2 X 660MW NCC POWER PROJECT Painampuram, Muthukur Mandal, S.P.S.R. Nellore District, A.P.      OWNER:  NCC POWER PROJEC

42 0 889KB

Report DMCA / Copyright

DOWNLOAD PDF FILE

Uat Sizing [PDF]

  • 0 0 0
  • Gefällt Ihnen dieses papier und der download? Sie können Ihre eigene PDF-Datei in wenigen Minuten kostenlos online veröffentlichen! Anmelden
Datei wird geladen, bitte warten...
Zitiervorschau

2 X 660MW NCC POWER PROJECT Painampuram, Muthukur Mandal, S.P.S.R. Nellore District, A.P.      OWNER: 

NCC POWER PROJECTS LIMITED OWNER’S CONSULTANT:                                          

                                 TATA CONSULTING ENGINEERS LIMITED  EPC CONTRACTOR:                          

                                                 NCC LIMITED  EPC CONTRACTOR’S CONSULTANT: 

L&T-SARGENT & LUNDY LIMITED L&T‐S&L JOB No.:  T658000 

11/3.45kV AUXILIARY TRANSFORMER SIZING CALCULATION L&T‐S&L DOC. NO. : T658000‐BN02‐00‐BBT‐141008 

TOTAL NO. OF PAGES : 6  TOTAL NO. OF ATTACHMENTS : 5 

REV: 0

NCCL DOC.NO.: NPT10111‐PE‐E‐EC‐530104‐001  NCC LIMITED DOC. CATEGORY: (USE TICK MARK)

OWNER / OWNER’S CONSULTANT

A

REVIEW / APPROVAL CODE:

I

a

APPROVED

b

APPROVED EXCEPT AS NOTED, FORWARD FINAL DRAWING/ DOCUMENT

c

APPROVED EXCEPT AS NOTED, RESUBMISSION REQUIRED

d

DISAPPROVED

e

FOR INFORMATION / REFERENCE ONLY

ISSUED FOR INFORMATION

APPROVAL

INQUIRY

ORDER

CONSTRUCTION/ DESIGN

AS BUILT

NAME

SIGN.

DATE

NAME

DISCIPLINE

SIGN.

DATE

REVISION CERTIFICATION  PREPARED

REVISION No.

0



NAME

DATE

CT

17-NOV-12

REVIEWED

MECH

CIVIL

-

-

NAME ELEC PPL/ DEY

APPROVED

C&I

SES

-

-

DATE

NAME

DATE

17-NOV-12

SCH

17-NOV-12

L&T-S&L Document No: T658000-BN02-00-BBT-141008

11/3.45kV AUXILIARY TRANSFORMER SIZING CALCULATION

NCC Document No.: NPT10111-PE-E-EC-530104-001 Rev No: 0 Date : 17-NOV-12

2 X 660MW NCC POWER PROJECT

REVISION SUMMARY SHEET 

REV.  0                                     

DETAILS  /  DESCRIPTION 

DATE 

Issued for Approval

17‐NOV‐12                                    

                                                                     

L&T-S&L Document No: T658000-BN02-00-BBT-141008

11/3.45kV AUXILIARY TRANSFORMER SIZING CALCULATION

NCC Document No.: NPT10111-PE-E-EC-530104-001 Rev No: 0 Date : 17-NOV-12

2 X 660MW NCC POWER PROJECT

TABLE OF CONTENTS    DESCRIPTION 

Sl. No. 

PAGE NO. 

1.0  

PURPOSE AND SCOPE 



2.0  

DESIGN INPUTS 



3.0  

ASSUMPTIONS/ CONSIDERATIONS 



4.0  

METHODOLOGY 



5.0  

ACCEPTANCE CRITERIA 



6.0  

CALCULATIONS 



7.0  

RESULTS 



8.0  

REFERENCES 



9.0  

ATTACHMENTS 

6                                           

Document No:

11/3.45kV AUXILIARY TRANSFORMER SIZING CALCULATION

T658000-BN02-00-BBT-141008 Rev No: 0 Page 4 of 6

2 X 660MW NCC POWER PROJECT

1.0

PURPOSE AND SCOPE 

1.1

Purpose 

Date:17-NOV-2012

The purpose of this calculation is to size MVA rating of 11/3.45 kV Auxiliary Transformers i.e. Unit  Auxiliary  Transformers  (UAT’s),  Station  Auxiliary  Transformers  (SAT’s),  Coal  handling  Plant  Auxiliary Transformers (CHPAT’s) and Ash Handling Plant Auxiliary Transformers (AHPAT’s).   1.2

Scope  The scope of this document is to size the MVA rating of UAT, SAT, AHPAT and CHAPAT. The other  parameters of transformers like impedance, tap positions etc. are not covered in this calculation  since those will be decided based on power system studies as a separate deliverable. 

2.0

DESIGN INPUTS  a) Design Criteria Document – Electrical (Doc.no. T658000‐DD02‐00‐ZEN‐140001)  b) Key Single line diagram (Doc.no. – T658000‐YU02‐00‐ZEN‐143101)  c) BTG Vendor Load list (Doc.no. F951C‐D1‐WZT‐04)  d) BOP Electrical Load List (Doc. No. T658000‐XL00‐00‐ZEN‐110001) 

3.0

ASSUMPTIONS/ CONSIDERATIONS  a) Following  values  of  Efficiency  &  Power  factor  for  various  loads  are  considered  as  indicated  below:  Description HT Motors rated up to  1000 kW  HT Motors rated above  1000 kW  LT Motors up to 110 kW   LT Motors above 110 kW 

Power Factor

Efficiency 

0.85  (0.7 for Coal Mill  motor)  0.85    0.8  0.85 

0.9 

0.95    0.85  0.85 

b) Following values of Load factor for various loads are considered as indicated below:  Description 

Load Factor 

Intermittent loads like cranes,  hoists, welding receptacle,  valves/dampers ,  elevators  Other Intermittent loads 

0.2 

0.5 

c) Brake horse power rating (BKW) for motors is considered as 85% of the nameplate rating HT  Loads where Name plate ratings are available, but the BKW ratings are not available.  d) CHP  loads  have  been  considered  based  on  worst  condition  of  loading  (longest  path)  when  both conveying stream are in operation during emergency case. 

11/3.45kV AUXILIARY TRANSFORMER SIZING CALCULATION 2 X 660MW NCC POWER PROJECT

4.0

Document No:

T658000-BN02-00-BBT-141008 Rev No: 0

Date:17-NOV-2012

Page 5 of 6

METHODOLOGY  a) Individual  Input  kVA  requirements  of  each  of  the  motor  is  calculated  based  on  the  Load  list  using the following formula:   

Input kVA  =

 (Motor Name Plate  kW x Load Factor)     (Efficienc y x Power Factor) 

                                                OR 

Input kVA  =

 (Motor B kW)     (Efficienc y x Power Factor) 

b) Total  kVA  requirement  is  determined  based  on  all  the  individual  motors  plus  the  power  feeders.  c)  Load of each LV Service transformer (3.3/0.433 kV) considered in CHP and AHP HT Auxiliary  Transformer after applying Diversity factor 0.9 on total kVA requirement of each individual LV  service Transformer.   d) 10 % margin is taken on total kVA requirement for each 11/.3.45 kV Auxiliary Transformer.  e) Standard transformer rating (in MVA) is selected based on the total kVA requirement.  f) For transformers having rating greater than 5MVA cooling classification shall be ONAN/ONAF.  The  calculated  MVA  rating  shall  be  the  ONAF  rating.  The  ONAN  rating  shall  be  80%  of  the  ONAF rating.  g) For transformers having rating less than or equal to 5 MVA, the cooling classification shall be  ONAN only and the calculated MVA rating shall be ONAN.  5.0

ACCEPTANCE CRITERIA  a) MVA rating of Each Unit auxiliary transformer (UAT) shall be adequate to supply 50% of 3.3kV  unit auxiliary loads plus largest standby motor.  b) MVA rating of Each SAT shall be adequate  for the maximum of the following load conditions:‐  i) Case ‐ A: One SAT is not available    

100% of the load connected to 3.3kV station aux. switchgear for two (2) units  

ii) Case ‐ B: One UAT is not available  50% of 3.3kV Station aux. loads of 2 units (both SATs are available) + Transferred load of  one Unit auxiliary Transformer under maintenance/outage.  c) MVA  rating  of  Each  AT  for  CHP  and  AHP  shall  be  adequate  to  meet  100%  of  the  load  requirement connected to respective 3.3kV switchgear.  6.0

CALCULATIONS  a) For Unit Auxiliary Transformer sizing Calculation, refer Attachment–1.  b) For Station Auxiliary Transformer sizing Calculation, refer Attachment–2. 

