30 0 210KB
PROCESS VALIDATION / RE-VALIDATION Objective:
1
To set & validate the range of process parameters of a product under devlopment
2
To maintain product quality within process operating range.
3
To monitor and improve effectiveness of manufacturing process.
Benefits: 1
Increase productivity.
2
Reduce manufacturing cost.
3
Avoid potential customer complaint.
4
Reduce rejection level
Document No: Issue No: Rev No:
APS-WP-15 1 0
Sr. No.
Input
PROCESS VALIDATION / REVALIDATION PROCEDURE Process Steps ( What)
( How)
Page Issue Date : Rev Date:
01 of 02 11.03.2016 11.03.2016
Why
Output Documents / Records
Responsibility (Who)
Where
CFT for NPD
Conference
Prior to Mould buy-off To derive the process , DurIng taking new parameters, at which the product for Painting produced part is meeting desired quality parameters.
Process Validation Plan
When
Process Validation ( For Parts and Process Under devlopment) 1
Product Drawing, List of New Validation plan for new products parts,Pre-launch PFD,Pre-launch Control plan, List of process; Skill Matrix, List of measuring Instruments
By refering list of new parts ,conversion technology applied and consulting process owner/Department head.
2
Product Drawing, List of New Select Operators who is qualified Refering Skill matrix. Minimum skill requirment parts,Pre-launch PFD,Pre-launch to operate the applicable is "U" level Control plan, List of process; Skill processes Matrix, List of measuring Instruments
CFT for NPD
Conference
Prior to Mould buy-off To derive the process , DurIng taking new parameters, at which the product for Painting produced part is meeting desired quality parameters.
Process Validation Plan
3
Product Drawing, List of New parts,Pre-launch PFD,Pre-launch Control plan, List of process; Skill Matrix, List of measuring Instruments
Ensure measuring instruments are under valid calibration
By refering Calibration certificate
CFT for NPD
Conference
Prior to Mould buy-off To derive the process , DurIng taking new parameters, at which the product for Painting produced part is meeting desired quality parameters.
Process Validation Plan
4
Process Validation plan, skilled operator,Mould Flow Analysis, R.M.Data sheet,Mould of new part for process validation, For Painting:New part.
Design combination of process parameter to be validated w.r.t product quality
Based on Process expert view , select critical parameter .Keep one parameter constant & vary other parameters at lower ,mean & upper band.
DH-Production, Plant head
Production shop floor
During Mould trial for process validation , DurIng taking new product for Painting
To derive process parameters
Process Validation Report
DH-Production,
Production shop floor
During Mould trial for process validation , DurIng taking new product for Painting
To validate process parameter capable of producing desired quality parts.
Produced parts at various process parameter combinations,Daily production Report
(While using DOE tool for Process Validation:Based on Process expert view , select critical parameter.Select suitable DOE model in Minitab software & feed the data, Run the software to derive the design combination for parameters).
5
Process Validation Report
Produce 25 parts continiously at By refering design combination of Parameters each designed parameter combination
6
Process Validation Report,Produced parts
Verify the produced parts for acceptance status
By inspecting dimensions & Asthetics as per control plan
QA engineer
Production shop floor
After production of parts for validation
To validate process parameter capable of producing desired quality parts.
Produced part Inspection Report/ Lay out Inspection report
7
Produced part Inspection Report/ Lay out Inspection report
Freeze the Process Parameters with tolerance band
Select the optimal process parameter combination which satisfies all product quality requirements & record the same in Process parameter sheet.
