45 1 1MB
Commissioning
Summary
This manual provides detailed instructions for the commissioning of the elevator control CO MX and covers the control releases 4.0 up to 6.2. CO MX may also be referred to as Miconic MX-GC.
Modification
09
10
11
12
13
Prepared
20.03.2012
KA No.
160626
160745
212701
155556
155609
Reviewed
14.02.2012
KA Date
19.10.07 16.05.08 18.09.09 01.09.11 01.05.12
CO MX 4.x / 5.x / 6.x
ferreite
Norms Chkd 09.03.2012
helfensy
Released
paicean
01.05.2012
Format
Commissioning INVENTIO AG
borchefa
A4 CH-6052 Hergiswil
Classification
Lead Office
11220
EB7
K 604453
EN
Copyright © 2012 INVENTIO AG All rights reserved. INVENTIO AG, Seestrasse 55, CH-6052 Hergiswil, owns and retains all copyrights and other intellectual property rights in this manual. It shall only be used by SCHINDLER personnel or authorized SCHINDLER agents for purposes which are in the interest of SCHINDLER. Any reproduction, translation, copying or storing in data processing units in any form or by any means without prior permission of INVENTIO AG is regarded as infringement and will be prosecuted.
Page 1/57
Table of Contents 1
2 3 4
5
6
7
8
9 10
A1 A2 A3 A4 A5 A6 A7 A8
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
Safety Advice. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1 Safety Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2 Safety Warnings Used in this Manual . . . . . . . . . . . . . . . . . . General Notes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . * Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . * Preparation of Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.1 Preconditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.2 * Car . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.3 * Control Cabinet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . * Inspection Travel with IMOF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5.1 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5.2 Check Inspection Travel with IMOF . . . . . . . . . . . . . . . . . . . 5.3 * Setup of Door Interface . . . . . . . . . . . . . . . . . . . . . . . . . 5.3.1 * Setup of PCBA LONIBV . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5.3.2 * Setup of PCBA LONDIM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . * Measuring Travel. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.1 * Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2 Execution of Measuring Travel . . . . . . . . . . . . . . . . . . . . . . Car I/Os. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7.1 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7.2 Setup of MX COP. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7.3 Setup of CIM (COP Interface Module) . . . . . . . . . . . . . . . . . . * Elevator I/Os . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8.1 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8.2 Setup of MX Fixtures . . . . . . . . . . . . . . . . . . . . . . . . . . . 8.3 Setup of LIM (landing interface module) . . . . . . . . . . . . . . . . . 8.4 * Setup of BIO2 Fixtures . . . . . . . . . . . . . . . . . . . . . . . . . 8.5 Setup of BIO2 Interfaces . . . . . . . . . . . . . . . . . . . . . . . . . * Completion Work Simplex Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . * Group Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10.1 * Commissioning Duplex Installation . . . . . . . . . . . . . . . . . . . 10.2 * Commissioning Multiplex Installation . . . . . . . . . . . . . . . . . . PCBA ASIXA31 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . PCBA ASIXA32 and ASIXA33. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . User Interface SMLCD. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . * PCBA LONIC1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . * PCBA LONIC3 and LONICK1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . PCBA LONDIM (door interface module) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Wiring of CIM and LIM. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Service Codes Miconic 10 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
K 604453
3 3 3 4 5 7 7 7 9 12 12 13 14 14 16 18 18 19 21 21 22 23 25 25 26 28 30 34 37 38 38 39 40 42 44 45 47 50 54 55
13 2/57
1
Safety Advice
1.1
Safety Equipment
All people involved must know and follow the company and local safety regulations. Protective clothing and appropriate safety equipment must be worn.
1.2
Hard Hat
Safety Shoes
Protective Gloves
Safety Goggles
Hearing Protection
Full Body Harness
Safety Warnings Used in this Manual
The following types of safety warnings are used in the present manual. DANGER The safety warning with the signal word “Danger” is used to indicate a hazardous situation which, if not avoided, will result in death or serious injury.
WARNING The safety warning with the signal word “Warning” is used to indicate a hazardous situation which, if not avoided, could result in death or serious injury.
NOTICE The safety warning with the signal word “Notice” is used to address practices that could result in property damage but not in injury.
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 3/57
2 Parallel or Serial Components
General Notes
The following diagram shows the definition for parallel and serial components.
Parallel- or Serial Components? [7570; 01.12.2004]
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 4/57
3
* Prerequisites DANGER
Hazardous Voltage Contact with live parts will result in electric shock causing serious injury or death. Take the following precautions: Do not touch live parts. Switch off the main switch and de-energize the installation completely before starting to work on the installation. WARNING Bypassing of Safety Devices and Safety Contacts Any bypassing of safety-relevant devices could result in damage to the installation or in serious injury or death. Bypassing the safety circuit without explicit instruction is prohibited. Always take appropriate safety measures if premeditated bypassing is necessary for specific work on the installation. Do not use bypassing of safety devices if prohibited by local code. Always leave the installation with all bypassing disabled. WARNING Installation Travel with ESE During Installation and Commissioning Installation travel with ESE is not limited at the hoistway ends, which could result in damage to the installation by the car crashing at a hoistway end. Moreover, the presence of people and material on the construction site in combination with an installation which is only partly completed makes installation travel during installation and commissioning a potentially hazardous maneuver, which could result in serious injury or death. Take the following precautions: Move the car very carefully through the hoistway. Make sure that the installation travel puts neither people nor materials at risk. NOTICE Plugging/Unplugging Connectors on Energized Devices Hot plugging - unless explicitly permitted - could result in the destruction of devices. Prior to plugging in or unplugging connectors on devices, switch off the devices concerned. To ensure efficient diagnostics and troubleshooting, the following requirements must be complied with: Only personnel familiar with the product and qualified through training are authorized to carry out the procedures specified in this manual. All diagnostic procedures must be carried out in sequence. Do not continue with the next step until the step in progress has been completed successfully. Where applicable, sufficient lighting must be available in the hoistway and on the car for safe working. Tools
Tool Multimeter
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
Description
> 25 k/V sensitivity up to 1000 VDC measuring range diode test and continuity test test leads with insulated probe tips.
K 604453
13 5/57
Related Documents
Number
Document
Customer specific
Schematics
K 604262
TICO Miconic MX-GC with SMLCD
K 604265
Installation Miconic MX-GC with SMLCD
K 604454
Diagnostics Miconic MX-GC with SMLCD
K 604266
Maintenance Miconic MX-GC with SMLCD
EJ 41320599
Overall Commissioning CO MX Rel. 4.x, 5.x, 6.x with VFxxBR and VFxxPF1
EJ 41410503
Overall Commissioning Miconic MX-GC, TX-GC, TX-GC2 with VFxx DC
K 604437
Diagnostic LON Interfaces
K 604447
Diagnostic BIO2 Interfaces
Refer to Schindler Application Portal PNC to view the documents.
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 6/57
4 Summary
* Preparation of Control
The following steps describe how to prepare the elevator control for "Recall Travel with IMOF" (Installation Travel).
4.1 Required Installations / Components
Preconditions
Installation of basic components must be completed according to overall commissioning instructions (see documents). The counterweight balance has been adjusted so that with manually opened brake the car will move upwards and with ~ 60 kg in the car, it will move downwards. The mechanical brake has been adjusted. Depending on the installation method, move the car to a position ~ 1.0 m below the uppermost floor or ~ 1.0 m above the lowest floor. Mains according to the electrical supplier is available. The buffers have been installed and are operational (filled with oil). The overspeed governor and the safety gear are mounted and operating reliably. Safety contacts hoistway and car have been installed and wired till to the elevator control cabinet (cables are not yet plugged in).
4.2 Preparation Car
* Car
No
Step
400
Switch ON the hoistway lighting.
401
Check that following switches have been turned OFF: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present) JFIS, FI-switch control (if present) JFIL, FI-switch light (if present). Refer to the schematics.
402
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
AS, ASIXA, check that following connector is unplugged: BAT, emergency power supply.
K 604453
13 7/57
No
Step
403
OKR, LONICx, unplug following connectors: POWC, power supply car LUET, car in door zone signal TT, telephone wire AGSI, encoder AGSI, ALSIS or SALSIS SI (LONIC1/LONIC2: AGSI), shaft info (traveling cable) PHNR-D / PHNR-U releveling (if incremental shaft info) KSE, contacts hoistway end (if present) LONT1, LON door 1 LONT2, LON door 2 (if present) POWT1, power supply door 1 POWT2, power supply door 2 (if present) POWD400 / POW400T1 / POW400T2, 3-phase power supply doors (if present) LONTC, LON car operating panel(s) LC, car lighting LMI, load measuring interface (if present) MVEC, car fan motor (if present) KUET, hoistway information KUET 2KUET, hoistway information KUET2 (if present) SOA, alarm horn car GNT, car operating panel intercom (if present) RAC, connection car relay alarm (if present).