Document No:

11/3.45kV AUXILIARY TRANSFORMER SIZING CALCULATION

T658000-BN02-00-BBT-141008 Rev No: 0

Date:17-NOV-2012

Page 6 of 6

2 X 660MW NCC POWER PROJECT

c) For AHP Auxiliary Transformer sizing Calculation, refer Attachment–3.  d) For CHP Auxiliary Transformer sizing Calculation, refer Attachment‐4  7.0

RESULTS  Selected Auxiliary Transformer rating:  Transformer 

Selected Rating (ONAN/ONAF) (MVA) 

Unit auxiliary transformer (UAT) 

8.0

8/10 

Station Auxiliary Transformer (SAT) 

10/12.5 

AHP Auxiliary Transformer (AHPAT)

6/7.5

CHP Auxiliary Transformer (CHPAT) 

12.8/16 

REFERENCES  Nil 

9.0

ATTACHMENTS  a) Attachment‐1: Unit Auxiliary Transformer sizing Calculation  b) Attachment‐2: Station Auxiliary Transformer sizing Calculation  c) Attachment‐3: AHP Auxiliary Transformer sizing Calculation  d) Attachment‐4: CHP Auxiliary Transformer sizing Calculation  e) Attachment‐5: BTG Vendor Load List 

Unit Auxiliary Transformer Sizing Calculation (Attachment-1)

Client: NCC POWER PROJECTS LIMITED Project: 2 × 660 MW NCC POWER PROJECT Project No. : T658000

Doc No. : T658000-BN02-00-BBT-141008 Rev. No.: 0

Voltage (V)

Type of Duty

Load factor

Power factor

Efficiency

kVA for each  working load

Total kVA

1000



kW

3300

C

0.85

0.70

0.90

1349

4048

BTG Vendor Load list

2 CEP‐1, 3

2

1

1

1200



kW

3300

C

0.85

0.85

0.95

1263

1263

BTG Vendor Load list

3 CCCW Pump‐1

1

1

0

550



kW

3300

C

0.85

0.85

0.90

611

611

BTG Vendor Load list

4 T‐BFP Booster Pump‐1

1

1

0

570



kW

3300

C

0.85

0.85

0.90

633

633

BTG Vendor Load list

5 OCCW Pump‐2

1

0

1

500



kW

3300

C

0.85

0.85

0.90

556

0

BTG Vendor Load list

6 Sealing Air Fan‐2

1

0

1

280



kW

3300

C

0.85

0.85

0.90

311

0

BTG Vendor Load list

Bus Section S

Subtotal (kVA)

6555

Considering a margin of 10% 

656

i) Total (kVA)

7211

ii) Additional load (kVA) of largest standby motor Coal Mill‐7

1349

Considering failure of largest standby motor (Coal Mill‐7) = Total kVA (i) + Additional load (kVA) of Coal Mill‐7 (ii) Selected Transformer rating (MVA)

Page 1 of 2

8560 10

Remarks

kW/ kVA /A

1

W

Source of Load

BkW of  Drive/Actual Load  of Power Feeder

3

No. of Total load 4

Description

1 Coal Mill‐1, 3, 5, 7

Sl. No

Rating of motor /  Load/Transformer

Panel Name: 3.3 kV Unit Auxiliary Switchgear‐1A 

Client: NCC POWER PROJECTS LIMITED Project: 2 × 660 MW NCC POWER PROJECT Project No. : T658000

Doc No. : T658000-BN02-00-BBT-141008 Rev. No. : 0

Unit Auxiliary Transformer Sizing Calculation (Attachment-1)

Voltage (V)

Type of Duty

Load factor

Power factor

Efficiency

kVA for each working  load

Total kVA

3

1

1000



kW

3300

C

0.85

0.70

0.90

1349

4048

BTG Vendor Load list

2

CEP‐2

1

1

0

1200



kW

3300

C

0.85

0.85

0.95

1263

1263

BTG Vendor Load list

3

CCCW Pump‐2

1

0

1

550



kW

3300

C

0.85

0.85

0.90

611

0

BTG Vendor Load list

4

T‐BFP Booster Pump‐2

1

1

0

570



kW

3300

C

0.85

0.85

0.90

633

633

BTG Vendor Load list

5

OCCW Pump‐1

1

1

0

500



kW

3300

C

0.85

0.85

0.90

556

556

BTG Vendor Load list

6

Sealing Air Fan‐1

1

1

0

280



kW

3300

C

0.85

0.85

0.90

311

311

BTG Vendor Load list

7

Start‐up system cooling  water pump

1

0

1

400



kW

3300

C

0.85

0.85

0.90

444

0

BTG Vendor Load list

Sl. No

Bus Section S

Subtotal (kVA)

6811

Considering a margin of 10% 

681

i) Total (kVA)

7492

ii) Additional load (kVA) of largest standby motor Coal Mill‐8

1349

Considering failure of largest standby motor (Coal Mill‐8) = Total kVA (i) + Additional load (kVA) of Coal Mill‐8 (ii) Selected Transformer rating (MVA)

Page 2 of 2

8841 10

Remarks

kW/ kVA /A

4

W

Source of Load

BkW of Drive/Actual  Load of Power Feeder

Coal Mill‐2,4,6,8

No. of Total load

1

Description

Rating of motor /  Load/Transformer

Panel Name: 3.3 kV Unit Auxiliary Switchgear‐1B 

Client: NCC POWER PROJECTS LIMITED Project: 2 × 660 MW NCC POWER PROJECT Project No. : T658000

Station Auxiliary Transformer Sizing Calculation (Attachment-2)

Doc No. :T658000-BN02-00-BBT-141008 Rev. No. : 0

STATION AUXILIARY TRANSFORMER SIZING Sl. No

Load  (kVA)

Description

1

3.3 kV Station Auxiliary Switchgear‐A (SAS‐A) 

2049.0

2

3.3 kV Station Auxiliary Switchgear‐B (SAS‐B) 

2079.0

3

3.3 kV Unit Auxiliary Switchgear‐1A (or 2A) (UAS‐1A/2A)

4

3.3 kV Unit Auxiliary Switchgear‐1B (or 2B) (UAS‐1B/2B)

6555 6811 SAT‐1 

Source of Load Refer Page 2 of 5 of  Attachment‐2 Refer Page3 of 5 of  Attachment‐2 Refer Page 4 of 5 of  Attachment‐2 Refer Page 5 of 5 of  Attachment‐2 SAT‐2

Case ‐ A: One SAT is not available  (2049+2079)=4128

(2079+2049)=4128

(ii)Considering a margin of 10% (kVA) Total kVA ((i)+(ii))

412.8 4541

412.8 4541

Case ‐ B: One UAT is not available (i) 50% of the  Station aux. load for two (2) units  (kVA) (ii)Considering a margin of 10% (kVA) (iii) The transferred load of one UAT (kVA) Total kVA ((i)+(ii)+(iii))

2049 204.9 6811 9064.7

2079 207.9 6811 9097.7

Maximum possible load   (kVA) Selected Transformer Rating (MVA)

9064.7 12.5

9097.7 12.5

(i) Total Station Auxiliary load of two (2) units (kVA)

Page 1 of 5

Remarks

Client: NCC POWER PROJECTS LIMITED Project: 2 × 660 MW NCC POWER PROJECT Project No. : T658000

Station Auxiliary Transformer Sizing Calculation (Attachment-2)

Doc No. : T658000-BN02-00-BBT-141008 Rev. No.: 0

Voltage (V)

Type of Duty

Load factor

Power factor

Efficiency

kVA for each working  load

Total kVA

315



kW

3300

C

0.85

0.85

0.90

350

700

BOP Load

2 SWRO HP Feed Pump‐1, 3

2

1

1

630



kW

3300

C

0.85

0.85

0.95

663

663

BOP Load

1

1

0

255



kW

3300

C

0.85

0.85

0.90

283

283

BOP Load

1

1

0

362



kW

3300

C

0.85

0.85

0.90

402

402

BOP Load

Recovery water pump (Ash  pond)‐1 Transit Blow Down Transfer  4 Pump‐1

3

Bus Section S

Total (kVA)

2049

Page 2 of 5

Remarks

kW/ kVA /A

1

W

Source of Load

BkW of Drive/Actual  Load of Power Feeder

2

No. of Total load 3

Description

1 Air compressor‐1, 3, 5

Sl. No

Rating of motor / Load

Panel Name: 3.3 kV Station Auxiliary Switchgear‐A (SAS‐A)

Client: NCC POWER PROJECTS LIMITED Project: 2 × 660 MW NCC POWER PROJECT Project No. : T658000

Station Auxiliary Transformer Sizing Calculation (Attachment-2)

Doc No. : T658000-BN02-00-BBT-141008 Rev. No. : 0

kW/ kVA /A

Voltage (V)

Type of Duty

Load factor

Power factor

Efficiency

kVA for each  working load

Total kVA

Source of Load

1

1

315



kW

3300

C

0.85

0.85

0.90

350

350

BOP Load

2

SWRO HP Feed Pump‐2,  4

2

2

0

630



kW

3300

C

0.85

0.85

0.95

663

1326

BOP Load

3

Recovary water pump  (Ash Pond)‐2

1

0

1

255



kW

3300

C

0.85

0.85

0.90

283

0

BOP Load

4

Transit Blow Down  Transfer Pump‐1, 3

2

1

1

362



kW

3300

C

0.85

0.85

0.90

402

402

BOP Load

Total (kVA)

2079

Page 3 of 5

Remarks

BkW of  Drive/Actual Load  of Power Feeder

2

Bus Section S

Rating of motor /  Load

1 Air compressor‐2,4

W

No. of Total load

Description

Sl. No

Panel Name: 3.3 kV Station Auxiliary Switchgear‐1B

Doc No. : T658000-BN02-00-BBT-141008 Rev. No. : 0

Station Auxiliary Transformer Sizing Calculation (Attachment-2)

Client: NCC POWER PROJECTS LIMITED Project: 2 × 660 MW NCC POWER PROJECT Project No. : T658000

Voltage (V)

Type of Duty

Load factor

Power factor

Efficiency

kVA for each  working load

Total kVA

1000



kW

3300

C

0.85

0.70

0.90

1349

4048

BTG Vendor Load list

2 CEP‐1, 3

2

1

1

1200



kW

3300

C

0.85

0.85

0.95

1263

1263

BTG Vendor Load list

3 CCCW Pump‐1

1

1

0

550



kW

3300

C

0.85

0.85

0.90

611

611

BTG Vendor Load list

4 T‐BFP Booster Pump‐1

1

1

0

570



kW

3300

C

0.85

0.85

0.90

633

633

BTG Vendor Load list

5 OCCW Pump‐2

1

0

1

500



kW

3300

C

0.85

0.85

0.90

556

0

BTG Vendor Load list

6 Sealing Air Fan‐2

1

0

1

280



kW

3300

C

0.85

0.85

0.90

311

0

BTG Vendor Load list

Bus Section S

Total (kVA)

6555

Page 4 of 5

Remarks

kW/ kVA /A

1

W

Source of Load

BkW of  Drive/Actual Load  of Power Feeder

3

No. of Total load 4

Description

1 Coal Mill‐1, 3, 5, 7

Sl. No

Rating of motor /  Load/Transformer

Panel Name: 3.3 kV Unit Auxiliary Switchgear‐1A 

Client: NCC POWER PROJECTS LIMITED Project: 2 × 660 MW NCC POWER PROJECT Project No. : T658000

