TCR ARABIA COMPANY LIMITED PHASED ARRAY ULTRASONIC TESTING REPORT Client Project Location

ABENGOA (J3A) Independent Water Project JUBAIL

Test Procedure Technique Sheet No. Acceptance Standard

QCP/TCR/PAUT-004 REV.0 ASME B31.3

Date of Inspection Report No. Page No.

November 01,2022 RP-22-PAUT-261-TCR- ABENGOA 1 of 4

EQUIPMENT & MATERIAL SPECIFICATION Maker

Model

Serial No.

Cable Type

Software

Ref. Block

Cal. Block

Couplant

Material

Thickness

Item Specification

Accessible Area

Surface Condition

RD Tech Olympus

OmniScan MX 2

Omni 104494

Ambli Cable 2.5OM

OMNI PC / Tomoview 2.10R16

7.92 mm 2mm SDH

IIW V1 BLOCK

Chemetall UltraGel

SS

9.53mm

16” Pipe RACK 09

One side

Rough surface

SEARCH UNIT IDENTIFICATION & CALIBRATION SETTINGS Channel

Skew

Probe ID

Wedge

Min. Angle

Max. Angle

Scan

First Element

Last Element

Aperture

Index Offset (mm)

TCG%

Focal Depth

Type of Weld

HAZ

Cap Width (mm)

1

90

2.25L64-A2

SA2-N55S

450

670

SECTORIAL

49

64

16

-16

75% 85%

50

Butt weld

25%

18

PHASED ARRAY ULTRASONIC TESTING RESULT Weld Scan Start-End Point (mm)

Line Number / Weld Joint 2GPI020-01-SP-02 Elbow to Elbow

0-400 400-800 800-1300

Weld Joint Parts

BW05A

Indica tion No. -

Location (mm) Start

End

-

-

Lengt h (mm) -

Depth (mm) Start

End

Height (mm)

-

-

-

Type of Indicatio n -

Location of Indication

Result

-

-

-

-

-

-

-

-

-

ACCEPTED ACCEPTED

-

-

-

-

-

-

-

-

-

ACCEPTED

-

-

-

-

-

-

-

-

-

Remarks

NOTE: LEGEND:

S: Surface Indication, SS: Subsurface Indication, LF: Lack of Fusion, IF: Interpass Fusion, CRK: Crack, COR: Corrosion, GEO: Geometrical Indication, ODS: Outer Surface, IDS: Inner Surface, FI: Fabrication Indication, II: In-service Indication

Data acquisitioned by:

Interpreted by:

Reviewed by:

RINKESH / EHSANULLAH

RINKESH / EHSANULLAH

ABDUL WAHEED

TCR Arabia PAUT Level II

TCR Arabia PAUT Level II

TCR ARABIA NDT MANAGER ASNT LEVEL III

8

TCR ARABIA COMPANY LIMITED PHASED ARRAY ULTRASONIC TESTING REPORT Client Project Location

ABENGOA (J3A) Independent Water Project JUBAIL

Test Procedure Technique Sheet No. Acceptance Standard

QCP/TCR/PAUT-004 REV.0 ASME B31.3

0-400

Date of Inspection Report No. Page No.

November 01,2022 RP-22-PAUT-261-TCR- ABENGOA 2 of 4

8

TCR ARABIA COMPANY LIMITED PHASED ARRAY ULTRASONIC TESTING REPORT Client Project Location

ABENGOA (J3A) Independent Water Project JUBAIL

Test Procedure Technique Sheet No. Acceptance Standard

400-800

QCP/TCR/PAUT-004 REV.0 ASME B31.3

Date of Inspection Report No. Page No.

November 01,2022 RP-22-PAUT-261-TCR- ABENGOA 3 of 4

8

TCR ARABIA COMPANY LIMITED PHASED ARRAY ULTRASONIC TESTING REPORT Client Project Location

ABENGOA (J3A) Independent Water Project JUBAIL

Test Procedure Technique Sheet No. Acceptance Standard

QCP/TCR/PAUT-004 REV.0 ASME B31.3

800-1300

Date of Inspection Report No. Page No.

November 01,2022 RP-22-PAUT-261-TCR- ABENGOA 4 of 4