404
LONICx, plug in the following connectors: SKC, safety circuit car SKT1, safety circuit door 1 SKT2, safety circuit door 2 (bridge if not present) KF, safety gear contact KF1, safety gear second contact (bridge if not present) KNE, contact emergency limit (bridge if not present) KNA, emergency exit contact (bridge if not present) KCV, safety circuit contact car lock (only LONICK) SKC1, additional safety contacts car (bridge if not present) PWETSL, power for ETSL (if present) ETSL, emergency terminal slowdown device (bridge if not present) SKREC, inspection car panel (only with external inspection panel) REC, inspection car panel (only external inspection panel) PC, socket car. LONC, LON car Refer to the schematics.
405
Check that the wiring for safety circuit from PCBA LONICx (SKT1 / SKT2) to the door drive is executed correctly so that the safety circuit is closed. Refer to the schematics.
406
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
OKR, on PCBA RECPCB (which sits on PCBA LONICx), make the following connection: For car with maintenance hatch, plug in the cable of the KWL safety contact. For car without maintenance hatch, plug in the KWL bridging connector.
K 604453
13 8/57
4.3
* Control Cabinet
Also refer to the schematics where necessary.
Preparation Control Cabinet
No 407
Step Switch JFIS ON (if present) Switch JFIL ON (if present) Remain ON during the whole commissioning.
408
AS, Brake Module BCMM, switch SITB ON (if present).
409
ASIXA, set Elevator ID on the user interface rotary switch: Elevator A = Elevator ID 1 (Simplex) Elevator B = Elevator ID 2 and so on.
410
ASIXA, check that chip card is plugged in on user interface.
411
ASIXA, check that the following connectors are unplugged: X15A and X15B, logic signals drive RS422, communication drive AGSI, absolute encoder (if present) SI, shaft information (if present) Tacho, incremental encoder (if present) LUET, door zone signal LONS, LON hoistway 2LONS, LON hoistway Side 2 (if present) GNT, telealarm device (if present) GNT RS232, serial interface telealarm (if present) Ethernet, group connection (if present) POW236, voltage alarm DM236 (if present). The internal wiring of the cabinet has to be done according to the schematics.
412
EBBIO, check that the following connectors are unplugged: BIOS, BIO Bus hoistway (if present) 2BIOS, BIO Bus hoistway Side 2 (if present) PCBA EBBIO sits on PCBA ASIXA.
413
PDB, check that the following connectors are unplugged: POWC, power supply to the car 400V, power to car for 3-phase door operator (if present) SIS, power in for controller SIL, power in for car light.
414
ASIXA, plug in the following connectors: SK1, phase control relay (RKPH) (if not present: bridging connector) SKS, safety circuit hoistway SKC, safety circuit car KTS, safety circuit landing doors (wiring from landing door bridging control station if present) KV, contact door locking (manual doors) (if not present: bridging connector) RH, for landing door bridging control station (if not present: bridging connector) SK2, reserve (if not present: bridging connector) KKSA, to the Aramid rope monitoring box (if not present: bridging connector) KTHM, thermal contact machine room (if not present: bridging connector) JBRKTS (ASIXA32 only), switch bridge shaft doors (if not present: bridging connector). LONC, LON Car
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 9/57
No 415
Step Only in case the "Hong Kong Code of Practice" applies. LDBCS (Landing Door Bridging Control Station) plug in the following connectors: KTS, safety circuit landing doors KV, contact door locking (manual doors) (if not present: bridging connector).
416
AS, brake module, check that the following connectors to the magnetic brake are unplugged: MGB / MGB1, PCBA BCM2 (if present) MGB / MGB1, PCBA BCM420 (if present) Brake / Brake1, PCBA BCMM (if present).
417
AS, BCMZA 1 (SM250 brake module), check that the following cables are unplugged: POWIN (from PCBA PDB) MGB (from the brake) MGB1 (from the brake) TB (from the hoistway box transformer) EV (from the hoistway box BAT and to DEV, DEV1).
418
AS, BCMZA.NPE (SM250 brake module), check that the following cables are unplugged: BCM.POWIN at XNGB BCM.MGB at XMGB BCM.MGB1 at XMGB1 BCM.ASIX at XASIX.BCM BCM.MGB at XASIX.MGB. Hoistway, brake cabinet, following switches must be OFF: JF1 JF2.
419
Check mains supply from building site.
420
Turn the following switches ON: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present).
421
PDB, check the supply voltage on following connectors: SIS, power in for controller SIL, power in for car light.
422
Turn the following switches OFF: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present).
423
PDB plug in following connectors: SIS, power in for controller SIL, power in for car light.
424
On the user interface, set the following switch: JMOF = "1", installation travel switch.
425
ASIXA, set the following switches: JRH switch to position "RECALL" JHM switch to position "STOP".
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 10/57
No 426
Step Turn the following switches ON: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present) If there was no chip card expansion yet, the parameters are expanded and saved on PCBA GCIOB360 as "PCT" and "SCT". The CCS LED on the user interface blinks during this process.
427
GCIOB360, check the following LEDs: LED ERROR (red), not lit LED WDOG (green), blinks LED CPU (green), flickers LED STATUS (green), not lit. Wait until: The LED signalization settles as described (allow a few minutes). The boot sequence finishes. After booting, the SMLCD shows the status display, for example:
Be aware that SMLCD may display a variation of the indication shown above, depending on installation and SW version. 428
Turn the following switches OFF: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present).
429
Continue with: EJ 41320599 Overall Commissioning - CO MX Rel. 4.x, 5.x, 6.x with VFxxBR and VFxxPF1.
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 11/57
5
* Inspection Travel with IMOF WARNING
Hoistway Information System SALSIS with End-of-Travel Switch (KNE) Function Traveling on top of the car without a commissioned SALSIS could result in damage to the installation or in serious injury or death. Do not travel on top of the car until SALSIS is commissioned: To use SALSIS with the end-of-travel switch (KNE) function: Perform the commissioning of SALSIS from outside the hoistway, using the recall control (ESE) with IMOF, as described in J 604806 Instruction Manual. Summary
This chapter describes the activities for preparing the first travel on the car.
Preconditions
All the instructions given in chapter "Preparation of Control" have been carried out fully. LON communication to PCBA LONIC is established. SALSIS (if present) is commissioned.
5.1 General
No
Preparation Step
500
AS, check that JMOF switch on user interface is on position "1".
501
Turn the following switches ON: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control fuse (if present). Wait until the boot sequence finishes and the SMLCD displays:
Be aware that the SMLCD may display a variation of the indication shown above, depending on installation and SW version 502
Turn the following switches OFF: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control fuse (if present).
503
PDB, plug in the following connector: POWC, power supply to the car (traveling cable). 400V, power to car for 3-phase door operator (if present).
504
Turn the following switches ON: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control fuse (if present).
505
Set JREC to position "INSP" and JHC to position "STOP".
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 12/57
No 506
Step OKR, check voltage on the POWC connector. Refer to the schematics.
507
Turn the following switches OFF: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control fuse (if present).
508
OKR, LONICx, plug in the following connectors: POWC, power supply car LC, lighting car.
509
Turn the following switches and circuit breakers ON: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control fuse (if present). Wait until: The boot sequence finishes. The LON node SW download finishes (if applicable). A download in progress shows with a blinking "%"-sign on SMLCD. After booting, the SMLCD shows the status display, for example:
[7582; 03.12.2004]
510
OKR, check the LEDs on PCBA LONICx: LED 24 V (green), lit LED SERV (rot), not lit LED APPL (green), lit, switches OFF every 2 s communication OK. If the LED "APPL" remains OFF, execute a double reset on PCBA GCIOB 360.
5.2 Check Inspection Travel with IMOF
Check Inspection Travel with IMOF
No
Step
511
OKR, unlock JHC.
512
Press DREC-D: Car should travel downwards. Press DREC-U: Car should travel upwards.
513
Carry out an inspection travel and check the operation of JHC.
514
Check the operation of the contacts in the safety circuit. Refer to the schematics.
515
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
Turn the following switches and circuit breakers OFF: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control fuse (if present).
K 604453
13 13/57
5.3
* Setup of Door Interface
Also refer to the schematics where necessary.
Preparation OKR
Serial or Parallel Door Drive
No
Step
516
Check that the door drive is not blocked mechanically.
517
OKR, LONICx, plug in the following connectors: LONT1, LON Door 1 LONT2, LON Door 2 (if present) POWT1, power supply door 1 (if present) POWT2, power supply door 2 (if present).
518
OKR, plug in the following connector: 400 V, 3-phase power supply for door drive (if present).
519
OKR, LONICx, plug in the following connectors: POWD400, 3-phase power supply (if present) POW400T1, 3-phase power supply door 1 (if present) POW400T2. 3-phase power supply door 2 (if present)
520
OKR, check that JREC is set to position "INSP".