Station Auxiliary Transformer Sizing Calculation (Attachment-2)

Doc No. : T658000-BN02-00-BBT-141008 Rev. No. : 0

Type of Duty

Load factor

Power factor

Efficiency

kVA for each working  load

1

1000



kW

3300

C

0.85

0.70

0.90

1349

4048 BTG Vendor Load list

2

CEP‐2

1

1

0

1200



kW

3300

C

0.85

0.85

0.95

1263

1263 BTG Vendor Load list

3

CCCW Pump‐2

1

0

1

550



kW

3300

C

0.85

0.85

0.90

611

0

BTG Vendor Load list

4

T‐BFP Booster Pump‐2

1

1

0

570



kW

3300

C

0.85

0.85

0.90

633

633

BTG Vendor Load list

5

OCCW Pump‐1

1

1

0

500



kW

3300

C

0.85

0.85

0.90

556

556

BTG Vendor Load list

6

Sealing Air Fan‐1

1

1

0

280



kW

3300

C

0.85

0.85

0.90

311

311

BTG Vendor Load list

7

Start‐up system cooling  water pump

1

0

1

400



kW

3300

C

0.85

0.85

0.90

444

0

BTG Vendor Load list

Sl. No

Bus Section

Total (kVA)

6811

Page 5 of 5

Remarks

Voltage (V)

3

S

Source of Load

kW/ kVA /A

4

W

Total kVA

BkW of Drive/Actual  Load of Power Feeder

Coal Mill‐2,4,6,8

No. of Total load

1

Description

Rating of motor /  Load/Transformer

Panel Name: 3.3 kV Unit Auxiliary Switchgear‐1B 

AHP Auxiliary Transformer Sizing Calculation (Attachment-3)

Client: NCC POWER PROJECTS LIMITED Project: 2 × 660 MW NCC POWER PROJECT Project No. : T658000

Doc No. : T658000-BN02-00-BBT-141008 Rev. No. : 0

950

3

1

0

1

1

450

2

1

0

0

1

1600

2

0

1

1

0

1600

kW

3300

C

0.85

0.85

0.90

1056

2111

BOP Load List

kW

3300

C

0.85

0.85

0.90

500

1000

BOP Load List

1139

kVA

3300

C

1.00





1139

1139

BOP Load List

1071

kVA

3300

C

1.00





1071

1071

BOP Load List

‐ ‐

(i) Subtotal (kVA)

5321

(ii) Considering a margin of 10% Total (kVA) ((i)+(ii)) Selected Transformer rating (MVA)

532 5853 7.5

Page 1 of 1

Remarks

Source of Load

0

Total kVA

1

kVA for each working  load

1

Efficiency

1

Power factor

3

Load factor

S

Type Of Load

W

BkW of Drive/Actual  Load of Power Feeder

Rating of motor /  Load

Bus Section‐2

Bus Section‐1 S

Voltage (V)

Outgoing for Ash  compressor cum Slurry  3 Service Transformer  (3.3/0.433 kV) Outgoing for Ash Silo  Service Transformer  4 (3.3/0.433 kV)

W

kW/ kVA /A

Conveying Compressor  1 (Centrifugal type) VFD drive for HCSD PUMP  2 motor

No. of Total load

Description

Sl. No

Panel Name: 3.3 kV AHP Switchgear

Client: NCC POWER PROJECTS LIMITED Project: 2 × 660 MW NCC POWER PROJECT Project No. : T658000

AHP Auxiliary Transformer  Sizing Calculation (Attachment‐3)

Doc No. : T658000‐BN02‐00‐BBT‐141008 Rev No. 0

Voltage (V)

Type Of Duty

Load factor

Power factor

Efficiency

Total kVA

S

W

S

1 Clinker Grinder ‐ 1

1

0

0

0

15.0

kW

415

C

0.85

0.80

0.85

18.75

Electrical BOP Load List

2 Clinker Grinder ‐ 2

0

0

1

0

15.0

kW

415

C

0.85

0.80

0.85

18.75

Electrical BOP Load List

3 Clinker Grinder ‐ 3

0

1

0

0

15.0

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

4 Clinker Grinder ‐ 4

0

0

0

1

15.0

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

1

0

0

0

55.0

kW

415

C

1.00

0.85

1.00

64.71

Electrical BOP Load List

0

0

1

0

55.0

kW

415

C

1.00

0.85

1.00

64.71

Electrical BOP Load List

7 ABCN‐1

1

0

0

0

15.0

kW

415

C

0.85

0.80

0.85

18.75

Electrical BOP Load List

8 ABCN‐4

0

0

1

0

15.0

kW

415

C

0.85

0.80

0.85

18.75

Electrical BOP Load List

9 ABCN‐5

1

0

0

0

37.0

kW

415

C

0.85

0.80

0.85

46.25

Electrical BOP Load List

10 BA Overflow Transfer Pumps ‐ 1

1

0

0

0

75.0

kW

415

C

0.85

0.80

0.85

93.75

Electrical BOP Load List

11 BA Overflow Transfer Pumps ‐ 2

0

0

1

0

75.0

kW

415

C

0.85

0.80

0.85

93.75

Electrical BOP Load List

12 BA Overflow Transfer Pumps ‐ 3

0

1

0

0

75.0

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

13 BA Overflow Transfer Pumps ‐ 4

0

0

0

1

75.0

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

14 Seal Water Pump ‐ 1

1

0

0

0

37.0

kW

415

C

0.85

0.80

0.85

46.25

Electrical BOP Load List

15 Seal Water Pump ‐ 2

0

0

0

1

37.0

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

16 BA LP Water Pump ‐ 1

1

0

0

0

110.0

kW

415

C

0.85

0.80

0.85

137.50 Electrical BOP Load List

17 BA LP Water Pump ‐ 2

0

0

1

0

110.0

kW

415

C

0.85

0.80

0.85

137.50 Electrical BOP Load List

18 BA LP Water Pump ‐ 3

0

1

0

0

110.0

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

19 ESP Blower ‐ 1

1

0

0

0

55.0

kW

415

I

0.50

0.80

0.85

40.44

Electrical BOP Load List

20 ESP Blower ‐ 2

0

0

1

0

55.0

kW

415

I

0.50

0.80

0.85

40.44

Electrical BOP Load List

21 ESP Blower ‐ 3

0

0

0

1

55.0

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

22 IA Compressor ‐ 1

0

0

1

0

125.0

kW

415

C

0.85

0.85

0.85

23 IA Compressor ‐ 2

0

1

0

0

125.0

kW

415

C

0.85

0.85

0.85

0.00

Electrical BOP Load List

24 IA Compressor ‐ 3

0

0

0

1

125.0

kW

415

C

0.85

0.85

0.85

0.00

Electrical BOP Load List

25 Dryer for IA compressor ‐ 1

1

0

0

0

3.7

kW

415

C

0.85

0.80

0.85

4.63

Electrical BOP Load List

26 Dryer for IA compressor ‐ 2

0

1

0

0

3.7

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

27 Dryer for IA compressor ‐ 3

0

0

0

1

3.7

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

28 Drain Pump in Ash water Pump house ‐ 1

0

0

1

0

5.5

kW

415

I

0.50

0.80

0.85

4.04

Electrical BOP Load List

29 Drain Pump in Ash water Pump house ‐ 2

0

1

0

0

5.5

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

30 Heater for ESP ‐ 1

1

0

0

0

22.0

kW

415

I

0.20

1.00

1.00

4.40

Electrical BOP Load List

31 Heater for ESP ‐ 2

0

0

1

0

22.0

kW

415

I

0.20

1.00

1.00

4.40

Electrical BOP Load List

32 Heater for ESP ‐ 3

0

1

0

0

22.0

kW

415

I

0.20

1.00

1.00

0.00

Electrical BOP Load List

33 Vaccum pump area drain pump ‐ 1

1

0

0

0

7.5

kVA

415

C

0.85

0.80

0.85

6.38

Electrical BOP Load List

34 Vaccum pump area drain pump ‐ 2

0

0

1

0

7.5

kVA

415

C

0.85

0.80

0.85

6.38

Electrical BOP Load List

35 Vaccum pump area drain pump ‐ 3

0

0

1

0

7.5

kVA

415

C

0.85

0.80

0.85

6.38

Electrical BOP Load List

36 Vaccum pump area drain pump ‐ 4

0

1

0

0

7.5

kVA

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

37 Vaccum pump area drain pump ‐ 5

0

1

0

0

7.5

kVA

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

38 Vaccum pump area drain pump ‐ 6

0

0

0

1

7.5

kVA

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

39 Sludge Pump for clarification system ‐ 1

1

0

0

0

7.5

kW

415

I

0.50

0.80

0.85

5.51

Electrical BOP Load List

40 Sludge Pump for clarification system ‐ 2

0

0

0

1

7.5

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

41 Clarifire

1

0

0

0

11.0

kW

415

C

0.85

0.80

0.85

13.75

Electrical BOP Load List

Description

SCC‐1& 2 power pack,elect. Optd. Flap gate, motor for  cross travell os SCC, etc. ‐ 1 SCC‐1& 2 power pack,elect. Optd. Flap gate, motor for  6 cross travell os SCC, etc. ‐ 2 5

Page 1 of 5

Remarks

kW/ kVA /A

W

Sr. No.

