20 0 71KB
INCREASE EAST WEST PIPELINE CAPACITY Project No.: BI-10-01214 Coaster Daily Inspection Checklist Contractor:- Petrojet
Sub-Contractor:-
Month:-
Year :-
Vehicle : Driver Name:
Vehicle Number :
SN.
Item Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18 19 20 21 22 23 24
1 Driver has valid authorization license 2 Vehicle has valid certificate of inspection 3 Vehicle body in good condition and clean 4 Any leaks ( specify ) 5 All covers and guards 6 Transmission Oil Level 7 Engine Oil level 8 Hydraulic Oil Level 9 Coolant 10 Diesel & water Levels 12 Side Mirrors 14 First Aid box 15 Fire extinguisher (UL/FM listed) 16 Brakes Conditions 17 Battery Condition 18 High beam ight 19 Low Beam Light 20 Indicators 21 Windscreen 22 Wipers 23 Wiring Condition 24 Backup Audible Alarm 25 Seat Belt 26 Isolation Mechanism (Key System Function) 27 Horn Recommendation : Operator shall turn off and isolate the heavy equipment when he keeps the key himself. Checked By:
Signature
Remarks
25
26
27
28
29
30
31