.LTD.
DATE: 29/10/2014 DRAWING No: PED-0242-05-001
P.O No: 101652 REV.0
PROJECT TITLE : RABIGH II REFINING AND PETROCHEMICAL PROJECT DESCRIPTION : PRESSURE VESSEL FABRICATION
ITE WORK PROCESESS M ACTIVITY No:
A
Pre-Inspection Meeting
1
DOCUMENTS
1.1
Weld Map, WPS, PQR, Weld Repair Procedure, Welding Control & Consumable Procedure
1.2
Welder Qualification Record Review
1.3
NDE Personnel Qualification and Procedure Review
2
Receiving Inspection
CHARECTERISTIC TO BE CHECKED
Review of Weld Map, WPS, Fabrication Drawings, & Applicable Codes & Specifications
Review of Welder Qualification Records
Review of NDE (RT, UT, MT, PT) Procedures & Codes & Spec.
EQUIPMENT NAME : BYPRO OIL DRUM REFERENCE DOCUMENTS/ ACCEPTANCE CRETERIA.
2.1
Review of MTC/ Material Specification DOC No: OPR08-01
GSCC
ZS
CLIENT
AI
GS E&C
Res Sign Res Sign Res Sign Res H
H
-
-
SA
Sign Res
H
H
Approved GSCC WPS & PQR and & Approved Procedures
H
R
R
R
R
As per ASME Sec. IX
Approved 3rd Party WQT Records
H
R
R
R
R
AMES Sec. V
Approved 3rd Party Procedures
H
R
R
R
R
H
R
R
R
R
Mill Test Certificates
H
R
R
R
R
As per Drawings ASME Sec. VIII Div.1
R
R
R
R
R
ASME Sec. II Part A Identification Marking Heat Number against MTC / Material Specification
INSPECTION STAGES INSPECTION FORM & RECORD
Approved Fabrication Drawings, ASME Sec. IX, ASME Sec. VIII. Div 1
Visual Inspection, Dimension Checking As Per Specification Shell, Dishes, Forgings, Pipe & Fittings, Nozzles
VESEEL TAG No: P 210-D-1126
MTC & Material
Specification
Incoming Material Inspection Report, Doc. No: OPR08-40
REV.NO: 02
PAGE 2
Sign
GULF SKY CRANES & CONT. CO. LTD INSPECTION TEST PLAN ( ITP) No:
GSCC-ZS-PV-ITP-005-2014
CLIENT : ZAMIL STEEL CO.LTD.
DATE: 29/10/2014 DRAWING No: PED-0242-05-001
P.O No: 101652 REV.0
PROJECT TITLE : RABIGH II REFINING AND PETROCHEMICAL PROJECT DESCRIPTION : PRESSURE VESSEL FABRICATION
ITE WORK PROCESESS M ACTIVITY No:
2.2
Welding Consumables
3
Material Traceability of Pressure Parts, Attachment to Pressure Parts
4
4.1
CHARECTERISTIC TO BE CHECKED
VESEEL TAG No: P 210-D-1126
EQUIPMENT NAME : BYPRO OIL DRUM REFERENCE DOCUMENTS/ ACCEPTANCE CRETERIA.
Verification against the Requirement of the Consumable MTC
As per ASME Sec. II Part C
INSPECTION STAGES INSPECTION FORM & RECORD
GSCC
ZS
AI
CLIENT GS E&C
Res Sign Res Sign Res Sign Res
SA
Sign Res
Raw Material Inspection Report.Doc. OPR08-04
H
R
R
S
R
Traceability Verification As per MTC And approved Fabrication Drawings.
Drawings, marking on Plates & Pipes ASME Sec. VIII Div.1
Approved Fabrication Drawings, Incoming Material Inspection Reports Doc.OPR08-40
H
R
R
R
R
Fit-Up Alignment check, Tack Welds, Surveillance of welding parameters against the applicable WPS
Fabrication Drawings, applicable WPS and Weld Map
Inspection Report, DOC. OPR08-64
H
W
WFirst, RRest
IW
IW
PT on back gouged Surface
ASME Sec. V
3rd PARTY Procedure AIS QP-7.5.1D
H
W
R
S
S
Visual Inspection of welds 100%
ASME Sec. VIII Div. 1
Inspection Report, DCO.OPR08H 07
R
R
S
S
H
R
R
S
S
H
R
R
R
R
In-Process Inspection
Long Seam & Cir. Seam Fit-Up, Welding to the Shell to Head
Carry out MT (100%)
Carry out RT (Head to Shell Circular Seam-Full RT, Shell Long Seam-Spot RT )
DOC. No: OPR08-01
ASME Sec. V & ASME Sec VIII,Div.1
3rd PARTY, AIS QP-7.5.1C
ASME Sec. V & ASME Sec
3rd PARTY, AIS QP-7.5.1A
VIII,Div.1
REV.NO: 02
PAGE 3
Sign
GULF SKY CRANES & CONT. CO. LTD INSPECTION TEST PLAN ( ITP) No:
GSCC-ZS-PV-ITP-005-2014
CLIENT : ZAMIL STEEL CO.LTD.