Rating of  feeder

Bus Section ‐ 2

Bus Section ‐ 1

Panel Name: 415V Ash Compressor Cum Slurry PMCC

147.06 Electrical BOP Load List

Client: NCC POWER PROJECTS LIMITED Project: 2 × 660 MW NCC POWER PROJECT Project No. : T658000

AHP Auxiliary Transformer  Sizing Calculation (Attachment‐3)

Doc No. : T658000‐BN02‐00‐BBT‐141008 Rev No. 0

Voltage (V)

Type Of Duty

Load factor

Power factor

Efficiency

Total kVA

S

W

S

42 Polyelectrolyte dosing pump ‐ 1

0

0

1

0

1.5

kW

415

I

0.50

0.80

0.85

1.10

Electrical BOP Load List

43 Polyelectrolyte dosing pump ‐ 2

0

1

0

0

1.5

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

44 Polyelectrolyte agitator ‐ 1

1

0

0

0

1.1

kW

415

I

0.50

0.80

0.85

0.81

Electrical BOP Load List

45 Polyelectrolyte agitator ‐ 2

0

0

0

1

1.1

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

46 agitator for Lime dosing tank ‐ 1

0

0

1

0

1.1

kW

415

I

0.50

0.80

0.85

0.81

Electrical BOP Load List

47 agitator for Lime dosing tank ‐ 2

0

1

0

0

1.1

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

48  Lime dosing pump ‐ 1

1

0

0

0

2.2

kW

415

I

0.50

0.80

0.85

1.62

Electrical BOP Load List

49  Lime dosing pump ‐ 2

0

0

0

1

2.2

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

50 Alum dosing pump ‐ 1

0

0

1

0

1.5

kW

415

I

0.50

0.80

0.85

1.10

Electrical BOP Load List

51 Alum dosing pump ‐ 2

0

1

0

0

1.5

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

52 agitator for alum tank ‐ 1

1

0

0

0

3.7

kW

415

I

0.50

0.80

0.85

2.72

Electrical BOP Load List

53 agitator for alum tank ‐ 2

0

0

0

1

3.7

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

54 Misc. Crane , hoist 

1

0

0

0

15.0

kW

415

I

0.20

0.80

0.85

4.41

Electrical BOP Load List

55 Exhaust Fan for Compressor house ‐ 1

1

0

0

0

0.6

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

56 Exhaust Fan for Compressor house ‐ 2

1

0

0

0

0.6

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

57 Exhaust Fan for Compressor house ‐ 3

1

0

0

0

0.6

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

58 Exhaust Fan for Compressor house ‐ 4

1

0

0

0

0.6

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

59 Exhaust Fan for Compressor house ‐ 5

1

0

0

0

0.6

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

60 Exhaust Fan for Compressor house ‐ 6

0

0

1

0

0.6

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

61 Exhaust Fan for Compressor house ‐ 7

0

0

1

0

0.6

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

62 Exhaust Fan for Compressor house ‐ 8

0

0

1

0

0.6

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

63 Exhaust Fan for Compressor house ‐ 9

0

0

1

0

0.6

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

64 Exhaust Fan for Ash Water pump house ‐ 1

1

0

0

0

0.6

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

65 Exhaust Fan for Ash Water pump house ‐ 2

1

0

0

0

0.6

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

66 Exhaust Fan for Ash Water pump house ‐ 3

1

0

0

0

0.6

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

67 Exhaust Fan for Ash Water pump house ‐ 4

0

0

1

0

0.6

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

68 Exhaust Fan for Ash Water pump house ‐ 5

0

0

1

0

0.6

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

69 Exhaust Fan for Ash Water pump house ‐ 6

0

0

1

0

0.6

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

70 MLDB ‐ 1

1

0

0

0

100.0

kVA

415

C

1.00





100.00 Electrical BOP Load List

71 Misc. Load 

1

0

0

0

100.0

kVA

415

C

1.00





100.00 Electrical BOP Load List

Description

Subtotal (kVA)

1266.10

(i) Considering diversity factor of 0.9 (kVA)

1139.49

(ii) Considering a design margin of 10% (kVA)

113.95

Total (kVA) ((i) + (ii))

1253.44

Selected Transformer rating (MVA)

1.60

Page 2 of 5

Remarks

kW/ kVA /A

W

Sr. No.

Rating of  feeder

Bus Section ‐ 2

Bus Section ‐ 1

Panel Name: 415V Ash Compressor Cum Slurry PMCC

Client: NCC POWER PROJECTS LIMITED Project: 2 × 660 MW NCC POWER PROJECT Project No. : T658000

AHP Auxiliary Transformer  Sizing Calculation (Attachment‐3)

Doc No. : T658000‐BN02‐00‐BBT‐141008 Rev. No. : 0

Voltage (V)

Type Of Duty

Load factor

Power factor

Efficiency

Total kVA

S

W

S

1 ABCN‐2

1

1

0

0

37

kW

415

C

0.85

0.80

0.85

46.25

Electrical BOP Load List

2 ABCN‐2

0

0

1

0

37

kW

415

C

0.85

0.80

0.85

46.25

Electrical BOP Load List

3 ABCN‐2

0

1

0

0

37

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

4 ABCN‐2

0

0

0

1

37

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

5 ABCN‐3

1

0

0

0

15

kW

415

C

0.85

0.80

0.85

18.75

Electrical BOP Load List

6 ABCN‐6

1

0

0

0

37

kW

415

C

0.85

0.80

0.85

46.25

Electrical BOP Load List

7 ABCN‐7

1

0

0

0

22

kW

415

C

0.85

0.80

0.85

27.50

Electrical BOP Load List

8 Belt conveyor for ABCN‐8

1

0

0

0

15

kW

415

C

0.85

0.80

0.85

18.75

Electrical BOP Load List

9 Belt conveyor for ABCN‐9

0

0

1

0

15

kW

415

C

0.85

0.80

0.85

18.75

Electrical BOP Load List

10 Drain Pump for Silo area ‐ 1

0

0

1

0

5.5

kW

415

I

0.50

0.80

0.85

4.04

Electrical BOP Load List

11 Drain Pump for Silo area ‐ 2

0

1

0

0

5.5

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

12 Silo fludising blower ‐ 1

1

0

0

0

37.5

kW

415

C

0.85

0.80

0.85

46.88

Electrical BOP Load List

13 Silo fludising blower ‐ 2

0

0

1

0

37.5

kW

415

C

0.85

0.80

0.85

46.88

Electrical BOP Load List

14 Silo fludising blower ‐ 3

0

1

0

0

37.5

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

15 Silo air heater ‐ 1

1

0

0

0

22

kW

415

C

1.00

1.00

1.00

22.00

Electrical BOP Load List

16 Silo air heater ‐ 2

0

0

1

0

22

kW

415

C

1.00

1.00

1.00

22.00

Electrical BOP Load List

17 Silo air heater ‐ 3

0

0

0

1

22

kW

415

C

1.00

1.00

1.00

0.00

Electrical BOP Load List

18 Rotary vane feeder ‐ 1

1

0

0

0

3.7

kW

415

I

0.50

0.80

0.85

2.72

Electrical BOP Load List

19 Rotary vane feeder ‐ 2

1

0

0

0

3.7

kW

415

I

0.50

0.80

0.85

2.72

Electrical BOP Load List

20 Rotary vane feeder ‐ 3

1

0

0

0

3.7

kW

415

I

0.50

0.80

0.85

2.72

Electrical BOP Load List

21 Rotary vane feeder ‐ 4

1

0

0

0

3.7

kW

415

I

0.50

0.80

0.85

2.72

Electrical BOP Load List

22 Rotary vane feeder ‐ 5

0

0

1

0

3.7

kW

415

I

0.50

0.80

0.85

2.72

Electrical BOP Load List

23 Rotary vane feeder ‐ 6

0

0

1

0

3.7

kW

415

I

0.50

0.80

0.85

2.72

Electrical BOP Load List

24 Rotary vane feeder ‐ 7

0

0

1

0

3.7

kW

415

I

0.50

0.80

0.85

2.72

Electrical BOP Load List

25 Rotary vane feeder ‐ 8

0

1

0

0

3.7

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

26 Rotary vane feeder ‐ 9

0

1

0

0

3.7

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

27 Rotary vane feeder ‐ 10

0

1

0

0

3.7

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

28 Rotary vane feeder ‐ 11

0

0

0

1

3.7

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

29 Rotary vane feeder ‐ 12

0

0

0

1

3.7

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

30 Rotary vane feeder ‐ 13

0

0

0

1

3.7

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

31 Rotary vane feeder ‐ 14

0

0

0

1

3.7

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

32 Ash conditioner ‐ 1

1

0

0

0

18.5

kW

415

I

0.50

0.80

0.85

13.60

Electrical BOP Load List

33 Ash conditioner ‐ 2

1

0

0

0

18.5

kW

415

I

0.50

0.80

0.85

13.60

Electrical BOP Load List

34 Ash conditioner ‐ 3

0

0

1

0

18.5

kW

415

I

0.50

0.80

0.85

13.60

Electrical BOP Load List

35 Ash conditioner ‐ 4

0

0

1

0

18.5

kW

415

I

0.50

0.80

0.85

13.60

Electrical BOP Load List

36 Ash conditioner ‐ 5

0

1

0

0

18.5

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

37 Ash conditioner ‐ 6

0

1

0

0

18.5

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

38 Ash conditioner ‐ 7

0

0

0

1

18.5

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

39 Telescopic spout ‐ 1

1

0

0

0

1.1

kW

415

I

0.50

0.80

0.85

0.81

Electrical BOP Load List

40 Telescopic spout ‐ 2

1

0

0

0

1.1

kW

415

I

0.50

0.80

0.85

0.81

Electrical BOP Load List

Description

Page 3 of 5

Remarks

kW/ kVA /A

W

Sr. No.