The table below shows what kind of door interface is used. In addition it shows in which chapter the corresponding steps for the commissioning can be found. Type of Door Interface
Commissioning Instructions
Hardware
Bus
Varidor 30 CME
Continue with chapter "Setup PCBA LONIBV of PCBA LONIBV"
LON
Other Door Drives with LON-Bus Interface
Continue with chapter "Setup PCBA LONDIM of PCBA LONDIM"
LON
5.3.1 Varidor 30 CME
* Setup of PCBA LONIBV
No
Step
521
On PCBA LONIBV of Varidor 30 CME door drive, enter the following settings for the sliding switch: Entrance Side 1: SZ1 Entrance Side 2: SZ2.
522
Check that all wiring between the PCBA LONIBV (Varidor 30 CME) and the PCBA LONICx (OKR) is done properly. Refer to the respective schematics.
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 14/57
No 523
Step Turn the following switches and circuit breakers ON: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control fuse (if present). Wait until: The boot sequence finishes. The LON node SW download finishes (if applicable). A download in progress shows with a blinking "%"-sign on SMLCD. After booting, the SMLCD shows the status display, for example:
[7582; 03.12.2004]
524
Check the LEDs on PCBA LONIBV.
525
Turn the following switches and circuit breakers OFF: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control fuse (if present).
526
OKR, set JREC switch to position "NORMAL".
527
Continue with: EJ 41320599 Overall Commissioning - CO MX Rel. 4.x, 5.x, 6.x with VFxxBR and VFxxPF1.
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 15/57
5.3.2
* Setup of PCBA LONDIM
The PCBA LONDIM (LON Door Interface) is installed in the door interface box DIB. Two door drives require two DIBs.
Interfaces to Parallel Door Drives
No
Step
528
Check that: All wiring between DIB, OKR and door drive is done according to the schematics. I/Os not used on PCBA LONDIM are terminated with a bridging connector according to the schematics.
529
LONDIM, check that the following connectors are plugged in: LONT, LON Door SKT, safety circuit door POWT, power supply door 400 V, 3-phase power supply for door drive (if present).
530
LONDIM, DOOR TYPE Code (2 rotary switches) Check and if necessary, adjust the two rotary switches "DOOR TYPE" according to the schematics. See also appendix.
531
LONDIM, Entrance Side (slide switch) Enter the following settings for the sliding switch: Entrance side 1: SZ1 Entrance side 2: SZ2.
532
Turn the following switches and circuit breakers ON: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control fuse (if present). Wait until: The boot sequence finishes. The LON node SW download finishes (if applicable). A download in progress shows with a blinking "%"-sign on SMLCD. After booting, the SMLCD shows the status display, for example:
[7582; 03.12.2004]
533
Perform a reset on GCIOB.
534
LONDIM, check following LON bus and power supply LEDs: LED 24 V (green), lit, 24 VDC available LED APPL (green), lit, switches OFF every 5 s, LON Communication OK LED SERVICE (red), not lit, LON Communication OK.
535
LONDIM, check status of the 7-Segment display (shows the internal status of the door software in the MX-GC controller): If the display shows an "8" (Error 8), no valid door type was selected by the two rotary switches "DOOR TYPE Code". Check the setting according to the schematics. A table of all possible status is found in the appendix.
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 16/57
No
Step
536
LONDIM, check the status LEDs (green) for the I/Os. (some of them may not be relevant for the actual door drive, refer to the schematics. Also refer to the respective appendix.
537
LONDIM, use the 3 Check Buttons to check the behavior of the door drive (some of them may not work with the actual door drive, refer to the schematics): 1) JREC ON 2) Press DRET-O: Door must open 3) Press DRET-S: Door must close 4) Press DVRT together with DRET-O / DRET-S: Door must open / close with slow speed.
538
Turn the following switches and circuit breakers OFF: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control fuse (if present).
539
OKR, set JREC switch to position "NORMAL".
540
Continue with: EJ 41320599 Overall Commissioning - CO MX Rel. 4.x, 5.x, 6.x with VFxxBR and VFxxPF1.
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 17/57
6
* Measuring Travel
Summary
The following steps instruct how to prepare and carry out a measuring travel.
Preconditions
All of the preceding steps in the complete commissioning procedure have been carried out.
6.1 General
Control Cabinet
Car
No
Step
600
The operation of all contacts in the safety circuit must be tested. KNE contacts must be correctly set. All KUET devices must be installed correctly.
601
Check that following switches have been turned OFF: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present).
602
AS, ASIXA, plug in the following connectors: AGSI, Absolute encoder (if present) SI, shaft information (if present) Tacho, incremental encoder (if present) LUET, Car in door zone signal (traveling cable).
603
The complete safety circuit must be installed and connected properly.
604
OKR, LONICx, plug in the following connectors: LUET, car in door zone signal (traveling cable) AGSI, encoder AGSI, ALSIS or SALSIS SI (LONIC1/LONIC2: AGSI), shaft info (traveling cable) PHNR-D / PHNR-U releveling (if incremental shaft info) KSE, contacts hoistway end (if present) KUET, magnetic / optical switches - KUET / KUET1 2KUET, magnetic / optical switches - 2KUET / 2KUET1 (if present).
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
* Preparation
K 604453
13 18/57
6.2
Execution of Measuring Travel NOTICE
Getting Trapped During Measuring Travel If the car gets blocked during measuring travel, unblocking of the car has to be performed at the control cabinet. A technician staying in the car, on the car roof or in the hoistway during measuring travel could get trapped and therefore would depend on outside help for rescue and unblocking the car. Always initiate measuring travel from a safe location. Execution of Measuring Travel
No 605
Step Turn the following switches and circuit breakers ON: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present) Wait until the boot sequence finishes, and the SMLCD displays the elevator status. Make sure that the car door remains closed during the boot sequence.
606
Move the car using the recall control station and take note of the signal change from KUETs by checking the LED LUET on the user interface. Check the correct installation of KUETs by counting the floor numbers.
607
Position the car in the door zone at the uppermost floor. Check that the LED LUET on the user interface is ON. During the measuring travel the elevator control compares the number of KUET signals with the PCT (chip card). It is therefore very important to start at the uppermost floor.
608
Before proceeding, make sure that nobody is in the car or in the hoistway.
609
AS, execute the following steps to start measuring travel: 1) Use SMLCD to activate the measuring travel: Login - Commands - Special Trips - JLF - OK 2) Set JMOF to position "0" 3) Set JRH to position "NORMAL".
The elevator control initializes a measuring travel. The car travels to the bottom floor and remains in the door zone. After releveling, the measuring travel is finished. XX = actual position of car.
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 19/57
No 610
Step Check the SMLCD display:
Be aware that the SMLCD may display a variation of the indication shown above, depending on installation and SW version 611
SMLCD, execute a "Drive End Commissioning" to save the learned hoistway image to NVRAM: Login - Commands - Drv End Commis - OK. Wait until SMLCD displays: DrvEndCommis Success
612
Check that for every entrance side one door movement has been done: Send the car to a floor with entrance side 1 (and if present to entrance side 2) by using SMLCD and ensure the door opens and closes. Login - Commands - Car Call - Floor - Entry Side - OK. This launches the measuring travel of the door drive.
613
Use SMLCD to execute car calls and check that the car travels to the correct floor and the door opens properly. Login - Commands - Car Call - Floor - Entry Side - OK. Make sure that nobody is in the car and nobody enters the car during these trips.
For SW versions 2.60, the distance parameter KSERE is set automatically according to the installation type: 100 mm for MRL elevators with car maintenance platform (for example P23K) 600 mm for MRL elevators without car maintenance platform (for example W38K) 1500 mm for MR elevators. 614
Applicable only to SW versions < 2.60. Use the SMLCD to adjust the KSERE-Dist parameter: Login - Parameters - Drive General - KSERE-Dist. This parameter defines the stopping position at each hoistway end when the car travels in inspection mode. The distance is measured from the bottom or, respectively, top landing floor. Typical values are between 100 and 1000 mm, depending on braking deceleration and load condition. Make sure to set a safe value even for worst case conditions (that is an empty car traveling upward or a full car traveling downward). The car should be prevented from reaching the KNE-D/U position.
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 20/57
7
Car I/Os
Summary
The following steps instruct how to connect and check the car I/Os.
Preconditions
All of the preceding steps in the complete commissioning procedure have been carried out.
7.1 OKR
Serial or Parallel Car Operating Panels
Preparation
No
Step
700
Turn the following switches and circuit breakers OFF: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present).
701
OKR, LONICx, plug in the following connectors: LONTC, LON Car Operating Panel(s) LMI, load measuring interface (if present).
The table below shows what kind of car operating panels / indicators or interfaces are used. In addition it shows in which chapter or external Technical Catalogue the corresponding steps for the commissioning can be found. Type of Car Fixtures MX-Fixtures
Commissioning Instructions
Hardware
Continue with chapter "Setup LONCOP of MX COP" LONCOPE
Bus LON
NWDB NWPB(5) NWSL NWLC NWPBC NWDY MX Basic Fixtures
Separate documentation
LONMXB
LON
Z-Line Fixtures (Miconic 10)
Continue with K 604032
HBOX
LON
Other Fixtures with LON-Bus Interfaces
Continue with chapter "Setup LONCPI of CIM (COP Interface NWIOD6 Module)" NWIO36
AZRC LON
NWIOC3 T-Fixtures
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
Separate documentation
LONCIB
K 604453
LON
13 21/57
7.2 Introduction
Setup of MX COP
The PCBA LONCOP(E) is the interface between LON bus and car operating and indicating elements. LONCOP(E) - LON Car Operating Panel (E Fixtures)
MX COP
No
Step
702
Make sure that the electrical connections between PCBA LONCOP(E) and PCBA LONICx (OKR) are made correctly. Check against the corresponding schematics if in doubt.