DATE: 29/10/2014 DRAWING No: PED-0242-05-001
P.O No: 101652 REV.0
PROJECT TITLE : RABIGH II REFINING AND PETROCHEMICAL PROJECT DESCRIPTION : PRESSURE VESSEL FABRICATION
4.2
Rolled Nozzle Neck
4.3
4.4
4.5
Nozzle layout
Marking on shell and head
EQUIPMENT NAME : BYPRO OIL DRUM INSPECTION STAGES
REFERENCE DOCUMENTS/ ACCEPTANCE CRETERIA.
INSPECTION FORM & RECORD
Fit-up alignment check, Tack Welds, Surveillance of welding p a r a m e t e r s against the applicable WPS.
Fabrication Drawings, applicable WPS & ASME Sec VIII. Div.1
Inspection Reports, DOC. OPR08-64
H
W
R
R
R
PT on the back gouged surfaces & 100% Visual Inspection, 100 % RT for Nozzle butt welds, 100 % MT
ASME Sec .V
3rd Party Procedure AIS QP-7.5.1A AIS-QP 7.5 1C
H
R
R
R
R
Nozzle Orientation conformity and
As Per Fabrication
Inspection Reports,
Drawings.
DOC. OPR08-67
H
W
R
S
R
Fit-Up Tack weld visual check, Surveillance of welding parameters against applicable WPS, weld Visual 100%
Applicable WPS/ Weld Map, Reports
Inspection Report OPR08-64 OPR08-07 H
W
R
S
R
Verify fit-up tolerance,100 % PT & Full RT
ASME Sec .V
3rd Party Procedure AIS QP-7.5.1A AIS-QP 7.5 1D
Fit-Up Tack weld visual check, Surveillance of welding parameters against applicable WPS
Applicable WPS/ Weld Map, Reports
Inspection Report OPR08-64 OPR08-07 H
W
R
S
R
ITE WORK PROCESESS M ACTIVITY No:
Nozzle Fabrication
VESEEL TAG No: P 210-D-1126
CHARECTERISTIC TO BE CHECKED
verification of weld edge preparation
10" above joints pipe to pipe, pipe to elbow, pipe to flange, pipe to Tee etc..
10" below joints pipe to pipe, pipe to elbow, pipe to flange, pipe to Tee etc.
Verify fit-up tolerance,100 % Weld visual & PT DOC. No:
ASME Sec .V
GSCC
ZS
AI
CLIENT GS E&C
Res Sign Res Sign Res Sign Res
Sign Res
3rd Party Procedure AIS QP-7.5.1A AIS-QP 7.5 1D REV.NO: 00
SA
PAGE 4
Sign
GULF SKY CRANES & CONT. CO. LTD INSPECTION TEST PLAN ( ITP) No:
GSCC-ZS-PV-ITP-005-2014
CLIENT : ZAMIL STEEL CO.LTD.
DATE: 29/10/2014 DRAWING No: PED-0242-05-001
P.O No: 101652 REV.0
PROJECT TITLE : RABIGH II REFINING AND PETROCHEMICAL PROJECT DESCRIPTION : PRESSURE VESSEL FABRICATION
Nozzle Neck to shell & head fit-up & welding
Fit-Up Tack weld visual check, Surveillance of welding parameters against applicable WPS, weld Visual 100%
Applicable WPS / Weld Main Drawings ASME Sec V
Inspection Reports Doc. OPR08-64
H
W
WFirst, RRest
IW /S
IW
PT on back gouged Surface
ASME Sec V
3rd PARTY, AIS QP-7.5.1D
H
R
R
S
S
UT on Nozzle Neck to head & shell weld
ASME Sec VIII Div-1, PED-246-UT
PED -QC-07,Rev-0
H
R
R
S
S
MT on Nozzle Neck to shell and head weld
ASME Sec V
3rd PARTY, AIS QP-7.5.1C
H
R
R
S
R
Inspection Report DOC. OPR08-07
H
W
R
S
R
H
W
R
S
S
H
W
R
IW/S
R
External attachment Fit-Up & Welding on the vessels including leg support and Lifting lugs MT on Leg supports to Shell Attachment welds MT on all External attachment welds & temporary support removed area & Arc strikes removed area.