Rating of  feeder

Bus Section ‐ 2

Bus Section ‐ 1

Panel Name: 415V Ash Silo PMCC

Client: NCC POWER PROJECTS LIMITED Project: 2 × 660 MW NCC POWER PROJECT Project No. : T658000

AHP Auxiliary Transformer  Sizing Calculation (Attachment‐3)

Doc No. : T658000‐BN02‐00‐BBT‐141008 Rev. No. : 0

Voltage (V)

Type Of Duty

Load factor

Power factor

Efficiency

Total kVA

S

W

S

41 Telescopic spout ‐ 3

0

0

1

0

1.1

kW

415

I

0.50

0.80

0.85

0.81

Electrical BOP Load List

42 Telescopic spout ‐ 4

0

1

0

0

1.1

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

43 Telescopic spout ‐ 5

0

1

0

0

1.1

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

44 Telescopic spout ‐ 6

0

0

0

1

1.1

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

45 Telescopic spout ‐ 7

0

0

0

1

1.1

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

46 Telescopic spout scavanger fan ‐ 1

1

0

0

0

1.1

kW

415

I

0.50

0.80

0.85

0.81

Electrical BOP Load List

47 Telescopic spout scavanger fan ‐ 2

0

0

1

0

1.1

kW

415

I

0.50

0.80

0.85

0.81

Electrical BOP Load List

48 Telescopic spout scavanger fan ‐ 3

0

0

1

0

1.1

kW

415

I

0.50

0.80

0.85

0.81

Electrical BOP Load List

49 Telescopic spout scavanger fan ‐ 4

0

1

0

0

1.1

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

50 Telescopic spout scavanger fan ‐ 5

0

1

0

0

1.1

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

51 Telescopic spout scavanger fan ‐ 6

0

0

0

1

1.1

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

52 Telescopic spout scavanger fan ‐ 7

0

0

0

1

1.1

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

53 Ash Conditioner Water Pump ‐ 1

1

0

0

0

15

kW

415

I

0.50

0.80

0.85

11.03

Electrical BOP Load List

54 Ash Conditioner Water Pump ‐ 2

0

0

1

0

15

kW

415

I

0.50

0.80

0.85

11.03

Electrical BOP Load List

55 Ash Conditioner Water Pump ‐ 3

0

0

0

1

15

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

56 Bin vibrator ‐ 1

1

0

0

0

0.5

kW

415

C

0.85

0.80

0.85

0.63

Electrical BOP Load List

57 Bin vibrator ‐ 2

1

0

0

0

0.5

kW

415

C

0.85

0.80

0.85

0.63

Electrical BOP Load List

58 Bin vibrator ‐ 3

0

0

1

0

0.5

kW

415

C

0.85

0.80

0.85

0.63

Electrical BOP Load List

59 Bin vibrator ‐ 4

0

1

0

0

0.5

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

60 Vibrating screen ‐ 1

0

0

1

0

1.1

kVA

415

C

1.00





1.10

Electrical BOP Load List

61 Vibrating screen ‐ 2

0

1

0

0

1.1

kVA

415

C

1.00





0.00

Electrical BOP Load List

62 Vibrating screen ‐ 3

0

0

0

1

1.1

kVA

415

C

1.00





0.00

Electrical BOP Load List

63 BA 2nd Stage crusher ‐ 1

1

0

0

0

7.5

kW

415

C

0.85

0.80

0.85

9.38

Electrical BOP Load List

64 BA 2nd Stage crusher ‐ 2

0

1

0

0

7.5

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

65 BA 2nd Stage crusher ‐ 3

0

0

0

1

7.5

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

66 Belt Conveyor ‐ 1

1

0

0

0

75

kW

415

C

0.85

0.80

0.85

93.75

Electrical BOP Load List

67 Belt Conveyor ‐ 2

0

0

1

0

75

kW

415

C

0.85

0.80

0.85

93.75

Electrical BOP Load List

68 Dose screw motor 

0

0

1

0

18.5

kW

415

C

0.85

0.80

0.85

23.13

Electrical BOP Load List

69 Feed screw motor

1

0

0

0

18.5

kW

415

C

0.85

0.80

0.85

23.13

Electrical BOP Load List

70 High torque agitator motor

0

0

1

0

75

kW

415

C

0.85

0.80

0.85

93.75

Electrical BOP Load List

71 Charge pump motor

1

0

0

0

55

kW

415

C

0.85

0.80

0.85

68.75

Electrical BOP Load List

72 Drain Pump in Recovery water Pump house ‐ 1

0

0

1

0

5.5

kW

415

I

0.50

0.80

0.85

4.04

Electrical BOP Load List

73 Drain Pump in Recovery water Pump house ‐ 2

0

1

0

0

5.5

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

74 Misc. Crane , hoist 

1

0

0

0

20

kW

415

I

0.20

0.80

0.85

5.88

Electrical BOP Load List

75 Exhaust fan ‐ 1

1

0

0

0

0.55

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

76 Exhaust fan ‐ 2

1

0

0

0

0.55

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

77 Exhaust fan ‐ 3

1

0

0

0

0.55

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

78 Exhaust fan ‐ 4

1

0

0

0

0.55

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

79 Exhaust fan ‐ 5

1

0

0

0

0.55

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

Description

Page 4 of 5

Remarks

kW/ kVA /A

W

Sr. No.

Rating of  feeder

Bus Section ‐ 2

Bus Section ‐ 1

Panel Name: 415V Ash Silo PMCC

Client: NCC POWER PROJECTS LIMITED Project: 2 × 660 MW NCC POWER PROJECT Project No. : T658000

AHP Auxiliary Transformer  Sizing Calculation (Attachment‐3)

Doc No. : T658000‐BN02‐00‐BBT‐141008 Rev. No. : 0

Voltage (V)

Type Of Duty

Load factor

Power factor

Efficiency

Total kVA

S

W

S

80 Exhaust fan ‐ 6

0

0

1

0

0.55

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

81 Exhaust fan ‐ 7

0

0

1

0

0.55

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

82 Exhaust fan ‐ 8 

0

0

1

0

0.55

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

83 Exhaust fan ‐ 9

0

0

1

0

0.55

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

84 Exhaust fan ‐ 10

0

0

1

0

0.55

kW

415

C

0.85

0.80

0.85

0.69

Electrical BOP Load List

85 MLDB‐1

1

0

0

0

100

kVA

415

C

1.00





100.00 Electrical BOP Load List

86 MLDB‐2

1

0

0

0

100

kVA

415

C

1.00





100.00 Electrical BOP Load List

86 Misc Load

1

0

0

0

100

kVA

415

C

1.00





100.00 Electrical BOP Load List

Description

Subtotal (kVA)

1190.06

(i) Considering diversity factor of 0.9 (kVA)

1071.06

(ii) Considering a design margin of 10% (kVA)

107.11

Total (kVA) ((i) + (ii))

1178.16

Selected Transformer rating (MVA)

1.6

Page 5 of 5

Remarks

kW/ kVA /A

W

Sr. No.

Rating of  feeder

Bus Section ‐ 2

Bus Section ‐ 1

Panel Name: 415V Ash Silo PMCC

CHP Auxiliary Transformer sizing calculation (Attachment-4)

Client: NCC POWER PROJECTS LIMITED Project: 2 × 660 MW NCC POWER PROJECT Project No. : T658000

Doc No. : T658000-BN02-00-BBT-141008 Rev. No. : 0

Voltage (V)

Type of Duty

Load factor

Power factor

Efficiency

kVA for each working  load

Total kVA

1

0

0

1

685

594

kW

3300

C



0.85

0.90

776

776

BOP Load List 

2

BCN‐2A

1

0

0

1

0

510

441

kW

3300

C



0.85

0.90

576

576

BOP Load List 

3

BCN‐2B

1

1

0

0

0

510

441

kW

3300

C



0.85

0.90

576

576

BOP Load List 

4

BCN‐2C

1

0

0

1

0

510

441

kW

3300

C



0.85

0.90

576

576

BOP Load List 

5

BCN‐3A/B

2

1

0

1

0

390

336

kW

3300

C



0.85

0.90

439

878

BOP Load List 

6

BCN‐4A/B

2

1

0

1

0

465

402

kW

3300

C



0.85

0.90

525

1051 BOP Load List 

7

BCN‐5A/B

2

1

0

1

0

550

477

kW

3300

C



0.85

0.90

624

1247 BOP Load List 

9

BCN‐E1A/B

2

1

0

0

1

655

594

kW

3300

C



0.85

0.90

776

776

10

Ring Granulator

4

1

1

1

1

950

860

kW

3300

C



0.85

0.95

1065

2130 BOP Load List 

11

Feeder to S/R machine

3

2

0

1

0

750

583

kVA

3300

C







583

1749 BOP Load List 

12

Feeder for CHP Service  Transformer (3.3/0.433 kV)

2

0

1

1

0

1600 1407

kVA

3300

C

1.00





1407

1407 BOP Load List 

13

Feeder for Dust Supression  Pump House Service  Transformer (3.3/0.433 kV)

2

1

0

0

1

750

kVA

3300

C

1.00





678

678

Bus Section‐2

Sl. No

No. of Total load

S

W

S

678

(i) Subtotal (kVA) (ii) Considering a margin of 10% (kVA) Total (kVA)((i)+(ii)) Selected Transformer rating (MVA)

12423 1242 13665 16

Page 1 of 1

BOP Load List 

BOP Load List 

Remarks

kW/ kVA /A

2

W

Source of Load

BkW of Drive/Actual  Load of Power Feeder

BCN‐1A/B

Bus Section‐1

1

Description

Rating of motor / Load

Panel Name: 3.3 kV CHP Switchgear 

Client: NCC POWER PROJECTS LIMITED Project: 2 × 660 MW NCC POWER PROJECT Project No. : T658000

CHP Auxiliary Transformer  Sizing Calculation (Attachment‐4)