CFT for NPD
Production shop floor
After Inspection of produced parts for quality requirment
To freeze process parameters
Process Parameter sheet
Document No: Issue No: Rev No:
APS-WP-15 1 0 FOR REVALIDATION: ( For Existing parts/Process under gone any 4M (Man/Machine/Material/ Method) change )
1
Product Drawing, List of parts,PFD,Control plan; List of process; skill matrix ,Change management ,SPC report
PROCESS VALIDATION / REVALIDATION PROCEDURE
Plan for Re-validation of processes
Plan for Re-validation of processes that goes under any change in Man/Machine/Material/Method, ,Product change,abnormal rejection level,
DH - Production
Production shop floor
During change management procedure(any change in Man/Machine/Material /Method, ,Product change),OR when observed abnormal rejection level,
Page Issue Date : Rev Date:
02 of 02 11.03.2016 11.03.2016
To re-validate process parameter
Process Re-validation plan
2
Product Drawing, List of New Select Operators who is qualified Refering Skill matrix. Minimum skill requirment parts,Pre-launch PFD,Pre-launch to operate the applicable is "U" level Control plan, List of process; Skill processes Matrix, List of measuring Instruments
CFT for NPD
Conference
Prior to Mould buy-off To derive the process , DurIng taking new parameters, at which the product for Painting produced part is meeting desired quality parameters.
Process Validation Plan
3
Product Drawing, List of New parts,Pre-launch PFD,Pre-launch Control plan, List of process; Skill Matrix, List of measuring Instruments
CFT for NPD
Conference
Prior to Mould buy-off To derive the process , DurIng taking new parameters, at which the product for Painting produced part is meeting desired quality parameters.
Process Validation Plan
4
Process Re- Validation plan, Operator Skill Matrix , Process parameter sheet(previous),
DH-Production, Plant head
Production shop floor
Before going for next production run
DH-Production,
Production shop floor
During Mould trial for To Re-validate process process Re-validation parameter capable of , DurIng taking producing desired changed product for quality parts. Painting
Ensure measuring instruments are under valid calibration
By refering Calibration certificate
Design combination of process Based on Process expert view , select critical parameter to be re-validated w.r.t parameter that will affect product quality due to product quality change in 4M.Keep one parameter constant & vary other parameters at lower ,mean & upper band.
To derive revised process parameter
Process Validation Report
(While using DOE tool for Process Validation:Based on Process expert view , select critical parameter that will affect product quality due to change in 4M.Select suitable DOE model in Minitab software & feed the data, Run the software to derive the design combination for parameters). 5
Process Validation Report
Produce 25 parts continiously at By refering design combination of Parameters each designed parameter combination
6
Process Validation Report,Produced parts
Verify the produced parts for acceptance status
By inspecting dimensions & Asthetics as per control plan
QA engineer
Production shop floor
After production of parts for Revalidation
To Re - validate process parameter capable of producing desired quality parts.
Produced part Inspection Report/ Lay out Inspection report
7
Produced part Inspection Report/ Lay out Inspection report
Freeze the Process Parameters with tolerance band
Select the optimal process parameter combination which satisfies all product quality requirements & record the same in Process parameter sheet.
CFT
Production shop floor
After Inspection of produced parts for quality requirment
To freeze process parameters
Process Parameter sheet
Rev No.
Rev Date
Reason for revision
Produced parts at various process parameter combinations,Daily production Report
REFERENCE DOCUMENT Doc. No:
APS/WP/15/RD-01
Rev. No:
0
Process Validation Plan For The Year
Rev. Date: 11.03.2016
Reference document of Page
Project / Customer Name
1
2
3
4
5
6
7
8
9
Part
Process
April P A
May P A
June P A
July P A
Aug P A
Actual(A) Months Sep Oct Nov P A P A P A
1 of 1
Plan(P) Sr. No.
APS/WP/15
Page 01 of Dec P A
Jan P A
Feb P A
March P A
REFERENCE DOCUMENT Doc. No:
APS/WP/15/RD-02
Rev. No:
0
Process Re-Validation Plan For The Year
Rev. Date: 11.03.2016
APS/WP/15
Page
1 of 1
Plan(P) Sr. No.