4.8
All the Internal Fit-Up and Welding on the Vessel
INSPECTION STAGES INSPECTION FORM & RECORD
CHARECTERISTIC TO BE CHECKED
Welding parameters, surveillance against applicable WPS, Verification of location Inspection of weld
4.7
EQUIPMENT NAME : BYPRO OIL DRUM REFERENCE DOCUMENTS/ ACCEPTANCE CRETERIA.
ITE WORK PROCESESS M ACTIVITY No:
4.6
VESEEL TAG No: P 210-D-1126
Fit-Up Tack weld visual check, Surveillance of welding parameters against applicable WPS, weld Visual 100% Verify Fit-Up tolerance DOC .No:
Fabrication Drawings, Applicable WPS. 3rd Party MT Procedure AIS-7.5.1C
3rd PARTY, AIS QP-7.5.1C
3rd Party MT Procedure AIS-7.5.1C
3rd PARTY, AIS QP-7.5.1C
Applicable WPS/ Approved Drawings. Inspection Reports.
Inspection Report WPS, DOC. OPR08-07
REV.NO: 00
GSCC
ZS
AI
CLIENT GS E&C SA
Res Sign Res Sign Res Sign Res
Sign Res
PAGE 5
Sign
GULF SKY CRANES & CONT. CO. LTD INSPECTION TEST PLAN ( ITP) No:
GSCC-ZS-PV-ITP-005-2014
CLIENT : ZAMIL STEEL CO.LTD.
DATE: 29/10/2014 DRAWING No: PED-0242-05-001
P.O No: 101652 REV.0
PROJECT TITLE : RABIGH II REFINING AND PETROCHEMICAL PROJECT DESCRIPTION : PRESSURE VESSEL FABRICATION
ITE WORK PROCESESS M ACTIVITY No:
4.9
4.10
4.11
4.12
4.13
Internal Inspection of Vessel (Before closing the Head)
Final Dimension & Visual checking of Vessel
RF Pads leak Test
CHARECTERISTIC TO BE CHECKED
VESEEL TAG No: P 210-D-1126
EQUIPMENT NAME : BYPRO OIL DRUM REFERENCE DOCUMENTS/ ACCEPTANCE CRETERIA.
INSPECTION STAGES INSPECTION FORM & RECORD
ASME Sec. VIII. Div.1 Approved Drawings,
MT on Internal attachment welds
ASME Sec .V
3rd PARTY AIS QP-7.5.1C
Fabrication Drawings, Inspection Reports.
APPROVED DWG, Inspection Reports. DOC.
Fabrication Tolerance
OPR08-08
Approved Procedures QP PPT-08 Rev.0
Pneumatic Test of Pads at 5 PSIG
Certification of Equipment Applicable ASME Certification Mark in & PDR Equipment with PART STAMP
Documents Review and Equipment Release
Dossier Review (IRB)
DOC.No:
ZS
AI
CLIENT GS E&C
Res Sign Res Sign Res Sign Res
Visual Inspection of Internal surface and verification of nozzle internal sharp corners rounding off.
Verification of dimension (Over all dimensions, Nozzles and attachments) and Final Visual Inspection
GSCC
Inspection Report DOC. OPR08-07,
SA
Sign Res
H
W
W
W
W
H
W
W
W
W
H
H
W
H
W
Inspection Report OPR08-12
H
W
R
W
W
Drawings
Certification rub off / Photo
H
R
H
W
R
ASME Sec. VIII , Div.1
Approved Formats
H
H
R
W
R
REV.NO: 00
PAGE 6
Sign
GULF SKY CRANES & CONT. CO. LTD INSPECTION TEST PLAN ( ITP) No:
GSCC-ZS-PV-ITP-005-2014
CLIENT : ZAMIL STEEL CO.LTD.
DATE: 29/10/2014 DRAWING No: PED-0242-05-001
P.O No: 101652 REV.0
PROJECT TITLE : RABIGH II REFINING AND PETROCHEMICAL PROJECT DESCRIPTION : PRESSURE VESSEL FABRICATION
ITE WORK PROCESESS M ACTIVITY No:
LEGEND:
DOC.No:
CHARECTERISTIC TO BE CHECKED
VESEEL TAG No: P 210-D-1126
EQUIPMENT NAME : BYPRO OIL DRUM REFERENCE DOCUMENTS/ ACCEPTANCE CRETERIA.
INSPECTION STAGES INSPECTION FORM & RECORD
GSCC
ZS
CLIENT
AI
GS E&C
Res Sign Res Sign Res Sign Res
Sign Res
IW- Initial Witness , H- Hold Points , W- Witness Points , S- Surveillance , R- Review of Records
REV.NO: 00
PAGE 7
SA Sign