Doc No. : T658000‐BN02‐00‐BBT‐141008 Rev. No. : 0

Type Of Duty

Load factor

Power factor

Efficiency

1

0

0

0

90

kW

415

C

0.85

0.80

0.85

112.50 Electrical BOP Load List

2

Vibrating Grizzly Feeder ‐ 2

1

0

0

0

90

kW

415

C

0.85

0.80

0.85

112.50 Electrical BOP Load List

3

Vibrating Grizzly Feeder ‐ 3

0

0

1

0

90

kW

415

C

0.85

0.80

0.85

112.50 Electrical BOP Load List

4

Vibrating Grizzly Feeder ‐ 4

0

0

1

0

90

kW

415

C

0.85

0.80

0.85

112.50 Electrical BOP Load List

5

Centrigugal Fan ‐ 1

1

0

0

0

160

kW

415

C

0.85

0.85

0.85

188.24 Electrical BOP Load List

6

Centrigugal Fan ‐ 2

0

0

0

1

160

kW

415

C

0.85

0.85

0.85

0.00

Electrical BOP Load List

7

Fan inlet Damper ‐ 1

1

0

0

0

2.2

kW

415

C

0.85

0.80

0.85

2.75

Electrical BOP Load List

8

Fan inlet Damper ‐ 2

0

0

1

0

2.2

kW

415

C

0.85

0.80

0.85

2.75

Electrical BOP Load List

9

Motorise Damper ‐ 1

1

0

0

0

1.1

kW

415

C

0.85

0.80

0.85

1.38

Electrical BOP Load List

10

Motorise Damper ‐ 2

1

0

0

0

1.1

kW

415

C

0.85

0.80

0.85

1.38

Electrical BOP Load List

11

Motorise Damper ‐ 3

1

0

0

0

1.1

kW

415

C

0.85

0.80

0.85

1.38

Electrical BOP Load List

12

Motorise Damper ‐ 4

1

0

0

0

1.1

kW

415

C

0.85

0.80

0.85

1.38

Electrical BOP Load List

13

Motorise Damper ‐ 5

1

0

0

0

1.1

kW

415

C

0.85

0.80

0.85

1.38

Electrical BOP Load List

14

Motorise Damper ‐ 6

1

0

0

0

1.1

kW

415

C

0.85

0.80

0.85

1.38

Electrical BOP Load List

15

Motorise Damper ‐ 7

0

0

1

0

1.1

kW

415

C

0.85

0.80

0.85

1.38

Electrical BOP Load List

16

Motorise Damper ‐ 8

0

0

1

0

1.1

kW

415

C

0.85

0.80

0.85

1.38

Electrical BOP Load List

17

Motorise Damper ‐ 9

0

0

1

0

1.1

kW

415

C

0.85

0.80

0.85

1.38

Electrical BOP Load List

18

Motorise Damper ‐ 10

0

0

1

0

1.1

kW

415

C

0.85

0.80

0.85

1.38

Electrical BOP Load List

19

Motorise Damper ‐ 11

0

0

1

0

1.1

kW

415

C

0.85

0.80

0.85

1.38

Electrical BOP Load List

20

Motorise Damper ‐ 12

0

0

1

0

1.1

kW

415

C

0.85

0.80

0.85

1.38

Electrical BOP Load List

21

Motorise Damper ‐ 13

0

1

0

0

1.1

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

22

Motorise Damper ‐ 14

0

1

0

0

1.1

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

23

Motorise Damper ‐ 15

0

1

0

0

1.1

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

24

Motorise Damper ‐ 16

0

1

0

0

1.1

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

25

Motorise Damper ‐ 17

0

0

0

1

1.1

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

26

Motorise Damper ‐ 18

0

0

0

1

1.1

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

27

Motorise Damper ‐ 19

0

0

0

1

1.1

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

28

Motorise Damper ‐ 20

0

0

0

1

1.1

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55

Rotary Air Lock Valve ‐ 1 Rotary Air Lock Valve ‐ 2 Rotary Air Lock Valve ‐ 3 Rotary Air Lock Valve ‐ 4 Screw Conveyor ‐ 1 Screw Conveyor ‐ 2 Screw Conveyor ‐ 3 Screw Conveyor ‐ 4 Slide Gate with Gear Motor ‐ 1 Slide Gate with Gear Motor ‐ 2 Slide Gate with Gear Motor ‐ 3 Slide Gate with Gear Motor ‐ 4 Slide Gate with Gear Motor ‐ 5 Slide Gate with Gear Motor ‐ 6 Slide Gate with Gear Motor ‐ 7 Slide Gate with Gear Motor ‐ 8 BFD‐1A BFD‐1B Splitter Gate ‐ 1 Splitter Gate ‐ 2 Splitter Gate ‐ 3 Splitter Gate ‐ 4 Splitter Gate ‐ 5 Splitter Gate ‐ 6 Splitter Gate ‐ 7 Splitter Gate ‐ 8 Splitter Gate ‐ 9

1 1 0 0 1 1 0 0 1 1 1 1 0 0 0 0 1 0 1 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0

0 0 1 1 0 0 1 1 0 0 0 0 1 1 1 1 0 1 0 1 1 2 2 2 2 2 2

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1

3.7 3.7 3.7 3.7 5.5 5.5 5.5 5.5 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 132 132 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2

kW kW kW kW kW kW kW kW kW kW kW kW kW kW kW kW kW kW kW kW kW kW kW kW kW kW kW

415 415 415 415 415 415 415 415 415 415 415 415 415 415 415 415 415 415 415 415 415 415 415 415 415 415 415

I I I I I I I I I I I I I I I I C C I I I I I I I I I

0.20 0.20 0.20 0.20 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.85 0.85 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50

0.70 0.70 0.70 0.70 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.85 0.85 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80

0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85

1.24 1.24 1.24 1.24 4.04 4.04 4.04 4.04 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 155.29 155.29 1.62 1.62 1.62 3.24 3.24 3.24 3.24 3.24 3.24

Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List

W

S

W

S

Page 1 of 6

Remarks

Voltage (V)

Vibrating Grizzly Feeder ‐ 1

Description

Total kVA

kW/ kVA /A

1

Sr. No.

Rating of  feeder

Bus Section ‐ 2

Bus Section ‐ 1

Panel Name: 415V CHP SERVICE PMCC

Client: NCC POWER PROJECTS LIMITED Project: 2 × 660 MW NCC POWER PROJECT Project No. : T658000

CHP Auxiliary Transformer  Sizing Calculation (Attachment‐4)

Doc No. : T658000‐BN02‐00‐BBT‐141008 Rev. No. : 0

Voltage (V)