1
2
3
4
5
6
7
8
9
Processes Part
April P A
May P A
June P A
July P A
Aug P A
Actual(A) Months Sep Oct Nov P A P A P A
Reference document of
Page 01 of Dec P A
Jan P A
Feb P A
March P A
REFERENCE DOCUMENT Doc. No:
APS/WP/15/RD-03
Rev. No:
0
Rev. Date: 11.03.2016 DATE:SHIFT:MOULD :RAW MAT:GRADE:PREDRYING TEMP/TIME:TONNAGE:CY.TIME(SEC):INJECTION INJECTION ON ON FILL TIME COOLING TIME X'FER POSITION PROFILE FEATURES/TIMER INSERT MOLDING EJE.RET.VERIFICATION GAS ASSIT.INTERFACE CY.ALARM LIMIT(SEC) CY.DELAY (SEC) INJECTION DELAY (SEC) FRONT SUCK BK.DELAY(SEC) REFILL DELAY (SEC) REAR SUCK BK.DELAY (SEC) REFILL OVERRUN TIME (SEC) EJECTOR FWD.DELAY (SEC) EJECTOR RET.DELAY(SEC) PARALLEL REFILL DELAY (SEC)
PROCESS SPECIFICATION SHEET PROFILE
CLAMP CLOSE POS.(MM) SPD.(MM/SEC) PRS(BAR) TIME (SEC) CLAMP OPEN
PROFILE OPEN LIMIT
POS.(MM) SPD.(MM/SEC) PRS(BAR) TIME (SEC) FILL POS.(MM) SPD.(MM/SEC) PRS(BAR) PACKING/HOLD ON TIME (SEC) PRS(BAR) REFILL POS. SPD. BACK PRS. TEMPERATURE
EZ-1
SET ACT. HRS Z1 TEMPERATURE Z9 TEMPERATURE
Reference document of APS/WP/15 Page
MOLD SAFETY 1 2
1
SLOW OPEN
01 0f 02
TONNAGE
BRK AWAY
SPD.10
PROFILE SHOT SIZE
SUCK BK
NOZ.
Z1
Z2
Z3
Z4
FEED
OIL
Z2
Z3
Z4
Z5
Z6
Z7
Z8
Z10
Z11
Z12
Z13
Z14
Z15
Z16
PREPARED BY:
CHECKED BY:
APPROVED BY:
REFERENCE DOCUMENT Doc. No:
APS/WP/15/RD-03
Rev. No:
0
Rev. Date: 11.03.2016 EJECTOR FORWARD ON/OFF PULSE POS.(MM) SPD(MM/S) PRS.(BAR)
CORE
PROCESS SPECIFICATION SHEET ON ON LIMIT
CORE-1 B4
SEQUENCE A4 EJEC.POS. SPD % PRS (BAR) DELAY (SEC) TIMER (SEC) CORE SET SEQ. A0 - OFF A1- SET BEFORE CLP.CLOSE A2- SET PARRALLEL TO CLP.CLS.BEFORE POS. A3- SET AFTER CLP.CLS.BEFORE INJECTION A4- START CLOSE, STOP, SET FULL CLS. A5- SET PARRALLEL TO CLP.CLS. AFTER CLP.OPEN A6- SET BEFORE EJEC.RETRACT PROCESS LIMIT: PRESSURE: +/- 10 KGS/CM² SPEED: +/- 10 MM/S TEMPERARURE: +/- 10°C SHOT SIZE: ±5 MM TIME: ±5 SEC
STAY FWD ON/OFF EJE.ON FLY ON/OFF OVERRIDE ON/OFF START POS. RET.OVERIDE
EJE.RET
PULSE
SPD. POS.
CORE-1
B0- OFF B1- PULL AFTER CLAMP OPEN B2- PULL PARRALLEL TO CLP.OPEN BEFORE POS. B3- PULL AFTER COOLING BEFORE OPEN B4- START OPEN, STOP, PULL FULL OPEN B5- PULL PARRALLEL TO CLP.OPEN AFTER CLP.POS. B6- PULL AFTER EJECTOR RETRACT
Reference document of APS/WP/15 Page
1
02 0f 02
AIR EJECTOR 1 2 AIR ON/OFF ON/OFF START POS. DELAY ON TIME
PREPARED BY:
CHECKED BY:
APPROVED BY:
REFERENCE DOCUMENT Doc. No:
APS/WP/15/RD-04
Rev. No:
0
PROCESS VALIDATION REPORT
Rev. Date: 11.03.2016 Year
2011-2012 Machine RM Used/supplier Operation Stage
Plan Month/Date
Name of Person
1 2 3 C) Processing Machines Processing Sr. Machines 1
Page
APS/WP/15 01 0f 04
Actual Date Customer
Part name √Inj. Molding / Painting/Assembly/
A) The following are the qualified operators for Sr.No
Reference document of
Experience
B) Material /Child Part used: Training
Sr.No.