703
LONCOP(E), the LONTC connector must be plugged in.
704
Check the settings on PCBA LONCOP: MODE, row / sequence OUT1, setting ZS1/ZS2 for column 1 OUT2, setting ZS1/ZS2 for column 2 OUT3, setting ZS1/ZS2 for column 3.
705
Check the settings on the configurable NW PCBAs (connected to PCBA LONCOP) according to the schematics.
706
Turn the following switches and circuit breakers ON: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present) Wait until: The boot sequence finishes. The LON node SW download finishes (if applicable). A download in progress shows with a blinking "%"-sign on SMLCD. After booting, the SMLCD shows the status display, for example:
[7582; 03.12.2004]
707
Check the LEDs on PCBA LONCOP(E).
708
Travel to all floors and check that: All car calls are being answered The COP display functions properly The doors function properly (DT-O / DT-S) Key switches and additional lamp elements function properly.
709
Continue with chapter "Elevator I/Os".
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 22/57
7.3 Introduction
Setup of CIM (COP Interface Module)
The COP Interface Module (CIM) is normally mounted on the car roof and consists on a combination of the following hardware: LONCPI, LON COP and position indicator NWIOD6, Neuron Wire 6 I/O car calls (4-cable wiring) NWIO36, Neuron Wire 6 I/O car calls (3-cable wiring) NWIOC3, Neuron Wire 3 I/O configurable.
Interfaces to Parallel COPs
No
Step
710
Make sure that the electrical connections between CIM, COP and indicators are made correctly. Check against the corresponding schematics if in doubt. See also appendix "PCBA LONIC1".
711
LONCPI, check that connector LONTC is plugged in.
712
Check the settings on PCBA LONCPI: Hoist. Entr (entrance side) DT-O / DT-S, normally open or normally closed contacts Blink Enable, activating of blinking car calls acknowledge lamps Gray Binary, gray or binary code for position indicator Gray Inversion, inverse function of the gray or binary code Rotary Switch, (not used with MX-GC). See the respective appendix for the wiring.
713
Check the settings on PCBA NWIOC3 (if present): BMK I/O 1 - I/O 3, BMK function according to schematics Inversion I/O 1 - I/O 3, normally open or normally closed contacts, "ON" = normally closed Mode, mode A or B for the wiring Jumper I/O 1 - I/O 3, all jumpers have to be plugged either in position "A" or in position "B". See the respective appendix for the wiring.
714
Turn the following switches and circuit breakers ON: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present) Wait until: The boot sequence finishes. The LON node SW download finishes (if applicable). A download in progress shows with a blinking "%"-sign on SMLCD. After booting, the SMLCD shows the status display, for example:
[7582; 03.12.2004]
715
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
Check the LEDs on the following PCBAs: LONCPI, NWIOD6, NWIO36 and NWIOC3 (if present).
K 604453
13 23/57
No 716
Travel to all floors and check that: All car calls are being answered The COP display functions properly The doors function properly (DT-O / DT-S) Key switches and additional lamp elements function properly.
717
Continue with chapter "Elevator I/Os".
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
Step
K 604453
13 24/57
8
* Elevator I/Os
Introduction
The following steps instruct how to connect and check the elevator I/Os.
Preconditions
All of the preceding steps in the complete commissioning procedure have been carried out.
8.1 Control Cabinet
Preparation
No
Step
800
Turn the following switches and circuit breakers OFF: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present).
801
On ASIXA, plug in the following connector(s): LONS, LON hoistway 2LONS, LON hoistway Side 2 (if present). Refer to the respective schematics.
802
Applicable for BIO2 bus only. On EBBIO, plug in the following connector(s): BIOS, BIO Bus hoistway (if present) 2BIOS, BIO Bus hoistway Side 2 (if present) The PCBA EBBIO (if present) sits on the PCBA ASIXA. Refer to the respective schematics.
Serial or Parallel Fixtures /Indicators
The table below shows what kind of Landing Operating Panels / Indicators or Interfaces are used. In addition it shows in which chapter or external Technical Catalogue the corresponding steps for the commissioning can be found. Type of Landing Fixtures MX-Fixtures
Commissioning Instructions
Hardware
Continue with chapter "Setup LONCUS of MX Fixtures" LONCUB
Bus LON
LONPBD NWPBU/D NWSL NWLC NWPBC LONDI LONDY(H) LONDYIO3 ZRTM10
Z-Line Fixtures (Miconic 10)
Continue with K 604027 "Commissioning Landing Elements"
Other Fixtures with LON-Bus Interface
Continue with chapter "Setup LONIOC 3/5 of LIM (Landing Interface LONIO2 Module)" LONIO32
LON
LON
LONDGI 1 LONPII 1 LONPGIO LONDGIO
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 25/57
Type of Landing Fixtures BIO2 Fixtures
Commissioning Instructions
Hardware
Continue with chapter "Setup BIODCE of BIO2 Fixtures" BIOPCSE
Bus BIO2
BIOAPI Other Fixtures with BIO2-Bus Interfaces
8.2 MX Fixtures
Continue with "Setup of BIO2 SLCU2 Fixtures" and for the SLCUM2 PCBA SLCUX with "Setup of SLCUX BIO2 Interfaces"
BIO2
Setup of MX Fixtures
No
Step
803
Check the correct wiring and settings of the LOPs, LIPs and BIBs (Building Interface Box) according the schematics.
804
Turn the following switches and circuit breakers ON: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present) Wait until: The boot sequence finishes. The LON node SW download finishes (if applicable). A download in progress shows with a blinking "%"-sign on SMLCD. After booting, the SMLCD shows the status display, for example:
[7582; 03.12.2004]
805
Use SMLCD to "Freeze" the LON node tree Login - Commands - Freeze Node Tr - OK. Check on SMLCD display (upper right corner): "?"
= "freeze" not yet done
"?"(blinking) = executing "freeze" command "!"
= different or missing LON nodes after "freeze"
"!"(blinking) = "freeze" was not successful no display
= "freeze" done and no changes with the nodes
The LON nodes are saved in a list on the PCBA GCIOB. For diagnostic reasons, this list is periodically checked against the existing LON nodes. The freeze is mandatory in order to enable the controller to recognize the critical (safety-relevant) I/Os.
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 26/57
No 806
Step Travel to all floors and check that: All landing calls are being answered The LIP displays function properly Key switches and additional lamp elements function properly. Refer to the schematics.
807
Turn the following switches and circuit breakers OFF: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present).
808
Continue with chapter "Completion Work Simplex Installation".
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 27/57
8.3 Introduction
Setup of LIM (landing interface module)
The Landing Interface Modules LIM are mounted in the hoistway near the operating / indicating panels and consist of a combination of the following hardware: LOP (landing operating panel): LONIO2, PCBA LON with 2 I/Os for DE up / down (4-cable wiring) LONIO32, PCBA LON with 2 I/Os for DE up / down (3-cable wiring) LONIOC3/5, PCBA LON with 3 / 5 configurable I/Os LIP (landing indicator panel): LONDGI, PCBA LON with direction indicator and gong interface LONPII, PCBA LON with position indicator and gong interface LIOP (landing indicator/operating panel): LONDGIO, PCBA LON with direction indicator, gong interface and I/Os LONPGIO, PCBA LON with position indicator, gong interface and I/Os Safety Circuit Disconnection and Bypassing (Korea only): LONUESK, PCBA LON with relays to disconnect and bypass safety circuit pit contacts (defined as critical I/Os)
LIM
No
Step
809
Make sure that the electrical connections between the LIM, operating panels and indicators are made correctly. Check against the corresponding schematics if in doubt. See also appendix "PCBA LONIC1".
810
Check settings on LONIO2, LONIO32, and LONDGIO PCBAs (if present) Hoist. Entr (entrance side) Floor Number.
811
Check settings on LONIOC3/5 PCBAs (if present): Hoist. Entr (entrance side) Floor Number BMK I/O 1 - I/O 3/5, BMK function according to schematics Inversion I/O 1 - I/O 3/5, normally open or normally closed contacts, "ON" = normally closed Mode, mode A or B for the wiring Jumper I/O 1 - I/O 3/5, all jumpers have to be plugged either in position "A" or in position "B". See the respective appendix for the wiring.
812
Check settings on LONDGI PCBAs (if present): Hoist. Entr (entrance side) Floor Number.
813
Check settings on LONPII and LONPGIO PCBAs (if present): Hoist. Entr (entrance side) Floor Number Binary / Gray, gray or binary code for position indicator Selector, selector or position shown on position indicator, selector = "ON" Fire Mode, mode out of order indicator Inversion, inverse function of the gray or binary code. See the respective appendix for the wiring.