Type Of Duty

Load factor

Power factor

Efficiency

Total kVA

Splitter Gate ‐ 10 Splitter Gate ‐ 11

0 0

0 0

2 2

1 1

2.2 2.2

kW kW

415 415

I I

0.50 0.50

0.80 0.80

0.85 0.85

3.24 3.24

Electrical BOP Load List Electrical BOP Load List

58

Supply Fan Motor ‐ 1

1

0

0

0

18.5

kW

415

C

0.85

0.80

0.85

23.13

Electrical BOP Load List

59

Supply Fan Motor ‐ 2

0

0

0

1

18.5

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

60

Exhaust Fan Motor ‐ 1

1

0

0

0

1.1

kW

415

C

0.85

0.80

0.85

1.38

Electrical BOP Load List

61

Exhaust Fan Motor ‐ 2

0

1

0

0

1.1

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

62

Exhaust Fan Motor ‐ 3

0

0

0

1

1.1

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

63

Split A.C. Unit – 3 TR ‐ 1

0

0

1

0

11

kW

415

C

0.85

0.80

0.85

13.75

Electrical BOP Load List

64

Split A.C. Unit – 3 TR ‐ 2

0

1

0

0

11

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

65

Split A.C. Unit – 3 TR ‐ 3

0

0

0

1

11

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

66

Flap Gate ‐ 1

1

0

0

0

7.5

kW

415

I

0.50

0.85

1.00

4.41

Electrical BOP Load List

67

Flap Gate ‐ 2

1

0

0

0

7.5

kW

415

I

0.50

0.85

1.00

4.41

Electrical BOP Load List

68

Flap Gate ‐ 3

1

0

0

0

7.5

kW

415

I

0.50

0.85

1.00

4.41

Electrical BOP Load List

69

Flap Gate ‐ 4

1

0

0

0

7.5

kW

415

I

0.50

0.85

1.00

4.41

Electrical BOP Load List

70

Flap Gate ‐ 5

1

0

0

0

7.5

kW

415

I

0.50

0.85

1.00

4.41

Electrical BOP Load List

71

Flap Gate ‐ 6

1

0

0

0

7.5

kW

415

I

0.50

0.85

1.00

4.41

Electrical BOP Load List

72

Flap Gate ‐ 7

1

0

0

0

7.5

kW

415

I

0.50

0.85

1.00

4.41

Electrical BOP Load List

73

Flap Gate ‐ 8

1

0

0

0

7.5

kW

415

I

0.50

0.85

1.00

4.41

Electrical BOP Load List

74

Flap Gate ‐ 9

0

0

1

0

7.5

kW

415

I

0.50

0.85

1.00

4.41

Electrical BOP Load List

75

Flap Gate ‐ 10

0

0

1

0

7.5

kW

415

I

0.50

0.85

1.00

4.41

Electrical BOP Load List

76

Flap Gate ‐ 11

0

0

1

0

7.5

kW

415

I

0.50

0.85

1.00

4.41

Electrical BOP Load List

77

Flap Gate ‐ 12

0

0

1

0

7.5

kW

415

I

0.50

0.85

1.00

4.41

Electrical BOP Load List

78

Flap Gate ‐ 13

0

0

1

0

7.5

kW

415

I

0.50

0.85

1.00

4.41

Electrical BOP Load List

79

Flap Gate ‐ 14

0

0

1

0

7.5

kW

415

I

0.50

0.85

1.00

4.41

Electrical BOP Load List

80

Flap Gate ‐ 15

0

0

1

0

7.5

kW

415

I

0.50

0.85

1.00

4.41

Electrical BOP Load List

81

Rack and Pinion Gate ‐ 1

0

0

1

0

5.5

kW

415

I

0.50

0.80

0.85

4.04

Electrical BOP Load List

82

Rack and Pinion Gate ‐ 2

0

1

0

0

5.5

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

83

Brakes ‐ 1

1

0

0

0

0.75

kW

415

I

0.50

0.80

0.85

0.55

Electrical BOP Load List

84

Brakes ‐ 2

1

0

0

0

0.75

kW

415

I

0.50

0.80

0.85

0.55

Electrical BOP Load List

85

Brakes ‐ 3

1

0

0

0

0.75

kW

415

I

0.50

0.80

0.85

0.55

Electrical BOP Load List

86

Brakes ‐ 4

1

0

0

0

0.75

kW

415

I

0.50

0.80

0.85

0.55

Electrical BOP Load List

87

Brakes ‐ 5

0

0

1

0

0.75

kW

415

I

0.50

0.80

0.85

0.55

Electrical BOP Load List

88

Brakes ‐ 6

0

0

1

0

0.75

kW

415

I

0.50

0.80

0.85

0.55

Electrical BOP Load List

89

Brakes ‐ 7

0

0

1

0

0.75

kW

415

I

0.50

0.80

0.85

0.55

Electrical BOP Load List

90

Electric Hoist (type1) ‐ 1

1

0

0

0

31

kVA

415

I

0.20

0.80

0.85

6.20

Electrical BOP Load List

91

Electric Hoist (type1) ‐ 2

1

0

0

0

31

kVA

415

I

0.20

0.80

0.85

6.20

Electrical BOP Load List

92

Electric Hoist (type1) ‐ 3

0

0

1

0

31

kVA

415

I

0.20

0.80

0.85

6.20

Electrical BOP Load List

93

Electric Hoist (type1) ‐ 4

0

0

1

0

31

kVA

415

I

0.20

0.80

0.85

6.20

Electrical BOP Load List

94

Electric Hoist (type1) ‐ 5

0

0

1

0

31

kVA

415

I

0.20

0.80

0.85

6.20

Electrical BOP Load List

95

Electric Hoist (type2) ‐ 1

1

0

0

0

25

kW

415

I

0.20

0.80

0.85

7.35

Electrical BOP Load List

Description

W

S

W

S

Page 2 of 6

Remarks

kW/ kVA /A

56 57

Sr. No.

Rating of  feeder

Bus Section ‐ 2

Bus Section ‐ 1

Panel Name: 415V CHP SERVICE PMCC

Client: NCC POWER PROJECTS LIMITED Project: 2 × 660 MW NCC POWER PROJECT Project No. : T658000

CHP Auxiliary Transformer  Sizing Calculation (Attachment‐4)

Doc No. : T658000‐BN02‐00‐BBT‐141008 Rev. No. : 0

Voltage (V)

Type Of Duty

Load factor

Power factor

Efficiency

Total kVA

Electric Hoist (type2) ‐ 2

1

0

0

0

25

kW

415

I

0.20

0.80

0.85

7.35

Electrical BOP Load List

97

Electric Hoist (type2) ‐ 3

1

0

0

0

25

kW

415

I

0.20

0.80

0.85

7.35

Electrical BOP Load List

98

Electric Hoist (type2) ‐ 4

1

0

0

0

25

kW

415

I

0.20

0.80

0.85

7.35

Electrical BOP Load List

99

Electric Hoist (type2) ‐ 5

1

0

1

0

25

kW

415

I

0.20

0.80

0.85

14.71

Electrical BOP Load List

100

Electric Hoist (type2) ‐ 6

1

0

1

0

25

kW

415

I

0.20

0.80

0.85

14.71

Electrical BOP Load List

101

Electric Hoist (type2) ‐ 7

1

0

1

0

25

kW

415

I

0.20

0.80

0.85

14.71

Electrical BOP Load List

102

Electric Hoist (type3) ‐ 1

1

0

0

0

4.8

kW

415

I

0.20

0.80

0.85

1.41

Electrical BOP Load List

103

Electric Hoist (type3) ‐ 2

1

0

0

0

4.8

kW

415

I

0.20

0.80

0.85

1.41

Electrical BOP Load List

104

Electric Hoist (type3) ‐ 3

1

0

0

0

4.8

kW

415

I

0.20

0.80

0.85

1.41

Electrical BOP Load List

105

Electric Hoist (type3) ‐ 4

1

0

0

0

4.8

kW

415

I

0.20

0.80

0.85

1.41

Electrical BOP Load List

106

Electric Hoist (type3) ‐ 5

1

0

0

0

4.8

kW

415

I

0.20

0.80

0.85

1.41

Electrical BOP Load List

107

Electric Hoist (type3) ‐ 6

0

0

1

0

4.8

kW

415

I

0.20

0.80

0.85

1.41

Electrical BOP Load List

108

Electric Hoist (type3) ‐ 7

0

0

1

0

4.8

kW

415

I

0.20

0.80

0.85

1.41

Electrical BOP Load List

109

Electric Hoist (type3) ‐ 8

0

0

1

0

4.8

kW

415

I

0.20

0.80

0.85

1.41

Electrical BOP Load List

110

Electric Hoist (type3) ‐ 9

0

0

1

0

4.8

kW

415

I

0.20

0.80

0.85

1.41

Electrical BOP Load List

111

Electric Hoist (type3) ‐ 10

0

0

1

0

4.8

kW

415

I

0.20

0.80

0.85

1.41

Electrical BOP Load List

112

Elevator

1

0

0

0

22

kW

415

I

0.20

0.80

0.85

6.47

Electrical BOP Load List

113

Coupling Cooling oil circulating pump ‐ 1

1

0

0

0

3.7

kW

415

C

0.85

0.80

0.85

4.63

Electrical BOP Load List

114

Coupling Cooling oil circulating pump ‐ 2

1

0

0

0

3.7

kW

415

C

0.85

0.80

0.85

4.63

Electrical BOP Load List

115

Coupling Cooling oil circulating pump ‐ 3

1

0

0

0

3.7

kW

415

C

0.85

0.80

0.85

4.63

Electrical BOP Load List

116

Coupling Cooling oil circulating pump ‐ 4

1

0

0

0

3.7

kW

415

C

0.85

0.80

0.85

4.63

Electrical BOP Load List

117

Coupling Cooling oil circulating pump ‐ 5

0

0

1

0

3.7

kW

415

C

0.85

0.80

0.85

4.63

Electrical BOP Load List

118

Coupling Cooling oil circulating pump ‐ 6

0

0

1

0

3.7

kW

415

C

0.85

0.80

0.85

4.63

Electrical BOP Load List

119

Coupling Cooling oil circulating pump ‐ 7

0

0

1

0

3.7

kW

415

C

0.85

0.80

0.85

4.63

Electrical BOP Load List

120

Hydraulic power pack for crusher ‐ 1

1

0

0

0

5.5

kW

415

I

0.50

0.85

1.00

3.24

Electrical BOP Load List

121

Hydraulic power pack for crusher ‐ 2

0

0

1

0

5.5

kW

415

I

0.50

0.85

1.00

3.24

Electrical BOP Load List

122

Hydraulic power pack for crusher ‐ 3

0

1

0

0

5.5

kW

415

I

0.50

0.85

1.00

0.00

Electrical BOP Load List

123

Hydraulic power pack for crusher ‐ 4

0

0

0

1

5.5

kW

415

I

0.50

0.85

1.00

0.00

Electrical BOP Load List

124

Catch pit pumps ‐ 1

1

0

0

0

2.2

kW

415

I

0.50

0.80

0.85

1.62

Electrical BOP Load List

125

Catch pit pumps ‐ 2

0

0

1

0

2.2

kW

415

I

0.50

0.80

0.85

1.62

Electrical BOP Load List

126

Catch pit pumps ‐ 3

0

1

0

0

2.2

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

127

Catch pit pumps ‐ 4

0

0

0

1

2.2

kW

415

I

0.50

0.80

0.85

0.00

Electrical BOP Load List

128

CSU‐1 

0

0

1

0

80

kW

415

I

0.50

0.85

1.00

47.06

Electrical BOP Load List

129

ILMS ‐ 1

1

0

0

0

25.5

kW

415

C

1.00

0.85

1.00

30.00

Electrical BOP Load List

130

ILMS ‐ 2

0

0

0

1

25.5

kW

415

C

1.00

0.85

1.00

0.00

Electrical BOP Load List

131

Metal Detector ‐ 1

0

0

1

0

1

kVA

415

I

0.50





0.50

Electrical BOP Load List

132

Metal Detector ‐ 2

0

1

0

0

1

kVA

415

I

0.50





0.00

Electrical BOP Load List

133

Centrifugal (Supply Fan)

1

0

0

0

18.5

kW

415

C

0.85

0.80

0.85

23.13

Electrical BOP Load List

134

Motorise Fire Damper

0

0

1

0

1.1

kW

415

I

0.50

0.80

0.85

0.81

Electrical BOP Load List

Description

W

S

W

S

Page 3 of 6

Remarks

kW/ kVA /A

96

Sr. No.