Material
Specification
Inspection Status
1
D)Measuring Instrument/ Equipment list. Sr. No. Calibration Name of Instrument date
Make
Calibration due
Records of Process Validation Trial 01 Variable Paramer
UMO
Parameters to be kept Constant
Value
Set value of Variable parameter
Parametrs to be checked Observation
Observation Status Method
REFERENCE DOCUMENT Doc. No:
APS/WP/15/RD-04
Rev. No:
0
PROCESS VALIDATION REPORT
Rev. Date: 11.03.2016
Reference document of Page
APS/WP/15 02 0f 04
Trial 02 Variable Paramer
UMO
Parameters to be kept Constant
Value
Parameters to be kept Constant
Value
Set value of Variable parameter
Parametrs to be checked Observation
Observation Status Method
Trial 03 Variable Paramer
UMO
Set value of Variable parameter
Parametrs to be checked Observation
Observation Status Method
REFERENCE DOCUMENT Doc. No:
APS/WP/15/RD-04
Rev. No:
0
PROCESS VALIDATION REPORT
Rev. Date: 11.03.2016
Reference document of Page
APS/WP/15 03 0f 04
Trial 04 Variable Paramer
UMO
Parameters to be kept Constant
Value
Set value of Variable parameter
UMO
Parameters to be kept Constant
Value
Set value of Variable parameter
Parametrs to be checked Observation
Observation Status Method
Trial 05 Variable Paramer
Parametrs to be checked
Observation
Observation Method
Status
REFERENCE DOCUMENT Doc. No:
APS/WP/15/RD-04
Rev. No:
0
PROCESS VALIDATION REPORT
Rev. Date: 11.03.2016
Reference document of Page
APS/WP/15 04 0f 04
Records of Process Validation Trial 06 Variable Paramer
UMO
Parameters to be kept Constant
Value
Set value of Variable parameter
UMO
Parameters to be kept Constant
Value
Set value of Variable parameter
Parametrs to be checked Observation
Observation Status Method
Trial 07 Variable Paramer
Prepared by :
Reviewed by : DH(QAD)
Parametrs to be checked Observation
Observation Status Method
Approved by : CEO/Plant Head
REFERENCE DOCUMENT Doc. No:
APS/WP/15/RD-05
Rev. No:
0
PROCESS RE-VALIDATION REPORT
Rev. Date: 11.03.2016 Year
2011-2012 Machine RM Used/supplier Operation Stage
Plan Month/Date
Name of Person
1 2 3 C) Processing Machines Processing Sr. Machines 1
Page
01 0f 04
Actual Date Customer
Part name √Inj. Molding / Painting/Assembly/
A) The following are the qualified operators for Sr.No
Reference document of APS/WP/15
Experience
B) Material /Child Part used: Training
Sr.No.
Material
Inspection Specification Status
1
D)Measuring Instrument/ Equipment list. Sr. No. Name of Instrument
Make
Calibration date
Calibration due
Records of Process Re-Validation Trial 01 Variable Paramer
UMO
Parameters to be kept Constant
Value
Set value of Variable parameter
Parametrs to be checked Observation
Observatio Status n Method
REFERENCE DOCUMENT Doc. No:
APS/WP/15/RD-05
Rev. No:
0
Rev. Date: 11.03.2016
PROCESS RE-VALIDATION REPORT
Reference document of APS/WP/15 Page
02 0f 04
Trial 02 Variable Paramer
UMO
Parameters to be kept Constant
Value
Parameters to be kept Constant
Value
Set value of Variable parameter
Parametrs to be checked Observation
Observatio Status n Method
Trial 03 Variable Paramer
UMO
Set value of Variable parameter
Parametrs to be checked Observation
Observatio Status n Method
REFERENCE DOCUMENT Doc. No:
APS/WP/15/RD-05
Rev. No:
0
Rev. Date: 11.03.2016
PROCESS RE-VALIDATION REPORT