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 28/57
No 814
Step Turn the following switches and circuit breakers ON: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present) Wait until: The boot sequence finishes. The LON node SW download finishes (if applicable). A download in progress shows with a blinking "%"-sign on SMLCD. After booting, the SMLCD shows the status display, for example:
[7582; 03.12.2004]
815
Check the LEDs on the following PCBAs: LONIO2, LONIOC3/5, LONDGI and LONPII (if present).
816
Use SMLCD to "Freeze" the LON node tree Login - Commands - Freeze Node Tr - OK. Check on SMLCD display (upper right corner): "?"
= "freeze" not yet done
"?"(blinking) = executing "freeze" command "!"
= different or missing LON nodes after "freeze"
"!"(blinking) = "freeze" was not successful no display
= "freeze" done and no changes with the nodes
[7585; 03.12.2004]
The LON nodes are saved in a list on PCBA GCIOB. For diagnostic reasons, this list is periodically checked against the existing LON nodes. The freeze is mandatory in order to enable the controller to recognize the critical (safety-relevant) I/Os. 817
Travel to all floors and check that: All landing calls are being answered The LIP displays function properly Key switches and additional lamp elements function properly.
818
Turn the following switches and circuit breakers OFF: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present).
819
Continue with chapter "Completion Work Simplex Installation".
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 29/57
8.4 About BIO2 Landing Fixtures
* Setup of BIO2 Fixtures
In this chapter the BIO2 Landing Fixtures Teach-in procedure is described. With those procedure: The elevator control learns all LIPs and LOPs and their location (floor number and entrance side). Further the LIPs and LOPs themselves learn their location and can be addressed by the elevator control. Important to know: After power on, single or double reset wait 5 minutes before starting Teach-in. Key switches/lamps need further configuration. This is done on the node itself with a separate mechanical setting (e.g. DIP switch) or with programmable PCBAs (see next chapter). If the configuration data resulting from a teach-in requires correction, there is no other way than redo the teach-in. A teach-in always overwrites the existing configuration data. For floors with restricted access see "Restricted Access" (Locked floors will not be served during Teach-in) For parallel operated doors, see "Parallel Operated Doors". If there are unintended landing calls during the "Teach-in" procedure see "Unintended landing calls during Teach-in Mode with opened/closed doors" A single reset on GCIOB360 is needed before starting Teach-in. CADI-GC or SMLCD shall not be used to generate car calls during the Teach-in procedure. With the BIO2 landing bus for MX-GC the following hardware components will be used: PCBA BIODCE (BIO Direction, Calls, E-Fixtures) Landing Indicating / Operating Panel with Further Travel Indicator PCBA BIOPCSE (BIO Position, Calls, Switches, E-Fixtures) Landing Indicating / Operating Panel with Position- and Further Travel-Indicator PCBA BIOAPI (BIO Asia Pacific Indicator) Landing Indicating / Operating Panel for Asia / Pacific PCBA SLCU2 (Smart Landing Call Unit 2), (DE, JBF or JDE) PCBA SLCUM2 (Smart Landing Call Unit 2 Main Floor) (DE-U/D, JBF or JDE, direction arrows, gong, gray code indicator) PCBA SLCUX1 (Smart Landing Call Unit X), (4 Inputs / Outputs) PCBA BPC(S)DG or BPC(S)DR (BIO Positions indicators with Calls (and Switches) for D-fixtures (Green or Red) - D-fixtures landing indicating and operating panel for D-AP LOP.
BIO2 Landing Fixtures Teach-In Procedure
No
Step
820
Make sure that the electrical connections between all landing elements are made correctly. Check against the corresponding schematics if in doubt.
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 30/57
No 821
Step Turn the following switches and circuit breakers ON: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present) Wait until: The boot sequence finishes. The LON node SW download finishes (if applicable). A download in progress shows with a blinking "%"-sign on SMLCD. After booting, the SMLCD shows the status display, for example:
[7582; 03.12.2004]
822
Use the SMLCD to issue a car call to the floor where the controller cabinet is located Login - Commands - Car Call - Floor - OK.
823
Make a single reset and wait five minutes for the complete scan of all BIO nodes.
824
Use the SMLCD to activate the "Teach-in" mode: Login – Commands – Teach-in – ON – OK. Check displays on SMLCD:
[7586; 03.12.2004]
The elevator control opens the door and keeps it open. In case of operational LIPs on landing, "Out-of-Service" is indicated to the passengers. XX = floor number. 825
In car give a call to the landing location which has to be configured (start with the floor farthest from the controller cabinet). The car moves to the requested landing, opens the door and keeps it opened. If there are selective operated entrance sides, for each side a separate car call must be issued. If there are parallel operated entrance sides, the car call must be issued twice. The first will start the Teach-in for one side, the second will start the Teach-in for the opposite side (see Parallel Operated Doors). In teach-in mode, one car call per trip is accepted only.
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 31/57
No
Step
826
At the desired floor, leave the car and press the LOP pushbutton UP (or the only LOP pushbutton) for 5 seconds. The LOP pushbutton must be pressed within 12 seconds after the doors are open. 3 seconds after releasing the LOP pushbutton, the acknowledge lamp on the LOP turns on for 3 seconds and the buzzer in the COP beeps 3 times (with SLCUX two more times Any further configuration is disabled until another car call is executed.
827
For every landing operating panel repeat the last two steps. When the configuration is complete travel back to the floor where the controller cabinet is located. (Travel to controller cabinet prevents form unintended configuration by passengers.)
828
Use the SMLCD to deactivate the "Teach-in" mode: Login - Commands - Teach-in - OFF - OK.
Parallel Operated Doors
829
If there are two entrance sides with parallel operated doors on the same landing, execute the following steps: On entrance side 1, press the LOP pushbutton UP (or the only LOP button) for 5 seconds. The LOP pushbutton must be pressed within 12 seconds after the doors are open. Three seconds after releasing the pushbutton on the LOP, the acknowledge lamps on the LOP turns on for 3 seconds and the buzzer in the COP beeps
830
Go back in the car and execute a car call for the same floor again: On entrance side 2, press the LOP pushbutton UP (or the only button) for 5 seconds. The LOP pushbutton must be pressed within 12 seconds after the doors are open. Three seconds after releasing the button on the LOP, the acknowledge lamp on the LOP turns on for 3 seconds and the buzzer in the COP beeps.
Restricted Access
831
If there are locked floors by restricted access feature, execute the following steps: 1) Disable the restricted access. 2) On entrance side 1, press the LOP pushbutton UP (or the only LOP button) for 5 seconds. The LOP pushbutton must be pressed within 12 seconds after the doors are open. Three seconds after releasing the button on the LOP: The acknowledge lamps on the LOP switches on for 3 seconds The buzzer in the COP beeps for 1 second.
Unintended Landing Calls During Teach-in Mode with Opened Doors
832
If an unintended landing call is entered this landing operating panel will be configured with the location of the landing on which the car is located. The buzzer in the COP beeps. Any further configuration is disabled until another car call is entered. In this case the wrong configured landing operating panel has to be configured again. In "Teach-in" mode, landing calls are not served as such but work as configuration inputs.
Unintended Landing Calls During Teach-in Mode with Closed Doors
Landing calls for configuration purpose are not accepted if the car door is not fully open. This prevents unintended configuration by elevator passengers. 833
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
Perform a single reset and wait for 5 minutes.
K 604453
13 32/57
834
Use SMLCD to "Freeze" the BIO2 nodes. Check on SMLCD display (upper right corner): Login - Commands - Freeze Node Tr - OK. "?"
= "freeze" not yet done
"?"(blinking) = executing "freeze" command "!"
= different or missing BIO2 nodes after "freeze"
"!"(blinking) = "freeze" was not successful no display
= "freeze" done and no changes with the nodes
[7585; 03.12.2004]
The BIO2 nodes are saved in a list on PCBA GCIOB. For diagnostic reasons, this list is periodically checked against the existing BIO2 nodes. The freeze is mandatory in order to enable the controller to recognize the critical (safety-relevant) I/Os. 835
After freeze is complete perform a double reset.
836
Travel to all floors and check that: All landing calls are being answered The LIP displays function properly Key switches and additional lamp elements function properly (I/Os for SLCUX see next chapter).
837
Turn the following switches and circuit breakers OFF: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present).
838
Continue with chapter "Completion Work Simplex Installation".
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 33/57
8.5 About the BIO2 Landing Interface
Setup of BIO2 Interfaces
In this chapter the settings of the BIO2 Landing Interface SLCUX for parallel fixtures are described. For Learning the location (floor and entrance side) of single LIPs and LOPs the "Teach-in" procedure is used. For the teach-in procedure, refer to chapter "Setup of BIO2 Fixtures" in this document. The settings have to be completed before starting with the I/O configuration. Reassigning a function to a redundant I/O requires a 2-step procedure: 1) Assign "No Function" to the respective I/O (this deletes the old function). This step has be carried out on both controls that are associated with the redundant I/O. 2) Assign the desired new function to the respective I/O. This procedure is required even if the reassigned new function is non-redundant. No
Step
839
Check the correct wiring and settings of all landing elements according to the schematics.