Rating of  feeder

Bus Section ‐ 2

Bus Section ‐ 1

Panel Name: 415V CHP SERVICE PMCC

Client: NCC POWER PROJECTS LIMITED Project: 2 × 660 MW NCC POWER PROJECT Project No. : T658000

CHP Auxiliary Transformer  Sizing Calculation (Attachment‐4)

Doc No. : T658000‐BN02‐00‐BBT‐141008 Rev. No. : 0

Voltage (V)

Type Of Duty

Load factor

Power factor

Efficiency

Total kVA

Centrifugal Pump

1

0

0

0

15

kW

415

C

0.85

0.80

0.85

18.75

Electrical BOP Load List

136

Axial Fan (Exhaust) ‐ 1

1

0

0

0

1.1

kW

415

C

0.85

0.80

0.85

1.38

Electrical BOP Load List

137

Axial Fan (Exhaust) ‐ 2

1

0

0

0

1.1

kW

415

C

0.85

0.80

0.85

1.38

Electrical BOP Load List

138

Axial Fan (Exhaust) ‐ 3

1

0

0

0

1.1

kW

415

C

0.85

0.80

0.85

1.38

Electrical BOP Load List

139

Axial Fan (Exhaust) ‐ 4

0

0

1

0

1.1

kW

415

C

0.85

0.80

0.85

1.38

Electrical BOP Load List

140

Axial Fan (Exhaust) ‐ 5

0

0

1

0

1.1

kW

415

C

0.85

0.80

0.85

1.38

Electrical BOP Load List

141

Split A.C. Unit – 3 TR ‐ 1

1

0

0

0

10

kW

415

C

1.00

0.85

1.00

11.76

Electrical BOP Load List

142

Split A.C. Unit – 3 TR ‐ 2

0

0

1

0

10

kW

415

C

1.00

0.85

1.00

11.76

Electrical BOP Load List

143

Split A.C. Unit – 3 TR ‐ 3

0

1

0

0

10

kW

415

C

1.00

0.85

1.00

0.00

Electrical BOP Load List

144

Split A.C. Unit – 2 TR ‐ 1

1

0

0

0

2.6

kW

415

C

1.00

0.85

1.00

3.06

Electrical BOP Load List

145

Split A.C. Unit – 2 TR ‐ 2

0

0

1

0

2.6

kW

415

C

1.00

0.85

1.00

3.06

Electrical BOP Load List

146

Split A.C. Unit – 2 TR ‐ 3

0

0

1

0

2.6

kW

415

C

1.00

0.85

1.00

3.06

Electrical BOP Load List

147

Split A.C. Unit – 2 TR ‐ 4

0

1

0

0

2.6

kW

415

C

1.00

0.85

1.00

0.00

Electrical BOP Load List

148

Misc. Load ‐ 1

1

0

0

0

100

kVA

415

C

0.50





50.00

Assumed

149

Misc. Load ‐ 2

0

0

1

0

100

kVA

415

C

0.50





50.00

Assumed

Description

W

S

W

S

Subtotal (kVA)

1564.24

(i) Considering diversity factor of 0.9 (kVA)

1407.82

(ii) Considering a design margin of 10% (kVA)

140.78

Total (kVA) ((i) + (ii))

1548.60

Selected Transformer rating (MVA)

1.60

Page 4 of 6

Remarks

kW/ kVA /A

135

Sr. No.

Rating of  feeder

Bus Section ‐ 2

Bus Section ‐ 1

Panel Name: 415V CHP SERVICE PMCC

Client: NCC POWER PROJECTS LIMITED Project: 2 × 660 MW NCC POWER PROJECT Project No. : T658000

CHP Auxiliary Transformer  Sizing Calculation (Attachment‐4)

Doc No. :  T658000‐BN02‐00‐BBT‐141008 Rev. No. : 0

Voltage (V)

Type Of Duty

Load factor

Power factor

Efficiency

S

W

S

1 DS Pump for Stockyard ‐ 1

1

0

0

0

90

kW

415

C

0.85

0.80

0.85

2 DS Pump for Stockyard ‐ 2

0

0

0

1

90

kW

415

C

0.85

0.80

0.85

3 Compressor DE & Service air ‐ 1

0

0

1

0

110

kW

415

C

0.85

0.80

0.85

4 Compressor DE & Service air ‐ 2

0

1

0

0

110

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

5 Air Dryer ‐ 1

1

0

0

0

2.2

kW

415

C

0.85

0.80

0.85

2.75

Electrical BOP Load List

6 Air Dryer ‐ 2

0

0

0

1

2.2

kW

415

C

0.85

0.80

0.85

0.00

Electrical BOP Load List

7 DFDS Water Pump ‐ 1

1

0

0

0

5.5

kW

415

C

0.85

0.80

0.85

6.88

Electrical BOP Load List

8 DFDS Water Pump ‐ 2

0

0

1

0

5.5

kW

415

C

0.85

0.80

0.85

6.88

Electrical BOP Load List

9 10 11 12 13 14 15

1 0 1 0 0 1 0

0 0 0 0 0 0 0

0 0 0 1 1 0 1

0 1 0 0 0 0 0

30 30 132 132 22 9.3 1.5

kW kW kW kW kW kW kW

415 415 415 415 415 415 415

C C C C I C I

0.85 0.85 0.85 0.85 0.50 0.85 0.50

0.80 0.80 0.85 0.85 0.80 0.80 0.80

0.85 0.85 0.85 0.85 0.85 0.85 0.85

37.50 0.00 155.29 155.29 16.18 11.63 1.10

Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List Electrical BOP Load List

16 Axial Fan (Exhaust)

1

0

0

0

5.5

kW

415

C

0.85

0.80

0.85

6.88

Electrical BOP Load List

17 Catch pit Pumps ‐ 1

1

0

0

0

2.2

kW

415

I

0.50

0.80

0.85

1.62

Electrical BOP Load List

18 Catch pit Pumps ‐ 2

0

0

1

0

2.2

kW

415

I

0.50

0.80

0.85

1.62

Electrical BOP Load List

19 Misc. Load feeder ‐ 1

1

0

0

0

100

kVA

415

C

0.50





50.00

Assumed

20 Misc. Load feeder ‐ 2

1

0

0

0

100

kVA

415

C

0.50





50.00

Assumed

Service Water Pump ‐ 1 Service Water Pump ‐ 2 Compressor DFDS ‐ 1 Compressor DFDS ‐ 2 Setteled Water Transfer Pump Centrifugal (Supply Fan) Motorise Fire Damper

112.50 Electrical BOP Load List 0.00

753.60

(i) Considering diversity factor of 0.9 (kVA)

678.24

(ii) Considering a design margin of 10% (kVA)

67.82

Total (kVA) ((i) + (ii))

746.07 0.75

Page 5 of 6

Electrical BOP Load List

137.50 Electrical BOP Load List

Subtotal (kVA)

Selected Transformer rating (MVA)

Remarks

Description

Total kVA

kW/ kVA /A

W

Sr. No.

Rating of  feeder

Bus Section ‐ 2

Bus Section ‐ 1

Panel Name: 415V DSPH PMCC

Client: NCC POWER PROJECTS LIMITED Project: 2 × 660 MW NCC POWER PROJECT Project No. : T658000

CHP Auxiliary Transformer  Sizing Calculation (Attachment‐4)

Doc No. :  T658000‐BN02‐00‐BBT‐141008 Rev. No. : 0

kVA

415

C

1.00

-

-

336.00 Electrical BOP Load List

Remarks

Efficiency

336

Total kVA

Power factor

0

Load factor

0

Type Of Duty

1

W

Voltage (V)

1 Loads for SR system 

S

kW/ kVA /A

W

Rating of  feeder

Description

Bus Section ‐ 2

Bus Section ‐ 1

Sr. No.

Panel Name: 415V SR PMCC

S 0

2 Boom Conveyor

0

0

1

0

132

kW

415

C

0.85

0.85

0.85

155.29 Electrical BOP Load List

3 Intermidiate Conveyor

0

0

1

0

132

kW

415

C

0.85

0.85

0.85

155.29 Electrical BOP Load List

4 Belt weigher

1

0

0

0

1

kVA

415

C

1.00

-

-

1.00

Subtotal (kVA)

647.59

(i) Considering diversity factor of 0.9 (kVA)

582.83

(ii) Considering a design margin of 10% (kVA)

58.28

Total (kVA) ((i) + (ii))

641.11

Selected Transformer rating (MVA)

0.75

Page 1 of 1

Electrical BOP Load List

ATTACHMENT-5:BTG Load List Technic Requirement For Project Engineering No: F951C-D1-WZT-04 Project Name

INDIA NCCPPL 2X660MW COAL-FIRED POWER PLANT PROJECT

Design Stage

Design

Input Data Required for Electrical systems

Title

Attached DOC.or XLS. Qty. : Pages (页) 38 Technic Requirement : (Including Attachment List) □ Important

Basic

Rev. A

; Normal

Attached DRG. Qty. : 9 Pieces(张)

Supply “Input Data Required for Electrical systems” A edition. Detail seen the file: “F951C-D1-WZT-04_Input Data Required for Electrical systems_-A-20120428.pdf”.

Discipline: Electric

DESIGN ENGINEER PROJECT ENGINEER CONTRACTOR :

CNTIC-TEPC

Kan Hetian

CHECK

Li Yang

Kan Hetian

ENGINEER IN CHARGE

Pan Hai

Consortium

CONTRACTOR'S ENGINEERS :

NORTHEAST ELECTRIC POWER DESIGN INSTITUTE CHINA POWER ENGINEERING CONSULTING GROUP

ATTACHMENT-2:BTG Load List

loads of MV include 3kV and 11kV No.

Equipment Description

Rated power (kW)

Voltage (kV)

MOTOR SPEED (RPM)

DUTY CO

IO

QTY (NOS)

RUNNIN STANDBY G

INTERLOCK/NONINTERLOCK (DCSS/PLC/LOCAL)

INSTALLATION LOCATION

POWER SUPPLY N/E/U

1

汽动给水泵前置泵 T-BFP booster pump

570

3.3

*

2

2

0

DCSS

0m floor of turbine house

N

2

电动给水泵电动机 Motor-driven BFP Motor

8800

11

*

1

0

1

DCSS

0m floor of turbine house

N

3

凝结水泵 Condensate pump

1200

3.3

*

3

2

1

DCSS

Condensate pump pit in turbine house

N

4

闭式循环冷却水泵 CCCW pump

550

3.3

*

2

1

1

DCSS

0m floor of turbine house

N

5

开式循环冷却水泵 OCCW pump

500

3.3

*

2

1

1

DCSS

0m floor of turbine house

N

6

磨煤机 Coal mill

1000

3.3

*

8

6

2

DCSS

0m floor of coal buffer bin

N

7

送风机 Forced draft fan

1800

11

*

2

2

0

DCSS

Air fan house of bolier

N

8

一次风机 Primary air fan

4200

11

*

2

2

0

DCSS

Air fan house of bolier

N

9

吸风机 Induced draft air fan

4000

11

*

2

2

0

DCSS

Induced draft air fan house

N

10

密封风机电动机 Sealing air fan

280

3.3

*

2

1

1

DCSS

0m floor of coal buffer bin

N

11

启动系统循环泵电动机 Start-up system cooling water pump

400

3.3

1

0

1

DCSS

*

N

Remark