Reference document of APS/WP/15 Page
03 0f 04
Trial 04 Variable Paramer
Parameters to be kept Constant
UMO
Value
Set value of Variable parameter
Parametrs to be checked Observation
Observatio Status n Method
Records of Process Re-Validation Trial 05 Variable Paramer
UMO
Parameters to be kept Constant
Value
Set value of Variable parameter
Parametrs to be checked Observation
Observatio n Method
Status
REFERENCE DOCUMENT Doc. No:
APS/WP/15/RD-05
Rev. No:
0
Rev. Date: 11.03.2016
PROCESS RE-VALIDATION REPORT
Reference document of APS/WP/15 Page
04 0f 04
Trial 06 Variable Paramer
UMO
Parameters to be kept Constant
Value
Set value of Variable parameter
Parametrs to be checked Observation
Observatio Status n Method
Trial 07 Variable Paramer
UMO
Prepared by :
Parameters to be kept Constant
Value
Reviewed by :
Set value of Variable parameter
Parametrs to be checked Observation
Approved by :
Observatio Status n Method
DH(QAD)
CEO/Plant Head
REFERENCE DOCUMENT Doc. No:
APS/WP/15/RD-06
Rev. No:
0
PROCESS VALIDATION REPORT
Rev. Date: 11.03.2016 Year
2011-2012
Machine 1000T
Plan Month/Date
Customer
Name of Person
1 2 3 C) Processing Machines Processing Sr. Machines 1
01 0f 02
M&M
152 HXE Black /Zylog
√Inj. Molding / Painting/Assembly/
A) The following are the qualified operators for Sr.No
APS/WP/15
Page
Actual Date
Spear wheel Cover
RM Used/supplier Operation Stage
Reference document of
B) Material /Child Part used:
Experience
Training
Sr.No.
Material
Specification
Inspection Status
1
D)Measuring Instrument/ Equipment list. Sr. No. Calibration Name of Instrument date
Make
Calibration due
Records of Process Validation Trial 01 HRS temp Injection Speed Hold On Pressure/ti
230/230/230/230/2 30/230/230 60/65/70/70/60/60
Flash Short Moulding
60/6/10
White Mark
10
Injection time
bar
Back Pressure barrel temp 225/225/220/215/210 Refilling speed 90/90/90 Refilling Pressure 80/80/80 Injection Pressure 60/60/55/50/50/50 Cooling Time 35 suckback 15 shot size 123 preheating temp/tim
3
90°C/90min
Visual No flash short molding Visual
No flash
No white mark Visual
No White Mark
ok Short Moulding Not ok
No Warpage Visual No Fixture InspVisual No crack Visual No weld line Visual flow mark Visual No sink mark Visual No burn mark Visual
ok No silver ok streaks ok No Warpage No Fixture Inspe ok ok No crack ok No weld line ok No flow mark ok No sink mark No burn mark ok
black spot
No black spot Visual
No black spot
Flash Short Moulding
No flash
No flash
Sliver Streaks Warpage Fixture Inspection Crack weld line flow mark sink mark burn mark
No silver strea Visual
ok
Trial 02 HRS temp Injection Speed Hold On Pressure/ti
Injection time
bar
230/230/230/230/2 30/230/230 60/65/70/70/60/60 60/6/10
10 Back Pressure barrel temp 225/225/220/215/210 Refilling speed 90/90/90 Refilling Pressure 80/80/80 Injection Pressure 60/60/55/50/50/50 Cooling Time 35 suckback 15 shot size 123 preheating temp/tim
White Mark
4
90°C/90min
Sliver Streaks Warpage Fixture Inspection Crack weld line flow mark sink mark burn mark black spot
Visual
No Short MouldVisual No White Visual Mark No silver Visual streaks
ok No Short Mouldi ok No White Mark
No Warpage Visual No Fixture InspVisual No crack Visual No weld line Visual No flow mark Visual No sink mark Visual No burn mark Visual