840
Turn the following switches and circuit breakers ON: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present) Wait until: The boot sequence finishes. The LON node SW download finishes (if applicable). A download in progress shows with a blinking "%"-sign on SMLCD. After booting, the SMLCD shows the status display, for example:
[7582; 03.12.2004]
841
Use SMLCD to activate "Service Visit" in order to disable the monitoring of critical I/Os. Login - Commands - Service Visit - ON - OK. SMLCD displays a blinking "*" and an acoustic signal sounds when "Service Visit" is activated.
842
Use the SMLCD to activate the I/O configuration Login - Commands - Program IO Fun. The SMLCD shows a list of all programmable PCBAs:
[7587; 03.12.2004]
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 34/57
No
Step
843
Choose the type of PCBA that has to be programmed and press "OK" (SMLCD shows a list of all programmable PCBAs of the chosen type which are connected to the BIO2 bus):
844
Choose the PCBA that has to be programmed and press "OK" (SMLCD shows the current IO configuration):
[7588; 03.12.2004]
[7589; 03.12.2004]
845
Select the Input or Output which has to be programmed by scrolling trough the list and press "OK".
[7590; 03.12.2004]
846
Select the desired "BMK" name and press "OK". For confirmation press "OK" again: The system stores the BMK code permanently on the PCBA. Go back with "ESC".
847
Continue with the single I/O configurations by repeating the steps 839 to 843.
848
Finish the configuration by pressing the "ESC" button.
849
Perform a single reset and wait 5 minutes.
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 35/57
No 850
Step Use SMLCD to freeze the BIO2 nodes: Login - Commands - Freeze Node Tr - OK. Check on SMLCD display (upper right corner): "?"
= "freeze" not yet done
"?"(blinking) = executing "freeze" command "!"
= different or missing BIO2 nodes after "freeze"
"!"(blinking) = "freeze" was not successful no display
= "freeze" done and no changes with the nodes
[7585; 03.12.2004]
The BIO2 nodes are saved in a list on PCBA GCIOB. For diagnostic reasons, this list is periodically checked against the existing BIO2 nodes. The freeze is mandatory in order to enable the controller to recognize the critical (safety-relevant) I/Os. 851
Perform a single reset and wait until the SMLCD displays "N".
852
Use the SMLCD to deactivate "Service Visit" in order to enable the monitoring of critical I/Os. Login - Commands - Service Visit - OFF - OK.
853
Travel to all floors and check that: All landing calls are being answered The LIP displays function properly Key switches and additional lamp elements function properly.
854
Turn the following switches and circuit breakers OFF: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present).
855
Continue with chapter "Completion Work Simplex Installation".
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 36/57
9
* Completion Work Simplex Installation
Summary
The following steps describe how to connect and to test further components.
Preconditions
All of the preceding steps in the complete commissioning procedure have been carried out. No
Step
900
Check the following function: Emergency light in the car must come ON.
901
LONICx, plug in the following connectors: SOA, alarm horn on car MVEC, car fan motor (if present) TT, telephone wire (traveling cable) (if present) GNT, to the car operating panel intercom (if present) RAC, connection car relay alarm (if present) Close the OKR cover.
902
If there is a Building Interface Box (BIB) check the correct wiring and setting. Refer to the schematics.
903
Turn the following switches and circuit breakers ON: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present) Wait until the boot sequence is finished and the display on SMLCD shows the elevator status.
904
Check the following function: When the various alarm buttons are pressed, the alarm horn must sound.
905
If there is a Building Interface Box (BIB) check the correct function of the Inputs and / or outputs. Refer to the schematics.
906
Turn the following switches and circuit breakers OFF: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present).
907
If no further work in hoistway has to be done, turn hoistway lighting OFF.
908
Continue with: EJ 41320599 Overall Commissioning - CO MX Rel. 4.x, 5.x, 6.x with VFxxBR and VFxxPF1.
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 37/57
10
* Group Control
Summary
The commissioning of elevators in the group can be done singly or as a whole. Refer to the schematics if necessary. A difference is made between duplex (n = 2) and multiplex installations (n > 2).
Preconditions
All of the preceding steps in the complete commissioning procedure have been carried out. Check that the power supply units are wired according to the schematics. Check that the critical I/Os are wired according to the schematics.
10.1
* Commissioning Duplex Installation
Unless stated otherwise, the following steps are valid for both elevator control cabinets.
No
Step
1000
Turn the following switches and circuit breakers OFF: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present).
1001
ASIXA, check that the following connectors are plugged in: ETHERNET, Ethernet connection to the next elevator. Ethernet connections for duplex must have blue connectors. With a gateway for Lobby Vision also a duplex installation needs an Ethernet hub.
1002
Turn the following switches and circuit breakers ON: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present) Wait until the boot sequence finishes and SMLCD displays the elevator status. When an elevator control detects another elevator control for the first time, the controller performs a reset.
1003
Travel to all floors and check that: All floor calls are being answered The displays are functioning Group functions are carried out (if present).
1004
Turn the following switches and circuit breakers OFF: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present).
1005
Continue with: EJ 41320599 Overall Commissioning - CO MX Rel. 4.x, 5.x, 6.x with VFxxBR and VFxxPF1.
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 38/57
10.2
* Commissioning Multiplex Installation
Unless indicated otherwise, the following steps are valid for all elevator control cabinets.
No
Step
1006
Turn the following switches and circuit breakers OFF: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present).
1007
ASIXA, check that the following connectors are plugged in (all elevator controls in group): ETHERNET, connection to Ethernet hub (in AS 1). Ethernet connections for 3 ore more elevators in a group must have green connectors.
1008
Elevator 1: Ethernet hub, check that the following connectors are plugged in: 24 V Power supply Ethernet connection to PCBA ASIXA Ethernet connections to all remaining elevator controller.
1009
Turn the following switches and circuit breakers ON: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present) Wait until the boot sequence finishes and the SMLCD shows the elevator status. When an elevator control detects another elevator control for the first time, the controller performs a reset.
1010
Travel to all floors and check that: all floor calls are being answered the displays are functioning group functions are carried out (if present).
1011
Turn the following switches and circuit breakers OFF: JH, main power switch SIL, lighting mains fuse (if present) JHO, options main switch (if present) SIS, control main switch (if present).
1012
Continue with: EJ 41320599 Overall Commissioning - CO MX Rel. 4.x, 5.x, 6.x with VFxxBR and VFxxPF1.
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 39/57
A1
PCBA ASIXA31
Overview and Designations
18a
18b
18c
18d 18e 18f
18g
27 28 29
19 30
17
20
16 21
15 14
22 23 24
13 12
25 26
11 10
9
8 7 6
5
4
3
2
1c
1b
1a
PCBA ASIXA31 [5154; ]
Pos.
Designation
Description
1
a) EB3 b) EBFAN c) EBBIO
a) Extension Board 3 b) Extension Board Motor Fan c) Extension Board BIO Bus
2
GCIOB 360
GCIOB Controller Board
3
LONC
LON Car
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 40/57
Pos.