ok No silver ok streaks ok No Warpage No Fixture Inspe ok ok No crack ok No weld line ok No flow mark ok No sink mark No burn mark ok
No black spot Visual
No black spot
No flash
No flash
ok
Trial 03 HRS temp Injection Speed Hold On Pressure/ti
Injection time
bar
230/230/230/230/2 30/230/230 60/6/10
10 Back Pressure barrel temp 225/225/220/215/210 Refilling speed 90/90/90 Refilling Pressure 80/80/80 Injection Pressure 60/60/55/50/50/50 Cooling Time 35 suckback 15 shot size 123 preheating temp/tim
Flash Short Moulding
60/65/70/70/60/60
90°C/90min
White Mark
5
Sliver Streaks Warpage Fixture Inspection Crack weld line flow mark sink mark burn mark black spot
Visual
No Short MouldVisual No White Visual Mark No silver Visual streaks
ok No Short Mouldi ok No White Mark
No Warpage Visual No Fixture InspVisual No crack Visual No weld line Visual No flow mark Visual No sink mark Visual No burn mark Visual
ok No silver ok streaks ok No Warpage No Fixture Inspe ok ok No crack ok No weld line ok No flow mark ok No sink mark No burn mark ok
No black spot Visual
No black spot
ok
REFERENCE DOCUMENT Doc. No:
APS/WP/15/RD-06
Rev. No:
0
PROCESS VALIDATION REPORT
Rev. Date: 11.03.2016
Reference document of
APS/WP/15
Page
02 0f 02
Trial 04 HRS temp Injection Speed Hold On Pressure/ti Injection time
bar
230/230/230/230/2 30/230/230 60/6/10
10 Back Pressure barrel temp 225/225/220/215/210 Refilling speed 90/90/90 Refilling Pressure 80/80/80 Injection Pressure 60/60/55/50/50/50 Cooling Time 35 suckback 15 shot size 123 preheating temp/tim
Flash Short Moulding
60/65/70/70/60/60
White Mark
6
90°C/90min
No flash
Visual
No Short MouldVisual No White Visual Mark No silver Visual streaks
No flash
ok No Short Mouldi ok No White Mark
No Warpage Visual No Fixture InspVisual No crack Visual No weld line Visual No flow mark Visual No sink mark Visual No burn mark Visual
ok No silver ok streaks ok No Warpage No Fixture Inspe ok ok No crack ok No weld line ok No flow mark ok No sink mark No burn mark ok
black spot
No black spot Visual
No black spot
Flash Short Moulding
No flash
No flash
Sliver Streaks Warpage Fixture Inspection Crack weld line flow mark sink mark burn mark
ok
Trial 05 HRS temp Injection Speed Hold On Pressure/ti
230/230/230/230/2 30/230/230 60/65/70/70/60/60 60/6/10
Injection time
bar
Back Pressure barrel temp 225/225/220/215/210 Refilling speed 90/90/90 Refilling Pressure 80/80/80 Injection Pressure 60/60/55/50/50/50 Cooling Time 35 suckback 15 shot size 123 preheating temp/tim
7
90°C/90min
ok No Short Mouldi ok
Sliver Streaks Warpage Fixture Inspection Crack weld line flow mark sink mark burn mark black spot
No black spot Visual
No black spot
No flash
No flash
White Mark
10
Visual
No Short MouldVisual No White Visual Mark No silver Visual streaks No Warpage Visual No Fixture InspVisual No crack Visual No weld line Visual No flow mark Visual No sink mark Visual No burn mark Visual
No White Mark
ok No silver ok streaks ok No Warpage No Fixture Inspe ok ok No crack ok No weld line ok No flow mark ok No sink mark No burn mark ok ok
Trial 06 HRS temp Injection Speed Hold On Pressure/ti
230/230/230/230/2 30/230/230 60/65/70/70/60/60
Flash Short Moulding
60/6/10
Injection time
bar
Back Pressure barrel temp 225/225/220/215/210 Refilling speed 90/90/90 Refilling Pressure 80/80/80 Injection Pressure 60/60/55/50/50/50 Cooling Time 35 suckback 15 shot size 123 preheating temp/tim
Sliver Streaks Warpage Fixture Inspection Crack weld line flow mark sink mark burn mark black spot
No black spot Visual
Flash
Flash No short molding
White Mark
10
8
90°C/90min
Visual
No Short MouldVisual No White Visual Mark No silver Visual streaks No Warpage Visual No Fixture InspVisual No crack Visual No weld line Visual No flow mark Visual No sink mark Visual No burn mark Visual
ok No Short Mouldi ok No White Mark
ok No silver ok streaks ok No Warpage No Fixture Inspe ok ok No crack ok No weld line ok No flow mark ok No sink mark No burn mark ok No black spot
ok
Trial 07 HRS temp Injection Speed Hold On Pressure/ti
Injection time
bar
Back Pressure barrel temp Refilling speed Refilling Pressure Injection Pressure Cooling Time suckback shot size preheating temp/tim
230/230/230/230/2 30/230/230 60/65/70/70/60/60
Short Moulding
60/6/10
White Mark
Visual Visual
Flash Found No Short Mouldi
No white mark Visual
No White Mark
Visual
No silver streaks No Warpage
Visual
No Fixture Inspe
80/80/80 60/60/55/50/50/50 35 15 123
Crack weld line flow mark sink mark burn mark
No silver streaks No Warpage No Fixture Inspection No crack No weld line No flow mark No sink mark No burn mark
Visual Visual Visual Visual Visual
No crack No weld line No flow mark No sink mark No burn mark
90°C/90min
black spot
No black spot Visual
No black spot
10 225/225/220/215/210 90/90/90
9
Sliver Streaks Warpage Fixture Inspection
Visual
Not ok ok ok ok ok ok ok ok ok ok ok ok
Prepared by :
Reviewed by : DH(QAD)
Approved by : CEO/Plant Head
REFERENCE DOCUMENT Doc. No:
APS/WP/15/RD-06
Rev. No:
0
Rev. Date: 11.03.2016
LAYOUT INSPECTION REPORT
Reference document of
APS/WP/15
Page
01 0f 01
INSPECTION REPORT PRODUCT NAME:
DATE:
PART NO / REV NO:
DRAWING NO / REV NO:
CUSTOMER NAME:
MATERIAL:
M/C SPECIFICATION:
COMPONENT WEIGHT:
SR.NO
SPECIFIED DIMENSION
TOLERANCE
OBSERVED DIMENSION 1
2
3
4
REMARKS 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 a- OK * - REJECT (TO BE RECTIFIED IN THE MOULD) ◘ ACCEPTED UNDER DEVIATION □ TO BE CHANGED IN DRAWING REMARKS / VISUAL INSPECTION:
INSPECTED BY: APPROVED BY :
REFERENCE DOCUMENT Doc. No:
APS/WP/15/RD-06
Rev. No:
0
Rev. Date: 11.03.2016 Page No:
LAYOUT INSPECTION REPORT
22 23
Page
01 0f 01
INSPECTION REPORT DATE: DRAWING NO / REV NO: MATERIAL: COMPONENT WEIGHT:
SPECIFIED DIMENSION
TOLERANCE
OBSERVED DIMENSION 1
16 17 18 19 20 20A 20B 21
APS/WP/15
1 of 1
PRODUCT NAME: PART NO / REV NO: CUSTOMER NAME: M/C SPECIFICATION: SR.NO
Reference document of
Z= 736.8 Z= 652.9 Æ 6.5 Æ 7.0 Æ 7.0 Z= 652.9 Z= 736.8 Æ 6.5 FRONT VIEW 415.10 7.60
2
3
REMARKS 4
5
± 0.435
763.8 - 652.9= 83.90 REQUIRED, ACTUALLY OBSERVED 84.2
± 0.18 ± 0.18 ± 0.19
Æ 6.4 Æ 6.9 Æ 6.9
± 0.435
763.8 - 652.9= 83.90 REQUIRED, ACTUALLY OBSERVED 84.2
± 0.18
Æ 6.4
± 0.775 ± 0.18
414.60
OK
Æ 6.4 Æ 7.1 Æ 7.1
OK OK
Æ 6.4
OK
414.70 IMAGINARY DIM FROM DATUM 200/X
OK -
a- OK * - REJECT (TO BE RECTIFIED IN THE MOULD) ◘ ACCEPTED UNDER DEVIATION □ TO BE CHANGED IN DRAWING REMARKS / VISUAL INSPECTION:
INSPECTED BY:
0
APPROVED BY :
0
APPROVED BY :
0