Designation
Description
4
LONS
LON Hoistway
5
2LONS
LON Hoistway (2. Side)
6
AGSI
Absolute Encoder Hoistway Information
7
LUET
Lamp Overbridging Door
8
ETHERNET
Ethernet Group Connector
9
GNT RS232
RS232 communication to Device Telealarm
10
DRIVE RS422
RS422 communication to Drive
11
BAT
Battery
12
GNT
Telealarm Device
13
ZQF
Travel Counter
14
POW 236
Power Alarm Device for Italy
15
KTHM
Contact Thermal Machine Room
16
KKSA
Contact Supervision Rope Aramid
17
BCM
Brake Control Module
18
Safety Circuit:
19
MGB
Magnetic Brake
20
X15A
Logic signals to Drive
21
X15B
Logic signals to Drive
22
PSW
Used with BCMZA 1
23
GW
Gateway Building Bus
24
2NGO
Power Supply Options
25
NGO
Power Supply Options
26
NGL
Power Supply Unit Elevator
27
RSK1
LED: Relay Safety Circuit (1)
28
VRSK
LED: Amplifier Relay Safety Contact
29
RSK
LED: Relay Safety Circuit
30
RB
a) Phase Control Relay b) Hoistway c) a) SK1 b) SKS c) SKC d) KTS e) KV Car d) Hoistway Doors e) Door locking (manual doors) f) Bypass Operation (only f) RH g) SK2 Hong Kong) g) Reserve 2
LED: Relay Brake Designations of PCBA ASIXA31
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 41/57
A2
PCBA ASIXA32 and ASIXA33
PCBA ASIXA 32 is used in MX-GC Release 5.1, 5.2 and 6.0. PCBA ASIXA 33 has been introduced with Release 6.1. PCBA ASIXA 33 is fully backward compatible and can be used to replace ASIXA 32. Overview and Designations
18a
18b
18c
18d 18e 18f
18g
27 28 29
19 30
17
20
16 21
15 14 13 12 11
ASIXA 32.Q 34 Id.No. 591853 ASIXA 33.Q Id.No. 594217
31
22 23 24
32
25 26
10
9 33 8 7 6
5
4
3
2
1c
1b
1a
PCBA ASIXA32 and 33 [26112; 28.07.2008]
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 42/57
Pos. Designation
Description
1
a) EB3 b) EBFAN c) EBBIO
a) Extension Board 3 b) Extension Board Motor Fan c) Extension Board BIO Bus
2
GCIOB 360
GCIOB Controller Board
3
LONC
LON Car
4
LONS
LON Hoistway
5
2LONS
LON Hoistway (2. Side)
6
AGSI
Absolute Encoder Hoistway Information
7
LUET
Lamp Overbridging Door
8
ETHERNET
Ethernet Group Connector
9
GNT RS232
RS232 communication to Device Telealarm
10
DRIVE RS422
RS422 communication to Drive
11
BAT
Battery
12
GNT
Telealarm Device
13
ZQF
Travel Counter
14
POW 236
Power Alarm Device for Italy
15
KTHM
Contact Thermal Machine Room
16
KKSA
Contact Supervision Rope Aramid
17
BCM
Brake Control Module
18
Safety Circuit: a) SK1 b) SKS c) SKC d) KTS e) KV f) RH g) SK2
a) Phase Control Relay b) Hoistway c) Car d) Hoistway Doors e) Door locking (manual doors) f) Bypass Operation (only Hong Kong) g) Reserve 2
19
MGB
Magnetic Brake
20
X15A
Logic signals to Drive
21
X15B
Logic signals to Drive
22
PSW
Used with BCMZA 1
23
GW
Gateway Building Bus
24
2NGO
Power Supply Options
25
NGO
Power Supply Options
26
NGL
Power Supply Unit Elevator
27
RSK1
LED: Relay Safety Circuit (1)
28
VRSK
LED: Amplifier Relay Safety Contact
29
RSK
LED: Relay Safety Circuit
30
RB
LED: Relay Brake
31
JBRKTS
Switch Bridge Shaft Doors
32
SI
Shaft Information Interface
33
IGSI
Incremental Shaft Information
34
SERVICE
LON node service button and LED Designations of PCBA ASIXA32 and 33
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 43/57
A3
User Interface SMLCD
Overview and Description
3
2
6
5
4 1
7
8 [4307; 28.09.2004]
Pos.
Description
1
Status voltage supply and LED Door Trigger
2
Safety circuit
3
Chip Card, Elevator-ID
4
Direction and Floor Level LEDs
5
Installation travel mode switch
6
Status information group communication and LON/BIO2 Bus
7
4-line SMLCD (Service Module LCD)
8
Operation keys SMLCD MX-UI: Layout with Descriptions
For detailed information about SMLCD, see K 604454 Diagnostics "Miconic MX-GC.
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 44/57
A4
* PCBA LONIC1
Overview and Designations
PCBA LONIC1 [20192; 15.01.2007]
Pos.
Designation
Description
1
a) SKREC / b) REC
Connector to REC panel
2
RLNC-A
Relay emergency light car
3
RVEC-A
Relay ventilator car
4
RLC-A
Relay light car
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 45/57
Pos.
Designation
Description
5
MVEC
Motor fan car
6
PC
Socket Car
7
POWT2
Power supply door 2
8
LC
Power supply car light
9
POWT1
Power supply door 1
10
POWC
Power supply car
11
LONTC
LON COP
12
LONRES
LON reserve
13
LONC
LON car
14
LONT2
LON door 2
15
LONT1
LON door 1
16
RES
Reserve
17
LMI
Load measurement interface
18
AGSI
Encoder (AGSI / ALSIS / SALSIS)
19
AGSI
Shaft information (traveling cable)
20
SOA
Signal system audible alarm
21
GNT
Device telealarm
22
TT
Emergency call
23
RAC
Relay alarm car
24
2KUET
Contacts bridging door side 2
25
KUET
Contacts bridging door side 1
26
LUET
Signal floor level
27
KF
Contact safety gear
28
SKC1
Safety circuit car, second contacts
29
KNA
Contact emergency exit
30
SKC
Safety circuit car
31
SKT1
Safety circuit door 1
32
SKT2
Safety circuit door 2
33
RUET
Relay bridging door
34
RUET1
Relay bridging door, second contacts Designations of PCBA LONIC1
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 46/57
A5
* PCBA LONIC3 and LONICK1
Overview and Designations
PCBA LONIC3 [20121; 11.01.2007]
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 47/57
PCBA LONICK1 [20127; 12.01.2007]
Pos.
Designation
Description
1
a) SKREC / b) REC
Connector to REC panel
2
RLNC-A
Relay emergency light car
3
RLC-A
Relay light car
4
RVEC-A
Relay ventilator car
5
LC
Power supply car light
6
POW400T1
3-phase power supply door 1
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 48/57
Pos.
Designation
Description
7
POW400T2
3-phase power supply door 2
8
POWD400
3-phase power supply (traveling cable)
9
POWT1
Power supply door 1
10
MVEC
Motor fan car
11
PC
Socket Car
12
POWT2
Power supply door 2
13
POWC
Power supply car
14
PWETSL
Power supply ETSL
15
LONTC
LON COP
16
LONRES
LON reserve
17
LONC
LON car
18
LONT2
LON door 2
19
LONT1
LON door 1
20
RES
Reserve
21
PHNR-D
Photocell releveling down
22
PHNR-U
Photocell releveling up
23
LMI
Load measurement interface
24
KSE
Contact shaft end
25
AGSI
Encoder (AGSI / ALSIS / SALSIS)
26
SI
Shaft information (traveling cable)
27
SOA
Signal system audible alarm
28
TT
Emergency call
29
GNT
Device telealarm
30
RAC
Relay alarm car
31
2KUET
Contacts bridging door side 2
32
KUET
Contacts bridging door side 1
33
LUET
Signal floor level
34
SKC1
Safety circuit car, second contacts
35
KNA
Contact emergency exit
36
ETSL
Speed monitoring in shaft end
37
SKC
Safety circuit car
38
SKT1
Safety circuit door 1
39
SKT2
Safety circuit door 2
40
KNE
Contact emergency limit
41
KF1
Contact safety gear, second contact
42
KF
Contact safety gear
43
RUET
Relay bridging door
44
RUET1
Relay bridging door, second contacts
45
Only PCBA LONICK1: KCV
Contact car lock
46
Only PCBA LONICK1: RUENA
KNA bypassing
47
Only PCBA LONICK1: RUENA1
KNA bypassing
48
Only PCBA LONICK1: RUETFF1
Door and door lock bypassing
49
Only PCBA LONICK1: RUETFF
Door and door lock bypassing
Designations of PCBA LONIC3 and LONICK1
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 49/57
A6
PCBA LONDIM (door interface module)
Overview
PCBA LONDIM [1846; 28.09.2004]
I/O Status LEDs
LED
I/O
Function
KSKB
I
Contact closing force limiter
KET-O
I
Contact end door opening
KET-S
I
Contact end door closing
KTHMH
I
Contact thermo motor door
REP
I
Relay detection people (Progard R)
RPHT
I
Relay photocell door
JHCT/JRET
I
Switch stop car door / Switch inspection door
KSPT
I
Contact blocking door
SPIN1-3
I
Spare inputs 1-3
DRET-S
I
Push button inspection door closing
DVRT
I
Push button reduced speed door
DRET-O
I
Push button inspection door opening
RVRT/RVRT-S (R1)
O
Command slow open / close (in combination with VST-O / VST-S) Command slow close (only in combination with VST-S)
RT-S
O
Command door close
O
Command door open
O
Relay magnet holding brake
Remarks Lit if contact on door drive is not opened
Lit if button is pressed
Lit if relay contact is closed
(R2) RT-O (R3) RMGH/RMGH-A (R4) RV
Relay magnet holding brake OFF O
Command landing door locking
O
Relay blocking door OFF
(R5) RSPT-A (R6) RET
(if no stop switch is operated) O
(R7) R8
Lit, if contact on PCBA LONDIM is closed
Command inspection door (only with JREC ON)
O
Spare output I/O Status LEDs
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 50/57
Door Type Settings
Door Software Model
Door Type
Door Type Setting
Software Model 1 (automatic)
QKS9-1/10-1 QKS9VF/10VF
01
Software Model 2 (automatic)
LUST_QKS9
02
Software Model 3 (automatic)
LUST QKS6
03
Software Model 4 (automatic)
Varidor 20 / 30 (parallel)
04
Software Model 5 (automatic)
LUST QKS6 (with VRVRT)
05
Software Model 6 (automatic)
QKS9/10
06
Software Model 10 (automatic / semi automatic)
Automatic: QKS8 QKS11 Varidor10E LUST QKS8 LUST QKS11 Wittur Mosquito.
LUST_QKS9_VRVRT 41
Semi automatic: QK11 Wittur Mosquito HT. Software Model 11 (automatic / semi automatic)
Automatic: Wittur AC Slycma AC Slycma VF TAT2 / TAF2 (Schlieren).
42
Semi automatic: Wittur AC HT. Software Model 12 (automatic / semi automatic)
Automatic: Varidor10F LUST QKS9 QKS8 with holding brake QKS11 with holding brake LUST QKS8 with holding brake LUST QKS11 with holding brake QKS11 with holding brake.
43
Semi automatic: QK11 with holding brake. Software Model 13 (automatic / semi automatic)
Automatic: Fermator VVVF-3 Wittur RCF1 Wittur Flash Sematic Encoder System Siemens AT 25.
44
Semi automatic: Fermator VVVF-3 HT.
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 51/57
Door Software Model Software Model 14 (automatic / semi automatic)
Door Type
Door Type Setting
Automatic: Wittur TVLD Sematic F28 / F29 Wittur DC (RCRE24 / RC48).
45
Semi automatic: Wittur DC (RCRE24/RC48) HT. Software Model 20 (semi automatic)
QK8 QK8F.
81
Software Model 21 (semi automatic)
Kiekert TMS-2 Slycma PLYCAB2 Varidor 20M.
82
Software Model 22 (semi automatic)
Fermator folding door Peignen folding door.
83
Software Model 30 (manually operated)
HT Progard S HT Photocell HT Skirting KFL.
A1
Door Types Settings
The 7-segment display shows the internal status of the door software in the MX-GC controller. The real status of the door may be different and can be verified by viewing the status LEDs. Diagnosis via Display
Display
Description
Remarks
O
Opened
Door has been opened by door control SW.
O.
Opened manually (not by Door has been opened either manually or by DRET-O. command from control software) Revision car was switched ON with open door. LONDIM has just powered up with open door.
C
Closed
C.
Closed manually (not by Door has been closed either manually or by DRET-S. command from control Revision car was switched ON with closed door. software) LONDIM has just powered up with closed door.
Door has been closed by door control SW.
L
Locked
Door has been locked by door control SW.
S
Stopped (door is neither fully open nor fully closed)
Door has been stopped by door control SW.
S.
Stopped in revision control (door is neither fully opened nor fully closed)
Door has been stopped under revision control car (on-board buttons DRET-O/S).
H.
Manual operated
LONDIM has just powered up with neither fully opened nor fully closed door. Door is in manual mode and can be moved by hand: Communication to door control is broken (LED APPL is OFF). JKFM is ON and a landing door has been opened (KTS).
P.
Powerless
All relays on LONDIM are OFF: Emergency stop button pressed (JHCT, JHC, JHM, JHSG).
o
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
Opening
Door is opening by command from door control SW.
K 604453
13 52/57
Display
Description
Remarks
o.
Door is opening without command from door control Opening manually (not by command from control SW (either manually or by DRET-O). software)
c
Closing
Door is closing by command from door control SW.
c.
Closing manually
Door is closing without command from door control SW (either manually or by DRET-S).
2 Undefined door position (Error)*
KET-O / KET-S are active at the same time.
8 No valid door type was (Error)* selected by the rotary switches
Refer to the schematics.
7-Segment Display
* Flashing of the display indicates an error condition. Example: Display flashes "8" and "S." alternately. This condition indicates that the door type is invalid and the LONDIM state is "manually stopped".
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 53/57
A7
Wiring of CIM and LIM
CIM (COP interface module)
Wiring of CIM [1866; 28.09.2004]
LIM (landing interface module)
Wiring of LIM [1867; 28.09.2004]
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 54/57
A8
Service Codes Miconic 10
Introduction
Several services in basic elevator function M10 can be activated and deactivated using service code entries on the Z-Line or Z-Line II Terminals.
Activation of Service Codes
Service codes are activated as follows: Click on the handicapped key of the M10 terminal to initiate the execution of a service code. This is acknowledged on the terminal display by indication of a 'h'. Click a second time on the handicapped key. A 'c' is displayed and number of the service code can be entered (see table below for valid codes). During entry, there is no display of the entered digits. Invalid entries are acknowledged by displaying '??'. If a request cannot be executed, 'XX' is displayed.
Standard Service Codes
Service codes are identified by a four or three digit number and have the following initial values (length and assignment can be changed, see below): Standard Service Code 1)
Activation State (Activity on Success)
JRV - Independent Service 0001 ... 0008
JRV ON (for elevator 1 ... 8) (The elevator designation is displayed, for example ">A" for elevator with Lift ID 1, then the elevator will arrive on the floor and can be controlled from the car operating panel)
JRVP - Independent Service with Parking 0009, 0011, ..., 0023
JRVP ON (for elevator 1 ... 8) (The elevator designation is displayed, for example ">A" for elevator with Lift ID 1, then the elevator will arrive on the floor and stay there in parking position)
0010, 0012, ..., 0024
JRVP OFF (for elevator 1 ... 8) (The elevator designation is displayed, for example ">A" for elevator with Lift ID 1, then the elevator will be released from its parking position)
JAB - "Out-of-Service" Service 0025, 0027, ..., 0039
JAB ON (for elevator 1 ... 8) (Display of elevator designation, for example ">A" for elevator with Lift ID 1)
0026, 0028, ..., 0040
JAB OFF (for elevator 1 ... 8) (Display of elevator designation, for example ">A" for elevator with Lift ID 1)
DF5 - VIP Service (Elevator) 0041 ... 0048
DF5 ON (for elevator 1 ... 8) (The terminal displays '*' and the destination floor must be entered, now the elevator designation is displayed, for example ">A" for elevator with Lift ID 1, then the elevator will arrive on the floor to execute the travel to the desired floor)
DF6 - VIP Service (Group) NF2 - Emergency Service (Group) 0049
DF6 / NF2 ON (best elevator in group) (The terminal displays '*' and the destination floor must be entered, now the elevator designation is displayed, for example ">A" for elevator with Lift ID 1, then the elevator will arrive on the floor to execute the travel to the desired floor)
JNO - Emergency Power Control 0050, 0052, ..., 0064
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
JNO ON (for elevator 1 ... 8) (Display of elevator designation, for example ">A" for elevator with Lift ID 1)
K 604453
13 55/57
Standard Service Code 1) 0051, 0053, ..., 0065
Activation State (Activity on Success) JNO OFF (for elevator 1 ... 8) (Display of elevator designation, for example ">A" for elevator with Lift ID 1)
Normal Travel 066
Spare
NF1 - Emergency Service (Elevator) 0067 ... 0074
NF1 ON (for elevator 1 ... 8) (The terminal displays " * " and the destination floor must be entered, now the elevator designation is displayed, for example ">A" for elevator with Lift ID 1, then the elevator will arrive on the floor to execute the travel to the desired floor)
JLI - Attendant Control Miconic 10 0075, 0077, ..., 0089
JLI ON (for elevator 1 ... 8) (The elevator designation is displayed, for example ">A" for elevator with Lift ID 1, then the elevator will arrive on the floor and can be controlled from the car operating panel)
0076, 0078, ..., 0090
JLI OFF (for elevator 1 ... 8) (The elevator designation is displayed, for example ">A" for elevator with Lift ID 1, then the elevator will be released from attendant control)
1) The service codes in the table are the initial values of the external service codes, which are identical to the internal service codes. These external codes can be changed and adapted to user requirements using a special service code or CADI GC (see below). Service Codes Available on Terminal (Standard/Initial Values)
Change Length of Service Codes
The length of the service codes can be switched between 4 digits (default setting, see figure below) and 3 digits using CADI GC in the menu 'Miconic10 Parameter Terminals Floor Terminal':
[6876; 12.11.2004]
Thus it may be required, depending on the individual installation, to skip a trailing 0 from the codes indicated in the table (for example entry of 066 instead of 0066 for normal travel).
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 56/57
Change Service Codes with CADI GC
The number assignment of the service codes can be changed with CADI GC under the menu point 'Miconic10 Commands Service Activation Codes':
[6875; 12.11.2004]
Detail
Description / Remarks
Service
Name of the service, including lift number.
Activation Code
These codes are the currently assigned values as they can be executed on the Z-Line Terminals of the installation. They are initially identical to the standard codes as listed in the code table above.
Activation Mode
The following modes are possible: Activated Deactivated Timer Mode (uses time fields 'Activation from/to') CADI GC Screen for Service Activation Codes
Change Service To fulfill customer requirements, the number assignment of the service codes can be also Codes on Keypad be changed on ZRTL: Initiate the code change by execution of the special service code 255. Upon entry of this code, 'OC' (Old Code) is displayed to request the code which has to be changed. Before the first change of a specific code, this value is identical to its standard code as listed in the code table above. Enter the number of the code to be changed Upon the request 'NC' (New Code) enter the new code number Upon the request 'VC' (Verify Code) enter the new code number a second time for verification.
CO MX 4.x / 5.x / 6.x Commissioning Copyright © 2012 INVENTIO AG
K 604453
13 57/57